Annexure: B DETAILS OF CONTRACTS PLACED BY LIMITED … 2015 - March 2016/2_AnnexB_Apr15_Mar16.pdfM/S...

35
Annexure: B DETAILS OF CONTRACTS PLACED BY LIMITED TENDER (For Civil Engg. /Elect. Engg. /S & T/Mech. etc works) (Status for the Month : APRIL 2015 – MARCH 2016) Works Awarded : APRIL 2015 S. N. Tender No. Date of opening Description of Item/ Work LOA No. and date Contractor’s Name and address Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works) Rate (for supply contract)/ Tendered Cost (For Engg./ Elect./S&T/Mech. Etc Works) Value of Contract Scheduled completion date (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 IRCON/ Civil / 1029/ RCF-RBL/ 10/Parkin g/LT/53 Dated 31.03.201 5 16.04.2015 Construction of Car Parking in TTC & Admin building, Two Wheelers Parking in Workshop area, covering of exposed ramps on both sides of both RUB with Thermal Insulated Polycarbonate sheet and other misc. civil works in Workshop & Township area of Rail Coach Factory, Lalganj, Raebareli IRCON/Civil/10 29/RCF- RBL/10/Tender /Parking/LT/53/ 7454 Dated 16.04.2015 M/s Vishnu Saran & Co., 113/163, Swaroop Nagar, Kanpur - 208 002 ` 9.76 Crores Schedule-A = ` 319.06 Lacs (At Par) Schedule-B = ` 657.21 Lacs (At Par) Total = ` 976.27 Lacs `976.27 Lacs 05 months from the date of issue of LOA 2 IRCON/ 2048/ISC- BEHALA/ TENDER/ CP Roof/14/7 Dated 18.03.201 5 06.04.2015 Supply, fabrication, transportation and fixing in position the structural steel work and in truss/ built up tubular (round, square or rectangular hollow tubes etc.) with cutting, hoisting, fixing in position and painting including Roof Sheeting as per drawings/ specifications in connection with the construction of roof for Cricket Pavilion and covering roof works at ramp portions for Eastern Railway at Behala IRCON/K-RO/ 2048/ISC- BEHALA/CP Roof/MPE/54 Dated 23.04.2015 M/s Makpower Engineers 235, Marshall House, 33/1, N. S. Road, Kolkata - 700 001 ` 49.00 Lacs ` 49.00 Lacs ` 43,38,300/- 90-days from the date of issue of LOA Contd.../-

Transcript of Annexure: B DETAILS OF CONTRACTS PLACED BY LIMITED … 2015 - March 2016/2_AnnexB_Apr15_Mar16.pdfM/S...

Page 1: Annexure: B DETAILS OF CONTRACTS PLACED BY LIMITED … 2015 - March 2016/2_AnnexB_Apr15_Mar16.pdfM/S Endeavour Instrument Pvt. Ltd, 45/3, Changodar Industrial Estate, Ahmedabad PIN

Annexure: BDETAILS OF CONTRACTS PLACED BY LIMITED TENDER

(For Civil Engg. /Elect. Engg. /S & T/Mech. etc works)

(Status for the Month : APRIL 2015 – MARCH 2016)

Works Awarded : APRIL 2015

S. N.

Tender No.

Date of opening

Description of Item/ Work LOA No. and date

Contractor’s Name and address

Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/ Tendered Cost

(For Engg./ Elect./S&T/Mech. Etc Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

1 IRCON/ Civil /1029/

RCF-RBL/ 10/Parking/LT/53 Dated

31.03.2015

16.04.2015 Construction of Car Parking in TTC & Admin building, Two Wheelers Parking in Workshop area, covering of exposed ramps on both sides of both RUB with Thermal Insulated Polycarbonate sheet and other misc. civil works in Workshop & Township area of Rail Coach Factory, Lalganj, Raebareli

IRCON/Civil/1029/RCF-

RBL/10/Tender/Parking/LT/53/

7454Dated

16.04.2015

M/s Vishnu Saran & Co.,

113/163, Swaroop Nagar, Kanpur - 208 002

` 9.76 Crores Schedule-A = ` 319.06 Lacs

(At Par)Schedule-B = ` 657.21 Lacs

(At Par)Total = ` 976.27 Lacs

`976.27 Lacs 05 months from the date

of issue of LOA

2 IRCON/2048/ISC-BEHALA/TENDER/

CP Roof/14/7

Dated18.03.201

5

06.04.2015 Supply, fabrication, transportation and fixing in position the structural steel work and in truss/ built up tubular (round, square or rectangular hollow tubes etc.) with cutting, hoisting, fixing in position and painting including Roof Sheeting as per drawings/ specifications in connection with the construction of roof for Cricket Pavilion and covering roof works at ramp portions for Eastern Railway at Behala

IRCON/K-RO/ 2048/ISC-

BEHALA/CP Roof/MPE/54

Dated 23.04.2015

M/s Makpower Engineers

235, Marshall House,

33/1, N. S. Road,Kolkata - 700 001

` 49.00 Lacs ` 49.00 Lacs ` 43,38,300/- 90-days from the date of

issue of LOA

Contd.../-

Page 2: Annexure: B DETAILS OF CONTRACTS PLACED BY LIMITED … 2015 - March 2016/2_AnnexB_Apr15_Mar16.pdfM/S Endeavour Instrument Pvt. Ltd, 45/3, Changodar Industrial Estate, Ahmedabad PIN

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

3 IRCON/2055/Gaya-

Manpur-ROB/

e-Tender/2015/09 Dated

06.04.2015

22.04.2015Fabrication, assembly, Erection and Painting of Steel Bowstring girder in Railway span and staircase in connection to Construction of ROB at Km 1.000 of Manpur Bypass in state of Bihar

IRCON/2055/ GAYA-

MANPUR/ ROB/STEEL/LOA/29/ 711

Dated 25.04.2015

M/s Maa Durga Constech Pvt. Ltd.,

A-401, Block-A,Omshailbaran

Apartment,Brahamsthan Road,

Sheikhpura,Raja Bazar,

Patna - 800 014

` 3,05,55,944/- 1.50 % below the tendered amount

` 3,00,97,605/- 06-months from the date

of issue of LOA

4IRCON/ 2059/

CGRP/ Tender/15/

Survey Team Dated

12.02.2015

11.03.2015Hiring of Survey team for establishment of vertical control, topographic survey & traversing along the proposed alignment with all allied resources for construction of New B.G. Electrified Double Line in the State of Chhattisgarh over South East Central Railway between Kharsia and Dharmajaygarh including Spur Line from Gharghoda to Gare Pelma

IRCON/ 2059/ CGRP/ Tender/15/

Survey Team/ 279

Dated 29.04.2015

M/s Aarvee Associates,Architects, Engineers & Consultants Pvt. Ltd.,

8-2-5, Ravula Residency,

Srinagar Colony,Hyderabad - 500 082Ph.: 040-23737633Fax: 040-23736277

Email: [email protected]

` 77,20,350.00 0.90% below (` 76,50,866.85+

Service Tax @ 12.36%

i.e.` 945,647.14)

` 85,96,513.99(including

Service Tax)

30-months from the date

of issue of LOA

Contd.../-

Page 3: Annexure: B DETAILS OF CONTRACTS PLACED BY LIMITED … 2015 - March 2016/2_AnnexB_Apr15_Mar16.pdfM/S Endeavour Instrument Pvt. Ltd, 45/3, Changodar Industrial Estate, Ahmedabad PIN

Works Awarded : MAY 2015

S. N.

Tender No.

Date of opening

Description of Item/ Work LOA No. and date

Contractor’s Name and address

Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/

Tendered Cost (For Engg./ Elect./S&T/Mech. Etc Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

1 IRCONPBTL/ 1034/CO/BKN-PHALODI RAJASTHAN INSURANCE POLICY/01

Dated 01.04.2015

16.04.2015 Providing Contractor's All Risk (CAR) Insurance policy for the works of Construction of “Widening and Strengthening of the existing Bikaner- Phalodi Section to four lane from km 4.200 to km 55.250 and Two lane with Paved Shoulder from km 55.250 to km 163.500 of NH-15 on BOT (Toll) basis in the state of Rajasthan”

IRCONPBTL/1034/CO/BKN

-PHALODI RAJASTHAN INSURANCE POLICY/01

Dated 12.05.2015

ICICI Lombard General Insurance Company Limited,

Plot No. 18, Block-K,

Lajpat Nagar-II,New Delhi - 110 024Ph. 011-66082499,

64587928, Email:

[email protected]

` 2,05,65,648/- (including service @ 12.36%)

Unit rate of Premium as %

over the SI: 0.051667% on

SI, ` 822.9 Cr.

` 76,74,228/- Expected Completion = 910 days from Appointed date indicative date

is 6th May,2015

Defect Liability Period = 365

days from completion

date

2 IRCON/MECH/9002/MAL.LOCO/ T.E

Dated 17.02.2015

04.03.2015 Supply of Air Brake Valves & Spares for YDM-4 (MG) DIiesel Locomotive for IRCON’S Malaysia Loco Project

IRCON/MECH/9002/MAL. LOCO/PUR/

596Dated

14.05.2015

M/s Stone India Ltd.,16 Taratalla Road, Kolkata - 700 088

24 Items - ` 3,35,488/- Within 90 days from date of

PO

3 IRCON/ MECH/

9002/MAL .LOCO/T.E

Dated 11.03.2015

06.04.2015 Supply of Axle Lining (Suspension Bearing) for YDM-4 (MG) Diesel Locomotive for IRCON’S Malaysia Loco Project

IRCON/MECH/9002/MAL. LOCO/PUR/

594Dated

14.05.2015

M/s Rama Engineering Works, Plot No. 768, Phase-1, I.D.A., Subhash Nagar Jeedimetla,

Hyderabad

i) Axle lining (Std) – 240 Set

ii) Axle lining 1/16” – 16 Setiii) Axle lining 1/8” – 48 Set

` 9600/- per Set ` 44,02,944/- Delivery for 150 set within

60 days & balance within 150 days from

date of PO

Contd.../-

Page 4: Annexure: B DETAILS OF CONTRACTS PLACED BY LIMITED … 2015 - March 2016/2_AnnexB_Apr15_Mar16.pdfM/S Endeavour Instrument Pvt. Ltd, 45/3, Changodar Industrial Estate, Ahmedabad PIN

Works Awarded : MAY 2015

S. N.

Tender No.

Date of opening

Description of Item/ Work LOA No. and date

Contractor’s Name and address

Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/ Tendered Cost (For

Engg./ Elect./S&T/Mech. Etc Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

4 IRCON/ 2049/

ROB-II-BIHAR/

e-Tender/ 2015/12 Dated

16.04.2015

04.05.2015 Diversion road (additional) from RCD office to BSNL exchange at Main road of Khagaria as per direction of district administration in connection to the construction of ROB in lieu of LC-23B at Khagaria in the state of Bihar

IRCON/2049/ROB-II-BIHAR/ LC-

23/2015/12/ LOA/37/849

Dated18.05.2015

M/s Samsai Infra, 3, Mezanine Floor,

Kashi Palace, Near Mourya Lok,Patna - 800 001

` 1,15,95,116/- 14.50 % above the tendered amount

`1,32,76,407.82 2 months (including monsoon

period) from the date of

issue of LOA

5 IRCON/1035/

DMRC CT-1-A/

TENDER/Rail

Shifting, Dated

13.05.2015

21.05.2015 Loading of 1080 Grade, (Head Harden), 18m long rails in transporters own trailers with their crane from the stacks at Depots of DMRC at various locations in NCR and transportation of the same to various locations along alignment for Phase -III Corridors of DMRC for CT-1A Contract (Mukundpur to Lajpat Nagar)

IRCON/1035/ DMRC CT-1-A/

TENDER/Rail Shifting

Dated 27.05.2015

M/s M.K. Trailers Service Pvt. Ltd.

