    ASHRAE 1999 9-1

    Chapter 9Analog Electronic Controls

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    2/48

    ASHRAE 1999 9-2

    Control I/O

    Analog Input Temperature 100 ohm, 1000 ohm

    0-20mA, 4- 20mA, 0 10 Vdc,

    Digital Input

    On/OFF

    Pulse

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    3/48

    ASHRAE 1999 9-3

    Control Output

    Analog Output 0-20mA, 4- 20mA, 0 10 Vdc,

    Digital Output

    On/OFF

    Pulse

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    4/48

    ASHRAE 1999 9-4

    Application-SpecificElectronic Controllers

    Single-zone unit controllers

    Control of VAV air handlers and

    packaged units Control of multizone air handlers

    Economizer enthalpy control VAV box controllers

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    5/48

    ASHRAE 1999 9-5

    Types of Actuators

    Electronic-electric Electronic-hydraulic

    Electronic-pneumatic

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    6/48

    ASHRAE 1999 9-6

    Hydraulic Actuator

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    7/48

    ASHRAE 1999 9-7

    Single Zone Unit

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    8/48

    ASHRAE 1999 9-8

    VAV System Control

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    9/48

    ASHRAE 1999 9-9

    Chapter 10Digital Controls

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    10/48

    ASHRAE 1999 9-10

    Basic DDC Loop

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    11/48

    ASHRAE 1999 9-11

    Types of Input/Output Points

    Analog inputs Binary (digital) inputs

    Analog outputs Binary (digital) outputs

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    12/48

    ASHRAE 1999 9-12

    Small Stand-Alone Panel

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    13/48

    ASHRAE 1999 9-13

    System With DataGathering I/O Panels

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    14/48

    ASHRAE 1999 9-14

    Distributed Intelligence

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    15/48

    ASHRAE 1999 9-15

    Two-Tiered Network

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    16/48

    ASHRAE 1999 9-16

    Types of System Software

    Network communications software Panel operating systems

    Application software Utility software

    OMI software

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    17/48

    ASHRAE 1999 9-17

    Programming Languages

    Text-based languages Graphical programming

    Ladder logic

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    18/48

    ASHRAE 1999 9-18

    Text-Based Programming100 C*** ECONOMIZER OUTDOOR AIR DAMPER CONTROL105 C*** SHUT DAMPER WHEN FAN IS OFF110 IF (FANDPS.EQ.ON) THEN GOTO 510120 SET (0, OADMPR)130 GOTO 1000500 C*** SHUT OFF ECONOMIZER WHEN OAT >65510 DBSWIT (1, OATEMP, 63, 65, $LOC3)520 IF ($LOC3) THEN GOTO 610530 SET (20, OADMPR)540 GOTO 1000600 C*** OUTDOOR AIR DAMPER, N.C., 0 TO 100%610 LOOP (128, MATEMP, $LOC1, 55, 10, 30, 0, 1, 50.0, 0, 100, 0620 MAX (OADMPR, $LOC1, 20)1000 C*** END OF ECONOMIZER CONTROL

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    19/48

    ASHRAE 1999 9-19

    Graphical Programming

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    20/48

    ASHRAE 1999 9-20

    Ladder Logic Programming

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    21/48

    ASHRAE 1999 9-21

    Question & Answer TemplateResponse

    32. Is there heating control? (y/n) Yes

    33. Type of heating control: (select a, b, c or d) C

    a. Two-position

    b. Modulating with face and bypass damperc. Modulating without face and bypass damper

    d. Modulating with common heating and cooling

    36. What is the heating output with the fan off? (___%) 0%37. What is the heating setpoint? (___F) 105F

    38. Is there an auxiliary two-position output? (y/n) No

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    22/48

    ASHRAE 1999 9-22

    Typical I/O Schedule

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    23/48

    ASHRAE 1999 9-23

    DDC Control Schematic

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    24/48

    ASHRAE 1999 9-24

    Sequence of Operation Occupied mode

    Unoccupied mode Setback mode Fan alarm mode

    Room temperature control Dry bulb economizer control Mixed air low limit control Fan alarm Filter alarm Freeze alarm

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    25/48

    ASHRAE 1999 9-25

    Graphical Programming

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    26/48

    ASHRAE 1999 9-26

    Advantages of DDC Increased accuracy

    Flexibility Sophisticated control sequences Energy management Trending Alarm reporting

    Remote monitoring and control Preventative maintenance Lower cost in many applications

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    27/48

    ASHRAE 1999 9-27

    Agenda

    Introduction

    System Architecture

    Communication Protocol

    How to design a system

    Q & A

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    28/48

    ASHRAE 1999 9-28

    IntroductionBMSBuilding Management System

    It is used for Monitoring & Control the followings:

    1) HVAC System

    2) Fire Services System3) Plumbing & Drainage System

    4) Electrical System,

    5) Lighting System

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    29/48

    ASHRAE 1999 9-29

    Others Features

    Energy Audit Software

    Data Visualization

    Totalization Time Scheduling

    Event Program

    Remote Access

    Loading Profile

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    30/48

    ASHRAE 1999 9-30

    BMS Role

    Manage occupant comfortAlert operators of facility problems

    Reduce energy usage

    Protect facility assets

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    31/48

    ASHRAE 1999 9-31

    Design Background & Intent

    Central Control and Monitoring System

    Centralize Monitoring and Control system to managea group of building systems

    Provide management features for building systemsoperation and monitoring

    Provide reporting features to summary the systems

    status and alarm reporting

    Reduce manpower or providing better service

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    32/48

    ASHRAE 1999 9-32

    Benefits

    Lowers EnergyCost

    Lowers OperationsCost

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    33/48

    ASHRAE 1999 9-33

    What it does

    Connects to major M&E equipment in the building.

