Annexure: B DETAILS OF CONTRACTS PLACED BY LIMITED … 2015 - March 2016/2_AnnexB_Apr15_Mar16.pdfM/S...
Transcript of Annexure: B DETAILS OF CONTRACTS PLACED BY LIMITED … 2015 - March 2016/2_AnnexB_Apr15_Mar16.pdfM/S...
Annexure: BDETAILS OF CONTRACTS PLACED BY LIMITED TENDER
(For Civil Engg. /Elect. Engg. /S & T/Mech. etc works)
(Status for the Month : APRIL 2015 – MARCH 2016)
Works Awarded : APRIL 2015
S. N.
Tender No.
Date of opening
Description of Item/ Work LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost
(For Engg./ Elect./S&T/Mech. Etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 IRCON/ Civil /1029/
RCF-RBL/ 10/Parking/LT/53 Dated
31.03.2015
16.04.2015 Construction of Car Parking in TTC & Admin building, Two Wheelers Parking in Workshop area, covering of exposed ramps on both sides of both RUB with Thermal Insulated Polycarbonate sheet and other misc. civil works in Workshop & Township area of Rail Coach Factory, Lalganj, Raebareli
IRCON/Civil/1029/RCF-
RBL/10/Tender/Parking/LT/53/
7454Dated
16.04.2015
M/s Vishnu Saran & Co.,
113/163, Swaroop Nagar, Kanpur - 208 002
` 9.76 Crores Schedule-A = ` 319.06 Lacs
(At Par)Schedule-B = ` 657.21 Lacs
(At Par)Total = ` 976.27 Lacs
`976.27 Lacs 05 months from the date
of issue of LOA
2 IRCON/2048/ISC-BEHALA/TENDER/
CP Roof/14/7
Dated18.03.201
5
06.04.2015 Supply, fabrication, transportation and fixing in position the structural steel work and in truss/ built up tubular (round, square or rectangular hollow tubes etc.) with cutting, hoisting, fixing in position and painting including Roof Sheeting as per drawings/ specifications in connection with the construction of roof for Cricket Pavilion and covering roof works at ramp portions for Eastern Railway at Behala
IRCON/K-RO/ 2048/ISC-
BEHALA/CP Roof/MPE/54
Dated 23.04.2015
M/s Makpower Engineers
235, Marshall House,
33/1, N. S. Road,Kolkata - 700 001
` 49.00 Lacs ` 49.00 Lacs ` 43,38,300/- 90-days from the date of
issue of LOA
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
3 IRCON/2055/Gaya-
Manpur-ROB/
e-Tender/2015/09 Dated
06.04.2015
22.04.2015Fabrication, assembly, Erection and Painting of Steel Bowstring girder in Railway span and staircase in connection to Construction of ROB at Km 1.000 of Manpur Bypass in state of Bihar
IRCON/2055/ GAYA-
MANPUR/ ROB/STEEL/LOA/29/ 711
Dated 25.04.2015
M/s Maa Durga Constech Pvt. Ltd.,
A-401, Block-A,Omshailbaran
Apartment,Brahamsthan Road,
Sheikhpura,Raja Bazar,
Patna - 800 014
` 3,05,55,944/- 1.50 % below the tendered amount
` 3,00,97,605/- 06-months from the date
of issue of LOA
4IRCON/ 2059/
CGRP/ Tender/15/
Survey Team Dated
12.02.2015
11.03.2015Hiring of Survey team for establishment of vertical control, topographic survey & traversing along the proposed alignment with all allied resources for construction of New B.G. Electrified Double Line in the State of Chhattisgarh over South East Central Railway between Kharsia and Dharmajaygarh including Spur Line from Gharghoda to Gare Pelma
IRCON/ 2059/ CGRP/ Tender/15/
Survey Team/ 279
Dated 29.04.2015
M/s Aarvee Associates,Architects, Engineers & Consultants Pvt. Ltd.,
8-2-5, Ravula Residency,
Srinagar Colony,Hyderabad - 500 082Ph.: 040-23737633Fax: 040-23736277
Email: [email protected]
` 77,20,350.00 0.90% below (` 76,50,866.85+
Service Tax @ 12.36%
i.e.` 945,647.14)
` 85,96,513.99(including
Service Tax)
30-months from the date
of issue of LOA
Contd.../-
Works Awarded : MAY 2015
S. N.
Tender No.
Date of opening
Description of Item/ Work LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/
Tendered Cost (For Engg./ Elect./S&T/Mech. Etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 IRCONPBTL/ 1034/CO/BKN-PHALODI RAJASTHAN INSURANCE POLICY/01
Dated 01.04.2015
16.04.2015 Providing Contractor's All Risk (CAR) Insurance policy for the works of Construction of “Widening and Strengthening of the existing Bikaner- Phalodi Section to four lane from km 4.200 to km 55.250 and Two lane with Paved Shoulder from km 55.250 to km 163.500 of NH-15 on BOT (Toll) basis in the state of Rajasthan”
IRCONPBTL/1034/CO/BKN
-PHALODI RAJASTHAN INSURANCE POLICY/01
Dated 12.05.2015
ICICI Lombard General Insurance Company Limited,
Plot No. 18, Block-K,
Lajpat Nagar-II,New Delhi - 110 024Ph. 011-66082499,
64587928, Email:
` 2,05,65,648/- (including service @ 12.36%)
Unit rate of Premium as %
over the SI: 0.051667% on
SI, ` 822.9 Cr.
` 76,74,228/- Expected Completion = 910 days from Appointed date indicative date
is 6th May,2015
Defect Liability Period = 365
days from completion
date
2 IRCON/MECH/9002/MAL.LOCO/ T.E
Dated 17.02.2015
04.03.2015 Supply of Air Brake Valves & Spares for YDM-4 (MG) DIiesel Locomotive for IRCON’S Malaysia Loco Project
IRCON/MECH/9002/MAL. LOCO/PUR/
596Dated
14.05.2015
M/s Stone India Ltd.,16 Taratalla Road, Kolkata - 700 088
24 Items - ` 3,35,488/- Within 90 days from date of
PO
3 IRCON/ MECH/
9002/MAL .LOCO/T.E
Dated 11.03.2015
06.04.2015 Supply of Axle Lining (Suspension Bearing) for YDM-4 (MG) Diesel Locomotive for IRCON’S Malaysia Loco Project
IRCON/MECH/9002/MAL. LOCO/PUR/
594Dated
14.05.2015
M/s Rama Engineering Works, Plot No. 768, Phase-1, I.D.A., Subhash Nagar Jeedimetla,
Hyderabad
i) Axle lining (Std) – 240 Set
ii) Axle lining 1/16” – 16 Setiii) Axle lining 1/8” – 48 Set
` 9600/- per Set ` 44,02,944/- Delivery for 150 set within
60 days & balance within 150 days from
date of PO
Contd.../-
Works Awarded : MAY 2015
S. N.
Tender No.
Date of opening
Description of Item/ Work LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost (For
Engg./ Elect./S&T/Mech. Etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
4 IRCON/ 2049/
ROB-II-BIHAR/
e-Tender/ 2015/12 Dated
16.04.2015
04.05.2015 Diversion road (additional) from RCD office to BSNL exchange at Main road of Khagaria as per direction of district administration in connection to the construction of ROB in lieu of LC-23B at Khagaria in the state of Bihar
IRCON/2049/ROB-II-BIHAR/ LC-
23/2015/12/ LOA/37/849
Dated18.05.2015
M/s Samsai Infra, 3, Mezanine Floor,
Kashi Palace, Near Mourya Lok,Patna - 800 001
` 1,15,95,116/- 14.50 % above the tendered amount
`1,32,76,407.82 2 months (including monsoon
period) from the date of
issue of LOA
5 IRCON/1035/
DMRC CT-1-A/
TENDER/Rail
Shifting, Dated
13.05.2015
21.05.2015 Loading of 1080 Grade, (Head Harden), 18m long rails in transporters own trailers with their crane from the stacks at Depots of DMRC at various locations in NCR and transportation of the same to various locations along alignment for Phase -III Corridors of DMRC for CT-1A Contract (Mukundpur to Lajpat Nagar)
IRCON/1035/ DMRC CT-1-A/
TENDER/Rail Shifting
Dated 27.05.2015
M/s M.K. Trailers Service Pvt. Ltd.
BC-301, 1st Floor, Mangolpuri Ind. Area, Phase-II,
New Delhi PIN - 110 034
` 33,07,000/- `33,07,000/- `33,37,920/- 25.04.2016
Contd.../-
Works Awarded : JUNE 2015
S. N.
Tender No.
Date of opening
Description of Item/ Work LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For
Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost (For
Engg./ Elect./S&T/Mech. Etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 IRCON/ MECH/P&E/TRANS/2T
M/488 Dated
06.05.2015
20.05.2015 Transportation of 1 No. Transit Mixer from Mangalore to Benapole Border
IRCON/MECH/P&E/TRANS/2T
M/488/429 Dated
09.06.2015
M/s New Transport Organisation
New Delhi
1 ` 2,86,029/- `2,86,029.00 Within 25 days from the date of intimations from IRCON that the
equipment is ready for dispatch
2 IRCON/ MECH/P&E/TRANS/2T
M/488 Dated
06.05.2015
20.05.2015 Transportation of 1 No. Transit Mixer from Shalimar, Howrah to Benapole Border
IRCON/MECH/P&E/TRANS/2T
M/488/430 Dated
09.06.2015
M/s Anil Cargo Pvt. Limited
New Delhi
1 ` 65,333.00 ` 65,333.00 Within 25 days from the date of intimations from IRCON that the
equipment is ready for dispatch
3 IRCON/ 2057/NSTP/BUNK
HOUSE/2015/01, Dated
16.5.2015
05.06.2015 Supply, installation & commissioning of 3 nos. Bunk house office at Project site in connection with the proposed railway track/siding for coal/non-coal transportation system for Nabinagar Super Thermal Power Project (3x660 MW) Dist. Aurangabad in Bihar State
IRCON/2057/NSTP/BUNK
HOUSE/LOA/ 2015/01
Dated11.6.2015
M/s Metal Home Engineering303, Noorani
Manor, Near Aisha Masjid, Mumbra, Thane - 400 612
Maharashtra
3 BUNK HOUSE ` 27.95 Lacs ` 22,68,966.00 10.09.2015
Contd.../-
Works Awarded JUNE 2015
S. N.
Tender No.