BC-301, 1st Floor, Mangolpuri Ind. Area, Phase-II,

New Delhi PIN - 110 034

` 33,07,000/- `33,07,000/- `33,37,920/- 25.04.2016

Contd.../-

Page 5: Annexure: B DETAILS OF CONTRACTS PLACED BY LIMITED … 2015 - March 2016/2_AnnexB_Apr15_Mar16.pdfM/S Endeavour Instrument Pvt. Ltd, 45/3, Changodar Industrial Estate, Ahmedabad PIN

Works Awarded : JUNE 2015

S. N.

Tender No.

Date of opening

Description of Item/ Work LOA No. and date

Contractor’s Name and address

Quantity (for supply contract)/ Estimated Cost (For

Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/ Tendered Cost (For

Engg./ Elect./S&T/Mech. Etc Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

1 IRCON/ MECH/P&E/TRANS/2T

M/488 Dated

06.05.2015

20.05.2015 Transportation of 1 No. Transit Mixer from Mangalore to Benapole Border

IRCON/MECH/P&E/TRANS/2T

M/488/429 Dated

09.06.2015

M/s New Transport Organisation

New Delhi

1 ` 2,86,029/- `2,86,029.00 Within 25 days from the date of intimations from IRCON that the

equipment is ready for dispatch

2 IRCON/ MECH/P&E/TRANS/2T

M/488 Dated

06.05.2015

20.05.2015 Transportation of 1 No. Transit Mixer from Shalimar, Howrah to Benapole Border

IRCON/MECH/P&E/TRANS/2T

M/488/430 Dated

09.06.2015

M/s Anil Cargo Pvt. Limited

New Delhi

1 ` 65,333.00 ` 65,333.00 Within 25 days from the date of intimations from IRCON that the

equipment is ready for dispatch

3 IRCON/ 2057/NSTP/BUNK

HOUSE/2015/01, Dated

16.5.2015

05.06.2015 Supply, installation & commissioning of 3 nos. Bunk house office at Project site in connection with the proposed railway track/siding for coal/non-coal transportation system for Nabinagar Super Thermal Power Project (3x660 MW) Dist. Aurangabad in Bihar State

IRCON/2057/NSTP/BUNK

HOUSE/LOA/ 2015/01

Dated11.6.2015

M/s Metal Home Engineering303, Noorani

Manor, Near Aisha Masjid, Mumbra, Thane - 400 612

Maharashtra

3 BUNK HOUSE ` 27.95 Lacs ` 22,68,966.00 10.09.2015

Contd.../-

Page 6: Annexure: B DETAILS OF CONTRACTS PLACED BY LIMITED … 2015 - March 2016/2_AnnexB_Apr15_Mar16.pdfM/S Endeavour Instrument Pvt. Ltd, 45/3, Changodar Industrial Estate, Ahmedabad PIN

Works Awarded JUNE 2015

S. N.

Tender No.

Date of opening

Description of Item/ Work LOA No. and date

Contractor’s Name and address

Quantity (for supply contract)/ Estimated Cost (For

Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/

Tendered Cost (For Engg./ Elect./S&T/Mech. Etc Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

4 IRCON/1034/IPBTL/Tenders/

Weigh Bridge/46

Dated 23.05.2015

03.06.2015 Providing Supply 2 no Pit Less Weigh Bridge including Transportation, Installation, Commissioning, Calibration, Stamping Loading of 16.00x3.00 meter size of Platform with a capacity of 100MTx10KG (Capacity x Accuracy) at Ex-factory and unloading at Km 45.600 and Km 127.00 between Bikaner-Phalodi Highway of NH-15 in the state of Rajasthan

IRCON/1034/IPBTL/Weigh

Bridge/46/278-A Dated

12.06.2015

M/S Endeavour Instrument Pvt. Ltd,

45/3, Changodar Industrial Estate,

AhmedabadPIN - 380 006

Gujrat

Item Rate: `18,34,996.00

Item Rate: `18,34,996.00

`17,19,000.00 Three weeks from the date

of issue of Purchase

Order

5 IRCON/1034/PBTL/Tender/Lab Establishme

nt/ 40 Dated

06.04.2015

22.04.2015 Supply, Installation and commissioning of Laboratory Equipment’s at IRCON’s Site Camp near Km.45+600 in connection with Widening & Strengthening of the existing Bikaner-Phalodi Section to 4-Lane from Km.4.200 to Km.55.250 and 2-Lane with Paved shoulder from Km.55.250 to Km.163.500 of NH-15 in the State of Rajasthan

IRCON/1034/PBTL/BPHP/LAB EQUIP/192

Dated 27.05.15 and

IRCON/1034/PBTL/BPHP/LAB EQUIP/287

Dated 15.06.2015

M/s Accrotech Sceintific Industries

Motinagar New Delhi

Item Rate: `21,91,602.00

Item Rate: `21,91,602.00

`16,08,062.63 75 days from date of

issue of LOA Dated

27.05.2015

Contd.../-

Page 7: Annexure: B DETAILS OF CONTRACTS PLACED BY LIMITED … 2015 - March 2016/2_AnnexB_Apr15_Mar16.pdfM/S Endeavour Instrument Pvt. Ltd, 45/3, Changodar Industrial Estate, Ahmedabad PIN

Works Awarded JUNE 2015

S. N.

Tender No.

Date of opening

Description of Item/ Work LOA No. and date

Contractor’s Name and address

Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/

Tendered Cost (For Engg./ Elect./S&T/Mech. Etc Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

6 IRCON/ Civil/

e-Tender/ 1029/RCF

-RBL/ /LT/54 Dated

23.05.2015

11.06.2015 Construction of Senior Secondary School building including internal and external plumbing, sanitary and drainage services and related ancillary works of the building and other miscellaneous works in the Township of RCF/RBL

IRCON/Civil/e-Tender/ 1029/

RCF-RBL/ Sr.Secondary/

LOA/LT/54/ 7718 Dated

16.06.2015

M/s Ansh Project Service, 174/199,

A.K.L Kydganj, Allahabad (UP)

` 733.92 Lacs Schedule-A =` 689.77 Lacs

(1% below DSR)Schedule-B = ` 37.17 Lacs

Total = ` 726.95 Lacs

` 726.95 Lacs

09 months from the date

of issue of LOA

7 IRCON/2057/NSTP/Ancillary

Work /2015/02 Dated

30.5.2015

16.06.2015 Construction of Septic Tank, Installation of Water Tank, Pedestal of Bunk House & G.I. Barbed Wire Fencing, Gates etc. at Project site in connection with the proposed Railway Siding for Nabinagar Super Thermal Power Project (3X660 MW) of Nabinagar Power Generating Company Ltd. (NPGC), Dist. AURANGABAD (BIHAR)

IRCON/2057/ NSTP/ Ancillary

Work/LOA/ 2015/02 Dated

18.06.2015

M/s Sanjay Sharma,Gosain Bagh, Station Road,Gaya (Bihar)

36 Items ` 17,94,639.21 ` 16,51,068.00 17.09.2015

Contd.../-

Page 8: Annexure: B DETAILS OF CONTRACTS PLACED BY LIMITED … 2015 - March 2016/2_AnnexB_Apr15_Mar16.pdfM/S Endeavour Instrument Pvt. Ltd, 45/3, Changodar Industrial Estate, Ahmedabad PIN

Works Awarded JULY 2015

S. N.

Tender No.

Date of opening

Description of Item/ Work LOA No. and date

Contractor’s Name and address

Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/

Tendered Cost (For Engg./ Elect./S&T/Mech. Etc

Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

1 IRCON/ PO/TN/

JAYNAGAR-2050/15/23

Dated 27.05.2015

10.06.2015 Construction of civil work including "Balance work of Embankment", Blanketing & other ancillary works in Indian portion of alignment from Km 0.000 to Km 02.975 in connection with Gauge Conversion & Construction of New Broad Gauge Railway Line from JAYNAGAR (INDIA) to BARDIBAS (NEPAL)” .Package No. : EMBK - 01 (India)

IRCON/2050/BGL.JBB/

Tender/ Pkg.-EMBK-

01(India) /202 Dated

01.07.2015

M/s Gopal MishraRajhata Binodpur

Katihar(Bihar)Pin : 854 101

` 3,88,66,549/- 18.0 % above ` 4,58,62,528/- 09 months from the

date of issue of LOA

2 IRCON/1035/DMRC

CT-1-A/ TENDER/ SURVEY

Dated 15.06.2015

30.06.2015 Survey works between Mukundpur - Lajpat Nagar (Delhi) for Standard Gauge for Contract CT -1 A of DMRC

IRCON/1035/DMRC CT-1-A/ TENDER/

SURVEY/ Dated

03.07.2015

M/s Measure Techno Services, C-5/2, Sector-5, Rohini, Delhi - 110 085

` 24,86,000/- ` 24,86,000/- ` 33,43,700/- 06.06.2016

3 IRCON/ 2055/ROB-

BIHAR/ GAYA-

MANPURC/e-Tender/ 2015/13 Dated

05.06.2015

19.06.2015 Execution of Road work like Granular sub base (GSBC), Wet Mix Macadam (WMM), Dense Bituminous Macadam (DBM), Bituminous Concrete (BC), Mastic Asphalt and Bridge Protection work in lieu of Construction of Road over Bridge at CH.1.00 Manpur bypass at Manpur of SH-04 in Gaya District, Bihar

IRCON/2055/ Gaya-Manpur/ 2015/13/LOA/

42/1092 Dated

06/07.07.2015

M/s Hari Construction &

Associates Pvt. Ltd., At & PO: Keshawe,

P.S.:Barauni,Distt. - Begusarai (Bihar), PIN : 851

134

` 273.26 Lacs 15.00 % above ` 314.25 Lacs 6 months (including monsoon

period) from the date of

issue of LOA

Contd.../-

Page 9: Annexure: B DETAILS OF CONTRACTS PLACED BY LIMITED … 2015 - March 2016/2_AnnexB_Apr15_Mar16.pdfM/S Endeavour Instrument Pvt. Ltd, 45/3, Changodar Industrial Estate, Ahmedabad PIN

Works Awarded JULY 2015

S. N.

Tender No.

Date of opening

Description of Item/ Work LOA No. and date

Contractor’s Name and address

Quantity (for supply contract)/ Estimated Cost (For

Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/

Tendered Cost (For Engg./ Elect./S&T/Mech. Etc

Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

4 IRCON/1034/IPBTL/

Tender/Emulsion Storage Tank/42 Dated

19.06.2015

06.07.2015 Providing Supply Emulsion Storage Tank 4 Nos of Capacity 15KL (2 Nos Tank at Km 45.600 & 2 Nos at Km 127.000 KM) between Bikaner - Phalodi Highway of NH-15 in the state of Rajasthan including Loading at Factory, Transportation, Unloading, at IRCON Site

IRCON/1034/IPBTL/Storage

tank/42/385 Dated

14.07.2015

M/s Moris Industries,144/1, GIDC-1,Highway Road,

Mehsana - 384 002Gujrat

Tel.: 2762250522

` 16,47,450/- 4.70% below ` 15.70 Lacs 04 weeks from the date of issue of

LOA

5 IRCON/1035/DMRC

CT-1-A/ TENDER/

Reinf. Steel/Lot-1

Dated 10.07.2015

20.07.2015 Manufacture & Supply of 12mm diameter reinforcement steel (TMT, Fe 500) for Contract CT-1A of DMRC along the alignment of CT-1A contract (Lajpat Nagar to Mukundpur) or at IRCON's Store at ESI Hospital near Panjabi Bagh, Delhi

IRCON/1035/ DMRC CT-1-

A/TENDER/

Reinf. Steel/ Lot-1/65Dated

23.07.2015

M/s Jindal Steel & Power Limited Jindal Center,

5th Floor, Tower A, Plot No. 2,

Sector - 32, Gurgaon (Haryana)

Ph. : 9560898221

300 MT Basic Cost :` 35,450/- Per MT +

Transportation ` 430 Per MT + CST @ 2%

against issue of Form C

` 1,09,75,500/- -

6 IRCON/ 2049/ROB-II-BIHAR/ e-Tender/ 2015/18 Dated

25.06.2015

15.07.2015 Construction of Granular sub base (GSBC), wet mix macadam(WMM), Dense Bituminous Macadam(DBM) and Bituminous Concrete (BC) in connection to the construction of ROB in lieu of LC-159A/SPL at Km. 164/15-165/1 between Jivdhara - Motihari section on Muzaffarpur - Gorakhpur route in Samastipur Division E.C. Railway, Bihar

IRCON/2049/ ROB-II-Bihar/

e-Tender/ 2015 /

18/LOA/49/ 1246 Dated

24.07.2015

M/s Samsai Infra, 3, Mezanine Floor,

Kashi Place, Near Mourya Lok,

Patna (Bihar)PIN - 800 001

` 130.80 Lacs 9.95% above ` 143.82 Lacs 6 months (including monsoon period) from the date of issue of

LOA

Contd.../-

Page 10: Annexure: B DETAILS OF CONTRACTS PLACED BY LIMITED … 2015 - March 2016/2_AnnexB_Apr15_Mar16.pdfM/S Endeavour Instrument Pvt. Ltd, 45/3, Changodar Industrial Estate, Ahmedabad PIN

Works Awarded JULY 2015

S. N.

Tender No.

