APPLICATION DOCUMENT REF. NO. 4.10 KEY PLAN INDICATIVE … · Landscape Planting Indicative...

8
" " " " " " " " 4.10_SHT1 4.10_SHT2 4.10_SHT3 4.10_SHT4 4.10_SHT5 4.10_SHT6 Client Drawn SJ Date 18/05/2017 Checked JW Approved KC Drawing Number 4.10 KEY PLAN Project Title APPLICATION DOCUMENT REF. NO. 4.10 KEY PLAN INDICATIVE GAS SUPPLY PIPELINE CONNECTION WORKS: PIPELINE SECTIONS Reproduced from Ordnance Survey digital map data © Crown copyright 2017. All rights reserved. Licence number 0100031673 100 0 100 200 300 400 500 m ± Scale @ A3 1:12,500 Scott House Alençon Link, Basingstoke Hampshire, RG21 7PP Telephone (01256) 310200 Fax (01256) 310201 www.aecom.com AECOM Purpose of Issue THIS DOCUMENT HAS BEEN PREPARED PURSUANT TO AND SUBJECT TO THE TERMS OF AECOM'S APPOINTMENT BY ITS CLIENT. AECOM ACCEPTS NO LIABILITY FOR ANY USE OF THIS DOCUMENT OTHER THAN BY ITS ORIGINAL CLIENT OR FOLLOWING AECOM'S EXPRESS AGREEMENT TO SUCH USE, AND ONLY FOR THE PURPOSES FOR WHICH IT WAS PREPARED AND PROVIDED. Rev File Name:K:\5004 - Information Systems\60506766_Eggborough_CCGT_DCO\02_Maps\DCO Application\_DCO Application Document\Doc 4.10 Indicative Gas Supply Pipeline Connection Works Plans\Figure 4_10 - Whole Pipeline Corridor_Overview.mxd LEGEND The Order Limits " Access Point to Gas Pipeline Corridor Feeder 29 (existing gas pipeline) DCO Gas Pipeline Alignment Landscape Planting Indicative Construction Technique (within Pipeline Construction Corridor) Auger Boring Horizontal Directional Drilling Open Cut Trench Construction EGGBOROUGH POWER LTD EGGBOROUGH CCGT DCO Drawing Title Infrastructure Planning (Applications: Prescribed Forms and Procedures) Regulations 2009 Regulation 5(2)(o) 4.10_SHT7 I ND I CA TI VE GAS SUPLY P I PEL I NE CONNECT I ON WORKS TYP I CAL CROS SECT I ON OF CONST RU CT I ON CORR I DOR 01 DCO APPLICATION

Transcript of APPLICATION DOCUMENT REF. NO. 4.10 KEY PLAN INDICATIVE … · Landscape Planting Indicative...

"

"

"

"

"

"

"

"

"

"

ExistingMainEntrance

TranmoreLaneEntrance

4.10_SHT1

4.10_SHT2

4.10_SHT3

4.10_SHT4

4.10_SHT5

4.10_SHT6

Client

Dra wnSJDa te18/05/2017

CheckedJW

ApprovedKC

Dra wing Number4.10 KEY PLAN

Project T itle

APPLICAT ION DOCU MENT REF. NO. 4.10 KEY PL ANINDICAT IV E GAS SU PPL Y PIPELINE

CONNECT ION WORKS: PIPELINE SECT IONS

Reproduced from Ordnance Survey digita l ma p da ta © Crown copyright 2017. All rights reserved. L icence number 0100031673

100 0 100 200 300 400 500m

±

Sca le @ A31:12,500

Scott HouseAlençon L ink, Ba singstokeHampshire, RG21 7PPT elephone (01256) 310200Fa x (01256) 310201www.a ecom.com

AECOM

Purpose of Issue

T HIS DOCU MENT HAS BEEN PREPARED PU RSU ANT T O AND SU BJECT T O T HE T ERMS OFAECOM'S APPOINT MENT BY IT S CL IENT . AECOM ACCEPT S NO LIABIL IT Y FOR ANY U SE OF T HIS

DOCU MENT OT HER T HAN BY IT S ORIGINAL CL IENT OR FOL LOWING AECOM'S EXPRESS AGREEMENTT O SU CH U SE, AND ONL Y FOR T HE PU RPOSES FOR WHICH IT WAS PREPARED AND PROV IDED.

