APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1...

113
APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports Class 1 component supports have been included within Appendix F. Class 2 component supports have been included within Appendix G. Class 3 component supports have been included within Appendix H. Salem Unit 1 ISl PROGRAM - LTP 3rd INTERVAL I- I REV. 0 CHG. 0

Transcript of APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1...

Page 1: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

APPENDIX I

ISI Long Term Plan (Class 1,2,3) Component Supports

Class 1 component supports have been included within Appendix F.

Class 2 component supports have been included within Appendix G.

Class 3 component supports have been included within Appendix H.

Salem Unit 1 ISl PROGRAM - LTP 3rd INTERVAL

I- I REV. 0 CHG. 0

Page 2: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

APPENDIX J

ISI Long Term Plan (Pressure Tests)

Salem Unit I ISI PROGRAM - LTP J- 1 3rd INTERVAL

REV. 0 CHG. 0

Page 3: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

PSE&G IS' PUBLIC SERVICE ELEC. & GAS

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN SUMMARY NUMBERS 950000 THROUGH 959900

July 16, 2001 REVISION 0

repared By: Date

,eer AReview:C- e; . -4:5 Date 7/ 0

MIl e 'ew: Date 0-

Page 4: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS 1 ALL STATUS COMPONENTS

PRESSURE TEST

INSPECTION INTERVAL_

ASME

SEC. XI SUMMARY EXAMINATION AREA CATEGY NDE NUMBER IDENTIFICATION ITEM NO METH

CLASS 1 SYSTEMS (REF. DWG. NO. N/A)

PLAN STATUS

FIRST SECOND THIRD PERIOD PERIOD PERIOD

-OUT AGE1 2 34 12 34 1 23 4

INSTRUCTIONS **CALIBRATION BLOCK"t

950000 SPT-1-RC-001

ALL CLASS 1 SYSTEMS

B-P VT-2 1 -

2 C C 3 X X -

"**PERFORMED IN MODE

C CC

X X -

C C -

X x

01RF - NDE TO BE PERFORMED UNDER W/O# 50010116. THE FOLLOWING NOTIFICATIONS WERE GENERATED FOR MINOR PACKING

LEAKS. 20066123 - 20066124 - 20066125 - 20066184 - 20066185 - 20066186 - 20066147 - 20066178 - 20066179

20066180 AND 20066191.

95RF - W.O.#950716013-01 TO PERFORM VT-2.

99RF - W.O.# 50002947 TO PERFORM NDE.

#11 AIW PUMP AND PIPING BOUNDED BY 11AF3... (REF. DWG. NO. N/A)

950050 SPT-1-AF-001

(AF) AUXILIARY FEED

WATER SYSTEM

D-B VT-2 1- - ------2 c - C -3 x - X -

C X

BOUNDARY CONT'D:

12AF923, 13 & 14AF921 &

I1AF101 RECIRC. RETURN

TO THE AFST. **PERFORMED

IN MODE 3.**

99RF - W.O.#50000402-0050 TO PERFORM NDE.

#12 AFW PUMP AND PIPING BOUNDED BY 12AF3... (REF. DWG. NO. N/A)

950100 SPT-1-AF-002

(AF) AUXILIARY FEED

WATER SYSTEM

D-B VT-2 1 2 C 3 x - -

C -- - X - -

C X

BOUNDARY CONTVD: 11 &

12AF23. **PERFORMED IN

MODE 3.**

99RF - W.O.#50000402-0050 TO PERFORM NDE.

BOUNDED BY IAF3, 1AF42 & 11-14AF86 (REF. DWG. NO. N/A)

950150 SPT-1-AF-003

(AF) AUXILIARY FEED

WATER SYSTEM

D-B VT-2 1

2 C 3 x

"**PERFORMED IN MODE

C - - C - - X - - - X -

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730.

95RF - W.O.#950526019-15 TO PERFORM VT-2.

PAGE: 1

Page 5: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

PRESSURE TEST

PAGE: 2SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS 3 ALL STATUS COMPONENTS

INSPECTION INTERVAL_ p

ASME FIRST

SEC. XI PERIOD

SUMMARY EXAMINATION AREA CATEGY NDE- ------ 0 NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1

BOUNDED BY 11 & 12AF3, 13AF3 & AFWST (REF. DWG. NO. N/A)

LAN STATUS

SECOND THIRD PERIOD PERIOD

U T A G E 2 3 4 1 2 3 4

INSTRUCTIONS "**CALIBRATION BLOCK**

950200 SPT-1-AF-004

(AF) AUXILIARY FEED

WATER SYSTEM

D-B VT-2 1 2 C 3 x

99RF - W.O.#50000402-0050 TO PERFORM NDE.

FEED WATER FOR 11 SIG (REF. DWG. NO. N/A)

950225 SPT-1-BF-001

(BF) BOILER FEED

SYSTEM

C-H VT-2 1 2 c 3 x

**PERFORMED IN MODE 3.**C - -

K - - -

C - X

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

FEED WATER FOR 12 S/G (REF. DWG. NO. N/A)

950230 SPT-1-BF-002

(BF) BOILER FEED

SYSTEM

C-H VT-2 1 2 C 3 x

"**PERFORMED IN MODE

3. **- C - -- - - -

C -X - -

O1RF - NDE TO BE PERFORMED UNDER W/O# 50009730

FEED WATER FOR 13 SIG (REF. DWG. NO. N/A)

950235 SPT-1-BF-003

(BF) BOILER FEED

SYSTEM

C-H VT-2 1 -2c 3 x

**PERFORMED IN MODE 3.**C - -

K - - -

C

X

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

FEED WATER FOR 14 S/G (REF. DWG. NO. N/A)

950240 SPT-1-BF-004

(BF) BOILER FEED

SYSTEM

C-H VT-2 1 -2 C 3 x

**PERFORMED IN MODE 3.**- - C - -

- - X - - -

C

X -

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

cC - -

KX -- - -

Page 6: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS 2 ALL STATUS CCKMPONENTS

PRESSURE TEST

INSPECTION INTERVAL- PLA

ASME FIRST SE

SEC. XI PERIOD PE

SUMMARY EXAMINATION AREA CATEGY NDE O-----------0 U NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2

BOUNDED BY 11 & 12CA330 & 11 & 12CA543 (REF. DWG. NO. N/A)

950250 SPT-1-CA-001

(CA) CONTROL AIR

C-H VT-2 1 2 C 3 x

NSTATUS

COND RIOD

TAGE G

3 4

C X

THIRD PERIOD

1 2 3 4

C X

INSTRUCTIONS "**CALIBRATION BLOCK"*

THIS SPT TO INCLUDE THE

LEAK RATE TESTING OF

TUBING BETWEEN VALVES

ICA1714 / 1CA1715 AND

THE 100' & 130'

PERSONNEL AIRLOCK DOOR

SEALS TO SATISFY ASME

SECTION XI (REF. PR#

980402325, AND P&ID

205247, SHT. 1)

**PERFORMED IN MODE 3.**

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730.

BOUNDED BY 1CA1714 AND AIRLOCK DOOR SEALS (REF. DWG. NO. N/A)

950260 SPT-1-CA-002

(CA) CONTROL AIR

C-H VT-2 1 -

2 - - -3 - K - - - X -

C

X

THIS SPT TO INCLUDE THE

LEAK RATE TESTING OF

TUBING BETWEEN VALVES

1CA1714 AND THE 100'

PERSONNEL AIRLOCK DOOR

SEALS TO SATISFY ASME

SECTION XI (REF. PR#

980402325, AND P&ID

205247, SHT. 1)

**PERFORMED IN MODE 3.**

01RF - ORDER# 50009730 TO PERFORM VT-2.

BOUNDED BY 1CA1715 AND AIRLOCK DOOR SEALS (REF. DWG. NO. N/A)

950270 SPT-1-CA-003

(CA) CONTROL AIR

C-H VT-2 1 -

2 - - -

3-Kx - - - X -

C

X

THIS SPT TO INCLUDE THE

LEAK RATE TESTING OF

TUBING BETWEEN VALVES

1CA1715 AND THE 130'

PERSONNEL AIRLOCK DOOR

SEALS TO SATISFY ASME

SECTION XI (REF. PR#

980402325, AND P&ID

205247, SHT. 1)

**PERFORMED IN MODE 3.**

01RF - ORDER# 50009730 TO PERFORM VT-2.

PAGE: 3

Page 7: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

PRESSURE TEST

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS 3 ALL STATUS COMPONENTS

INSPECTION INTERVAL- PLAN S

ASME FIRST SECON

SEC. XI PERIOD PERIO

SUMMOARY EXAMINATION AREA CATEGY NDE ------------ 0 U T A NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3

BOUNDED BY 1CC66, 1CC72 & #12 LETDOWN HX. (REF. DWG. NO. N/A)

950300 SPT-1-CC-001

(CC) COMPONENT COOLING

SYSTEM

D-B

TATUS

UD THIRD )D PERIOD

GE4-----4 1 2 34

VT-2 1------------

2 c - - -c-3 X - - - X - - --X--

INSTRUCTIONS **CALIBRATION BLOCK**

**PERFORpME IN MODE

3.**

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730.

BOUNDED BY 11CC6, 11CC8 & #11 CCWHX. (REF. DWG. NO. N/A)

950350 SPT-1-CC-002

(CC) COMPONENT COOLING

SYSTEM

D-B VT-2 1 -

2C - -3 x - - -

"**PERFORMED IN MODE

C - -

IC - - -

C -

X - -

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730.

BOUNDED BY 1CC6, 12CCB & 12CCWHX (REF. DWG. NO. N/A)

950400 SPT-1-CC-003

(CC) COMPONENT COOLING

SYSTEM

D-B VT-2 1------------2 C - - - C- - C--3 x - -- x ---X--

**PERFORMED IN MODE

1.**

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730.

BOUNDED BY SPENT FUEL SX, MS RAD MONITORS... (REF. DWG. NO. N/A)

950450 SPT-1-CC-004

(CC) COMPONENT COOLING

SYSTEM

D-B VT-2 1 -

2 C - -3x - - -

C - -

X - - -

C

X

BOUNDARY CONTID: POST

LOCA SAMPLE COOLERS, BAE

& WASTE GAS COMPRESSORS.

**PERFORMED IN MODE 1.**

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. VT-2 EXAM NOTED LEAK AT VALVE 12CC3

REPAIR UNDER NOTIFICATION # 60000581.

BOUNDED BY 1CC911 & 1CC313 INSIDE OF CONTAINMENT (REF. DWG. NO. N/A)

AND A CATCH BAG/ MAINT. TO

950500 SPT-1-CC-005

(CC) COMPONENT COOLING

SYSTEM

C-H/D-B VT-2 1 -2 C - -3 x - - -

- C -

- XC - -C

X

**PERFORMED IN MODE

3.**

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

PAGE: 4

Page 8: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS 3 ALL STATUS CCHPONENTS

INSPECTION INTERVAL_ PLAN STATUS

ASME FIRST SECOND THIRD

SEC. XI PERIOD PERIOD PERIOD

SUMMARY EXAMINATION AREA CATEGY NDE ------------ 0 U T A G E------NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4

BOUNDED BY #1 CONTROL RM A/C UNIT, #1 EXPANSION... (REF. DWG. NO. N/A)

950550 SPT-1-CH-001

(CH) CHILLED WATER

SYSTEM

D-B VT-2 1- - ------

2 C - - - C - -3X - - - X - - -

C

X

PAGE: 5

INSTRUCTIONS "**CALIBRATION BLOCK**

BOUNDARY CONT'D: TANK &

11 - 13 CHILLER UNITS.

"**PERFORMED IN MODE 1.**

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730.

BOUNDED BY #1 ECAC & MS RAD MONITORS FOR THE S/G (REF. DWG. NO. N/A)

950600 SPT-1-CH-002

(CH) CHILLED WATER

SYSTEM

D-B VT-2 1---------2 C - - C 3 x - - - X

C

X

**PERFORMED IN MODE

1.**

01RF - ORDER# 50009730 TO PERFORM NDE.

BOUNDED BY 1CS16, 1CS17 & SPRAY ADDITIVE TANK (REF. DWG. NO. N/A)

950650 SPT-1-CS-001

(CS) CONTAINMENT SPRAY

SYSTEM

D-B VT-2 1---------2 C - - C

3 x - - - x

**PERFORMED IN MODE

C

X

01RF - ORDER# 50009730 TO PERFORM NDE. VALVE 1CS58 WAS NOTED WITH WHITE CRYSTAL LIKE SUBSTANCE MAINT. TO REPAIR

UNDER NOTIFICATION# 20047881.

BOUNDED BY DISCH OF 11 & 12 CS PMPS TO ... (REF. DWG. NO. N/A)

950700 SPT-1-CS-002

(CS) CONTAINMENT SPRAY

SYSTEM

D-B VT-2 1 -

2c - -3x - - -

C - -

X - - -

C X

BOUNDARY CONT'D: 11 &

12CS2, EDUCTOR AND

RECIR. LINE. **PERFORMED

IN MODE 5.**

01RF - ORDER# 50009730 TO PERFORM NDE.

BOUNDED BY 11 & 12CS2 THRU THE TEMP. PIPING... (REF. DWG. NO. N/A)

950750 SPT-1-CS-003

(CS) CONTAINMENT SPRAY

SYSTEM

C-H VT-2 1 ------------2 - - - C C

3 x - -- -X X

BOUNDARIES CONT'D:

DURING THE CONTAINMENT

SPRAY FULL FLOW TEST.

**PERFORMED IN MODE 5.**

01RF - ORDER# 50009730 TO PERFORM NDE.

DATE: 07/16/2001

REVISION: 0

PRESSURE TEST

Page 9: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS 2 ALL STATUS COMPONENTS

PRESSURE TEST

INSPECTION INTERVAL_ PLAN ST

ASME FIRST SECOND

SEC. XI PERIOD PERIOD

SUOMMARY EXAMINATION AREA CATEGY NDE - ----------- 0 U T A NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3

BOUNDED BY 1CS900, 1CS901, 1CS902 & ICS903 (REF. DWG. NO. N/A)

950800 SPT-1-CS-004

(CS) CONTAINMENT SPRAY

SYSTEM

C-H

ATUS

GE 4

VT-2 1- - ------

2 C - - - C - -3 X - - X- - -

THIRD

PERIOD

1 2 3 4

C

X

INSTRUCTIONS "**CALIBRATION BLOCK**

PERFORM THIS SPT DURING

THE LLRT. **PERFORMED IN

MODE 5.**

01RF - ORDER# 50009730 TO PERFORM NDE.

BORIC ACID RECIRC. (100' & 120'), VCT ROOM ... (REF. DWG. NO. N/A)

950850 SPT-1-CV-001

(CVC) CHEMICAL VOLUME

CONTROL SYSTEM

C-H VT-2 1- - ------

2 - - - C - -3x- - - x- - -

C X

BOUNDARY CONT' D:

CHARGING PUMP AREA,

BORIC ACID STORAGE TANK

AREA (20' AUX).

"**PERFORMED IN MODE 3.**

01RF - ORDER# 50009730 TO PERFORM NDE.

CVC PIPING (REF. DWG. NO. N/A)

950900 SPT-1-CV-002

(CVC) CHEMICAL VOLUME

CONTROL SYSTEM

C-H VT-2 1 2

3C - - - C - -

X - - - X - - -

C X

"**PERFORMED IN MODE

3.**

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

BOUNDED BY 1CV64, ICV53, 1CV82, 1CV48... (REF. DWG. NO. N/A)

950950 SPT-1-CV-003

(CVC) CHEMICAL VOLUME

CONTROL SYSTEM

C-H VT-2 1 2 3

C - -

x - - -

C - X -

- c

- X -

BOUNDARY CONT'D: AND 11

THRU 14CV99. **PERFORMED

IN MODE 3.**

01RF - ORDER# 50009730 TO PERFORM NDE. VT-2 EXAM NOTED VALVES 1CV82 AND 1CV56 WITH PACKING LEAKAGE, MAINT. TO

REPAIR UNDER NOTI. # 20047882 AND 20047884 VALVE ICV124 NOTED FLANGE TO FLANGE LEAK, NOT.# 20053014 WAS

WRITTEN TO PULL BOLT AND PERFORM VT-3.

#11 CENTRIFUGAL CHARGING PUMP (REF. DWG. NO. N/A)

951000 SPT-1-CV-004

(CVC) CHEMICAL VOLUME

CONTROL SYSTEM

C-H VT-2 1-2c - -3x- - -

"**PERFORMED IN MODE 3.**C -

X - -- C -- X -

01RF - ORDER# 50009730 TO PERFORM NDE. VT-2 EXAMINATION NOTED BORON BUILD UP ON DISCHARGE FLANGE TO FLANGE

CONNECTION NOTIFICATION# 20031941 WAS WRITTEN TO PULL BOLT AND PERFORM VT-3.

PAGE: 6

Page 10: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

PRESSURE TEST

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS 2 ALL STATUS COMPONENTS

INSPECTION INTERVAL_

ASME FIRST

SEC. XI PERIOD

SUMMARY EXAMINATION AREA CATEGY NDE - - -NUMBER IDENTIFICATION ITEM NO METH 1 2 3

#12 CENTRIFUGAL CHARGING PUMP (REF. DWG. NO. N/A)

PLAN STATUS

SECOND THIRD PERIOD PERIOD

-- OUTAGE

4 1 2 3 4 1 2 3 4INSTRUCTIONS

**CALIBRATION BLOCK**

951050 SPT-1-CV-005

(CVC) CHEMICAL VOLUME

CONTROL SYSTEM

C-H VT-2 1 -

2c - -3 x - - -

**PERFORMED IN MODE

C -

- X- C -

- X - -

01RF - ORDER# 50009730 TO PERFORM NDE. VT-2 EXAM NOTED PACKING LEAK ON VALVE ICV82. MAINT. TO FIX UNDER

NOTIFICATION # 20047882.

#13 CENTRIFUGAL CHARGING PUMP (REF. DWG. NO. N/A)

951100 SPT-1-CV-006

(CVC) CHEMICAL VOLUME

CONTROL SYSTEM

C-H VT-2 1 -

2c - -3x - - -

C X

C -- X - -

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 #13 IS OUT OF SERVICE AND WILL REMAIN OUT

AS PER CR980915258.

THIS EXAM IS FOR THE

#13 CHRG PUMP WHICH IS

ABANDONED IN PLACE AND

PERMANENTLY TAGGED OUT

AND ALSO CONSIDERED

ABANDONED IN PLACE. DO

NOT DELETE FROM LTP

UNTIL DESIGN REVISED TO

CUT & CAP. **PERFORMED

IN MODE 3.**

OF SERVICE INDEFINITELY

BOUNDED BY 1DR30 & 1DR29 (REF. DWG. NO. N/A)

951150 SPT-1-DR-001

(DR) DEMINERALIZED

WATER SYSTEM

C-H VT-2 1------------2 C - - - C C--3 x - - - X X---

"**PERFORMED IN MODE

3.**

01RF - ORDER# 50009730 TO PERFORM NDE. VT-2 EXAM WAS PERFORM TWICE THE SECOND AT A HIGHER PRESSURE.

BOUNDED BY 1FP275 & 1FP147 (REF. DWG. NO. N/A)

951200 SPT-1-FP-001

(FP) FIRE PROTECTION

SYSTEM

C-H VT-2 1------------2 c - - - C C -3 x - - - X X - -

**PERFORMED IN MODE

3.**

01RF - ORDER# 50009730 TO PERFORM NDE.

PAGE: 7

Page 11: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS 2 ALL STATUS COMPONENTS

PRESSURE TEST

INSPECTION INTERVAL PLAN STATUS

ASME FIRST SECOND

SEC. XI PERIOD PERIOD

SUMMARY EXAMINATION AREA CATEGY NDE O----------- 0 U T A G E NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4

BOUNDED BY 11-14 S/G BLOWDOWN LINES TO 11-14GB4 (REF. DWG. NO. N/A)

THIRD PERIOD

1 2 3 4INSTRUCTIONS

**CALIBRATION BLOCK**

951250 SPT-1-GB-001

(GB) GENERATOR

BLOWDOWN SYSTEM

C-H VT-2 1 -

2C - -

3x - - -

"**PERFORMED IN MODE 3. **C - -

X - - -- C - X - -

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

#11-14 S/G MAIN STEAM PIPING (REF. DWG. NO. N/A)

951300 SPT-1-MS-001

(MS) MAIN STEAM SYSTEM

C-H/D-B VT-2 1----------2 C - - - C 3 X -X - - x

**PERFORMED IN MODE 3.**

01RF - ORDER# 50009730 TO PERFORM NDE.

BOUNDED BY IMS201 & 13MS45 (REF. DWG. NO. N/A)

951350 SPT-1-MS-002

(MS) MAIN STEAM SYSTEM

D-B VT-2 1 -

2C - -3 x - - -

**PERFORMED IN MODE

C X

- C - X

O0RF - NDE TO BE PERFORMED UNDER W/O# 50009730.

BOUNDED BY 1NT25 TO THE PRT (REF. DWG. NO. N/A)

951400 SPT-1-RC-003

(RC) REACTOR COOLANT

SYSTEM

C-H VT-2 1 -

2c - -3x - - -

C - - C

X - - X

**PERFORMED IN MODE

5.**

01RF - ORDER# 50009730 TO PERFORM NDE.

BOUNDED BY 1PR17 & IPRI8 (REF. DWG. NO. N/A)

951450 SPT-1-RC-004

(RC) REACTOR COOLANT

SYSTEM

C-H VT-2 1 2C - -

3x- - -

C

X- C -- X -

SPT PERFORMED DURING THE

LLRT. **PERFORMED IN

MODE 3.**

01RF - ORDER# 50009730 TO PERFORM NDE.

PAGE: 8

Page 12: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

PRESSURE TEST

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS 2 ALL STATUS COMPONENTS

INSPECTION INTERVAL_

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY NDE NUMBER IDENTIFICATION ITEM NO METH

BOUNDED BY 1PR25 (REF. DWG. NO. N/A)

951500 SPT-1-RC-005

(RC) REACTOR COOLANT

SYSTEM

C-H

PLAN STATUS

FIRST SECOND THIRD PERIOD PERIOD PERIOD

-OUT AGE1 2 34 1 234 1 23 4

VT-2 1-----------2 C - - - C C 3 x - - - x x

INSTRUCTIONS **CALIBRATION BLOCK**

SPT PERFORMED DURING THE

LLRT. **PERFORMED IN

MODE 3.**

01RF - ORDER# 50009730 TO PERFORM NDE.

BOUNDED BY SUCTION FROM #11 HOT LEG THRU #11... (REF. DWG. NO. N/A)

951550 SPT-1-RH-001

(RE) RESIDUAL HEAT

REMOVAL SYSTEM

C-H VT-2 1------------

2 C - - C C 3 x - - - X X

01RF - ORDER# 50009730 TO PERFORM NDE. VT-2 EXAM NOTED DRIED BORON ON #11 RHR PUMP SHAFT.

UNDER NOTIFICATION #20062679.

BOUNDED BY 12RH4 THRU 12 RHR PUMP LOOP TO HOT... (REF. DWG. NO. N/A)

BOUNDARY CONT D: RHR

LOOP TO 13RH27.

**PERFORMED IN MODE 4.**

MAINT TO PERFORM REPAIRS

951600 SPT-1-RH-002

(RH) RESIDUAL HEAT

REMOVAL SYSTEM

C-H VT-2 1-- -------

2 C - - - C 3 x - - x

C X

BOUNDARY CONT'D: LEGS

THRU 1RH26. **PERFORMED

IN MODE 4.**

O1RF - NDE TO BE PERFORMED UNDER W/O# 50009730.

BOUNDED BY 1SA118 & 1SA119 (REF. DWG. NO. N/A)

951650 SPT-1-SA-001

(SA) STATION AIR

SYSTEM

C-H VT-2 1-- -------2 C - - C

3 x - - - x

**PERFORMED IN MODE 5.**C

X

01RF - ORDER# 50009730 TO PERFORM NDE.

BOUNDED BY 1SA262, 1SA264, 1SA265, 1SA267... (REF. DWG. NO. N/A)

951700 SPT-1-SA-002

(SA) STATION AIR

SYSTEM

C-H VT-2 1 -

2c - -

3x - - -C - -

x - - -

C -

X - -

BOUNDARY CONT'D: ISA268

& ISA270. THIS SPT TO

BE PERFORMED DURING THE

LLRT. **PERFOMaED IN

MODE 5.**

01RF - ORDER# 50009730 TO PERFORM NDE.

PAGE: 9

Page 13: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS 23 ALL STATUS COMPONENTS

PRESSURE TEST

INSPECTION INTERVAL_ PLAN STA

ASME FIRST SECOND

SEC. XI PERIOD PERIOD

SUMMARY EXAMINATION AREA CATEGY NDE ------------ 0 U T A G NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3

INSPECTION BOUNDARY SHOWN ON DRWG 603233-01 (REF. DWG. NO. N/A)

ITUS

THIRD PERIOD

4 1 2 34INSTRUCTIONS

**CALIBRATION BLOCK**

951750 SPT-1-SF-001

(SF) SPENT FUEL SYSTEM

C-H/D-B VT-2 1------------

2 c - - C - - --- C 3 X - --- X - -- -X

**PERFORMED IN MODE

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. VT-2 EXAMINATION NOTED A TUBING LEAK AT

REPAIRS UNDER NOTIFICATION# 20046652.

1FI656. MAINT. TO DO

BOUNDED BY THE RWST & PUMP SUCTION PIPING (REF. DWG. NO. N/A)

951800 SPT-1-SJ-001

(SJ) SAFETY INJECTION

SYSTEM

C-H/D-B VT-2 1- - ------2C - - C -3X - - X - -

**PERFORMED IN MODE

- C - X

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730.

BOUNDED BY 11-14 ACCUMULATOR & 1SJ60 (REF. DWG. NO. N/A)

951850 SPT-1-SJ-002

(SJ) SAFETY INJECTION

SYSTEM

D-B VT-2 1--------------3 1 - - - - C 3K---------------

- C -

- KX

**PERFORMED IN MODE

3.**

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. VT-2 EXAM NOTED VALVE 12SJ266 HAS DRIED

PERFORM REPAIRS UNDER NOTIFICATIO 3 20054356.

BOUNDED BY 11 & 12 SJ44 TO SUCTION OF RHR PUMPS (REF. DWG. NO. N/A)

BORON ON IT. MAINT. TO

951900 SPT-1-SJ-003

(SJ) SAFETY INJECTION

SYSTEM

C-H VT-2 1 2 C --- C ---- C 3 x - -X - - X

"**PERFORMED IN MODE

5.**

01RF - ORDER# 50009730 TO PERFORM NDE. VT-2 EXAM NOTED DRIED BORON ON I1RER PUMP SHAFT MAINT. TO REPAIR UNDER

NOTIFICATION #20062679.

BOUNDED BY 11 SI PUMP SUCT. & DISCH... (REF. DWG. NO. N/A)

951950 SPT-1-SJ-004

(SJ) SAFETY INJECTION

SYSTEM

C-H VT-2 1------------2 C -C C -3 x - -X - - - X -

BOUNDARY CONT'D: VALVES

11SJ40 , 11SJ134 &

12SJ33. **PERFORMED IN

MODE D.**

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730.

PAGE: 10

Page 14: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS 2 ALL STATUS COMPONENTS

PRESSURE TEST

INSPECTION INTERVAL

SUMMARY EXAMINATION AREA NUMBER IDENTIFICATION

BOUNDED BY #12 SI PUMP

952000 SPT-1-SJ-005

(SJ) SAFETY INJECTION

SYSTEM

PLAN

ASME FIRST SEC

SEC. XI PERIOD PER

CATEGY NDE O----------- 0 U T ITEM NO METH 1 2 3 4 1 2

SUCT. & DISCH... (REF. DWG. NO. N/A)

C-E

*STATUS

OND IOD

AGE

3 4

VT-2 1- - ------2 C - - - C 3 x - - - X

THIRD

PERIOD

1 2 3 4

C -

- X - -

INSTRUCTIONS **

CALIBRATION BLOCK**

BOUNDARY CONT D: VALVES

12SJ40, 12SJ134 &

12SJ33. **PERFORMED IN

MODE D.**

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730.

BOUNDED BY 11SJ40 TO THE HOT LEG (REF. DWG. NO. N/A)

952050 SPT-1-SJ-006

(SJ) SAFETY INJECTION

SYSTEM

B-P VT-2 2 C -- --- C 3 x - - - X

"**PERFORMED IN MODE D.**C

X -

01RF - NDE TO BE PERFORMED UNDER WI/O# 50009730

BOUNDED BY 12SJ40 TO THE HOT LEG (REF. DWG. NO. N/A)

952100 SPT-1-SJ-007

(SJ) SAFETY INJECTION

SYSTEM

B-P VT-2 1 2 C - - ---C-3 x - - - X

**PERFORMED IN MODE D. **-- C -

X

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

BOUNDED BY 11 & 12SJ134 TO THE COLD LEG (REF. DWG. NO. N/A)

952150 SPT-1-SJ-008

(SJ) SAFETY INJECTION

SYSTEM

B-P/C-H VT-2 1 -

3 x - - -

C - X -

C

X

**PERFORMED IN MODE

D. **

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

FROM C/SI PMPS THRU BIT TO COLD LEGS (REF. DWG. NO. N/A)

952200 SPT-1-SJ-009

(SJ) SAFETY INJECTION

SYSTEM

B-P/C-H VT-2 1------------2 C C - - C 3 x X - - - X -

**PERFORMED IN MODE

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

PAGE: 11

Page 15: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS 2 ALL STATUS CCMPONENTS

PRESSURE TEST

INSPECTION INTERVAL

ASME F)

SEC. XI PE

SUMMARY EXAMINATION AREA CATEGY NDE NUMBER IDENTIFICATION ITEM NO METH 1 2

BOUNDED BY lSS64 & ISSI10 (REF. DWG. NO. N/A)

PLAN STATUS

IRST SECOND THIRD "RIOD PERIOD PERIOD

---- OUTAGE--------S3 4 1 2 34 1 23 4

INSTRUCTIONS **CALIBRATION BLOCK**

952250 SPT-1-SS-001

(SS) SAMPLING SYSTEM

C-H VT-2 1 2C -C 3 x -

**PERFORMED IN MODE

- C C -- X X - -

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730.