Date of opening
Description of Item/ Work LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For
Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/
Tendered Cost (For Engg./ Elect./S&T/Mech. Etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
4 IRCON/1034/IPBTL/Tenders/
Weigh Bridge/46
Dated 23.05.2015
03.06.2015 Providing Supply 2 no Pit Less Weigh Bridge including Transportation, Installation, Commissioning, Calibration, Stamping Loading of 16.00x3.00 meter size of Platform with a capacity of 100MTx10KG (Capacity x Accuracy) at Ex-factory and unloading at Km 45.600 and Km 127.00 between Bikaner-Phalodi Highway of NH-15 in the state of Rajasthan
IRCON/1034/IPBTL/Weigh
Bridge/46/278-A Dated
12.06.2015
M/S Endeavour Instrument Pvt. Ltd,
45/3, Changodar Industrial Estate,
AhmedabadPIN - 380 006
Gujrat
Item Rate: `18,34,996.00
Item Rate: `18,34,996.00
`17,19,000.00 Three weeks from the date
of issue of Purchase
Order
5 IRCON/1034/PBTL/Tender/Lab Establishme
nt/ 40 Dated
06.04.2015
22.04.2015 Supply, Installation and commissioning of Laboratory Equipment’s at IRCON’s Site Camp near Km.45+600 in connection with Widening & Strengthening of the existing Bikaner-Phalodi Section to 4-Lane from Km.4.200 to Km.55.250 and 2-Lane with Paved shoulder from Km.55.250 to Km.163.500 of NH-15 in the State of Rajasthan
IRCON/1034/PBTL/BPHP/LAB EQUIP/192
Dated 27.05.15 and
IRCON/1034/PBTL/BPHP/LAB EQUIP/287
Dated 15.06.2015
M/s Accrotech Sceintific Industries
Motinagar New Delhi
Item Rate: `21,91,602.00
Item Rate: `21,91,602.00
`16,08,062.63 75 days from date of
issue of LOA Dated
27.05.2015
Contd.../-
Works Awarded JUNE 2015
S. N.
Tender No.
Date of opening
Description of Item/ Work LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/
Tendered Cost (For Engg./ Elect./S&T/Mech. Etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
6 IRCON/ Civil/
e-Tender/ 1029/RCF
-RBL/ /LT/54 Dated
23.05.2015
11.06.2015 Construction of Senior Secondary School building including internal and external plumbing, sanitary and drainage services and related ancillary works of the building and other miscellaneous works in the Township of RCF/RBL
IRCON/Civil/e-Tender/ 1029/
RCF-RBL/ Sr.Secondary/
LOA/LT/54/ 7718 Dated
16.06.2015
M/s Ansh Project Service, 174/199,
A.K.L Kydganj, Allahabad (UP)
` 733.92 Lacs Schedule-A =` 689.77 Lacs
(1% below DSR)Schedule-B = ` 37.17 Lacs
Total = ` 726.95 Lacs
` 726.95 Lacs
09 months from the date
of issue of LOA
7 IRCON/2057/NSTP/Ancillary
Work /2015/02 Dated
30.5.2015
16.06.2015 Construction of Septic Tank, Installation of Water Tank, Pedestal of Bunk House & G.I. Barbed Wire Fencing, Gates etc. at Project site in connection with the proposed Railway Siding for Nabinagar Super Thermal Power Project (3X660 MW) of Nabinagar Power Generating Company Ltd. (NPGC), Dist. AURANGABAD (BIHAR)
IRCON/2057/ NSTP/ Ancillary
Work/LOA/ 2015/02 Dated
18.06.2015
M/s Sanjay Sharma,Gosain Bagh, Station Road,Gaya (Bihar)
36 Items ` 17,94,639.21 ` 16,51,068.00 17.09.2015
Contd.../-
Works Awarded JULY 2015
S. N.
Tender No.
Date of opening
Description of Item/ Work LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/
Tendered Cost (For Engg./ Elect./S&T/Mech. Etc
Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 IRCON/ PO/TN/
JAYNAGAR-2050/15/23
Dated 27.05.2015
10.06.2015 Construction of civil work including "Balance work of Embankment", Blanketing & other ancillary works in Indian portion of alignment from Km 0.000 to Km 02.975 in connection with Gauge Conversion & Construction of New Broad Gauge Railway Line from JAYNAGAR (INDIA) to BARDIBAS (NEPAL)” .Package No. : EMBK - 01 (India)
IRCON/2050/BGL.JBB/
Tender/ Pkg.-EMBK-
01(India) /202 Dated
01.07.2015
M/s Gopal MishraRajhata Binodpur
Katihar(Bihar)Pin : 854 101
` 3,88,66,549/- 18.0 % above ` 4,58,62,528/- 09 months from the
date of issue of LOA
2 IRCON/1035/DMRC
CT-1-A/ TENDER/ SURVEY
Dated 15.06.2015
30.06.2015 Survey works between Mukundpur - Lajpat Nagar (Delhi) for Standard Gauge for Contract CT -1 A of DMRC
IRCON/1035/DMRC CT-1-A/ TENDER/
SURVEY/ Dated
03.07.2015
M/s Measure Techno Services, C-5/2, Sector-5, Rohini, Delhi - 110 085
` 24,86,000/- ` 24,86,000/- ` 33,43,700/- 06.06.2016
3 IRCON/ 2055/ROB-
BIHAR/ GAYA-
MANPURC/e-Tender/ 2015/13 Dated
05.06.2015
19.06.2015 Execution of Road work like Granular sub base (GSBC), Wet Mix Macadam (WMM), Dense Bituminous Macadam (DBM), Bituminous Concrete (BC), Mastic Asphalt and Bridge Protection work in lieu of Construction of Road over Bridge at CH.1.00 Manpur bypass at Manpur of SH-04 in Gaya District, Bihar
IRCON/2055/ Gaya-Manpur/ 2015/13/LOA/
42/1092 Dated
06/07.07.2015
M/s Hari Construction &
Associates Pvt. Ltd., At & PO: Keshawe,
P.S.:Barauni,Distt. - Begusarai (Bihar), PIN : 851
134
` 273.26 Lacs 15.00 % above ` 314.25 Lacs 6 months (including monsoon
period) from the date of
issue of LOA
Contd.../-
Works Awarded JULY 2015
S. N.
Tender No.
Date of opening
Description of Item/ Work LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For
Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/
Tendered Cost (For Engg./ Elect./S&T/Mech. Etc
Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
4 IRCON/1034/IPBTL/
Tender/Emulsion Storage Tank/42 Dated
19.06.2015
06.07.2015 Providing Supply Emulsion Storage Tank 4 Nos of Capacity 15KL (2 Nos Tank at Km 45.600 & 2 Nos at Km 127.000 KM) between Bikaner - Phalodi Highway of NH-15 in the state of Rajasthan including Loading at Factory, Transportation, Unloading, at IRCON Site
IRCON/1034/IPBTL/Storage
tank/42/385 Dated
14.07.2015
M/s Moris Industries,144/1, GIDC-1,Highway Road,
Mehsana - 384 002Gujrat
Tel.: 2762250522
` 16,47,450/- 4.70% below ` 15.70 Lacs 04 weeks from the date of issue of
LOA
5 IRCON/1035/DMRC
CT-1-A/ TENDER/
Reinf. Steel/Lot-1
Dated 10.07.2015
20.07.2015 Manufacture & Supply of 12mm diameter reinforcement steel (TMT, Fe 500) for Contract CT-1A of DMRC along the alignment of CT-1A contract (Lajpat Nagar to Mukundpur) or at IRCON's Store at ESI Hospital near Panjabi Bagh, Delhi
IRCON/1035/ DMRC CT-1-
A/TENDER/
Reinf. Steel/ Lot-1/65Dated
23.07.2015
M/s Jindal Steel & Power Limited Jindal Center,
5th Floor, Tower A, Plot No. 2,
Sector - 32, Gurgaon (Haryana)
Ph. : 9560898221
300 MT Basic Cost :` 35,450/- Per MT +
Transportation ` 430 Per MT + CST @ 2%
against issue of Form C
` 1,09,75,500/- -
6 IRCON/ 2049/ROB-II-BIHAR/ e-Tender/ 2015/18 Dated
25.06.2015
15.07.2015 Construction of Granular sub base (GSBC), wet mix macadam(WMM), Dense Bituminous Macadam(DBM) and Bituminous Concrete (BC) in connection to the construction of ROB in lieu of LC-159A/SPL at Km. 164/15-165/1 between Jivdhara - Motihari section on Muzaffarpur - Gorakhpur route in Samastipur Division E.C. Railway, Bihar
IRCON/2049/ ROB-II-Bihar/
e-Tender/ 2015 /
18/LOA/49/ 1246 Dated
24.07.2015
M/s Samsai Infra, 3, Mezanine Floor,
Kashi Place, Near Mourya Lok,
Patna (Bihar)PIN - 800 001
` 130.80 Lacs 9.95% above ` 143.82 Lacs 6 months (including monsoon period) from the date of issue of
LOA
Contd.../-
Works Awarded JULY 2015
S. N.
Tender No.
Date of opening
Description of Item/ Work LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost (For
Engg./ Elect./S&T/Mech. Etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
7 IRCON/ 2059/CGRP/
Tender EC12/15/ GT Work
Dated 05.06.2015
24.06.2015 Conducting Geo-Technical Investigations including Drilling of Boreholes, Collecting Test Samples & Laboratory Testing from Urga to Kusmunda and Gharghoda to Donga Mauha for Construction of New B.G. Electrified Double Line Railway Track in the state of Chhattisgarh over South East Central Railway between Kharsia and Dharmjaygarh including Spur Line from Gharghoda to Gare Pelma
IRCON/ 2059/CGRP/
Tender EC12/15/ GT
Work/355 Dated
28.07.2015
M/s S&S AssociatesPlot No. 7GH/1353/D-15
Sector-9, CDA,P.O./P.S.-Markat Nagar, Cuttak, Odisha - 753 014Tel/Fax: 0671-6542018
Mob.: 9437023018,9338823018
Email: [email protected]@gmail.com
` 33,96,163.17 8% below+
Service Tax @14%
` 35,61,895.94 100 - days from the date of issue of
LOA
8 IRCON/MECH/P&E/BIKANER-PHALODI/
PROCURE/WATER
TANKER/499/RET-I
Dated 17.06.2015
07.07.2015 Supply, Testing & Commissioning of 04 nos. Water Tankers for Bikaner Phalodi Highway Project at Rajasthan
IRCON/MECH/P&E/BIKANER-PHALODI/
PROCURE/WATER
TANKER/499/RET-I
Dated 29.07.2015
M/s TATA Motors Limited,
Commercial Vehicle Division
Jeevan Tara Building5, Sansad Marg New
Delhi - 110 001
4 nos. `13,68,799.00 `54,75,196.00 8 weeks from the
date of LOA
Contd.../-
Works Awarded AUGUST 2015
S. N.
Tender No.