Rev

File Name:K:\5004 - Information Systems\60506766_Eggborough_CCGT_DCO\02_Maps\DCO Application\_DCO Application Document\Doc 4.10 Indicative Gas Supply Pipeline Connection Works Plans\Figure 4_10 - Whole Pipeline Corridor_Overview.mxd

LEGENDT he Order L imits

"Access Point to Ga s PipelineCorridorFeeder 29 (existing ga s pipeline)DCO Ga s Pipeline AlignmentL a ndsca pe Pla nting

Indica tive Construction T echnique(within Pipeline Construction Corridor)

Auger BoringHorizonta l Directiona l DrillingOpen Cut T rench Construction

EGGBOROU GH POWER L T DEGGBOROU GH CCGT DCODra wing T itle

Infra structure Pla nning (Applica tions: PrescribedForms and Procedures)Regula tions 2009 – Regula tion 5(2)(o)

4.10_SHT7

INDICAT IV E GAS SU PPL Y PIPEL INECONNECT ION WORKS T Y PICAL CROSSSECT ION OF CONST RU CT ION CORRIDOR

01

DCO APPLICATION

"

"Proposed AGI

West LaneAccess

Purpose of Issue

Project T itle

Dra wing T itle

Dra wn Checked

Scott HouseAlençon L ink, Ba singstokeHa mpshire, RG21 7PPT elephone (01256) 310200Fa x (01256) 310201www.a ecom.com

AECOM

Da teApproved

Dra wing Number

4.10_SHT1

T HIS DOCU MENT HAS BEEN PREPARED PU RSU ANT T O AND SU BJECT T O T HET ERMS OF AECOM'S APPOINT MENT BY IT S CL IENT . AECOM ACCEPT S NO L IABIL IT YFOR ANY U SE OF T HIS DOCU MENT OT HER T HAN BY IT S ORIGINAL CL IENT ORFOL L OWING AECOM'S EXPRESS AGREEMENT T O SU CH U SE, AND ONL Y FOR T HE

PU RPOSES FOR WHICH IT WAS PREPARED AND PROV IDED.

AECOM Interna l Project No. Sca le @ A360506766 1:2,500SJ JW EB 18/05/2017

Client

File Name:K:\5004 - Information Systems\60506766_Eggborough_CCGT_DCO\02_Maps\DCO Application\_DCO Application Document\Doc 4.10 Indicative Gas Supply Pipeline Connection Works Plans\Figure 4_10 - Whole Pipeline Corridor.mxd

±50 0 50 100 150 200m

L EGENDT he Order L imits

"Access Point to Ga s PipelineCorridorFeeder 29 (existing ga s pipeline)DCO Ga s Pipeline AlignmentL a ndsca pe Pla nting

Indica tive Construction T echnique(within Pipeline Construction Corridor)

Auger BoringHorizonta l Directiona l DrillingOpen Cut T rench Construction

APPLICAT ION DOCU MENTREF. NO. 4.10 SHEET 1

INDICAT IV E GAS SU PPL Y PIPELINECONNECT ION WORKS:PIPELINE SECT IONS

EGGBOROU GH CCGT DCO

EGGBOROU GH POWER L T D

T HIS DRAWING IS T O BE U SED ONL Y FOR T HE PU RPOSE OFISSU E T HAT IT WAS ISSU ED FOR AND IS SU BJECT T O AMENDMENT

CopyrightReproduced from Ordnance Survey digita l map da ta © Crown copyright 2017. All rights reserved. L icence number 0100031673.

