APRIL 2014

PORT OF ITAQUI

Page 2: APRIL 2014 PORT OF ITAQUI · Daily dump: 22 kt/day Annual discharge: 5.8 (Mta 1st Phase) For 2nd. Phase, with the doubling of the hoppers => Mta 8.0 Mta TEGRAM RAILWAY CONNECTION

PORT LOCATION

Suez Canal

Panama Canal

Strategic location on the coast of the northeastern region; Shorter routes to Europe and USA comparing to ports of the South and Southeast (about one week); In 2015, after enlargement of Panama Canal ,the trip to ASIA will become more competitive.

Page 3: APRIL 2014 PORT OF ITAQUI · Daily dump: 22 kt/day Annual discharge: 5.8 (Mta 1st Phase) For 2nd. Phase, with the doubling of the hoppers => Mta 8.0 Mta TEGRAM RAILWAY CONNECTION

3

SÃO LUIS PORT COMPLEX

Terminal da Raposa

TERMINALS OPERATED BY EMAP PRIVATE TERMINALS TERMINALS (FUTURE INVESTMENTS)

Page 4: APRIL 2014 PORT OF ITAQUI · Daily dump: 22 kt/day Annual discharge: 5.8 (Mta 1st Phase) For 2nd. Phase, with the doubling of the hoppers => Mta 8.0 Mta TEGRAM RAILWAY CONNECTION

4

WATER ACCESS

Internal Channel

External Channel

The polygonal ofItaqui

Anchoring area

ACCESS CHANNEL ACTUAL

Minimum Depth 23 m

Limiting Width 500 m

Maximum Authorized Draught

22,3 m

Length

101 km

Page 5: APRIL 2014 PORT OF ITAQUI · Daily dump: 22 kt/day Annual discharge: 5.8 (Mta 1st Phase) For 2nd. Phase, with the doubling of the hoppers => Mta 8.0 Mta TEGRAM RAILWAY CONNECTION

5

AREA OF THE ORGANIZED PORT

FUTURE INDUSTRIAL DISTRICT & PORT CONNECTION

MÓDULO G

MÓDULO F-Norte

Page 6: APRIL 2014 PORT OF ITAQUI · Daily dump: 22 kt/day Annual discharge: 5.8 (Mta 1st Phase) For 2nd. Phase, with the doubling of the hoppers => Mta 8.0 Mta TEGRAM RAILWAY CONNECTION

Hinterland of the Port of Itaqui

HINTERLAND: LOGISTICS INTEGRATION

Road network with more than 55,000 miles, linking federal, state and municipal roads.

Rail network formed by TLSA and EFC/FNS.

Page 7: APRIL 2014 PORT OF ITAQUI · Daily dump: 22 kt/day Annual discharge: 5.8 (Mta 1st Phase) For 2nd. Phase, with the doubling of the hoppers => Mta 8.0 Mta TEGRAM RAILWAY CONNECTION

7

PORT OF ITAQUI

ACTUAL INFRAESTRUCTURE

(*) B-108 under construction.

To be released at the first semester of 2014.

B-108*

B-106 B-105 B-104

B-103

B-102

B-101

B-100

Page 8: APRIL 2014 PORT OF ITAQUI · Daily dump: 22 kt/day Annual discharge: 5.8 (Mta 1st Phase) For 2nd. Phase, with the doubling of the hoppers => Mta 8.0 Mta TEGRAM RAILWAY CONNECTION

8

AGRIBUSINESS - 10 million tonnes of grains (soybeans and corn): TEGRAM

- Soya bran and vegetable oil (food chain and bio-diesel)

- Sugar and Ethanol

- Cotton

OIL & GAS – GAS, ENERGY AND PETROLEUM DERIVATIVES. - Input and outputs of Petroleum Derivatives - Refinery and Distribution companies. - Potential development : supply chain related to energy and petrochemical projects. - Development of off-shore and ship maintenance industry and services providers

FOREST PRODUCTS - Cellulose

- Pellets

SOLID BULK MINERALS - Fertilizers: increase on demand due to growth of agricultural production at MAPITOBA (around 10% per year) - Civil Construction – new cement plants (clinker and slag).