BOUNDED BY lSS49 & lSS107 (REF. DWG. NO. N/A)

952300 SPT-1-SS-002

(SS) SAMPLING SYSTEM

C-H VT-2 1------------2 C - - - C C -3 x - - - X X - -

"**PERFORMED IN MODE

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. VT-2 EXAM NOTED VALVES lSS49 AND lSS107 HAD PACKING LEAKS. MAINT.

TO PERFORM REPAIRS UNDER NOTIFICATIONS # 20049912 AND 20054437.

BOUNDED BY lSS33 & ISS104 (REF. DWG. NO. N/A)

952350 SPT-1-SS-003

(SS) SAMPLING SYSTEM

C-H VT-2 I---------- - --2 C - - - C C -3 x x - - XX - -

**PERFORMED IN MODE

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. VT-2 EXAM NOTED VALVE lSS33 WITH PACKING LEAK MAINT. TO DO REPAIRS

UNDER NOTIFICATION # 20049913.

BOUNDED BY ISS27 & lSS103 (REF. DWG. NO. N/A)

952400 SPT-1-SS-004

(SS) SAMPLING SYSTEM

C-H VT-2 1------------2 C - - C -

3 x - -- - - x- X -

"**PERFORMED IN MODE

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730.

95RF - W.O.#950501065-01 TO PERFORM VT-2.

BOUNDED BY llSS93 & llSS94 (REF. DWG. NO. N/A)

952450 SPT-1-SS-005

(SS) SAMPLING SYSTEM

C-H VT-2 1- - ------

2 C - - - C - -3 x - - X- - -

**PERFORMED IN MODE

C X

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730.

PAGE: 12

Page 16: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS 2 ALL STATUS COMPONENTS

PRESSURE TEST

INSPECTION INTERVAL PLAN STATUS

ASME FIRST SECOND

SEC. XI PERIOD PERIOD

SUMMOARY EXAMINATION AREA CATEGY NDE O----------- 0 U T A G E NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4

BOUNDED BY 12SS93 & 12SS94 (REF. DWG. NO. N/A)

THIRD PERIOD

1 2 3 4INSTRUCTIONS

**CALIBRATION BLOCK**

952500 SPT-1-SS-006

(SS) SAMPLING SYSTEM

C-H VT-2 1 -

2 C - -3 x - - -

C

XC

- X - -

"**PERFORMED IN MODE

3.**

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730.

BOUNDED BY 13SS93 & 13SS94 (REF. DWG. NO. N/A)

952550 SPT-1-SS-007

(SS) SAMPLING SYSTEM

C-H VT-2 1 -

2c 3X -

"**PERFORMED IN MODE

3. **C C -

X X - -

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730.

BOUNDED BY 14SS93 & 14SS94 (REF. DWG. NO. N/A)

952600 SPT-1-SS-008

(SS) SAMPLING SYSTEM

C-H VT-2 1 -

2C 3X -

**PERFORMED IN MODE 3.**C

XC -

X - -

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730.

BOUNDED BY 11VC17 & 11VC19 (REF. DWG. NO. N/A)

952650 SPT-I-SS-009

(SS) SAMPLING SYSTEM

C-H VT-2 1 -

2C 3X -

C X

C -X - -

SPT TO BE PERFORMED

DURING LLRT. **PERFORMED

IN MODE 5.**

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730.

BOUNDED BY 11VC18 & 11VC20 (REF. DWG. NO. N/A)

952700 SPT-1-SS-010

(SS) SAMPLING SYSTEM

C-H VT-2 1 -

23 3 x -

C C -

X X - -

SPT TO BE PERFORMED

DURING LLRT. **PERFORMED

IN MODE 5.**

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730.

BOUNDED BY 12VC18 & 12VC20 (REF. DWG. NO. N/A)

952750 SPT-1-SS-011

(SS) SAMPLING SYSTEM

C-H VT-2 1 -

23 3 x

C - -

X - - -

C

X

SPT TO BE PERFORMED

DURING LLRT. **PERFORMED

IN MODE 5.**

01RF - W/O# 50009730 TO PERFORM NDE.

PAGE: 13

Page 17: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS 2 ALL STATUS COMPONENTS

PRESSURE TEST

INSPECTION INTERVAL_

ASME FiP

SEC. XI PEP

SUOEARY EXAMINATION AREA CATEGY NDE NUMBER IDENTIFICATION ITEM NO METE 1 2

BOUNDED BY 12VC17 & 12VC19 (REF. DWG. NO. N/A)

952800 SPT-1-SS-012

(SS) SAMPLING SYSTEM

C-H

PLAN STATUS

tST SECOND THIRD LIOD PERIOD PERIOD

---- OUTAGE3 4 1 2 34 1 234

VT-2 1 -- ------

2c - - - C - -3 x - - - X - - -

- C - X

INSTRUCTIONS **

C ALIBRATION BLOCK**

SPT TO BE PERFORMED

DURING LLRT. **PERFORMED

IN MODE 5.**

01RF - W/O# 50009730 TO PERFORM NDE. VT-2 EXAM NOTED PACKING LEAK ON VALVE 12VC19 MAINT. TO REPAIR UNDER NOTIF#

20062509.

BOUNDED BY 13SS181 & 13SS182 (REF. DWG. NO. N/A)

952850 SPT-1-SS-013

(SS) SAMPLING SYSTEM

C-H VT-2 1 -

2 C - -3 x - - -

"**PERFORMED IN MODE 5.**C - -

X - - -- C - X

01RF - ORDER# 50009730 TO PERFORM NDE. VT-2 EXAM NOTED DRY BORON PACKING LEAK ON VALVE

REPAIRS UNDER NOTIFICATION #20053313.

13 SS 181 MAINT. TO PERFORM

BOUNDED BY llSS181 & llSS182 (REF. DWG. NO. N/A)

952900 SPT-1-SS-014

(SS) SAMPLING SYSTEM

C-H VT-2 1------------

2 C - C - - --- C 3 X - - - X X

**PERFORME IN MODE

5.**

01RF - ORDER# 50009730 TO PERFORM NDE. VT-2 EXAM NOTED DRY BORON PACKING LEAK ON VALVE

REPAIRS UNDER NOTIFICATION #20053318.

11 SS 181 MAINT. TO PERFORM

BOUNDED BY 13SS184 & 13SS185 (REF. DWG. NO. N/A)

952950 SPT-1-SS-015

(SS) SAMPLING SYSTEM

C-H VT-2 1 -

2c - -3x - - -

- C X -

- C - X

01RF - ORDER# 50009730 TO PERFORM NDE. VT-2 EXAM NOTED DRY BORON PACKING LEAK ON VALVE

MAINT. TO PERFORM REPAIRS UNDER NOTIFICATION #20053316 AND 20062827.

95RF - W.O.#950501062-01 TO PERFORM VT-2.

BOUNDED BY 11SS188 & 11SS189 POST LOCA SAMPLING (REF. DWG. NO. N/A)

"**PERFORMED IN MODE

5.**

13 SS 184 AND 13 SS 185

953000 SPT-1-SS-016

(SS) SAMPLING SYSTEM

C-H VT-2 1------------

2 c - C C 3 X K --- X - -- X

**PERFORMED IN MODE

01RF - ORDER# 50009730 TO PERFORM NDE. VT-2 EXAM NOTED DRY BORON PACKING LEAK ON VALVE

REPAIRS UNDER NOTIFICATION #20053320.

11 SS 189 MAINT. TO PERFORM

PAGE: 14

Page 18: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

PRESSURE TEST

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS 3 ALL STATUS COMPONENTS

INSPECTION INTERVAL PLAN STATUS

ASME FIRST SECOND

SEC. XI PERIOD PERIOD

SUMMARY EXAMINATION AREA CATEGY NDE ------------ 0 U T A G E NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4

BOUNDED BY S.W. INTAKE DISCH. HDRS BAYS 1 & 2 (REF. DWG. NO. N/A)

THIRD PERIOD

1 2 3 4

PAGE: 15

INSTRUCTIONS **CALIBRATION BLOCK**

953050 SPT-1-SW-001

(SW) SERVICE WATER

SYSTEM

D-B VT-2 1-2 C - -3 x - - -

C C X X - -

**PERFORMED IN MODE

1.**

01RF - ORDER# 50009730 TO PERFORM NDE.

BOUNDED BY #13 S.W. PUMP & STRAINER (REF. DWG. NO. N/A)

953100 SPT-1-SW-002

(SW) SERVICE WATER

SYSTEM

D-B VT-2 1-2 C - -3 x - - -

C - - - C - -

X - - - X - - -

99RF - W.o.#50000402-0050 TO PERFORM NDE.

BOUNDED BY #12 S.W. PUMP & STRAINER (REF. DWG. NO. N/A)

953150 SPT-1-SW-003

(SW) SERVICE WATER

SYSTEM

D-B VT-2 1 -

2C 3X -

- C - - X -

C - -

**PERFORMED IN MODE

1.**

01RF - ORDER# 50009730 TO PERFORM NDE.

BOUNDED BY #11 S.W. PUMP & STRAINER (REF. DWG. NO. N/A)

953200 SPT-1-SW-004

(SW) SERVICE WATER

SYSTEM

D-B VT-2 1 -

2 C - -3 x ---

C C X X -

**PERFORMED IN MODE

1.**

O1RF - ORDER# 50009730 TO PERFORM NDE.

BOUNDED BY #16 S.W. PUMP & STRAINER (REF. DWG. NO. N/A)

953250 SPT-1-SW-005

(SW) SERVICE WATER

SYSTEM

D-B VT-2 1 -

2 C - -

3 x - - -C - - - C X- - - X -

99RF - W.O.#50000402-0050 TO PERFORM NDE.

Page 19: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS 3 ALL STATUS CCOPONENTS

PRESSURE TEST

INSPECTION INTERVAL_

ASME FIRST

SEC. XI PERIOD

SUMMARY EXAMINATION AREA CATEGY NDE ------------ 0 NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1

BOUNDED BY #15 S.W. PUMP & STRAINER (REF. DWG. NO. N/A)

PLAN STATUS

SECOND THIRD PERIOD PERIOD

UTAGE

2 3 4 1 2 3 4INSTRUCTIONS

"**CALIBRATION BLOCK**

953300 SPT-1-SW-006

(SW) SERVICE WATER

SYSTEM

D-B VT-2 12 C - - - C 3 x--- x

C -X - -

01RF - ORDER# 50009730 TO PERFORM NDE.

BOUNDED BY #14 S.W. PUMP & STRAINER (REF. DWG. NO. N/A)

953350 SPT-1-SW-007

(SW) SERVICE WATER

SYSTEM

D-B VT-2 1 2 C - - - C 3 x - - - X

C X

01RF - ORDER# 50009730 TO PERFORM NDE.

BOUNDED BY #11 & 12 S.W HEADERS (REF. DWG. NO. N/A)

953400 SPT-1-SW-008

(SW) SERVICE WATER

SYSTEM

D-B VT-2 1- - ------2 C - - - C - -

3x - - - x - - -C

x

01RF - ORDER# 50009730 TO PERFORM NDE.

BOUNDED BY 1SW163 & 1SW181 (SS SJ PUMP LO COOLER) (REF. DWG. NO. N/A)

953450 SPT-1-SW-009

(SW) SERVICE WATER

SYSTEM

D-B VT-2 1--------------------2C - - - C - - - - C 32 - - - c -

01RF - NDE TO BE PERFORMED UNDER W/OS 50009730.

BOUNDED BY #11 RHR PUMP ROC4 COOLER (REF. DWG. NO. N/A)

953500 SPT-1-SW-010

(SW) SERVICE WATER

SYSTEM

D-B VT-2 1 -2c - -

3x - - -C - -

K - - -

C

X -

**PERFORMED IN MODE 1

THRU 5.**

01RF - ORDER# 50009730 TO PERFORM NDE. 1SW481 & 1SW485 WERE FOUND WITH A LEAK AT THE FLANGE-TO-TUBING THREADED

CONNECTION, MAINT. TO FIX UNDER NOTIF. # 20040015 & 20040016 RESPECTIVELY.

PAGE: 16

Page 20: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS 3 ALL STATUS COMPONENTS

PRESSURE TEST

INSPECTION INTERVAL PLAN STATUS

ASME FIRST SECOND THIRD

SEC. XI PERIOD PERIOD PERIOD

SUMMARY EXAMINATION AREA CATEGY NDE O----------- 0 U T A G E------NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4

BOUNDED BY 1SW199 & 211 (12 CHRG PMP L.O. COOLERS) (REF. DWG. NO. N/A)

953550 SPT-1-SW-011

(SW) SERVICE WATER

SYSTEM

D-B VT-2 1 ----------

2 C C- - - C 3 x - - - x X

INSTRUCTIONS **CALIBRATION BLOCK**

**PERFORMED IN MODE

1-5.**

01RF - ORDER# 50009730 TO PERFORM NDE.

BOUNDED BY 11SW145 & 151 (11 CS PMP ROOM COOLER) (REF. DWG. NO. N/A)

953600 SPT-1-SW-012

(SW) SERVICE WATER

SYSTEM

D-B VT-2 1- - ------

2 C - - - C - -3X - - - X - - -

"**PERFORMED IN MODE- C -

- X - -

O1RF - ORDER# 50009730 TO PERFORM NDE.

BOUNDED BY #11 CCW PUMP ROOM COOLER (REF. DWG. NO. N/A)

953650 SPT-1-SW-013

(SW) SERVICE WATER

SYSTEM

D-B VT-2 1- - ------

2 C C - -

3 x - - - x - - -

"**PERFORMED IN MODE 1. **C

X

01RF - ORDER# 50009730 TO PERFORM NDE.

BOUNDED BY #1 AFW PUMP ROOM COOLER (REF. DWG. NO. N/A)

953700 SPT-1-SW-014

(SW) SERVICE WATER

SYSTEM

D-B VT-2 1 -

23 - -3 x - - -

C - -X - - -

C

X

**PERFORMED IN MODE

1. **

01RF - ORDER# 50009730 TO PERFORM NDE.

BOUNDED BY IA EMERG. DIESEL GENERATOR SW VALVES (REF. DWG. NO. N/A)

953750 SPT-1-SW-015

(SW) SERVICE WATER

SYSTEM

D-B VT-2 1------------

2 - - - C C 3 x - - - X X

**PERFORMED IN MODE

1.**

01RF - ORDER# 50009730 TO PERFORM NDE.

PAGE: 17

Page 21: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS 3 ALL STATUS COMPONENTS

PRESSURE TEST

INSPECTION INTERVAL

ASME FIRST SECOND SEC. XI PERIOD PERIOD

SUAMMARY EXAMINATION AREA CATEGY NDE O----------- 0 U T A G E NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1

BOUNDED BY 1B EMERG. DIESEL GENERATOR SW VALVES (REF. DWG. NO. N/A)

953800 SPT-1-SW-016

(SW) SERVICE WATER

SYSTEM

D-B

THIRD PERIOD

2 3 4

VT-2 1------------

2 C C-- - -c3 X X X ---

INSTRUCTIONS "**CALIBRATION BLOCK**

**PERFORMED IN MODE

1.**

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730.

BOUNDED BY IC EMERG. DIESEL GENERATOR SW VALVES (REF. DWG. NO. N/A)

953850 SPT-1-SW-017

(SW) SERVICE WATER

SYSTEM

D-B VT-2 1----------------------- - - -- -- ---

2 - - - C - -3X - - - X - - -

C -- X - -

**PERFORMED IN MODE

1.**

01RF - ORDER# 50009730 TO PERFORM NDE. VT-2 EXAM NOTED GASKET LEAK AT FLANGE TO FLANGE CONNECTION MAINT. TO REPAIR

UNDER NOTIFICATION # 20048306.

BOUNDED BY 11SW23 & 12SW23 (REF. DWG. NO. N/A)

953900 SPT-1-SW-018

(SW) SERVICE WATER

SYSTEM

D-B VT-2 1---------2 C - --3 x - - - X - -

"**PERFORMED IN MODE

1.**C X

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. BOUNDED-B Y --- 12----C-------HEAT------ EXCHANGER----------- (REF-... .... D... G...... . .......

BOUNDED BY #12 CCW HEAT EXCHANGER (REP. DWG. NO. N/A)

953950 SPT-1-SW-019

(SW) SERVICE WATER

SYSTEM

D-B VT-2 1---------2 c C -3 x X - -

C

X

**PERFORMED IN MODE

1.**

01RF - ORDER# 50009730 TO PERFORM NDE.

BOUNDED BY #12 CCW PUMP ROOM COOLER (REF. DWG. NO. N/A)

954000 SPT-1-SW-020

(SW) SERVICE WATER

SYSTEM

D-B VT-2 1------------

2 C - - - C C 3x - - - x X

**PERFORMED IN MODE

1. **

01RF - ORDER# 50009730 TO PERFORM NDE. ~- - - - - - - - - --. . . -.. . . .... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

PAGE: 18

PLAN STATUS

Page 22: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

PRESSURE TEST

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS 3 ALL STATUS COMPONENTS

INSPECTION INTERVAL_

ASME FIRST

SEC. XI PERIOD

SUMMARY EXAMINATION AREA CATEGY NDE -- -

NUMBER IDENTIFICATION ITEM NO METS 1 2 3

BOUNDED BY #12 RHR ROOM COOLER (REF. DWG. NO. N/A)

PLAN STATUS

SECOND THIRD PERIOD PERIOD

-- OUTAGE

4 1 2 3 4 1 2 3 4INSTRUCTIONS

"**CALIBRATION BLOCK**

954050 SPT-1-SW-021

(SW) SERVICE WATER

SYSTEM

D-B VT-2 1 -

2C - -3x - - -

C C X X -

"t*PERFORMED IN MODE 1

THU 5.**

01RF - ORDER# 50009730 TO PERFORM NDE. 12SW505 WAS FOUND WITH A LEAK AT THE TUBING TO PIPE THREADED CONNECTION,

MAINT. TO FIX UNDER NOTIF. # 20040011.

BOUNDED BY 1SW185 & 12SW472... (REF. DWG. NO. N/A)

954100 SPT-1-SW-022

(SW) SERVICE WATER

SYSTEM

D-B VT-2 1-2C - -3x - - -

C -

X - -

- C -- X

BOUNDARY CONT'D: #11

CHARGING PUMP LUBE OIL

COOLERS. **PERFORMED IN

MODE 1 THRU 5.**

01RF - ORDER# 50009730 TO PERFORM NDE. 1SW186 WAS FOUND WITH A LEAK AT THE

MAINT. TO FIX UNDER NOTIF. # 20039959.

BOUNDED BY 1SW175 & 220 (11 SJ PMP RM COOLER) (REF. DWG. NO. N/A)

TUBING TO PIPE THREADED CONNECTION,

954150 SPT-1-SW-023

(SW) SERVICE WATER

SYSTEM

D-B VT-2 1 -2 1 - -

3x - - -

"**PERFORMED IN MODE i.**- C -

X - -- C -- X

01RF - ORDER# 50009730 TO PERFORM NDE. 1SW179 WAS FOUND WITH A LEAK AT THE

MAINT. TO FIX UNDER NOTIF. # 20050089.

BOUNDED BY ISW145 & 151 (12 CS PMP RM COOLER) (REF. DWG. NO. N/A)

TUBING TO PIPE THREADED CONNECTION,

954200 SPT-1-SW-024

(SW) SERVICE WATER

SYSTEM

D-B VT-2 1------------

2 C - - - C C

3 x- - - X X

**PERFORMED IN MODE

5.**

O0RF - ORDER# 50009730 TO PERFORM NDE.

BOUNDED BY 1SW219 & 213 (13 CHRG PMP RM COOLER) (REF. DWG. NO. N/A)

PAGE: 19

Page 23: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

PRESSURE TEST

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS 3 ALL STATUS CCMPONENTS

INSPECTION INTERVAL

SUMMARY EXAMINATION AREA NUMBER IDENTIFICATION

954250 SPT-1-SW-025

(SW) SERVICE WATER

SYSTEM

ASME FIRST

SEC. XI PERIOD

CATEGY NDE ITEM NO METH 1 2 3 4

D-B VT-2 1 -

2C - -3 x ---

PLAN STATUS

SECOND PERIOD

OUTAGE 1 23 4

THIRD PERIOD

1 2 34

C C X X

INSTRUCTIONS "**CALIBRATION BLOCK**

THIS EXAM IS FOR THE

ROOM COOLER FOR #13 CHRG

PUMP WHICH IS ABANDONED

IN PLACE AND THE ROOM

COOLER IS PERMANENTLY

TAGGED OUT AND ALSO

CONSIDERED ABANDONED IN

PLACE. DO NOT DELETE

FR•M LTP UNTIL DESIGN

REVISED TO CUT & CAP.

**PERFORMED IN MODE 3.**

01RF - ORDER# 50009730 TO PERFORM NDE.01RF - THIS EXAM IS FOR THE ROOM COOLER FOR #13 CHRG PUMP WHICH IS

ABANDONED IN PLACE AND THE ROOM COOLER IS PERMANENTLY TAGGED OUT AND ALSO CONSIDERED ABANDONED IN PLACE.

BOUNDED BY 11SW91 & 102 (#11 CHILLER) (REF. DWG. NO. N/A)

954300 SPT-1-SW-026

(SW) SERVICE WATER

SYSTEM

D-B VT-2 1------------2 c - - - C C-3X - - - X X--

"**PERFORMED IN MODE

1.**

01RF - ORDER# 50009730 TO PERFORM NDE. VALVE 11SW97 WAS FOUND WITH A FLANGE-TO-FLANGE LEAK. NOTIF. # 20040038 WAS

WRITTEN TO FIX.

BOUNDED BY 12SW91 & 102 (#12 CHILLER) (REF. DWG. NO. N/A)

954350 SPT-1-SW-027

(SW) SERVICE WATER

SYSTEM

D-B VT-2 1- - ------

2 C - - - C - -3 x - - - x - - -

C -X - -

**PERFORMED IN MODE 1

THRU 3.**

01RF - ORDER# 50009730 TO PERFORM NDE.

BOUNDED BY 13SW91 & 102 (#13 CHILLER) (REF. DWG. NO. N/A)

954400 SPT-1-SW-028

(SW) SERVICE WATER

SYSTEM

D-B VT-2 1------------

2 C - - - C C-3 x - - - x X--

"**PERFORMED IN MODE

1. **

01RF - ORDER# 50009730 TO PERFORM NDE.

PAGE: 20

Page 24: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS 3 ALL STATUS COMPONENTS

PRESSURE TEST

INSPECTION INTERVAL

SUMMARY EXAMINATION AREA NUMBER IDENTIFICATION

BOUNDED BY 11SW54 & 76

954450 SPT-1-SW-029

(SW) SERVICE WATER

SYSTEM

ASME

SEC. XI CATEGY

FIRST PERIOD

NDEITEM NO METE 1 2 3 4

(#11 CFCU) (REF. DWG. NO. N/A)

D-B VT-2 1 -2C - -3x - - -

PLAN STATUS

SECOND PERIOD

OUTAGE -

THIRD PERIOD

1 2 3 4 1 2 3 4

C X

INSTRUCTIONS **CALIBRATION BLOCK**

**PERFORMED IN MODE

3.**C -- - X - -

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730.

BOUNDED BY 12SW5 & 76 (012 CFCU) (REF. DWG. NO. N/A)

954500 SPT-1-SW-030

(SW) SERVICE WATER

SYSTEM

D-B VT-2 1 -

2c - -3x - - -

**PERFORMED IN MODE

3.**C X

C -X - -

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730.

BOUNDED BY 13SW54 & 12SW76 (#13 CFCU) (REF. DWG. NO. N/A)

954550 SPT-1-SW-031

(SW) SERVICE WATER

SYSTEM

D-B VT-2 1 -

2C - -3 x - - -

**PERFORMED IN MODE 59.**C

- X-- -- -- C -

X

O1RF - NDE TO BE PERFORMED UNDER w/o# 50009730. VT-2 EXAM NOTED FLANGE

NOTIFICATION # 20049667.

BOUNDED BY 14SW54 & 14SW76 (#14 CFCU) (REF. DWG. NO. N/A)

LEAK AT VALVE 13SW54 MAINT. TO REPAIR UNDER

954600 SPT-1-SW-032

(SW) SERVICE WATER

SYSTEM

D-B VT-2 1------------2 C C -C 3 x X -X -

**PERFORMED IN MODE

01RF - NDE TO BE PERFORMED UNDER w/o# 50009730.

#15 CFCU (REF. DWG. NO. N/A)

954650 SPT-1-SW-033

(SW) SERVICE WATER

SYSTEM

D-B VT-2 1 -

2c - -3x - - -

C

X -

- C X

"**PERFORMED IN MODE

1-5.**

01RF - ORDER# 50009730 TO PERFORM NDE.

PAGE: 21

Page 25: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

PRESSURE TEST

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS 3 ALL STATUS COMPONENTS

INSPECTION INTERVAL_

ASME

SEC. XI SUMMARY EXAMINATION AREA CATEGY NDE NUMBER IDENTIFICATION ITEM NO METH

(REF. DWG. NO. N/A)

PLAN STATUS

FIRST SECOND THIRD PERIOD PERIOD PERIOD

-OUTAGE---------

1 2 3 4 1 2 3 4 1 2 3 4INSTRUCTIONS

**CALIBRATION BLOCK"*

954655 SPT-1-SW-034

(SW) SERVICE WATER

SYSTEM

D-B VT-2 1 2

3C - -X - - -

C - -

X - - -

C -

X - -

"*PERFORMED IN MODE 1

THRU 3.**

O1RF - ORDER# 50009730 TO PERFORM NDE.

954660 SPT-1-SW-035

(SW) SERVICE WATER

SYSTEM

D-B VT-2 1 2 3

**PERFORMED IN MODE 3.**

C - - - C - - - - C C - - - C -X - - - X X -

O1RF - ORDER# 50009730 TO PERFORM NDE. VT-2 EXAM NOTED VALVE 1-SW-482 HAD A BODY TO

TO REPAIR UNDER NOTIFICATION # 20048211.

BONNET GASKET LEAK. AND MAINT.

954665 SPT-1-SW-036

(SW) SERVICE WATER

SYSTEM

D-B VT-2 1- - -----

2 c - C 3 x- x

01RF - ORDER# 50009730 TO PERFORM NDE. VT-2 EXAM NOTED VALVE 11-SW-234

UNDER NOIFICATION# 20047930.

**PERFORPME IN MODE

C - - 3. S N K -

HAS AN ACTIVE DIAPNRAC• LEAK. MAINT. TO FIX

954670 SPT-1-SW-037

(SW) SERVICE WATER

SYSTEM

D-B VT-2 1- - -----

2C - - - C

3x - - - X

**PERFORMED IN MODE 3.**C -

X - -

01RF - ORDER# 50009730 TO PERFORM NDE.

954675 SPT-1-SW-038

(SW) SERVICE WATER

SYSTEM

D-B VT-2 1-2C - -

3x - - -

**PERFORMED IN MODE 3.**C

X

- C -

- X - -

01RF - ORDER# 50009730 TO PERFORM NDE. ....... BO NDE BY---- 1--C...... ...... (RE..F.............. ..... . D.. NO--........... N/A

BOUNDED BY IVC1 & IVC2 (REF. DWG. NO. N/A)

954700 SPT-1-VC-001

(VC) CONTAINMENT

VENTILATION SYSTEM

C-H VT-2 1 -

2C - -3x - - -

C - -

K - - -

C -

x

SPT TO BE PERFORMED

DURING LLRT. **PERFORMED

IN MODE 5.**

01RF - ORDER# 50029262 & 50009894 TO PERFORM NDE.

PAGE: 22

Page 26: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

PRESSURE TEST

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS 2 ALL STATUS COMPONENTS

INSPECTION INTERVAL_

SUMMARY EXAMINATION AREA NUMBER IDENTIFICATION

BOUNDED BY 1VC7 & 1VC8

954750 SPT-1-VC-002

(VC) CONTAINMENT

VENTILATION SYSTEM

ASME SEC. XI CATEGY NDE ITEM NO METH

(REF. DWG. NO. N/O

C-H

PLAN STATUS

FIRST SECOND PERIOD PERIOD

-2OUTAGE1 2 34 1 2 34

THIRD PERIOD

1 2 34

i)

VT-2 1 -

2 C - -3 x ---

C - -

K - - -

C - -

x - - -

INSTRUCTIONS **CALIBRATION BLOCK"*

CODE CASE N-522 APPLIES.

SPT TO BE PERFORMED

DURING LLRT. **PERFORMED

IN MODE 5.**

99RF - W.O.#50000402 TO PERFORM NDE. CODE CASE N-522 WAS APPLIED.

BOUNDED BY 1VC5 & 1VC6 (REF. DWG. NO. N/A)

954800 SPT-1-VC-003

(VC) CONTAflNMENT

VENTILATION SYSTEM

C-H VT-2 1 -

23 3 x -

C - -

K - - -

C -X - -

SPT TO BE PERFORMED

DURING LLRT. **PERFORMED

IN MODE 5.**

01RF - ORDER# 50009730 TO PERFORM NDE.

BOUNDED BY lVC9 & 1VC10 (REF. DWG. NO. N/A)

954850 SPT-1-VC-004

(VC) CONTAINMENT

VENTILATION SYSTEM

C-H VT-2 1 -

2C 3X -

C - -

K - - -

C -

X - -

SPT TO BE PERFORMED

DURING LLRT. ** PERFORMED

IN MODE 0.**

01RF - ORDER# 50009730 TO PERFORM NDE. .. -.... - BOUNDED-BY-1VC-1---.VC-2-(REF..... ......... D------------- ... NO.. .... N/A).......

