    Audit ReportDoc ID: FM-198

    Revision: 2.1

    Efective Date: TBD

    Table of Contents

    Audit Information.......................................................................................................................................2

    Verification of Scope of Registration / Monogram License(s and !"clusions....................................#

    Audit Report............................................................................................................................................... #

    Management S$stem Re%uirements.................................................................................................... #

    4.1.1 Quality Management System......................................................................................................34.4.1 Quality Manual............................................................................................................................3

    4.1.2 Quality Policy.............................................................................................................................. 3

    4.1.3 Quality Objectives.......................................................................................................................4

    4.1.5 Communication........................................................................................................................... 4

    4.2 Management Responsibility........................................................................................................... 4

    4.3 Ogani!ational Capability...............................................................................................................5

    4.3.1 Povision o" Resouces...............................................................................................................5

    4.3.2.2 Pesonnel Competence........................................................................................................... 5

    4.3.2.3 #aining an$ %&aeness...........................................................................................................'

    4.3.3 (o) *nvionment...................................................................................................................... '

    4.4 +ocumentation Re,uiements...................................................................................................... .-

    4.4.3 Contol o" +ocuments................................................................................................................. -

    4.5 Contol o" Reco$s......................................................................................................................... -

    &MS Monitoring' Measurement' Anal$sis Impro)ement.................................................................*'.2.1 Custome Satis"action.................................................................................................................

    '.2.2 /ntenal %u$its.............................................................................................................................

    '.2.3 Pocess *valuation.....................................................................................................................0

    '.3 %nalysis o" +ata............................................................................................................................. 0

    '.4.2 Coective %ction.........................................................................................................................0

    '.4.3 Peventive %ction...................................................................................................................... 1

    '.5 Management Revie&................................................................................................................... 1

    Ris+ Assessment Management....................................................................................................... ,,Contingenc$ -lanning.........................................................................................................................,2Management of Cange...................................................................................................................... ,2

    -roduct Realiation................................................................................................................................. ,0

    Audit Conditions......................................................................................................................................,0

    -roduct Realiation 1 Contract Re)ie............................................................................................. ,3-roduct Realiation 4 5esign 5e)elopment................................................................................... ,6-roduct Realiation 4 -urcasing.......................................................................................................,7-roduct Realiation 1 -roduction and Ser)icing.............................................................................. 228se of A-I Monogram' A-I&R and A9A: Mar+s...............................................................................26

    Audit Time Summar$............................................................................................................................... 2*

    Audit Summar$........................................................................................................................................ 2*

    Conclusion / Recommendation.............................................................................................................. 27

    Supplemental Audit Information................................................................................................... ......... #;

  • 8/21/2019 api audit checklist 9thedition.docx

    2/36

    Audit ReportDoc ID: FM-198

    Revision: 2.1

    Efective Date: TBD

    Top of the Docume

    Audit Information

    Audit I5>

    Lead Auditor>

    Audit Team Members>

    Audit Start 5ate> Audit !nd 5ate>

    Sifts> Start Time !nd Time 9o. of!mplo$ees Audited? (@/9

    Sift ,

    Sift 2

    Sift #

    !"planation(required for 

    shifts not audited):

    Additional Comments>

    Audit Criteria>

    /SO 01 %P/ Spec Q1 %P/ Spec Q2

    /SO#S 201 /SO 141 OS%S 11

     %P/ Specs (list all applicable specifications6

    Ot7e citeia6

    &MS and Applicable

    Standards/Specifications(verify current versions)>

    Audit Scope/=becti)e:

    Re%uired Audit 5a$s>Actual Audit

    5a$s>

    Justification required if different from required aud

    days

    Bustification

    (Notify !I of changes)6

    Additional Comments>

    9umber of Maor

    ("ystemic)>

    Minor

    (Isolated)>Concerns>

    Comments>

    Page 2 o" 3'

  • 8/21/2019 api audit checklist 9thedition.docx

    3/36

    Audit ReportDoc ID: FM-198

    Revision: 2.1

    Efective Date: TBD

    Top of the Docume

    Verification of Scope of Registration / Monogram License(s and !"clusions

    Verif$ eac of te folloing> Select =ne>

    Additional comments>

    Audit Report

    Management S$stem Re%uirements

    In the space provided belo%, detail the ob'ective evidence (documentation revie%ed, records revie%ed and personnel intervie%ed) to

    ensure conformance %ith #" requirements Detail any discrepancies * nonconformance identified

    Re%uirement> =becti)e !)idence/Comments>

    0.,., &ualit$ Management S$stem

    >ei"y t7at t7e ogani!ation 7as establis7e$=$ocumente$= implemente$ an$ maintaine$ aQMS "o all sevicing an$ po$ucts povi$e$ "ouse in t7e petoleum an$ natual gas in$usty.

    0.0., &ualit$ Manual

    >ei"y t7at t7e QM a$$esses t7e "ollo&ing

    e,uiements6

    •Scope o" t7e QMS= inclu$ing eei"y t7at t7e Quality Policy 7as been $e"ine$=

    $ocumente$ an$ appove$ as e,uie$ an$ meets

    all e,uiements i$enti"ie$ in t7e applicable

    stan$a$.

    Page 3 o" 3'

  • 8/21/2019 api audit checklist 9thedition.docx

    4/36

    Audit ReportDoc ID: FM-198

    Revision: 2.1

    Efective Date: TBD

    0.,.# &ualit$ =becti)es

    >ei"y t7at Quality Objectives ae appove$=

    $ocumente$= an$ establis7e$ at elevant

    "unctions an$ levels an$ ae measuable an$

    consistent &it7 t7e Quality Policy.

    >ei"y @P/s ae i$enti"ie$ "o use in +ata %nalysis.

    0.,.0 -lanning

    >ei"y t7at management 7as ensue$ t7at6

    • citeia an$ met7o$s nee$e$ "o t7e opeation an$

    contol o" t7e QMS ae $etemine$= manage$

    an$ ae e""ective

    • planning o" t7e QMS is caie$ out to meet spec

    e,uiements

    Re%uirement> =becti)e !)idence/Comments>

    0.,.3 Communication

    0.,.3., Internal Communication

    >ei"y t7at t7e ogani!ation 7as establis7e$

    appopiate communication pocesses an$ t7e

    e""ectiveness o" t7e MS is communicate$.

    >ei"y t7at pocesses 7ave been establis7e$ to

    ensue t7at t7e impotance o" meeting

    e,uiements an$ analysis o" $ata is

    communicate$ at elevant "unctions.

    0.,.3.2 !"ternal Communication

    >ei"y t7at t7e ogani!ation 7as establis7e$

    appopiate communication &it7 eei"y t7at communications pocesses meet

    applicable e,uiements o" t7e stan$a$.

