COMPANY PRESENTATION
![Page 2: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/2.jpg)
COMPLETED PROJECTS
![Page 3: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/3.jpg)
VVTV OIL MARINE JETTY – VASSILIKO CYPRUS
Construction of an 1.5 Km Oil Jetty. Driving of 50 m long, 1.2 m diameter, 40 ton, 1:3 raked
steel tubular piles. Installaltion of 3m diameter, 52m long 200ton monopiles Concrete works (pre-cast and cast in-situ offshore)
![Page 4: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/4.jpg)
VVTV OIL MARINE JETTY – VASSILIKO CYPRUS
![Page 5: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/5.jpg)
VVTV OIL MARINE JETTY – VASSILIKO CYPRUS
![Page 6: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/6.jpg)
FLISVOS MARINA EXTENSION – FALIRO
Construction of a 47 mega yacht marina. 550m rubble mount breakwater armoured with quarry rock. 450m quaywalls.
68m pier on steel tubular piles driven in hard clay filled with concrete (Φ1000, 39m),
![Page 7: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/7.jpg)
FLISVOS MARINA EXTENSION – FALIRO
![Page 8: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/8.jpg)
FLISVOS MARINA EXTENSION – FALIRO
![Page 9: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/9.jpg)
FLISVOS MARINA EXTENSION – FALIRO
![Page 10: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/10.jpg)
VOLISSOS FISHING PORT – CHIOS
Basin Dredging, Construction of 240m qauywalls and Construction of 180m breakwaters
![Page 11: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/11.jpg)
MARATHOKAMPOS FISHING PORT – SAMOS
Basin dredging 70.000m3, 320m quaywalls, 100m breakwaters.
![Page 12: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/12.jpg)
PANTOKRATORAS SAILING PORT - PREVEZA
Extensive Basin Rock Dredging, Hollow Concrete Blocks Quaywall
![Page 13: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/13.jpg)
CONSTRUCTION OF EVDILOS PORT – IKARIA
Basin Dredging 30.000m3 200m concrete blocks quaywalls and 230m breakwaters. 110,000 M3 Rockwork 32,000 M3 Concrete This job was subcontracted to two local size subcontractors while
ARCHIMEDES held the management
![Page 14: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/14.jpg)
PORT OF ASTROS – ASTROS
Basin Dredging 35.000m3 250m concrete block quaywalls 300m breakwaters
![Page 15: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/15.jpg)
Improvement of National Road Samos - Karlovasi. Section Kourou Dere
2 Km Road Construction 1 km Shore Protection
![Page 16: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/16.jpg)
Dredging of VTTV Oil Marine Jetty Berthing Area
Dredging of 330.000m3 of silt, silty clay, marl, hard marl, gravel and boulders.
![Page 17: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/17.jpg)
MOORING DOLPHINS (MONOPILES) INSTALLATION
![Page 18: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/18.jpg)
Limenas Alon at Pireaus Central Port - Pireaus
Basin dredging 20000m3, 200m caisson quaywall at -12m, Relieving prism, concrete superstructure, central port sewage and potable
water network, microtunneling for sewage network etc
![Page 19: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/19.jpg)
Agiokabos Fishing Harbour – LARISA
65 boat fishing port, Breakwaters:400m rumble
mound with TETRAPOD armour units,
Quay walls:150m
![Page 20: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/20.jpg)
PILE TESTING FOR THE GEOTECH STUDY OF VTTV
Pile Test Execution (2 piles tested offshore and one tested onshore)
Offshore borehole execution Geotechnical study issuance
![Page 21: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/21.jpg)
Marina at Coufonissi – Cyclades
Construction of a 30 yacht marina, Breakwaters:145m, Quay walls: 275m, service networks
![Page 22: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/22.jpg)
Marina at Neo Klima - Skopelos island
Construction of a 66 yatch marina, Breakwaters:65m, Quay walls:185m
![Page 23: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/23.jpg)
Orfani Fishing Harbour – Kavala
Construction of a 60 boat fishing port, Breakwaters:465m, Quay walls:150m, Construction of concrete superstructure with all pertinent
