Project Profile on Mott MacDonaldAmusement Park iNDEXTB
TR-03 1
Sector Tourism
Sub - sector Adventure
Profile No. TR - 03
Project Title Amusement Park at Saputara, Junagadh, Bhavnagar, Porbander,
Valsad, Navsari, Rajkot, Jamnagar, Champaner (Pavagadh), Bharuch/Ankleshwar
Project Description
Amusement Parks generally refer to theme-based
parks like Essel World, Water parks and Disney Land.
New creative thoughts could be studied and
implemented like Scary parks, etc. Currently, a wide
range of amusement parks are available in Gujarat out
of which only water parks have become popular. More
different theme based parks need to be set up in the
coming years. The features of an Amusement Park in
general are Roller Coaster, Great Poseidon, Flame
ride, Giant wheel, Fun house, Horror house, Maze,
Niagara, Paratrooper, Air fighter, Striking cars,
Jumping Seat, Vintage cars, etc.
Market and Growth Drivers
Market
The target market for the amusement park is the domestic and foreign Tourist. The major subsections
are foreigners, NRG/NRI, upper class domestic tourists and week end tourists from the city. Due to
large number of local /weekend tourist, this demand is generally found to be high during weekends,
festivals and public holidays.
Table: Tourist inflow into Gujarat in 2005
ConnectivityPlace
Domestic
Tourist
(lakh)
Foreign
Tourist
Nos
Placesof
Interest/
Circuits
Road Rail Air
Valsad 0.71 224
Atul, Billimora,
Dandi, Gandevi,
Nargol, Navsari,
Sarigam, Teethal,
Excellent Excellent Inadequate
SaputaraNavsari
Porbandar
Champaner
-
8/2/2019 Amusement-park New 03
2/6
Project Profile on Mott MacDonaldAmusement Park iNDEXTB
TR-03 2
ConnectivityPlace
Domestic
Tourist
(lakh)
Foreign
Tourist
Nos
Placesof
Interest/
Circuits
Road Rail Air
Ubharat, Udvada,
Umbergaon,
Valsad, Vapi
Rajkot 3.98 2694
Ghela Somnath,
Gondal, Morbi,
Jetpur, Rajkot,
Tankara, Virpur,
Wankera
Excellent Excellent Good
Saputara 1.38 78 Ahwa, Saputara Excellent Inadequate Inadequate
Bhavnagar 2.06 4174
Alang, Bhavnagar,
Gadhada, Gopnath
Mahadev, Mahuva,
Palitana, Rajpar,
Sanosar,
Savarkundala,
Shatrunjaya, Shihor,
Velavadar,
Vallabhipur.
Excellent Excellent Good
Jamnagar 1.01 7731
Beyt Dwarka, Bedi,
Dwarka, Harshad
Mata, Jamnagar,
Sikka
Excellent Excellent Inadequate
Porbandar 1.24 2011
Chorwad, Girnar.
Keshod, Mangrol,
Porbandar,
Prabhas, Satadhar,
Sasangir, Somnath,
Tulsi Shyam,
Veraval.
Excellent Excellent Inadequate
Navsari Na Na
Atul, Billimora,
Dandi, Gandevi,
Nargol, Navsari,
Sarigam, Teethal,
Ubharat, Udvada,
Excellent Excellent Inadequate
-
8/2/2019 Amusement-park New 03
3/6
Project Profile on Mott MacDonaldAmusement Park iNDEXTB
TR-03 3
ConnectivityPlace
Domestic
Tourist
(lakh)
Foreign
Tourist
Nos
Placesof
Interest/
Circuits
Road Rail Air
Umbergaon,
Valsad, Vapi
Bharuch/Ankleshwar 2.67 322
Ankleshwar,
Bharuch, Dahej,
Garadeshwar,
Jambusar,
Kabirvad, Kavi,
Malsamot,
Navagam, Rajpipla,
Shuklatrith.
Excellent Excellent Inadequate
Champaner(Pavagadh) 21.36* 198
Champaner, Dahod,
Devgadh baria,
Godhra, Halol,
Kalol, Limkheda,
Pavagadh.