    Re%uirement> =becti)e !)idence/Comments>

    0.2 Management Responsibilit$

    0.2., Resources

    +escibe 7o& top management ensues

    availability o" esouces essential to t7e QMS.

    0.2.2 Responsibilit$ and Autorit$

    +escibe 7o& esponsibilities= aut7oities= an$

    accountabilities ae $e"ine$= $ocumente$ an$

    Page 4 o" 3'

  • 8/21/2019 api audit checklist 9thedition.docx

    5/36

    Audit ReportDoc ID: FM-198

    Revision: 2.1

    Efective Date: TBD

    communicate$ t7oug7out t7e ogani!ation.

    0.2.# Management Representati)e

    /$enti"y t7e name o" t7e appointe$ Management

    Repesentative.

    >ei"y Competence= #aining ? %&aeness "o

    appointment.

    >ei"y applicable esponsibility an$ aut7oity 7as

    been gante$.

    +escibe 7o& t7e Management Repesentative

    epots to management on t7e pe"omance o" t7e

    MS.

    Re%uirement> =becti)e !)idence/Comments>

    0.# =rganiational Capabilit$0.#., -ro)ision of Resources

    +escibe 7o& t7e ogani!ation $etemines an$

    allocates esouces nee$e$ to implement=

    maintain an$ impove t7e e""ectiveness o" t7e

    e,uiements o" t7e MS.

    Re%uirement> =becti)e !)idence/Comments>

    0.#.2.2 -ersonnel Competence -rocedure>

    >ei"y t7at t7e poce$ue meets all e,uiements

    o" t7e applicable stan$a$ an$ is contolle$=

    implemente$= an$ maintaine$.

    o& $oes t7e ogani!ation $etemine t7e

    necessay competence "o pesonnel pe"oming

    &o) a""ecting po$uct ,ualityA

    (7at actions $oes t7e ogani!ation ta)e to a$$ess

    position competency e,uiementsA

    >ei"y is) assessment associate$ &it7 po$uct

    ,uality inclu$es t7e availability o" competent

    pesonnel. *nsue is)s ae i$enti"ie$ an$

    contolle$ 5.3c.

    Page 5 o" 3'

  • 8/21/2019 api audit checklist 9thedition.docx

    6/36

    Audit ReportDoc ID: FM-198

    Revision: 2.1

    Efective Date: TBD

    0.#.2.# Training and Aareness -rocedure>

    >ei"y t7at t7e poce$ue meets all e,uiements

    o" t7e applicable stan$a$ an$ is contolle$=

    implemente$= an$ maintaine$.

    >ei"y t7at t7e ogani!ation6

    • povi$es "o QMS taining an$ job tainingB

    • inclu$es custome9speci"ie$ an$o custome9

    povi$e$ tainingB

    • i$enti"ies t7e "e,uency an$ content o" tainingB

    • ensue pesonnel ae a&ae o" t7e elevance an$

    impotance o" t7ei activities an$ 7o& t7ey

    contibute to t7e ac7ievements o" t7e ,uality

    objectivesB an$

    • maintains appopiate eco$s.

    o& $oes t7e "acility i$enti"y taining nee$s an$

    ensue t7at pesonnel eceive a$e,uate taining

    to a$$ess competency nee$s. (7at ot7e

    met7o$s 7as t7e "acility use$ to a$$ess

    competency nee$s outsoucing= pocess

    c7anges= etc.A

    +escibe 7o& t7e e""ectiveness o" t7e actions

    evaluate$ an$ maintaine$ i.e.= competence

    evaluation to ensue competence e,uiements

    ae met.

    Re%uirement> =becti)e !)idence/Comments>

    0.#.# Dor+ !n)ironment

    +escibe t7e &o) envionment= inclu$ing

    buil$ings= &o)space an$ utilitiesB pocess

    e,uipmentB suppoting sevicesB con$itions un$e

    &7ic7 &o) is pe"ome$.

    >ei"y t7at t7e ogani!ation 7as $etemine$=

    povi$e$= manages= an$ maintains t7e &o)

    envionment nee$e$ to ac7ieve con"omity

    applicable to t7e manu"actue o" t7e po$ucts.

    >ei"y is) assessment associate$ &it7 po$uct

    $elivey inclu$es "acilitye,uipment availability an$

    maintenance. *nsue is)s ae i$enti"ie$ an$

    contolle$ 5.3a.

    Page ' o" 3'

  • 8/21/2019 api audit checklist 9thedition.docx

    7/36

    Audit ReportDoc ID: FM-198

    Revision: 2.1

    Efective Date: TBD

    Re%uirement> =becti)e !)idence/Comments>

    0.0 5ocumentation Re%uirements

    0.0.2 -rocedures

    >ei"y t7at poce$ue e,uie$ by t7e stan$a$ aeestablis7e$= $ocumente$= implemente$= an$maintaine$ "o continual suitability.

    0.0.# Control of 5ocuments -rocedure>

    >ei"y t7at t7e poce$ue meets all e,uiements

    o" t7e applicable stan$a$ an$ is contolle$=

    implemente$= an$ maintaine$.

    +escibe 7o& t7e "acility contols $ocuments

    e,uie$ by t7e QMS to ensue t7at elevant

    vesions ae use$ an$ maintaine$.

    +escibe 7o& e

    >ei"y t7at t7e poce$ue meets all e,uiements

    o" t7e applicable stan$a$ an$ is contolle$=

    implemente$= an$ maintaine$.

    o& $oes t7e "acility ensue integation o"

    eei"y t7at po$uct an$ ot7e speci"ic

    e,uiements ae integate$ as e,uie$.

    0.3 Control of Records -rocedure>

    >ei"y t7at t7e poce$ue meets all e,uiements

    o" t7e applicable stan$a$ an$ is contolle$=

    implemente$= an$ maintaine$.

    o& $oes t7e "acility i$enti"y= stoe= potect=etain= etieve an$ $ispose o" eco$sA

    as t7e "acility i$enti"ie$ contols an$

    esponsibilities nee$e$ to i$enti"y= collect= stoe=

    potect= etain= etieve an$ $ispose o" eco$sA

    as t7e "acility maintaine$ eco$s base$ on t7ee,uie$ etention times as speci"ie$ in t7eapplicable stan$a$= po$uct spec= an$ o t7ecustome QMS e,uiementsA

    Page - o" 3'

  • 8/21/2019 api audit checklist 9thedition.docx

    8/36

    Audit ReportDoc ID: FM-198

    Revision: 2.1

    Efective Date: TBD

    &MS Monitoring' Measurement' Anal$sis Impro)ement

    Re%uirements> =becti)e !)idence / Comments>

    E.2., Customer Satisfaction -rocedure>

    >ei"y t7at t7e poce$ue meets all e,uiementso" t7e applicable stan$a$ an$ is contolle$=

    implemente$= an$ maintaine$.