Date of opening

Description of Item/ Work LOA No. and date

Contractor’s Name and address

Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/ Tendered Cost (For

Engg./ Elect./S&T/Mech. Etc Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

7 IRCON/ 2059/CGRP/

Tender EC12/15/ GT Work

Dated 05.06.2015

24.06.2015 Conducting Geo-Technical Investigations including Drilling of Boreholes, Collecting Test Samples & Laboratory Testing from Urga to Kusmunda and Gharghoda to Donga Mauha for Construction of New B.G. Electrified Double Line Railway Track in the state of Chhattisgarh over South East Central Railway between Kharsia and Dharmjaygarh including Spur Line from Gharghoda to Gare Pelma

IRCON/ 2059/CGRP/

Tender EC12/15/ GT

Work/355 Dated

28.07.2015

M/s S&S AssociatesPlot No. 7GH/1353/D-15

Sector-9, CDA,P.O./P.S.-Markat Nagar, Cuttak, Odisha - 753 014Tel/Fax: 0671-6542018

Mob.: 9437023018,9338823018

Email: [email protected]@gmail.com

` 33,96,163.17 8% below+

Service Tax @14%

` 35,61,895.94 100 - days from the date of issue of

LOA

8 IRCON/MECH/P&E/BIKANER-PHALODI/

PROCURE/WATER

TANKER/499/RET-I

Dated 17.06.2015

07.07.2015 Supply, Testing & Commissioning of 04 nos. Water Tankers for Bikaner Phalodi Highway Project at Rajasthan

IRCON/MECH/P&E/BIKANER-PHALODI/

PROCURE/WATER

TANKER/499/RET-I

Dated 29.07.2015

M/s TATA Motors Limited,

Commercial Vehicle Division

Jeevan Tara Building5, Sansad Marg New

Delhi - 110 001

4 nos. `13,68,799.00 `54,75,196.00 8 weeks from the

date of LOA

Contd.../-

Page 11: Annexure: B DETAILS OF CONTRACTS PLACED BY LIMITED … 2015 - March 2016/2_AnnexB_Apr15_Mar16.pdfM/S Endeavour Instrument Pvt. Ltd, 45/3, Changodar Industrial Estate, Ahmedabad PIN

Works Awarded AUGUST 2015

S. N.

Tender No.

Date of opening

Description of Item/ Work LOA No. and date

Contractor’s Name and address

Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/

Tendered Cost (For Engg./ Elect./S&T/Mech. Etc Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

1 IRCON/MECH/9002/MAL.LOCO

/T.E Dated

02.07.2015

20.07.2015 Snubber Assembly for YDM - 4 (MG) diesel locomotives for export to Malaysia

IRCON/MECH/9002/MAL.LOCO/607

Dated 13.08.2015

M/s G.B Equipment Systems Ltd.

16, Ballupur Road, Chakrata Road,

Dehra-dun - 248 001Uttarakhand

120 Nos ` 5,585/- Ex. Taxes

` 7,60,677/- 120 days from date of

PO

2 IRCON/2044/Ganga

Bridge-Patna/16/2015/04

12.08.2015 Drilling and Fixing of Anchor Bars with Hilti Chemical at Pier P37 & Abutment A2 for pedestal work of 64m span at Pehlejaghat (North End)” of Rail cum Road Bridge across river Ganga at Patna

IRCON/2044/GBSS-

Patna/16/2015/01/6847/Digha Dated13.08.2015

M/s Avtar Techno Solution Pvt. Ltd.,

BC-171C,East Shalimar Bagh

Delhi - 110 088

Schedule-A = 620 nos.

Schedule-B = 20 nos.

Schedule-A = ` 3260.94 Lacs

Schedule-B = ` 1004.24 Lacs

`20,41,869.35 /- 25 days from the date of issue of

LOA

3 IRCON/MECH/P&E/BI

KANER-PHALODI

/DG SET/503/RET-I Dated

19.06.2015

03.07.2015 Supply, Testing & Commissioning of 01 no. 600 KVA DG Set for Bikaner Phalodi Highway Project

IRCON/MECH/P&E/BIKANER-PHALODI/DG

SET/503/RET-I Dated

19.08.2015

M/s Elmech Engineers,

1402, Chiranjiv Tower, 43, Nehru Place, New Delhi

PIN - 110 019

01 No. `43,04,122.00/- ` 43,04,122/- 6 weeks from the

date of LOA

4 IRCON/1035DMRC

Ph.III CT-1-A/Insurance/

CAR/75 Date

07.08.2015

17.08.2015 Insurance (CAR & WC Policy) for the project "Supply installation, testing and commissioning of ballastless track of standard gauge, Part-1 corridor of sections of Mukundpur - Lajpat Nagar (excluding) Line-7, in elevated and underground sections of Delhi MRTS Project of Phase-III", For DMRC CT-1A Contract

IRCON/1035DMRC Ph.III

CT-1-A/ Insurance/CAR/

IFFCO-TOKIO/91

Dated 20.08.2015

M/s IFFCO-TOKIO General Insurance

505, Kailash Building,

26 K.G. MargNew Delhi - 110 001

` 29,50,000/- ` 29,50,000/- ` 25,52,344/- 22.02.2017 i.e. 24 Months

from 23.02.2017

Contd.../-

Page 12: Annexure: B DETAILS OF CONTRACTS PLACED BY LIMITED … 2015 - March 2016/2_AnnexB_Apr15_Mar16.pdfM/S Endeavour Instrument Pvt. Ltd, 45/3, Changodar Industrial Estate, Ahmedabad PIN

Works Awarded SEPTEMBER 2015

S. N.

Tender No. Date of opening

Description of Item/ Work LOA No. and date

Contractor’s Name and address

Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/ Tendered Cost (For

Engg./ Elect./S&T/Mech. Etc

Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

1 IRCON/MECH/P&E/BIKANER-PHALODI/PRO

CURE/AIR COMPRESSORS/500/RET-I

Dated 27.07.2015

14.08.2014 Supply, Testing and Commissioning of 02 nos. Air Compressors for Bikaner Phalodi Highway Project at Rajasthan

IRCON/MECH/P&E/BIKANER-

PHALODI/PROCURE/AIR

COMPRESSORS/500/RET-I Dated

10.09.2015

M/s Abhishek Sales Corporation,

C-55/3, Okhla, Indl, Area Phase-II,New Delhi -110 020

02 nos. ` 7,69,080/- ` 15,38,160/- 6 weeks from the date of

LOA.

2 NIT-47 07.11.2015 Hiring services towards House Upkeeping, Office Work, Account Section at Bikaner and Security Services at Camp-1 Km 45+600

IRCON/1034/PBTL/NH-15/NIT/47

Dated16.09.2015

M/s M.S. Service Pvt. Ltd.

SCO-I Himuda commercial Complex,

Sai Road, Baddi,Distt. - Solan (H.P.)

e-mail: [email protected]

Item Rate `17,05,650/-

Item Rate `17,05,650/- `16,88,112/-

06 months from date of

LOA

3 IRCON/1034/ PBTL/NH-

15/Tenders/ Maintenance/46

Dated 10.09.2015

16.09.2015 Maintenance of Existing Road Pavement from Km 95+000 to Km 163+500 of Bikaner-Phalodi Section of NH-15

IRCON/1034/PBTL/NH-

15/NIT/46/LOA/540 Dated

18.09.2015

M/S Heera Ram Godara Sec-4 Plot No-94,

Adarsh Nagar PhalodiRajasthan

` 42,02,110/- 9.77% above

` 46,12,656.15 06 months from date of

LOA

4 IRCON/MECH/P&E/SGHP/RB

L/514 Dated

17.08.2015

01.09.2015 Transportation of 3 Nos Equipment from RCF/RBL to Shivpuri Guna Highway Project

IRCON/MECH/P&E/SGHP/RBL/51

4/2/529Dated

21.09.2015

M/s New Transport Organisation ,

8551,Roshanara Road,2nd Floor,

Gulshan Housing Building, New Delhi - 7

` 1.08 Lacs

Contd.../-

Page 13: Annexure: B DETAILS OF CONTRACTS PLACED BY LIMITED … 2015 - March 2016/2_AnnexB_Apr15_Mar16.pdfM/S Endeavour Instrument Pvt. Ltd, 45/3, Changodar Industrial Estate, Ahmedabad PIN

Works Awarded SEPTEMBER 2015

S. N.

Tender No. Date of opening

Description of Item/ Work LOA No. and date

Contractor’s Name and address

Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/ Tendered Cost (For

Engg./ Elect./S&T/Mech. Etc

Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

5 IRCON/MECH/P&E/SGHP/R

BL/514 Dated

17.08.2015

01.09.2015 Transportation of 3 Nos Plant and Equipment from RCF/RBL to Shivpuri Guna Highway Project

IRCON/MECH/P&E/SGHP/RBL/

514/3/530 Dated

21.09.2015

M/s Darcl Logistics Limited , 19,Tilak Bazar,

Hisar - 125 001 (Haryana)

` 19.58 Lacs ` 11.91 Lacs 20 days from the date of

intimation from IRCON that

the equipment are ready for

dispatch

6 IRCON/1035/

DMRC Ph.III CT-1-

A/Insurance/PIIP Dated

01.09.2015

11.09.2015 Insurance (PIIP) for the project "Supply installation testing commissioning of ballastless track of standard gauge, Part 1 Corridor of section of Mukundpur- Lajpat Nagar (excluding) line-7, in elevated and underground section of Delhi MRTS Project of Phase III" for DMRC CT-1A Contract

IRCON/1035/DMRC Ph.III

CT-1-A/Insurance/

PIIP/OICL/118Dated

22.09.2015

M/s Oriental Insurance Co. Ltd.,

Div. No.-20, N-39, Conn. Circus, New Delhi - 110 001

` 21,37,000 ` 21,37,000 ` 5,55,672/- 22.02.2017 (24 Months

from 23.02.2017)

7 IRCON/MECH/P&E/SGHP/RBL/514

Dated 17.08.2015

01.09.2015 Transportation of 1 No Equipment from RCF/RBL to IRCON, Greater Noida

IRCON/MECH/P&E/SGHP/RBL/

514/1/532 Dated

23.09.2015

M/s Anil Cargo Pvt. Ltd. 8445/1,1st Floor,

Aryya Nagar,Pahar Gunj,

New Delhi - 55

Job ` 0.44 Lac

Contd.../-

Page 14: Annexure: B DETAILS OF CONTRACTS PLACED BY LIMITED … 2015 - March 2016/2_AnnexB_Apr15_Mar16.pdfM/S Endeavour Instrument Pvt. Ltd, 45/3, Changodar Industrial Estate, Ahmedabad PIN

Works Awarded SEPTEMBER 2015

S. N.

Tender No. Date of opening

Description of Item/ Work LOA No. and date

Contractor’s Name and address

Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/ Tendered Cost (For

Engg./ Elect./S&T/Mech. Etc

Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

8 IRCON/ Tender/ JBNRL/

2051/15/03 Dated

07.08.2015

21.08.2015 Execution of Electrical works at Bathnaha Railway station, Supply, Erection, Testing and Commissioning of octagonal 6.0 M poles on Platform No. 2 including 2Cx10 sq mm aluminum armored cable with luminaries & electrification of PP Shed PF No. 1 & 2 and FOB

IRCON/2051/ JBNRL/Elect

Works/BTH/ LOA/ 59/1221 Dated

24.09.2015

M/s Nav Bharat Construction,Lemuabad,

Pandark, Barh, Patna (Bihar)

` 18.15 Lacs At par on some BOQ items & 5% above on balance

BOQ items

` 18.48 Lacs 07 (Seven) Months

9 IRCON/2034/ROB-BIHAR/

e-Tender/L.C-

72/2015/32 Dated

16.09.2015

28.09.2015 Balance Work for Construction of Road Over Bridge (ROB) in Bihar including Substructure, Superstructure including approaches at Level Crossings No.72 at Patna City

IRCON/2034/ROB-BIHAR/LC-

72/2015/LOA/75/1661 Dated30.09.2015

M/s Samsai Infra,3, Mezanine Floor, Kashi

Place,Near Mourya Lok, Patna

(Bihar)PIN - 800 001

` 269.03 Lakhs

15.00 above

` 309.39 Lacs

09 months (including monsoon

period) from the date of

issue of LOA

Contd.../-

Page 15: Annexure: B DETAILS OF CONTRACTS PLACED BY LIMITED … 2015 - March 2016/2_AnnexB_Apr15_Mar16.pdfM/S Endeavour Instrument Pvt. Ltd, 45/3, Changodar Industrial Estate, Ahmedabad PIN

Works Awarded OCTOBER 2015

S. N.

Tender No. Date of opening

Description of Item/ Work LOA No. and date

Contractor’s Name and address

Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/ Tendered Cost (For

Engg./Elect./S&T/ Mech. Etc Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

1 IRCON/1035/DMRC CT-1-A/

TENDER/Reinf.