BOUNDED BY 1VC11 & IVC12 (REF. DWG. NO. N/A)

954900 SPT-1-VC-005

(VC) CONTAINMENT

VENTILATION SYSTEM

C-H VT-2 1 -

23 3 x -

- C C--- X -X- --

01RF - W/O# 50009730 TO PERFORM NDE. VT-2 EXAM NOTED PACKING LEAK ON VALVE IVC11 MAINT.

20062508.

SPT TO BE PERFORMED

DURING LLRT. *"PERFORMED

IN MODE 5.**

TO REPAIR UNDER NOTIF#

BOUNDED BY 1VC13 & 1VC14 (REF. DWG. NO. N/A)

954950 SPT-1-VC-006

(VC) CONTAINMENT

VENTILATION SYSTEM

C-H VT-2 1 -

2 C - -3 x - - -

C C -X XC--

SPT TO BE PERFORMED

DURING LLRT. **PERFORMED

IN MODE 5.**

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. -- - - - - - - - ------------.. . .-.-.- ------.-. . ---------. . ----.. . . . . . . . . . . .

PAGE: 23

Page 27: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

PRESSURE TEST

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS 2 ALL STATUS CCOMPONENTS

INSPECTION INTERVAL_

ASME

SEC. XI SUMMARY EXAMINATION AREA CATEGY NDE NUMBER IDENTIFICATION ITEM NO METH

BOUNDED BY 1VC3 & 1VC4 (REF. DWG. NO. N/A)

955000 SPT-1-VC-007

(VC) CONTAINMENT

VENTILATION SYSTEM

C-H

PLAN STATUS

FIRST SECOND PERIOD PERIOD

-2OUTAGE2 34 1 2 34

THIRD PERIOD

1 2 3 4

VT-2 1------------

2 - - - C C 3X - - - X X

INSTRUCTIONS "**CALIBRATION BLOCK**

SPT TO BE PERFORMED

DURING LLRT. **PERFORMED

IN MODE 5.**

01RF - ORDER# 50029262 & 50009894 TO PERFORM NDE.

BOUNDED BY 11-14 WGDT, 11 & 12 WGC... (REF. DWG. NO. N/A)

955050 SPT-1-WG-001

(WG) WASTE GAS SYSTEM

D-B VT-2 1 -

2C - -

3x - - -C -x - -

C

X

BOUNDARY CONT'D: AND

SUCTION AND DISCHARGE

HEADERS. **PERFORMED IN

MODE 3.**

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730..

(REF. DWG. NO. N/A)

955055 SPT-1-WG-002

(WG) WASTE GAS SYSTEM

D-B VT-2 1 - -

2 C 3 x

C X

C X

BOUNDARY CONT D: AND

SUCTION AND DISCHARGE

HEADERS. **PERFORMED IN

MODE 3. **

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730.

BOUNDED BY 1WL98, 99 & 108 (REF. DWG. NO. N/A)

955100 SPT-1-WL-001

(WL) WASTE LIQUID

SYSTEM

C-H VT-2 1 - -2 C 3 x

C - - C - -

X - - - -

SPT TO BE PERFORMED

DURING THE LLRT (CODE

CASE N-522 APPLIES).

**PERFORMED IN MODE 3.**

99RF - W.O.#50000402 TO PERFORM NDE. CODE CASE N-522 APPLIES

BOUNDED BY lSF22 & lSF36 TO THE REFUELING CANAL (REF. DWG. NO. N/A)

955150 SPT-1-WL-002

(WL) WASTE LIQUID

SYSTEM

C-H VT-2 1 -

2C - -

3x - - -

**PERFORMED IN MODE 3.**C C

X XC-

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730.

PAGE: 24

Page 28: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS 2 ALL STATUS COMPONENTS

PRESSURE TEST

INSPECTION INTERVAL_

ASME FIRST

SEC. XI PERIOD

SUMMARY EXAMINATION AREA CATEGY NDE NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4

BOUNDED BY 1WL96 & 1WL97 (REF. DWG. NO. N/A)

PLAN STATUS

SECOND THIRD PERIOD PERIOD

OUTAGE

1 2 3 4 1 2 3 4INSTRUCTIONS

**CALIBRATION BLOCK**

955200 SPT-1-WL-003

(WL) WASTE LIQUID

SYSTEM

C-H VT-2 1 -2 c 3 x

**PERFOPRMD IN MODE 5.**

- - C----------- - -- ---C C-X X -

01RF - ORDER# 50009730 TO PERFORM NDE.

BOUNDED BY 1WL12 & 1WL13 (REF. DWG. NO. N/A)

955250 SPT-1-WL-004

(WL) WASTE LIQUID

SYSTEM

C-H VT-2 1 -

2C - -

3x - - -

"**PERFORMED IN MODE 5.**C - -

X - - -

C - X - -

01RF - ORDER# 50009730 TO PERFORM NDE.

BOUNDED BY 1WL16 & 1WL17 (REF. DWG. NO. N/A)

955300 SPT-1-WL-005

(WL) WASTE LIQUID

SYSTEM

C-H **PERFORMED IN MODE 5.**

VT-2 1 -

2 c 3 x

01RF - ORDER# 50009730 TO PERFORM NDE.

BOUNDED BY 1WR80 & IWR81 (REF. DWG. NO. N/A)

955350 SPT-1-WR-001

(WR) WASTE RECOVERY

SYSTEM

C-H VT-2 1 -

2 c 3 x

"**PERFORMED IN MODE

3.**C X

C -X - -

O1RF - ORDER# 50009730 TO PERFORM NDE.

(REF. DWG. NO. N/A)

958010 NR-SPT-1-BR-001

(BR) BORON RECOVERY

SYSTEM

A-B

NR0578

VT-2 1 2 3 s s

A

S S-

AA -

S S--

RECURRING TASK NO.

(IDENTIFIED IN

NUREG-0578 FILE)

**PERFORMED IN MODE 1

THRU 5**

ORDER# 30009422 TO PERFORM NDE.

W.O.#950410297 TO PERFORM VT-2.

W.O.# 30003261 TO PERFORM NDE. S.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..-

PAGE: 25

01RF

95RF

99RF -

C C -

X X - -

Page 29: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS 23 ALL STATUS CObnONENTS

PRESSURE TEST

INSPECTION INTERVAL

SUMMARY EXAMINATION AREA NUMBER IDENTIFICATION

958020 NR-SPT-1-CS-001

(CS) CONTAINMENT SPRAY

SYSTEM

ASME

SEC. XI

CATEGY NDE ITEM NO METE

A-E VT-2 1

NR0578 2 3

FIRST PERIOD

1 2 3 4

S S--

PLAN STATUS

SECOND THIRD PERIOD PERIOD

OUTAGE--------1 2 34 1 2 34

S- A

S -

A S

A -

S - -

INSTRUCTIONS "**CALIBRATION BLOCK**

RECURRING TASK NO.

(IDENTIFIED IN

NUREG-0578 FILE)

**PERFORMED IN MODE 1

THRU 5**

ORDER# 50009730 TO PERFORM NDE.

W.O.# 950501073 TO PERFORM VT-2.

ORDER# 30003265-0010 TO PERFORM NDE.

958030 NR-SPT-1-CS-002 A-E

(CS) CONTAINMENT SPRAY NR0578

SYSTEM

VT-2 1 -

2- - -

35S S - -

S-k SS8- -

Ak-

S S--

RECURRING TASK NO.

(IDENTIFIED IN

NUREG-0578 FILE)

"**PERFORMED IN MODE 1

THRU 5**

ORDER# 50009730 TO PERFORM NDE.

W.O.# 950501074 TO PERFORM VT-2.

ORDER # 30003271-0010 TO PERFORM NDE. - -----.. . --------------------------------.. . . . . . . . . . . . .

NR-SPT-1-CV-001 A-E

(CV) CHEMICAL & VOLUME NR0578

CONTROL SYSTEM

VT-2 1-

2- - -

3s s- -A - AA -

S S S S--

RECURRING TASK NO.

(IDENTIFIED IN

NUREG-0578 FILE)

**PERFORMED IN MODE 1

THRU 5**

01RF - ORDER# 50009730 TO PERFORM NDE. VT-2 EXAM NOTED BORON LEAKAGE AT DISCHARGE FLANGE NOTIFICATION # 20031941

WAS WRITTEN TO REMOVE BOLT AND DO VT-3.

95RF - W.O.# 950501075 TO PERFORM VT-2.

99RF - ORDER # 30003275-0010 TO PERFORM NDE.

958050 NR-SPT-1-CV-002 A-E

(CV) CHEMICAL & VOLUME NR0578

CONTROL SYSTEM

VT-2 1 -2- - -

3s5s- -

- k

s5--AA -

S S--

RECURRING TASK NO.

(IDENTIFIED IN

NUREG-0578 FILE)

**PERFORMED IN MODE 1

THRU 5**

01RF - ORDER# 50009730 TO PERFORM NDE. VALVE 1CV82 HAS A PACKING LEAK. MAINT. TO FIX UNDER NOTIFICATION #

20047882.

95RF - W.O.# 950501076 TO PERFORM VT-2.

99RF - W.O.# 30003279 TO PERFORM NDE.

PAGE: 26

01RF

95RF

99RF -

01RF

95RF

99RF -

958040

Page 30: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

PRESSURE TEST

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS 23 ALL STATUS COMPONENTS

INSPECTION INTERVAL

ASME

SEC. XI SUMMARY EXAMINATION AREA CATEGY NUMBER IDENTIFICATION ITEM NO

958060 NR-SPT-1-CV-003 A-E

(CV) CHEMICAL & VOLUME NR0578

CONTROL SYSTEM

NDE METH

VT-2 1 2

3

PLAN STATUS

FIRST SECOND THIRD PERIOD PERIOD PERIOD

-OUTAGE

1 2 3 4 1 2 3 4 1 2 3 4

S S

A S S -

AA -

S S--

INSTRUCTIONS **CALIBRATION BLOCK**

RECURRING TASK NO.

(IDENTIFIED IN

NUREG-0578 FILE)

**PERFORMED IN MODE 1

THRU 5**

ORDER# 30012848 TO PERFORM NDE. CHARGING PUMP IS OUT OF SERVICE AS PER CR980915258.

W.O.# 950325137 TO PERFORM VT-2.

ORDER # 30002509-0010 TO PERFORM NDE. nO. 13 CHARGING PUMP (PDP) IS CLEARED & TAGGED FOR SHIFT SUPRV. AND

WILL REMAIN OOS AS PER CR980915258, THERFORE NO SYSTEM LEAKAGE EXAM CAN BE PERFORMED.

958070 NR-SPT-1-CV-004 A-E

(CV) CHEMICAL & VOLUME NR0578

CONTROL SYSTEM

VT-2 1-2--355 - -

A S S -

A A S S

RECURRING TASK NO.

(IDENTIFIED IN

NUREG-0578 FILE)

**PERFORMED IN MODE 1

THRU 5**

01RF - ORDER# 50009730 TO PERFORM NDE. VALVE 1CV82 1CV56 1CV72 AND 1CV73 HAVE PACKING LEAKS. MAINT. TO FIX UNDER

NOTIFICATION # 20047882 - 20047884 - 20048644 AND 20048645.

95RF - W.O.# 950501077 TO PERFORM VT-2.

99RF - ORDER # 30003285-0010 TO PERFORM NDE.

958080 NR-SPT-1-CV-005 A-E

(CV) CHEMICAL & VOLUME NR0578

CONTROL SYSTEM

VT-2 1-2- - -

3 s s--- -A A A

S S - S S -

RECURRING TASK NO.

(IDENTIFIED IN

NUREG-0578 FILE)

**PERFORMED IN MODE 1

THRU 5**

01RF - ORDER# 50009730 TO PERFORM NDE. VT-2 EXAM NOTED VALVE

20051333 WAS WRITTEN TO REMOVE BOLT AND DO VT-3. ALSO

NOTI.* 20047895 AND 20051331.

95RF - W.O.# 950405037 TO PERFORM VT-2.

99RF - ORDER # 30003290-0010 TO PERFORM NDE.

1CV253 WITH BORON LEAKAGE AT FLANGE NOTIFICATION

NOTED PACKING AND CAP LEAKING MAINT. TO REPAIR UNDER

958090 NR-SPT-1-CV-006 A-E

(CV) CHEMICAL & VOLUME NR0578

CONTROL SYSTEM

VT-2 1 -

2--355--

A S S -

A A S S

RECURRING TASK NO.

(IDENTIFIED IN

NUREG-0578 FILE)

**PERFORMED IN MODE 1

THRU 5**

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. VT-2 EXAM NOTED VALVE 1CV124 WITH DRIED BORON AND WAS PREVIOUSLY

NOTED ON NOTIFICATION # 20047886.

95RF - W.O.# 950501072 TO PERFORM VT-2.

99RF - W.O.# 30003301-0010 TO PERFORM NDE.

PAGE: 27

01RF

95RF

99RF -

Page 31: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

PRESSURE TEST

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS 23 ALL STATUS COMPONENTS

INSPECTION INTERVAL_

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY NDE NUMBER IDENTIFICATION ITEM NO METH

958100 NR-SPT-1-CV-007 A-! VT-2 1

(CV) CHEMICAL & VOLUME NR0578 2

CONTROL SYSTEM 3

FIRST PERIOD

1 2 3 4

PLAN STATUS

SECOND PERIOD

OUTAGE 1 23 4

A -

S S - S S

THIRD PERIOD

1 2 3 4

A A SA - -

INSTRUCTIONS **CALIBRATION BLOCK**

RECURRING TASK NO.

(IDENTIFIED IN

NUREG-0578 FILE)

**PERFORME IN MODE 1

THRU 5**

NDE TO BE PERFORMED UNDER W/O# 50009730.

W.O.# 950501071 TO PERFORM VT-2.

W.O.#30003305-0010 TO PERFORM NDE.

958110 NR-SPT-1-RH-001

(RE) REHEAT REMOVAL

SYSTEM

A-!

NR0578

VT-2 1 -

2- - -355- -

A

S S --A A S S - -

RECURRING TASK NO.

(IDENTIFIED IN

NUREG-0578 FILE)

**PERFOPICM IN MODE 1

THRU 5**

01RF - ORDER# 30011254 TO PERFORM NDE. VT-2 EXAM NOTED DRIED BORON ON #11 RHR PUMP SHAFT. MAINT TO PERFORM REPAIRS

UNDER NOTIFICATION #20062679.

95RF - W.O.# 950501070 TO PERFORM VT-2.

19RF - ORDER # 30003353 TO PERFORM NDE. DURING SPT IIRH8 WAS FOUND WITH A BODY TO BONNET LEAK (REF NOT#

20007176).

958120 NR-SPT-1-RE-002

(RH) REHEAT REMOVAL

SYSTEM

A-E VT-2 1 -

NR0578 2 - - -

3 s s--

A - A S S -- S

A

S

RECURRING TASK NO.

(IDENTIFIED IN

NUREG-0578 FILE)

"**PERFORMED IN MODE 1

THRU 5**

NDE TO BE PERFORMED UNDER W/O# 30012276.

W.O.#950501068 TO PERFORM VT-2.

ORDER # 30003359-0010 TO PERFORM NDE.

958130 NR-SPT-1-SI-001 A-!

(SJ) SAFETY INJECTION NR0578

SYSTEM

VT-2 1 -2--35S--

A

S S --AA -

s S-

RECURRING TASK NO.

(IDENTIFIED IN

NUREG-0578 FILE)

**PERFORMED IN MODE 1

THRU 5**

NDE TO BE PERFORMED UNDER W/O# 30012161.

W.O0. 950501069-1 TO PERFORM VT-2.

ORDER # 30003362-0010 TO PERFORM NDE. 1) #11 SI PUMP TO COLD LEG INJECTION. 2) #11 SI PUMP TO HOT LEG

INJECTION.

PAGE: 28

01RF

95RF

99RF -

01RF

95RF

99RF -

01RF

95RF

99RF -

Page 32: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS 13 ALL STATUS COMPONENTS

PRESSURE TEST

INSPECTION INTERVAL

SUMMARY EXAMINATION AREA NUMBER IDENTIFICATION

958140 NR-SPT-1-SI-002

(SJ) SAFETY INJECTION

SYSTEM

ASME

SEC. XI CATEGY ITEM NO

A-E

NR0578

FIRST PERIOD

NDE METH 1 2 3 4

VT-2 1 -

2- - -

3 S S - -

PLAN STATUS

SECOND THIRD PERIOD PERIOD

OUTAGE--------

1 2 3 4 1 2 3 4

- - A - AA S S - S S-

INSTRUCTIONS **CALIBRATION BLOCK**

RECURRING TASK NO.

(IDENTIFIED IN

NUREG-0578 FILE)

**PERFORMED IN MODE 1

THRU 5**

01RF - NDE TO BE PERFORMED UNDER W/O# 30012027.

95RF - W.O.# 950501067-1 TO PERFORM VT-2.

99RF - ORDER # 30003370-0010 TO PERFORM NDE. 1)

INJECTION.

958150 NR-SPT-1-SI-003 A-E

(SJ) SAFETY INJECTION NR0578

SYSTEM

01RF

95RF

?9RF -

VT-2 1 2

3

#12 SI PUMP TO COLD LEG INJECTION. 2) #12 SI PUMP TO HOT LEG

S SA

s s-

AA -SBS- -

RECURRING TASK NO.

(IDENTIFIED IN

NUREG-0578 FILE)

"**PERFORMED IN MODE 1

THRU 5**

NDE TO BE PERFORMED UNDER w/o# 30012344.

W.O.# 950501066 TO PERFORM VT-2.

ORDER # 30003383-0010 TO PERFORM NDE. . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

958160 NR-SPT-1-SS-001

(SS) SAMPLING SYSTEM

A-E

NR0578

VT-2 1-2- - -

3 SS - -

A S S-

A A -

S S--

RECURRING TASK NO.

(IDENTIFIED IN

NUREG-0578 FILE)

**PERFORMED IN MODE 1

THRU 5**

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. VT-2 EXAM NOTED VALVES

TO PERFORM REPAIRS UNDER NOTIFICATION # 20049912 AND 200499132.

95RF - W.O.# 950501065 TO PERFORM VT-2.

99RF -

1SS49 AND 1SS33 WITH PACKING LEAKS MAINT.

W.O.# 30003389 TO PERFORM NDE.

958170 NR-SPT-1-SS-002

(SS) SAMPLING SYSTEM

A-E

NR0578

VT-2 1-

2- - -355- -

- -A- A A S S S S -

RECURRING TASK NO.

(IDENTIFIED IN

NUREG-0578 FILE)

**PERFORMED IN MODE 1

THRU 5**

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730.

95RF - W.O.# 950501064 TO PERFORM VT-2.

99RF - W.O.# 30003395 TO PERFORM NDE.

PAGE: 29

Page 33: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

PRESSURE TEST

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS 23 ALL STATUS COMPONENTS

INSPECTION INTERVAL

SUMMARY EXAMINATION AREA NUMBER IDENTIFICATION

958180 NR-SPT-1-SS-003

(SS) SAMPLING SYSTEM

ASME

SEC. XI

CATEGY NDE ITEM NO METH

A-E VT-2

NR0578

PLAN STATUS

FIRST SECOND THIRD PERIOD PERIOD PERIOD

-OUTAGE

1 2 3 4 1 2 3 4 1 2 34

1

2 3 S S - -

- - A S5S- -

A A S S

INSTRUCTIONS "**CALIBRATION BLOCK**

RECURRING TASK NO.

(IDENTIFIED IN

NUREG-0578 FILE)

**PERFORMED IN MODE 1

THRU 5**

01RF - NDE TO BE PERFORMED UNDER W/O# 30013040.

95RF - W.O.#950501063 TO PERFORM VT-2.

99RF - ORDER # 30003410-0010 TO PERFORM NDE.

958190 NR-SPT-1-SS-004

(SS) SAMPLING SYSTEM

A-E

NR0578

VT-2 1- - ------2 - -- A 3 S S -- S S --

AA -

s s

RECURRING TASK NO.

(IDENTIFIED IN

NUREG-0578 FILE)

"**PERFORMED IN MODE 1

THRU 5**

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. VT-2 EXAM NOTED PACKING LEAKS ON THE FOLLOWING VALVES 11SS190

-11SS189 -ILSS181 -13SS185 -13SS191 AND 13SS181 MAINT TO DO REPAIRS UNDER NOTI. # 20053342 -20053320

20053318 -20053316 -20053315 AND 20053313

95RF - W.O.# 950501062 TO PERFORM VT-2.

99RF - ORDER # 30003404-0010 TO PERFORM NDE. CODE CASE N-522 APPLIES.

958200 NR-SPT-1-WG-001 A-E

(WG) WASTE GAS SYSTEM NR0578

VT-2 1 -2- - -

395 - -- A - AA -

S S - S S

RECURRING TASK NO.

(IDENTIFIED IN

NUREG-0578 FILE)

**PERFORMED IN MODE 1

THRU 5**

NDE TO BE PERFORMED UNDER W/O# 30008087.

W.O.# 950501061 TO PERFORM VT-2.

W.O.# 30003416 TO PERFORM NDE.

958210 NR-SPT-1-WG-002 A-E

(WG) WASTE GAS SYSTEM NR0578

VT-2 1 -2- - -

3s s- -

S-k s5--

A A SA -S

RECURRING TASK NO.

(IDENTIFIED IN

NUREG-0578 FILE)

"**PERFORMED IN MODE 1

THRU 5**

01RF - NDE TO BE PERFORMED UNDER W/O# 30009264.

95RF - W.O.# 950501060 TO PERFORM VT-2.

99RF - W.O.# 30003424-0010 TO PERFORM NDE.

PAGE: 30

01RF

95RF

99RF -

Page 34: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

PRESSURE TEST

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS 33 ALL STATUS COMPONENTS

INSPECTION INTERVAL_

ASME

SEC. XI SUMM(ARY EXAMINATION AREA CATEGY NDE NUMBER IDENTIFICATION ITEM NO METE

958220 NR-SPT-1-WG-003 A-E VT-2

(WG) WASTE GAS SYSTEM NR0578

1

2

3

FIRST PERIOD

1 2 3 4

S S

PLAN STATUS

SECOND THIRD PERIOD PERIOD

OUTAGE------

1 2 3 4 1 2 34

A - A A

S S - - S -

INSTRUCTIONS "**CALIBRATION BLOCK**

RECURRING TASK NO.

(IDENTIFIED IN

NUREG-0578 FILE)

**PERFORMED IN MODE 1

THRU 5**

01RF - NDE TO BE PERFORMED UNDER W/O# 30009264.

95RF - W.O.# 950501059 TO PERFORM VT-2.

99RF - W.O.# 30003430 TO PERFORM NDE.

958230 NR-SPT-1-WG-004 A-E

(WG) WASTE GAS SYSTEM NR0578

VT-2 1 -

2- - -

3 S S - -

- A - AA -S S - S S

RECURRING TASK NO.

(IDENTIFIED IN

NUREG-0578 FILE)

**PERFORMED IN MODE 1

THRU 5**

NDE TO BE PERFORMED UNDER W/O# 30008554.

W.O.# 940501154 TO PERFORM VT-2.

W.O.# 30003436-0010 TO PERFORM NDE.

NR-SPT-1-WG-005 A-E

(WG) WASTE GAS SYSTEM NR0578

VT-2 1 -

2- - -3 s s--

RECURRING TASK NO.

- - A A A - - (IDENTIFIED IN

S - - SS NUREG-0578 FILE)

**PERFORMED IN MODE 1

THRU 5**

NDE TO BE PERFORMED UNDER W/O# 30012025.

W.O.# 950501058 TO PERFORM VT-2.

W.O.# 30003443-0010 TO PERFORM NDE.

958250 NR-SPT-1-WG-006 A-E

(WG) WASTE GAS SYSTEM NR0578

VT-2 1 -

2- - -3S S- -

k

55--AA -

S S--

RECURRING TASK NO.

(IDENTIFIED IN

NUREG-0578 FILE)

**PERFORMED IN MODE 1

THRU 5**

01RF - NDE TO BE PERFORMED UNDER W/O# 30009303.

95RF - W.O.# 950501057-1 TO PERFORM VT-2.

99RF - W.O.# 30003452-0010 TO PERFORM NDE.

PAGE: 31

01RF

95RF

99RF

'ý-958240

O1RF

95RF

99RF -

Page 35: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

PRESSURE TEST

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS 33 ALL STATUS COMPONENTS

INSPECTION INTERVAL_

ASHE

SEC. XI SUMMARY EXAMINATION AREA CATEGY NDE NUMBER IDENTIFICATION ITEM NO METH

958260 NR-SPT-1-WG-007 A-E VT-2 1

(WG) WASTE GAS SYSTEM NR0578 2

3

PLAN STATUS

FIRST SECOND THIRD PERIOD PERIOD PERIOD

-~OUTAGE------

1 2 3 4 1 2 3 4 1 2 3 4

A - AA -

S S S S - 55 -

INSTRUCTIONS "**CALIBRATION BLOCK**

RECURRING TASK NO.

(IDENTIFIED IN

NUREG-0578 FILE)

**PERFORMED IN MODE 1

THRU 5**

NDE TO BE PERFORMED UNDER W/O# 30012418.

W.O.# 950412033 TO PERFORM VT-2.

ORDER# 30003460 TO PERFORM NDE. REF. ORDER NO. 30001535-0090 & 0100, TO PERFORM ASSOCIATED LLRT.

958270 NR-SPT-1-WL-001

(WL) WASTE LIQUID

SYSTEM

A-E VT-2 1 -

NR0578 2 - - -

3 s s --

A S S -

A A S S

RECURRING TASK NO.

(IDENTIFIED IN

NUREG-0578 FILE)

**PERFOPME IN MODE 1

THRU 5**

01RF - NDE TO BE PERFORMED UNDER W/O# 30008549.

95RF - W.O.#950501056-1, TO PERFORM VT-2.

99RF - W.OA. 30003469 TO PERFORM NDE.

PAGE: 32

01RF

95RF

99RF -

Page 36: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

APPENDIX K

ISI Long Term Plan (IVVI)

Salem Unit I ISI PROGRAM - LTP K-1 3rd INTERVAL

REV. 0 CHG. 0

Page 37: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

PSE&G IS' PUBLIC SERVICE ELEC. & GAS

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN SUMMARY NUMBERS 931000 THROUGH 935150

July 16, 2001 REVISION 0

Prepared By:

Peer Review:

ANII R : "

Date P/ /

Date ZO01

Date 0"

e (Zýs

Page 38: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS 1 ALL STATUS COMPONENTS

RPV (UPPER INTERNALS REMOVED)

INSPECTION INTERVAL_

ASME

SEC. XI SUMMARY EXAMINATION AREA CATEGY NDE NUMBER IDENTIFICATION ITEM NO METH

VESSEL INTERIOR (REF. DWG. NO. V-004)

931000 IVVI-100

UPPER INTERNALS TO

LOWER INTERNALS KEYS

B-N-3 VT-3 1 -

B13.70 2 -

3- -

PLAN STATUS

FIRST SECOND THIRD PERIOD PERIOD PERIOD

-23 OUTAGE-----------12 34 12 34 1 234

C X

INSTRUCTIONS "**CALIBRATION BLOCK**

ACCESSIBLE AREA TO BE

EXAMINED EACH PERIOD.

01RF - FTI UNDER ORDER# 50009730 TO PERFORM NDE.

VESSEL INTERIOR (REF. DWG. NO. V-003, 005)

931050 IVVI-101

UPPER CORE & SUPPORT

PLATE

B-N-3 VT-3 1 -

B13.70 2 -

3- -C X -

ACCESSIBLE AREA TO BE

EXAMINED EACH PERIOD.

THE VT-3 SHALL ALSO

INCLUDE THE ALIGNMENT

KEYWAY (0 DEGREE

ACCESSIBLE ONLY),

SUPPORT COLUMNS,

THERMOCOUPLE COLUMNS,

GUIDE TUBES AND MIXING

DEVICES FOR ENGAGEMENT.

" 01RF - VT-3 TO BE PERFORMED UNDER W/O# 50009730. VT-3 EXAM TO SATISFY SECTION XI REQUIREMENTS WAS PERFORMED AT

TIME OF FUEL PIN INSPECTION PER SC.MD-FR.FH-0011 (Q) REV. 9 PARA. 5.2.21 AREAS CAN ALSO BE VIEWED UNDER

SUM# 931000 TAPE #4

PAGE: 1

Page 39: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS 1 ALL STATUS COMPONENTS

RPV (CORE BARREL INPLACE OR REMOVED)

INSPECTION INTERVAL_

ASME

SEC. XI SUMMARY EXAMINATION AREA CATEGY NDE NUMBER IDENTIFICATION ITEM NO METH

VESSEL INTERIOR (REF. DWG. NO. V-001)

932100 IVVI-202

CORE BARREL-TO-FLG

MATING SURFACES

B-N-I

B13. 10

VT-3 1 2

3

FIRST PERIOD

1 2 3 4

X

PLAN STATUS

SECOND THIRD PERIOD PERIOD

OUTAGE--------1 2 34 1 23 4

INSTRUCTIONS "**CALIBRATION BLOCK**

ACCESSIBLE AREA TO BE

EXAMINED EACH PERIOD.- X X - -

01RF - FTI UNDER ORDER# 50009730 TO PERFORM NDE. V................. ------ IO (R EF------------- ... D WG.. ... N O.. ...........- ...........

VESSEL INTERIOR (REP. DWG. NO. V-002)

932150 IVVI-203 A-E

VESSEL HEAD ALIGNING VII

KEYS (PINS)

VT-3 1 2

3 Y - - - Y - - - y - -

ACCESSIBLE AREA TO BE

EXAMINED EACH PERIOD.

THESE KEYS ARE LOCATED

AT 0, 90, 180 & 270

DEGREES.

01RF - FTI UNDER ORDER# 50009730 TO PERFORM NDE. S. .. . . . . . . . . . . . . . . . . . .. .. . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

932200 IVVI-204 A-E

FLOW NOZZLES AT FLANGE VII

AREA

VT-3 1 2

3 yC--

- y Y - _

ACCESSIBLE AREA TO BE

EXAMINED EACH PERIOD.