    (7at met7o$s 7ave t7e ogani!ation implemente$"o obtaining an$ using in"omation elating tocustome peception as to &7et7e e,uiements7ave been metA

    o& 7as t7e ogani!ation e""ectively measue$

    custome satis"action an$ analy!e$ t7e esultsA

    E.2.2 Internal Audits -rocedure>

    >ei"y t7at t7e poce$ue meets all e,uiements

    o" t7e applicable stan$a$ an$ is contolle$=

    implemente$= an$ maintaine$.

    /$enti"y t7e $ate t7e last intenal au$it &as

    complete$.

    >ei"y t7at t7e au$it &as pe"ome$ &it7in 12

    mont7s "om t7e pevious intenal au$it i"

    applicable.

    Note:  !I interprets +ast Internal udit- to mean the lastcomplete audit of the .NTI$. ", %hether performed at one

    time or over the period of /0 months

    +i$ intenal au$it planning ta)e into account

    esults o" pevious au$its an$ citicality o" t7e

    pocess being au$ite$A

    >ei"y t7at t7e intenal au$it pe"ome$6

    • con"oms to planne$ aangements inclu$ing t7e

    e,uiements o" t7e applicable stan$a$ speci"icationB

    • 7as been e""ectively implemente$ an$ maintaine$=

    inclu$ing eco$sB

    • &as pe"ome$ by in$epen$ent objective=

    competent pesonnelB

    • inclu$e outsouce$ activities t7at impact t7e ,uality

    o" t7e po$uct an$ t7at ae pe"ome$ at t7e

    "acilityBan$

    • inclu$es all pocesses e,uie$ by t7e MS e,uie$

    Page o" 3'

  • 8/21/2019 api audit checklist 9thedition.docx

    9/36

    Audit ReportDoc ID: FM-198

    Revision: 2.1

    Efective Date: TBD

    to meet t7e applicable stan$a$ speci"ication.

    +escibe 7o& t7e ogani!ation a$$essesnoncon"omances i$enti"ie$ $uing t7e intenal au$ite.g.= esponse times= esponsibilities= epoting=

    an$ eco$s.

    E.2.# -rocess !)aluation

    (7at met7o$s ae applie$ "o monitoing an$

    measuing QMS pocessesA #7ese met7o$s

    s7all $emonstate t7e ability o" t7e pocesses to

    ac7ieve planne$ esults.

    (7en planne$ esults ae not ac7ieve$= &7at

    actions ae ta)en to ensue con"omity o" t7epo$uctA /$enti"y e =becti)e !)idence / Comments>

    E.# Anal$sis of 5ata -rocedure>

    >ei"y t7at t7e poce$ue meets all e,uiements

    o" t7e applicable stan$a$ an$ is contolle$=

    implemente$= an$ maintaine$.

    (7at $ata 7ave been $etemine$= collecte$ an$ analy!e$ to $emonstate t7e suitability an$ e""ectiveness o" t7e QMSA[ "uch data analysis may be related to quality ob'ectives and result in modifications to these ob'ectives, number of nonconforming product, etc ] 

    5ata T$pes Anal$sis MetodReported

    Fo

  • 8/21/2019 api audit checklist 9thedition.docx

    10/36

    Audit ReportDoc ID: FM-198

    Revision: 2.1

    Efective Date: TBD

    (7at actions ae ta)en by t7e ogani!ation to

    eliminate t7e cause o" noncon"omitiesA %ctions

    s7oul$ inclu$e6

    • evie&ing noncon"omities

    $etemining cause o" noncon"omities• evaluating action to pevent ecuence

    • $eteminingimplementing action nee$e$

    • eco$ing o" esults

    • evie&ing coective action ta)en

    +escibe 7o& coective actions vei"ie$ "o 

    e""ectiveness.

    o& ae coective actions initiate$A o& ae

    esponse times "o a$$essing coective actions

    tac)e$A

    E.0.# -re)enti)e Action -rocedure>

    (7at actions ae ta)en by t7e ogani!ation to

    minimi!e t7e li)eli7oo$ o" potential

    noncon"omitiesA %ctions s7oul$ inclu$e6

    • $etemining potential noncon"omities an$ t7ei 

    cause

    • evaluating action to pevent occuence

    • $eteminingimplementing action nee$e$

    • eco$ing o" esults

    • evie&ing peventive action ta)en.

    Re%uirements> =becti)e !)idence / Comments>

    E.3 Management Re)ie -rocedure>

    >ei"y t7at t7e poce$ue meets all e,uiements

    o" t7e applicable stan$a$ an$ is contolle$=

    implemente$= an$ maintaine$.

    /$enti"y $ates o" management evie&s &it7in t7elast 129mont7 peio$. >ei"y t7at managementevie&s ae con$ucte$ at least evey 12 mont7s.

    >ei"y t7at t7e management evie& 7as been

    $ocumente$ &it7 su""icient evi$ence to

    Page 1 o" 3'

  • 8/21/2019 api audit checklist 9thedition.docx

    11/36

    Audit ReportDoc ID: FM-198

    Revision: 2.1

    Efective Date: TBD

    $emonstate con"omity &it7 applicable

    e,uiements. /" no= note $e"iciencies.

    E.3.2 Re)ie Input 9 >ei"y t7at t7e management

    evie& inclu$es all inputs e,uie$ by t7e

    applicable stan$a$= inclu$ing6

    •Result o" au$its

    •Custome ee$bac)

    •Results o" Ris) %ssessment

    •Status o" C% P%

    •Supplie Pe"omance %nalysis

    •Pocess Pe"omance an$ Po$uct Con"omity

    •C7anges t7at coul$ a""ect t7e MS

    •Recommen$ations "o /mpovement

    E.3.# Re)ie =utput 4 >ei"y t7at t7e

    management evie& output inclu$es a summay

    assessment o" t7e e""ectiveness o" t7e MS$etailing any6

    •Re,uie$ c7anges to t7e pocesses

    •+ecisions an$ actions

    •Re,uie$ esouces

    •/mpovement "o po$ucts

    Ris+ Assessment Management

    Re%uirements> =becti)e !)idence / Comments>

    3.# Ris+ Management Assessment -rocedure>

    >ei"y t7e poce$ue meets all e,uiements o" t7estan$a$ an$ is contolle$= implemente$= an$

    maintaine$.

    >ei"y t7e RM pocess 7as been establis7e$ to

    i$enti"y an$ contol is)s associate$ &it76

    • impact on $elivey= inclu$ing "acilitye,uipment

    availability= maintenance an$ supplie

    pe"omance an$ mateial availabilitysupplyB

    ,uality o" po$uct= inclu$ing $elivey o"

    noncon"oming po$uct ?availability o"

    competent pesonnel.