Steel/Lot-2 Dated

30.09.2015

07.10.2015 Manufacture & Supply of 10 mm diameter reinforcement steel (TMT, Fe 500) for Contract CT-1A of DMRC along the alignment of CT-1A contract (Lajpat Nagar to Mukundpur) or at IRCON's Store at ESI Hospital near Panjabi Bagh, Delhi-Lot-2

IRCON/1035/ DMRC CT-1-A/

TENDER/ Reinf. Steel/

Lot-2/36Dated

08.10.2015

M/s Steel Authority of India Limited Branch Sales Office Jeevan Deep Building, 10

Sansad Marg,New Delhi - 110 001

300 MT (i) Basic Cost:` 32650/- Per

MT + (ii)

Transportation` 350 Per MT +VAT @5% on(i) + (ii)

` 1,03,95,000/- -

2 IRCON/1034/PBTL/NH-

15/MECH/ERECTION OF CRUSHER

REPAIR/152 Dated

04.09.2015

18.09.2015 Erection of 200TPH , 3 Stage, Metso Make, Crushing Plant at IRCON Camp at Km 127+000 NH-15 Near Baap (Rajasthan) in Bikaner-Phalodi Highway Project Site

IRCON/1034/PBTL/NH-15/MECH/

ERECTION OF CRUSHER

REPAIR/152/ 570 Dated10.10.2015

M/s M.S. Engineering Consultant

No. 6, Plot No. 11,N.K.K. Nagar, Vallam,

Tanjavur - 613 001(Tamil Nadu)

Phonr # 04362-236432, 9994899867

Item Rate: ` 11,55,000/-

Item Rate: ` 11,55,000/-

`11,91,300/- 60 Days from the date of issue of

LOA

3 IRCON/3017/SGTL/Bamaur Camp/Office

Civil/301 Dated

29.09.2015

09.10.2015 Construction of Foundation and Platform for erection of pre-fab office Building at Km.276”4-Laning of Shivpuri-Guna section of NH-3 from Km. 236.000 to 319.700 in the state of Madhya Pradesh”( Stage-I)

IRCON/3017/SGTL/Bamaur

Camp/Office Civil/301/31

Dated10.10.2015

M/s. Maa Nihal Devi Construction Company

In front of SBI,A.B. Road,Kolaras,Dist –Shivpuri - 473 774,Madhya Pradesh

` 638806.44 8.80% above cost put to

Tender `553070.92

` 601741.16 15 Days

Contd.../-

Page 16: Annexure: B DETAILS OF CONTRACTS PLACED BY LIMITED … 2015 - March 2016/2_AnnexB_Apr15_Mar16.pdfM/S Endeavour Instrument Pvt. Ltd, 45/3, Changodar Industrial Estate, Ahmedabad PIN

Works Awarded OCTOBER 2015

S. N.

Tender No. Date of opening

Description of Item/ Work LOA No. and date

Contractor’s Name and address

Quantity (for supply contract)/ Estimated Cost (For

Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/

Tendered Cost (For Engg./ Elect./S&T/Mech. Etc

Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

4 IRCON/3017/SGTL/Bamaur Camp/Camp Office(pre-fab)/302 Dated

29.09.2015

09.10.2015 Construction of Pre-fab Office building at Km.276 “4-Laning of Shivpuri-Guna section of NH-3 from Km. 236.000 to 319.700 in the state of Madhya Pradesh”( Stage-I)

IRCON/3017/SGTL/Bamaur

Camp/Camp Office (Pre-

fab)/302/35A Dated.19.10.2015

M/s. Indian ConstructionsPlot No.-39,

Rail Vihar, Sector-33, NOIDA, G.B Nagar,

Uttar Pradesh.

` 2165730.18 14.2% above Cost

put to Tender

`1949286.76

` 2226085.48 30 Days

5 IRCON/3018/DFCCIL-

CTP12/INSURANCE/02

Dated12.10.2015

16.10.2015 Contractors All Risk Insurance, Third Party Insurance & Workmen Compensation Insurance for CTP-12 DFCCIL Project between Vaitarana and Sachin.

IRCON/3018/DFCCIL-CTP12/

INSURANCE/02/1015Dated

27.10.2015

M/s ICICI LOMBARD GENERAL

INSURANCE COMPANY LTD, ICICI Lombard House, 414, Veer Savarkar Marg,

Prabhadevi,Mumbai - 400 025

NA NA ` 2,17,77,056/-28.10.2019

6 IRCON/3017/SGTL/Bamaur

Crusher Civil/303

Dated 08.10.2015

17.10.2015 Construction of Foundation Panel Room, Retaining Wall and other associated work for erection of Crusher at Bamaur village 276 “4 - Laning of Shivpuri - Guna section of NH-3 from Km. 236.000 to 332.100 in the state of M. P.” ( Stage-I)

IRCON/3017/ SGTL/Bamaur/

Crusher Civil/303/37

Dated27.10.2015

M/s. Raj Associates37A/10B, Mulla

Compound,Near Blood Bank,

Allahabad (UP) - 211 002

` 4217809.34 1.50% below Cost put to

Tender `3775015.49

` 3718390.26 90 Days

7 IRCON/1035/DMRC Ph.III

CT-1-A/ITENDER/M

SS Dated

10.09.2015

21.10.2015 Design, Manufacture, Supply & Transportation of Mass Spring System as Noise Mitigation Measure in Underground Ballastless Track Section (Circular Tunnel/Cut & Cover box tunnel) of DMRC CT-1A Contract

IRCON/1035/DMRC Ph.III

CT-1-A/ ITENDER/MSS

/165 Dated 30.10.2015

M/s Getzner Werkstoffe GmbH Herrenau 5, 6706

Bürs, Austria

Misc. Items Quantity

Item Rate Euro 2,092,698

29.04.2016(6 Months

from 30.10.2015)

Contd.../-

Page 17: Annexure: B DETAILS OF CONTRACTS PLACED BY LIMITED … 2015 - March 2016/2_AnnexB_Apr15_Mar16.pdfM/S Endeavour Instrument Pvt. Ltd, 45/3, Changodar Industrial Estate, Ahmedabad PIN

Works Awarded NOVEMBER 2015

S. N.

Tender No. Date of opening

Description of Item/ Work LOA No. and date

Contractor’s Name and address

Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/ Tendered Cost (For

Engg./ Elect./S&T/Mech. Etc

Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

1 IRCON/3017/SGTL/Tender

/Bamaur Camp/Qtrs .(foundation) /

306 Dated

02.11.2015

18.11.2015 Construction of foundation and platform for erection of Pre-fab staff accommodation at IRCON’s Main Camp near Village Bamaur,A.B Road ( km.276 of NH-3) for Ircon SGTL (Agreement No.ISGTL/CO/SG/IRCON/CORRES/02 dtd.02.09.2015) in connection with ”4-Laning of Shivpuri-Guna section of NH-3 from km 236 to km 332.100 in the State of Madhya Pradesh”( STAGE-I)

IRCON/3017/SGTL/Tender

/Bamaur Camp/Qtrs.(foundation)/

306/50Dated

19.11.2015

M/s Indian Constructions Plot No.30,Rail Vihar,

Sector-33,Noida, G. B. Nagar,

Uttar Pradesh

`31,84,434/- 6.1% below Cost put to

Tender `2948503.00

` 2768644/- 30 Days

2 IRCON/1034/PBTL/NH-

15/Tenders/ Hiring

Service/ Bikaner/47

Dated 26.10.2015

07.11.2015 Hiring services towards House Upkeeping, Office Work, Account Section at Bikaner and Security Services at Camp-1 Km.45+600

IRCON/1034/PBTL/NH-

15/UTILITY SERVICES/631

Dated20.11.2015

M/s M.S. Services Pvt. Ltd.,

SCO-I Himuda commercial Complex,

Sai Road, Baddi, Distt. - Solan -173 212 (H.P.)

e-mail: [email protected]

Item Rate `17,05,650/-

Item Rate `17,05,650/- `16,88,112/-

06 months from date

of LOA

3 IRCON/1034/PBTL/NH-

15/Tenders/Hiring Service/ Phalodi /48

Dated 26.10.2015

07.11.2015 Hiring services towards House Upkeeping, Office Work at Phalodi and Security at Camp-2 at Km.127+000

IRCON/1034/PBTL/NH-

15/UTILITY SERVICES/631

-(A)Dated

20.11.2015

M/s S.S. Services Pvt. Ltd.,

J.P. Colony, Kaledi(NH-8), Shahpura,Jaipur - 303 103

(Rajasthan)

Item Rate `12,66,084/-

Item Rate `12,66,084/- `12,66,084/-

06 months from date

of LOA

Contd.../-

Page 18: Annexure: B DETAILS OF CONTRACTS PLACED BY LIMITED … 2015 - March 2016/2_AnnexB_Apr15_Mar16.pdfM/S Endeavour Instrument Pvt. Ltd, 45/3, Changodar Industrial Estate, Ahmedabad PIN

Works Awarded NOVEMBER 2015

S. N.

Tender No. Date of opening

Description of Item/ Work LOA No. and date

Contractor’s Name and address

Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/ Tendered Cost (For

Engg./ Elect./S&T/Mech. Etc

Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

4 IRCON/1035/DMRC CT-1-A/ TENDER/GI

Dummy Plate/ Dated

09.11.2015

23.11.2015 Manufacture, Supply, Transportation & Delivery of 4mm thick M.S. galvanized dummy plate of different sizes with holes of required diameter at specified locations including loading unloading and delivery of the materials to IRCON's store at Jakhira (Delhi) for CT-1-A Contract of DMRC (Mukundpur to Lajpat Nagar)

IRCON/1035/DMRC CT-1-A/

TENDER/GI Dummy Plate/

Dated 28.11.2015

M/s Ajay Fabricator C-74, Vijay Vihar, Ph.I,

Delhi - 85

Misc. items Quantity

Item Rate ` 18,52,200/- 27.03.2016 (Four

Months from the date of issue of

LOA)

Contd.../-

Page 19: Annexure: B DETAILS OF CONTRACTS PLACED BY LIMITED … 2015 - March 2016/2_AnnexB_Apr15_Mar16.pdfM/S Endeavour Instrument Pvt. Ltd, 45/3, Changodar Industrial Estate, Ahmedabad PIN