Date of opening
Description of Item/ Work LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/
Tendered Cost (For Engg./ Elect./S&T/Mech. Etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 IRCON/MECH/9002/MAL.LOCO
/T.E Dated
02.07.2015
20.07.2015 Snubber Assembly for YDM - 4 (MG) diesel locomotives for export to Malaysia
IRCON/MECH/9002/MAL.LOCO/607
Dated 13.08.2015
M/s G.B Equipment Systems Ltd.
16, Ballupur Road, Chakrata Road,
Dehra-dun - 248 001Uttarakhand
120 Nos ` 5,585/- Ex. Taxes
` 7,60,677/- 120 days from date of
PO
2 IRCON/2044/Ganga
Bridge-Patna/16/2015/04
12.08.2015 Drilling and Fixing of Anchor Bars with Hilti Chemical at Pier P37 & Abutment A2 for pedestal work of 64m span at Pehlejaghat (North End)” of Rail cum Road Bridge across river Ganga at Patna
IRCON/2044/GBSS-
Patna/16/2015/01/6847/Digha Dated13.08.2015
M/s Avtar Techno Solution Pvt. Ltd.,
BC-171C,East Shalimar Bagh
Delhi - 110 088
Schedule-A = 620 nos.
Schedule-B = 20 nos.
Schedule-A = ` 3260.94 Lacs
Schedule-B = ` 1004.24 Lacs
`20,41,869.35 /- 25 days from the date of issue of
LOA
3 IRCON/MECH/P&E/BI
KANER-PHALODI
/DG SET/503/RET-I Dated
19.06.2015
03.07.2015 Supply, Testing & Commissioning of 01 no. 600 KVA DG Set for Bikaner Phalodi Highway Project
IRCON/MECH/P&E/BIKANER-PHALODI/DG
SET/503/RET-I Dated
19.08.2015
M/s Elmech Engineers,
1402, Chiranjiv Tower, 43, Nehru Place, New Delhi
PIN - 110 019
01 No. `43,04,122.00/- ` 43,04,122/- 6 weeks from the
date of LOA
4 IRCON/1035DMRC
Ph.III CT-1-A/Insurance/
CAR/75 Date
07.08.2015
17.08.2015 Insurance (CAR & WC Policy) for the project "Supply installation, testing and commissioning of ballastless track of standard gauge, Part-1 corridor of sections of Mukundpur - Lajpat Nagar (excluding) Line-7, in elevated and underground sections of Delhi MRTS Project of Phase-III", For DMRC CT-1A Contract
IRCON/1035DMRC Ph.III
CT-1-A/ Insurance/CAR/
IFFCO-TOKIO/91
Dated 20.08.2015
M/s IFFCO-TOKIO General Insurance
505, Kailash Building,
26 K.G. MargNew Delhi - 110 001
` 29,50,000/- ` 29,50,000/- ` 25,52,344/- 22.02.2017 i.e. 24 Months
from 23.02.2017
Contd.../-
Works Awarded SEPTEMBER 2015
S. N.
Tender No. Date of opening
Description of Item/ Work LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost (For
Engg./ Elect./S&T/Mech. Etc
Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 IRCON/MECH/P&E/BIKANER-PHALODI/PRO
CURE/AIR COMPRESSORS/500/RET-I
Dated 27.07.2015
14.08.2014 Supply, Testing and Commissioning of 02 nos. Air Compressors for Bikaner Phalodi Highway Project at Rajasthan
IRCON/MECH/P&E/BIKANER-
PHALODI/PROCURE/AIR
COMPRESSORS/500/RET-I Dated
10.09.2015
M/s Abhishek Sales Corporation,
C-55/3, Okhla, Indl, Area Phase-II,New Delhi -110 020
02 nos. ` 7,69,080/- ` 15,38,160/- 6 weeks from the date of
LOA.
2 NIT-47 07.11.2015 Hiring services towards House Upkeeping, Office Work, Account Section at Bikaner and Security Services at Camp-1 Km 45+600
IRCON/1034/PBTL/NH-15/NIT/47
Dated16.09.2015
M/s M.S. Service Pvt. Ltd.
SCO-I Himuda commercial Complex,
Sai Road, Baddi,Distt. - Solan (H.P.)
e-mail: [email protected]
Item Rate `17,05,650/-
Item Rate `17,05,650/- `16,88,112/-
06 months from date of
LOA
3 IRCON/1034/ PBTL/NH-
15/Tenders/ Maintenance/46
Dated 10.09.2015
16.09.2015 Maintenance of Existing Road Pavement from Km 95+000 to Km 163+500 of Bikaner-Phalodi Section of NH-15
IRCON/1034/PBTL/NH-
15/NIT/46/LOA/540 Dated
18.09.2015
M/S Heera Ram Godara Sec-4 Plot No-94,
Adarsh Nagar PhalodiRajasthan
` 42,02,110/- 9.77% above
` 46,12,656.15 06 months from date of
LOA
4 IRCON/MECH/P&E/SGHP/RB
L/514 Dated
17.08.2015
01.09.2015 Transportation of 3 Nos Equipment from RCF/RBL to Shivpuri Guna Highway Project
IRCON/MECH/P&E/SGHP/RBL/51
4/2/529Dated
21.09.2015
M/s New Transport Organisation ,
8551,Roshanara Road,2nd Floor,
Gulshan Housing Building, New Delhi - 7
` 1.08 Lacs
Contd.../-
Works Awarded SEPTEMBER 2015
S. N.
Tender No. Date of opening
Description of Item/ Work LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost (For
Engg./ Elect./S&T/Mech. Etc
Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
5 IRCON/MECH/P&E/SGHP/R
BL/514 Dated
17.08.2015
01.09.2015 Transportation of 3 Nos Plant and Equipment from RCF/RBL to Shivpuri Guna Highway Project
IRCON/MECH/P&E/SGHP/RBL/
514/3/530 Dated
21.09.2015
M/s Darcl Logistics Limited , 19,Tilak Bazar,
Hisar - 125 001 (Haryana)
` 19.58 Lacs ` 11.91 Lacs 20 days from the date of
intimation from IRCON that
the equipment are ready for
dispatch
6 IRCON/1035/
DMRC Ph.III CT-1-
A/Insurance/PIIP Dated
01.09.2015
11.09.2015 Insurance (PIIP) for the project "Supply installation testing commissioning of ballastless track of standard gauge, Part 1 Corridor of section of Mukundpur- Lajpat Nagar (excluding) line-7, in elevated and underground section of Delhi MRTS Project of Phase III" for DMRC CT-1A Contract
IRCON/1035/DMRC Ph.III
CT-1-A/Insurance/
PIIP/OICL/118Dated
22.09.2015
M/s Oriental Insurance Co. Ltd.,
Div. No.-20, N-39, Conn. Circus, New Delhi - 110 001
` 21,37,000 ` 21,37,000 ` 5,55,672/- 22.02.2017 (24 Months
from 23.02.2017)
7 IRCON/MECH/P&E/SGHP/RBL/514
Dated 17.08.2015
01.09.2015 Transportation of 1 No Equipment from RCF/RBL to IRCON, Greater Noida
IRCON/MECH/P&E/SGHP/RBL/
514/1/532 Dated
23.09.2015
M/s Anil Cargo Pvt. Ltd. 8445/1,1st Floor,
Aryya Nagar,Pahar Gunj,
New Delhi - 55
Job ` 0.44 Lac
Contd.../-
Works Awarded SEPTEMBER 2015
S. N.
Tender No. Date of opening
Description of Item/ Work LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost (For
Engg./ Elect./S&T/Mech. Etc
Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
8 IRCON/ Tender/ JBNRL/
2051/15/03 Dated
07.08.2015
21.08.2015 Execution of Electrical works at Bathnaha Railway station, Supply, Erection, Testing and Commissioning of octagonal 6.0 M poles on Platform No. 2 including 2Cx10 sq mm aluminum armored cable with luminaries & electrification of PP Shed PF No. 1 & 2 and FOB
IRCON/2051/ JBNRL/Elect
Works/BTH/ LOA/ 59/1221 Dated
24.09.2015
M/s Nav Bharat Construction,Lemuabad,
Pandark, Barh, Patna (Bihar)
` 18.15 Lacs At par on some BOQ items & 5% above on balance
BOQ items
` 18.48 Lacs 07 (Seven) Months
9 IRCON/2034/ROB-BIHAR/
e-Tender/L.C-
72/2015/32 Dated
16.09.2015
28.09.2015 Balance Work for Construction of Road Over Bridge (ROB) in Bihar including Substructure, Superstructure including approaches at Level Crossings No.72 at Patna City
IRCON/2034/ROB-BIHAR/LC-
72/2015/LOA/75/1661 Dated30.09.2015
M/s Samsai Infra,3, Mezanine Floor, Kashi
Place,Near Mourya Lok, Patna
(Bihar)PIN - 800 001
` 269.03 Lakhs
15.00 above
` 309.39 Lacs
09 months (including monsoon
period) from the date of
issue of LOA
Contd.../-
Works Awarded OCTOBER 2015
S. N.
Tender No. Date of opening
Description of Item/ Work LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost (For
Engg./Elect./S&T/ Mech. Etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 IRCON/1035/DMRC CT-1-A/
TENDER/Reinf.