    +escibe t7e tools= tec7ni,ues an$ t7ei

    application "o is) i$enti"ication= assessment an$

    mitigation utili!e$ by t7e ogani!ation.

    Identif$process interaction / e"amples of Ris+ Assessment Management

    implementation and tools / tecni%ues used>

    Cec+ eac re%uirement upon

    )erification(e&planation must be

    given for any blan1 bo&es)>

    Ris)s i$enti"ie$

    Ris)s assesse$

    Page 11 o" 3'

  • 8/21/2019 api audit checklist 9thedition.docx

    12/36

    Audit ReportDoc ID: FM-198

    Revision: 2.1

    Efective Date: TBD

    Ris)s mitigate$

    Reco$s maintaine$

    Contingenc$ -lanning

    Re%uirements> =becti)e !)idence / Comments>

    3.3 Contingenc$ -lanning -rocedure>

    >ei"y t7e poce$ue meets all e,uiements o" t7e

    stan$a$ an$ is contolle$= implemente$= an$

    maintaine$.

    >ei"y t7at contingency planning is base$ on

    assesse$ is)s 5.3.

    >ei"y t7at t7e output o" contingency planning is

    $ocumente$= up$ate$ an$ communicate$ ase,uie$.

    Identif$process interaction / e"amples of Contingenc$ -lanning implementation>

    Cec+ eac re%uirement upon

    )erification(e&planation must be

    given for any blan1 bo&es)>

    Dase$ on assesse$ is)s

    Output $ocumente$ up$ate

    as e,uie$

    Output communicate$

    Reco$s maintaine$

    Management of Cange

    Re%uirements> =becti)e !)idence / Comments>

    3.,, M=C -rocess

    +escibe t7e MOC pocess establis7e$ by t7e

    "acility.

    >ei"y t7at t7e MOC pocess 7as been establis7e$

    to ensue t7at integity o" t7e MS &7en c7anges

    ae planne$ an$ implemente$.

    o& $oes t7e "acility i$enti"y potential is)s

    associate$ &it7 c7anges pio to ma)ing t7e

    c7angeA

    >ei"y t7at c7anges ae appove$ as e,uie$ pio 

    to ma)ing c7anges.

    Page 12 o" 3'

  • 8/21/2019 api audit checklist 9thedition.docx

    13/36

    Audit ReportDoc ID: FM-198

    Revision: 2.1

    Efective Date: TBD

    +escibe 7o& t7e "acility ensues t7at t7e MOC

    pocess is use$ "o c7anges t7at may a""ect t7e

    QMS negatively= inclu$ing c7anges6

    •to t7e ogani!ational stuctueB

    •in )ey o essential pesonnelB

    •in citical suppliesB an$

    •to MS pocesses= inclu$ing c7anges esulting

    "om C% P%

    +escibe t7e ogani!ationEs pocess "o

    noti"ication o" c7anges. (7en is noti"ication

    e,uie$A #o &7o is noti"ication e,uie$A

    Identif$ process interaction / e"amples of Management of Cange

    implementation>

    Cec+ eac re%uirement upon

    )erification(e&planation must be

    given for any blan1 bo&es)>;egative a""ects on QMS

    i$enti"ie$

    Ris)s i$enti"ie$ pio to c7an

     %ppove$ pio to c7ange

    ;oti"ication o" c7ange

    Reco$s maintaine$

    Page 13 o" 3'

  • 8/21/2019 api audit checklist 9thedition.docx

    14/36

    Audit ReportDoc ID: FM-198

    Revision: 2.1

    Efective Date: TBD

    -roduct Realiation

    Audit Conditions

    The audit must determine the degree to %hich products are being manufactured under the scope of the applicable !I

    onogram icense(s) and * or $egistered #"Determine the availability of the products for revie% and revie% processes in con'unction %ith these products

     s a reminder, product and service are to be considered the same

    Priority should be established at the start of the audit to verify manufacturing according to the following

    conditions:

    Categor$ Categor$ 5efinition

    , Monogam po$uct cuently being manu"actue$ an$ available "o evie&

    2Monogammable po$uct meeting all e,uiements but not ma)e$ po$uct cuently being

    manu"actue$ an$ available "o evie&

    # ;on9monogammable po$uct cuently being manu"actue$ an$ available "o evie&

    0 Monogam po$uct manu"actue$ since t7e last %P/ au$it but not available "o evie& records re)ie

    3Monogammable po$uct manu"actue$ since t7e last %P/ au$it but not available "o evie& records

    re)ie

    E ;on9monogammable po$uct manu"actue$ since t7e last %P/ au$it

    6o $ual ? egistation clients 8 Po$uct cuently being manu"actue$ o sevices cuently being

    povi$e$ t7at "all un$e t7e scope o" t7e egistee$ ,uality management system.9=T! ,> Please see %P/ Ceti"ication Pogams ad)isor$ * ega$ing implementation o" QMS e,uiements by a :icensee at

    7ttp6&&&.api.ogceti"icationsmonogam$ocumentsa$visoies.c"m

    9=T! 2> Please i$enti"y any po$ucts sevices t7at ae being a$$e$ to t7e scope o" :icensing an$ o Registation= inclu$ing po$ucts

    sevices t7at ae Fne&G an$ 7ave been a$$e$ since t7e last au$it. #7ese po$ucts sevices must be consi$ee$ &7en sampling

    objective evi$ence $uing t7e au$it. o e

    Categor$ -roduct/Ser)ice Identification Specification (as applicabl

    Page 14 o" 3'

  • 8/21/2019 api audit checklist 9thedition.docx

    15/36

    Audit ReportDoc ID: FM-198

    Revision: 2.1

    Efective Date: TBD

    Top of the Docume

    -roduct Realiation 1Contract Re)ie

    Re%uired -rocedure>

    2erify that procedure(s) meet all requirements of the applicable standard and is controlled, implemented, and maintained

