AS- CCR02- 03.06.05 Magnet Test Organisation all coordination : Austin Ball/Alain Herve, NN to be t/infra coordination : Andrea Gaddi t team: Domenico Campi, Benoit Cure D etector R acks & Infra C abling DAQ S afety DCS Trigger Low voltag DQM O nline D B O fflineRem ote op A nalysis H ardw are S ervices room & CR & RC & DSS Infra e-log overall Austin Laza Andrea A rchana Frans C hristoph D onatella Tim Sergei Ilaria Frank Lucas S uichi P atrick? m agnet Andrea Slava G illes mapping Rich Slava G illes align G yorgy Pedro Arce DT Alberto Kirsten Fabio Enrico Marina/Marco Marina RB A nna Warsaw Pierluigi Pierluigi CSC Arm ando Frank Valeri Richard RE Archana Pierluigi Archana HCAL P aw el S uzuki Serguei Suichi EB K en Wolfgang Wolfgang Gunther Francesca TK Michael Laurent M acchi Frederic DCS Frank xxxxxxxx Frank G . DAQ Frans xxxxxxx Gaetano Trigger Tim xxxxxx Low Volt Sergei xxxxxxxx To be finalised by 31 May currently the responsibility of the Commissioning Task Force Run Workshop 2 May 05, AB Domenico Slava Gyorgy Fabio Marcello,Macek,Kryztof* Armando Pawel Wolfgang Michael Frank Frans Tim Sergei *(LBB,Trig Crates,Sorter Crate, +r/o crate) Cabling & CR

Transcript of AS- CCR02-03.06.05 Magnet Test Organisation Overall coordination : Austin Ball/Alain Herve, NN to be...

Page 1: AS- CCR02-03.06.05 Magnet Test Organisation Overall coordination : Austin Ball/Alain Herve, NN to be added Magnet/infra coordination : Andrea Gaddi Magnet.

AS- CCR02-03.06.05

Magnet Test Organisation

Overall coordination : Austin Ball/Alain Herve, NN to be addedMagnet/infra coordination : Andrea GaddiMagnet team: Domenico Campi, Benoit Cure

Detector Racks & Infra Cabling DAQ Safety DCS TriggerLow voltage DQM Online DB OfflineRemote opsAnalysisHardware Services room & CR & RC & DSS Infra e-log

overall Austin Laza Andrea Archana Frans Christoph Donatella Tim Sergei Ilaria Frank Lucas Suichi Patrick?magnet Andrea Slava Gillesmapping Rich Slava Gillesalign Gyorgy Pedro ArceDT Alberto Kirsten Fabio Enrico Marina/Marco MarinaRB Anna Warsaw Pierluigi PierluigiCSC Armando Frank Valeri RichardRE Archana Pierluigi ArchanaHCAL Pawel Suzuki Serguei SuichiEB Ken Wolfgang Wolfgang Gunther FrancescaTK Michael Laurent Macchi FredericDCS Frank xxxxxxxx Frank G.DAQ Frans xxxxxxx GaetanoTrigger Tim xxxxxxLow Volt Sergei xxxxxxxx

To be finalised by 31 May

currently the responsibility of the Commissioning Task Force

Run Workshop 2 May 05, AB

DomenicoSlavaGyorgyFabioMarcello,Macek,Kryztof* ArmandoPawelWolfgangMichaelFrankFransTimSergei

*(LBB,Trig Crates,Sorter Crate, +r/o crate)

Cabling & CR

Page 2: AS- CCR02-03.06.05 Magnet Test Organisation Overall coordination : Austin Ball/Alain Herve, NN to be added Magnet/infra coordination : Andrea Gaddi Magnet.

AS- CCR02-03.06.05

Austin Cabling and Control Room

SectorsChambersIn Magnet Test

Requirements in FED Room(Laza)

Requirements in TowersPlease indicate which racks will be powered

Requirements onCable Tray/s

Requirements On Balcony Barrack

Control RoomRequirements

Web Address for more information

Magnet

Andrea Domenico None None None None PC + Monitor YesGlobal info from DCS

To ask Donatella

Mapping

Rich Slava None

Alignment

Gyorgy Gyorgy PC + Monitor To ask Gyorgy

DT Alberto Fabio 10 cm2 None PC + Monitor http://montecas.home.cern.ch/montecas/pub_doc/CABLES/

RB +RE

Anna (RB) Archana (RE) Marcello MaciekKrzysztof (LBB andTrigger Crates + Sorter Crate + Readout Crate)