Steel/Lot-2 Dated
30.09.2015
07.10.2015 Manufacture & Supply of 10 mm diameter reinforcement steel (TMT, Fe 500) for Contract CT-1A of DMRC along the alignment of CT-1A contract (Lajpat Nagar to Mukundpur) or at IRCON's Store at ESI Hospital near Panjabi Bagh, Delhi-Lot-2
IRCON/1035/ DMRC CT-1-A/
TENDER/ Reinf. Steel/
Lot-2/36Dated
08.10.2015
M/s Steel Authority of India Limited Branch Sales Office Jeevan Deep Building, 10
Sansad Marg,New Delhi - 110 001
300 MT (i) Basic Cost:` 32650/- Per
MT + (ii)
Transportation` 350 Per MT +VAT @5% on(i) + (ii)
` 1,03,95,000/- -
2 IRCON/1034/PBTL/NH-
15/MECH/ERECTION OF CRUSHER
REPAIR/152 Dated
04.09.2015
18.09.2015 Erection of 200TPH , 3 Stage, Metso Make, Crushing Plant at IRCON Camp at Km 127+000 NH-15 Near Baap (Rajasthan) in Bikaner-Phalodi Highway Project Site
IRCON/1034/PBTL/NH-15/MECH/
ERECTION OF CRUSHER
REPAIR/152/ 570 Dated10.10.2015
M/s M.S. Engineering Consultant
No. 6, Plot No. 11,N.K.K. Nagar, Vallam,
Tanjavur - 613 001(Tamil Nadu)
Phonr # 04362-236432, 9994899867
Item Rate: ` 11,55,000/-
Item Rate: ` 11,55,000/-
`11,91,300/- 60 Days from the date of issue of
LOA
3 IRCON/3017/SGTL/Bamaur Camp/Office
Civil/301 Dated
29.09.2015
09.10.2015 Construction of Foundation and Platform for erection of pre-fab office Building at Km.276”4-Laning of Shivpuri-Guna section of NH-3 from Km. 236.000 to 319.700 in the state of Madhya Pradesh”( Stage-I)
IRCON/3017/SGTL/Bamaur
Camp/Office Civil/301/31
Dated10.10.2015
M/s. Maa Nihal Devi Construction Company
In front of SBI,A.B. Road,Kolaras,Dist –Shivpuri - 473 774,Madhya Pradesh
` 638806.44 8.80% above cost put to
Tender `553070.92
` 601741.16 15 Days
Contd.../-
Works Awarded OCTOBER 2015
S. N.
Tender No. Date of opening
Description of Item/ Work LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For
Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/
Tendered Cost (For Engg./ Elect./S&T/Mech. Etc
Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
4 IRCON/3017/SGTL/Bamaur Camp/Camp Office(pre-fab)/302 Dated
29.09.2015
09.10.2015 Construction of Pre-fab Office building at Km.276 “4-Laning of Shivpuri-Guna section of NH-3 from Km. 236.000 to 319.700 in the state of Madhya Pradesh”( Stage-I)
IRCON/3017/SGTL/Bamaur
Camp/Camp Office (Pre-
fab)/302/35A Dated.19.10.2015
M/s. Indian ConstructionsPlot No.-39,
Rail Vihar, Sector-33, NOIDA, G.B Nagar,
Uttar Pradesh.
` 2165730.18 14.2% above Cost
put to Tender
`1949286.76
` 2226085.48 30 Days
5 IRCON/3018/DFCCIL-
CTP12/INSURANCE/02
Dated12.10.2015
16.10.2015 Contractors All Risk Insurance, Third Party Insurance & Workmen Compensation Insurance for CTP-12 DFCCIL Project between Vaitarana and Sachin.
IRCON/3018/DFCCIL-CTP12/
INSURANCE/02/1015Dated
27.10.2015
M/s ICICI LOMBARD GENERAL
INSURANCE COMPANY LTD, ICICI Lombard House, 414, Veer Savarkar Marg,
Prabhadevi,Mumbai - 400 025
NA NA ` 2,17,77,056/-28.10.2019
6 IRCON/3017/SGTL/Bamaur
Crusher Civil/303
Dated 08.10.2015
17.10.2015 Construction of Foundation Panel Room, Retaining Wall and other associated work for erection of Crusher at Bamaur village 276 “4 - Laning of Shivpuri - Guna section of NH-3 from Km. 236.000 to 332.100 in the state of M. P.” ( Stage-I)
IRCON/3017/ SGTL/Bamaur/
Crusher Civil/303/37
Dated27.10.2015
M/s. Raj Associates37A/10B, Mulla
Compound,Near Blood Bank,
Allahabad (UP) - 211 002
` 4217809.34 1.50% below Cost put to
Tender `3775015.49
` 3718390.26 90 Days
7 IRCON/1035/DMRC Ph.III
CT-1-A/ITENDER/M
SS Dated
10.09.2015
21.10.2015 Design, Manufacture, Supply & Transportation of Mass Spring System as Noise Mitigation Measure in Underground Ballastless Track Section (Circular Tunnel/Cut & Cover box tunnel) of DMRC CT-1A Contract
IRCON/1035/DMRC Ph.III
CT-1-A/ ITENDER/MSS
/165 Dated 30.10.2015
M/s Getzner Werkstoffe GmbH Herrenau 5, 6706
Bürs, Austria
Misc. Items Quantity
Item Rate Euro 2,092,698
29.04.2016(6 Months
from 30.10.2015)
Contd.../-
Works Awarded NOVEMBER 2015
S. N.
Tender No. Date of opening
Description of Item/ Work LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost (For
Engg./ Elect./S&T/Mech. Etc
Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 IRCON/3017/SGTL/Tender
/Bamaur Camp/Qtrs .(foundation) /
306 Dated
02.11.2015
18.11.2015 Construction of foundation and platform for erection of Pre-fab staff accommodation at IRCON’s Main Camp near Village Bamaur,A.B Road ( km.276 of NH-3) for Ircon SGTL (Agreement No.ISGTL/CO/SG/IRCON/CORRES/02 dtd.02.09.2015) in connection with ”4-Laning of Shivpuri-Guna section of NH-3 from km 236 to km 332.100 in the State of Madhya Pradesh”( STAGE-I)
IRCON/3017/SGTL/Tender
/Bamaur Camp/Qtrs.(foundation)/
306/50Dated
19.11.2015
M/s Indian Constructions Plot No.30,Rail Vihar,
Sector-33,Noida, G. B. Nagar,
Uttar Pradesh
`31,84,434/- 6.1% below Cost put to
Tender `2948503.00
` 2768644/- 30 Days
2 IRCON/1034/PBTL/NH-
15/Tenders/ Hiring
Service/ Bikaner/47
Dated 26.10.2015
07.11.2015 Hiring services towards House Upkeeping, Office Work, Account Section at Bikaner and Security Services at Camp-1 Km.45+600
IRCON/1034/PBTL/NH-
15/UTILITY SERVICES/631
Dated20.11.2015
M/s M.S. Services Pvt. Ltd.,
SCO-I Himuda commercial Complex,
Sai Road, Baddi, Distt. - Solan -173 212 (H.P.)
e-mail: [email protected]
Item Rate `17,05,650/-
Item Rate `17,05,650/- `16,88,112/-
06 months from date
of LOA
3 IRCON/1034/PBTL/NH-
15/Tenders/Hiring Service/ Phalodi /48
Dated 26.10.2015
07.11.2015 Hiring services towards House Upkeeping, Office Work at Phalodi and Security at Camp-2 at Km.127+000
IRCON/1034/PBTL/NH-
15/UTILITY SERVICES/631
-(A)Dated
20.11.2015
M/s S.S. Services Pvt. Ltd.,
J.P. Colony, Kaledi(NH-8), Shahpura,Jaipur - 303 103
(Rajasthan)
Item Rate `12,66,084/-
Item Rate `12,66,084/- `12,66,084/-
06 months from date
of LOA
Contd.../-
Works Awarded NOVEMBER 2015
S. N.
Tender No. Date of opening
Description of Item/ Work LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost (For
Engg./ Elect./S&T/Mech. Etc
Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
4 IRCON/1035/DMRC CT-1-A/ TENDER/GI
Dummy Plate/ Dated
09.11.2015
23.11.2015 Manufacture, Supply, Transportation & Delivery of 4mm thick M.S. galvanized dummy plate of different sizes with holes of required diameter at specified locations including loading unloading and delivery of the materials to IRCON's store at Jakhira (Delhi) for CT-1-A Contract of DMRC (Mukundpur to Lajpat Nagar)
IRCON/1035/DMRC CT-1-A/
TENDER/GI Dummy Plate/
Dated 28.11.2015
M/s Ajay Fabricator C-74, Vijay Vihar, Ph.I,
Delhi - 85
Misc. items Quantity
Item Rate ` 18,52,200/- 27.03.2016 (Four
Months from the date of issue of
LOA)
Contd.../-
Works Awarded DECEMBER 2015
S. N.
Tender No. Date of opening
Description of Item/ Work LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost (For
Engg./ Elect./S&T/Mech. Etc
Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 IRCON/3017/SGTL/Tender
/Bamaur Camp/
Workshop & Lab/309 Dated
26.11.2015
07.12.2015 Construction of workshop and Lab at Ircon’s Main Camp near Village Bamaur, A. B. Road (Km.276 of NH-3) for Ircon SGTL (Agreement No.ISGTL/CO/SG/ IRCON/CORRES/02 Dated 02.09.2015) in connection with ”4-Laning of Shivpuri-Guna section of NH-3 from km 236 to km 332.100 in the State of Madhya Pradesh” (STAGE-I)
IRCON/3017/SGTL/Tender /Bamaur Camp/
Workshop & Lab/309/62
Dated09.12.2015
M/s Padmawati Constructions Prakash
Sadan,RZ-15/91,East Sagarpur,
Gali No.-2,Near chhoti Sabji
Mandi,New Delhi - 46
` 4391563/- 4.5 % below Cost
put to tender
` 3948683
3770992.27
60 Days
2 NIT – 55 09.12.2015 Construction of Generator Sheds for WMM, HMP & Crusher Plants, Underground Water Tank for 200 TPH Crusher for Water Sprinkling System, Internal Electrification for Crusher, Weigh Bridge & Additional Dormitory for 10 nos. and other allied works at Camp-2 Km 127 in connection of Bikaner Phalodi Highway section in the state of Rajasthan
IRCON/1034/PBTL/NH-
15/Tenders/ Generator
Sheds, Dormitory,
Water Tank/55/677
Dated 11.12.2015
M/s Regional Power Infrastructure
Near Hotel Madhuwan NH-15,
Bikaner Road,BAP, Jodhpur - 342
307
`22,71,338.65
At Par `22,71,338.65
Two months from the date of issue of
LOA
3 IRCON/10 34/PBTL/ NH-15/
BPHP/Pkg EUS-II-
PHLD/50Dated:
17.11.2015
04.12.2015 Carrying out Electrical Line Utility Shifting from Km 95+000 to Km 163+500 in connection with Construction of Bikaner Phalodi Highway section of NH-15 in the State of Rajasthan(Package : BPHP/EUS-II-PHLD)
IRCON/1034/PBTL/NH-
15/BPHP/NIT-50/Pkg EUS-II-
PHLD/682Dated
14.12.2015
M/s Jain Sons,213/5, Nasia Marg,
Ajmer(Rajasthan)