    3.,., Contract Re)ie -rocedure>

    Contract

    Re)ie

    (3.,.,

    List all Contracts re)ieed / sampled>

    5eterminationof -roduct

    Re%uirements

    (3.,.2

    5etail e)idence obser)ed(including records and documents revie%ed,

     personnel intervie%ed, and processes observed)>

    Cec+ eac re%uirement upon

    )erification( e&planation must be

    given for any blan1 bo&es)>

    5etermination of re%uirements> Custome Re,uiements

    :egal ot7e applicablee,uiements

    Re,uiements not state$ by

    custome 

     %lso vei"y6

    Re,uiements con"ime$ an$ eco$s

    maintaine$ &7ee no e,uiements ae

    state$$ocumente$ by custome 

    Re)ie of

    -roduct

    Re%uirements(3.,.#

    Re)ie of re%uirements> Revie&e$ pio to

    commitment

    Re,uiements i$enti"ie$ an$

    $ocumente$

    Capability con"ime$

    Reco$s maintaine$

    Canges to

    Re%uirements

    (3.,.#

    Canges to contract re%uirements> +ocuments amen$e$

    C7anges communicate$

    AuditorHs Assessment of -rocess(es>

  • 8/21/2019 api audit checklist 9thedition.docx

    16/36

    Audit ReportDoc ID: FM-198

    Revision: 2.1

    Efective Date: TBD

    Top of the Document 

    -roduct Realiation 1 -lanning

    -lanning(3.2

    5etail e)idence obser)ed(including records and documents revie%ed,

     personnel intervie%ed, and processes observed)>

    Cec+ eac re%uirement upon

    )erification(e&planation must be

    given for any blan1 bo&es)>

    -lanning of product realiation> Consistent &it7 QMS poces

    Re,uie$ esouces &o)

    envionment 4.3

    Po$uct custome

    e,uiement 5.1

    :egal ot7e applicable

    e,uiements

    Contingencies base$ on is)

    assessment 5.3= 5.5

    +esign an$ $evelopment

    e,uiements 5.4

    Re,uie$ vei"ication=

    vali$ation= monitoing=

    measuing= inspection= test

    activities

    MOC 5.11

    Reco$s maintaine$

    =utput of product realiation planning> Output $ocumente$

    Plans up$ate$ as c7anges

    occu 

    Plans maintaine$ suitably

    AuditorHs Assessment of -rocess(es>

  • 8/21/2019 api audit checklist 9thedition.docx

    17/36

    Audit ReportDoc ID: FM-198

    Revision: 2.1

    Efective Date: TBD

    Top of the Docume

    -roduct Realiation 4 5esign 5e)elopment

    Re%uired -rocedure>

    2erify that procedure(s) meet all requirements of the applicable standard and is controlled, implemented, and maintained

    3.0 5esign 5e)elopment -lanning Control -rocedure>

    5esign

    5e)elopment

    Acti)ities

    Select all tat appl$>

    Pe"ome$ in97ouse

    Pe"ome$ at a $i""eent location &it7in t7e same ogani!ation

    Outsouce$

    *

  • 8/21/2019 api audit checklist 9thedition.docx

    18/36

    Audit ReportDoc ID: FM-198

    Revision: 2.1

    Efective Date: TBD

    5esign 5e)elopment =utputs> Output as pe 5.4.3

    Reco$s Maintaine$

     %lso vei"y6

    9 +%C i$enti"ie$ e"eence$

    9 Citical po$uctscomponents i$enti"ie$

    e"eence$

    5esign 5e)elopment Re)ie> Revie& as pe 5.4.4

    Reco$s Maintaine$

    5esign 5e)elopment >ei"ication an$ inal Revie

    as pe 5.4.5

    Con$ucte$ $ocumente$ pe

    planne$ aangement 5.4.1

    Reco$s Maintaine$

    5esign 5e)elopment Validation Appro)al> >ali$ation an$ %ppoval aspe 5.4.'

    Reco$s Maintaine$

    5esign 5e)elopment Canges> C7anges as pe 5.4.-

    Reco$s Maintaine$

    5esign

    5e)elopment

    Controls 1

    =utsourced

    (3.0.,

    SupplierHs Competenc$ and Control of =utsourced Acti)ities> Pesonnel Competence

    Reco$s Maintaine$

     %lso vei"y6

    9Resouces= esponsibilities= aut7oitiesan$ t7ei inte"aces

    9 Supplies contol= &7en $esign activiti

    ae outsouce$

    Training

    Competence( 

    Design 4

    Development)

    (0.#.2.2' 0.#.2.#

    &ualification/competenc$ of personnel> CompetentQuali"ie$

    #aining *valuation

    Reco$s Maintaine$

    AuditorHs Assessment of -rocess(es>

    Page 1 o" 3'

  • 8/21/2019 api audit checklist 9thedition.docx

    19/36

    Audit ReportDoc ID: FM-198

    Revision: 2.1

    Efective Date: TBD

  • 8/21/2019 api audit checklist 9thedition.docx

    20/36

    Audit ReportDoc ID: FM-198

    Revision: 2.1

    Efective Date: TBD

    Top of the Docume

    -roduct Realiation 4-urcasing

    Re%uired -rocedure(s>

    2erify that procedure(s) meet all requirements of the applicable standard and is controlled, implemented, and maintained

    3.E.,., -urcasing Poce$ue63.E.# Verification of -urcased -roducts and

    Acti)itiesPoce$ue6

    3.6.# Identification and Traceabilit$ Poce$ue6

    3.6.0 -roduct Inspection/Test Status Poce$ue6

    3.6.3 Customer4supplied -ropert$ Poce$ue6

    3.6.E.,-reser)ation of -roduct Poce$ue6

    -urcasing

    Controls

    (3.E.,

    5etail e)idence obser)ed(including records and documents revie%ed,

     personnel intervie%ed, and processes observed)>

    Cec+ eac re%uirement upon

    )erification(e&planation must be

    given for any blan1 bo&es)>

    Control of -urcasing> Citicality o"activitiespo$ucts

    $etemine$

    #ype an$ e

  • 8/21/2019 api audit checklist 9thedition.docx

    21/36

    Audit ReportDoc ID: FM-198

    Revision: 2.1

    Efective Date: TBD

    =utsourced

    Acti)ities

    (3.E.,.E

    List all outsourced acti)ities and processes (if applicable>Ogani!ationEs applicable

    QMS e,uiements satis"ie$

    Reco$s Maintaine$

     %lso vei"y6

    Ogani!ation maintains esponsibility "o

    po$uct con"omance to speci"ie$

    e,uiements inclu$ing %P/ Spec

    Control of outsourced acti)ities>

    -urcasing

    Information

    (3.E.2

    -urcasing Information (include contracts*!3s sampled 5minimum of

    6)> %cceptance citeia

    $ocumente$

    Reco$s Maintaine$

     %lso vei"y6

    +ocumente$ e,uiements pe 5.'.2a

    c$= &7ee applicable

    Verification

    of -urcased

    -roduct /

    Acti)ities

    (3.E.#

    Verification of conformance to purcase re%uirements (include

    records revie%ed as evidence of conformance )>

    Reco$s Maintaine$

     %lso vei"y6

    9 Contols "o vei"ication at supplieEs

    pemises= &7ee applicable

    Identification

    and

    Traceabilit$(3.6.#

    Verification of identification / traceabilit$ (as applicable> Reco$s Maintaine$

    +elivey an$ post9$elivey

    activities

    Maintenance an$

    eplacement o" i$enti"ication

    ma)s

     %lso vei"y6

    /$enti"ication an$ taceability o"

    custome9supplie$ po$ucts

    -roduct

    Inspection /

    Test Status

    (3.6.0

    Identification of inspection and/or test status (as applicable> /n$icates con"omity non9

    con"omity o po$uct

    Reco$s Maintaine$

     %lso vei"y6

    Release o" po$uct t7at meets

    e,uiementso aut7oi!e$ un$e

    Page 21 o" 3'