GENERAL CARGO CONTAINERS -New regular container lines -Expansion of the Industrial Park of Maranhão -Vertical integration of the production chain

MARKET SEGMENTS

Page 9: APRIL 2014 PORT OF ITAQUI · Daily dump: 22 kt/day Annual discharge: 5.8 (Mta 1st Phase) For 2nd. Phase, with the doubling of the hoppers => Mta 8.0 Mta TEGRAM RAILWAY CONNECTION

9

GENERAL CARGO 2013

Cement 35%

General Cargo 22%

Rails 21%

Aluminum 21%

Fluoride 1%

Page 10: APRIL 2014 PORT OF ITAQUI · Daily dump: 22 kt/day Annual discharge: 5.8 (Mta 1st Phase) For 2nd. Phase, with the doubling of the hoppers => Mta 8.0 Mta TEGRAM RAILWAY CONNECTION

10

LIQUID BULK CARGO 2013

Caustic Soda 0,07%

Supply 0,26%

Alcohol / Ethanol

1%

LPG 2%

Petroleum Derivatives

(Import) 41%

Petroleum Derivatives

(Distribution) 56%

Page 11: APRIL 2014 PORT OF ITAQUI · Daily dump: 22 kt/day Annual discharge: 5.8 (Mta 1st Phase) For 2nd. Phase, with the doubling of the hoppers => Mta 8.0 Mta TEGRAM RAILWAY CONNECTION

11

SOLID BULK CARGO 2013

Bentonite+ Anthracite

0,004

Manganese 1%

Wheat 1%

Rice 2%

Corn 3%

Clinker + Slag 3%

Coal 6%

Copper 8%

Fertilizers 17%

Pig iron 22%

Soybeans 37%

Page 12: APRIL 2014 PORT OF ITAQUI · Daily dump: 22 kt/day Annual discharge: 5.8 (Mta 1st Phase) For 2nd. Phase, with the doubling of the hoppers => Mta 8.0 Mta TEGRAM RAILWAY CONNECTION

AGRIBUSINESS AT ITAQUI 31% of the cargo handled 2013 - 4,8 million tonnes

12

Area of Cerrado

NEW AGRICULTURAL FRONTIER

MA

PI

TO

BA

Food production in Brazil will grow by 40% between 2010 and 2020 according to the Organization for economic co-operation and development (OECD).

Fertilizers 29%

Soybeans 62%

Corn 4%

Wheat 2%

Rice 3%

Page 13: APRIL 2014 PORT OF ITAQUI · Daily dump: 22 kt/day Annual discharge: 5.8 (Mta 1st Phase) For 2nd. Phase, with the doubling of the hoppers => Mta 8.0 Mta TEGRAM RAILWAY CONNECTION

HISTORIC & PROJECTION

Source: PDZ do Porto do Itaqui – 2012

3.200.000

6.549.000

Ton

ne

s p

er

year

12.400.000

15.000.000 GRAINS

567.786 485.882 515.077 669.134 928.284

1.232.742 1.384.420 1.427.423 1.700.127 1.750.853

2.063.178 2.503.901

2.744.687 2.974.624

36.824 526.471

204.446

2007 2008 2009 2010 2011 2012 2013

Fertilizers

Soybeans

Corn

Page 14: APRIL 2014 PORT OF ITAQUI · Daily dump: 22 kt/day Annual discharge: 5.8 (Mta 1st Phase) For 2nd. Phase, with the doubling of the hoppers => Mta 8.0 Mta TEGRAM RAILWAY CONNECTION

GRAIN TERMINAL OF MARANHÃO

MULTIMODAL EFFICIENCY

14

Page 15: APRIL 2014 PORT OF ITAQUI · Daily dump: 22 kt/day Annual discharge: 5.8 (Mta 1st Phase) For 2nd. Phase, with the doubling of the hoppers => Mta 8.0 Mta TEGRAM RAILWAY CONNECTION

TEGRAM

II

III

IV

I

LOTE I – TERMINAL CORREDOR NORTE (TCN) (NOVAAGRI-ESTRUTURA DE ARMAZENAGEM E ESCOAMENTO AGRÍCOLA S.A. AND CHS DO BRASIL )

LOTE II – GLENCORE SERVIÇOS E COMÉRCIO DE PRODUTOS AGRÍCOLAS LTDA.

