DCGB/MKT | 18/01/2017 © Bosch Rexroth AG 2018. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights. 1 “From the surface to the sea bed, we move everything” Craig Grant, OEM Sales Manager, Bosch Rexroth, The Drive & Control Company

Transcript of “From the surface to the sea bed, we move everything” · 2018. 1. 18. · Working with Allseas...

Page 1: “From the surface to the sea bed, we move everything” · 2018. 1. 18. · Working with Allseas on platform installation / decommissioning and pipe lay vessel to supply the complete

DCGB/MKT | 18/01/2017© Bosch Rexroth AG 2018. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.

1

“From the surface to the sea bed,we move everything”

Craig Grant, OEM Sales Manager,Bosch Rexroth, The Drive & Control Company

Page 2: “From the surface to the sea bed, we move everything” · 2018. 1. 18. · Working with Allseas on platform installation / decommissioning and pipe lay vessel to supply the complete

DCGB/MKT | 18/01/2017© Bosch Rexroth AG 2018. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.

2

Working with Allseas on platform installation / decommissioning and pipe lay vessel to supply the complete motion compensation system

Project Experience and Expertise

From the surface to the sea bed, we move everything

Page 3: “From the surface to the sea bed, we move everything” · 2018. 1. 18. · Working with Allseas on platform installation / decommissioning and pipe lay vessel to supply the complete

31.01.2017 | DCBN/MKT | © Bosch Rexroth AG 2017. Alle Rechte vorbehalten, auch bzgl. jeder Verfügung, Verwertung, Reproduktion, Bearbeitung, Weitergabe sowie für den Fall von Schutzrechtsanmeldungen.

AHC Cylinders and HPU for Z-drive

Scope of Supply:16x AHC Cylinder Assembly16x AHC Accumulator Assembly32x Lift Cylinder Assembly16x P-Line Accumulator Assembly32x Ringside Accumulator Assembly16x LCA Module Components,

each containing:2x PHC Piston Accumulator4x FL Piston Accumulator2x FL Manifold Blocks2x QL Manifold Blocks2x PHC Manifold Blocks1x Set Hydraulic Components

16x Local Hydraulic Power Units16x Set Control Cabinets

From the surface to the sea bed, we move everything

Page 4: “From the surface to the sea bed, we move everything” · 2018. 1. 18. · Working with Allseas on platform installation / decommissioning and pipe lay vessel to supply the complete

31.01.2017 | DCBN/MKT | © Bosch Rexroth AG 2017. Alle Rechte vorbehalten, auch bzgl. jeder Verfügung, Verwertung, Reproduktion, Bearbeitung, Weitergabe sowie für den Fall von Schutzrechtsanmeldungen.

Cylinders and controls for XY-Drive

16x Y-Drive Cylinder Equipment16x Motor Carriage Equipment16x Hydraulic Controls Equipment16x Inboard Support X-Drive Equipment 16x Inboard Support X-Locking Equipment16x X-Locking Hydr. Power Unit Equipment16x Outboard Support X-Drive Equipment 16x Outboard Support X-Locking Equipment

From the surface to the sea bed, we move everything

Page 5: “From the surface to the sea bed, we move everything” · 2018. 1. 18. · Working with Allseas on platform installation / decommissioning and pipe lay vessel to supply the complete

31.01.2017 | DCBN/MKT | © Bosch Rexroth AG 2017. Alle Rechte vorbehalten, auch bzgl. jeder Verfügung, Verwertung, Reproduktion, Bearbeitung, Weitergabe sowie für den Fall von Schutzrechtsanmeldungen.

Central Hydraulic Power Unit

2x Central Hydraulic Power Unit Assembly2x Storage and Boost Oil Unit1x Interconnecting Pipework for CHPU1x Electric Control SystemMain Components:-Main E-Motors 8x 500KW-Axial Piston Units 8x Dual H-A4VSO250-Deep filtration Units 4x VacuClean 80 VCS-Manifold blocks, incl. control valves

From the surface to the sea bed, we move everything

Page 6: “From the surface to the sea bed, we move everything” · 2018. 1. 18. · Working with Allseas on platform installation / decommissioning and pipe lay vessel to supply the complete

From the surface to the sea bed, we move everything

DCGB/MKT | 18/01/2017© Bosch Rexroth AG 2018. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.

6