  • 8/21/2019 api audit checklist 9thedition.docx

    22/36

    Audit ReportDoc ID: FM-198

    Revision: 2.1

    Efective Date: TBD

    concession

    Customer4

    supplied

    -ropert$

    (3.6.3

    Control of customer4supplied propert$ (if applicable> Poce$ue pe 5.-.5

    Reco$s maintaine$

     %lso vei"y6

    Re,uiements "o epoting to custome 

    -reser)ation

    of -roduct

    Storage and

    Assessment

    (3.6.E' 3.6.E.2

    -reser)ation of products and constituent parts (include evidence of 

    verification of stoc1 assessment)>Poce$ue pe 5.-.'.1

    Re,uiements "o stoage

    an$ assessment i$enti"ie$

    +esignate$ stoage aeas

    Reco$s maintaine$

     %lso vei"y6

    9 /$enti"icationtaceability ma)s=tanspotation= 7an$ling= pac)aging a

    potection

    9 /nteval appopiate to t7e po$uctpatbeing assesse$

    Inspection

    and testing

    (3.6.6

    Inspection and testing of purcased product / ser)ices6 Poce$ue pe 5.-.-.1

    *vi$ence o" con"omity

    &it7 acceptance citeia

    maintaine$

    Training

    Aareness

    -ersonnel

    Competence

    (in5house and

    outsourced)

    (0.#.2.2'

    0.#.2.#

    &ualification/competenc$ of personnel> #aining "e,uency an$

    contents i$enti"ie$

    Competent,uali"ie$

    #aining evaluation

    Reco$s maintaine$

     %lso vei"y6

    9 Custome9speci"ie$povi$e$ taining

    9%&aeness o" pesonnel &it7 espect t

    t7ei activitiescontibution to QMS

    AuditorHs Assessment of -rocess(es>

  • 8/21/2019 api audit checklist 9thedition.docx

    23/36

    Audit ReportDoc ID: FM-198

    Revision: 2.1

    Efective Date: TBD

    Top of the Document

    -roduct Realiation 1 -roduction and Ser)icing

    =ter 

    processes

    included>

    Po$uction ? Sevice Povision Pesonnel Competence

    #aining ? %&aeness Contol o" #esting= Measuing ? Monitoing *,uipment

    Po$uct Release MOCContol o" ;oncon"oming Po$uct Ris) %ssessment ? Management

    Manu"actuing Capability

    Re%uired -rocedure>

    2erify that procedure(s) meet all requirements of the applicable standard and is controlled, implemented, and maintained

    3.6.,., -roduction Poce$ue6

    3.6.,.2 Ser)icing (if applicable) Poce$ue6

    3.6.* -re)enti)e Maintenance Poce$ue6

    3.* Control of Testing' Monitoring and

    Measurement !%uipmentPoce$ue6

    3.7 -roduct Release Poce$ue6

    -roduction and/or Ser)icing

    !rovide a detailed overvie% of the production * servicing activities and capabilities observed at the facility

    Include all monogrammable and non5monogrammable products

    5escription of -roduction and/or Ser)icing processes (describe %hat manufacturing processes actually ta1e place at

    the facility and interactions)>

    5escription of -roduction / Ser)icing capabilities 78hat capabilities does the facility have (ie, are they capable of

    manufacturing, %hat are they capable of manufacturing)9 >

    Page 23 o" 3'

  • 8/21/2019 api audit checklist 9thedition.docx

    24/36

    Audit ReportDoc ID: FM-198

    Revision: 2.1

    Efective Date: TBD

    -roduction /

    Ser)icing

    Acti)ities

    List production / ser)icing processes re)ieed / sampled>

    Control of

    -roduction

    (3.6.,.,

    5etail e)idence obser)ed(including records and documents revie%ed,

     personnel intervie%ed, and processes observed)>

    Cec+ eac re%uirement upon

    )erification(e&planation must be

    given for any blan1 bo&es)>

    Controls establised and implemented for production> Poce$ue as pe 5.-.1.1

    +esign e,uiementsc7anges

    Suitable e,uipment

    Pocess contol $ocuments

     %lso vei"y6

    9 /mplementation o" Quality Plan= i" e,uie$9 (o) instuctions= &7en applicable

    9 Monitoing ? measuing activities9 Po$uct elease activities

    Control of

    Ser)icing (if

    applicable)

    (3.6.,.2

    Controls establised and implemented for ser)icing> Poce$ue as pe 5.-.1.2

    Revie& o" e,uiements

    Suitable e,uipment

    /$enti"icationtaceability

    Pocess contol $ocuments

     %lso vei"y6

    9 (o) instuctions= &7en applicable

    9 Monitoing ? measuing activities9 Re,uiements "o elease o" sevice$

    po$uct

    -rocess

    Control

    5ocuments

    (3.6.,.#

    5ocumentation of process controls> /nclu$es e,uiements "o

    vei"ying con"omance &it7

    ,uality plans= po$uct specs=

    custome e,uiements

    Re"eence instuctions

     %cceptance citeia

     %lso vei"y6

    /nspection 7ol$s an$ &itness points

    -roduct

    Realiation

    Capabilit$

    5ocuments

    (3.6.,.0

    -roduct realiation documentation sampled> Po$uct eali!ation plan 5.2

    Reco$s o" evie&vei"ication=

    vali$ation= monitoing=measuement= inspection=

    tests

     %cceptance citeia

    $emonstating capability to

    manu"actue po$ucts"amily

    o" po$ucts

    Page 24 o" 3'

  • 8/21/2019 api audit checklist 9thedition.docx

    25/36

    Audit ReportDoc ID: FM-198

    Revision: 2.1

    Efective Date: TBD

    Validation of

    -rocesses for

    -roduction

    and Ser)icing

    (3.6.,.3

    Validation of processes for production and ser)ices (including

    outsourced)>

    +emonstates ability to

    ac7ieve planne$ esults

    >ei"ication o" supplie

    con"omance to stan$a$

    e,uiements 5.'.1.'