accessories
![Page 24: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/24.jpg)
SHEET PILE COATING REPAIR IN ES SIDER , LIBYA
![Page 25: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/25.jpg)
Ras Hilal Fishing Harbour PHASE A, Libya
300m rubble mound breakwaters with Acropode armour units 320m quay walls Clamshell dredging of basin and approach channel
![Page 26: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/26.jpg)
Ras Hilal Fishing Harbour PHASE A, Libya
300m rubble mound breakwaters with Acropode armour units 320m quay walls Clamshell dredging of basin and approach channel
![Page 27: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/27.jpg)
Ras Hilal Fishing Harbour PHASE B, Libya
700m rubble mound breakwaters with Acropode armour units 400m quay walls 650m mass concrete sea wall
![Page 28: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/28.jpg)
Ras Hilal Fishing Harbour PHASE B, Libya
![Page 29: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/29.jpg)
![Page 30: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/30.jpg)
MAIN EQUIPMENT LIST
1 FLOATING CRANE 120 T (Owned)
1 FLOATING CRANE 55T (Half owned)
2 SPUD BARGE EXCAVATORS (1 Owned, 1 half owned)
2 TUGBOATS (1 Owned, 1 half owned)
IHC S-280 HAMMER & POWERPACK P800 (Owned)
1 VIBRATORY HAMMER PVE105m (Owned)
2 SPLIT HOPPER BARGES 1000 M3 (Owned)
2 FLAT BARGES (1 Owned, 1 Secured)
1 CRAWLER CRANE 200T (Owned)
1 Dredger Excavator (Owned)
![Page 31: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/31.jpg)
Floating Crane “ASTAKOS” LIMA 2400
100 ton lifting capacity 5.5m3 clamshell bucket 50m x 20m x 3m barge
![Page 32: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/32.jpg)
Floating Crane “NIKOLAOS”
55 ton lifting capacity 3.0 m3 clamshell bucket 29m x 13m x 1.5m barge
![Page 33: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/33.jpg)
200ton MANITOWOC CRANE M888 on a JACKUP BARGE
200tonliftingcapacity
55m boom
![Page 34: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/34.jpg)
Spud Barge Excavator “ERIMANTHOS”
![Page 35: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/35.jpg)
Spud Barge Excavator “DEMETRIOS”
![Page 36: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/36.jpg)
Tug Boat Vassileios 540HP
540hp horsepower
![Page 37: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/37.jpg)
Tug Boat “MICHAIL” 450 HP
![Page 38: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/38.jpg)
Split Hopper Barge LORA I
940m3 capacity
![Page 39: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/39.jpg)
Split Hopper Barge LORA II
940m3 capacity
![Page 40: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/40.jpg)
Flat barge “ATHINA”
1500ton capacity
![Page 41: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/41.jpg)
Flat Barge “ELLI”
![Page 42: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/42.jpg)
PILE DRIVING TEMPLATE
Cantilever supporting truss Two hydraulically operated grippers at top and bottom
![Page 43: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/43.jpg)
IMPACT HAMMER IHC S280
![Page 44: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/44.jpg)
VIBRATING HAMMER PVE 105m
Eccentric moment 105kgm Max. Frequency 1350tpm Centrifigural Force 2150kN
![Page 45: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/45.jpg)
DREDGER EXCAVATOR ON SPRUD
![Page 46: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/46.jpg)
COMPANY’s KEY PEOPLE
Civil Engineers 14
Mechanical Engineers 1
Survey Engineers 2
H&S Engineers 1
QA&QC Engineers 2
Accounting officers 3
Superintendents 3
Foremen 3
Welding engineers 1
![Page 47: Archimedes Presentation](https://reader031.fdocuments.net/reader031/viewer/2022020108/587250491a28ab852f8b6e3f/html5/thumbnails/47.jpg)
SAFETY & RISK ASSESSMENT
Commitment to a safety culture throughout all operations.
Our approach to safety summarized by the four ‘Cs’ :
Control – monitoring, auditing, supervision Cooperation – ensuring participation and commitment Communication – signal commitment, meetings Competence – training, certification.