Works Awarded DECEMBER 2015

S. N.

Tender No. Date of opening

Description of Item/ Work LOA No. and date

Contractor’s Name and address

Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/ Tendered Cost (For

Engg./ Elect./S&T/Mech. Etc

Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

1 IRCON/3017/SGTL/Tender

/Bamaur Camp/

Workshop & Lab/309 Dated

26.11.2015

07.12.2015 Construction of workshop and Lab at Ircon’s Main Camp near Village Bamaur, A. B. Road (Km.276 of NH-3) for Ircon SGTL (Agreement No.ISGTL/CO/SG/ IRCON/CORRES/02 Dated 02.09.2015) in connection with ”4-Laning of Shivpuri-Guna section of NH-3 from km 236 to km 332.100 in the State of Madhya Pradesh” (STAGE-I)

IRCON/3017/SGTL/Tender /Bamaur Camp/

Workshop & Lab/309/62

Dated09.12.2015

M/s Padmawati Constructions Prakash

Sadan,RZ-15/91,East Sagarpur,

Gali No.-2,Near chhoti Sabji

Mandi,New Delhi - 46

` 4391563/- 4.5 % below Cost

put to tender

` 3948683

3770992.27

60 Days

2 NIT – 55 09.12.2015 Construction of Generator Sheds for WMM, HMP & Crusher Plants, Underground Water Tank for 200 TPH Crusher for Water Sprinkling System, Internal Electrification for Crusher, Weigh Bridge & Additional Dormitory for 10 nos. and other allied works at Camp-2 Km 127 in connection of Bikaner Phalodi Highway section in the state of Rajasthan

IRCON/1034/PBTL/NH-

15/Tenders/ Generator

Sheds, Dormitory,

Water Tank/55/677

Dated 11.12.2015

M/s Regional Power Infrastructure

Near Hotel Madhuwan NH-15,

Bikaner Road,BAP, Jodhpur - 342

307

`22,71,338.65

At Par `22,71,338.65

Two months from the date of issue of

LOA

3 IRCON/10 34/PBTL/ NH-15/

BPHP/Pkg EUS-II-

PHLD/50Dated:

17.11.2015

04.12.2015 Carrying out Electrical Line Utility Shifting from Km 95+000 to Km 163+500 in connection with Construction of Bikaner Phalodi Highway section of NH-15 in the State of Rajasthan(Package : BPHP/EUS-II-PHLD)

IRCON/1034/PBTL/NH-

15/BPHP/NIT-50/Pkg EUS-II-

PHLD/682Dated

14.12.2015

M/s Jain Sons,213/5, Nasia Marg,

Ajmer(Rajasthan)

`6,35,02,770- 4.86% above

`6,65,89,005/-

Four months from the date of issue of

LOA

Contd.../-

Page 20: Annexure: B DETAILS OF CONTRACTS PLACED BY LIMITED … 2015 - March 2016/2_AnnexB_Apr15_Mar16.pdfM/S Endeavour Instrument Pvt. Ltd, 45/3, Changodar Industrial Estate, Ahmedabad PIN

Works Awarded DECEMBER 2015

S. N.

Tender No. Date of opening

Description of Item/ Work LOA No. and date

Contractor’s Name and address

Quantity (for supply contract)/ Estimated Cost (For

Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/ Tendered Cost (For

Engg./ Elect./S&T/Mech. Etc Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

4 IRCON/1034/PBTL/NH-15/BPHP/Pk

g EUS-I-BKNR/49

Dated 17.11.2015

04.12.2015 Carrying out Electrical Line Utility Shifting from Km 4+200 to Km 95+000 in connection with Construction of Bikaner Phalodi Highway section of NH-15 in the state of Rajasthan(Package : BPHP/EUS-I-BKNR)

IRCON/1034/PBTL/NH-

15/BPHP/NIT-49/Pkg EUS-I-

BKNR/683 Dated

14.12.2015

M/s Jagdamba Engineers & Builders,

VPO Moondsar,Bikaner

Rajasthan

`5,08,81,660/- 4.93% above

`5,33,90,126/- Four months

from the

date of issue of

LOA

5 IRCON/2049/

ROB-II-BIHAR/

e-Tender/ 2015/37 Dated

24.11.15

09.12.2015 Construction of Granular sub base (GSBC), wet mix macadam (WMM), Dense Bituminous Macadam (DBM), Mastic Asphalt and Bituminous Concrete (BC) in connection to the construction of ROB in lieu of LC - 47B at Km. 163/6-7 on Begusarai - Tilrath section on Barauni - Saharsa route in Sonepur Division E.C. Railway, Bihar

IRCON/2049/ROB-II-BIHAR/

e-Tender/2015/37/LOA/

88/2054Dated

16/17.12.2015

M/s. Ram Kripal Singh Construction

(P) Ltd., 702, Panchwati Plaza, Kutchery Road,

Ranchi(Jharkhand)

` 202.19 Lacs 16.50% above

`235.56 Lacs 4 months (including monsoon period) from the date of issue of

LOA

6 IRCON/1034/PBTL/

NH-15/Tree Cutting/51

Dated17.11.2015

09.12.2015 Cutting of trees with trunks and branches and removal of stumps, roots transportation to nominated locations with all lead and lifts and stacking of material from Km 4+200 to Km 163+500 in connection of Bikaner Phalodi Highway section in the state of Rajasthan, (Pkg.- BPHP/TREE CUTTING)

IRCON/1034/PBTL/NH-15/Tree

Cuitting/51/ 694 Dated 18.12.2015

M/s Hansraj Krishan Lal,

Ward No. 27 (New),Badopal Road,

SurathgarhSri Ganaganagar

`51,50,213.22 9.97% above

`56,63,689/- Two months

from the

date of issue of

LOA

Contd.../-

Page 21: Annexure: B DETAILS OF CONTRACTS PLACED BY LIMITED … 2015 - March 2016/2_AnnexB_Apr15_Mar16.pdfM/S Endeavour Instrument Pvt. Ltd, 45/3, Changodar Industrial Estate, Ahmedabad PIN

Works Awarded DECEMBER 2015

S. N.

Tender No. Date of opening

Description of Item/ Work LOA No. and date

Contractor’s Name and address

Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply

contract)/ Tendered Cost (For Engg./ Elect./S&T/Mech.

Etc Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

7 IRCON/1034/PBTL/NH-

15/BPHP/Pkg WUS-II-

BKNR/52Dated:

17.11.2015

10.12.2015 Providing and relocation of existing PHED water pipe line between Km.128.00 to Km.145.00 along project highway on NH-15 in connection with widening of Bikaner Phalodi Highway section in the state of Rajasthan (Pkg.- BPHP/WUS-II-BAP)

IRCON/1034/PBTL/NH-15/

BPHP/Pkg.WUS-II-

BAP/52/691Dated

18.12.2015

M/s G. L. Taparia,Mahavir Chowk,

Nr. Chaacha Nehru School

P.O. Nokha,Distt. – Bikaner

`3,83,29,380/- 6.43% above

`4,07,93,959/- Three months from the date of issue of

LOA

8 IRCON/1034/PBTL/NH-15/BPHP/

Pkg WUS-III-PHLDR/53

Dated:17.11.2015

10.12.2015 Providing and relocation of existing PHED water pipe line between Km 145.00 to Km 163.500 along project highway on NH-15 in connection with widening of Bikaner Phalodi Highway in the State of Rajasthan (Pkg.- BPHP/WUS-III-PHLD)

IRCON/1034/PBTL/NH-15/

BPHP/Pkg WUS-III-

PHLD/53/693 Dated

18.12.2015

M/s Maheshwari Construction Pvt. Ltd.,

Bikaner Road,Nokha–334 803

(Rajasthan)

`2,30,70,354/- 5.00% above

`2,42,23,872/- Three months from the date of issue of

LOA

9 IRCON/1035/DMRCCT-1-A/

TENDER/Reinf. Steel/

Lot-4 Dated

12.12.2015

17.12.2015 Manufacture & Supply of 10 & 12 mm diameter reinforcement steel (TMT, Fe 500) for Contract CT-1A of DMRC along the alignment of CT-1A contract (Lajpat Nagar to Mukundpur) or at IRCON's Store at ESI Hospital near Panjabi Bagh, Delhi Lot-4

IRCON/1035/DMRC CT-1-A/ TENDER/Reinf. Steel/Lot-4/231

Dated 18.12.2015

M/s JSW Steel Ltd.3rd floor, Thappar

House, 124, Janpath Lane

New Delhi - 110 001

Misc. Item Quantity

Item Rate ` 89,99,025/- -

Contd.../-

Page 22: Annexure: B DETAILS OF CONTRACTS PLACED BY LIMITED … 2015 - March 2016/2_AnnexB_Apr15_Mar16.pdfM/S Endeavour Instrument Pvt. Ltd, 45/3, Changodar Industrial Estate, Ahmedabad PIN

Works Awarded DECEMBER 2015

S. N.

Tender No. Date of opening

Description of Item/ Work LOA No. and date

Contractor’s Name and address

Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/ Tendered Cost (For

Engg./ Elect./S&T/Mech. Etc Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

10 IRCON/3017/SGTL/Bamaur

Camp/Plant Foudation /

314Dated

03.12.2015

17.12.2015 Construction of Foundation for HMP,WMM & Concrete batching Plant at Bamaur camp on Km.276 ( NH-3) for Ircon SGTL (Agreement No.ISGTL/CO/SG/IRCON/CORRES/02 dtd.02.09.2015) In connection with”4-Laning of Shivpuri-Guna section of NH-3 from Km.236 to Km.332.100 in the state of Madhya Pradesh”( Stage-I)

IRCON/3017/ SGTL/Bamaur

Camp/Plant Foundation/31

4 Dated19.12.2015

M/s. Raj Associates37A/10B, Mulla

Compound,Near Blood Bank,

Allahabad (UP) - 211 002

` 35,66,000 At Par Cost put to Tender

for Part-A 28,59,468/- & 10 % above cost put to tender for

Part-B 6,43,500/-

` 35,67,318/- 60 days for part-A and 90 days for part-B

11 IRCON/ Tender/

JBNRL/2051/15/04 Dated

04.11.15

20.11.2015 Construction of Staff Quarters and other associated ancillary works in Indian Custom Yard

IRCON/2051/JBNRL/ Staff Quarters/

ICY/LOA/ 1288 Dated 22.12.15

M/s Sunrise Construction,

Ramganj,Islampur (WB)

` 172.94 Lacs Percentage Above on BOQ rates

` 183.33 Lacs

06 (Six) months

12 IRCON/ Tender/

JBNRL/2051/15/05Dated

04.11.15

20.11.2015 Construction of Station Building and other associated ancillary works at Indian Custom Yard

IRCON/2051/JBNRL/ Station

Building/ ICY/LOA/ 1289 Dated 22.12.15

M/s Bagmati Construction

Company, Subhash Chowk, Forbesganj

(Bihar)

` 176.61 Lacs Percentage Above on BOQ rates

` 187.23 Lacs

6 (Six) months

Contd.../-

Page 23: Annexure: B DETAILS OF CONTRACTS PLACED BY LIMITED … 2015 - March 2016/2_AnnexB_Apr15_Mar16.pdfM/S Endeavour Instrument Pvt. Ltd, 45/3, Changodar Industrial Estate, Ahmedabad PIN

Works Awarded DECEMBER 2015

S. N.

Tender No. Date of opening

Description of Item/ Work LOA No. and date

Contractor’s Name and address

Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/ Tendered Cost (For

Engg./ Elect./S&T/Mech. Etc Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

13 IRCON/3017/SGTL/Tender/Electrical utility

shifting/Badarwas-I /

311 Dated

01.12.2015

22.12.2015 Shifting of Electrical Utility between Shivpuri to Guna for Ircon SGTL (Agreement No. ISGTL/CO/SG/ IRCON/CORRES/02 Dated 02.09.2015) in connection with "4-Laning of Shivpuri-Guna section of NH-3 from Km.236 to Km.332.100 in the state of Madhya Pradesh (Stage-I) – Badarwas-I Distribution Centre