Infra structure Pla nning (Applica tions: PrescribedForms and Procedures)Regula tions 2009 – Regula tion 5(2)(o)

DCO APPLICATION

Rev:

01

"

"

Burn LodgeFarm Access

(Construction Only)

Whitings LaneAccess

Purpose of Issue

Project T itle

Dra wing T itle

Dra wn Checked

Scott HouseAlençon L ink, Ba singstokeHa mpshire, RG21 7PPT elephone (01256) 310200Fa x (01256) 310201www.a ecom.com

AECOM

Da teApproved

Dra wing Number

4.10_SHT2

T HIS DOCU MENT HAS BEEN PREPARED PU RSU ANT T O AND SU BJECT T O T HET ERMS OF AECOM'S APPOINT MENT BY IT S CL IENT . AECOM ACCEPT S NO L IABIL IT YFOR ANY U SE OF T HIS DOCU MENT OT HER T HAN BY IT S ORIGINAL CL IENT ORFOL L OWING AECOM'S EXPRESS AGREEMENT T O SU CH U SE, AND ONL Y FOR T HE

PU RPOSES FOR WHICH IT WAS PREPARED AND PROV IDED.

AECOM Interna l Project No. Sca le @ A360506766 1:2,500SJ JW EB 18/05/2017

Client

File Name:K:\5004 - Information Systems\60506766_Eggborough_CCGT_DCO\02_Maps\DCO Application\_DCO Application Document\Doc 4.10 Indicative Gas Supply Pipeline Connection Works Plans\Figure 4_10 - Whole Pipeline Corridor.mxd

±50 0 50 100 150 200m

L EGENDT he Order L imits

"Access Point to Ga s PipelineCorridorFeeder 29 (existing ga s pipeline)DCO Ga s Pipeline AlignmentL a ndsca pe Pla nting

Indica tive Construction T echnique(within Pipeline Construction Corridor)

Auger BoringHorizonta l Directiona l DrillingOpen Cut T rench Construction

APPLICAT ION DOCU MENTREF. NO. 4.10 SHEET 2

INDICAT IV E GAS SU PPL Y PIPELINECONNECT ION WORKS:PIPELINE SECT IONS

EGGBOROU GH CCGT DCO

EGGBOROU GH POWER L T D

T HIS DRAWING IS T O BE U SED ONL Y FOR T HE PU RPOSE OFISSU E T HAT IT WAS ISSU ED FOR AND IS SU BJECT T O AMENDMENT

CopyrightReproduced from Ordnance Survey digita l map da ta © Crown copyright 2017. All rights reserved. L icence number 0100031673.

Infra structure Pla nning (Applica tions: PrescribedForms and Procedures)Regula tions 2009 – Regula tion 5(2)(o)

DCO APPLICATION

Rev:

01

"

Fox LaneAccess

Purpose of Issue

Project T itle

Dra wing T itle

Dra wn Checked

Scott HouseAlençon L ink, Ba singstokeHa mpshire, RG21 7PPT elephone (01256) 310200Fa x (01256) 310201www.a ecom.com

AECOM

Da teApproved

Dra wing Number

4.10_SHT3

T HIS DOCU MENT HAS BEEN PREPARED PU RSU ANT T O AND SU BJECT T O T HET ERMS OF AECOM'S APPOINT MENT BY IT S CL IENT . AECOM ACCEPT S NO L IABIL IT YFOR ANY U SE OF T HIS DOCU MENT OT HER T HAN BY IT S ORIGINAL CL IENT ORFOL L OWING AECOM'S EXPRESS AGREEMENT T O SU CH U SE, AND ONL Y FOR T HE

PU RPOSES FOR WHICH IT WAS PREPARED AND PROV IDED.