O1RF - FTI UNDER ORDER# 50009730 TO PERFORM NDE.

932250 IVVI-205

IRRADIATION SPECIMEN

PLUGS (FLG AREA)

A-E

VII

VT-3 1 -

2 - - -

3-7y- - -7yC -y---

ACCESSIBLE AREA TO BE

EXAMINED EACH PERIOD.

THERE ARE 8 SPECIMEN

ACCESS HOLE PLUGS.

01RF - FTI UNDER ORDER# 50009730 TO PERFORM NDE.

PAGE: 2

Page 40: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS 1 ALL STATUS COMPONENTS

RPV (CORE BARREL INTER. REMOVED OR INPLACE

INSPECTION INTERVAL_

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY NDE NUMBER IDENTIFICATION ITEM NO METH

VESSEL INTERIOR (REF. DWG. NO. V-009)

933000 IVVI-300

BAFFLE PANEL BOLTS VII

FIRST PERIOD

1 2 3 4

PLAN STATUS

SECOND PERIOD

THIRD PERIOD

OUTAGE--------1 2 34 1 23 4

VT-3 1 2 -3- - -

INSTRUCTIONS **CALIBRATION BLOCK**

ACCESSIBLE AREA TO BE

EXAMINED EACH PERIOD.

01RF - FTI UNDER ORDER# 50009730 TO PERFORM NDE.

933050 IVVI-301

DEBRIS SCAN ON CORE

BARREL DISTR. PLATE

A-E

VII

VT-3 1 2 3- Y - y

C -

Y

ACCESSIBLE AREA TO BE

EXAMINED EACH PERIOD.

01RF - FTI UNDER ORDER# 50009730 TO PERFORM NDE.

VESSEL INTERIOR (REF. DWG. NO. V-001, 008)

933100 IVVI-302

CIRC WELD ABOVE CORE

BARREL SHROUD

B-N-3

B13.70

VT-3 1 2 3

ACCESSIBLE AREA TO BE

EXAMINED EACH PERIOD.

01RF - FTI UNDER ORDER# 50009730 TO PERFORM NDE.

VESSEL INTERIOR (REF. DWG. NO. V-006)

933150 IVVI-303 B-N-3

THERMAL SHIELD PINS IN B13.70

CORE BARREL

VT-3 1 2

3

ACCESSIBLE AREA TO BE

EXAMINED EACH PERIOD.

NOTE: THERMAL SHIELD

PINS ARE LOCATED TOP &

BOTTOM OF THERMAL

SHIELD.

01RF - FTI UNDER ORDER# 50009730 TO PERFORM NDE.

VESSEL INTERIOR (REF. DWG. NO. V-009)

933200 IVVI-304 B-N-3

UPPER CORE PLATE KEYS B13.70

IN CORE BARREL

VT-3 1-2-3--

C X

ACCESSIBLE AREA TO BE

EXAMINED EACH PERIOD.

THE UPPER CORE PLATE

KEYS ARE LOCATED AT 0,

90, 180 & 270 DEGREES.

01RF - FTI UNDER ORDER# 50009730 TO PERFORM NDE.

PAGE: 3

K -y - _

C -X - -

C -X - -

Page 41: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS 1 ALL STATUS COMPONENTS

RPV (CORE BARREL INTER. REMOVED OR INPLACE

INSPECTION INTERVAL

ASME

SEC. XI SUMMARY EXAMINATION AREA CATEGY NDE NUMBER IDENTIFICATION ITEM NO METH

VESSEL INTERIOR (REF. DWG. NO. V-009, 010

933250 IVVI-305

TOP OF FORMERS (0 TO

360 DEG.) PLAN VIEW

FIRST PERIOD

1 2 3 4

B-N-3 VT-3 1 -

B13.70 2 - - -

3- - - -

PLAN STATUS

SECOND THIRD PERIOD PERIOD

OUTAGE--------1 2 34 1 2 34

C X

INSTRUCTIONS **CALIBRATION BLOCK**

ACCESSIBLE AREA TO BE

EXAMINED EACH PERIOD.

01RF - FTI UNDER ORDER# 50009730 TO PERFORM NDE.

VESSEL INTERIOR (REF. DWG. NO. V-001,V-00)

933300 IVVI-306 B-N-3

INSIDE CORE BARREL TOP B13.70

FLG-TO-SHELL WELD

VT-3 1 -

2 - - -

3 - - - -

C X -

ACCESSIBLE AREA TO BE

EXAMINED EACH PERIOD.

01RF - FTI UNDER ORDER# 50009730 TO PERFORM NDE.

VESSEL INTERIOR (REF. DWG. NO. V-001)

933350 IVVI-307

CORE BARREL & RPV

OUTLET NOZZLE INTERFAC

B-N-3

B13.70

VT-3 1 -

2 - - -

3 - - - -

C -X -

ACCESSIBLE AREA TO BE

EXAMINED EACH PERIOD.

THE VT-3 SHALL INCLUDE

SURFACES OF THE NOZZLES.

THE NOZZLES ARE LOCATED

AT THE 22 (14 S/G), 158

(13 S/G), 202 (11 S/G) &

338 (12 S/G) DEGREES.

01RF - FTI UNDER ORDER# 50009730 TO PERFORM NDE.

VESSEL INTERIOR (REF. DWG. NO. V-011)

933400 IVVI-308

LOWER CORE PLATE

(DISTR. PLATE) FORGING

B-N-3 VT-3 1 --------------- -------- ACCESSIBLE AREA TO BE

B13.70 2 C------- - --- EXAMINED WHEN LOWER CORE BARREL IS REMOVED. THE

VT-3 SHALL ALSO INCLUDE

PINS, BOLTING AND

GENERAL AREA OF THE

LOWER CORE PLATE.

01RF - FTI UNDER ORDER# 50009730 TO PERFORM NDE.

PAGE: 4

Page 42: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS 1 ALL STATUS COMPONENTS

RPV (CORE BARREL WHEN REMOVED)

INSPECTION INTERVAL

ASME F

SEC. XI SUMMARY EXAMINATION AREA CATEGY NDE NUMBER IDENTIFICATION ITEM NO METH

CORE SUPPORT STRUCTURE (REF. DWG. NO. V-001)

934000 IVVI-400

OUTSIDE CORE BARREL

BOTTOM FLG WELD

B-N-3

B13.70

PLAN STATUS

IRST SECOND 'ERIOD PERIOD

-2OUTAGE2 34 1 2 34

THIRD PERIOD

1 2 3 4

VT-3 1 -

2 - - -

3 - - - -

INSTRUCTIONS "**CALIBRATION BLOCK**

ACCESSIBLE SURFACES TO

BE EXAMINED EACH 10 YEAR

INTERVAL.

01RF - FTI UNDER ORDER# 50009730 TO PERFORM NDE.

CORE SUPPORT STRUCTURE (REF. DWG. NO. V-001.V-00)

934050 IVVI-401

OUTSIDE CORE BARREL

TOP FLG WELD

B-N-3

B13.70

VT-3 1 2 3

C X

ACCESSIBLE SURFACES TO

BE EXAMINED EACH 10 YEAR

INTERVAL.

01RF - FTI UNDER ORDER# 50009730 TO PERFORM NDE.

CORE SUPPORT STRUCTURE (REF. DWG. NO. V-007)

934100 IVVI-402 B-N-3

ANTI ROTATION LUGS TOP B13.70

& BOTTOM (4 EA.)

VT-3 1 2 3

C X

ACCESSIBLE SURFACES TO

BE EXAMINED EACH 10 YEAR

INTERVAL.

01RF - FTI UNDER ORDER# 50009730 TO PERFORM NDE. -C SUPPORT-- STRUCTURE...........................(REF.....D...G....NO...................

CORE SUPPORT STRUCTURE (REF. DWG. NO. V-001)

934150 IVVI-403

CIRC WELD OUTSIDE

BARREL ABOVE SHROUD

B-N-3

B13.70

VT-3 1 - -

2- -3- - -

ACCESSIBLE SURFACES TO

BE EXAMINED EACH 10 YEAR

INTERVAL.

01RF - FTI UNDER ORDER# 50009730 TO PERFORM NDE.

CORE SUPPORT STRUCTURE (REF. DWG. NO. V-007)

934200 IVVI-404 B-N-3

OUTSIDE OUTLET NOZZLES B13.70

OF BARREL (4 EA.)

VT-3 1----------2 - - - - - - - - c 3 - - - - - - - - x

ACCESSIBLE SURFACES TO

BE EXAMINED EACH 10 YEAR

INTERVAL.

01RF - FTI UNDER ORDER# 50009730 TO PERFORM NDE.

PAGE: 5

C -X - -

C X

Page 43: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS 1 ALL STATUS COMPONENTS

RPV (VESSEL INTER. W1 CORE BARREL REMOVED)

INSPECTION INTERVAL

SUMMARY EXAMINATION AREA

ASME

SEC. XI CATEGY NDE

NUMBER IDENTIFICATION ITEM NO METH

VESSEL INTERIOR (REF. DWG. NO. V-001)

PLAN STATUS

FIRST SECOND THIRD PERIOD PERIOD PERIOD

-OUT AGE12 34 12 34 1 2 34

INSTRUCTIONS "*CALIBRATION BLOCK**

935000 IVVI-500 B-N-i

INLET & OUTLET NOZZLES B13.10

VT-3 1 -

2 - - -

3 - - - -

EXAMINE AREAS MADE

ACCESSIBLE BY CORE

BARREL REMOVAL.

01RF - FTI UNDER ORDER# 50009730 TO PERFORM NDE.

VESSEL INTERIOR (REF. DWG. NO. V-001, 012)

935050 IVVI-501 A-E

INSTRUMENTATION TUBES VII

VT-3 1 -

2- - -3 - ---

-C Y -

EXAMINE AREAS MADE

ACCESSIBLE BY CORE

BARREL REMOVAL.

01RF - FTI UNDER ORDER# 50009730 TO PERFORM NDE.

VESSEL INTERIOR (REF. DWG. NO. V-001)

935100 IVVI-502

DEBRIS SCAN AND

GENERAL AREA

B-N-1

B13.10

VT-3 1 23

- C - X

EXAMINE AREAS MADE

ACCESSIBLE BY CORE

BARREL REMOVAL.

O1RF - FTI UNDER ORDER# 50009730 TO PERFORM NDE.

INTER ATTACH'S BEYOND BELTLINE REGION (REF. DWG. NO. V-001)

935150 IVVI-503

CORE BARREL SUPPORT

LUGS (6 EA.)

B-N-2 VT-3 1 -- -----

B13.60 2- - -----3- - ------

C X

ACCESSIBLE AREAS TO BE

EXAMINED WHEN CORE

BARREL IS REMOVED.

O1RF - FTI UNDER ORDER# 50009730 TO PERFORM NDE.

PAGE: 6

C X

Page 44: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

APPENDIX L

ISI Long Term Plan (Class MC)

Salem Unit I ISl PROGRAM - LTP L- I 3rd INTERVAL

REV. 0 CHG. 0

Page 45: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

PS.E&G IS' PUBLIC SERVICE ELEC. & GAS

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN SUMMARY NUMBERS 820000 THROUGH 836500

July 16, 2001 REVISION 0

Prepared By:

Peer Review:

ANII Review: •

DateL//6 'c

Date 7•o /o

Date b

Page 46: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

CONTAINMENT VESSEL

PAGE: 1SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS M ALL STATUS COMPONENTS

INSPECTION INTERVAL_

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY NDE NUMBER IDENTIFICATION ITEM NO METH

CONT. VESSEL PRESSURE RETAINING BOUNDARY

820000 LNR-S1-QUAD-000A-078 E-A

QUADRANT "A" FROM 78' E1.11

TO 100'

PLAN STATUS

FIRST SECOND THIRD PERIOD PERIOD PERIOD

-~OUTAGE------

12 3 4 1 2 3 4 1 2 3 4

(REF. DWG. NO. E-001)

VT-G 1------------2 - ---- ---------- 3 - x - - - x - - X -

INSTRUCTIONS "**CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. LINER IS INACCESSABLE DUE TO INSULATION.

820100 LNR-S1-QUAD-000B-078 E-A

QUADRANT "B" FROM 78' E1.11

TO 100'

VT-G 1------------2 - ---- ---------- 3 - x - - - x - - - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W1O# 50009730. VT-G NOTED MEDIUM RUST NOTIFICATION# 20064308 WAS GENERATED.

820200 LNR-S1-QUAD-000C-078 E-A

QUADRANT "C" FROM 78' E1.11

TO 100'

VT-G 1------------2 x- - ----------- -- c 3 - x - - - X - - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. LINER IS INACCESSABLE DUE TO INSULATION.

\ 320300 LNR-S1-QUAD-000D-078

QUADRANT "D" FROM 78'

TO 100'

E-A

E1.11

VT-G 1 -

2 - - -3 - x - - X

C - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. VT-G NOTED LIGHT AND MEDIUM RUST ON EXPOSED LINER SURFACE

NOTIFICATIO# 20064308 WAS GENERATED.

820400 LNR-S1-QUAD-000A-100 E-A

QUADRANT "A" FROM 100' E1.11

TO 130'

VT-G 1 2 - C

3 - X X - - - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER WO# 50009730. VT-G NOTED LIGHT RUST AND PAINT CHIPPING NOTIFICATION# 20064308

WAS GENERATED.

820500 LNR-S1-QUAD-000B-100 E-A

QUADRANT "B" FROM 100' E1.11

TO 130'

VT-G 1

2 C

3 - X - - - X - - - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER WO# 50009730. VT-G NOTED LIGHT TO MEDIUM RUST AND PAINT CHIPPING NOTIFICATION#

20064308 WAS GENERATED.

Page 47: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

CONTAINMENT VESSEL

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS M ALL STATUS COMPONENTS

INSPECTION INTERVAL_

SUMMARY EXAMINATION AREA NUMBER IDENTIFICATION

820600 LNR-SI-QUAD-000C-100

ASME

SEC. XI CATEGY ITEM NO

E-A

QUADRANT "C" FROM 100' E1.11

TO 130'

NDE METH

PLAN STATUS

FIRST SECOND THIRD PERIOD PERIOD PERIOD

-23 OUTAGE-----------1 2 34 12 34 1 23 4

VT-G 1-----------2 ------------- -- C 3 - x - - X - - - X

INSTRUCTIONS "**CALIBRATION BLOCK**

- PERFORM 100% GENERAL - VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O#

20064308 WAS GENERATED.

820700 LNR-S1-QUAD-000D-100 E-A

QUADRANT "D" FROM 100' E1.11

TO 130'

O1RF - NDE TO BE PERFORMED UNDER W/O#

20064308 WAS GENERATED.

820800 LNR-S1-QUAD-000A-130 E-A

QUADRANT "A" FROM 130' E1.11

TO 218'

01RF - NDE TO BE PERFORMED UNDER W/O#

20064308 WAS GENERATED.

820900 LNR-S1-QUAD-000B-130 E-A

QUADRANT "B" FROM 130' E1.11

TO 218'

50009730. VT-G NOTED MISC RUST AREAS AND PAINT CHIPPING NOTIFICATION#

VT-G 1------------2 ------------- -- C 3 - X - - - X - - - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

50009730. VT-G NOTED MISC RUST AREAS AND PAINT CHIPPING NOTIFICATION#

VT-G 1------------

2 --------------- C 3 - x - - X - - - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

50009730. VT-G NOTED MISC RUST AREAS AND PAINT CHIPPING NOTIFICATION#

VT-G 1 -2--3 - X-- X - -

C - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730.

20064308 WAS GENERATED.

VT-G NOTED MISC RUST AREAS AND PAINT CHIPPING NOTIFICATION#

821000 LNR-S1-QUAD-000C-130 E-A

QUADRANT "C" FROM 130' E1.11

TO 218'

VT-G 1------------

2 ------------- -- C 3 - x - - X - - - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. VT-G NOTED MISC RUST AREAS AND PAINT CHIPPING ON LINER

NOTIFICATION# 20064308 WAS GENERATED. AND 4 STUDS ATTACHED TO LINER HAVE HEAVY RUST NOTIFICATION# 20064412

WAS GENERATED.

821100 LNR-S1-QUAD-000D-130 E-A

QUADRANT "D" FROM 130' E1.11

TO 218'

VT-G 1-2--3 - X -- X

- C -- X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. VT-G NOTED MISC RUST AREAS AND PAINT CHIPPING NOTIFICATION#

20064308 WAS GENERATED. AND 4 STUDS PROTRUDING FROM WALL WITH HEAVY RUST NOTIFICATION# 20064412 WAS

GENERATED.

PAGE: 2 '

Page 48: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS M ALL STATUS COMPONENTS

CONTAINMENT VESSEL

INSPECTION INTERVAL_

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY NUMBER IDENTIFICATION ITEM NO

821200 LNR-S1-QUAD-000A-218 E-A

QUADRANT "A" FROM 218' E1.11

TO 288'

PLAN STATUS

FIRST SECOND THIRD PERIOD PERIOD PERIOD

NDE ------------ OUTAGE------METH 1 2 3 4 1 2 3 4 1 2 3 4

VT-G 1------------2 ------- ---- - -- - C-

3 - X- - - X - - -- -

INSTRUCTIONS "**CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. VT-G NOTED WELDED ATTACHMENTS TO LINER ARE RUSTED NOTIFICATION#

20064412 WAS GENERATED.

821300 LNR-S1-QUAD-000B-218 E-A

QUADRANT "B" FROM 218 El.11

'TO 288'

VT-G 1------------2 - - - - - - - - - C -3 - x - - - X X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. VT-G NOTED WELDED ATTACHMENTS TO LINER ARE RUSTED NOTIFICATION#

20064412 WAS GENERATED

821400 LNR-S1-QUAD-000C-218 E-A

QUADRANT "C" FROM 218' E1.11

TO 288'

VT-G 1 2 - - - - - - - - - C 3 - x - - - x - - - X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

O1RF - NDE TO BE PERFORMED UNDER W/O# 50009730. VT-G NOTED WELDED ATTACHMENTS TO LINER ARE RUSTED NOTIFICATION#

20064412 WAS GENERATED

821500 LNR-S1-QUAD-000D-218 E-A

QUADRANT "D" FROM 218' E1.11

TO 288'

VT-G 1

2 C

3 - x - X - - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. VT-G NOTED WELDED ATTACHMENTS TO LINER ARE RUSTED NOTIFICATION#

20064412 WAS GENERATED

REVISION: 0

DATE: 07/16/2001 PAGE : 3

Page 49: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS M ALL STATUS COMPONENTS

CONTAINMENT MOISTURE BARRIER

INSPECTION INTERVAL_ PLAN STA

ASME FIRST SECOND

SEC. xi PERIOD PERIOD

SUMMARY EXAMINATION AREA CATEGY NDE O----------- 0 U T A G NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3

CONT. VESSEL LOWER LINER MOISTURE BARRIER (REF. DWG. NO. E-001)

821600 MBR-S1-QUAD-000A-078

QUAD "A" MOIST BAR @ 78' EL. 270/0 DEG

E-A

E1.30

VT-G 1 -

2 - - -3 - x - -

.TUS

THIRD PERIOD

4 1 2 3 4

C - XX -

INSTRUCTIONS **CALIBRATION BLOCK"*

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. VT-G NOTED INSULATION HOLD DOWN STUDS DETERIORATED AND MISSING

NOTIFICATION# 20064417 WAS GENERATED.

821700 MBR-SI-QUAD-OOOB-078

QUAD "B" MOIST BAR @

78' EL. 0/90 DEG

E-A

El.30

VT-G 1- - ------

3 - - - - - X - - C - X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. VT-G NOTED INSULATION HOLD DOWN STUDS DETERIORATED AND MISSING

NOTIFICATION# 20064417 WAS GENERATED.

821800 MBR-SI-QUAD-000C-078

QUAD "C" MOIST BAR @

78' EL. 90/180 DE

E-A

E1.30

VT-G 1------------2 - -3 - x - - - X - - X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

NDE TO BE PERFORMED UNDER W/O# 50009730. VT-G NOTED INSULATION HOLD DOWN STUDS DETERIORATED AND MISSING

NOTIFICATION# 20064417 WAS GENERATED.

CONT. VESSEL LOWER LINER MOISTURE BARRIER (REF. DWG. NO. E-002)

821900 MBR-S1-QUAD-OOOD-078

QUAD "D" MOIST BAR @

78' EL. 180/270 DEG

E-A

E1.30

VT-G 1------------2 - - - - - - - - - C 3 - x - - - X - - X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. VT-G NOTED INSULATION HOLD DOWN STUDS DETERIORATED AND MISSING

NOTIFICATION# 20064417 WAS GENERATED.

PAGE: 4

Kx01RF -

Page 50: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

CONTAINMENT VESSEL

PAGE: 5SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS M ALL STATUS COMPONENTS

INSPECTION INTERVAL- PLAN ST

ASME FIRST SECOND

SEC. XI PERIOD PERIOD

SUIMARY EXAMINATION AREA CATEGY NDE ------------ 0 U T A

NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-024)

822000 PEN-S1-M-01 E-A

QUADRANT "A" MECH PEN El.Il

AT 108' EL.

ATUS

I THIRD PERIOD

GE4-----4 1 2 34

VT-G 1------------

2 - x - -- - --- - -- 3 - x - - - x - - - X - -

INSTRUCTIONS **CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. VT-G NOTED MEDIUM RUST OUTSIDE CONT.NOTIFICATION# 20064414 WAS

GENERATED. AND COATING ON INSIDE CONT. IS PEELING NOTIFICATION# 20064308 WAS GENERATED.

822100 PEN-S1-M-02 E-A

QUADRANT "B" MECH PEN E1.11

AT 108' EL.

VT-G 1------------

2 - X - -- - --- - -- 3 - x - - - X X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER w/O# 50009730. VT-G NOTED BLISTERING RUST OUTSIDE CONT.NOTIFICATION# 20064392 WAS

GENERATED. AND COATING ON INSIDE CONT. IS PEELING NOTIFICATION# 20064308 WAS GENERATED.

822200 PEN-S1-M-03 E-A

QUADRANT "D" MECH PEN El.11

AT 108' EL.

VT-G 1 2 - C

3 - X - - - X-- - - X

PERFORM 100% GENERAL VISUAL (VT-G) EXAM EVERY

PERIOD

NDE TO BE PERFORMED UNDER W/O# 50009730. VT-G NOTED MEDIUM RUST OUTSIDE CONT.NOTIFICATION# 20064414 WAS

GENERATED. AND COATING ON INSIDE CONT. IS PEELING NOTIFICATION# 20064308 WAS GENERATED.

822300 PEN-S1-M-04 E-A

QUADRANT "C" MECH PEN E1.l1

AT 108' EL.

VT-G 1

3 - X - - - X - -C

- X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730.

GENERATED. AREA INSIDE CONT. WAS ACCEPABLE.

COATING ON INSIDE CONT. IS PEELING NOTIFICATION# 20064308 WAS

822400 PEN-SI-M-05 E-A

QUADRANT "A" MECH PEN El.11

AT 107' EL.

VT-G 1------------2 - - - - - - - - - C -3 - x - - X - - - X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. VT-G NOTED MEDIUM RUST OUTSIDE CONT.NOTIFICATION# 20064414 WAS

GENERATED. AND COATING ON INSIDE CONT. IS PEELING NOTIFICATION# 20064308 WAS GENERATED.

822500 PEN-Sl-M-06 E-A

QUADRANT "B" MECH PEN El.11

AT 96' EL.

VT-G 1-

2 -3 - x- - - X - X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. VT-G NOTED BLISTERING RUST OUTSIDE CONT.NOTIFICATION# 20064392 WAS

GENERATED. AND COATING ON INSIDE CONT. IS PEELING NOTIFICATION# 20064308 WAS GENERATED.

'--.-01RF -

Page 51: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS M ALL STATUS COMPONENTS

CONTAINMENT VESSEL

INSPECTION INTERVAL_

ASME SEC. XI

EXAMINATION AREA CATEGY NDE

IDENTIFICATION ITEM NO METH

PEN-SI-M-07 E-A VT-G

QUADRANT "D" MECH PEN E1.11

AT 96' EL.

PLAN STATUS

FIRST SECOND THIRD PERIOD PERIOD PERIOD

-23 OUTAGE-----------1 2 34 1 234 1 234

2 - - --- - - - - c 3 - x - - X - - - X

INSTRUCTIONS "**CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED. OUTSIDE CONTAINMENT WAS ACCEPTABLE.

822700 PEN-Si-M-08 E-A

QUADRANT "C" MECH PEN E1.11

AT 96' EL.

VT-G 1C-----------2 - -3 - x - - X - - - X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED. BLISTERING RUST ON OUTSIDE CONTAINMENT NOTI.# 20064392 WAS GENERATED.

822800 PEN-S1-M-09 E-A

QUADRANT "D" MECH PEN E1.11

AT 90' EL.

VT-G 1------------2 - -3 - x - - X - X -

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON

NOTIFICATION# 20064308 WAS GENERATED. OUTSIDE CONTAINMENT WAS ACCEPTABLE.

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-023)

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

INSIDE OF CONTAINMENT

822900 PEN-S1-M-10 E-A

QUADRANT "D" MECH PEN E1.11

AT 85' EL.

VT-C 1

3 - - - - X - -C -X - -

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED-RUSTING THRU COATING ON

OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

823000 PEN-SI-M-iI E-A

QUADRANT "D" MECH PEN Ei.11

AT 85' EL.

VT-G 1 2 - - - - - - - - - C -3 - x - - - X - - - X - -

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON

OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

BOTH INSIDE AND OUTSIDE

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

BOTH INSIDE AND OUTSIDE

REVISION: 0

StU4ARY NUMBER

822600

DATE: 07/16/2001 PAGE : 6

Page 52: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

CONTAINMENT VESSEL

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS M ALL STATUS COMPONENTS

INSPECTION INTERVAL- PLAN ST

ASME FIRST SECONE

SEC. XI PERIOD PERIOD

SUMMARY EXAMINATION AREA CATEGY NDE O----------- 0 U T A NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-020)

823100 PEN-S1-M-12 E-A

QUADRANT "D" MECH PEN El.11

AT 85' EL.

'ATUS

THIRD I PERIOD

GE4-----4 1 2 34

VT-G 1C-----------2 - x - -- - --- - -- 3 - x - -X - -

INSTRUCTIONS **CALIBRATION BLOCK"*

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED. BLISTERING RUST ON OUTSIDE CONTAINMENT NOTIFICATION # 20064392 WAS

GENERATED.

823200 PEN-S1-M-13 E-A

QUADRANT "D" MECH PEN El.11

AT 88' EL.

VT-G 1C-----------2 - ------------ -- - -3 - x - -X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED. OUTSIDE CONTAINMENT WAS ACCEPTABLE.

823300 PEN-Sl-M-14 E-A

QUADRANT "D" MECH PEN El.ll

AT 85' EL.

VT-G 1C-----------2 - x - -- - --- - -- 3 - x - - - x - - -

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING

NOTIFICATION# 20064308 WAS GENERATED. OUTSIDE CONTAINMENT WAS ACCEPTABLE.

823400 PEN-Sl-M-15 E-A

QUADRANT "D" MECH PEN El.II

AT 88' EL.

VT-G 1C-----------2 - ---- -------- -- - -3 - x - - - X X - -

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING

NOTIFICATION# 20064308 WAS GENERATED. OUTSIDE CONTAINMENT WAS ACCEPTABLE.

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

ON INSIDE OF CONTAINMENT

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

ON INSIDE OF CONTAINMENT

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-023)

823500 PEN-Sl-M-16 E-A

QUADRANT "D" MECH PEN El.11

AT 85' EL.

VT-G 1-C2 - - -

3 - x - - - X

-- C -

-

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING

NOTIFICATION# 20064308 WAS GENERATED. OUTSIDE CONTAINMENT WAS ACCEPTABLE.

823600 PEN-SI-M-17 E-A

QUADRANT "D" MECH PEN E1.l1

AT 90' EL.

VT-G 1 2 C

3 - X - - X X -

)1RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING

NOTIFICATION# 20064308 WAS GENERATED. OUTSIDE CONTAINMENT WAS ACCEPTABLE.

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

ON INSIDE OF CONTAINMENT

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

ON INSIDE OF CONTAINMENT

PAGE: 7

Page 53: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

CONTAINMENT VESSEL

PAGE: 8SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS X ALL STATUS COMPONENTS

INSPECTION INTERVAL

SUMMARY EXAMINATION AREA NUMBER IDENTIFICATION

823700 PEN-SI-M-18

QUADRANT "D" MECH PEN

AT 88' EL.

ASME FIRST

SEC. XI PERIOD

CATEGY NDE ITEM NO METH 1 2 3 4

E-A VT-G 1 -

E1.lI 2 - - -

3 - x - -

PLAN STATUS

SECOND THIRD PERIOD PERIOD

OUTAGE--------1 2 34 1 2 34

C - X - - X - -

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON

NOTIFICATION# 20064308 WKS GENERATED. OUTSIDE CONTAINMENT WAS ACCEPTABLE.

INSTRUCTIONS **CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

INSIDE OF CONTAINMENT

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-019)

823800 PEN-Sl-M-19 E-A

QUADRANT "D" MECH PEN E1.ll

AT 124' EL.

VT-G 1------------2 - - - - - - - - - C 3 - x - -- X - - - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED. BLISTERING RUST ON OUTSIDE CONTAINMENT NOTIFICATION# 20064392 WAS

GENERATED.

823900 PEN-Sl-M-20 E-A

QUADRANT "D" MECH PEN E1.11

AT 124' EL.

VT-G 1------------2 - - - - - - - - - C 3 - x - -- X - - - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED. BLISTERING RUST ON OUTSIDE CONTAINMENT NOTIFICATION# 20064392 WAS

GENERATED.