IRCON/3017/SGTL/Tender/Electrical Utility

Shifting/Badarwas-I/311

Dated22.12.2015

M/s. Bhupendra Sharma,

34,Near New Bus Stand,

Vidisha, MP

` 38761842/- 7.10% Above cost put to

tender` 34889325/-

` 37366467/- 90 days

14 IRCON/3017/SGTL/Tender/Electrical utility

shifting/Badarwas-II /

312 Dated

01.12.2015

22.12.2015 Shifting of Electrical Utility between Shivpuri to Guna for Ircon SGTL( Agreement No. ISGTL/CO/SG/IRCON/CORRES/02 dtd. 02.09.2015) in connection with "4-Laning of Shivpuri-Guna section of NH-3 from km.236 to Km.332.100 in the state of Madhya Pradesh (Stage-I) – Badarwas -II Distribution Centre

IRCON/3017/SGTL/Tender/Electrical Utility

Shifting/Badarwas-

II/312Dated

22.12.2015

M/s. Bhupendra Sharma

34, Near New Bus Stand,Vidisha, MP

` 25647522/- 7.0% Above cost put to

tender` 22892011/-

` 24494452/- 90 days

15 IRCON/ Tender/

JBNRL/2051/15/06 Dated

04.11.15

21.11.15 Construction of 3 Bay Platform Passenger Shelter's at Platform No. 2 of Bathnaha Railway Station

IRCON/2051/JBNRL/ PP

Shelter/63/ LOA / 1290 Dated

23.12.2015

M/s Ishani Constructions,

Ward No.3,Sultan Pokhar,

Forbesganj (Bihar)

` 29.81 Lacs Percentage Above on BOQ rates

` 34.66 Lacs 04 (Four) months

Contd.../-

Page 24: Annexure: B DETAILS OF CONTRACTS PLACED BY LIMITED … 2015 - March 2016/2_AnnexB_Apr15_Mar16.pdfM/S Endeavour Instrument Pvt. Ltd, 45/3, Changodar Industrial Estate, Ahmedabad PIN

Works Awarded DECEMBER 2015

S. N.

Tender No. Date of opening

Description of Item/ Work LOA No. and date

Contractor’s Name and address

Quantity (for supply contract)/ Estimated Cost (For

Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/ Tendered Cost (For

Engg./ Elect./S&T/Mech. Etc Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

16 IRCON/2034/ROB-Bihar/e-Tender/2015/36 Dated

24.11.2015

07.12.2015 Fabrication, assembly, erection and painting of Foot Over Bridge (FOB) over Electrified Railway running track in connection to Construction of ROB in lieu of LC-46 at Jamui in the state of Bihar

IRCON/2034/ROB-BIHAR/

E-Tender/2015/36/LOA/

91/2088Dated

23.12.2015

M/s Maa Durga Constech Pvt. Ltd.,

A-401, Block-A, Omshailbaran

Apartment, Brahmasthan Road, Sheikhpura,

Raza Bazar,Patna - 800 014

` 74.42 Lacs 13% above ` 84.10 Lacs 4 months (including monsoon period)

from the date of issue of

LOA

17 IRCON/3017/SGTL/

Tender /Bamaur Camp/

Accomodation (Pre-fab)/310 Dated

26.11.2015

07.12.2015 Construction of Pre-fab accommodation at Km.276 for Ircon SGTL (Agreement No. ISGTL/CO/SG/IRCON/CORRES/02 Dated 02.09.2015) in connection with ”4-Laning of Shivpuri - Guna section of NH-3 from Km.236 to Km.332.100 in the state of Madhya Pradesh” ( Stage-I)

IRCON/3017/SGTL/Tender /Bamaur

Camp/Qtrs(Pre-fab) /310/63

Dated 25.12.2016

M/s Indian Constructions Plot No.- 39,Rail Vihar,Sector-33,

NOIDA,G.B Nagar,

Uttar Pradesh.

`8846372.00 1.60% below Cost put to

Tender `7961735/-

`7834347.24 45 days

18 IRCON/1034/PBTL/NH-15/MECH/HMP/SPARES/157 dated:24/11/2015

02.12.2015 Supply of Spares for Hot Mix Plant Model ANP 1500 and ANP 2000

IRCON/1034/PBTL/NH-

15/MECH/HMP/SPARES/157

Dated28.12.2015

M/s Amman Apollo India Pvt Ltd, Plot No.

2, At'Ditasan, Post Jagudan, State

Highway, Mehsana Gujrat-382710

Item Rate:` 78,84,976/-

`78,84,976/- `73,63,978/- 15 Days from date of LOI

Contd.../-

Page 25: Annexure: B DETAILS OF CONTRACTS PLACED BY LIMITED … 2015 - March 2016/2_AnnexB_Apr15_Mar16.pdfM/S Endeavour Instrument Pvt. Ltd, 45/3, Changodar Industrial Estate, Ahmedabad PIN

Works Awarded DECEMBER 2015

S. N.

Tender No. Date of opening

Description of Item/ Work LOA No. and date

Contractor’s Name and address

Quantity (for supply contract)/ Estimated Cost (For

Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/ Tendered Cost (For

Engg./ Elect./S&T/Mech. Etc

Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

19 IRCON/3017/SGTL/MECH/ERECTI

ON OF CRUSHER/NIT/2101

Dated 28.11.2015

21.12.2015 Erection of for METSO make 200 TPH,Three stage, crushing plant at Ircon’s Camp near KM.276+000 NH-3 near Bamaur village in Shivpuri-Guna Highway Project.

IRCON/3017/SGTL/MECH/ERECTION

OF CRUSHER/NIT/2101 Dated

29.12.2015

Shree,Balaji Borewells, A1,Panchwati,Airport

road,Bhopal

13,11,025.00 Item rate 13,50,000.00 45 Days from issue

of LOA

20 IRCON/2049/ROB-II-BIHAR/

e-Tender/2015/39 Dated

09.12.2015

24.12.2015 Construction of Brick wall for pier protection and other miscellaneous work as directed by Engineer-in charge in connection to construction of ROB in lieu of LC No.47 B at Begusarai, Bihar

IRCON/2049/ ROB-II-Bihar/ e-

Tender/ 2015/39

/LOA/92/2132 Dated

29.12.2015

M/s.Gita Prasad Sharma, New Aitwarpur,

Sipara,Patna

` 86.00 Lacs 12% above ` 96.33 Lacs 6 months (including monsoon period)

from the date of issue of

LOA

21 IRCON/1034/PBTL/NH-

15/BPHP/Pkg.WUS-1-

BKNR/59

Dated:

10.12.2015

23.12.2015 Providing and relocation of existing PHED water pipe line between Km 4.200 to Km 95.000 along project highway on NH-15 in connection with Widening of Bikaner Phalodi Highway in the State of Rajasthan (Pkg.- BPHP/WUS-I-BKNR)

IRCON/1034/PBTL/NH-15/ BPHP/Pkg.

WUS-1-BKNR/59/724

Dated31.12.2015

M/s Shri Ganpati Tubewell Co.

Near Bus stand,Shahpur – 303 103

Rajasthan

`2,63,20,851/- 3.00% below

`2,55,31,225.47 Three months from the date of issue of

LOA

Contd.../-

Page 26: Annexure: B DETAILS OF CONTRACTS PLACED BY LIMITED … 2015 - March 2016/2_AnnexB_Apr15_Mar16.pdfM/S Endeavour Instrument Pvt. Ltd, 45/3, Changodar Industrial Estate, Ahmedabad PIN

Works Awarded JANUARY 2016

S. N.

Tender No. Date of opening

Description of Item/ Work LOA No. and date

Contractor’s Name and address

Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/ Tendered Cost (For

Engg./ Elect./S&T/Mech. Etc Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

1 IRCON/3017/SGTL/Tender

/Electrical utility shifting/

KolarasRural-I/315

Dated 04.12.2015

26.12.2015 Shifting of Electrical Utility between Shivpuri to Guna for Ircon SGTL (Agreement No. ISGTL/CO/SG/IRCON/ CORRES/02 Dated 02.09.2015) in connection with "4-Laning of Shivpuri - Guna section of NH-3 from Km.236 to Km.332.100 in the state of Madhya Pradesh (Stage-I) - Kolaras Rural - I Distribution Centre

IRCON/3017/SGTL/Tender/Electrical Utility Shifting Kolaras

Rural-I/315 Dated

01.01.2016

M/s Bhupendra Sharma 34, Near New Bus Stand,

Vidisha, MP

`23121215/- 5.5 % Above cost put to

tender `.20809093/-

`21953593/- 90 days

2 IRCON/3017/SGTL/Tender

/Electrical utility shifting/

Kolaras Rural-II/316

Dated 05.12.2015

26.12.2015 Shifting of Electrical Utility between Shivpuri to Guna for Ircon SGTL (Agreement No. ISGTL/CO/SG/IRCON/ CORRES/02 Dated 02.09.2015) in connection with "4-Laning of Shivpuri - Guna section of NH-3 from Km.236 to Km.332.100 in the state of Madhya Pradesh (Stage-I) - Kolaras Rural - II Distribution Centre

IRCON/3017/SGTL/Tender/Electrical Utility Shifting Kolaras

Rural-II/316 Dated

01.01.2016

M/s Bhupendra Sharma 34, Near New Bus Stand,

Vidisha, MP

`31459050/- 5.4% Above cost put to

tender `28313146/-

`29842056/- 90 days

3 IRCON/3017/SGTL/Tender

/Electrical utility shifting/

Kolaras Town/317

Dated 05.12.2015

26.12.2015 Shifting of Electrical Utility between Shivpuri to Guna for Ircon SGTL (Agreement No. ISGTL/CO/SG/IRCON/ CORRES/02 Dated 02.09.2015) in connection with "4-Laning of Shivpuri - Guna section of NH-3 from Km.236 to Km.332.100 in the state of Madhya Pradesh (Stage-I) - Kolaras Town Distribution Centre

IRCON/3017/SGTL/Tender/Electrical Utility Shifting Kolaras

Town/317 Dated

01.01.2016

M/s Bhupendra Sharma 34, Near New Bus Stand,

Vidisha, MP

`27696547/- 5.5% Above cost put to

tender `24967217/-

`26340414/- 90 days

Contd.../-

Page 27: Annexure: B DETAILS OF CONTRACTS PLACED BY LIMITED … 2015 - March 2016/2_AnnexB_Apr15_Mar16.pdfM/S Endeavour Instrument Pvt. Ltd, 45/3, Changodar Industrial Estate, Ahmedabad PIN

Works Awarded JANUARY 2016

S. N.

Tender No. Date of opening

Description of Item/ Work LOA No. and date

Contractor’s Name and address

Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/ Tendered Cost (For

Engg./ Elect./S&T/Mech. Etc

Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

4 IRCON/3017/SGTL/Tender

/Electrical utility shifting/Guna-I/318

Dated 09.12.2015

04.01.2016 Shifting of Electrical Utility between Shivpuri to Guna for Ircon SGTL (Agreement No. ISGTL/CO/SG/IRCON/ CORRES/02 Dated 02.09.2015) in connection with "4-Laning of Shivpuri - Guna section of NH-3 from Km.236 to Km.332.100 in the state of Madhya Pradesh (Stage-I) - Guna - I Distribution Centre

IRCON/3017/SGTL/Tender/Electrical Utility Shifting/Guna-

I/318Dated

04.01.2016

M/s. Tejswani Infrastructure

1244, Sector-8,Avas Vikas Colony,

Sikandra,Agra

`37798383/- 4.75 % Above cost put to

tender` 34021211/-

` 35637219/- 90 days

5 IRCON/3017/SGTL/Tender

/Electrical utility shifting/Guna-II/319

Dated 09.12.2015

04.01.2016 Shifting of Electrical Utility between Shivpuri to Guna for Ircon SGTL (Agreement No. ISGTL/CO/SG/IRCON/ CORRES/02 Dated 02.09.2015) in connection with "4-Laning of Shivpuri - Guna section of NH-3 from Km.236 to Km.332.100 in the state of Madhya Pradesh (Stage-I) - Guna - II Distribution Centre

IRCON/3017/SGTL/Tender/Electrical Utility Shifting/Guna-

II/319Dated

04.01.2016

M/s Bhupendra Sharma 34, Near New Bus Stand,

Vidisha, MP

`17709941/- 4.33 % Above cost put to

tender` 15942010/-

` 16632299/- 90 days

6 IRCON/1035/DMRC CT-1-A /TENDER/EG

Dated 16.12.2015

29.12.2015 Supply, Transportation & Delivery of High Strength, Free Flowing, Non-Shrink, Epoxy Grout Material for the Epoxy Grout Material for the Grouting of Ballastless Track Turnouts for CT-1-A Contract of DMRC at IRCON's store at Delhi.