`6,35,02,770- 4.86% above
`6,65,89,005/-
Four months from the date of issue of
LOA
Contd.../-
Works Awarded DECEMBER 2015
S. N.
Tender No. Date of opening
Description of Item/ Work LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For
Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost (For
Engg./ Elect./S&T/Mech. Etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
4 IRCON/1034/PBTL/NH-15/BPHP/Pk
g EUS-I-BKNR/49
Dated 17.11.2015
04.12.2015 Carrying out Electrical Line Utility Shifting from Km 4+200 to Km 95+000 in connection with Construction of Bikaner Phalodi Highway section of NH-15 in the state of Rajasthan(Package : BPHP/EUS-I-BKNR)
IRCON/1034/PBTL/NH-
15/BPHP/NIT-49/Pkg EUS-I-
BKNR/683 Dated
14.12.2015
M/s Jagdamba Engineers & Builders,
VPO Moondsar,Bikaner
Rajasthan
`5,08,81,660/- 4.93% above
`5,33,90,126/- Four months
from the
date of issue of
LOA
5 IRCON/2049/
ROB-II-BIHAR/
e-Tender/ 2015/37 Dated
24.11.15
09.12.2015 Construction of Granular sub base (GSBC), wet mix macadam (WMM), Dense Bituminous Macadam (DBM), Mastic Asphalt and Bituminous Concrete (BC) in connection to the construction of ROB in lieu of LC - 47B at Km. 163/6-7 on Begusarai - Tilrath section on Barauni - Saharsa route in Sonepur Division E.C. Railway, Bihar
IRCON/2049/ROB-II-BIHAR/
e-Tender/2015/37/LOA/
88/2054Dated
16/17.12.2015
M/s. Ram Kripal Singh Construction
(P) Ltd., 702, Panchwati Plaza, Kutchery Road,
Ranchi(Jharkhand)
` 202.19 Lacs 16.50% above
`235.56 Lacs 4 months (including monsoon period) from the date of issue of
LOA
6 IRCON/1034/PBTL/
NH-15/Tree Cutting/51
Dated17.11.2015
09.12.2015 Cutting of trees with trunks and branches and removal of stumps, roots transportation to nominated locations with all lead and lifts and stacking of material from Km 4+200 to Km 163+500 in connection of Bikaner Phalodi Highway section in the state of Rajasthan, (Pkg.- BPHP/TREE CUTTING)
IRCON/1034/PBTL/NH-15/Tree
Cuitting/51/ 694 Dated 18.12.2015
M/s Hansraj Krishan Lal,
Ward No. 27 (New),Badopal Road,
SurathgarhSri Ganaganagar
`51,50,213.22 9.97% above
`56,63,689/- Two months
from the
date of issue of
LOA
Contd.../-
Works Awarded DECEMBER 2015
S. N.
Tender No. Date of opening
Description of Item/ Work LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply
contract)/ Tendered Cost (For Engg./ Elect./S&T/Mech.
Etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
7 IRCON/1034/PBTL/NH-
15/BPHP/Pkg WUS-II-
BKNR/52Dated:
17.11.2015
10.12.2015 Providing and relocation of existing PHED water pipe line between Km.128.00 to Km.145.00 along project highway on NH-15 in connection with widening of Bikaner Phalodi Highway section in the state of Rajasthan (Pkg.- BPHP/WUS-II-BAP)
IRCON/1034/PBTL/NH-15/
BPHP/Pkg.WUS-II-
BAP/52/691Dated
18.12.2015
M/s G. L. Taparia,Mahavir Chowk,
Nr. Chaacha Nehru School
P.O. Nokha,Distt. – Bikaner
`3,83,29,380/- 6.43% above
`4,07,93,959/- Three months from the date of issue of
LOA
8 IRCON/1034/PBTL/NH-15/BPHP/
Pkg WUS-III-PHLDR/53
Dated:17.11.2015
10.12.2015 Providing and relocation of existing PHED water pipe line between Km 145.00 to Km 163.500 along project highway on NH-15 in connection with widening of Bikaner Phalodi Highway in the State of Rajasthan (Pkg.- BPHP/WUS-III-PHLD)
IRCON/1034/PBTL/NH-15/
BPHP/Pkg WUS-III-
PHLD/53/693 Dated
18.12.2015
M/s Maheshwari Construction Pvt. Ltd.,
Bikaner Road,Nokha–334 803
(Rajasthan)
`2,30,70,354/- 5.00% above
`2,42,23,872/- Three months from the date of issue of
LOA
9 IRCON/1035/DMRCCT-1-A/
TENDER/Reinf. Steel/
Lot-4 Dated
12.12.2015
17.12.2015 Manufacture & Supply of 10 & 12 mm diameter reinforcement steel (TMT, Fe 500) for Contract CT-1A of DMRC along the alignment of CT-1A contract (Lajpat Nagar to Mukundpur) or at IRCON's Store at ESI Hospital near Panjabi Bagh, Delhi Lot-4
IRCON/1035/DMRC CT-1-A/ TENDER/Reinf. Steel/Lot-4/231
Dated 18.12.2015
M/s JSW Steel Ltd.3rd floor, Thappar
House, 124, Janpath Lane
New Delhi - 110 001
Misc. Item Quantity
Item Rate ` 89,99,025/- -
Contd.../-
Works Awarded DECEMBER 2015
S. N.
Tender No. Date of opening
Description of Item/ Work LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost (For
Engg./ Elect./S&T/Mech. Etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
10 IRCON/3017/SGTL/Bamaur
Camp/Plant Foudation /
314Dated
03.12.2015
17.12.2015 Construction of Foundation for HMP,WMM & Concrete batching Plant at Bamaur camp on Km.276 ( NH-3) for Ircon SGTL (Agreement No.ISGTL/CO/SG/IRCON/CORRES/02 dtd.02.09.2015) In connection with”4-Laning of Shivpuri-Guna section of NH-3 from Km.236 to Km.332.100 in the state of Madhya Pradesh”( Stage-I)
IRCON/3017/ SGTL/Bamaur
Camp/Plant Foundation/31
4 Dated19.12.2015
M/s. Raj Associates37A/10B, Mulla
Compound,Near Blood Bank,
Allahabad (UP) - 211 002
` 35,66,000 At Par Cost put to Tender
for Part-A 28,59,468/- & 10 % above cost put to tender for
Part-B 6,43,500/-
` 35,67,318/- 60 days for part-A and 90 days for part-B
11 IRCON/ Tender/
JBNRL/2051/15/04 Dated
04.11.15
20.11.2015 Construction of Staff Quarters and other associated ancillary works in Indian Custom Yard
IRCON/2051/JBNRL/ Staff Quarters/
ICY/LOA/ 1288 Dated 22.12.15
M/s Sunrise Construction,
Ramganj,Islampur (WB)
` 172.94 Lacs Percentage Above on BOQ rates
` 183.33 Lacs
06 (Six) months
12 IRCON/ Tender/
JBNRL/2051/15/05Dated
04.11.15
20.11.2015 Construction of Station Building and other associated ancillary works at Indian Custom Yard
IRCON/2051/JBNRL/ Station
Building/ ICY/LOA/ 1289 Dated 22.12.15
M/s Bagmati Construction
Company, Subhash Chowk, Forbesganj
(Bihar)
` 176.61 Lacs Percentage Above on BOQ rates
` 187.23 Lacs
6 (Six) months
Contd.../-
Works Awarded DECEMBER 2015
S. N.
Tender No. Date of opening
Description of Item/ Work LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost (For
Engg./ Elect./S&T/Mech. Etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
13 IRCON/3017/SGTL/Tender/Electrical utility
shifting/Badarwas-I /
311 Dated
01.12.2015
22.12.2015 Shifting of Electrical Utility between Shivpuri to Guna for Ircon SGTL (Agreement No. ISGTL/CO/SG/ IRCON/CORRES/02 Dated 02.09.2015) in connection with "4-Laning of Shivpuri-Guna section of NH-3 from Km.236 to Km.332.100 in the state of Madhya Pradesh (Stage-I) – Badarwas-I Distribution Centre
IRCON/3017/SGTL/Tender/Electrical Utility
Shifting/Badarwas-I/311
Dated22.12.2015
M/s. Bhupendra Sharma,
34,Near New Bus Stand,
Vidisha, MP
` 38761842/- 7.10% Above cost put to
tender` 34889325/-
` 37366467/- 90 days
14 IRCON/3017/SGTL/Tender/Electrical utility
shifting/Badarwas-II /
312 Dated
01.12.2015
22.12.2015 Shifting of Electrical Utility between Shivpuri to Guna for Ircon SGTL( Agreement No. ISGTL/CO/SG/IRCON/CORRES/02 dtd. 02.09.2015) in connection with "4-Laning of Shivpuri-Guna section of NH-3 from km.236 to Km.332.100 in the state of Madhya Pradesh (Stage-I) – Badarwas -II Distribution Centre
IRCON/3017/SGTL/Tender/Electrical Utility
Shifting/Badarwas-
II/312Dated
22.12.2015
M/s. Bhupendra Sharma
34, Near New Bus Stand,Vidisha, MP
` 25647522/- 7.0% Above cost put to
tender` 22892011/-
` 24494452/- 90 days
15 IRCON/ Tender/
JBNRL/2051/15/06 Dated
04.11.15
21.11.15 Construction of 3 Bay Platform Passenger Shelter's at Platform No. 2 of Bathnaha Railway Station
IRCON/2051/JBNRL/ PP
Shelter/63/ LOA / 1290 Dated
23.12.2015
M/s Ishani Constructions,
Ward No.3,Sultan Pokhar,
Forbesganj (Bihar)