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-021)

824000 PEN-Sl-M-21 E-A

QUADRANT "D" MECH PEN El.11

AT 85' EL.

VT-G 1

2 C

3 - x---- X - - - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED. OUTSIDE CONTAINMENT WAS ACCEPTABLE.

824100 PEN-Sl-M-22 E-A

QUADRANT "D" MECH PEN El.11

AT 85' EL.

VT-G 1- - ------

3 - - - - - - - -- C -

-- X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED. BLISTERING RUST ON OUTSIDE CONTAINMENT NOTIFICATION# 20064392 WAS

GENERATED.

Page 54: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

CONTAINMENT VESSEL

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS M ALL STATUS COMPONENTS

INSPECTION INTERVAL

SUMMARY EXAMINATION AREA NUMBER IDENTIFICATION

824200 PEN-S1-M-23

QUADRANT "D" MECH PEN

AT 88' EL.

ASME

SEC. XI CATEGY ITEM NO

E-A

El.11

PAGE: 9

PLAN STATUS

FIRST SECOND THIRD PERIOD PERIOD PERIOD

NDE --------------OUTAGE------METH 1 2 3 4 1 2 3 4 1 2 3 4

VT-G 1------------2 -C - - c 3 - x - - - X X - -

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON

NOTIFICATION# 20064308 WAS GENERATED. OUTSIDE CONTAINMENT WAS ACCEPTABLE.

824300 PEN-S1-M-24 E-A

QUADRANT "D" MECH PEN E1.11

AT 85' EL.

VT-G 1------------2 - - --- - - - - C 3 - x - - - X X - -

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON

NOTIFICATION# 20064308 WAS GENERATED. OUTSIDE CONTAINMENT WAS ACCEPTABLE.

824400 PEN-S1-M-25 E-A

QUADRANT "D" MECH PEN E1.11

AT 85' EL.

VT-G 1------------2 - - --- - - - - c 3 - x - - - X X - -

INSTRUCTIONS "**CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

INSIDE OF CONTAINMENT

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

INSIDE OF CONTAINMENT

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - EDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED. OUTSIDE CONTAINMENT WAS ACCEPTABLE. / ~ ~ ~ ~ ~ ~ ~ ~ ~ - -- ---- -- -- -- -- --- ----.. . ... .--------.--- -- -- ------ ---- --- ----.. .... . . ---- ------.. .. . . . . .. .... .. ..... . .. . . .. .. . .. . . .

824500 PEN-Sl-M-26 E-A

QUADRANT "D" MECH PEN E1.11

AT 90' EL.

VT-G 1 ------------2 - - --- - - - - c 3 - x - - - X X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED. OUTSIDE CONTAINMENT WAS ACCEPTABLE.

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-022)

824600 PEN-S1-M-27 E-A

QUADRANT "D" MECH PEN E1.11

AT 88' EL.

VT-G 1 -2- 3 - - - -

- X - -

- C -

- X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED. OUTSIDE CONTAINMENT WAS ACCEPTABLE.

Page 55: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

CONTAINMENT VESSEL

PAGE: 10SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS M ALL STATUS COMPONENTS

INSPECTION INTERVAL_

ASME

SEC. XI

SUMMOARY EXAMINATION AREA CATEGY NDE NUMBER IDENTIFICATION ITEM NO METH

CONT. VESSEL PRESSURE RETAINING BOUNDARY

824700 PEN-S1-M-28 E-A

QUADRANT "A" MECH PEN El.11

AT 70' EL.

FIRST PERIOD

1 2 3 4

PLAN STATUS

SECOND THIRD PERIOD PERIOD

OUTAGE--------1 2 34 1 234

(REF. DWG. NO. E-036)

VT-G 1-C2 - - -

3 - - - -

INSTRUCTIONS **CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD BOTH INSIDE AND

OUTSIDE OF CONTAINMENT

ARE INACCESSIBLE.

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. BOTH INSIDE AND OUTSIDE OF CONTAINMENT ARE INACCESSIBLE.

824800 PEN-Sl-M-29 E-A

QUADRANT "D" MECH PEN El-.11

AT 70' EL.

VT-G 1

3 - - - - - - - - - - - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD BOTH INSIDE AND

OUTSIDE OF CONTAINMENT

ARE INACCESSIBLE.

01RF - BOTH INSIDE AND OUTSIDE OF CONTAINMENT ARE INACCESSIBLE.

824900 PEN-Sl-M-30 E-A

QUADRANT "A" MECH PEN El.11

AT 50' EL.

VT-G 1 -- ------

3 - X - - - X - -

- - - - PERFORM 100% GENERAL - C - VISUAL (VT-G) EXAM EVERY

-X PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING TERU COATING

OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

825000 PEN-Sl-M-31 E-A

QUADRANT "D" MECH PEN El.11

AT 50' EL.

VT-G 1C-----------

2 -- CX 3 - x - - - X X - -

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING

OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-022)

ON BOTH INSIDE AND OUTSIDE

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

ON BOTH INSIDE AND OUTSIDE

825100 PEN-Sl-M-32 E-A

QUADRANT "D" MECH PEN E1.11

AT 88' EL.

VT-C 1- - ------

3 - X - - - X - -

- C X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED. OUTSIDE CONTAINMENT WAS ACCEPTABLE.

Page 56: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

CONTAINMENT VESSEL

PAGE: 11SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS M ALL STATUS CC•ONENTS

INSPECTION INTERVAL_

ASME FIRST

SEC. XI PERIOD

SUMMARY EXAMINATION AREA CATEGY NDE

NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4

825200 PEN-S1-M-33 E-A VT-G 1

QUADRANT "D" MECH PEN E1.l1 2 - - -

3 - X AT 85' EL.

PLAN STATUS

SECOND THIRD PERIOD PERIOD

-OUTAGE

1 2 3 4 1 2 3 4

X-C -X - -

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON

NOTIFICATION# 20064308 WAS GENERATED. OUTSIDE CONTAINMENT WAS ACCEPTABLE.

825300 PEN-Sl-M-34 E-A

QUADRANT "D" MECH PEN El.ll

AT 90' EL.

VT-G 1-l2 - - -

3 - x - - - XC -X - -

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON

NOTIFICATION# 20064308 WAS GENERATED. OUTSIDE CONTAINMENT WAS ACCEPTABLE.

825400 PEN-Sl-M-35 E-A

QUADRANT "D" MECH PEN El.11

AT 90' EL.

VT-G 1 -

2--3 - X - - - X

C -

X - -

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON

NOTIFICATION# 20064308 WAS GENERATED. OUTSIDE CONTAINMENT WAS ACCEPTABLE.

825500 PEN-Sl-M-36 E-A

QUADRANT "D" MECH PEN El.11

AT 85' EL.

VT-G 1C-----------

2 - -------------- 3 - X - - - x - - - X -

INSTRUCTIONS **CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

INSIDE OF CONTAINMENT

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

INSIDE OF CONTAINMENT

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

INSIDE OF CONTAINMENT

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED. AND BLISTERING RUST ON OUTSIDE OF CONTAINMENT NOTIFICATION WAS

GENERATED..

825600 PEN-Sl-M-37 E-A

QUADRANT "D" MECH PEN El.11

AT 90' EL.

VT-G Cl------- ------------ ---

2 --------------- C 3 - X - - - x - - - X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED. OUTSIDE CONTAINMENT WAS ACCEPTABLE.

Page 57: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

CONTAINMENT VESSEL

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS M ALL STATUS COMPONENTS

INSPECTION INTERVAL_

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY NDE NUMBER IDENTIFICATION ITEM NO METH

CONT. VESSEL PRESSURE RETAINING BOUNDARY

825700 PEN-Sl-M-38

QUADRANT "D" FUEL

TRANS TUBE AT 91' EL.

E-A

El.f11

FIRST PERIOD

1 2 3 4

PLAN STATUS

SECOND PERIOD

OUTAGE 1 2 34

THIRD PERIOD

1 2 3 4

(REF. DWG. NO. E-034)

VT-G 1 -

2 - - -

3 - - - -

INSTRUCTIONS **CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD INACCESSIBLE

REQUIRES REMOVAL OF

CONCRETE PLUG.

01RF - INACCESSIBLE REQUIRES REMOVAL OF CONCRET PLUG.

825750 PEN-S1-M-38-BLIND E-A

FLANGE QUADRANT El.11

"D" FUEL TRANS TUBE AT

91' EL.

VT-G 1 -- ------

3 - X - - - X - -C

- X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-022)

825800 PEN-S1-M-39 E-A

QUADRANT "D" MECH PEN E1.11

AT 88' EL.

VT-G 1 -

2 - - -3 - x - - X - -

C - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

O1RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED. OUTSIDE CONTAINMENT WAS ACCEPTABLE.

825900 PEN-S1-M-40 E-A

QUADRANT "D" MECH PEN E1.11

AT 124' EL.

VT-G 1------------

2 X- - ------------- c 3 - x - - -X - - - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED. BLISTERING RUST ON OUTSIDE OF CONTAINMENT NOTIFICATION # 20064308 WAS

GENERATED.

826000 PEN-S1-M-41 E-A

QUADRANT "D" MECH PEN E1.11

AT 88' EL.

VT-G 1

2 3 -3 - X -- -x - - - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED. RUST ON WELD AREA ON OUTSIDE OF CONTAINMENT NOTIFICATION # 20064414

WAS GENERATED.

PAGE: 12

Page 58: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

CONTAINMENT VESSEL

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS M ALL STATUS COMPONENTS

INSPECTION INTERVAL_

SUIMMARY EXAMINATION AREA NUMBER IDENTIFICATION

826100 PEN-S1-M-42

QUADRANT "D" MECH PEN

AT 88' EL.

ASME

SEC. XI CATEGY ITEM NO

E-A

El.11

NDE METH

VT-G 1 2

3

PLAN STATUS

FIRST SECOND THIRD PERIOD PERIOD PERIOD

-23 OUTAGE-----------1 2 34 12 34 1 2 34

- - - - - - X---- - -

INSTRUCTIONS "**CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

O1RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED. MINOR RUSTING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064414 WAS

GENERATED..

826200 PEN-S1-M-43 E-A

QUADRANT "D" MECH PEN El.11

AT 90' EL.

VT-G 1------------2 - - --- - - - - C 3 - x - - - X X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED. RUST ON WELD ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064414 WAS

GENERATED.

826300 PEN-S1-M-44 E-A

QUADRANT "D" MECH PEN El.11

AT 90' EL.

VT-G 1 -

2 - - -

3 - x - - - X

C -

X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

O1RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED. MINOR RUST ON OUTSIDE OF CONTAINMENT NOTIFICATION # 20064414 WAS

GENERATED.

826400 PEN-SI-M-45 E-A

QUADRANT "D" MECH PEN El.11

AT 90' EL.

VT-G 1 -

2 - - -3 - x - - - X

- C -

- X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED. OUTSIDE CONTAINMENT WAS ACCEPTABLE.

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-018)

826500 PEN-S1-M-46 E-A

QUADRANT "D" MECH PEN El.11

AT 90' EL.

VT-G 1 2 - X - -- - --- - -- 3 - x - - - X X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED. OUTSIDE CONTAINMENT WAS ACCEPTABLE.

PAGE: 13

Page 59: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

CONTAINMENT VESSEL

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS M ALL STATUS C0t4PONENTS

INSPECTION INTERVAL_ PLAN STATUS

SUM4ARY EXAMINATION AREA NUMBER IDENTIFICATION

826600 PEN-S1-M-47

QUADRANT "D" MECH PEN

AT 88' EL.

ASME FIRST SECOND THIRD

SEC. XI PERIOD PERIOD PERIOD

CATEGY NDE ------------ O U T A G E------

ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4

E-A VT-G 1------------

E1.I1 2- - -------- C

3 - x - - - x- - - X-

INSTRUCTIONS **CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED. OUTSIDE CONTAINMENT WAS ACCEPTABLE.

826700 PEN-SI-M-48 E-A

QUADRANT "D" MECH PEN El.11

AT 85' EL.

VT-G 1

2 C

3 - x - - X - - - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED. MINOR RUSTING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064414 WAS

GENERATED..

826800 PEN-S1-M-49 E-A

QUADRANT "D" MECH PEN E1.11

AT 88' EL.

VT-G 1

2 - C

3 - X X - - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED. OUTSIDE CONTAINMENT WAS ACCEPTABLE.

826900 PEN-Sl-M-50 E-A

QUADRANT "D" MECH PEN E1.11

AT 85' EL.

VT-G 1 2 C

3 - X - - X - X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON BOTH INSIDE AND OUTSIDE

OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

827000 PEN-S1-M-51 E-A

QUADRANT "D" MECH PEN El.11

AT 90' EL.

VT-G 1 -

2 - - -3 - x - - - X

- C -- X - -

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING

NOTIFICATION# 20064308 WAS GENERATED. OUTSIDE CONTAINMENT WAS ACCEPTABLE.

827100 PEN-S1-M-52 E-A

QUADRANT "D" MECH PEN El.11

AT 88' EL.

VT-G 1

3 - X - - - X - -

- C - X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

ON INSIDE OF CONTAINMENT

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED. BLISTERING RUST ON OUTSIDE OF CONTAINMENT NOTIFICATION # 20064392 WAS

GENERATED.

PAGE: 14

) 1RF -

Page 60: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

CONTAINMENT VESSEL

PAGE: 15SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS M ALL STATUS CCMPONENTS

INSPECTION INTERVAL

SUMMARY EXAMINATION AREA NUMBER IDENTIFICATION

827200 PEN-SI-M-53

QUADRANT "D" MECH PEN

AT 85' EL.

ASME FIRST

SEC. XI PERIOD

CATEGY NDE ITEM NO METH 1 2 3 4

E-A VT-G 1

E1.11 2 - - -3 - x - -

PLAN STATUS

SECOND THIRD PERIOD PERIOD

OUTAGE--------1 2 34 1 23 4

- X - - - X -

INSTRUCTIONS **CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING TURU COATING ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED. MINOR RUST ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064414 WAS

GENERATED.

827300 PEN-S1-M-54 E-A

QUADRANT "D" MECH PEN E1.11

AT 88' EL.

VT-G 1------------2 - - - - - - - - - C -3 - x - -- X - - - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED. OUTSIDE CONTAINMENT WAS ACCEPTABLE.

827400 PEN-S1-M-55 E-A

QUADRANT "D" MECH PEN El.11

AT 85' EL.

VT-G 1------------2 - - - - - - - - - C 3 - X - - - X - - - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

)1RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED. WHITE RESIDUE ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064414 WAS

GENERATED.

827500 PEN-S1-M-56 E-A

QUADRANT "D" MECH PEN E1.11

AT 90' EL.

VT-G 1 2 - C

3 - x - - - X - - - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED. OUTSIDE CONTAINMENT WAS ACCEPTABLE.

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-022)

827600 PEN-SI-M-57 E-A

QUADRANT "D" MECH PEN El.11

AT 88' EL.

VT-G 1

2 C

3 - x X - X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED. OUTSIDE CONTAINMENT WAS ACCEPTABLE.

Page 61: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

CONTAINMENT VESSEL

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS M ALL STATUS COMPONENTS

INSPECTION INTERVAL_

ASHE

SEC. XI SUMMARY EXAMINATION AREA CATEGY NDE NUMBER IDENTIFICATION ITEM NO METH

CONT. VESSEL PRESSURE RETAINING BOUNDARY

PLAN STATUS

FIRST SECOND THIRD PERIOD PERIOD PERIOD

-OUTAGE

1 2 3 4 1 2 3 4 1 2 3 4

(REF. DWG. NO. E-021)

INSTRUCTIONS **CALIBRATION BLOCK**

827700 PEN-SI-M-58 E-A

QUADRANT "D" MECH PEN E1.11

AT 90' EL.

VT-G 1------------

2 --------------- C 3 - x - - - X - - X

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON

NOTIFICATION# 20064308 WAS GENERATED. OUTSIDE CONTAINMENT WAS ACCEPTABLE.

827800 PEN-S1-M-59 E-A

QUADRANT "D" MECH PEN E1.11

AT 90' EL.

VT-G 1 l-2--3 - X - - X - -

C - X

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON

NOTIFICATION# 20064308 WAS GENERATED. OUTSIDE CONTAINMENT WAS ACCEPTABLE.

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

INSIDE OF CONTAINMENT

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

INSIDE OF CONTAINMENT

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-022)

827900 PEN-Sl-M-60 E-A

QUADRANT "D" MECH PEN El.11

AT 88' EL.

VT-G 1-C2--3 - X - - - X

C - X

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON

NOTIFICATION# 20064308 IWAS GENERATED. OUTSIDE CONTAINMENT WAS ACCEPTABLE.

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

INSIDE OF CONTAINMENT

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-018)

828000 PEN-S1-M-61 E-A

QUADRANT "D" MECH PEN El.11

AT 85' EL.

VT-G 1C-----------2 X- - ------------- c 3 - x - - - X - - - X - -

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON

NOTIFICATION# 20064308 WAS GENERATED. OUTSIDE CONTAINMENT WAS ACCEPTABLE. C.........NT....... ... V E S E P S R E A N N B O U N D ARY--------- (R EF-----------------------------.-D W-.............. ....N O....... ............. ......E

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-023)

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

INSIDE OF CONTAINMENT

828100 PEN-S1-M-62 E-A

QUADRANT "D" MECH PEN E1.11

AT 90' EL.

VT-G 1C- ------

3 - X - - - X - -- C - X -

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON

NOTIFICATION# 20064308 WAS GENERATED. OUTSIDE CONTAINMENT WAS ACCEPTABLE.

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

INSIDE OF CONTAINMENT

PAGE: 16

Page 62: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

CONTAINMENT VESSEL

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS M ALL STATUS COMPONENTS

INSPECTION INTERVAL

SUMMARY EXAMINATION AREA

ASME

SEC. XI CATEGY

NUMBER IDENTIFICATION ITEM NO

828200 PEN-S1-M-63 E-A

QUADRANT "D" MECH PEN El .11

AT 90' EL.

NDE METH

VT-G 1 2

3

PLAN STATUS

FIRST SECOND PERIOD PERIOD

--OUTAGE

THIRD PERIOD

1 2 3 4 1 2 3 4 1 2 3 4

- x---------------------------- -X - - - - X - -

INSTRUCTIONS **CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING

NOTIFICATION# 20064308 WAS GENERATED. BLISTERING RUST ON OUTSIDE OF CONTAINMENT

GENERATED.

ON INSIDE OF CONTAINMENT

NOTIFICATION #20064308 WAS

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-018)

828500 PEN-S1-M-66 E-A

QUADRANT "D" MECH PEN E1.11

AT 90' EL.

VT-G 1------------

2- 3 - X X X - -

01RF - NDE TO BE PERFORMED UNDER WfO# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING

NOTIFICATION# 20064308 WAS GENERATED. OUTSIDE CONTAINMENT WAS ACCEPTABLE.

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

ON INSIDE OF CONTAINMENT

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-021)

828600 PEN-S1-M-67 E-A

QUADRANT "D" MECH PEN E1.11

AT 88' EL.

VT-G 1------------2 - ---- -------- -- - -3 - x - -X - -

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING

NOTIFICATION# 20064308 WAS GENERATED. OUTSIDE CONTAINMENT WAS ACCEPTABLE.

828700 PEN-S1-M-68 E-A

QUADRANT "D" MECH PEN E1.11

AT 85' EL.

VT-G 1------------

2 - ---- -------- -- - -3 - x - - X - - X - -

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING

NOTIFICATION# 20064308 WAS GENERATED. BLISTERING RUST ON OUTSIDE OF CONTAINMENT

GENERATED.

828800 PEN-S1-M-69 E-A

QUADRANT "D" MECH PEN E1.11

AT 90' EL.

VT-G 1------------2 ------------- -- C-3 - x - - X - - X -

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING

NOTIFICATION# 20064308 WAS GENERATED. OUTSIDE CONTAINMENT WAS ACCEPTABLE.

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

ON INSIDE OF CONTAINMENT

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064392 WAS

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

ON INSIDE OF CONTAINMENT

PAGE: 17

Page 63: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

CONTAINMENT VESSEL

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS M ALL STATUS CC(PONENTS

INSPECTION INTERVAL PLAN STATUS

ASME FIRST SECOND

SEC. XI PERIOD PERIOD

SUMMARY EXAMINATION AREA CATEGY NDE ------------ 0 U T A G E NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-022)

THIRD PERIOD

1 2 3 4

PAGE: 18

INSTRUCTIONS "**CALIBRATION BLOCK**

828900 PEN-S1-M-70 E-A

QUADRANT "D" MECH PEN E1.11

AT 88' EL.

VT-G 1 -- ------

3 - x - - - x - -C

-- X - -

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON

OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

829000 PEN-S1-M-71 E-A

QUADRANT "D" MECH PEN E1.11

AT 85' EL.

VT-G l--------- - - --

2 --------------- C 3 - x - - - X - - - X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

BOTH INSIDE AND OUTSIDE

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED. BLISTERING RUST ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064392 WAS

GENERATED.

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-030)

829200 PEN-S1-E-01 E-A

QUADRANT "A" ELECT PEN El.11

AT 90' EL.

VT-G 1------------2 x- - ------------- c 3 - x - - - X - - X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED. OUTSIDE CONTAINMENT WAS INACCESIBLE DUE TO FIRE SHEILDING..

829300 PEN-S1-E-02 E-A

QUADRANT "A" ELECT PEN El.11

AT 90' EL.

VT-G 1 -

2 - - -

3 - x - - X- C - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON BOTH INSIDE AND OUTSIDE

OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

829400 PEN-Sl-E-03 E-A

QUADRANT "A" ELECT PEN El.ll

AT 90' EL.

VT-G 1C-----------2 - - - - - - - - - c 3 - x - - - X - - X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

Page 64: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

CONTAINMENT VESSEL

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS M ALL STATUS COMPONENTS

INSPECTION INTERVAL_

ASME

SEC. XI SUMMARY EXAMINATION AREA CATEGY NDE NUMBER IDENTIFICATION ITEM NO METH

CONT. VESSEL PRESSURE RETAINING BOUNDARY

829500 PEN-S1-E-04 E-A

QUADRANT "A" ELECT PEN E1 .11

AT 90' EL.

PLAN STATUS

FIRST SECOND THIRD PERIOD PERIOD PERIOD

-OUTAGE

1 2 3 4 1 2 3 4 1 2 3 4

(REF. DWG. NO. E-029)

VT-G 1 -

2 - - -3-Kx - - - X

C -X - -

INSTRUCTIONS **CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-030)

829600 PEN-Sl-E-05 E-A

QUADRANT "A" ELECT PEN El.11

AT 90' EL.

VT-G 1 -

2 - - -

3 -x - - - XC -X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

829700 PEN-S1-E-06 E-A

QUADRANT "A" ELECT PEN El.11

AT 90' EL.

VT-G 1 -

2 - - -

3 -x - - X -C -

- X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-029)

829800 PEN-Sl-E-07 E-A

QUADRANT "A" ELECT PEN El.11

AT 90' EL.

VT-G 1C-----------2 - -3 - x - - X - X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED.

829900 PEN-Sl-E-08 E-A

QUADRANT "A" ELECT PEN El.11

AT 88' EL.

VT-G 1C-----------2 X- - ------------- c 3 - x - - - x - - - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED.

PAGE: 19

Page 65: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

CONTAINMENT VESSEL

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS M ALL STATUS COMPONENTS

INSPECTION INTERVAL_

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY NDE NUMBER IDENTIFICATION ITEM NO METH

CONT. VESSEL PRESSURE RETAINING BOUNDARY

830000 PEN-S1-E-09 E-A

QUADRANT "A" ELECT PEN El.11

AT 90' EL.

PLAN STATUS

FIRST SECOND THIRD PERIOD PERIOD PERIOD

-23 OUTAGE-----------1 2 34 12 34 1 23 4

(REF. DWG. NO. E-030)

VT-G 1------------2 - ---- -------- -- - -3 - X - - - x - - -

INSTRUCTIONS "**CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

99RF - PSI BASELINE PERFORMED PER ORDER# 50000402, DUE TO AIRLOCK SEAL REPLACEMENT.

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-029)

830100 PEN-S1-E-10 E-A

QUADRANT "A" ELECT PEN EI.11

AT 90' EL.

VT-G 1 -

2 - - -

3 - x - - - XC -

X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING ON ELECTRICAL PROTECTIVE COVER ON INSIDE

OF CONTAINMENT NOTIFICATION# 20062744 WAS GENERATED. MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED.

830200 PEN-S1-E-11 E-A

QUADRANT "A" ELECT PEN El.11

AT 90' EL.

VT-G 1- - ------

3 - X - - - X - -

C -X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING ON ELECTRICAL PROTECTIVE COVER ON INSIDE

OF CONTAINMENT NOTIFICATION# 20062744 WAS GENERATED. MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-030)

830300 PEN-S1-E-12 E-A

QUADRANT "A" ELECT PEN El.11

AT 88' EL.

VT-G 1 -2--3 - X-- - X

C -X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W1O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

830400 PEN-S1-E-13 E-A

QUADRANT "A" ELECT PEN El.11

AT 90' EL.

VT-G 1- - ------

3 - X - - - X - -

- C -- X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

PAGE: 20

Page 66: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

CONTAINMENT VESSEL

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS M ALL STATUS COMPONENTS

INSPECTION INTERVAL- PLAN S

ASME FIRST SECONE

SEC. XI PERIOD PERIOD

SUMMARY EXAMINATION AREA CATEGY NDE O-----------0 U T A NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-029)

830500 PEN-Sl-E-14 E-A

QUADRANT "A" ELECT PEN El-.11

AT 85' EL.

'ATUS

THIRD p PERIOD

GE4-----4 1 2 34

VT-G 1------------

2 - ---- ---------- - -3 - x - - X X - -

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON

NOTIFICATION# 20064308 WAS GENERATED.

830600 PEN-S1-E-15 E-A

QUADRANT "A" ELECT PEN El.11

AT 90' EL.

VT-G 1------------

2 - ---- ---------- - -3 - x - - - X - - - X - -

INSTRUCTIONS **CALIBRATION BLOCK*"

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

INSIDE OF CONTAINMENT T

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (V'2-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-030)

830700 PEN-S1-E-16 E-A

QUADRANT "A" ELECT PEN El.11

AT 85' EL.

VT-G 1------------

2 - ---- ---------- - -3 - x - - - x - - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-029)

830800 PEN-S1-E-17 E-A

QUADRANT "A" ELECT PEN E.11

AT 90' EL.

VT-G 1 -2---3 - X- - X - -

- C -

- X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 'WAS GENERATED.

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-030)

830900 PEN-S1-E-18 E-A

QUADRANT "A" ELECT PEN El.11

AT 90' EL.

VT-G 1 2 - C------ - -- 3 - x - - - X - - - X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

K-,

PAGE: 21

Page 67: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS M ALL STATUS COMPONENTS

CONTAINMENT VESSEL

INSPECTION INTERVAL_

ASME

SEC. XI SUMARY EXAMINATION AREA CATEGY NDE NUMBER IDENTIFICATION ITEM NO METH

CONT. VESSEL PRESSURE RETAINING BOUNDARY

831000 PEN-S1-E-19 E-A

QUADRANT "A" ELECT PEN El.11

AT 90' EL.

PLAN STATUS

FIRST SECOND THIRD PERIOD PERIOD PERIOD

-OUTAGE

1 2 3 4 1 2 3 4 1 2 34

(REF. DWG. NO. E-029)

VT-C 1- - ------

3 - X - - - X - -

C - X

INSTRUCTIONS "**CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

O1RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-030)

831100 PEN-SI-E-20 E-A

QUADRANT "A" ELECT PEN El.11

AT 90' EL.

VT-G I -

2--3 - X - - - X

c X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-029)

831200 PEN-S1-E-21 E-A

QUADRANT "A" ELECT PEN El. 11

AT 90' EL.

VT-G 1 -

2--3 - X - - - X

C -- X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING TERU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

831300 PEN-SI-E-22 E-A

QUADRANT "A" ELECT PEN El.11

AT 88' EL.

VT-G 1------------

2 3 -3 - x - - - X X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-030)

831400 PEN-S1-E-23 E-A

QUADRANT "A" ELECT PEN El.11

AT 88' EL.

VT-G 1C-----------

2 - ---- -------- -- - -3 - x - - X - X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED.

PAGE: 22

Page 68: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

CONTAINMENT VESSEL

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS M ALL STATUS COMPONENTS

INSPECTION INTERVAL_

ASME

SEC. XI

SUMIMARY EXAMINATION AREA CATEGY NDE NUMBER IDENTIFICATION ITEM NO METH

831500 PEN-SI-E-24 E-A VT-G 1

QUADRANT "A" ELECT PEN El.11 2

AT 88' EL.

PLAN STATUS

FIRST SECOND THIRD PERIOD PERIOD PERIOD

-23 OUTAGE-----------1 2 34 12 34 1 234

- - X---- - - - - - -

INSTRUCTIONS "**CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

831600 PEN-S1-E-25 E-A

QUADRANT "A" ELECT PEN El.11

AT 88' EL.

VT-G 1C-----------2 - ---- ---------- - -3 - x - -X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-029)

831700 PEN-S1-E-26 E-A

QUADRANT "A" ELECT PEN El.11

AT 88' EL.

VT-G 1C-----------2 X. .----- - - --- C 3 - x - - X - X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

<>01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

831800 PEN-s1-E-27 E-A

QUADRANT "A" ELECT PEN El.11

AT 85' EL.

VT-G 1 -

2 - - -

3 - x - - - X -

C

X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER V/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-030)

831900 PEN-S1-E-28 E-A

QUADRANT "A" ELECT PEN El.11

AT 88' EL.