    Reco$s maintaine$

    -roduct

    &ualit$ -lans

    (if required)

    (3.6.2

    -roduct %ualit$ plan re%uired b$ te contract>  %$$esses eac7 e,uiement

    o" 5.-.2 a t7oug7 e

    Revisions $ocumente$

    appove$

    Communicate$

    Identification

    and

    Traceabilit$

    -roduct

    Inspection /

    Test Status

    -reser)ation

    of -roduct

    (3.6.#' 3.6.0'

    3.6.3' 3.6.E

    Identification / traceabilit$ trougout product realiation

    process>

    Reco$s maintaine$

     %lso vei"y 6

    9 +elivey an$ post9$elivey

    9 Maintenance eplacement o"

    i$enti"ication ma)s

    Identification of inspection / test status trougout product

    realiation process>

    Reco$s maintaine$

    in$icating con"omity

    noncon"omity o" po$uct

    Customer4supplied propert$ trougout product realiation (if

    applicable)>

    Poce$ue pe 5.-.5

    Reco$s maintaine$

     %lso vei"y6

    Re,uiements "o epoting to custome 

    -reser)ation of product trougout product realiation and

    deli)er$>

    /$enti"ication taceability

    ma)s

    #anspotation= 7an$ling=pac)aging an$ potection

    Reco$s maintaine$

    Storage and assessment trougout product realiation and

    deli)er$>

    +esignate$ stoage aea

    stoc) ooms

    Reco$s o" assessment

    maintaine$

    Page 25 o" 3'

  • 8/21/2019 api audit checklist 9thedition.docx

    26/36

    Audit ReportDoc ID: FM-198

    Revision: 2.1

    Efective Date: TBD

    Inspection

    and Testing

    (3.6.6

    In4process inspection and testing> Poce$ue as pe 5.-.-.1

    /nspection testing at planne$

    stages pe plan poce$ue

    *vi$ence o" con"omity &it7acceptance citeia maintaine$

    Poce$ue as pe 5.-.-.2

    inal inspection testing pe

    plan poce$ues

    *vi$ence o" con"omity to

    e,uiements maintaine$

    -re)enti)e

    Maintenance

    (3.6.*

    -re)enti)e maintenance for e%uipment used in product

    realiation>

    Poce$ue as pe 5.-.

    #ype o" e,uipment= "e,uency=

    esponsible pesonnel

    i$enti"ie$

    Reco$s maintaine$

    Control of

    Testing'

    Monitoring

    and

    Measuring

    !%uipment

    (3.*

    Control and maintenance of testing' monitoring and measuring

    e%uipment>

    Poce$ue as pe 5.

    /$enti"ication= status=

    taceability= "e,uency=

    calibationvei"ication

    met7o$s= acceptance citeia

     %lso vei"y6

    Contol o" out9o" 8toleance e,uipment

    an$ assessment o" pevious

    measuements

    Testing' monitoring and measurement e%uipment sampled> Ini,uely i$enti"ie$

    Calibation status i$enti"ie$

    #aceable to natElintEl stan$a$

    /nclu$e$ on egisty

    Reco$s maintaine$

     %lso vei"y6

    9Compute so"t&ae con"imation

    Page 2' o" 3'

  • 8/21/2019 api audit checklist 9thedition.docx

    27/36

    Audit ReportDoc ID: FM-198

    Revision: 2.1

    Efective Date: TBD

    9 * Poce$ue as pe 5.0

    Release upon satis"actoy

    completion o" planne$

    aangements

     %lso vei"y6

     %ppoval o" elease by aut7oitycustome

    &7en planne$ aangements ae not met

    Control of

    9onconforming

    -roduct

    (3.,;

    Control of nonconforming product> Poce$ue as pe 5.1.1

    Met7o$ o" a$$essing non9

    con"oming po$uct i$enti"ie$

    pe 5.1.2

    Concession appove$ by

    elevant aut7oity an$o

    custome 

    Custome noti"ication pe

    5.1.4

    Reco$s maintaine$ 5.1.5

     %lso vei"y6

    9 Pope i$enti"ication to pevent uninten$e$

    use

    9 %$$essing t7e noncon"omity

    9 /$enti"ication= $ocumentation= analysisan$ actions ta)en "o noncon"oming

    po$uct i$enti"ie$ a"te $elivey

    9 Ris) assessment associate$ &it7

    po$uct ,uality inclu$es supplie

    pe"omance. *nsue is)s ae i$enti"ie$

    an$ contolle$ 5.3b.

    Training /

    Competence

    (production

    and servicing

     personnel)(0.#.2.2'

    0.#.2.#

    &ualification/Competenc$ of personnel> #aining "e,uency an$

    contents i$enti"ie$

    Competent,uali"ie$

    #aining evaluation

    Reco$s maintaine$

     %lso vei"y6

    9 Custome9speci"ie$ povi$e$9 Outsouce$ pesonnel

    ,uali"icationcompetence

    AuditorHs Assessment of -rocess(es>

  • 8/21/2019 api audit checklist 9thedition.docx

    28/36

    Audit ReportDoc ID: FM-198

    Revision: 2.1

    Efective Date: TBD

    Page 2 o" 3'

  • 8/21/2019 api audit checklist 9thedition.docx

    29/36

    Audit ReportDoc ID: FM-198

    Revision: 2.1

    Efective Date: TBD

    Top of the Document

    8se of A-I Monogram' A-I&R and A9A: Mar+s

    A.3 Control of te Application of te A-I

    Monogram-rocedure>

    Re%uirements> =becti)e !)idence / Comments> ei"y t7e poce$ue $ocuments all

    ma)ingmonogamming e,uiements inclu$es all

    e,uiements o" %nne< %.

    +escibe t7e licenseeEs %P/ Monogam ma)ing

    emoval poce$ue "o non9con"oming po$uct.

    /$enti"y evi$ence o" implementation= i" applicable.

    AMA 4 i" t7e "acility 7as an %M%= i$enti"y t7e

    ma)ing "acility an$ $etail contols establis7e$.

    List all A-I MonogramMar+s sampled(on products, letterhead, business cards or

    any other medium)>

    Po$uct con"oms to %P/9spec

    e,uiements

     %pplie$ by licensee only

    /nclu$es ma) an$ license

    numbe 

     %pplie$ at license$ "acility

    location

    Verif$ conformance of te folloing re%uirements for use of te Monogram and A9A:/A-I&R

    mar+. An$ 9oselected is considered a nonconformance. @es 9o 9/A

     %P/QR Ma)s ae onl$ on coespon$ence= a$vetising= an$ pomotional mateials t7at ae elate$

    to t7e goo$s an$ sevices e"eence$ in t7e scope o" t7e Ogani!ationEs egistation.