` 29.81 Lacs Percentage Above on BOQ rates
` 34.66 Lacs 04 (Four) months
Contd.../-
Works Awarded DECEMBER 2015
S. N.
Tender No. Date of opening
Description of Item/ Work LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For
Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost (For
Engg./ Elect./S&T/Mech. Etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
16 IRCON/2034/ROB-Bihar/e-Tender/2015/36 Dated
24.11.2015
07.12.2015 Fabrication, assembly, erection and painting of Foot Over Bridge (FOB) over Electrified Railway running track in connection to Construction of ROB in lieu of LC-46 at Jamui in the state of Bihar
IRCON/2034/ROB-BIHAR/
E-Tender/2015/36/LOA/
91/2088Dated
23.12.2015
M/s Maa Durga Constech Pvt. Ltd.,
A-401, Block-A, Omshailbaran
Apartment, Brahmasthan Road, Sheikhpura,
Raza Bazar,Patna - 800 014
` 74.42 Lacs 13% above ` 84.10 Lacs 4 months (including monsoon period)
from the date of issue of
LOA
17 IRCON/3017/SGTL/
Tender /Bamaur Camp/
Accomodation (Pre-fab)/310 Dated
26.11.2015
07.12.2015 Construction of Pre-fab accommodation at Km.276 for Ircon SGTL (Agreement No. ISGTL/CO/SG/IRCON/CORRES/02 Dated 02.09.2015) in connection with ”4-Laning of Shivpuri - Guna section of NH-3 from Km.236 to Km.332.100 in the state of Madhya Pradesh” ( Stage-I)
IRCON/3017/SGTL/Tender /Bamaur
Camp/Qtrs(Pre-fab) /310/63
Dated 25.12.2016
M/s Indian Constructions Plot No.- 39,Rail Vihar,Sector-33,
NOIDA,G.B Nagar,
Uttar Pradesh.
`8846372.00 1.60% below Cost put to
Tender `7961735/-
`7834347.24 45 days
18 IRCON/1034/PBTL/NH-15/MECH/HMP/SPARES/157 dated:24/11/2015
02.12.2015 Supply of Spares for Hot Mix Plant Model ANP 1500 and ANP 2000
IRCON/1034/PBTL/NH-
15/MECH/HMP/SPARES/157
Dated28.12.2015
M/s Amman Apollo India Pvt Ltd, Plot No.
2, At'Ditasan, Post Jagudan, State
Highway, Mehsana Gujrat-382710
Item Rate:` 78,84,976/-
`78,84,976/- `73,63,978/- 15 Days from date of LOI
Contd.../-
Works Awarded DECEMBER 2015
S. N.
Tender No. Date of opening
Description of Item/ Work LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For
Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost (For
Engg./ Elect./S&T/Mech. Etc
Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
19 IRCON/3017/SGTL/MECH/ERECTI
ON OF CRUSHER/NIT/2101
Dated 28.11.2015
21.12.2015 Erection of for METSO make 200 TPH,Three stage, crushing plant at Ircon’s Camp near KM.276+000 NH-3 near Bamaur village in Shivpuri-Guna Highway Project.
IRCON/3017/SGTL/MECH/ERECTION
OF CRUSHER/NIT/2101 Dated
29.12.2015
Shree,Balaji Borewells, A1,Panchwati,Airport
road,Bhopal
13,11,025.00 Item rate 13,50,000.00 45 Days from issue
of LOA
20 IRCON/2049/ROB-II-BIHAR/
e-Tender/2015/39 Dated
09.12.2015
24.12.2015 Construction of Brick wall for pier protection and other miscellaneous work as directed by Engineer-in charge in connection to construction of ROB in lieu of LC No.47 B at Begusarai, Bihar
IRCON/2049/ ROB-II-Bihar/ e-
Tender/ 2015/39
/LOA/92/2132 Dated
29.12.2015
M/s.Gita Prasad Sharma, New Aitwarpur,
Sipara,Patna
` 86.00 Lacs 12% above ` 96.33 Lacs 6 months (including monsoon period)
from the date of issue of
LOA
21 IRCON/1034/PBTL/NH-
15/BPHP/Pkg.WUS-1-
BKNR/59
Dated:
10.12.2015
23.12.2015 Providing and relocation of existing PHED water pipe line between Km 4.200 to Km 95.000 along project highway on NH-15 in connection with Widening of Bikaner Phalodi Highway in the State of Rajasthan (Pkg.- BPHP/WUS-I-BKNR)
IRCON/1034/PBTL/NH-15/ BPHP/Pkg.
WUS-1-BKNR/59/724
Dated31.12.2015
M/s Shri Ganpati Tubewell Co.
Near Bus stand,Shahpur – 303 103
Rajasthan
`2,63,20,851/- 3.00% below
`2,55,31,225.47 Three months from the date of issue of
LOA
Contd.../-
Works Awarded JANUARY 2016
S. N.
Tender No. Date of opening
Description of Item/ Work LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost (For
Engg./ Elect./S&T/Mech. Etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 IRCON/3017/SGTL/Tender
/Electrical utility shifting/
KolarasRural-I/315
Dated 04.12.2015
26.12.2015 Shifting of Electrical Utility between Shivpuri to Guna for Ircon SGTL (Agreement No. ISGTL/CO/SG/IRCON/ CORRES/02 Dated 02.09.2015) in connection with "4-Laning of Shivpuri - Guna section of NH-3 from Km.236 to Km.332.100 in the state of Madhya Pradesh (Stage-I) - Kolaras Rural - I Distribution Centre
IRCON/3017/SGTL/Tender/Electrical Utility Shifting Kolaras
Rural-I/315 Dated
01.01.2016
M/s Bhupendra Sharma 34, Near New Bus Stand,
Vidisha, MP
`23121215/- 5.5 % Above cost put to
tender `.20809093/-
`21953593/- 90 days
2 IRCON/3017/SGTL/Tender
/Electrical utility shifting/
Kolaras Rural-II/316
Dated 05.12.2015
26.12.2015 Shifting of Electrical Utility between Shivpuri to Guna for Ircon SGTL (Agreement No. ISGTL/CO/SG/IRCON/ CORRES/02 Dated 02.09.2015) in connection with "4-Laning of Shivpuri - Guna section of NH-3 from Km.236 to Km.332.100 in the state of Madhya Pradesh (Stage-I) - Kolaras Rural - II Distribution Centre
IRCON/3017/SGTL/Tender/Electrical Utility Shifting Kolaras
Rural-II/316 Dated
01.01.2016
M/s Bhupendra Sharma 34, Near New Bus Stand,
Vidisha, MP
`31459050/- 5.4% Above cost put to
tender `28313146/-
`29842056/- 90 days
3 IRCON/3017/SGTL/Tender
/Electrical utility shifting/
Kolaras Town/317
Dated 05.12.2015
26.12.2015 Shifting of Electrical Utility between Shivpuri to Guna for Ircon SGTL (Agreement No. ISGTL/CO/SG/IRCON/ CORRES/02 Dated 02.09.2015) in connection with "4-Laning of Shivpuri - Guna section of NH-3 from Km.236 to Km.332.100 in the state of Madhya Pradesh (Stage-I) - Kolaras Town Distribution Centre
IRCON/3017/SGTL/Tender/Electrical Utility Shifting Kolaras
Town/317 Dated
01.01.2016
M/s Bhupendra Sharma 34, Near New Bus Stand,
Vidisha, MP
`27696547/- 5.5% Above cost put to
tender `24967217/-
`26340414/- 90 days
Contd.../-
Works Awarded JANUARY 2016
S. N.
Tender No. Date of opening
Description of Item/ Work LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost (For
Engg./ Elect./S&T/Mech. Etc
Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
4 IRCON/3017/SGTL/Tender
/Electrical utility shifting/Guna-I/318
Dated 09.12.2015
04.01.2016 Shifting of Electrical Utility between Shivpuri to Guna for Ircon SGTL (Agreement No. ISGTL/CO/SG/IRCON/ CORRES/02 Dated 02.09.2015) in connection with "4-Laning of Shivpuri - Guna section of NH-3 from Km.236 to Km.332.100 in the state of Madhya Pradesh (Stage-I) - Guna - I Distribution Centre
IRCON/3017/SGTL/Tender/Electrical Utility Shifting/Guna-
I/318Dated
04.01.2016
M/s. Tejswani Infrastructure
1244, Sector-8,Avas Vikas Colony,
Sikandra,Agra
`37798383/- 4.75 % Above cost put to
tender` 34021211/-
` 35637219/- 90 days
5 IRCON/3017/SGTL/Tender
/Electrical utility shifting/Guna-II/319
Dated 09.12.2015
04.01.2016 Shifting of Electrical Utility between Shivpuri to Guna for Ircon SGTL (Agreement No. ISGTL/CO/SG/IRCON/ CORRES/02 Dated 02.09.2015) in connection with "4-Laning of Shivpuri - Guna section of NH-3 from Km.236 to Km.332.100 in the state of Madhya Pradesh (Stage-I) - Guna - II Distribution Centre
IRCON/3017/SGTL/Tender/Electrical Utility Shifting/Guna-
II/319Dated
04.01.2016
M/s Bhupendra Sharma 34, Near New Bus Stand,
Vidisha, MP
`17709941/- 4.33 % Above cost put to
tender` 15942010/-
` 16632299/- 90 days
6 IRCON/1035/DMRC CT-1-A /TENDER/EG
Dated 16.12.2015
29.12.2015 Supply, Transportation & Delivery of High Strength, Free Flowing, Non-Shrink, Epoxy Grout Material for the Epoxy Grout Material for the Grouting of Ballastless Track Turnouts for CT-1-A Contract of DMRC at IRCON's store at Delhi.