VT-G 1C-----------

2 --------------- C-3 - x - - - X - - X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

PAGE: 23

Page 69: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

CONTAINMENT VESSEL

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS M ALL STATUS COMPONENTS

INSPECTION INTERVAL_

ASME

SEC. XI SUMMARY EXAMINATION AREA CATEGY NDE NUMBER IDENTIFICATION ITEM NO METH

CONT. VESSEL PRESSURE RETAINING BOUNDARY

PLAN STATUS

FIRST SECOND THIRD PERIOD PERIOD PERIOD

-OUTAGE

1 2 3 4 1 2 3 4 1 2 3 4

(REF. DWG. NO. E-029)

INSTRUCTIONS **CALIBRATION BLOCK**

832000 PEN-SI-E-29 E-A

QUADRANT "A" ELECT PEN El. 11

AT 88' EL.

VT-G 1 -

2 - - -3 - X - - x - -

c - x

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED. OUTSIDE OF CONTAINMENT WAS INACCESSIBLE DUE TO FIRE SHIELDING.

832100 PEN-S1-E-30 E-A

QUADRANT "A" ELECT PEN El.11

AT 85' EL.

VT-G 1 -

2--3 - X - X - -

C - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND PAINT CRACKING AND MINOR CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-030)

832200 PEN-S1-E-31 E-A

QUADRANT "A" ELECT PEN El.11

AT 88' EL.

VT-G 1 -

2 - - -3 - x - - X

C X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 NAS GENERATED.

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-029)

832300 PEN-Sl-E-32 E-A

QUADRANT "A" ELECT PEN EI.11

AT 88' EL.

VT-G 1------------

2 - ---- ---------- 3 - x - - -X - - X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

O1RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED PROTECTIVE COVER OFF WITH DARK RUST ON INSIDE

OF CONTAINMENT NOTI.* 20062731 & 20064590 WERE GENERATED. MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT

NOTI.* 20064308 WAS GENERATED

832400 PEN-Sl-E-33 E-A

QUADRANT "A" ELECT PEN El.11

AT 88' EL.

VT-G 1------------2 - ---- -------- -- 3 - x - - - X X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

PAGE: 24

Page 70: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

CONTAINMENT VESSEL

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS M ALL STATUS COMPONENTS

INSPECTION INTERVAL_

ASME

SEC. XI SUMMARY EXAMINATION AREA CATEGY NDE NUMBER IDENTIFICATION ITEM NO METH

CONT. VESSEL PRESSURE RETAINING BOUNDARY

PLAN STATUS

FIRST SECOND THIRD PERIOD PERIOD PERIOD

-23 OUTAGE-----------1 2 34 1 234 1 23 4

INSTRUCTIONS "CALIBRATION BLOCK**

(REF. DWG. NO. E-030)

832500 PEN-Sl-E-34 E-A

QUADRANT "A" ELECT PEN EI.11

AT 85' EL.

VT-G 1C-----------

2 ----- -------- -- C 3 - x - - - X - - X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-029)

832600 PEN-S1-E-35 E-A

QUADRANT "A" ELECT PEN El.11

AT 88' EL.

VT-G 1C-

2 - - -

3 - x - - XC -

- X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-030)

832700 PEN-Sl-E-36 E-A

QUADRANT "A" ELECT PEN El.11

AT 85' EL.

VT-G 1 - -2 - - -

3 - x - - XC

- X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-029)

832800 PEN-S1-E-37 E-A

QUADRANT "A" ELECT PEN El.11

AT 85' EL.

VT-G C--------- - - --

2 X- - ------------- c 3 - x - - -X - - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER w/o# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

832900 PEN-Sl-E-38 E-A

QUADRANT "A" ELECT PEN El.11

AT 88' EL.

VT-G C---------- - --

2 ------------- -- C 3 - x - - -X - - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

O0RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING TERU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

PAGE: 25

Page 71: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

CONTAINMENT VESSEL

PAGE: 26SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS M ALL STATUS COMPONENTS

INSPECTION INTERVAL

ASME

SEC.

SUMMARY EXAMINATION AREA CATEG NUMBER IDENTIFICATION ITEM

833000 PEN-Sl-E-39 E-A

QUADRANT "A" ELECT PEN El.11

AT 88' EL.

XI SNDE NO METH

VT-G

PLAN STATUS

FIRST SECOND THIRD PERIOD PERIOD PERIOD

-OUTAGE

1 2 3 4 1 2 3 4 1 2 3 4

2 3 - X - - - x- -

C - X

INSTRUCTIONS **CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-030)

833100 PEN-S1-E-40 E-A

QUADRANT "A" ELECT PEN El.11

AT 88' EL.

VT-G 1-----------

2 ----- -------- -- C-3 - x - - -x - - - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-029)

833200 PEN-Sl-E-41 E-A

QUADRANT "A" ELECT PEN El. 11

AT 85' EL.

VT-G 1 -

2 - - -3 - x - - X - -

C - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED.

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-030)

833300 PEN-Sl-E-42 E-A

QUADRANT "A" ELECT PEN El.11

AT 88' EL.

VT-G 1------------

2 - ---- ---------- C-3 - x - - X - - - X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-029)

833400 PEN-Sl-E-43 E-A

QUADRANT "A" ELECT PEN El.11

AT 85' EL.

VT-G 1------------

2 - ---- -------- -- C-3 - x - - - x - - - X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED. OUTSIDE CONTAINMENT WAS INACCESSIBLE DUE TO FIRE SHIELDING.

Page 72: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

CONTAINMENT VESSEL

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS M ALL STATUS COMPONENTS

INSPECTION INTERVAL

ASME

SEC. XI SUMMARY EXAMINATION AREA CATEGY NUMBER IDENTIFICATION ITEM NO

833500 PEN-Sl-E-44 E-A

QUADRANT "A" ELECT PEN El.11

AT 85' EL.

FIRST PERIOD

PAGE: 27

PLAN STATUS

SECOND THIRD PERIOD PERIOD

NDE ---------------- OUTAGE------METH 1 2 3 4 1 2 3 4 1 2 3 4

VT-G Cl- ------ -------- -------- 2 -- -3 - x- - - X - -- ---

INSTRUCTIONS "**CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-030)

833600 PEN-Sl-E-45 E-A

QUADRANT "A" ELECT PEN El.11

AT 90' EL.

VT-G 1------------

2 - ---- -------- -- - -3 - x - - - X - - - X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

833700 PEN-Sl-E-46 E-A

QUADRANT "A" ELECT PEN El.11

AT 85' EL.

VT-G C1-----------2 - - --- - - - - C 3 - x - - - X X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-029)

833800 PEN-Sl-E-47 E-A

QUADRANT "A" ELECT PEN El.11

AT 88' EL.

VT-G 1C-----------2 - - - - - - - - - C 3 - x - - X - X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

833900 PEN-Sl-E-48 E-A

QUADRANT "A" ELECT PEN El. 11

AT 85' EL.

VT-G 1 -2---3- -X X- --

C - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER WO# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

834000 PEN-S1-E-49 E-A

QUADRANT "A" ELECT PEN El.11

AT 85' EL.

VT-G 1C-----------2 - - - - - - - - - C 3 - x - - X - - - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

'- OlRF -

Page 73: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

CONTAINMENT VESSEL

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS M ALL STATUS COMPONENTS

INSPECTION INTERVAL_

ASME

SEC. XI SUMMARY EXAMINATION AREA CATEGY NDE NUMBER IDENTIFICATION ITEM NO METH

CONT. VESSEL PRESSURE RETAINING BOUNDARY

834100 PEN-S1-E-50 E-A

QUADRANT "A" ELECT PEN El.11

AT 88' EL.

PLAN STATUS

FIRST SECOND THIRD PERIOD PERIOD PERIOD

-23 OUTAGE-----------1 2 34 1 234 1 234

(REF. DWG. NO. E-030)

VT-G 1------------2 ------------- -- C 3 - x - - X - - X

INSTRUCTIONS "**CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING TERU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-029)

834200 PEN-S1-E-51 E-A

QUADRANT "A" ELECT PEN E1.11

AT 85' EL.

VT-G 1------------2 ------------- -- C-3 - X - - - X - - - X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

834300 PEN-S1-E-52 E-A

QUADRANT "A" ELECT PEN E3.11

AT 85' EL.

VT-G 1------------2 - - - ------------ c 3 - x - - -X - - - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

834400 PEN-S1-E-53 E-A

QUADRANT "A" ELECT PEN E3.11

AT 85' EL.

VT-G 1 -2 - - -

3 - x - - XC

- X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

O1RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

834500 PEN-S1-E-54 E-A

QUADRANT "A" ELECT PEN E1.11

AT 85' EL.

VT-G 1----------------------- - - -- -- ---2- - -3 - X - - - X - - - X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

834600 PEN-S1-E-55 E-A

QUADRANT "A" ELECT PEN E3.11

AT 85' EL.

VT-G 1 -

2 - - -

3 - x - - - XC -X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

PAGE: 28

Page 74: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

CONTAINMENT VESSEL

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS N ALL STATUS COMPONENTS

INSPECTION INTERVAL

SUMMARY EXAMINATION AREA NUMBER IDENTIFICATION

834700 PEN-SI-E-56

QUADRANT "A" ELECT PEN

AT 85' EL.

ASME

SEC. XI CATEGY NDE ITEM NO METH

E-A VT-G 1

E1.11 2 3

PLAN STATUS

FIRST SECOND THIRD PERIOD PERIOD PERIOD

-OUTAGE

1 2 3 4 1 2 3 4 1 2 3 4

- X - - - X-- - - X---

INSTRUCTIONS "**CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER WIO# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-030)

834800 PEN-Sl-E-57 E-A

QUADRANT "A" ELECT PEN El.11

AT 85' EL.

VT-G 1........................ 2 - x - -- - --- - -- 3 - X -- - X - - - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-029)

834900 PEN-S1-E-58 E-A

QUADRANT "A" ELECT PEN El.11

AT 85' EL.

VT-G 1------------

2 - ---- -------- -- - -3 - x - - X - X- -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064308 WAS GENERATED. OUTSIDE CONTAINMENT 5 STUDS NOT FULLY ENGAGED NOTIFICATION # 20064309

103 GENERATED.

835000 PEN-S1-E-59 E-A

QUADRANT "A" ELECT PEN El.11

AT 90' EL.

VT-G 1------------2 ----- -------- -- C-3 - X - - - x - - - X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

NOTIFICATION# 20064306 WAS GENERATED. OUTSIDE CONTAINMENT INACCESSIBLE DUE TO FIRE SHIELDING.

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-029)

835100 PEN-S1-E-60 E-A

QUADRANT "A" ELECT PEN El-.11

AT 88' EL.

VT-G 1- - ------

3 - x - - - X - -C

X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

PAGE: 29

Page 75: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

CONTAINMENT VESSEL

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS M ALL STATUS COMPONENTS

INSPECTION INTERVAL_ PLAN ST

ASME FIRST SECOND SEC. XI PERIOD PERIOD

SUMMARY EXAMINATION AREA CATEGY NDE O----------- 0 U T A NUMBER IDENTIFICATION ITEM NO METE 1 2 3 4 1 2 3

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-029)

835200 PEN-S1-E-61 E-A

QUADRANT "A" ELECT PEN El.11

AT 85' EL.

ATUS

I THIRD PERIOD

GE

4 1 2 34

VT-G 1

2 C 3 - x - - - X - - X -

INSTRUCTIONS **CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

835300 PEN-SI-E-62 E-A

QUADRANT "A" ELECT PEN El.11

AT 88' EL.

VT-G 1 2 - ---- -------- -- - -3 - x - - - X - - - X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

835400 PEN-S1-E-63 E-A

QUADRANT "A" ELECT PEN EI.11

AT 90' EL.

VT-G 1

2 C 3 - X - - - x- - - - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-030)

835500 PEN-S1-E-64 E-A

QUADRANT "A" ELECT PEN El.11

AT 90' EL.

VT-G 1------------

2 - ---- -------- -- - -3 - X - - X x - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-029)

835600 PEN-S1-E-65 E-A

QUADRANT "A" ELECT PEN El1.11

AT 88' EL.

VT-G 1 -

2---3 - X- X -

C

X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED RUSTING THRU COATING ON INSIDE OF CONTAINMENT

AND MINOR PAINT CHIPPING ON OUTSIDE OF CONTAINMENT NOTIFICATION# 20064308 WAS GENERATED.

PAGE: 30

"•.Jl0RF -

Page 76: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

CONTAINMENT VESSEL

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS M ALL STATUS COMPONENTS

INSPECTION INTERVAL_

ASME

SEC. XI SUMMARY EXAMINATION AREA CATEGY NDE NUMBER IDENTIFICATION ITEM NO METH

CONT. VESSEL PRESSURE RETAINING BOUNDARY

FIRST PERIOD

1 2 3 4

PLAN STATUS

SECOND THIRD PERIOD PERIOD

OUTAGE--------1 2 34 1 2 34

INSTRUCTIONS "**CALIBRATION BLOCK**

(REF. DWG. NO. E-055)

835700 ALK-S1-100-AIRLOCK E-A

QUADRANT "D" MECH PEN El.11

AT 100' EL.

VT-G 1- - ------

3 - X - - - x - -- C - X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

O0RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED MINOR PAINT CHIPPING ON

NOTIFICATION# 20064308 WAS GENERATED.

OUTSIDE OF AIRLOCK

835800 ALK-Sl-130-AIRLOCK E-A

QUADRANT "D" MECH PEN E1.11

AT 130' EL.

VT-G 1 -

2 - - -3 - x - - - X

- C -- X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED MINOR PAINT CHIPPING ON

NOTIFICATION# 20064308 WAS GENERATED

OUTSIDE OF AIRLOCK

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-017)

835900 HCH-Sl-130-EQ.RATCH E-A

QUADRANT "C" EQUIPMENT E1.11

HATCH AT 130' EL.

VT-G 1------------

2 - ---- -------- -- - -3 - X - - - X -X - -

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED MINOR RUST AND COATING

20064589 & 20064414 WERE GENERATED.

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

PERIOD

CHIPPING NOTIFICATIONS

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. 205392)

836000 PNL-S1-242-1

EMBEDDED LEAK CHASE

CHANNEL PANEL 242-1

E-A VT-G 1 -

AE-01 2 - - -

3 - y - - y - - - y

PSEG AUGMENTED

EXAMINATION(NOT CATEG.

E-C.) EXAMINE THE PANEL

PLATE, NON-EMBEDDED

PORTIONS OF THE PIPING

SYSTEM, AND THE CONCRETE

IN THE IIMMEDIATE AREA OF

THE PANEL FOR EVIDENCE

OF DEGRADATION, AND

VERIFICATION THAT THE

CAPS ARE INTACT AND

UNTAMPERED. **REF.EVAL:

S-C-SEE-1032-0**

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

PAGE: 31

Page 77: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

CONTAINMENT VESSEL

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS M ALL STATUS COMPONENTS

INSPECTION INTERVAL

SUMMARY EXAMINATION AREA NUMBER IDENTIFICATION

836100 PNL-Sl-243-1

EMBEDDED LEAK CHASE

CHANNEL PANEL 243-1

ASME

SEC. XI

CATEGY NDE ITEM NO METH

E-A VT-G 1

AE-01 2 3

FIRST PERIOD

1 2 3 4

- Y - -

PLAN STATUS

SECOND PERIOD

OUTAGE

1 2 3 4

y

THIRD PERIOD

1 2 34

Y

INSTRUCTIONS **CALIBRATION BLOCK"

PSEG AUGMENTED

EXAMINATION (NOT CATEG.

E-C.) EXAMINE THE PANEL

PLATE, NON-EMBEDDED

PORTIONS OF THE PIPING

SYSTEM, AND THE CONCRETE

IN THE If•MEDIATE AREA OF

THE PANEL FOR EVIDENCE

OF DEGRADATION, AND

VERIFICATION THAT THE

CAPS ARE INTACT AND

UNTAMPERED. **REF .EVAL:

S-C-SEE-1032-0**

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

836200 PNL-Sl-244-1

EMBEDDED LEAK CHASE

CHANNEL PANEL 244-1

E-A

AE-01

VT-G 1 -

2 - - -3 - - - -7- Y

PSEG AUGMENTED

EXAMINATION (NOT CATEG.

E-C.) EXAMINE THE PANEL

PLATE, NON-EMBEDDED

PORTIONS OF THE PIPING

SYSTEM, AND THE CONCRETE

IN THE IMMEDIATE AREA OF

TEE PANEL FOR EVIDENCE

OF DEGRADATION, AND

VERIFICATION THAT THE

CAPS ARE INTACT AND

UNTAMPERED. **REF. EVAL:

S-C-SEE-1032-0**

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 VT-G NOTED PANAL 244 AIR PRESSURE IS ON THIS PANEL NO LONGER BEING

UTILIZED NOTIFICATION #20064420 WAS GENERATED.

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. 211294)

PAGE: 32

Page 78: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

CONTAINMENT VESSEL

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS M ALL STATUS COMPONENTS

INSPECTION INTERVAL

SUMMARY EXAMINATION AREA NUMBER IDENTIFICATION

836300 PNL-S1-343-1

TUBING FROM FUEL XFER

TUBE TO PNL 343-1

ASME SEC. XI

CATEGY NDE ITEM NO METH

E-A VT-G

AE-02

FIRST PERIOD

1 2 3 4

1

2 3

PLAN STATUS

SECOND PERIOD

OUTAGE1 2 3 4

123

THIRD PERIOD

1 2 34

K -- I - -

INSTRUCTIONS **CALIBRATION BLOCK**

PSEG AUGMENTED

EXAMINATION(NOT CATEG.

E-C.) EXAMINE THE TUBING

FOR EVIDENCE OF

DEGRADATION, AND

VERIFICATION THAT THE

CAPS ARE INTACT AND

UNTAMPERED. REQ'D. PER

J.ANNETT 12/01/99.

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

CONT. VESSEL PRESSURE RETAINING BOUNDARY (REF. DWG. NO. E-066)

836400 ALK-Sl-100-TUBING

100 AIRKOCK TEST

TUBING

E-A VT-G 1 -

AE-03 2---3 - y - - - -

PSEG AUGMENTED

EXAMINATION (NOT CATEG.

E-C.) EXAMINE THE TUBING

FOR EVIDENCE OF

DEGRADATION, AND

VERIFICATION THAT THE

CAPS ARE INTACT AND

UNTAMPERED. REQ'D. PER

J.ANNETT 12/01/99.

01RF - NDE TO BE PERFORMED UNDER w/O# 50009730. (VT-G)

NOTIFICATION# 20064308 WAS GENERATED

EXAM NOTED MINOR PAINT CHIPPING ON OUTSIDE OF AIRLOCK

836500 ALK-Sl-130-TUBING

130 AIRKOCK TEST

TUBING

E-A VT-G 1 -

AE-03 2---3 - Y - -

PSEG AUGMENTED

K - - EXAMINATION (NOT CATEG. -Y Y E-C.) EXAMINE THE TUBING

FOR EVIDENCE OF

DEGRADATION, AND

VERIFICATION THAT THE

CAPS ARE INTACT AND

UNTAMPERED. REQ'D. PER

J.ANNETT 12/01/99.

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

PAGE: 33

Page 79: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

APPENDIX M

ISI Long Term Plan (Class CC)

Salem Unit 1 ISI PROGRAM - LTP M-1 3rd INTERVAL

REV. 0 CHG. 0

Page 80: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

PSE&G Isi PUBLIC SERVICE ELEC. & GAS

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN SUMMARY NUMBERS 900000 THROUGH 918400

July 16, 2001 REVISION 0

'#4Prepared By

Peer Review:

Date

Date I 20 I0

Date o-lI3o/5£

Page 81: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS C ALL STATUS COMPONENTS

REINFORCED CONCRETE CONTAINMENT STRUCTURE

INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY NDE

NUMBER IDENTIFICATION ITEM NO METE

CONT. VESSEL PRESSURE RETAINING BOUNDARY

900000 CON-S1-QUAD-000A-01 L-A

CONCRETE SURFACES QUAD Li.11

"A" CYL ROW 01

PLAN STATUS

FIRST SECOND THIRD PERIOD PERIOD PERIOD

- OUTAGE

1 2 3 4 1 2 3 4 1 2 3 4

(REF. DWG. NO. L-001)

VT-G 1 -2- 3- - X -

C - X

INSTRUCTIONS **CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

900100 CON-S1-QUAD-000A-02 L-A

CONCRETE SURFACES QUAD L1.11

"A" CYL ROW 02

VT-G 1 -

2 - - -

3 - - - - X

- C X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

900200 CON-S1-QUAD-000A-03 L-A

CONCRETE SURFACES QUAD LI.11

"A" CYL ROW 03

VT-G 1 2 3

C

X - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

300300-------- CO S1 A - -------OA-----0 L-A -------

)00300 CON Sl-QUAD-OOOA-04 L-A

CONCRETE SURFACES QUAD LI.11

"A" CYL ROW 04

VT-G 1

23 - - - - X

- C -

- X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

900400 CON-S1-QUAD-000A-05 L-A

CONCRETE SURFACES QUAD L1.11

"A" CYL ROW 05

VT-G 1 2 3 3X---------- -----

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 - - - - - - -- - --.. . . . - -. . . . . .

900500 CON-S1-QUAD-000A-06 L-A

CONCRETE SURFACES QUAD LI.11

"A" CYL ROW 06

VT-G 1 -

2 - - -

3 - - - - X -

- C -

-- X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

900600 CON-S1-QUAD-000A-07 L-A

CONCRETE SURFACES QUAD L1.1I

"A" CYL ROW 07

VT-G 1 2

3

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

- - - - X

x x

O1RF - NDE TO BE PERFORMED UNDER W/O# 50009730

REVISION: 0

PAGE: 1DATE: 07/16/2001

Page 82: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS C ALL STATUS COMPONENTS

REINFORCED CONCRETE CONTAINMENT STRUCTURE

INSPECTION INTERVAL

SUMMARY EXAMINATION AREA

ASME

SEC. XI CATEGY

FIRST PERIOD

NDE

NUMBER IDENTIFICATION ITEM NO METE

900700 CON-S1-QUAD-000A-08 L-A VT-G 1

CONCRETE SURFACES QUAD L1.11 2

"A" CYL ROW 08 3

PLAN STATUS

SECOND PERIOD

OUTAGE E

1 2 3 4 1 2 3 4

X - - -

THIRD PERIOD

1234

C X

INSTRUCTIONS **CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

900800 CON-S1-QUAD-000A-09 L-A

CONCRETE SURFACES QUAD Li.Il

"A" CYL ROW 09

VT-G 1C- ------

3 - --- x - - -

- C -

- X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER WO# 50009730

900900 CON-S1-QUAD-000A-10 L-A

CONCRETE SURFACES QUAD LI.11

"A" CYL ROW 010

VT-G 1 -

2 3 X - - -

C -X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER w/o# 50009730

901000 CON-S1-QUAD-000A-11 L-A

CONCRETE SURFACES QUAD L1.11

"A" CYL ROW 011

VT-G 1 -

2 - - -

3 - - - - X - - -- C -

- X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

O1RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP

901100 CON-S1-QUAD-000A-12 L-A

CONCRETE SURFACES QUAD LI.11

"A" CYL ROW 012

VT-G 1 2

3 X - - -

- C -

-- X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP

901200 CON-S1-QUAD-000A-13 L-A

CONCRETE SURFACES QUAD LI.11

"A" CYL ROW 013

VT-G 1 -2

3 - - X - - -

C

X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 -. . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(VT-G) EXAM NOTED SCALING < 3" DEEP

901300 CON-S1-QUAD-000A-14 L-A

CONCRETE SURFACES QUAD L1.11

"A" CYL ROW 14

VT-G 1 -

2

3 X - - -

C X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP

PAGE: 2

Page 83: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS C ALL STATUS CO4PONENTS

REINFORCED CONCRETE CONTAINMENT STRUCTURE

INSPECTION INTERVAL_

SUMkARY EXAMINATION AREA

ASME

SEC. XI

CATEGY NDE

PLAN STATUS

FIRST SECOND PERIOD PERIOD

-OUTAGE-

THIRD PERIOD

NUMBER IDENTIFICATION ITEM NO METE 1 2 3 4 1 2 3 4 1 2 3 4

901400 CON-S1-QUAD-OOOA-15 L-A VT-G 1------------

CONCRETE SURFACES QUAD L1.11 2---------- C 3X---------------

"A" CYL ROW 15

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP

INSTRUCTIONS **CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

901500 CON-Sl-QUAD-000A-16 L-A

CONCRETE SURFACES QUAD LI.11

"A" CYL ROW 16

VT-G 1 -2

3

-C

X X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP

901600 CON-S1-QUAD-000A-17 L-A

CONCRETE SURFACES QUAD LI.11

"A" CYL ROW 17

VT-G 1 -2---3- X - - -

- C X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP

901700 CON-S1-QUAD-000A-18 L-A

CONCRETE SURFACES QUAD LI.11

"A" CYL ROW 18

VT-G 1 -2

3

- - ----------- -

x x

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

NDE TO BE PERFORMED UNDER W/O# 50009730

CON-S1-QUAD-000A-19 L-A

CONCRETE SURFACES QUAD LI.11

"A" CYL ROW 19

(VT-G) EXAM NOTED SCALING < 3" DEEP

VT-G 1 -

2 3 X - - -

C X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP

901900 CON-S1-QUAD-000A-20 L-A

CONCRETE SURFACES QUAD LI.11

"A" CYL ROW 20

VT-G 1

2 - -XC 3 -X - X -- - x

PERFORM 100% GENERAL VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP

902000 CON-S1-QUAD-000A-21 L-A

CONCRETE SURFACES QUAD Li.11

"A" CYL ROW 21

VT-G 1

2---- K - - - - C 3 -X X --- x

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP

PAGE: 3

01RF

901800

Page 84: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS C ALL STATUS CCOMPONENTS

REINFORCED CONCRETE CONTAINMENT STRUCTURE

INSPECTION INTERVAL_

ASME

SEC. XI

SUMO4ARY EXAMINATION AREA CATEGY NDE

NUMBER IDENTIFICATION ITEM NO METH

902100 CON-S1-QUAD-OOOA-22 L-A VT-G

CONCRETE SURFACES QUAD L1.11

"A" CYL ROW 22

FIRST PERIOD

1 2 3 4

PLAN STATUS

SECOND THIRD PERIOD PERIOD

OUTAGE--------1 2 34 1 2 34

1

2 -c 3 ---- - - - X

INSTRUCTIONS **CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP

902200 CON-S1-QUAD-000A-23 L-A

CONCRETE SURFACES QUAD Li.Il

"A" CYL ROW 23

VT-G 1-----------

2 - C 3 - - - - x - - - - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

O1RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP

902300 CON-S1-QUAD-000A-24 L-A

CONCRETE SURFACES QUAD L1.11

"A" CYL ROW 24

VT-G 1- - ------

3---- x - - -

C X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP

902400 CON-S1-QUAD-000A-25 L-A

CONCRETE SURFACES QUAD LI.11

"A" CYL ROW 25

VT-G 1 -

2- - -

3 --- - X

C

X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP ----------. ---------. ---. . . . -. --------. I. -. --------------------------------------------------------------------------. -. -----------. -. ----------

902500 CON-SI-QUAD-000B-01 L-A

CONCRETE SURFACES QUAD LI.11

"B" CYL ROW 01

VT-G 1

2 C 3 ---- X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

NOTIFICATION # 20065351 WAS GENERATED.

(VT-G) EXAM NOTED SCALING < 3" DEEP AND LIGHT TO MEDIUM RUST

902600 CON-SI-QUAD-000B-02 L-A

CONCRETE SURFACES QUAD LI.11

"B" CYL ROW 02

VT-G 1

3---- X - - -C

X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

902700 CON-S1-QUAD-000B-03 L-A

CONCRETE SURFACES QUAD L1.11

"B" CYL ROW 03

VT-G 1

3---- X - -

- C -

- X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

¾����

PAGE: 4

Page 85: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS C ALL STATUS COMPONENTS

REINFORCED CONCRETE CONTAINMENT STRUCTURE

INSPECTION INTERVAL_

ASHE FIRST

SEC. XI PERIOD

EXAMINATION AREA CATEGY NDE

IDENTIFICATION ITEM NO METE 1 2 3 4

CON-SI-QUAD-000B-04 L-A VT-G 1

CONCRETE SURFACES QUAD LX.11 2 - - -3---

"B" CYL ROW 04

PLAN STATUS

SECOND THIRD PERIOD PERIOD

-OUT AGE1 2 34 1 2 34

X - - -C X - -

INSTRUCTIONS **CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

O1RF - NDE TO BE PERFORMED UNDER W/O# 50009730

902900 CON-S1-QUAD-000B-05 L-A

CONCRETE SURFACES QUAD LI.11

"B" CYL ROW 05

VT-G 1 -2---3- X - - -

C -- X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

O1RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP AND APPROX. 127' JOINT SEAL

HAS SEPERATED NOTIFICATION # 20065351 WAS GENERATED.