RB+ RECounting Room -------------1 Trigger Crate (9U)1 Read Out Crate (9U)1 Technical Trigger Crate (TTU) (9U)1 MainFrame Sy1527 (6U)1 Easy Crate HV (6U) 48 Volt modules---------------------------------------Cables CR->SX536 (17 are actually needed 3 x 12-fiber bundles...) LC Optical Fibers multimode 3 TTC ST Connector single-mode fibers to 15/ch TTC/oc (7 TTC ST Connector single mode fibers from TTC/oc to LBBs.... in absence of TTC/oc 7 fibers instead of 3 have to travel). 4 multipolar HV cables 3 10-pairs flat-cables for the EASY Crate controller (SY1527->EasyCrates) 3 Optical Ribbon Cables for DCS to CCS system 3 Techical Trigger multi-mode fibers (connector? LC...)Pacth Panels-----------Need to be completely discussed

Baseline solutionTower/Balconies Wheel + 2 (two sectors)-------------2 Link Board Boxes: (6U)4 Control Boards 10 Master Boards 18 Slave Boards1 Optical Package (DCS)1 Easy crate LV for the RPCs (6U) 1 Easy crate LV for LBB (Maybe there is space in the RPC LV)1 TTC/oc 16 Channel (1U)1 Aux Crate (thresh controller, trigger logic) (6U) 1 48 Volt module to supply the easy cratesWheel + 1 (one sector)------------- 1 Link Board Boxes: (6U) 2 Control Boards 5 Master Boards 8 Slave Boards 1 Optical Package (DCS)1 Easy crate LV for the RPCs and LBB (6U) 1 TTC/oc 16 Channel (1U)1 Aux Crate (thresh controller, trigger logic) (6U) 1 48 Volt module to supply the easy crates-------------------------- Forward (60 degree slice)--------------------------1 Link Board Boxes: (6U) 1 Control Boards 2 Master Boards 4 Slave Boards 1 Optical Package (DCS)1 Easy crate LV for the RPCs and LBB (6U) 1 48 Volt module to supply the easy crate(3U)1 TTC/oc 16 Channel (1U)1 Aux Crate (thresh controller, trigger logic) (6U)-------------

10 cm2 (RB)+10-cm2 (RE)

1 + 1 + 1 6U SY1527a spare space for 2 6U

PC + Monitor http://webcms.ba.infn.it/rpc/

CSC Armando Armando /Dick To complete information from Slice test onwards 10 cm2 PC + Monitor http://cern.ch/EmuSliceTest

RE Archana Ian See RB row See RB row See RB row 10 cm2 See RB row PC + Monitor http://cms-isr-endcap-rpc.web.cern.ch/cms-isr-endcap-rpc/

HCAL Pawel Pawel 4 HE +Wedges 14,15,16,178 HB +Wedges 3-101 HO RBX

HV8 HV Final CablesRouting-3, 6 and 9 o’clockLV Cables5 A3016 LV Units2 A3000 EASY Crates2 A3486 AC/DC Converters2 A1676 A branch controllers1 SY1527 LC mainframe Digital Signal Cables HE Standared production cablesHB TemporaryDCS Cables:2 DCS Hubs on YE+LaserHB – alcoveNitrogenWaterAir4 HE+ wedges :14,15,16,178 HB+ wedges: 14,15,16,17 and 6,7,8,91 HO RBX100watts/RBX. 4HE + 8 HB + 1 HO = 1300 Watts~ 20% inefficiency, ~ 1.5kW needed for HCALRequirements in FED Room(Laza)Requirements in Towers1 RackUnderneath CMS EB reserved minirack - one aircooled2 Heat Exch1 Turbine1 Deflector2 racks for DAQ (FED, FEC, TTC)1 rack for DCS1 rack for the triggercontent of triggerrack:- 1 PC (desktop), possibly with small TTF monitor,- 1 6U VME crate with power supply (TTC crate with LTC, TTCci's)- 1 3U crate for central clock distribution TTCmi with PS- 1 NIM crate with power supplydfdf

32.5 cm2 Backup LV Lambda LVS PC + Monitorhttp://sx5-hcal.web.cern.ch/sx5-hcal/magnet/summary.htm

Austin Cabling and Control Room

SectorsChambersIn Magnet Test

Requirements onCable Tray/s

Requirements On Balcony Barrack

Control RoomRequirements

ECAL Ken Wolfgang 1 SM in 6 o’clock 32 cm2 LV EASY Crate?Cooling Services

PC + Monitor

TK Michael Michael 65 cm2 2 racks for EASY(SY 1527, 5 crates, 3 48V)

PC + Monitor http://cmsdoc.cern.ch/cms/Tracker/html/TPO/MTCC/MTCC.html

DCS Frank Frank ?? PC + Monitor ??

DAQ Frans Frans ?? PC + Monitor 2 pm 25.05.05

Trigger Tim Tim 10 cm2 None PC + Monitor http://timc.home.cern.ch/timc/cms/trigger.html

Running docCollection ofInfo from sub-detectorsSystemsWill remain under CTF

Page 3: AS- CCR02-03.06.05 Magnet Test Organisation Overall coordination : Austin Ball/Alain Herve, NN to be added Magnet/infra coordination : Andrea Gaddi Magnet.

