Apresentação teleconferência 4T05 - Apresentação dos Resultados
Apresentação teleconferência - estaleiro...
-
Upload
llx -
Category
Technology
-
view
320 -
download
0
description
Transcript of Apresentação teleconferência - estaleiro...
1
June, 2010
OSX – Institutional Presentation
DisclaimerDisclaimer
The material that follows is a confidential presentation of general background information about OSX Brasil S.A. and its subsidiaries (collectively, “OSX”) as of
the date of the presentation. It is information in summary form and does not purport to be complete. No representation or warranty, express or implied, is made
concerning, and no reliance should be placed on, the accuracy, fairness, or completeness of this information.
This confidential presentation may contain certain forward-looking statements and information relating to OSX that reflect the current views and/or expectations
of OSX and its management with respect to its business and future events. Forward looking statements include, without limitation, any statement that may
predict, forecast, indicate or imply future results, performance or achievements, and may contain words like “anticipate”, “believe”, “estimate”, “expect”,
“forecast”, “plan”, “predict”, “project”, “target” or any other words or phrases of similar meaning. Such statements are subject to a number of risks, uncertainties
and assumptions. We caution you that a number of important factors could cause actual results to differ materially from the plans, objectives, expectations,
estimates and intentions expressed in this presentation. In no event, neither OSX nor any of its affiliates, directors, officers, agents or employees, nor any of the
placement agents or underwriters, shall be liable before any third party (including investors) for any investment or business decision made or action taken in
reliance on the information and statements contained in this presentation or for any consequential, special or similar damages.
All forward-looking statements in this presentation are based on information and data available as of the date they were made, and OSX undertakes no
obligation to update them in light of new information or future developments. This presentation and its contents are proprietary information and may not be
2
obligation to update them in light of new information or future developments. This presentation and its contents are proprietary information and may not be
reproduced or otherwise disseminated in whole or in part without OSX’s prior written consent.
Securities may not be offered or sold in the United States unless they are registered or exempt from registration under the United States Securities Act of 1933,
as amended. Any offering of securities to be made in the United States will be made solely by means of a confidential offering circular that may be obtained from
the placement agents or the underwriters. Such confidential offering circular will contain detailed information about OSX and its business. This presentation
does not constitute an offer, or invitation, or solicitation of an offer, to subscribe for or purchase any securities. Neither this presentation nor anything contained
herein shall form the basis of any contract or commitment whatsoever.
RationaleRationale
The Macro-Drainage Plan for the "Baixada Campista" Region was approved by the Rio de Janeiro’s State
Government on March 31st, 2010.
The Plan comprises the new Campos-Açu Channel, which will flow into the sea through the Açu Superport
Industrial Complex, allowing the implementation of a shipyard along its margin.
The Government of Rio de Janeiro emphasized its invitation for OSX to install its shipyard in the region,
creating up to 10,000 new jobs in the operational stage and 3,500 jobs in the construction stage.
OSX and LLX realized pre-feasibility studies for the implementation of the Açu Shipyard, and the
conceptual layout has already been approved by Hyundai Heavy Industries Co. Ltd.
3
conceptual layout has already been approved by Hyundai Heavy Industries Co. Ltd.
OSX has initiated the environmental licensing process for the implementation of the Açu Shipyard at the
competent environmental licensing agency in the Rio de Janeiro State.
The area for the Açu Shipyard has 320 hectares, with initial annual production capacity of approximately
180,000 ton/year of steel plates and 220,000 ton/year of integration.
This alternative does not represent a material budgetary change for OSX and the installation license is
estimated to be issued until April 2011.
The Açu Industrial Complex offers to the Açu Shipyard access to an integrated supply chain, including
steel mills, metal-mechanic companies and other shipbuilding suppliers and service providers.
Macro drainage planMacro drainage plan
Macro drainage execution signed on march 31st 2010
4
Shipyard Overall LayoutShipyard Overall Layout
US$ 1.7 bn investment
Steel processing of 180,000 ton/year and assembly of 220,000 ton/year
Up to 3,525 m water front (2,400 m on first phase)
Conceptual design approved by Hyundai Heavy Industries
Atlantic Ocean
5
Shipyard Overall Budget (preliminary)Shipyard Overall Budget (preliminary)
USD (MM) Total LLX OSX
Common Infrastructure 448 219 229
Investigation and Engineering 31 15 16
Civil Works 416 204 212
Offshore Dredging (854k m3) 111 55 56
Onshore Dredging (13,000k m3) 41 20 21
Break Water (2,300k m3) 264 129 135
Pre eng. costs + environmental 74 - 74
6
Civil works 447 - 447
Onshore Dredging (10,500k m3) 90 - 90
Quay (2,270 m) 262 - 262
Back area embankment (6,000k m3) 21 - 21
Site camp facility and management 74 - 74
Shipyard structure 544 - 544
Buildings 265 - 265
Dry Dock 133 - 133
Roads and Paving 146 - 146
Equipment and others 420 - 420
Total 1,933 219 1,714
Shipyard Licensing Timeline (expected)Shipyard Licensing Timeline (expected)
Reference Term June 2010
EIA filling August 2010
Public hearings November 2010
7
Preliminary License December 2010
Installation License April 2011
The EBX WayThe EBX Way
“The largest
order book in
the world” (Luiz Carneiro)
“10 years of
continuous
growth”(Eike Batista)
“The largest
shipyard in the
Americas” (Roberto Monteiro)
“We have
always over
delivered”
“Unique and non
replicable business
model”(Luiz Arthur)
“Insatiable
quest towards
perfection” (Eike Batista)
“A construction
slot in OSX’s
shipyard is
worth more
than gold” (Eduardo Musa)
“We have
billion dollar
project
execution
capability” (Eduardo Musa)
“Our combined
talent pool has
managed more
than 50.000
people” (Luiz Carneiro)
“A unique
sheltered location
along 8.5
thousand km of
coast in Brazil”(Roberto Monteiro)
8
“Asian
performance will
be reached in 2
years” (Luiz Carneiro)
“OGX
commitment
with national
content”(Paulo Mendonca)
“We love
transparency!”(Eike Batista)
“Its all about
reality”(Flavio Godinho)
“it’s all about
location,
location,
location”(Eike Batista)
delivered” (Eike Batista)
“OSX 1
accelerates the
beginning of
OGX’s
production”(Paulo Mendonca)
“We made
history in OGX
and will be
making it again
in OSX”(Flavio Godinho)
“Our assets are
made to last one
hundred years”(Alex Caminha)
“Unique business
dynamics” (Leonardo Moretzsohn)
“Synergies
across the EBX
Group will be
always
captured”(Ricardo Fonseca)
“Full alignment
of interests with
100% arm’s
length basis”(Paulo Gouvea)
Thank you !!
and welcome to Brazil !!
9
and welcome to Brazil !!