903000 CON-S1-QUAD-000B-06 L-A

CONCRETE SURFACES QUAD LI.11

"B" CYL ROW 06

VT-G 1 -2 - - -

3 - - - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER WIO# 50009730

903100 CON-SI-QUAD-000B-07 L-A

CONCRETE SURFACES QUAD Li.11

"B" CYL ROW 07

VT-G 1-

2- - -3 -- -- X - - -

C -

X - -

PERFORM 100% GENERAL VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER WIO# 50009730

903200 CON-S1-QUAD-000B-08 L-A

CONCRETE SURFACES QUAD L1.11

"B" CYL ROW 08

VT-G 1

3---- X - - -

C X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

O1RF - NDE TO BE PERFORMED UNDER W/O# 50009730

903300 CON-S1-QUAD-000B-09 L-A

CONCRETE SURFACES QUAD LI.11

"B" CYL ROW 09

VT-G 1 2

3 X - - -

- C -

- X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER WVO# 50009730

903400 CON-S1-QUAD-000B-10 L-A

CONCRETE SURFACES QUAD L1.11

"B" CYL ROW 10

VT-G 1

2 ----- C 3 -X - - X - -- X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

REVISION: 0

SUMMARY NUMBER

902800

DATE: 07/16/2001 PAGE : 5

(VT-G) EXAM NOTED SCALING < 3"' DEEP

Page 86: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS C ALL STATUS COMPONENTS

REINFORCED CONCRETE CONTAINMENT STRUCTURE

INSPECTION INTERVAL

ASME

SEC. XI SUMMARY EXAMINATION AREA CATEGY NDE NUMBER IDENTIFICATION ITEM NO METH

903500 CON-S1-QUAD-000B-11 L-A VT-G 1

CONCRETE SURFACES QUAD LI.11 2

"B" CYL ROW 11

PLAN STATUS

FIRST SECOND THIRD PERIOD PERIOD PERIOD

-OUTAGE 1 2 3 4 1 2 3 4 1 2 34

- - - - X-- -------- - -

INSTRUCTIONS **CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP

903600 CON-S1-QUAD-000B-12 L-A

CONCRETE SURFACES QUAD L1.11

"B" CYL ROW 12

VT-G 1 -

2---3-

X - - -- C

X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP

903700 CON-Sl-QUAD-000B-13 L-A

CONCRETE SURFACES QUAD L1.11

"B" CYL ROW 13

VT-G I1-----------2 - - --- ------ -- 3 - - - -x- - - x

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP

903800 CON-Sl-QUAD-000B-14 L-A

CONCRETE SURFACES QUAD LI.11

"B" CYL ROW 14

VT-G 1- - ------

3---- x - - -

C

X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP

903900 CON-S1-QUAD-000B-15 L-A

CONCRETE SURFACES QUAD L1.11

"B" CYL ROW 15

VT-G 1 -

2- - -3 - --- X - - -

C X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O* 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP

904000 CON-S1-QUAD-000B-16 L-A

CONCRETE SURFACES QUAD LI.11

"B" CYL ROW 16

VT-G 1 -2

3 - - X - - -

C X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP

904100 CON-SI-QUAD-000B-17 L-A

CONCRETE SURFACES QUAD L1.11

"B" CYL ROW 17

VT-G 1- - ------

3 ---- X - - -

C - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 31 DEEP

PAGE: 6

Page 87: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS C ALL STATUS COMPONENTS

REINFORCED CONCRETE CONTAINMENT STRUCTURE

INSPECTION INTERVAL

SUOMMARY EXAMINATION AREA NUMBER IDENTIFICATION

904200 CON-SI-QUAD-000B-18

ASME

SEC. XI

CATEGY NDE ITEM NO METH

L-A

CONCRETE SURFACES QUAD LI.11

"B" CYL ROW 18

PLAN STATUS

FIRST SECOND THIRD PERIOD PERIOD PERIOD

-23 OUTAGE-----------1 2 34 12 34 1 23 4

VT-G 1

2 - -3 - - --

INSTRUCTIONS **CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM? NOTED SCALING < 3" DEEP

904300 CON-S1-QUAD-000B-19 L-A

CONCRETE SURFACES QUAD LI.11

"B" CYL ROW 19

VT-G 1

3---- X - - - - -

PERFORM 100% GENERAL VISUAL (VT-G) EXAM EVERY

5-YEARS

O1RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP -- - - - - - - - - - - - - - - -----------------------.. . . . .- -.- ---------------.- -.- --------------------------.. . . . . .I.- --.-.. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

904400 CON-S1-QUAD-000B-20 L-A

CONCRETE SURFACES QUAD LI.11

"B" CYL ROW 20

VT-G 1 -

2---3- X - - -

- C X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP

904500 CON-S1-QUAD-000B-21 L-A

CONCRETE SURFACES QUAD LI.11

"B" CYL ROW 21

VT-G 1

2---- - - - - - C 3 -X X --- x

PERFORM 100% GENERAL VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP

904600 CON-S1-QUAD-000B-22 L-A

CONCRETE SURFACES QUAD Li. 11

"B" CYL ROW 22

VT-G 1 2 3 X - - -

- C - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP

904700 CON-S1-QUAD-000B-23 L-A

CONCRETE SURFACES QUAD Li.11

"B" CYL ROW 23

VT-G 1 -2

3

-C

X X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP

904800 CON-S1-QUAD-000B-24 L-A

CONCRETE SURFACES QUAD LI.11

"B" CYL ROW 24

VT-G 1 2 - C

3 --.-- X - - X-

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP

PAGE: 7

Page 88: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS C ALL STATUS COMPONENTS

REINFORCED CONCRETE CONTAINMENT STRUCTURE

INSPECTION INTERVAL

SUMMARY EXAMINATION AREA

ASME

SEC. XI

CATEGY NDE

PLAN STATUS

FIRST SECOND PERIOD PERIOD

-OUTAGE-NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4

904900 CON-S1-QUAD-000B-25 L-A VT-G 1 -

CONCRETE SURFACES QUAD L1.11 2 - - -

"B" CYL ROW 25 3

THIRD PERIOD

1 2 3 4 1 2 3 4

C X X--

INSTRUCTIONS "**CALIBRATION BLOCK*"

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP

905000 CON-S1-QUAD-000C-01 L-A

CONCRETE SURFACES QUAD Li.11

"C" CYL ROW 01

VT-G 1------------

2 - -------------3 - - - - x - - - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YFARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

NOTIFICATION # 20065351 NGAS GENERATED.

(VT-G) EXAM NOTED SCALING < 3" DEEP. PLUS LIGHT TO MEDIUM RUST

905100 CON-S1-QUAD-000C-02 L-A

CONCRETE SURFACES QUAD L1.11

"C" CYL ROW 02

VT-G 1------------

2 - - --- ------ -- 3 - - - - x - - - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP

905200 CON-SI-QUAD-000C-03 L-A

CONCRETE SURFACES QUAD LI.11

"C" CYL ROW 03

VT-G 1 2 3

- - - -------- --- X X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP -. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

905300 CON-S1-QUAD-000C-04 L-A

CONCRETE SURFACES QUAD L1.11

"C" CYL ROW 04

VT-G 1 -2

3

- - - -------- --- X X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP

905400 CON-Si-QUAD-000C-05 L-A

CONCRETE SURFACES QUAD LI.11

"C" CYL ROW 05

VT-G 1 -2- - -

3- - - - X - - -

-- C -

- X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP

905500 CON-S1-QUAD-000C-06 L-A

CONCRETE SURFACES QUAD L1.I1

"C" CYL ROW 06

VT-G 1

2 ----- C 3 -X X -- - x

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP

PAGE: 8

Page 89: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS C ALL STATUS COMPONENTS

REINFORCED CONCRETE CONTAINMENT STRUCTURE

INSPECTION INTERVAL_

ASME

SEC.

SUMMARY EXAMINATION AREA CATEG

NUMBER IDENTIFICATION ITEM

905600 CON-S1-QUAD-000C-07 L-A

CONCRETE SURFACES QUAD LI.11

"C" CYL ROW 07

XI rr NDE NO METH

VT-G 1

FIRST PERIOD

1 2 3 4

2 - - -

3 - - - -

PLAN STATUS

SECOND THIRD

PERIOD PERIOD OUTAGE

1 2 3 4 1 2 3 4

C--X X --

INSTRUCTIONS **CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP

905700 CON-Si-QUAD-000C-08 L-A VT-G 1 2---------------

CONCRETE SURFACES QUAD LI.11

"C" CYL ROW 083 ---- X - - - - X -

PERFORM 100% GENERAL VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP

905800 CON-S1-QUAD-000C-09 L-A

CONCRETE SURFACES QUAD L1.11

"C" CYL ROW 09

VT-G 1 2 - ----- C

3 - - - -X -

PERFORM 100% GENERAL VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP

905900 CON-S1-QUAD-000C-10 L-A

CONCRETE SURFACES QUAD LI.11

"C" CYL ROW 10

VT-G 1 -2-3--

C X - -X -

PERFORM 100% GENERAL VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP

906000 CON-S1-QUAD-000C-41 L-A

CONCRETE SURFACES QUAD LI.11

"C" CYL ROW 11

VT-G 1 2 3--- X1- --

- C -X

PERFORM 100% GENERAL VISUAL (VT-G) EXAM EVERY

5-YEARS

O0RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP

906100 CON-S1-QUAD-OOOC-12 L-A

CONCRETE SURFACES QUAD LI.11

"C" CYL ROW 12

VT-G 1 2 3 -- - X---

-- C -- -

- X -- --

PERFORM 100% GENERAL VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP -----------.I. -. ------------ -------------.-. I. -. -. . ---. - --------. -----. ------------- ---------------------------- ----------------------------

906200 CON-Sl-QUAD-000C-13 L-A

CONCRETE SURFACES QUAD LI.11

"C" CYL ROW 13

VT-G 1

2 ----- C 3 - - - - X -- - -

PERFORM 100% GENERAL VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP

PAGE: 9

Page 90: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS C ALL STATUS COMPONENTS

REINFORCED CONCRETE CONTAINMENT STRUCTURE

INSPECTION INTERVAL

SUMMARY EXAMINATION AREA NUMBER IDENTIFICATION

906300 CON-S1-QUAD-000C-14

CONCRETE SURFACES QUAD

"C" CYL ROW 14

ASME

SEC. XI

CATEGY NDE ITEM NO METH

L-A VT-G 1

L1.11 2 3

FIRST PERIOD

PLAN STATUS

SECOND PERIOD

THIRD PERIOD

-23 OUTAGE-----------1 2 34 12 34 1 234

X - - -

C

X -

INSTRUCTIONS **CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP

906400 CON-S1-QUAD-000C-15 L-A

CONCRETE SURFACES QUAD LI.11

"C" CYL ROW 15

VT-G 1C----------2 ---- C

3 x - - - x

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP

906500 CON-S1-QUAD-000C-16 L-A

CONCRETE SURFACES QUAD Li.II

"C" CYL ROW 16

VT-G 1-C2---3-

X - - -

C

- X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP

906600 CON-S1-QUAD-000C-17 L-A

CONCRETE SURFACES QUAD Ll.i1

"C" CYL ROW 17

VT-G 1- - ------

3 ---- X - - -C

- X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP

906700 CON-S1-QUAD-000C-18 L-A

CONCRETE SURFACES QUAD LI.11

"C" CYL ROW 18

VT-G 1 -

2 - - -

3 - - - - X - - -

C X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

906800 CON-S1-QUAD-000C-19 L-A

CONCRETE SURFACES QUAD LI.11

"C" CYL ROW 19

VT-G 1

2 C

3 ---- X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP

906900 CON-SI-QUAD-000C-20 L-A

CONCRETE SURFACES QUAD LI.11

"C" CYL ROW 20

VT-G 1

2 - -3 - - - - x - - - - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

PAGE: 10

Page 91: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS C ALL STATUS COMPONENTS

REINFORCED CONCRETE CONTAINMENT STRUCTURE

INSPECTION INTERVAL

ASSE

SEC. XI

EXAMINATION AREA CATEGY

IDENTIFICATION ITEM NO

CON-SI-QUAD-000C-21 L-A

CONCRETE SURFACES QUAD L1.11

"C" CYL ROW 21

NDE METE

VT-G

PLAN STATUS

FIRST SECOND THIRD PERIOD PERIOD PERIOD

-OUTAGE

1 2 3 4 1 2 3 4 1 2 34

1- --

2 - - - -X - - -

- C -

- X - -

INSTRUCTIONS **CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP. -- - - - - - - - - - - ----------------------------------------------------.. . . . .I.- ----------. .- ---------------------------------------.. . . . . . . . . . . . . . . . . .

907100 CON-S1-QUAD-000C-22 L-A

CONCRETE SURFACES QUAD Li.11

"C" CYL ROW 22

VT-G 1- - ------

3 ---- X - - --C -

- X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

907200 CON-S1-QUAD-000C-23 L-A

CONCRETE SURFACES QUAD Li.11

"C" CYL ROW 23

VT-G 1------------

2 - - --- ------ -- 3 -X - - X - -- x

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP

907300 CON-S1-QUAD-000C-24 L-A

CONCRETE SURFACES QUAD L1.11

"C" CYL ROW 24

VT-G 1- - ------

3 ---- x- - -C

x

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP

907400 CON-S1-QUAD-000C-25 L-A

CONCRETE SURFACES QUAD Li.11

"C" CYL ROW 25

VT-G 1------------

2 - - --- -------- 3 - - - - x - - - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

907500 CON-SI-QUAD-000D-01 L-A

CONCRETE SURFACES QUAD LI.11

"D" CYL ROW 01

VT-G 1 2 3 X - - -

C X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 S . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .-

907600 CON-S1-QUAD-000D-02 L-A

CONCRETE SURFACES QUAD LI.11

"D" CYL ROW 02

VT-G 1 -- ------

3---- x- - -

C X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

20065351 WAS GENERATED.

(VT-G) EXAM NOTED MEDIUM RUST ON SEAL BOLTING NOTIFICATION #

SUMMARY NUMBER

907000

PAGE: 11

1 2 3

Page 92: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS C ALL STATUS COMPONENTS

REINFORCED CONCRETE CONTAINMENT STRUCTURE

INSPECTION INTERVAL

ASME

SEC. SUMMARY EXAMINATION AREA CATEG NUMBER IDENTIFICATION ITEM

907700 CON-SI-QUAD-000D-03 L-A

CONCRETE SURFACES QUAD Li.11

"D" CYL ROW 03

X1 I NDE

NO METE

VT-C

PLAN STATUS

FIRST SECOND THIRD PERIOD PERIOD PERIOD

-23 OUTAGE-----------1 2 34 1 234 1 234

1----------------------------------

3---- X- - - -

INSTRUCTIONS "**CALIBRATION BLOCK**

- - - PERFORM 100% GENERAL

C - VISUAL (VT-G) EXAM EVERY X - -

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

20065351 WAS GENERATED

(VT-G) EXAM NOTED MEDIUM RUST ON SEAL BOLTING NOTIFICATION #

907800 CON-S1-QUAD-000D-04 L-A

CONCRETE SURFACES QUAD L1.11

"D" CYL ROW 04

VT-G 1---------

3 - - - -

- - - PERFORM 100% GENERAL

C - - VISUAL (VT-G) EXAM EVERY X -5-YEARS

O1RF - NDE TO BE PERFORMED UNDER W/O# 50009730

20065351 WAS GENERATED

(VT-G) EXAM NOTED MEDIUM RUST ON SEAL BOLTING NOTIFICATION #

907900 CON-S1-QUAD-000D-05 L-A

CONCRETE SURFACES QUAD L1.11

"D" CYL ROW 05

VT-G 1---------

3---- - - - - -

- - - PERFORM 100% GENERAL

C - VISUAL (VT-G) EXAM EVERY X -5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

20065351 WAS GENERATED

(VT-G) EXAM NOTED MEDIUM RUST ON SEAL BOLTING NOTIFICATION #

908000 CON-S1-QUAD-000D-06 L-A

CONCRETE SURFACES QUAD L1.11

"D" CYL ROW 06

VT-G 1 2 - - -

3 - - - - X - - -

C -- X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

908100 CON-SI-QUAD-OOOD-07 L-A

CONCRETE SURFACES QUAD LI.11

"D" CYL ROW 07

VT-G 1 - -2--

3- - - X - -

- C -

- X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

908200 CON-S1-QUAD-000D-08 L-A

CONCRETE SURFACES QUAD LI.11

"D" CYL ROW 08

VT-G 1 2- -3- - -

C X X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP. PLUS 130' AIRLOCK

MOISTURE/INTRUSION BARRIER COVER HAS 2" LONG & 1/2" WIDE HOLE NOTIFICATION# 20065351 WAS GENERATED.

PAGE: 12

Page 93: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS C ALL STATUS COMPONENTS

REINFORCED CONCRETE CONTAINMENT STRUCTURE

INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

908300 CON-S1-QUAD-000D-09 L-A

CONCRETE SURFACES QUAD L1.11

"D" CYL ROW 09

NDE METH

VT-G 1 2 3

PLAN STATUS

FIRST SECOND THIRD PERIOD PERIOD PERIOD

-23 OUTAGE-----------1 2 34 1 234 1 2 34

- -- - X - - -

- C -

- X - -

INSTRUCTIONS "**CALIBRATION BLOCK*"

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS AREAS UNDER

DUCT WORK IS

INACCESSIBLE.

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

INACCESSIBLE.

(VT-G) EXAM NOTED SCALING < 3" DEEP. AREAS UNDER DUCT WORK IS

908400 CON-S1-QUAD-000D-10 L-A

CONCRETE SURFACES QUAD L1.11

"D" CYL ROW 10

VT-G 1 -

2 - - -

3 - - - - X - - -

C

X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS AREAS UNDER

DUCT WORK IS

INACCESSIBLE.

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

INACCESSIBLE.

(VT-G) EXAM NOTED SCALING < 3" DEEP. AREAS UNDER DUCT WORK IS

908500 CON-SI-QUAD-000D-Il L-A

CONCRETE SURFACES QUAD L1.11

"D" CYL ROW 11

VT-G 1

3---- X - - -

C

X

PERFORM 100% GENERAL VISUAL (VT-G) EXAM EVERY

5-YEARS AREAS UNDER

DUCT WORK IS

INACCESSIBLE.

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

INACCESSIBLE.

(VT-G) EXAM NOTED SCALING < 3" DEEP. AREAS UNDER DUCT WORK IS

908600 CON-S1-QUAD-OOOD-12 L-A

CONCRETE SURFACES QUAD LI.11

"D" CYL ROW 12

VT-G 1 -2---3-

C X X -

PERFORM 100% GENERAL VISUAL (VT-G) EXAM EVERY

5-YEARS AREAS UNDER

DUCT WORK IS

INACCESSIBLE.

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

INACCESSIBLE.

908700 CON-S1-QUAD-000D-13 L-A VT-G

CONCRETE SURFACES QUAD L1.11

"D" CYL ROW 13

(VT-G) EXAM NOTED SCALING < 3" DEEP. AREAS UNDER DUCT WORK IS

3---- X - - -

C -

X - -

PERFORM 100% GENERAL VISUAL (VT-G) EXAM EVERY

5-YEARS AREAS UNDER

DUCT WORK IS

INACCESSIBLE.

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

INACCESSIBLE.

(VT-G) EXAM NOTED SCALING < 3" DEEP. AREAS UNDER DUCT WORK IS

PAGE: 13

Page 94: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS C ALL STATUS COMPONENTS

REINFORCED CONCRETE CONTAINMENT STRUCTURE

INSPECTION INTERVAL

ASME

SEC. SUMMARY EXAMINATION AREA CATEG NUMBER IDENTIFICATION ITEM

908800 CON-S1-QUAD-OOOD-14 L-A

CONCRETE SURFACES QUAD LI.11

"D" CYL ROW 14

XI

IY NDE NO METH

VT-G 1 2

3

PLAN STATUS

FIRST SECOND THIRD PERIOD PERIOD PERIOD

1 U T A G E 123 1 2 3 4 1 2 3 4 1 2 3 4

x - - -

C -

- X - -

INSTRUCTIONS **CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS AREAS UNDER

DUCT WORK IS

INACCESSIBLE.

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP. AREAS UNDER DUCT WORK IS

INACCESSIBLE.

908900 CON-S1-QUAD-000D-15 L-A

CONCRETE SURFACES QUAD L1.11

"D" CYL ROW 15

VT-G 1 -

2 - - -

3 - - - -

C

- X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS AREAS UNDER

DUCT WORK IS

INACCESSIBLE.

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

INACCESSIBLE.

AREAS UNDER DUCT WORK IS

909000 CON-S1-QUAD-OOOD-16 L-A

CONCRETE SURFACES QUAD Li.11

"D" CYL ROW 16

VT-G 1 -2

3C

- - X - - - - X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS AREAS UNDER

DUCT WORK IS

INACCESSIBLE.

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G)

INACCESSIBLE.

EXAM NOTED SCALING < 3" DEEP. AREAS UNDER DUCT WORK IS

909100 CON-S1-QUAD-000D-17 L-A

CONCRETE SURFACES QUAD L1.11

"D" CYL ROW 17

VT-G 1 -2 3 X - - -

- - - - PERFORM 100% GENERAL

-C - - VISUAL (VT-G) EXAM EVERY -X - 5-YEARS AREAS UNDER

DUCT WORK IS

INACCESSIBLE.

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G)

INACCESSIBLE.

EXAM NOTED SCALING < 3" DEEP. AREAS UNDER DUCT WORK IS

909200 CON-Si-QUAD-000D-18 L-A

CONCRETE SURFACES QUAD L1.11

"D" CYL ROW 18

VT-G 1 -

2

3- - X------- -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS AREAS UNDER

DUCT WORK IS

INACCESSIBLE.

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP. AREAS UNDER DUCT WORK IS

INACCESSIBLE.

PAGE: 14

X - - -

Page 95: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS C ALL STATUS COMPONENTS

REINFORCED CONCRETE CONTAINMENT STRUCTURE

INSPECTION INTERVAL

SUMMARY EXAMINATION AREA NUMBER IDENTIFICATION

909300 CON-SI-QUAD-000D-19

CONCRETE SURFACES QUAD

"D" CYL ROW 19

ASME SEC. XI

CATEGY NDE ITEM NO METE

L-A VT-G

L1.II

PLAN STATUS

FIRST SECOND THIRD PERIOD PERIOD PERIOD

-23 OUTAGE-----------1 2 34 1 234 1 2 34

2- - -3- - - -

X - - -c X - -

INSTRUCTIONS "CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS AREAS UNDER

DUCT WORK IS

INACCESSIBLE.

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

INACCESSIBLE.

(VT-G) EXAM NOTED SCALING < 3', DEEP. AREAS UNDER DUCT WORK IS

909400 CON-S1-QUAD-000D-20 L-A

CONCRETE SURFACES QUAD LI.11

"D" CYL ROW 20

VT-G 1

2 C

3 ---- X X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS AREAS UNDER

DUCT WORK IS

INACCESSIBLE.

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

INACCESSIBLE.

(VT-G) EXAM NOTED SCALING < 3" DEEP. AREAS UNDER DUCT WORK IS

909500 CON-S1-QUAD-000D-21 L-A

CONCRETE SURFACES QUAD LI.11

"D" CYL ROW 21

VT-G 1 -

2- - -

3- -- - X - - -

-C -

- X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS AREAS UNDER

DUCT WORK IS

INACCESSIBLE.

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

INACCESSIBLE.

AREAS UNDER DUCT WORK IS

909600 CON-SI-QUAD-000D-22 L-A

CONCRETE SURFACES QUAD Li.11

"D" CYL ROW 22

VT-G 1-2---3- X - - -

- C X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS AREAS UNDER

DUCT WORK IS

INACCESSIBLE.

O1RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

INACCESSIBLE.

AREAS UNDER DUCT WORK IS

909700 CON-S1-QUAD-000D-23 L-A

CONCRETE SURFACES QUAD LI.11

"D" CYL ROW 23

VT-G 1 2 3---KX

- C -- X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS AREAS UNDER

DUCT WORK IS

INACCESSIBLE.

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP. AREAS UNDER DUCT WORK IS

INACCESSIBLE.

PAGE: 15

Page 96: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS C ALL STATUS COMPONENTS

REINFORCED CONCRETE CONTAINMENT STRUCTURE

INSPECTION INTERVAL

SUM)4ARY EXAMINATION AREA NUMBER IDENTIFICATION

909800 CON-SI-QUAD-000D-24

CONCRETE SURFACES QUAD

"D" CYL ROW 24

ASME FIRST

SEC. XI PERIOD

CATEGY NDE ITEM NO METH 1 2 3 4

L-A VT-G 1 -

Ll.11 2 - - -

3----

PLAN STATUS

SECOND THIRD PERIOD PERIOD

-OUTAGE

1 2 3 4 1 2 3 4

X - - -

C X

INSTRUCTIONS "*C*ALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS AREAS UNDER

DUCT WORK IS

INACCESSIBLE.

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP. AREAS UNDER DUCT WORK IS

INACCESSIBLE.

909900 CON-S1-QUAD-000D-25 L-A

CONCRETE SURFACES QUAD LI.11

"D" CYL ROW 25

VT-G 1-----------2 - C 3 - - - - x - - - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS AREAS UNDER

DUCT WORK IS

INACCESSIBLE.

01RF - NDE TO BE PERFORMED UNDER W/O#

INACCESSIBLE.

50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP. AREAS UNDER DUCT WORK IS

910000 CON-SI-QUAD-000A-078

CONCRETE SURFACES

QUAD-A ELECT PEN AREA

L-A

LI.11

VT-G 1 -

2- - -

3 - --- X - - -

C

X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER w/o# 50009730

910100 CON-S1-QUAD-000D-078

CONCRETE SURFACES

QUAD-D MECH PEN AREA

L-A

Li.11

VT-G 1------------2-- - - -------- C 3 - - - - x - - - - x

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730. (VT-G) EXAM NOTED SCALING

BARRIER AND BOLTING NOTIF. # 20065351 WAS GENERATED. EFFLORESCENCE

NOTIF.# 20065352 WAS GENERATED.

< 3" DEEP. MEDIUM RUST ON MOISTURE

NOTED AT AZ.60 FROM FLOOR TO EL. 85'

910200 CON-S1-QUAD-000A-26 L-A

CONCRETE SURFACES QUAD LI.11

"A" DOME ROW 26

VT-G 1

2 3---X- - -

- C - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

910300 CON-S1-QUAD-000A-27 L-A

CONCRETE SURFACES QUAD L1.11

"A" DONE ROW 27

VT-G 1

2 3 -- - X - --

- C -

-- X--

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER w/o# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

PAGE: 16

Page 97: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS C ALL STATUS COMPONENTS

REINFORCED CONCRETE CONTAINMENT STRUCTURE

INSPECTION INTERVAL

SUMMARY EXAMINATION AREA NUMBER IDENTIFICATION

910400 CON-S1-QUAD-000A-28

CONCRETE SURFACES QUAD

"A" DOME ROW 28

ASME FIRST

SEC. XI PERIOD

CATEGY NDE

ITEM NO METH 1 2 3 4

L-A VT-G 1

Ll.II 2 - - -3- - - -

PLAN STATUS

SECOND THIRD

PERIOD PERIOD

OUTAGE

1 2 3 4 1 2 3 4

X - - -

C

- X

INSTRUCTIONS **CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

910500 CON-SI-QUAD-000A-29 L-A

CONCRETE SURFACES QUAD L1.11

"A" DOME ROW 29

VT-G 1 2 ------- -------- - C

3 ---- X - - - - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

910600 CON-SI-QUAD-000A-30 L-A

CONCRETE SURFACES QUAD L1.11

"A" DOME ROW 30

VT-G 1

2 - -3 - - - - X -X - -X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

910700 CON-S1-QUAD-000A-31 L-A

CONCRETE SURFACES QUAD LI.11

"A" DOME ROW 31

VT-G 1 -

2 - - -

3 - - - - X - - -

- C X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

910800 CON-S1-QUAD-000A-32 L-A

CONCRETE SURFACES QUAD LI.11

"A" DOME ROW 32

VT-G 1

3 ---- X - - -

C -

- X - -

PERFORM 100% GENERAL VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP. ------.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

910900 CON-S1-QUAD-000A-33 L-A

CONCRETE SURFACES QUAD Ll.11

"A" DOME ROW 33

VT-G 1 2 3-- - KX

-- C -

-

PERFORM 100% GENERAL VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

911000 CON-S1-QUAD-000A-34 L-A

CONCRETE SURFACES QUAD Ll.11

"A" DOME ROW 34

VT-G 1 -

2- - -3 - - - - X - - -

C X - -

PERFORM 100% GENERAL VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

PAGE: 17

Page 98: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS C ALL STATUS COMPONENTS

REINFORCED CONCRETE CONTAINMENT STRUCTURE

INSPECTION INTERVAL

SUMMARY EXAMINATION AREA NUMBER IDENTIFICATION

911100 CON-S1-QUAD-000A-35

ASME

SEC. XI CATEGY NDE ITEM NO METH

L-A

CONCRETE SURFACES QUAD L1.11

"A" DOlME ROW 35

PLAN STATUS

FIRST SECOND THIRD PERIOD PERIOD PERIOD

-OUTAGE

1 2 3 4 1 2 3 4 1 2 34

VT-G 1 -

2---3-

X - - -- C - X

INSTRUCTIONS **CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

911200 CON-S1-QUAD-000A-36 L-A

CONCRETE SURFACES QUAD LI.11

"A" DOME ROW 36

VT-G 1 2 3 X - - -

C

- X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP. . . .. . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

911300 CON-S1-QUAD-000A-37 L-A

CONCRETE SURFACES QUAD LI.11

"A" DOME ROW 37

VT-G 1-----------2 ---- C 3 ---- x - - - x -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP. S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ...................................................... . . . . . . . . . . . . . .

911400 CON-S1-QUAD-000A-38 L-A

CONCRETE SURFACES QUAD Li.11

"A" DOME ROW 38

VT-G 1------------2 - - --- -------- 3 - - - -x- - - - x

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

911500 CON-S1-QUAD-000A-39 L-A

CONCRETE SURFACES QUAD LI.11

"A" DOME ROW 39

VT-G 1 -

2 - - -

3 - - - - K - - -

C -X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

911600 CON-S1-QUAD-000A-40 L-A

CONCRETE SURFACES QUAD LI.11

"A" DCME ROW 40

VT-G 1 -

2 - - -

3 - - - -

CX-XX - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 I.. . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

911700 CON-SI-QUAD-000A-41 L-A

CONCRETE SURFACES QUAD LI.11

"A" DOME ROW 41

VT-G 1 -

2- - -3 --- -

C

X -K

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

PAGE: 18

Page 99: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS C ALL STATUS COMPONENTS

REINFORCED CONCRETE CONTAINMENT STRUCTURE

INSPECTION INTERVAL

ASME FIRST

SEC. XI PERIOD

SUMMARY EXAMINATION AREA CATEGY NDE

NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4

911800 CON-S1-QUAD-000A-42 L-A VT-G 1 -

CONCRETE SURFACES QUAD L1.11 2 "3A- - -

"A" DONE ROW 42

PLAN STATUS

SECOND PERIOD

THIRD PERIOD

OUTAGE------1 2 3 4 1 2 34

CX-X -

INSTRUCTIONS **CALIBRATION BLOCK*"

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 --------. ------. . . . . -------. -. --------. .----. . ---------------------. .----------. .