    #7e%P/QR %;%D Ma) as not been use$ on a po$uct o in suc7 a &ay as to suggest t7at

     %P/QR %;%D 7ave ceti"ie$ o appove$ any po$uct= pocess o sevice o" t7e egistee$ogani!ation.

    #7e %P/QR an$ %;%D Ma)s ae use$ in conunction it t7e ogani!ationEs name= location an$

    egistation ceti"icate numbes.

    #7e %;%D Ma) is use$ in conunction it t7e %P/QR Ma).

    #7e %P/QR an$ %;%D Ma)s are epo$uce$6

    5. in blac)= its oiginal colos o t7e pe$ominant colo o" t7e lette7ea$ o pinting='. on a clealy contasting bac)goun$= an$-. in a si!e &7ic7 ma)es t7e ma)Es "eatues clealy $istinguis7able= t7e lengt7 o" a si$e being in no

    case less t7an 12mm %P/QR Ma) an$ 1mm %;%D Ma).

    Ipon &itten noti"ication= t7e ogani!ation immediatel$ ceased and desisted in t7e use o" t7e %P/QR%;%D Ma)s an$o %P/ Monogam 1 upon suspension o cancellation o 2 use in any

    manne= &7ic7 %P/%P/QR intepets as mislea$ing.

    Applicant organiation 1 %P/QR= %;%D Ma)s an$o %P/ Monogam a)e not been i$enti"ie$ in

    pomotional mateials o ot7e company $ocumentation.

    Page 20 o" 3'

  • 8/21/2019 api audit checklist 9thedition.docx

    30/36

    Audit ReportDoc ID: FM-198

    Revision: 2.1

    Efective Date: TBD

    Top of

    Audit Time Summar$

    5ate Start Time !nd Time

    =pportunities for Impro)ement (=

    -ro)ide a summar$ of te closure and )erification of correcti)e actions for pre)ious findings' if an$>

    -ro)ide an o)erall assessment of te capabilit$ of te facilit$ to manufacture product(s (Monogram>

    -ro)ide an o)erall assessment of te effecti)eness of te management s$stem and te facilit$Hs abilit$ to

    acti)ities itin te scope of te registration>

    Page 3 o" 3'

  • 8/21/2019 api audit checklist 9thedition.docx

    31/36

    Audit ReportDoc ID: FM-198

    Revision: 2.1

    Efective Date: TBD

    Conclusion / Recommendation

    Registation an$ o :icensing ae gante$ continue$ einstate$ base$ on satis"actoy implementatio

    Management System an$ o $emonstate$ capability to meet applicable speci"ication e,uiements &it

    noncon"omities i$enti"ie$.

    Registation an$ o :icensing be gante$ continue$ einstate$ subject to t7e evie& o" t7e noncon"o

    i$enti"ie$ an$ acceptance o" appopiate coective actions by t7e %P/ Registation ? :icensing CommRegistation an$ o :icensing subject to t7e evie& o" t7e noncon"omances i$enti"ie$ an$ acceptanc

    appopiate coective actions by t7e %P/ Registation ? :icensing Committee. #7is $ecision may inclu

    au$it to vei"y t7e e,uie$ coective actions.

    9ote6%u$its may esult in suspension o cancellation o" t7e ogani!ationEs licenses an$o egistations o &it7

    application "o licensingegistation.%P/ ma)es t7e "inal $etemination o" ceti"ication status an$ s7all be t7e sole

    &7et7e licensue o egistation &ill be gante$maintaine$.Jou &ill be noti"ie$ by %P/ i" you licenseegistation

    a$vesely a""ecte$ by t7e esults o" t7is au$it.

    Comments / 9otes>

    =rganiationHs Representati)e Comments>

    !nter te ne"t audit date for 5ual/Registration Audits belo (Does not apply to onogram only audits)>

    •ist suveillance au$it a"te stage 2 initial au$it 8 MIS# be sc7e$ule$ 0 mont7s a"te t7e last $ay o" t7e stage 2 au$

    •Secon$ subse,uent suveillance au$its 8 aoun$ au$it annivesay $ate o" initial "ist suveillance au$it

    •Receti"ication au$its 8 at least ' mont7s pio to t7e e

    "y signing below# $ %we& attest that the information above is accurate and has been collected by the audit team durin

     performance of the audit that was assigned to me %us& by AP$:

    Audit Team Leader> 5ate>

    Audit Team Member> 5ate>Audit Team Member> 5ate>

    "y signing this document# it is not an admission of the acceptance of any nonconformities'concerns identified by

    team (he signature only confirms that the audit was performed) that a copy of this document %*+,-./& was left) and

    recommendations and audit conclusions were communicated by the auditor AP$ reserves the right to have final det

    of the level of nonconformity identified by in the audit AA0s and final audit report

    =rganiation Representati)e> 5ate>

    Page 31 o" 3'

  • 8/21/2019 api audit checklist 9thedition.docx

    32/36

    Audit ReportDoc ID: FM-198

    Revision: 2.1

    Efective Date: TBD

    (op of the 1ocument

    Supplemental Audit Information

    .nter additional information relevant to the audit, if necessary

  • 8/21/2019 api audit checklist 9thedition.docx

    33/36

    Audit ReportDoc ID: FM-198

    Revision: 2.1

    Efective Date: TBD

  • 8/21/2019 api audit checklist 9thedition.docx

    34/36

    Audit ReportDoc ID: FM-198

    Revision: 2.1

    Efective Date: TBD

    (op of th

  • 8/21/2019 api audit checklist 9thedition.docx

    35/36

    Audit ReportDoc ID: FM-198

    Revision: 2.1

    Efective Date: TBD

    (op of the 1ocument 

    =pening / Closing Meeting Attendance Seet

    8hen performing the opening and closing meeting, please refer to the 3pening and =losing meeting guidelines

    Audit I5>

    Audit Team Leader>

    Audit Team Members>

    Audit =bser)er(s>

    =pening Meeting (5a$

    Time>

    Closing Meeting

    (5a$ Time>

    -articipants (9ame Title 4 Initial/cec+ te meetings attended =pening Closing

    The information contained in this report is confidential and sub'ect to the confidentiality agreement bet%een the udit 

    Team*uditor(s) and !I Details of the assessment results are found in the succeeding pages of this report

    Page 35 o" 3'

  • 8/21/2019 api audit checklist 9thedition.docx

    36/36

    Audit ReportDoc ID: FM-198

    Revision: 2.1

    Efective Date: TBD

    (op of the 1oc

    Audit -ac+age Cec+list

    acility /n"omation S7eetKK Po$uct QuestionsK Stage 1 %u$it RepotK

    Q%RsKKQ1= 0t7 *$ition Lap

     %nalysis in$ings %%RsK

    > If required 

    >>!lease update as necessary