LOTE III – CGG TRADING S.A.

LOTE IV – CONSÓRCIO GRESCIMENTO (LOUIS DREYFUS COMMODITIES BRASIL S.A. e AMAGGI EXPORTAÇÃO AND IMPORTAÇÃO LTDA)

I II III IV

Investment of R$ 578 million FOUR INDEPENDENT WAREHOUSES with a capacity of 125,000 tons each, totaling 500,000 tons (static capacity).

Page 16: APRIL 2014 PORT OF ITAQUI · Daily dump: 22 kt/day Annual discharge: 5.8 (Mta 1st Phase) For 2nd. Phase, with the doubling of the hoppers => Mta 8.0 Mta TEGRAM RAILWAY CONNECTION

16

TEGRAM Investment of R$ 578 million

Warehouses Four independent warehouses with capacity of 125.000 Tonnes each. Total Storage Capacity 500.000 tonnes.

Road Reception System Capacity of 750 tons/hour each.

Train Reception System Extension with capacity of 3,000 tons/h per phase.

Port Shipment system 1st phase-2,500 t/h – Berth 103 - 5 million tons/year 2nd phase-2,500 t/h – Berth 100 - Additional 5 million tons/year Vessels type: PANAMAX

LOT I – TERMINAL CORREDOR NORTE (TCN) (NOVAAGRI-ESTRUTURA DE ARMAZENAGEM ESCOAMENTO AGRÍCOLA S.A. AND CHS DO BRASIL )

LOT III – CGG TRADING S.A.

LOT II – GLENCORE SERVIÇOS E COMÉRCIO DE PRODUTOS AGRÍCOLAS LTDA.

LOT IV – CONSÓRCIO GRESCIMENTO (LOUIS DREYFUS COMMODITIES BRASIL S.A. AND AMAGGI EXPORTAÇÃO E IMPORTAÇÃO LTDA)

Page 17: APRIL 2014 PORT OF ITAQUI · Daily dump: 22 kt/day Annual discharge: 5.8 (Mta 1st Phase) For 2nd. Phase, with the doubling of the hoppers => Mta 8.0 Mta TEGRAM RAILWAY CONNECTION

Tegram hoppers

Tegram railway extension

Railway extension

Connection conveyor belt

Hoppers - Warehouse

Grain warehouse

Connection conveyor belt

Warehouses – Berth 103

Storage / Shipment

Copper Polygonal

Copper expansion

Copper Polygonal

PROJECT:

Rail extension: ~ 4 km

Qty trains/day: 3 trains

Qty: train/wagons: 80 wagons

Cap. Wagon: 92 t

Daily dump: 22 kt/day

Annual discharge: 5.8 (Mta 1st

Phase)

For 2nd. Phase, with the doubling

of the hoppers => Mta 8.0 Mta

TEGRAM RAILWAY CONNECTION

Page 18: APRIL 2014 PORT OF ITAQUI · Daily dump: 22 kt/day Annual discharge: 5.8 (Mta 1st Phase) For 2nd. Phase, with the doubling of the hoppers => Mta 8.0 Mta TEGRAM RAILWAY CONNECTION

PORT EXPEDITION

Berth 103 1º Phase – 5MTPA

Berth 100 2º Phase – additional

5MTPA

Page 19: APRIL 2014 PORT OF ITAQUI · Daily dump: 22 kt/day Annual discharge: 5.8 (Mta 1st Phase) For 2nd. Phase, with the doubling of the hoppers => Mta 8.0 Mta TEGRAM RAILWAY CONNECTION

19

TEGRAM WAREHOUSES

Page 20: APRIL 2014 PORT OF ITAQUI · Daily dump: 22 kt/day Annual discharge: 5.8 (Mta 1st Phase) For 2nd. Phase, with the doubling of the hoppers => Mta 8.0 Mta TEGRAM RAILWAY CONNECTION