AS- CCR02-03.06.05

Participating detectors/sectors

CMS COSMIC CHALLENGECONFIGURATION

HCAL HE 14,15,16,17 HB 3-10ECAL 1 SM 6 o’clock TKDT, RPC barrel Alignment Sector 10,11 in YB+2 (Gas, cooling) Sector 10,11 in YB+1 (full)RE ..CSCALIGN Sector 10,11 YB+1..

YB0

Page 4: AS- CCR02-03.06.05 Magnet Test Organisation Overall coordination : Austin Ball/Alain Herve, NN to be added Magnet/infra coordination : Andrea Gaddi Magnet.

AS- CCR02-03.06.05

Cable trays

Balcony Barrack

YB0

JPC,LV

JPC,LV,JPG

LASERS

Cable length Measurements: Laza, Archana

Page 5: AS- CCR02-03.06.05 Magnet Test Organisation Overall coordination : Austin Ball/Alain Herve, NN to be added Magnet/infra coordination : Andrea Gaddi Magnet.

AS- CCR02-03.06.05

Balcony Barrack

SX5 Hall

YB0

Page 6: AS- CCR02-03.06.05 Magnet Test Organisation Overall coordination : Austin Ball/Alain Herve, NN to be added Magnet/infra coordination : Andrea Gaddi Magnet.

AS- CCR02-03.06.05

380cm

150cm

300cm

Proposal of cable routing inside hall

Diving Board

Page 7: AS- CCR02-03.06.05 Magnet Test Organisation Overall coordination : Austin Ball/Alain Herve, NN to be added Magnet/infra coordination : Andrea Gaddi Magnet.

AS- CCR02-03.06.05

On detector:

Stefan will make a proposal of the routing of cables from HB, EB, and TK on W0

Sector 8 o’clock prototype HB,EB Cable tray canbe used up to diving board

Cables will be strung in Oct NovMust check with parallel activity

Cooling is all finished by then - Lasse

Page 8: AS- CCR02-03.06.05 Magnet Test Organisation Overall coordination : Austin Ball/Alain Herve, NN to be added Magnet/infra coordination : Andrea Gaddi Magnet.

AS- CCR02-03.06.05

Details from Stephane BallyPrototype HE/EB Cable Tray

Page 9: AS- CCR02-03.06.05 Magnet Test Organisation Overall coordination : Austin Ball/Alain Herve, NN to be added Magnet/infra coordination : Andrea Gaddi Magnet.

AS- CCR02-03.06.05

Drawings of the cable routing from DT, RPC on YB1,YB2 – Done by Fabio, Mimo

Page 10: AS- CCR02-03.06.05 Magnet Test Organisation Overall coordination : Austin Ball/Alain Herve, NN to be added Magnet/infra coordination : Andrea Gaddi Magnet.

AS- CCR02-03.06.05

HCAL Fibre and other cables routingStephane Bally will measure the lengths from 3D model ..15 m upto large cable tray at wall (by measuring tape)

PP

Page 11: AS- CCR02-03.06.05 Magnet Test Organisation Overall coordination : Austin Ball/Alain Herve, NN to be added Magnet/infra coordination : Andrea Gaddi Magnet.

AS- CCR02-03.06.05

HE+, near side with location of HE signal p. panel (bottom left side inside bluestructure on inner side of disk)

Page 12: AS- CCR02-03.06.05 Magnet Test Organisation Overall coordination : Austin Ball/Alain Herve, NN to be added Magnet/infra coordination : Andrea Gaddi Magnet.

AS- CCR02-03.06.05

From S. Bally

Page 13: AS- CCR02-03.06.05 Magnet Test Organisation Overall coordination : Austin Ball/Alain Herve, NN to be added Magnet/infra coordination : Andrea Gaddi Magnet.

AS- CCR02-03.06.05

Control Room Update

2 Managed Switches – FED Room1 Managed Switch in Control Room(24 FastEthernet 2 Gbit ports NetGear Prosafe 24 SmartSwitch)

Network

Private in DAQ room; Private / CERN in FED; and CERN Control Room; Gatekeeper in DAQ room

Access Card Reader is being installed(only after this can other equipment be ordered)

Desks in process of procurement

Laser safety questions?

Page 14: AS- CCR02-03.06.05 Magnet Test Organisation Overall coordination : Austin Ball/Alain Herve, NN to be added Magnet/infra coordination : Andrea Gaddi Magnet.

AS- CCR02-03.06.05

Next Steps

CablingComplete length measurementsOrdering of cablesHV, LV, FibersCable tray installations…..

Control RoomFurnish desks etcPCs PrinterFaxWebcamPolycom…