    Automatic operation for routine and repetitive

    functions.Reduced operator training time through on screen

    instruction and supporting graphic display.

    Better management of energy cost through energymanagement programs.

    Better management of facility through historical

    records.Improved operation through software and hardware

    integration of different subsystems such as fire alarm

    and access control.

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    34/48

    ASHRAE 1999 9-34

    What Customer Wants BMS to Do

    Easy to use

    Easy to install

    Able to control the building with minimum manpowerand energy without risk of customers comfort.

    Open systems and vendor independence

    Web interface Dont make me buy software for each user

    Able to access remotely

    Keep me safe from hackers

    Current technology

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    35/48

    ASHRAE 1999 9-35

    System Structure

    The Metasys DistributedThe Metasys Distributed

    User InterfaceUser Interface

    TCP/IPTCP/IP

    N2N2

    BACnetBACnetLONLON

    AutomationAutomation

    EnginesEngines N2N2

    BACnetBACnetLONLON

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    36/48

    ASHRAE 1999 9-36

    Larger System Structure

    Alarm

    Printer

    NAE NAE

    PC

    Browser

    PC

    Browser

    ADS

    Hub/

    SwitchRouter

    Router

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    37/48

    ASHRAE 1999 9-37

    Network Controller Building Automation Functions

    Alarm detection/management Scheduling

    Trends Report

    Totalization

    Optimal start/ stop

    Custom control applications

    Event program

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    38/48

    ASHRAE 1999 9-38

    Network Controller

    BACnet IP (across the network)

    BACnet MS/TP (field bus standard) Variety of models

    Java Virtual Machine

    Embedded Microsoft OS IP http, soap, snmp, smtp, sntp

    LON (field bus compatibility)

    Web Services

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    39/48

    ASHRAE 1999 9-39

    BACnet Controllers Field Equipment Controllers

    Terminal Equipment Controllers

    Input/Output Modules FEC and IOM standard panels

    VAV Modular Assembly

    Controller Configuration Tool

    Wireless commissioning tool

    Network sensors

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    40/48

    ASHRAE 1999 9-40

    Life Safety & Smoke

    Control

    Smoke Control

    Engine

    TCP/IP

    IFC w/

    BACnet

    option

    Server

    Functional

    Integration

    Functional

    Integration

    SecondarySecondary

    reportingreporting

    Long termLong term

    eventeventstoragestorage

    S t C t l S h ti

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    41/48

    ASHRAE 1999 9-41

    System Control Schematic

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    42/48

    ASHRAE 1999 9-42

    System Control Schematic

    S t C t l S h ti

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    43/48

    ASHRAE 1999 9-43

    System Control Schematic

    P i t S h d l

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    44/48

    ASHRAE 1999 9-44

    Point Schedule

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    45/48

    ASHRAE 1999 9-45

    Configuration ProcessBinary Inputs

    Status

    Trip Alarm

    Binary OutputsStart / Stop

    Open / Close

    Analog InputsTemperature

    Pressure

    Analog OutputsValve Position

    Damper Position

    DDC

    ControllerPanel

    Wiring from equipment control panels,sensors and actuators are connect to

    DDC Controllers.

    DDC Controllers provide local stand-alonecontrol to maintain environment

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    46/48

    ASHRAE 1999 9-46

    Configuration ProcessBinary Inputs

    Status

    Trip Alarm

    Binary OutputsStart / Stop

    Open / Close

    Analog InputsTemperature

    Pressure

    Analog OutputsValve Position

    Damper Position

    DDC

    ControllerPanel

    Controllers are networked

    with subsystems to NAE.

    NAE provides supervisorycontrol and management

    features.

    TEC

    Computerised

    Subsystems

    Chiller Panel

    Fire Alarm

    Network

    Controller

    Configuration Process

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    47/48

    ASHRAE 1999 9-47

    Configuration Process

    Binary InputsStatus

    Trip Alarm

    Binary OutputsStart / Stop

    Open / Close

    Analog InputsTemperature

    Pressure

    Analog OutputsValve Position

    Damper Position

    DDC

    ControllerPanel

    NAEs and PCs

    are on a LAN.

    PCs provideGUI and data

    archiving.

    TEC

    Computerised

    Subsystems

    Chiller Panel

    Fire Alarm

    Network

    Controller

    NetworkController

  • 8/13/2019 ASHRAE Workshop Control WilliamYick Part 2

    48/48

    ASHRAE 1999 9-48

    Questions?Q & A