AECOM Interna l Project No. Sca le @ A360506766 1:2,500SJ JW EB 18/05/2017

Client

File Name:K:\5004 - Information Systems\60506766_Eggborough_CCGT_DCO\02_Maps\DCO Application\_DCO Application Document\Doc 4.10 Indicative Gas Supply Pipeline Connection Works Plans\Figure 4_10 - Whole Pipeline Corridor.mxd

±50 0 50 100 150 200m

L EGENDT he Order L imits

"Access Point to Ga s PipelineCorridorFeeder 29 (existing ga s pipeline)DCO Ga s Pipeline AlignmentL a ndsca pe Pla nting

Indica tive Construction T echnique(within Pipeline Construction Corridor)

Auger BoringHorizonta l Directiona l DrillingOpen Cut T rench Construction

APPLICAT ION DOCU MENTREF. NO. 4.10 SHEET 3

INDICAT IV E GAS SU PPL Y PIPELINECONNECT ION WORKS:PIPELINE SECT IONS

EGGBOROU GH CCGT DCO

EGGBOROU GH POWER L T D

T HIS DRAWING IS T O BE U SED ONL Y FOR T HE PU RPOSE OFISSU E T HAT IT WAS ISSU ED FOR AND IS SU BJECT T O AMENDMENT

CopyrightReproduced from Ordnance Survey digita l map da ta © Crown copyright 2017. All rights reserved. L icence number 0100031673.

Infra structure Pla nning (Applica tions: PrescribedForms and Procedures)Regula tions 2009 – Regula tion 5(2)(o)

DCO APPLICATION

Rev:

01

"

Millfield RoadAccess

Purpose of Issue

Project T itle

Dra wing T itle

Dra wn Checked

Scott HouseAlençon L ink, Ba singstokeHa mpshire, RG21 7PPT elephone (01256) 310200Fa x (01256) 310201www.a ecom.com

AECOM

Da teApproved

Dra wing Number

4.10_SHT4

T HIS DOCU MENT HAS BEEN PREPARED PU RSU ANT T O AND SU BJECT T O T HET ERMS OF AECOM'S APPOINT MENT BY IT S CL IENT . AECOM ACCEPT S NO L IABIL IT YFOR ANY U SE OF T HIS DOCU MENT OT HER T HAN BY IT S ORIGINAL CL IENT ORFOL L OWING AECOM'S EXPRESS AGREEMENT T O SU CH U SE, AND ONL Y FOR T HE

PU RPOSES FOR WHICH IT WAS PREPARED AND PROV IDED.

AECOM Interna l Project No. Sca le @ A360506766 1:2,500SJ JW EB 18/05/2017

Client

File Name:K:\5004 - Information Systems\60506766_Eggborough_CCGT_DCO\02_Maps\DCO Application\_DCO Application Document\Doc 4.10 Indicative Gas Supply Pipeline Connection Works Plans\Figure 4_10 - Whole Pipeline Corridor.mxd

±50 0 50 100 150 200m

L EGENDT he Order L imits

"Access Point to Ga s PipelineCorridorFeeder 29 (existing ga s pipeline)DCO Ga s Pipeline AlignmentL a ndsca pe Pla nting

Indica tive Construction T echnique(within Pipeline Construction Corridor)

Auger BoringHorizonta l Directiona l DrillingOpen Cut T rench Construction

APPLICAT ION DOCU MENTREF. NO. 4.10 SHEET 4

INDICAT IV E GAS SU PPL Y PIPELINECONNECT ION WORKS:PIPELINE SECT IONS

EGGBOROU GH CCGT DCO

EGGBOROU GH POWER L T D

T HIS DRAWING IS T O BE U SED ONL Y FOR T HE PU RPOSE OFISSU E T HAT IT WAS ISSU ED FOR AND IS SU BJECT T O AMENDMENT

CopyrightReproduced from Ordnance Survey digita l map da ta © Crown copyright 2017. All rights reserved. L icence number 0100031673.