Excellent Excellent Excellent
Junagadh 30.57* 2680
Chorwad, Girnar.
Keshod, Mangrol,
Porbandar,
Prabhas, Satadhar,
Sasangir, Somnath,
Tulsi Shyam,
Veraval.
Excellent Excellent Good
* includes day time tourist of religious places, Source: GITCO
Growth Drivers
Increase in number of foreigners visiting India due to the Brand India which offers everything
that a foreigner wants viz Heritage, Adventure, Culture, Wild Life, Pilgrimage, etc. As per
World Travel and Tourism Council (WTTC), the number of foreign tourists visiting India has
grown from 3.46 million in 2004 to 3.92 million in 2005.
Government of India (GOI) estimates the global population of Non Resident Indians (NRIs) at
around 20-25 million. This sector of population regularly visits India. A major chunk of this
population is the NRI of Gujarati origin popularly known as NRG. Off late there is a
substantial increase in NRIs/NRGs visiting India. The main reason being the strong bonding
to the native land and culture.
-
8/2/2019 Amusement-park New 03
4/6
Project Profile on Mott MacDonaldAmusement Park iNDEXTB
TR-03 4
According to the Department of Tourism (DOT - GOI), there are more then 7.2 Million Indians
traveling abroad every year. There is a substantial increase in these numbers every year and
is estimated to be growing at more than 15 %.
According to DOT GOI, the total population of Domestic Tourism in the year 2004 was 367
million. There was an increase of 19 % over the previous year. It is expected that domestic
tourism will grow robustly in the future owing to the rising income levels and economic growth.
The tourist growth rate in Gujarat is around 40 %.
Why Gujarat?
Suggested Capacity & Project Cost
The projected amusement park at multi locations can support crowd capacity of around 4,000 people /
day. The investment for this size of the project would be around INR 160 million (US $ 3.6 million).
Considering 10 locations, the total investment in this sector works to around INR 1,600 million (US $
36 Million).
-
8/2/2019 Amusement-park New 03
5/6
Project Profile on Mott MacDonaldAmusement Park iNDEXTB
TR-03 5
Project Cost
ParticularsTotal, Rs.
Million
Land & Site Development 22.0
Building 25.0
Machineries / Equipments 95.0
Vehicles 2.0
Office Equipments 2.5
Furniture & Fixtures 5.0
Preliminary & Pre-Operative Exp. 0.9
Provision for Contingencies 7.6
Total Capital Cost of Project 160.0
Means of Finance
Particulars Amount (Rs. Million)
Equity 48.00
Total Long Term Borrowings 112.00
Total Means of Finance 160.00
Major Financial Indicators
The major financial indicators on 10 year working basis are:
Indicator Average for Project
Gross Profit margin 51.43%
Net Profit Margin 26.07%
ROI 46.45%
Average DSCR 3.68
IRR 32.20%
Suggested Location
The locations suggested for setting up of the Amusement Park are Saputara, Junagadh, Bhavnagar,
Porbander, Valsad, Navsari, Rajkot, Jamnagar, Champaner (Pavagadh) and Bharuch / Ankleshwar.
-
8/2/2019 Amusement-park New 03
6/6
Project Profile on Mott MacDonaldAmusement Park iNDEXTB
TR-03 6
Project Time Line
The approximate time duration required for the establishment of this type of project is around 6-8
months.
Major Infrastructure Required
Connectivity: Good Rail, Road and Air connectivity to the location is the major infrastructure
requirement for the project.
Land Availability: As the project is in the hospitality sector, Land availability at prime location is a
major factor for the success of the project. It is very difficult to predict the land cost for the project as
location and availability would be very critical components while calculating the land prices.
Built up area: The total built up area required for the project is around 25,000 Square feet. The cost
of construction is taken as Rs.1000/Sq Feet.
Utilities Requirement: The major requirements of utilities are power, water and sanitation facilities.
Clearances Required
Environment clearance from Gujarat Pollution Control Board
Water and Power supply
Registration as commercial establishment with the required state/district authority
Agencies to be contacted
Industrial Extension Bureau
Mott MacDonald India
Tourism Corporation of Gujarat Limited