IRCON/1035/DMRC CT-1-A/

TENDER/EG/275Dated

07.01.2016

M/s Fosroc Chemical ( India ) Pvt. Ltd.D-166, Sector-10,

Distt.-Gautam Budhdha Nagar

Noida - 201 301(UP)

31000 Kg Basic Rate:-` 70.80 Per Kg; Excise Duty @ 12.50%;VAT/C

ST @ 2% & Transportation : ` 4.74 Per Kg

` 26,65,566/- 06-04-2016 (Four

Months from date of issue of LOA)

Contd.../-

Page 28: Annexure: B DETAILS OF CONTRACTS PLACED BY LIMITED … 2015 - March 2016/2_AnnexB_Apr15_Mar16.pdfM/S Endeavour Instrument Pvt. Ltd, 45/3, Changodar Industrial Estate, Ahmedabad PIN

Works Awarded JANUARY 2016

S. N.

Tender No. Date of opening

Description of Item/ Work LOA No. and date

Contractor’s Name and address

Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/ Tendered Cost (For

Engg./ Elect./S&T/Mech.

Etc Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

7 IRCON/1034/PBTL/Tender/

Lab Establishment

/57 dated 11.12.2015

29.12.2015 Supply, Installation and Commissioning of Laboratory Equipment’s at IRCON’s Site Camp near Km.127+000 in connection with widening & strengthening of the existing Bikaner-Phalodi Section to 4-Lane from Km.4.200 to Km.55.250 and 2-Lane with paved shoulder from Km.55.250 to Km.163.500 of NH-15 in the State of Rajasthan

IRCON/1034/PBTL/BPHP/LAB

EQUIP/752 Dated

12.01.2016

M/s Accro-Tech Scientific Industries, 1, DLF, Industrial Area,

Moti Nagar, New Delhi - 110 015

`6,71,641/- Item Rate of

Individual Items

` 5.86,359/- 37 (Thirty-Seven)

Days from the date of

issue of LOA

8 IRCON/2034/ROB-Bihar/e-Tender/2015/40 Dated

10.12.15

24.12.2015 Fabrication, assembly , erection and painting of Foot Over Bridge (FOB) over Electrified Railway running track in connection to Construction of ROB in lieu of LC-72 between Gulzarbagh - Patna Saheb Station of Danapur Division of East Central Railway in state of Bihar

IRCON/2034/ROB-BIHAR/

E-Tender/2015/40/LOA/

06/74Dated

15.01.2016

M/s Maa Durga Constech Pvt. Ltd.,

A-401, Block-A, Omshailbaran

Apartment,Brahmasthan Road, Sheikhpura, Raza

Bazar, Patna - 800 014

` 69.43 Lacs 12% above

` 77.77 Lacs 4 months (including monsoon

period) from the date of

issue of LOA

9 IRCON/1034/BPHP/TN/LT-61/Boulder-2

Dated 26.12.2015

06.01.2016 Supply of Hard Stone Boulder suitable for Asphalt work as per MORTH Specification (As after Crushing, the aggregates to be used for DBM and BC) and including Loading, Transporting and Unloading at IRCON’s Crusher at Camp No.2 Km.127 in connection with Widening and Strengthening of existing Bikaner-Phalodi Section to four lane from Km.4.200 to Km.55.250 and two lane with paved shoulder from Km.55.250 to Km.163.500 of NH-15 in the State of Rajasthan

IRCON/1034/BPHP/TN-

LT61/Boulder-2/755Dated:

16.01.2016

M/s Heera Ram Godara, Plot No.94,

Sector No.4, Aadarsh Nagar, Phalodi, Distt:

Jodhpur (Raj.)

1,00,000 MT

` 299/- per MT

`2,99,00,000/-

04 (Four) months from the date of

issue LOA

Contd.../-

Page 29: Annexure: B DETAILS OF CONTRACTS PLACED BY LIMITED … 2015 - March 2016/2_AnnexB_Apr15_Mar16.pdfM/S Endeavour Instrument Pvt. Ltd, 45/3, Changodar Industrial Estate, Ahmedabad PIN

Works Awarded JANUARY 2016

S. N.

Tender No.

Date of opening

Description of Item/ Work LOA No. and date

Contractor’s Name and address

Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/ Tendered Cost (For

Engg./ Elect./S&T/Mech. Etc

Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

10 IRCON/1034/BPHP/TN

/LT-60/Crusher/

Dated 26.12.2015

06.01.2016 Operation of 200 TPH, 3 Stage, Crushing & Screening Plant installed by IRCON at Camp No.2 Km.127.000 on NH-15 for crushing of boulders to produce different size of aggregates as per IRCON’s requirement and as directed by Engineer from time to time

IRCON/1034/BPHP/TN-

LT60/Op.Crusher/757 Dated

19.01.2016

M/s Kailash Chandra Dilip Kumar Construction Pvt. Ltd., 1313/14, 13th Floor, Real Teach Park, Sector-

30A, Near Inorbit Mall, Vashi,

Navi Mumbai - 400 703

450000 MT `133.68 per MT

`6,01,56,000/- 12 (Twelve) months from the date of LOA

11 IRCON/1034/BPHP/LT-

65/Misc. Work Dated 30.12.2015

14.01.2016 Materials Testing Work at IRCON’s Laboratory & Operation of Weigh Bridge and Survey Works in between Km.40+000 to Km.163+500 (Section-II & III) in connection with widening and strengthening of existing Bikaner Phalodi section

IRCON/1034/BPHP/LT-65/Misc.

Work/764 (B)Dated

20.01.2016

M/s S.S. Construction,J.P. Colony, Kaledi (NH-8), Shahpura, Jaipur - 303 103

(Rajasthan)

`32,67,720/- AT PAR `32,67,720/- 12 (Twelve) months from the date of issue of

LOA

12 NIT - 65 14.01.2016 Materials Testing Work at IRCON’s Laboratory & Operation of Weigh Bridge at Camp No.1 (Km.45+600) and Survey Work in between Km.4+200 to Km.40+000 (Section-I) in connection with widening and strengthening of existing Bikaner Phalodi section

IRCON/1034/BPHP/LT-65/Misc.

Work/764 (A)Dated

20.01.2016

M/s M.S. Services Pvt. Ltd.SCO-I Himuda Commercial Complex, Sai Road, Baddi,

Distt. - Solan -173 212 (H.P.) e-mail:

[email protected]

`19,03,344/- AT PAR `19,03,344/- 12 (Twelve) months from the date of LOA

13 IRCON/1035/DMRC CT-1-A

/TENDER/ Reinf.

Steel/Lot-5 Dated

15.01.2016

20.01.2016 Manufacture & Supply of 10 mm diameter reinforcement steel (TMT, Fe 500) for Contract CT-1A of DMRC along the alignment of CT-1A contract (Lajpat Nagar to Mukundpur) or at IRCON's Store at Delhi-Lot-5

IRCON/1035/DMRC CT-1-A/

TENDER/Reinf. Steel/Lot-

5/297 Dated 20.01.2016

M/s TATA steel Limited, Jeevan Bharti

BuildingTower-1,7th Floor,

124, Connaught Circus, New Delhi - 110 001

300 MT (i) Basic Cost: ` 30500/- Per

MT+ (ii) Transportatio

n` 300 Per MT+VAT

@5% on(i)

` 96,97,500/- -

Contd.../-

Page 30: Annexure: B DETAILS OF CONTRACTS PLACED BY LIMITED … 2015 - March 2016/2_AnnexB_Apr15_Mar16.pdfM/S Endeavour Instrument Pvt. Ltd, 45/3, Changodar Industrial Estate, Ahmedabad PIN

Works Awarded JANUARY 2016

S. N.

Tender No. Date of opening

Description of Item/ Work LOA No. and date

Contractor’s Name and address

Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/

Tendered Cost (For Engg./

Elect./S&T/Mech. Etc Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

14 IRCON/2049/ROB-II-

BIHAR/LC-45AB/e-

Tender/2015/42Dated 29.12.2015

14.01.2016 Construction of Granular Sub Base (GSBC), Wet Mix Macadam (WMM), Dense Bituminous Macadam (DBM) and Bituminous Concrete (BC) at approaches & Mastic Asphalt, BC over Deck Slabs in lieu of LC- 45 AB at Km 324/13-14 between Chapra Kachehari - Goldenganj Stations in Varanasi Division of North Eastern Railway,Bihar

IRCON/2049/ ROB-II-

BIHAR/LC-45AB/2016/LOA/09/161 Dated

29.01.2016

M/s Hari Construction & Associates Pvt. Ltd.,At & PO: Keshawe,

P.S.:Barauni,Distt.; Begusarai

PIN: 851 134(Bihar),

` 1,22,79,802.50 17% above

`1,43,67,369/- 2 months (including monsoon period) from the date of issue of

LOA

15 IRCON/1034/PBTL/NH-15/BPHP/Pkg. BP, CP-BKNR/LT-63, Dated: 30/12/2015

09.01.2016 Providing, Supplying & fixing of RCC Boundary Pillars, Chainage Pillars, & Delineator Cement Concrete Blocks Between Km 4.200 to Km 163.500 on NH-15 in connection with Widening and Strengthening of Bikaner Phalodi Section” (Package-BPHP/BP,CP,DP-BKNR)

IRCON/1034/NH-15/BPHP/Pkg. BP,CP-BKNR/

LT-63/ 778Dated

30.01.2016

M/s S.S. Construction, J.P.colony,

Khaledi, NH-8,Shahpura,

Jaipur (Raj)

`80,04,235/- 4.95% Above

`84,00,444.60 3 (Three) months

from date of issue of

LOA

16 IRCON/ 1034/PBTL/

NH-15/BPHP/R

oad Maint/66,

Dated: 31.12.2015

15.01.2016 Maintenance of Existing Road Pavement from Km.4+200 to Km. 95+000 Of Bikaner-Phalodi Section of NH-15 in the State of Rajasthan” (PACKAGE:I)

IRCON/1034/PBTL/NH-

15/BPHP/Road Maint/66/781

Dated 31.01.2016

M/s Manohar Construction Company,

Office; V.P.O. Phoolsar,

Tehsil:Kolayat,Distt: Bikaner

Rajasthan

`32,61,958/- 12.00% Above

`36,53,392.96 6 months from date of issue of

LOA

Contd.../-

Page 31: Annexure: B DETAILS OF CONTRACTS PLACED BY LIMITED … 2015 - March 2016/2_AnnexB_Apr15_Mar16.pdfM/S Endeavour Instrument Pvt. Ltd, 45/3, Changodar Industrial Estate, Ahmedabad PIN

Works Awarded FEBRUARY 2016

S. N.

Tender No. Date of opening

Description of Item/ Work LOA No. and date

Contractor’s Name and address

Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/

Tendered Cost (For Engg./ Elect./S&T/Mech. Etc

Works)

Value of Contract

Scheduled completio

n date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

1 IRCON/ 1034/NH-

15/BPHP/LT-67/MISC.

CAMP WORK Dated:

31.12.2015

15.01.2016. Construction of Miscellaneous work at Camp-I Km 45+600 of Bikaner - Phalodi Section of NH-15 in the state of Rajasthan

IRCON/1034/NH-15/BPHP/ LT-67/MISC.