20

TEGRAM DECEMBER 2013

Page 21: APRIL 2014 PORT OF ITAQUI · Daily dump: 22 kt/day Annual discharge: 5.8 (Mta 1st Phase) For 2nd. Phase, with the doubling of the hoppers => Mta 8.0 Mta TEGRAM RAILWAY CONNECTION

21

TEGRAM JANUARY 2014

Page 22: APRIL 2014 PORT OF ITAQUI · Daily dump: 22 kt/day Annual discharge: 5.8 (Mta 1st Phase) For 2nd. Phase, with the doubling of the hoppers => Mta 8.0 Mta TEGRAM RAILWAY CONNECTION

22

TEGRAM JANUARY 2014

Page 23: APRIL 2014 PORT OF ITAQUI · Daily dump: 22 kt/day Annual discharge: 5.8 (Mta 1st Phase) For 2nd. Phase, with the doubling of the hoppers => Mta 8.0 Mta TEGRAM RAILWAY CONNECTION

23

TEGRAM FEBRUARY 2014

Page 24: APRIL 2014 PORT OF ITAQUI · Daily dump: 22 kt/day Annual discharge: 5.8 (Mta 1st Phase) For 2nd. Phase, with the doubling of the hoppers => Mta 8.0 Mta TEGRAM RAILWAY CONNECTION

CONTAINERS

24

CMA-CGM – Itaqui, Belém, Vila do Conde, Santana, Santarém, Fort-De-France e and Port of Spain.

ALIANÇA– Manaus, Itaqui, Pecém, Suape, Santos, Itapoa (SC)

returning by the ports of Sepetiba, Suape, Pecém and Manaus.

LOG-IN– Itaqui, Vila do Conde, Suape, Fortaleza.

Page 25: APRIL 2014 PORT OF ITAQUI · Daily dump: 22 kt/day Annual discharge: 5.8 (Mta 1st Phase) For 2nd. Phase, with the doubling of the hoppers => Mta 8.0 Mta TEGRAM RAILWAY CONNECTION

CONTAINERS

(*) New regular line started by Aliança on July 2013.

Page 26: APRIL 2014 PORT OF ITAQUI · Daily dump: 22 kt/day Annual discharge: 5.8 (Mta 1st Phase) For 2nd. Phase, with the doubling of the hoppers => Mta 8.0 Mta TEGRAM RAILWAY CONNECTION

26

BERTH 102 MULTIPURPOSE

B-102 Length 236m

Depth: Approved 10, 5 m

Project: 12 m

Page 27: APRIL 2014 PORT OF ITAQUI · Daily dump: 22 kt/day Annual discharge: 5.8 (Mta 1st Phase) For 2nd. Phase, with the doubling of the hoppers => Mta 8.0 Mta TEGRAM RAILWAY CONNECTION

27

B-100 Length 320m Depth: Under approval 10m(*) Project: 15m

BERTH 100 MULTIPURPOSE

(*) Under approval process.

Page 28: APRIL 2014 PORT OF ITAQUI · Daily dump: 22 kt/day Annual discharge: 5.8 (Mta 1st Phase) For 2nd. Phase, with the doubling of the hoppers => Mta 8.0 Mta TEGRAM RAILWAY CONNECTION

CONTAINER STORAGE YARD (B-102)

Retroarea of B-102 Total area of 6.000m² To be concluded by Dec 2013.

Page 29: APRIL 2014 PORT OF ITAQUI · Daily dump: 22 kt/day Annual discharge: 5.8 (Mta 1st Phase) For 2nd. Phase, with the doubling of the hoppers => Mta 8.0 Mta TEGRAM RAILWAY CONNECTION

29

FUTURE CONTAINERS TERMINAL

TECON

2016 - 2020

TECON 1st Phase:

Pier 96, retroarea, access

bridge and container yard.