IRCON/1035/DMRC CT-1-A/
TENDER/EG/275Dated
07.01.2016
M/s Fosroc Chemical ( India ) Pvt. Ltd.D-166, Sector-10,
Distt.-Gautam Budhdha Nagar
Noida - 201 301(UP)
31000 Kg Basic Rate:-` 70.80 Per Kg; Excise Duty @ 12.50%;VAT/C
ST @ 2% & Transportation : ` 4.74 Per Kg
` 26,65,566/- 06-04-2016 (Four
Months from date of issue of LOA)
Contd.../-
Works Awarded JANUARY 2016
S. N.
Tender No. Date of opening
Description of Item/ Work LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost (For
Engg./ Elect./S&T/Mech.
Etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
7 IRCON/1034/PBTL/Tender/
Lab Establishment
/57 dated 11.12.2015
29.12.2015 Supply, Installation and Commissioning of Laboratory Equipment’s at IRCON’s Site Camp near Km.127+000 in connection with widening & strengthening of the existing Bikaner-Phalodi Section to 4-Lane from Km.4.200 to Km.55.250 and 2-Lane with paved shoulder from Km.55.250 to Km.163.500 of NH-15 in the State of Rajasthan
IRCON/1034/PBTL/BPHP/LAB
EQUIP/752 Dated
12.01.2016
M/s Accro-Tech Scientific Industries, 1, DLF, Industrial Area,
Moti Nagar, New Delhi - 110 015
`6,71,641/- Item Rate of
Individual Items
` 5.86,359/- 37 (Thirty-Seven)
Days from the date of
issue of LOA
8 IRCON/2034/ROB-Bihar/e-Tender/2015/40 Dated
10.12.15
24.12.2015 Fabrication, assembly , erection and painting of Foot Over Bridge (FOB) over Electrified Railway running track in connection to Construction of ROB in lieu of LC-72 between Gulzarbagh - Patna Saheb Station of Danapur Division of East Central Railway in state of Bihar
IRCON/2034/ROB-BIHAR/
E-Tender/2015/40/LOA/
06/74Dated
15.01.2016
M/s Maa Durga Constech Pvt. Ltd.,
A-401, Block-A, Omshailbaran
Apartment,Brahmasthan Road, Sheikhpura, Raza
Bazar, Patna - 800 014
` 69.43 Lacs 12% above
` 77.77 Lacs 4 months (including monsoon
period) from the date of
issue of LOA
9 IRCON/1034/BPHP/TN/LT-61/Boulder-2
Dated 26.12.2015
06.01.2016 Supply of Hard Stone Boulder suitable for Asphalt work as per MORTH Specification (As after Crushing, the aggregates to be used for DBM and BC) and including Loading, Transporting and Unloading at IRCON’s Crusher at Camp No.2 Km.127 in connection with Widening and Strengthening of existing Bikaner-Phalodi Section to four lane from Km.4.200 to Km.55.250 and two lane with paved shoulder from Km.55.250 to Km.163.500 of NH-15 in the State of Rajasthan
IRCON/1034/BPHP/TN-
LT61/Boulder-2/755Dated:
16.01.2016
M/s Heera Ram Godara, Plot No.94,
Sector No.4, Aadarsh Nagar, Phalodi, Distt:
Jodhpur (Raj.)
1,00,000 MT
` 299/- per MT
`2,99,00,000/-
04 (Four) months from the date of
issue LOA
Contd.../-
Works Awarded JANUARY 2016
S. N.
Tender No.
Date of opening
Description of Item/ Work LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost (For
Engg./ Elect./S&T/Mech. Etc
Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
10 IRCON/1034/BPHP/TN
/LT-60/Crusher/
Dated 26.12.2015
06.01.2016 Operation of 200 TPH, 3 Stage, Crushing & Screening Plant installed by IRCON at Camp No.2 Km.127.000 on NH-15 for crushing of boulders to produce different size of aggregates as per IRCON’s requirement and as directed by Engineer from time to time
IRCON/1034/BPHP/TN-
LT60/Op.Crusher/757 Dated
19.01.2016
M/s Kailash Chandra Dilip Kumar Construction Pvt. Ltd., 1313/14, 13th Floor, Real Teach Park, Sector-
30A, Near Inorbit Mall, Vashi,
Navi Mumbai - 400 703
450000 MT `133.68 per MT
`6,01,56,000/- 12 (Twelve) months from the date of LOA
11 IRCON/1034/BPHP/LT-
65/Misc. Work Dated 30.12.2015
14.01.2016 Materials Testing Work at IRCON’s Laboratory & Operation of Weigh Bridge and Survey Works in between Km.40+000 to Km.163+500 (Section-II & III) in connection with widening and strengthening of existing Bikaner Phalodi section
IRCON/1034/BPHP/LT-65/Misc.
Work/764 (B)Dated
20.01.2016
M/s S.S. Construction,J.P. Colony, Kaledi (NH-8), Shahpura, Jaipur - 303 103
(Rajasthan)
`32,67,720/- AT PAR `32,67,720/- 12 (Twelve) months from the date of issue of
LOA
12 NIT - 65 14.01.2016 Materials Testing Work at IRCON’s Laboratory & Operation of Weigh Bridge at Camp No.1 (Km.45+600) and Survey Work in between Km.4+200 to Km.40+000 (Section-I) in connection with widening and strengthening of existing Bikaner Phalodi section
IRCON/1034/BPHP/LT-65/Misc.
Work/764 (A)Dated
20.01.2016
M/s M.S. Services Pvt. Ltd.SCO-I Himuda Commercial Complex, Sai Road, Baddi,
Distt. - Solan -173 212 (H.P.) e-mail:
`19,03,344/- AT PAR `19,03,344/- 12 (Twelve) months from the date of LOA
13 IRCON/1035/DMRC CT-1-A
/TENDER/ Reinf.
Steel/Lot-5 Dated
15.01.2016
20.01.2016 Manufacture & Supply of 10 mm diameter reinforcement steel (TMT, Fe 500) for Contract CT-1A of DMRC along the alignment of CT-1A contract (Lajpat Nagar to Mukundpur) or at IRCON's Store at Delhi-Lot-5
IRCON/1035/DMRC CT-1-A/
TENDER/Reinf. Steel/Lot-
5/297 Dated 20.01.2016
M/s TATA steel Limited, Jeevan Bharti
BuildingTower-1,7th Floor,
124, Connaught Circus, New Delhi - 110 001
300 MT (i) Basic Cost: ` 30500/- Per
MT+ (ii) Transportatio
n` 300 Per MT+VAT
@5% on(i)
` 96,97,500/- -
Contd.../-
Works Awarded JANUARY 2016
S. N.
Tender No. Date of opening
Description of Item/ Work LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/
Tendered Cost (For Engg./
Elect./S&T/Mech. Etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
14 IRCON/2049/ROB-II-
BIHAR/LC-45AB/e-
Tender/2015/42Dated 29.12.2015
14.01.2016 Construction of Granular Sub Base (GSBC), Wet Mix Macadam (WMM), Dense Bituminous Macadam (DBM) and Bituminous Concrete (BC) at approaches & Mastic Asphalt, BC over Deck Slabs in lieu of LC- 45 AB at Km 324/13-14 between Chapra Kachehari - Goldenganj Stations in Varanasi Division of North Eastern Railway,Bihar
IRCON/2049/ ROB-II-
BIHAR/LC-45AB/2016/LOA/09/161 Dated
29.01.2016
M/s Hari Construction & Associates Pvt. Ltd.,At & PO: Keshawe,
P.S.:Barauni,Distt.; Begusarai
PIN: 851 134(Bihar),
` 1,22,79,802.50 17% above
`1,43,67,369/- 2 months (including monsoon period) from the date of issue of
LOA
15 IRCON/1034/PBTL/NH-15/BPHP/Pkg. BP, CP-BKNR/LT-63, Dated: 30/12/2015
09.01.2016 Providing, Supplying & fixing of RCC Boundary Pillars, Chainage Pillars, & Delineator Cement Concrete Blocks Between Km 4.200 to Km 163.500 on NH-15 in connection with Widening and Strengthening of Bikaner Phalodi Section” (Package-BPHP/BP,CP,DP-BKNR)
IRCON/1034/NH-15/BPHP/Pkg. BP,CP-BKNR/
LT-63/ 778Dated
30.01.2016
M/s S.S. Construction, J.P.colony,
Khaledi, NH-8,Shahpura,
Jaipur (Raj)
`80,04,235/- 4.95% Above
`84,00,444.60 3 (Three) months
from date of issue of
LOA
16 IRCON/ 1034/PBTL/
NH-15/BPHP/R
oad Maint/66,
Dated: 31.12.2015
15.01.2016 Maintenance of Existing Road Pavement from Km.4+200 to Km. 95+000 Of Bikaner-Phalodi Section of NH-15 in the State of Rajasthan” (PACKAGE:I)
IRCON/1034/PBTL/NH-
15/BPHP/Road Maint/66/781
Dated 31.01.2016
M/s Manohar Construction Company,
Office; V.P.O. Phoolsar,
Tehsil:Kolayat,Distt: Bikaner
Rajasthan
`32,61,958/- 12.00% Above
`36,53,392.96 6 months from date of issue of
LOA
Contd.../-
Works Awarded FEBRUARY 2016
S. N.
Tender No. Date of opening
Description of Item/ Work LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/
Tendered Cost (For Engg./ Elect./S&T/Mech. Etc
Works)
Value of Contract
Scheduled completio
n date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 IRCON/ 1034/NH-
15/BPHP/LT-67/MISC.
CAMP WORK Dated:
31.12.2015
15.01.2016. Construction of Miscellaneous work at Camp-I Km 45+600 of Bikaner - Phalodi Section of NH-15 in the state of Rajasthan
IRCON/1034/NH-15/BPHP/ LT-67/MISC.