Infra structure Pla nning (Applica tions: PrescribedForms and Procedures)Regula tions 2009 – Regula tion 5(2)(o)

DCO APPLICATION

Rev:

01

Purpose of Issue

Project T itle

Dra wing T itle

Dra wn Checked

Scott HouseAlençon L ink, Ba singstokeHa mpshire, RG21 7PPT elephone (01256) 310200Fa x (01256) 310201www.a ecom.com

AECOM

Da teApproved

Dra wing Number

4.10_SHT5

T HIS DOCU MENT HAS BEEN PREPARED PU RSU ANT T O AND SU BJECT T O T HET ERMS OF AECOM'S APPOINT MENT BY IT S CL IENT . AECOM ACCEPT S NO L IABIL IT YFOR ANY U SE OF T HIS DOCU MENT OT HER T HAN BY IT S ORIGINAL CL IENT ORFOL L OWING AECOM'S EXPRESS AGREEMENT T O SU CH U SE, AND ONL Y FOR T HE

PU RPOSES FOR WHICH IT WAS PREPARED AND PROV IDED.

AECOM Interna l Project No. Sca le @ A360506766 1:2,500SJ JW EB 18/05/2017

Client

File Name:K:\5004 - Information Systems\60506766_Eggborough_CCGT_DCO\02_Maps\DCO Application\_DCO Application Document\Doc 4.10 Indicative Gas Supply Pipeline Connection Works Plans\Figure 4_10 - Whole Pipeline Corridor.mxd

±50 0 50 100 150 200m

L EGENDT he Order L imits

"Access Point to Ga s PipelineCorridorFeeder 29 (existing ga s pipeline)DCO Ga s Pipeline AlignmentL a ndsca pe Pla nting

Indica tive Construction T echnique(within Pipeline Construction Corridor)

Auger BoringHorizonta l Directiona l DrillingOpen Cut T rench Construction

APPLICAT ION DOCU MENTREF. NO. 4.10 SHEET 5

INDICAT IV E GAS SU PPL Y PIPELINECONNECT ION WORKS:PIPELINE SECT IONS

EGGBOROU GH CCGT DCO

EGGBOROU GH POWER L T D

T HIS DRAWING IS T O BE U SED ONL Y FOR T HE PU RPOSE OFISSU E T HAT IT WAS ISSU ED FOR AND IS SU BJECT T O AMENDMENT

CopyrightReproduced from Ordnance Survey digita l map da ta © Crown copyright 2017. All rights reserved. L icence number 0100031673.

Infra structure Pla nning (Applica tions: PrescribedForms and Procedures)Regula tions 2009 – Regula tion 5(2)(o)

DCO APPLICATION

Rev:

01

"

"

"

ExistingHensall Gate

Entrance

Existing WandLane Access

Additional WandLane Access

(Construction Only)

Purpose of Issue

Project T itle

Dra wing T itle

Dra wn Checked

Scott HouseAlençon L ink, Ba singstokeHa mpshire, RG21 7PPT elephone (01256) 310200Fa x (01256) 310201www.a ecom.com

AECOM

Da teApproved

Dra wing Number

4.10_SHT6

T HIS DOCU MENT HAS BEEN PREPARED PU RSU ANT T O AND SU BJECT T O T HET ERMS OF AECOM'S APPOINT MENT BY IT S CL IENT . AECOM ACCEPT S NO L IABIL IT YFOR ANY U SE OF T HIS DOCU MENT OT HER T HAN BY IT S ORIGINAL CL IENT ORFOL L OWING AECOM'S EXPRESS AGREEMENT T O SU CH U SE, AND ONL Y FOR T HE

PU RPOSES FOR WHICH IT WAS PREPARED AND PROV IDED.