Page 30: APRIL 2014 PORT OF ITAQUI · Daily dump: 22 kt/day Annual discharge: 5.8 (Mta 1st Phase) For 2nd. Phase, with the doubling of the hoppers => Mta 8.0 Mta TEGRAM RAILWAY CONNECTION

FERTILIZERS

30

567.786 485.882 515.077

669.134

928.284

1.232.742

1.384.420

2007 2008 2009 2010 2011 2012 201330%

39%

33%

12%

To

ns

Historic of Fertilizers – Port of Itaqui

Forecast 2014 – 8% ( 1.5 MTPA)

Page 31: APRIL 2014 PORT OF ITAQUI · Daily dump: 22 kt/day Annual discharge: 5.8 (Mta 1st Phase) For 2nd. Phase, with the doubling of the hoppers => Mta 8.0 Mta TEGRAM RAILWAY CONNECTION

FERTILIZERS 2013

31

MURIATE OF POTASH 34%

SINGLE SUPERPHOSPHATE

21%

MONOAMMONIUM PHOSPHATE

16%

TRIPLE SUPERPHOSPHATE 9%

AMMONIUM SULPHATE 6%

UREA 4%

MINERAL FERTILIZER 4%

MAGNESIUM SULFATE 2%

CHEMICAL FERTILIZER 2%

NATURAL CALCIUM PHOSPHATE

2%

OTHERS 10%

Page 32: APRIL 2014 PORT OF ITAQUI · Daily dump: 22 kt/day Annual discharge: 5.8 (Mta 1st Phase) For 2nd. Phase, with the doubling of the hoppers => Mta 8.0 Mta TEGRAM RAILWAY CONNECTION

32

FUTURE PROJECTS

FERTILIZERS TERMINAL

-STRUCTURING PROJECT with final capacity of 5mtpa -3 LOTS

-2 WAREHOUSES per lot, each with 5,000 m²

-25,000 ton Capacity, totaling 150,000 ton static capacity

-Type vessel: Panamax

- EQUIPMENT - Dedicated berth

- Ship Unloader: capacity 2000 tons/h

- Conveyor belt

- Rail and Road Drainage System (16,000 tons/day – at least 50% rail)

Page 33: APRIL 2014 PORT OF ITAQUI · Daily dump: 22 kt/day Annual discharge: 5.8 (Mta 1st Phase) For 2nd. Phase, with the doubling of the hoppers => Mta 8.0 Mta TEGRAM RAILWAY CONNECTION

33

FUTURE PROJECTS

NEW PIER CONSTRUCTION - BERTH 99 (CELULOSE)

NEW PIER CONSTRUCTION - BERTH 98 (FERTILIZES)

Page 34: APRIL 2014 PORT OF ITAQUI · Daily dump: 22 kt/day Annual discharge: 5.8 (Mta 1st Phase) For 2nd. Phase, with the doubling of the hoppers => Mta 8.0 Mta TEGRAM RAILWAY CONNECTION

34

FUTURE PROJECTS

RETROAREA FOR BERTH 100 AND BERTH 101

Page 35: APRIL 2014 PORT OF ITAQUI · Daily dump: 22 kt/day Annual discharge: 5.8 (Mta 1st Phase) For 2nd. Phase, with the doubling of the hoppers => Mta 8.0 Mta TEGRAM RAILWAY CONNECTION

35

FUTURE PROJECTS

RETROAREA OF BERTH 104 AND BERTH 105 FOR GENERAL CARGO

Page 36: APRIL 2014 PORT OF ITAQUI · Daily dump: 22 kt/day Annual discharge: 5.8 (Mta 1st Phase) For 2nd. Phase, with the doubling of the hoppers => Mta 8.0 Mta TEGRAM RAILWAY CONNECTION

36

FUTURE PROJECTS

PETROBRAS PROJECT – PREMIUM REFINERY

Page 37: APRIL 2014 PORT OF ITAQUI · Daily dump: 22 kt/day Annual discharge: 5.8 (Mta 1st Phase) For 2nd. Phase, with the doubling of the hoppers => Mta 8.0 Mta TEGRAM RAILWAY CONNECTION

37

NEW BUSINESS MANAGEMENT Luciana Ferreira Kuzolitz [email protected] Phone: 00 55 98 3216 6066 Felipe Duailibe [email protected] Phone: 00 55 98 3216 6507 [email protected]