CAMP WORK/783
Dated 01.02.2016
M/s Mohd. Nasim Allah Bux,
Mohalla Vyaparion,C/o Taj Hotel,
Bikaner (Rajasthan)
`24,52,970/- AT PAR `24,52,970.00 2 months from date of issue of LOA
2 IRCON/ 2051/ JBNRL/
Electrical Works/06
dt..18.01.2016
03.02.2016 Execution of 11 KV, OH/HT/440V LT line replaced by underground cabling 3C x 240sqmm 11 KV XLPE HT three core aluminium armoured cable/ 4C x 120 sqmm XLPE single core aluminium armoured cable at Dakshine Maheshwari village at km. 3+075, 3+095 & 3+600 and erection of rail pole laying, testing & commissioning of underground cables
IRCON/2051/JBNRL/Electri
cal Works/ ICY/46/LOA/
Dated 09.02.2016
M/s Kumar Enterprise, Lemuabad,
Pandarak, Barh Patna (Bihar)
` 61.18 Lacs Percentage Above on BOQ rates
` 61.51 Lacs 05 (Five) months
3 IRCON/3017/SGTL/
Tender/Road
Maintenance-I/320 Dated
01.02.2016
17.02.2016 Maintenance of existing Road Pavement including shoulders,Camp at Bamaur with contractor’s own resources on NH-3 on Km.276 ( NH-3) for Ircon SGTL (Agreement No. ISGTL/CO/SG/IRCON/ CORRES/02 Dated 02.09.2015) in connection with "4-Laning of Shivpuri - Guna section of NH-3 from Km.236 to Km.332.100 in the state of Madhya Pradesh (Stage-I)
IRCON/3017/SGTL/Tender/
Road Maintenance/
320 Dated
18.2.2016
UMAKANT SINGHPost Harpur
Bochaha,Dist: Samastipur
` 48,61,043.65 10% above Cost put to Tender for
Part-A`2699843.65/- & 5 % above cost put to tender for
Part-B` 2161200/-
` 52,39,088.00 6 months from date of issue of LOA
Contd.../-
Works Awarded MARCH 2016
S. N.
Tender No. Date of opening
Description of Item/ Work LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost (For
Engg./ Elect./S&T/Mech. Etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 IRCON/CO/BPRP &
SGHP/Bitumin,Emulsion &
HSD Dated
04.12.2015
22.12.2015 Supply of Bitumin ( VG-40),Emulsion ( SS-1 & RS-1) and High Speed Diesel ( HSD) for widining and strengthning of the existing Bikaner-Pholodi section from Km 4.200 to km.163.500 of NH-15 in Rajasthan And Four Laning of Shivpuri-Guna section of NH-3 from Km.236.000 to Km.332.100 in the state of Madhya Pradesh
IRCON/CO/BPRP &
SGHP/BITUMIN,EMULSIO
N &HSD Dated
07.03.2016
M/s. Hindustan Petroleum
Corporation Limited,
Tel Bhavan, Sahakar Marg,
Jyoti Nagar,Jaipur - 302 005
RS-1 720MTRS-1 360 MTRS-1 384 MTHSD 3441 KL
25868.811/MT
25868.811/MT
25868.811/MT
47822.34/KL
20,24,28,630.70
30 months from date of issue of
LOA (04.09.18)
2 IRCON/CO/BPRP &
SGHP/Bitumin,Emulsion & HSD
Dated 04.12.2015
22.12.2015 Supply of Bitumin ( VG-40),Emulsion ( SS-1 & RS-1) and High Speed Diesel ( HSD) for widining and strengthning of the existing Bikaner-Pholodi section from Km 4.200 to km.163.500 of NH-15 in Rajasthan And Four Laning of Shivpuri-Guna section of NH-3 from Km.236.000 to Km.332.100 in the state of Madhya Pradesh
IRCON/CO/BPRP &
SGHP/BITUMIN,EMULSION &HSD/383
Dated 07.03.2016
M/s. Indian Oil Corporation
Limited,Jodhpur Divisional
Office,Jodhpur - 342 008
SS-1 2079 MTVG-40 27770
MTHSD 3100 KLHSD 4500 KLVG-40 10301
MT
24306.00/MT27875.00/MT39246.51/KL39212.65/KL27608.36/MT
140,71,58,161.00
30 months from date of issue of
LOA (04.09.18)
3 IRCON/1034/BPHP/TN/LT-
68/Utility Barrack Camp
No.2 Dated
01.02.2016
12.02.2016 Construction of Utility Barrack at IRCON Camp-2 Km 127+000
IRCON/1034/IPBTL//Utility Barrack
Camp No.2/68/836
Dated08.03.2016
M/s S.S. Construction,
J.P. Colony, Kaledi,NH p 8, Shahpura,
Jaipur (Raj.)
`6,90,818.58 2.95% above
`7,11,197.73 02-months from the date of issue of
LOA
Contd.../-
Works Awarded MARCH 2016
S. N.
Tender No. Date of opening
Description of Item/ Work LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost (For
Engg./ Elect./S&T/Mech. Etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
4 IRCON/2049/ROB –
Bihar-II/e-Tender/2016/07 Dated 27-02-2016
11.03.2016 Additional Measures For ROB Danapur with Carbon Fiber Laminates and Carbon Fiber Strip
IRCON/2049/ROB-II-
BIHAR/LC-35B/LOA/19/4
08, Dated14.03.16
M/s. Sanrachna Structural Strengthening
Pvt. Ltd.,Monalisa CHS,
103-104, First Floor, Hariniwas Circle,
Thane(W) - 400 602
`.70.04 Lacs Item Rate of Individual
Items
`.69,27,025.00 1(One) Month
from the date of Issue of
LOA
5 IRCON/3017/SGTL/MECH/CRUSHER/Convyor accessories/NIT/2104 Dated 16.02.16
02.03.2016 Supply of conveyor accessories and other parts for METSO make 200 TPH, Three stage, crushing plant at Ircon’s Camp at SGHP( Bamaur village )
IRCON/3017/SGTL/MECH/
Convyor accessories/21
04 Dated 16.03.2016
A to Z Infra spares (Pvt) Ltd.
Behind Bank of Baroda,Jhansi
16,14,620.22 Item rate 14,82,401.70 15 Days from
issue of LOA
6 IRCON/3017/SGTL/MECH/
Convyor Belts/NIT/2103
Dated 16.02.16
26.02.2016 Supply of conveyor belts for METSO make 200 TPH,Three stage,METSO make crushing plant at Ircon’s Camp near KM.276+000 NH-3 near Bamaur village in Shivpuri-Guna Highway Project.
IRCON/3017/SGTL/MECH/Co
nvyor Belts/2103
Dated 17.03.2016
A to Z Infra spares (Pvt) Ltd.
Behind Bank of Baroda,Jhansi
8,50,068 Item rate 7,95,294.000 15 Days from
issue of LOA
7 IRCON/3017/SGTL/MECH/400KVA/D.G.
Set/Engine repair/NIT/210
5 Dated 18.02.2016
25.02.2016 Repair of Kirloskar Engine of 400 KVA DG set at Ircon’s Camp at SGHP( Bamaur village )
IRCON/3017/SGTL/MECH/400KVA/D.G.Set/
Engine repair/2105
Dated 18.03.2016
M/s. Varun Electromech
Gwalior
6,06,000 Item rate 5,94,360.75 04 weeks from
issue of LOA
Contd.../-
Works Awarded MARCH 2016
S. N.
Tender No. Date of opening
Description of Item/ Work LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost (For
Engg./ Elect./S&T/Mech. Etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
8 IRCON/3017/SGTL/MECH/CRUSHER/Screen Mesh/NIT/2107 Dated 08.03.16
16.03.2016 Supply of Screen Mesh for METSO make 200 TPH, Three stage, crushing plant at Ircon’s Camp at SGHP( Bamaur village )
IRCON/3017/SGTL/MECH/CRUSHER/
Screen Mesh/2107
Dated 18.03.16
M/s. Steel Craft of India,
Kolkata
` 3,03,115.00 Item rate ` 3,03,147.00 02 weeks from
issue of LOA
9 IRCON/3017/SGTL/MECH/CRUSHER/Electric
al spares/NIT/2106 Dated
14.03.16
15.03.2016 Supply of Electrical spares for METSO make 200 TPH, Three stage, crushing plant at Ircon’s Camp at SGHP( Bamaur village )
IRCON/3017/SGTL/MECH/CRUSHER/El
ectrical spares/2106
Dated 19.03.16
M/s. Nanak Electric stores,Kanpur
` 7,15,278.06 Item rate ` 7,75,000.00 15 Days from
issue of LOA
10 IRCON/1034/BPHP/TN/LT-64/Construction of WMM by Operation and
running of WMM plant at Camp No.2,
transportation, laying at site
Dated14.03.162/5.03.2016
14.03.2016 Construction of Wet Mix Macadam by Operation and Running of WMM Plant at Camp No. 2 including Transportation and Laying of WMM Materials as per MORT&H specifications Laying with Paver/Grader at site site with IRCON's P&M and Aggregates, Laying between Km 80+000 to Km 163+500 of Bikaner-Phalodi Highway section of NH-15 in Rajasthan
IRCON/1034/BPHP/TN-LT-
64/P&L WMM/857
Dated 21.03.2016
M/s Rohtas Enterprises,
C-1, Sudarshan Pura, Industrial Area
Extension,Jaipur - 302 006
Mob.: 9414069912
`2,08,01,950/- Item Rate Individual
Items
`1,95,34,000/- 06-months from the date of issue of
LOA
Contd.../-
Works Awarded MARCH 2016
S. N.
Tender No. Date of opening
Description of Item/ Work LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost (For
Engg./ Elect./S&T/Mech. Etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
11 IRCON/1034/BPHP/TN/
LT-62/WMM Dated
28.12.2016
12.01.2016 Providing & Laying Wet Mix Macadam Base Course between Km 105+000 to Km 163+500 as per MORTH specifications on available stretches on Bikaner Phalodi section of NH-15
IRCON/1034/BPHP/TN-LT62/P&L WMM/871
Dated29.03.2016
M/s Shri Balaji Construction
Company, 81-82, Shanti Bhawan, Madan Mohan
Vihar, Near hotel Gateway, Jodhpur
(Raj.) - 342 027
20480 Cum @ `1270.19 per
Cum/ `2,60,13,491.20
Item Rate `1270/-per
Cum
`1,30,04,800/- 3-months from the date of issue of
LOA
Providing & Laying Wet Mix Macadam Base Course between Km 105+000 to Km 163+500 as per MORTH specifications on available stretches on Bikaner Phalodi section of NH-15
IRCON/1034/BPHP/TN-LT62/P&L WMM/872
Dated29.03.2016
M/s Heera Ram Godara,
Plot No. 94,Sector-4,
Aadarsh Nagar,Phalodi,
Distt.- Jodhpur (Raj.)
Tel.: 02925-222719
Item Rate `1270/-per
Cum
`1,30,04,800/- 3-months from the date of issue of
LOA