911900 CON-S1-QUAD-000A-43 L-A

CONCRETE SURFACES QUAD L1.11

"A" DOME ROW 43

VT-G 1 2 3 X - - -

- C X -

PERFORM 100% GENERAL VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

912000 CON-S1-QUAD-000A-44 L-A

CONCRETE SURFACES QUAD Li.11

"A" DOME ROW 44

VT-G 1 2

3 X - - -

-- C -

X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

912100 CON-S1-QUAD-000A-45 L-A

CONCRETE SURFACES QUAD LI.11

"A" DOME ROW 45

VT-G 1 2 3 X - -

C X

PERFORM 100% GENERAL VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

912200 CON-S1-QUAD-000A-46 L-A

CONCRETE SURFACES QUAD L1 .11

"A" DOME ROW 46

VT-G 1-2---3- X - - -

- C - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

912300 CON-Si-QUAD-000B-26 L-A

CONCRETE SURFACES QUAD Ll.11

"B" DOME ROW 26

VT-G 1 - -.

2 - - -

3 - - - - X - - -- C - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

O1RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (vT-G) EXAM NOTED SCALING < 3" DEEP.

912400 CON-S1-QUAD-000C-26 L-A

CONCRETE SURFACES QUAD LI.11

"C" DOME ROW 26

VT-G 1 -

2---3-

C

X - X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

PAGE: 19

(VT-G) EXAM NOTED SCALING < 3"1 DEEP.

Page 100: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS C ALL STATUS COMPONENTS

REINFORCED CONCRETE CONTAINMENT STRUCTURE

INSPECTION INTERVAL_

SUMMARY EXAMINATION AREA NUMBER IDENTIFICATION

912500 CON-S1-QUAD-000D-26

CONCRETE SURFACES QUAD

"D" DOME ROW 26

ASME

SEC. XI

CATEGY NDE ITEM NO METH

L-A VT-G 1

L1.11 2 3

PLAN STATUS

FIRST SECOND THIRD PERIOD PERIOD PERIOD

-~OUTAGE------

1 2 3 4 1 2 3 4 1 2 34

- - - - ------------ - -- ---C X -

INSTRUCTIONS "**CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS AREAS UNDER

DUCT WORK IS

INACCESSIBLE.

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP. AREAS UNDER DUCT WORK IS

INACCESSIBLE.

912600 CON-S1-QUAD-000B-27 L-A

CONCRETE SURFACES QUAD LI.11

"B" DOME ROW 27

VT-G 1 -

2 3

- - ------------ - -- ---C

X X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

912700 CON-S1-QUAD-000C-27 L-A

CONCRETE SURFACES QUAD LI.11

"C" DOME ROW 27

VT-G 1 -

2 - - -

3 - - - - x - - -

C

X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

912800 CON-S1-QUAD-000D-27 L-A

CONCRETE SURFACES QUAD LI.11

"D" DOME ROW 27

VT-G 1 2 3

C

X - - - X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS AREAS UNDER

DUCT WORK IS

INACCESSIBLE.

01RF - NDE TO BE PERFORMED UNDER W/O#

INACCESSIBLE.

912900 CON-S1-QUAD-000B-28 L-A

CONCRETE SURFACES QUAD LI.11

"B" DOME ROW 28

50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP. AREAS UNDER DUCT WORK IS

VT-G 1------------

2 - - --- -------- 3 - - - -x- - - - x

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

913000 CON-S1-QUAD-000C-28 L-A

CONCRETE SURFACES QUAD LI.11

"C" DOME ROW 28

VT-G 1 2

3C

X - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/10 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

PAGE: 20

O1Rr -

Page 101: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

PAGE: 21SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS C ALL STATUS COMPONENTS

REINFORCED CONCRETE CONTAINMENT STRUCTURE

INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY NDE

NUMBER IDENTIFICATION ITEM NO METH

913100 CON-S1-QUAD-OOOD-28 L-A VT-G 1

CONCRETE SURFACES QUAD L1.11 2 "3

"D" DOM ROW 28

FIRST PERIOD

1 2 3 4

PLAN STATUS

SECOND THIRD

PERIOD PERIOD

OUTAGE 1 2 34 1 23 4

- - - - - ------X X -

INSTRUCTIONS **CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS AREAS UNDER

DUCT WORK IS

INACCESSIBLE.

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP. AREAS UNDER DUCT WORK IS

INACCESSIBLE. ---------------- - -- ---- I ---- --- --- ---- ------- ---- ---- -------- -------- --- ---I ---- -------- ------- ---- ---- ------------ ------ --- ------ -- -- ---------- -

913200 CON-SI-QUAD-OOOB-29 L-A

CONCRETE SURFACES QUAD L1.11

"B" DOME ROW 29

VT-G 1 2

3 ---- X- C

-- -- X

PERFORM 100% GENERAL VISUAL (VT-G) EXAM EVERY

5-YEARS

NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

CON-S1-QUAD-000C-29 L-A

CONCRETE SURFACES QUAD L1.11

"C" DOME ROW 29

VT-G 1 2 3---KX

- C

X

PERFORM 100% GENERAL VISUAL (VT-G) EXAM EVERY

5-YEARS

NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

913400 CON-SI-QUAD-OOOD-29 L-A

CONCRETE SURFACES QUAD LI.11

"D" DOME ROW 29

VT-G 1

3---- X - - -

- C X -

PERFORM 100% GENERAL VISUAL (VT-G) EXAM EVERY

5-YEARS AREAS UNDER

DUCT WORK IS

INACCESSIBLE.

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP. AREAS UNDER DUCT WORK IS

INACCESSIBLE. ----~~~~~~~~~~-------------- - ------------------------------------------------------------------ ------------ --- --------------------

913500 CON-SI-QUAD-000B-30 L-A

CONCRETE SURFACES QUAD Li.11

"B" DOME ROW 30

VT-G 1

3- - - - K

PERFORM 100% GENERAL VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3", DEEP.

913600 CON-S1-QUAD-OOOC-30 L-A

CONCRETE SURFACES QUAD LI.11

"C" DOME ROW 30

VT-G 1 2 3---KX

- C -

- X --

PERFORM 100% GENERAL VISUAL (VT-G) EXAM EVERY

5-YEARS

O0RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

01RF

913300

)1RF -

Page 102: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

PAGE: 22SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS C ALL STATUS COMPONENTS

REINFORCED CONCRETE CONTAINMENT STRUCTURE

INSPECTION INTERVAL_

ASME SEC. XI

SUMMARY EXAMINATION AREA CATEGY NDE NUMBER IDENTIFICATION ITEM NO METH

913700 CON-S1-QUAD-000D-30 L-A VT-G

CONCRETE SURFACES QUAD LI.11

"D" DOME ROW 30

PLAN STATUS

FIRST SECOND THIRD PERIOD PERIOD PERIOD

-23 OUTAGE-----------1 2 34 1 234 1 23 4

1

2 3

-C - - - - X - - - - - -

INSTRUCTIONS **CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS AREAS UNDER

DUCT WORK IS

INACCESSIBLE.

01RF - NDE TO BE PERFORMED UNDER W/O#

INACCESSIBLE.

913800 CON-S1-QUAD-000B-31 L-A

CONCRETE SURFACES QUAD LI.11

"B" DOME ROW 31

50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP. AREAS UNDER DUCT WORK IS

VT-G I1 VT 2 - - -

2---3--

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) - ----------------------------.. . . . -------. . ----. --. ---------. . . . . . . . . . . . . . . . . . . . . . . . . . . . ..

913900 CON-S1-QUAD-000C-31 L-A

CONCRETE SURFACES QUAD LI.11

"C" DOME ROW 31

VT-G 1 -

2

3

- C - X -

EXAM NOTED SCALING < 3" DEEP.

-- ------------------------ ---- -X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

914000 CON-S1-QUAD-000D-31 L-A

CONCRETE SURFACES QUAD LI.11

"D" DOME ROW 31

VT-G 1 -

2 3

C x -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS AREAS UNDER

DUCT WORK IS

INACCESSIBLE.

01RF - NDE TO BE PERFORMED UNDER W/O#

INACCESSIBLE.

914100 CON-S1-QUAD-000B-32 L-A

CONCRETE SURFACES QUAD LI.11

"B" DOME ROW 32

50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP. AREAS UNDER DUCT WORK IS

VT-G 1 -2

3-C

X X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

914200 CON-S1-QUAD-000C-32 L-A

CONCRETE SURFACES QUAD L1.11

"C" DOME ROW 32

VT-G 1 2

3

- - ----------- -X X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

X - - -

Page 103: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

PAGE: 23SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS C ALL STATUS COMPONENTS

REINFORCED CONCRETE CONTAINMENT STRUCTURE

INSPECTION INTERVAL_

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY NDE NUMBER IDENTIFICATION ITEM NO METH

914300 CON-S1-QUAD-000D-32 L-A VT-G 1

CONCRETE SURFACES QUAD L1.11 2

"D" DOME ROW 32 3

PLAN STATUS

FIRST SECOND THIRD PERIOD PERIOD PERIOD

-23 OUTAGE-----------1 2 34 12 34 1 23 4

X - - -

C

X

INSTRUCTIONS "**CALIBRATION BLOCK"*

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS AREAS UNDER

DUCT WORK IS

INACCESSIBLE.

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING

INACCESSIBLE.

< 3" DEEP. AREAS UNDER DUCT WORK IS

914400 CON-S1-QUAD-000B-33 L-A

CONCRETE SURFACES QUAD L1.11

"B" DOME ROW 33

VT-G 1 -2-3- -

C X X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

914500 CON-S1-QUAD-000C-33 L-A

CONCRETE SURFACES QUAD L1.11

"C" DOME ROW 33

VT-G 1 -2

3

C

X - - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

914600 CON-S1-QUAD-000D-33 L-A

CONCRETE SURFACES QUAD LI.11

"D" DOME ROW 33

VT-G 1

2---- - - - - - C 3 -X - X --- x

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS AREAS UNDER

DUCT WORK IS

INACCESSIBLE.

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G)

INACCESSIBLE.

EXAM NOTED SCALING < 3' DEEP. AREAS UNDER DUCT WORK IS

914700 CON-SI-QUAD-000B-34 L-A

CONCRETE SURFACES QUAD Li.11

"B" DOME ROW 34

VT-G 1 2 3

C

X - X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

914800 CON-S1-QUAD-000C-34 L-A

CONCRETE SURFACES QUAD LI.11

"C" DOME ROW 34

VT-G 1-2 - - -

3- - - -C--

X -X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

Page 104: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

PAGE: 24SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS C ALL STATUS COMPONENTS

REINFORCED CONCRETE CONTAINMENT STRUCTURE

INSPECTION INTERVAL_

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY NDE NUMBER IDENTIFICATION ITEM NO METH

914900 CON-S1-QUAD-000D-34 L-A VT-G 1

CONCRETE SURFACES QUAD L1.11 2 "3 "ID" DOME ROW 34

PLAN STATUS

FIRST SECOND THIRD PERIOD PERIOD PERIOD

-OUTAG-E

1 2 3 4 1 2 3 4 1 2 3 4

- - - - X- -------

INSTRUCTIONS **CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS AREAS UNDER

DUCT WORK IS

INACCESSIBLE.

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G)

INACCESSIBLE.

EXAM NOTED SCALING < 3" DEEP. AREAS UNDER DUCT WORK IS

915000 CON-S1-QUAD-000B-35 L-A

CONCRETE SURFACES QUAD Li.11

"B" DOME ROW 35

VT-G 1 -2 3

C X X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

915100 CON-S1-QUAD-000C-35 L-A

CONCRETE SURFACES QUAD LI.11

"C" DOME ROW 35

VT-G 1 -

2 - - -

3 - - - - X - - -C X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

.1RF - NDE TO BE PERFORMED UNDER W/0# 50009730 (VT-C) EXAM NOTED SCALING < 3" DEEP.

915200 CON-S1-QUAD-000D-35 L-A

CONCRETE SURFACES QUAD LI.11

"D" DOME ROW 35

VT-G C 2 3-- - X-

C X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS AREAS UNDER

DUCT WORK IS

INACCESSIBLE.

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G)

INACCESSIBLE.

EXAM NOTED SCALING < 3" DEEP. AREAS UNDER DUCT WORK IS

915300 CON-Sl-QUAD-000B-36 L-A

CONCRETE SURFACES QUAD LI.11

"B" DOME ROW 36

VT-G 1 -2 3 X - - -

- C X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP. S. . . . . . .. . . . . . . . . .- -.- ---. .I.- --------. .- --------------------------------------------------------------------------.. . . . . . . . . . . .

915400 CON-S1-QUAD-000C-36 L-A

CONCRETE SURFACES QUAD LI.11

"C" DOME ROW 36

VT-G 1

3 - --- X - - -

- C X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

Page 105: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS C ALL STATUS COMPONENTS

REINFORCED CONCRETE CONTAINMENT STRUCTURE

INSPECTION INTERVAL_

ASME FIRST

SEC. XI PERIOD

SUMMARY EXAMINATION AREA CATEGY NDE NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4

915500 CON-S1-QUAD-000D-36 L-A VT-G 1 -

CONCRETE SURFACES QUAD L1.11 2 - - -

"D" DOME ROW 36

PLAN STATUS

SECOND THIRD PERIOD PERIOD

OUTAGE--------1 2 34 1 23 4

C X X - -

INSTRUCTIONS **CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS AREAS UNDER

DUCT WORK IS

INACCESSIBLE.

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G)

INACCESSIBLE.

EXAM NOTED SCALING < 3" DEEP. AREAS UNDER DUCT WORK IS

915600 CON-S1-QUAD-OOOB-37 L-A

CONCRETE SURFACES QUAD L1.11

"B" DOME ROW 37

VT-G 1 -2

3 - - XC X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

915700 CON-S1-QUAD-000C-37 L-A

CONCRETE SURFACES QUAD LI.11

"C" DOME ROW 37

VT-G 1 -2-3- - X - - -

C X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

915800 CON-S1-QUAD-000D-37 L-A

CONCRETE SURFACES QUAD Li.11

"D" DOME ROW 37

VT-G 1---------

3 X -

- - - PERFORM 100% GENERAL

C - - VISUAL (VT-G) EXAM EVERY

X 5-YEARS AREAS UNDER

DUCT WORK IS

INACCESSIBLE.

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

INACCESSIBLE.

(VT-G) EXAM NOTED SCALING < 3" DEEP. AREAS UNDER DUCT WORK IS

915900 CON-S1-QUAD-000B-38 L-A

CONCRETE SURFACES QUAD L1.11I

"B" DOME ROW 38

VT-G 1 2

3-C

- - X - - - - X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

916000 CON-S1-QUAD-000C-38 L-A

CONCRETE SURFACES QUAD LI.11

"C" DOME ROW 38

VT-G 1

2 - C 3 ---- X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

PAGE: 25

01RF-

Page 106: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS C ALL STATUS COMPONENTS

REINFORCED CONCRETE CONTAINMENT STRUCTURE

INSPECTION INTERVAL_

ASME

SEC. XI

SUMO•ARY EXAMINATION AREA CATEGY NDE NUMBER IDENTIFICATION ITEM NO METH

916100 CON-S1-QUAD-000D-38 L-A VT-G

CONCRETE SURFACES QUAD L1.11

"D" DOME ROW 38

PLAN STATUS

FIRST SECOND THIRD PERIOD PERIOD PERIOD

-23 OUTAGE-----------1 2 34 1 234 1 234

21- - -

2 - - -

3-1

X - - -

C

X -

INSTRUCTIONS **CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS AREAS UNDER

DUCT WORK IS

INACCESSIBLE.

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

INACCESSIBLE.

(VT-G) EXAM NOTED SCALING < 3" DEEP. AREAS UNDER DUCT WORK IS

916200 CON-S1-QUAD-000B-39 L-A

CONCRETE SURFACES QUAD Li.11

"B" DOME ROW 39

VT-G 1 2 3

PERFORM 100% GENERAL --C -VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

916300 CON-S1-QUAD-000C-39 L-A

CONCRETE SURFACES QUAD Li.11

"C" DOME ROW 39

VT-G 1 -

2 3

C - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

916400 CON-S1-QUAD-000D-39 L-A

CONCRETE SURFACES QUAD L1.11

"D" DOME ROW 39

VT-G 1 -2- 3- -

x - - -

C

X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS AREAS UNDER

DUCT WORK IS

INACCESSIBLE.

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G)

INACCESSIBLE.

EXAM NOTED SCALING < 3" DEEP. AREAS UNDER DUCT WORK IS

916500 CON-S1-QUAD-000B-40 L-A

CONCRETE SURFACES QUAD LI.11

"B" DOME ROW 40

VT-G 1 -2---3- X - - -

-C

X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

916600 CON-S1-QUAD-000C-40 L-A

CONCRETE SURFACES QUAD LI.11

"C" DOME ROW 40

VT-G 1 -

2- - -

3- - - - X - - -

-C -- x - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP.

PAGE: 26

Page 107: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS C ALL STATUS COMPONENTS

REINFORCED CONCRETE CONTAINMENT STRUCTURE

INSPECTION INTERVAL_

ASME

SEC. XI SUMMARY EXAMINATION AREA CATEGY NDE NUMBER IDENTIFICATION ITEM NO METH

916650 CON-SI-QUAD-000D-40 L-A VT-G

CONCRETE SURFACES QUAD LI.11

"I'D" DOME ROW 40

PLAN STATUS

FIRST SECOND THIRD PERIOD PERIOD PERIOD

-23 OUTAGE-----------1 2 34 1 234 1 2 34

2 - -------------3 - - --

INSTRUCTIONS "**CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS AREAS UNDER

DUCT WORK IS

INACCESSIBLE.

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 (VT-G) EXAM NOTED SCALING < 3" DEEP. AREAS UNDER DUCT WORK IS

INACCESSIBLE.

916700 CON-S1-QUAD-000B-41 L-A

CONCRETE SURFACES QUAD Li.11

"B" DCU4E ROW 41

VT-G 1-2-3--

- C XX

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

916800 CON-S1-QUAD-000C-41 L-A

CONCRETE SURFACES QUAD LI.11

"C" DOME ROW 41

VT-G 1 -2-3--

C X X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

NDE TO BE PERFORMED UNDER W/O# 50009730

916900 CON-S1-QUAD-000D-41 L-A

CONCRETE SURFACES QUAD L1.11

"D" DOME ROW 41

VT-G 1 2 3 X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS AREAS UNDER

DUCT WORK IS

INACCESSIBLE.

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 AREAS UNDER DUCT WORK IS INACCESSIBLE.

917000 CON-S1-QUAD-000B-42 L-A

CONCRETE SURFACES QUAD LI.1I

"B" DOME ROW 42

VT-G 1 -

2 - - -

3 - - - - X

C -

x

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

917100 CON-S1-QUAD-000C-42 L-A

CONCRETE SURFACES QUAD L1.11

"C" DOME ROW 42

VT-G 1 ------- ---------------- PERFORM 100% GENERAL

2 - - - -- ---------- - - VISUAL (VT-G) EXAM EVERY

3 - - - -x -------- -- --

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

¾��'

PAGE: 27

01RF -

C

X

Page 108: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS C ALL STATUS CCOPONENTS

REINFORCED CONCRETE CONTAINMENT STRUCTURE

INSPECTION INTERVAL_

ASME

SEC. XI

SUM)MARY EXAMINATION AREA CATEGY NDE NUMBER IDENTIFICATION ITEM NO METH

917200 CON-S1-QUAD-000D-42 L-A VT-G

CONCRETE SURFACES QUAD L1.11

"D" DOME ROW 42

PLAN STATUS

FIRST SECOND THIRD PERIOD PERIOD PERIOD

-- OUTAGE----------

1 2 3 4 1 2 3 4 1 2 3 4

1

2 3

- - - - X----------- - -- ---C -

X X - -

INSTRUCTIONS **CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS AREAS UNDER

DUCT WORK IS

INACCESSIBLE.

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 AREAS UNDER DUCT WORK IS INACCESSIBLE.

917300 CON-S1-QUAD-000B-43 L-A

CONCRETE SURFACES QUAD LI.11

"B" DOME ROW 43

VT-G 1- - ------

3---- x - - -

C

X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

917400 CON-S1-QUAD-OOOC-43 L-A

CONCRETE SURFACES QUAD LI.11

"C" DOME OW 43

VT-G 1 2

3 X - - -

- C -

- X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

CON-S1-QUAD-000D-43 L-A

CONCRETE SURFACES QUAD Li.11

"D" DOME ROW 43

VT-G 1 -

2 - - -

3 - - - -

C - X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS AREAS UNDER

DUCT WORK IS

INACCESSIBLE.

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 AREAS UNDER DUCT WORK IS INACCESSIBLE.

917600 CON-SI-QUAD-000B-44 L-A

CONCRETE SURFACES QUAD LI.11

"B" DO•4E ROW 44

VT-G 1 -

2 3 X - - -

c X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

917700 CON-S1-QUAD-000C-44 L-A

CONCRETE SURFACES QUAD L1 .11

"C" DOME ROW 44

VT-G 1 -2 3

- - ------------ - -- ---C X X

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

REVISION: 0

917500

DATE: 07/16/2001 PAGE : 28

Page 109: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS C ALL STATUS COMPONENTS

REINFORCED CONCRETE CONTAINMENT STRUCTURE

INSPECTION INTERVAL

SUMMARY EXAMINATION AREA NUMBER IDENTIFICATION

917800 CON-S1-QUAD-OOOD-44

CONCRETE SURFACES QUAD

"D" DOME ROW 44

PLAN ST

ASME FIRST SECOND

SEC. XI PERIOD PERIOD

CATEGY NDE ------------ O U T A ITEM NO METH 1 2 3 4 1 2 3

L-A VT-G 1- - -----

L1.11 2- - -----

3---- x -

'ATUS

THIRD I PERIOD

GE

E - -X - -

INSTRUCTIONS "t

*CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS AREAS UNDER

DUCT WORK IS

INACCESSIBLE.

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 AREAS UNDER DUCT WORK IS INACCESSIBLE.

917900 CON-S1-QUAD-000B-45 L-A

CONCRETE SURFACES QUAD LI.11

"B" DOME ROW 45

VT-G 1 2

3 x

-C

-X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

O1RF - NDE TO BE PERFORMED UNDER W/O# 50009730

918000 CON-S1-QUAD-000C-45 L-A

CONCRETE SURFACES QUAD Li.11

"C" DOME ROW 45

VT-G 1 2

3 x

C

X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

918100 CON-S1-QUAD-000D-45 L-A

CONCRETE SURFACES QUAD Li.11

"D" DOME ROW 45

VT-G 1 -2 - - -

3 - - - - X

- - - C -

- -- X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS AREAS UNDER

DUCT WORK IS

INACCESSIBLE.

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 - --------. -. ------. . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

AREAS UNDER DUCT WORK IS INACCESSIBLE.

918200 CON-S1-QUAD-000B-46 L-A

CONCRETE SURFACES QUAD L1.11

"B" DOME ROW 46

VT-G 1 --- -----

3 ---- -- C

X -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

918300 CON-S1-QUAD-000C-46 L-A

CONCRETE SURFACES QUAD L1.11

"C" DOME ROW 46

VT-G 1- - ------

3 - -- - -- K 32 - C -X - -

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730

PAGE: 29

Page 110: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

DATE: 07/16/2001

REVISION: 0

SALEM NUCLEAR GENERATING STATION UNIT 1

INSERVICE INSPECTION PROGRAM LONG TERM PLAN

CLASS C ALL STATUS COMPONENTS

REINFORCED CONCRETE CONTAINMENT STRUCTURE

INSPECTION INTERVAL

ASME

SEC. XI SUMMARY EXAMINATION AREA CATEGY NUMBER IDENTIFICATION ITEM NO

918400 CON-S1-QUAD-000D-46 L-A

CONCRETE SURFACES QUAD LI.11

"D" DOME ROW 46

NDE METH

PLAN STATUS

FIRST SECOND THIRD PERIOD PERIOD PERIOD

-23 OUTAGE-----------1 2 34 12 34 1 2 34

VT-G 1- -

2 - - -

3 - --- x - - -

- C -

- X - -

INSTRUCTIONS "*CALIBRATION BLOCK**

PERFORM 100% GENERAL

VISUAL (VT-G) EXAM EVERY

5-YEARS AREAS UNDER

DUCT WORK IS

INACCESSIBLE.

01RF - NDE TO BE PERFORMED UNDER W/O# 50009730 AREAS UNDER DUCT WORK IS INACCESSIBLE. - - - - - -- - - - - ----------------------------.. . . .- -------------.- -----. .- ---------.- ----------------------.. . . ---. --------------. . . . . . . . . . . . . . . . . . . . . .

PAGE: 30

Page 111: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

F1 8

Factory Mutual Insurance Company 1151 Boston-Providence Turnpike, P.O. Box 9102, Norwood, MA 02062 USA T: (781) 255-4200 F: (781) 255-4218

Factory Mutual Insurance Company Section XI Third Interval

Inspection Plan Report For

Salem Unit No. 1 Generating Station

I. Purpose

This review was performed in order to satisfy the requirements of ASME Section XI 1995 Edition 1996 Addenda specifically IWA-21 10 (a)(3).

II. Scope

The review of this inspection plan covered the following areas: examination categories and items, test and examination requirements, examination methods, percentages of parts selected for

examination, inservice test quantities, disposition of test results, test frequency, system pressure tests and sequence of successive examinations.

III. General Information

Reviewer: D. W. Kinley - ANII

Controlling Documents: 1. ASME Section XI 1995 Edition 1996 Addenda

2. ASME Section XI 1998 Edition 1998 Addenda via SH-RR-E01 and SC-RR-L01

3. Salem Unit No.1 Nuclear Generating Station, Inservice Inspection Program Third Interval

Long Term Plan (LTP) June 2001 Revision 0

IV. Comments

Page 112: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

Index 33805.02 -DiAc2 11 2000 ~.k Page 2

1. Cover sheet needs to be revised to reflect the correct name of the Authorized Inspection Agency as "Factory Mutual Insurance Company"

2. The "Table of Contents" has some pagination issues that should be addressed.

3. Paragraph 1.2 references Owners Responsibilities as IWA-4100, this should be IWA-1400.

4. Section 1.5 "Glossary" suggest removing the words "Hope Creek Generating Station Programs" from the definition of Code.

5. Section 1.5, Suggest defining an SER in the Glossary section.

6. Paragraph 2.2-second bullet forth line down, remove the "s" and substitute "Editions".

7. Paragraph 2.4.1, suggest removing the words "for the Pre-service and First Inspection Interval".

8. Paragraph 2.5 should add "IWL" after IWE.

9. Section 2.0 ISI Program Applicability, Code Case N-532-1 is listed however this should read Code Case N-532.

10. Paragraph 2.6, Suggest adding Code years after B3 1.1 and B31.7, Also noted that B3 1.1.0. should be B31.1.

11. Paragraph 3.2 add the number "4" after NPS in IWC- 1221(a) (2).

12. Paragraph 3.3 "The following components are exempted from theVT-lvisual examination of IWD-2500." Should reference VT-3 not VT-i.

13. Paragraph 3.5 Which Code Year an addenda apply to the IWF exemptions (i.e.1989 or 1995/ 1996 addenda for IWB).

14. Section 4.0, Exam Category B-A does not list Item No. B1.50 Repair Welds.

15. Section 4.0 Exam Category B-A, Suggest further defining "per Code Note (3)". Suggest

using something similar to the following "Per Foot Note 3 of Table IWB-2500-1 Exam

Category B-A of ASME Section XI 1995 Edition 1996 Addenda" or Include the entire

Footnote. This comment applies to all examination Categories where footnotes are utilized.

Page 113: APPENDIX I ISI Long Term Plan (Class 1,2,3) Component Supports · 950000 spt-1-rc-001 all class 1 systems b-p vt-2 1 - 2 c c cc 3 x x -"**performed in mode c x x -c c -x x 01rf -

Index 33805.02

Page 3

16. Section 5.0 Class 2 Examination Categories, The Item Description for Item C2.31 is misleading. The statement reads as if the weld size controls however in fact it is the vessel wall thickness. Suggest revising the whole exam table.

17. Section 5.0 Class 2 Examination Category Exam Category C-C. "Subject to Notes ... ",

Which notes are we referring to. Same comment as Item 14. This comment applies to all examination Categories where footnotes are utilized.

18. Section 5.0 Class 2 Examination Categories Exam Category C-F-1. It appears that the header in the middle of the chart is misplaced.

19. Section 6.0 Class 3 Examination Category for Exam Category D-A, in the item description the term "Integrally Welded Attachments" however Table IWD-2500-1 utilizes the term "welded attachment".

20. Section 6.0 Class 3 Examination Category D-B "per Note 1", which note are we talking about. Same as Comment 14.

21. Section 12.0 The Interval Date on the left side column-should be 05/19/01 instead of

05/13/01. Also noted that I RI5 is missing in the refueling outage column.

22. Relief Request S1-RR-A05, In the basis for relief a statement is made concerning the ANII

having Jurisdiction at the plant site. This is not the case, the Jurisdictional Authority would

be the State of New Jersey or the NRC. This falls in the realm of IWA-2240 and can be

accepted by demonstration to the ANII, but the ANII should not be referenced as a

Jurisdictional Authority.

V. CONCLUSION

Following a response to the comments and verification/ resolution of the above items. We will

sign the coversheet of the Salem Unit No. 1 Long Term Plan which will document our review and

acceptance required by ASME Section XI, 1995 Edition, 1996 Addenda in accordance with IWA

2110 (a)(3).

Submitted By:

• !,YW 0-le7- P 40/

(Au orized Nuclear In e spector) Date