CAMP WORK/783

Dated 01.02.2016

M/s Mohd. Nasim Allah Bux,

Mohalla Vyaparion,C/o Taj Hotel,

Bikaner (Rajasthan)

`24,52,970/- AT PAR `24,52,970.00 2 months from date of issue of LOA

2 IRCON/ 2051/ JBNRL/

Electrical Works/06

dt..18.01.2016

03.02.2016 Execution of 11 KV, OH/HT/440V LT line replaced by underground cabling 3C x 240sqmm 11 KV XLPE HT three core aluminium armoured cable/ 4C x 120 sqmm XLPE single core aluminium armoured cable at Dakshine Maheshwari village at km. 3+075, 3+095 & 3+600 and erection of rail pole laying, testing & commissioning of underground cables

IRCON/2051/JBNRL/Electri

cal Works/ ICY/46/LOA/

Dated 09.02.2016

M/s Kumar Enterprise, Lemuabad,

Pandarak, Barh Patna (Bihar)

` 61.18 Lacs Percentage Above on BOQ rates

` 61.51 Lacs 05 (Five) months

3 IRCON/3017/SGTL/

Tender/Road

Maintenance-I/320 Dated

01.02.2016

17.02.2016 Maintenance of existing Road Pavement including shoulders,Camp at Bamaur with contractor’s own resources on NH-3 on Km.276 ( NH-3) for Ircon SGTL (Agreement No. ISGTL/CO/SG/IRCON/ CORRES/02 Dated 02.09.2015) in connection with "4-Laning of Shivpuri - Guna section of NH-3 from Km.236 to Km.332.100 in the state of Madhya Pradesh (Stage-I)

IRCON/3017/SGTL/Tender/

Road Maintenance/

320 Dated

18.2.2016

UMAKANT SINGHPost Harpur

Bochaha,Dist: Samastipur

` 48,61,043.65 10% above Cost put to Tender for

Part-A`2699843.65/- & 5 % above cost put to tender for

Part-B` 2161200/-

` 52,39,088.00 6 months from date of issue of LOA

Contd.../-

Page 32: Annexure: B DETAILS OF CONTRACTS PLACED BY LIMITED … 2015 - March 2016/2_AnnexB_Apr15_Mar16.pdfM/S Endeavour Instrument Pvt. Ltd, 45/3, Changodar Industrial Estate, Ahmedabad PIN

Works Awarded MARCH 2016

S. N.

Tender No. Date of opening

Description of Item/ Work LOA No. and date

Contractor’s Name and address

Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/ Tendered Cost (For

Engg./ Elect./S&T/Mech. Etc Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

1 IRCON/CO/BPRP &

SGHP/Bitumin,Emulsion &

HSD Dated

04.12.2015

22.12.2015 Supply of Bitumin ( VG-40),Emulsion ( SS-1 & RS-1) and High Speed Diesel ( HSD) for widining and strengthning of the existing Bikaner-Pholodi section from Km 4.200 to km.163.500 of NH-15 in Rajasthan And Four Laning of Shivpuri-Guna section of NH-3 from Km.236.000 to Km.332.100 in the state of Madhya Pradesh

IRCON/CO/BPRP &

SGHP/BITUMIN,EMULSIO

N &HSD Dated

07.03.2016

M/s. Hindustan Petroleum

Corporation Limited,

Tel Bhavan, Sahakar Marg,

Jyoti Nagar,Jaipur - 302 005

RS-1 720MTRS-1 360 MTRS-1 384 MTHSD 3441 KL

25868.811/MT

25868.811/MT

25868.811/MT

47822.34/KL

20,24,28,630.70

30 months from date of issue of

LOA (04.09.18)

2 IRCON/CO/BPRP &

SGHP/Bitumin,Emulsion & HSD

Dated 04.12.2015

22.12.2015 Supply of Bitumin ( VG-40),Emulsion ( SS-1 & RS-1) and High Speed Diesel ( HSD) for widining and strengthning of the existing Bikaner-Pholodi section from Km 4.200 to km.163.500 of NH-15 in Rajasthan And Four Laning of Shivpuri-Guna section of NH-3 from Km.236.000 to Km.332.100 in the state of Madhya Pradesh

IRCON/CO/BPRP &

SGHP/BITUMIN,EMULSION &HSD/383

Dated 07.03.2016

M/s. Indian Oil Corporation

Limited,Jodhpur Divisional

Office,Jodhpur - 342 008

SS-1 2079 MTVG-40 27770

MTHSD 3100 KLHSD 4500 KLVG-40 10301

MT

24306.00/MT27875.00/MT39246.51/KL39212.65/KL27608.36/MT

140,71,58,161.00

30 months from date of issue of

LOA (04.09.18)

3 IRCON/1034/BPHP/TN/LT-

68/Utility Barrack Camp

No.2 Dated

01.02.2016

12.02.2016 Construction of Utility Barrack at IRCON Camp-2 Km 127+000

IRCON/1034/IPBTL//Utility Barrack

Camp No.2/68/836

Dated08.03.2016

M/s S.S. Construction,

J.P. Colony, Kaledi,NH p 8, Shahpura,

Jaipur (Raj.)

`6,90,818.58 2.95% above

`7,11,197.73 02-months from the date of issue of

LOA

Contd.../-

Page 33: Annexure: B DETAILS OF CONTRACTS PLACED BY LIMITED … 2015 - March 2016/2_AnnexB_Apr15_Mar16.pdfM/S Endeavour Instrument Pvt. Ltd, 45/3, Changodar Industrial Estate, Ahmedabad PIN

Works Awarded MARCH 2016

S. N.

Tender No. Date of opening

Description of Item/ Work LOA No. and date

Contractor’s Name and address

Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/ Tendered Cost (For

Engg./ Elect./S&T/Mech. Etc Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

4 IRCON/2049/ROB –

Bihar-II/e-Tender/2016/07 Dated 27-02-2016

11.03.2016 Additional Measures For ROB Danapur with Carbon Fiber Laminates and Carbon Fiber Strip

IRCON/2049/ROB-II-

BIHAR/LC-35B/LOA/19/4

08, Dated14.03.16

M/s. Sanrachna Structural Strengthening

Pvt. Ltd.,Monalisa CHS,

103-104, First Floor, Hariniwas Circle,

Thane(W) - 400 602

`.70.04 Lacs Item Rate of Individual

Items

`.69,27,025.00 1(One) Month

from the date of Issue of

LOA

5 IRCON/3017/SGTL/MECH/CRUSHER/Convyor accessories/NIT/2104 Dated 16.02.16

02.03.2016 Supply of conveyor accessories and other parts for METSO make 200 TPH, Three stage, crushing plant at Ircon’s Camp at SGHP( Bamaur village )

IRCON/3017/SGTL/MECH/

Convyor accessories/21

04 Dated 16.03.2016

A to Z Infra spares (Pvt) Ltd.

Behind Bank of Baroda,Jhansi

16,14,620.22 Item rate 14,82,401.70 15 Days from

issue of LOA

6 IRCON/3017/SGTL/MECH/

Convyor Belts/NIT/2103

Dated 16.02.16

26.02.2016 Supply of conveyor belts for METSO make 200 TPH,Three stage,METSO make crushing plant at Ircon’s Camp near KM.276+000 NH-3 near Bamaur village in Shivpuri-Guna Highway Project.

IRCON/3017/SGTL/MECH/Co

nvyor Belts/2103

Dated 17.03.2016

A to Z Infra spares (Pvt) Ltd.

Behind Bank of Baroda,Jhansi

8,50,068 Item rate 7,95,294.000 15 Days from

issue of LOA

7 IRCON/3017/SGTL/MECH/400KVA/D.G.

Set/Engine repair/NIT/210

5 Dated 18.02.2016

25.02.2016 Repair of Kirloskar Engine of 400 KVA DG set at Ircon’s Camp at SGHP( Bamaur village )

IRCON/3017/SGTL/MECH/400KVA/D.G.Set/

Engine repair/2105

Dated 18.03.2016

M/s. Varun Electromech

Gwalior

6,06,000 Item rate 5,94,360.75 04 weeks from

issue of LOA

Contd.../-

Page 34: Annexure: B DETAILS OF CONTRACTS PLACED BY LIMITED … 2015 - March 2016/2_AnnexB_Apr15_Mar16.pdfM/S Endeavour Instrument Pvt. Ltd, 45/3, Changodar Industrial Estate, Ahmedabad PIN

Works Awarded MARCH 2016

S. N.

Tender No. Date of opening

Description of Item/ Work LOA No. and date

Contractor’s Name and address

Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/ Tendered Cost (For

Engg./ Elect./S&T/Mech. Etc Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

8 IRCON/3017/SGTL/MECH/CRUSHER/Screen Mesh/NIT/2107 Dated 08.03.16

16.03.2016 Supply of Screen Mesh for METSO make 200 TPH, Three stage, crushing plant at Ircon’s Camp at SGHP( Bamaur village )

IRCON/3017/SGTL/MECH/CRUSHER/

Screen Mesh/2107

Dated 18.03.16

M/s. Steel Craft of India,

Kolkata

` 3,03,115.00 Item rate ` 3,03,147.00 02 weeks from

issue of LOA

9 IRCON/3017/SGTL/MECH/CRUSHER/Electric

al spares/NIT/2106 Dated

14.03.16

15.03.2016 Supply of Electrical spares for METSO make 200 TPH, Three stage, crushing plant at Ircon’s Camp at SGHP( Bamaur village )

IRCON/3017/SGTL/MECH/CRUSHER/El

ectrical spares/2106

Dated 19.03.16

M/s. Nanak Electric stores,Kanpur

` 7,15,278.06 Item rate ` 7,75,000.00 15 Days from

issue of LOA

10 IRCON/1034/BPHP/TN/LT-64/Construction of WMM by Operation and

running of WMM plant at Camp No.2,

transportation, laying at site

Dated14.03.162/5.03.2016

14.03.2016 Construction of Wet Mix Macadam by Operation and Running of WMM Plant at Camp No. 2 including Transportation and Laying of WMM Materials as per MORT&H specifications Laying with Paver/Grader at site site with IRCON's P&M and Aggregates, Laying between Km 80+000 to Km 163+500 of Bikaner-Phalodi Highway section of NH-15 in Rajasthan

IRCON/1034/BPHP/TN-LT-

64/P&L WMM/857

Dated 21.03.2016

M/s Rohtas Enterprises,

C-1, Sudarshan Pura, Industrial Area

Extension,Jaipur - 302 006

Mob.: 9414069912

`2,08,01,950/- Item Rate Individual

Items

`1,95,34,000/- 06-months from the date of issue of

LOA

Contd.../-

Page 35: Annexure: B DETAILS OF CONTRACTS PLACED BY LIMITED … 2015 - March 2016/2_AnnexB_Apr15_Mar16.pdfM/S Endeavour Instrument Pvt. Ltd, 45/3, Changodar Industrial Estate, Ahmedabad PIN

Works Awarded MARCH 2016

S. N.

Tender No. Date of opening

Description of Item/ Work LOA No. and date

Contractor’s Name and address

Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/ Tendered Cost (For

Engg./ Elect./S&T/Mech. Etc Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

11 IRCON/1034/BPHP/TN/

LT-62/WMM Dated

28.12.2016

12.01.2016 Providing & Laying Wet Mix Macadam Base Course between Km 105+000 to Km 163+500 as per MORTH specifications on available stretches on Bikaner Phalodi section of NH-15

IRCON/1034/BPHP/TN-LT62/P&L WMM/871

Dated29.03.2016

M/s Shri Balaji Construction

Company, 81-82, Shanti Bhawan, Madan Mohan

Vihar, Near hotel Gateway, Jodhpur

(Raj.) - 342 027

20480 Cum @ `1270.19 per

Cum/ `2,60,13,491.20

Item Rate `1270/-per

Cum

`1,30,04,800/- 3-months from the date of issue of

LOA

Providing & Laying Wet Mix Macadam Base Course between Km 105+000 to Km 163+500 as per MORTH specifications on available stretches on Bikaner Phalodi section of NH-15

IRCON/1034/BPHP/TN-LT62/P&L WMM/872

Dated29.03.2016

M/s Heera Ram Godara,

Plot No. 94,Sector-4,

Aadarsh Nagar,Phalodi,

Distt.- Jodhpur (Raj.)

Tel.: 02925-222719

Item Rate `1270/-per

Cum

`1,30,04,800/- 3-months from the date of issue of

LOA