AECOM Interna l Project No. Sca le @ A360506766 1:2,500SJ JW EB 18/05/2017

Client

File Name:K:\5004 - Information Systems\60506766_Eggborough_CCGT_DCO\02_Maps\DCO Application\_DCO Application Document\Doc 4.10 Indicative Gas Supply Pipeline Connection Works Plans\Figure 4_10 - Whole Pipeline Corridor.mxd

±50 0 50 100 150 200m

L EGENDT he Order L imits

"Access Point to Ga s PipelineCorridorFeeder 29 (existing ga s pipeline)DCO Ga s Pipeline AlignmentL a ndsca pe Pla nting

Indica tive Construction T echnique(within Pipeline Construction Corridor)

Auger BoringHorizonta l Directiona l DrillingOpen Cut T rench Construction

APPLICAT ION DOCU MENTREF. NO. 4.10 SHEET 6

INDICAT IV E GAS SU PPL Y PIPELINECONNECT ION WORKS:PIPELINE SECT IONS

EGGBOROU GH CCGT DCO

EGGBOROU GH POWER L T D

T HIS DRAWING IS T O BE U SED ONL Y FOR T HE PU RPOSE OFISSU E T HAT IT WAS ISSU ED FOR AND IS SU BJECT T O AMENDMENT

CopyrightReproduced from Ordnance Survey digita l map da ta © Crown copyright 2017. All rights reserved. L icence number 0100031673.

Infra structure Pla nning (Applica tions: PrescribedForms and Procedures)Regula tions 2009 – Regula tion 5(2)(o)

DCO APPLICATION

Rev:

01

36mWORKING WIDTH

TEMPORARYFENCING

TEMPORARYFENCING

TRENCH

SUBSOIL

TOPSOILPIPE WORKING AREA

6m 6m 4m 5m 7m 8mSUBSOILSTORAGE

PIPETRENCH

PIPE LAYINGAREA

CONSTRUCTIONEQUIPMENT

AREA

RUNNINGTRACK

TOP SOIL STORAGE

Filenam

e: C

:\U

SE

RS

\G

AR

ET

H.B

LO

OM

ER

\A

PP

DA

TA

\LO

CA

L\M

IC

RO

SO

FT

\W

IN

DO

WS

\T

EM

PO

RA

RY

IN

TE

RN

ET

F

ILE

S\C

ON

TE

NT

.O

UT

LO

OK

\F

8B

NL4A

5\F

IG

UR

E 4.10 - S

HT

7.D

WG

Last saved by: M

IC

HA

EL.S

AV

AG

E Last P

lotted: 2017-05-25

IS

O A

3 297m

m x 420m

m

Scott HouseAlençon Link, BasingstokeHampshire, RG21 7PPTelephone (01256) 310200Fax (01256) 310201www.aecom.com

AECOM

Project Title

Client

Purpose of Issue

Drawing Title

Drawn Checked Approved Date

Scale @ A3AECOM Internal Project No.

THIS DOCUMENT HAS BEEN PREPARED PURSUANT TO AND SUBJECT TO THETERMS OF AECOM'S APPOINTMENT BY ITS CLIENT. AECOM ACCEPTS NO LIABILITY

FOR ANY USE OF THIS DOCUMENT OTHER THAN BY ITS ORIGINAL CLIENT ORFOLLOWING AECOM'S EXPRESS AGREEMENT TO SUCH USE, AND ONLY FOR THE

PURPOSES FOR WHICH IT WAS PREPARED AND PROVIDED.

Drawing Number Rev

THIS DRAWING IS TO BE USED ONLY FOR THE PURPOSE OFISSUE THAT IT WAS ISSUED FOR AND IS SUBJECT TO AMENDMENT

Copyright

60506766

4.10_SHT 7

DCO APPLICATION

KC

01

EGGBOROUGH POWER LTD

MS

EGGBOROUGH CCGT DCO

RW

NOTES

1. DIMENSIONS ARE INDUCTIVE.

APPLICATION DOCUMENT REF. NO. 4.10 SHEET 7

INDICATIVE GAS SUPPLY PIPELINECONNECTION WORKS TYPICAL CROSS

SECTION OF CONSTRUCTION CORRIDOR

20.05.2017

INFRASTRUCTURE PLANNING (APPLICATIONS:PRESCRIBED FORMS AND PROCEDURES)REGULATIONS 2009 -REGULATION 5(2)(O).