Alcatel Lucnet bts offline commissioning

28
Presented by ENG: Ahmed Mohammed Nabieh Supervised by ENG : Amr Abd Elkreem Alcatel Lucent BTS Offline & Commissioning

Transcript of Alcatel Lucnet bts offline commissioning

Page 1: Alcatel Lucnet bts offline commissioning

Presented by ENG: Ahmed Mohammed NabiehSupervised by ENG : Amr Abd Elkreem

Alcatel Lucent BTSOffline & Commissioning

Page 2: Alcatel Lucnet bts offline commissioning

Introduction

Page 3: Alcatel Lucnet bts offline commissioning

The BTS commissioning & SW files are stored on the station unit module (SUMA)

The Station unit module is the core of the BTS ,it is responsible for • The O&M Functions such as Alarms reporting ,BTS Configuration,

internal Power Supply control & clock generation and distribution • Transmission functions by connecting the BTS to the BSC through the

ABIS cable.

The ABIS can carry up to 32 time slots• 0 to 30 are assigned to the TRES for normal traffic(voice and Data

services)• 31 : is assigned to the OMU in the SUMA card for signaling (Control

information) between BSC & BTS such as Alarm reporting ,BTS Master file Download, configuration files etc..

Page 4: Alcatel Lucnet bts offline commissioning

LED Color Status DescriptionOML Yellow On BTS is supervised and connected to the BSC

Blinking BTS & BSC link is being established

Off Link disconnected.

ABIS Yellow On Abis 1 is connected and can serve TCH/Signaling

Blinking There are Alarms on the ABIS

Off Not configured or not used.

O&M Yellow On SUMA master file & configuration are present in the EPROM

Blinking In a transient state, SUMA is loading the BTS MSF & Configuration file from the BSC

Off Not used.

FAULT

RED On Fatal alarm on BTS Module (ANC,TRE etc ..)

Blinking Non-fatal alarm. Such as Faulty Fan unit

Off No alarm.

SUMA card led status indication

Page 5: Alcatel Lucnet bts offline commissioning

Offline

Page 6: Alcatel Lucnet bts offline commissioning

• Switch the BTS off by pushing down its DC C/BS

Page 7: Alcatel Lucnet bts offline commissioning

• Unscrew the ABIS Cable

Page 8: Alcatel Lucnet bts offline commissioning

• Open BTS SW and Type User Name : commte Password : bts2site

Page 9: Alcatel Lucnet bts offline commissioning

• Go to Configuration Click On BTS Software Download

Page 10: Alcatel Lucnet bts offline commissioning

• Press the folder icon to start choosing the BTS Files

Page 11: Alcatel Lucnet bts offline commissioning

• Select Master File from the BTS SW folder

Page 12: Alcatel Lucnet bts offline commissioning

• Select 0CPF File from the BTS SW folder

Page 13: Alcatel Lucnet bts offline commissioning

• Wait for the BTS to download all the files ,During the SW Download the Suma LED Status will be : OML ,ABIS & O&M Flashing last file to be downloaded is the OCPF 002 file after that the O&M will be solid

Page 14: Alcatel Lucnet bts offline commissioning

Commissioning

Page 15: Alcatel Lucnet bts offline commissioning

• From Configuration choose BTS Commissioning

Page 16: Alcatel Lucnet bts offline commissioning

• Click on Start Commissioning

Page 17: Alcatel Lucnet bts offline commissioning

• Notice that the status of the commissioning changed from not running to running

Page 18: Alcatel Lucnet bts offline commissioning

• Edit Q1 address by clicking its start button

Page 19: Alcatel Lucnet bts offline commissioning

• Edit Remote Inventory by clicking its start button and press YES : if the update is already done in the Remote Inventory panelsNO : if the update is not done in the Remote Inventory panels

Page 20: Alcatel Lucnet bts offline commissioning

• Edit Sector Mapping by clicking its start buttonAssign sector-ID to each combiner and then press ok

Page 21: Alcatel Lucnet bts offline commissioning

• Edit Twin-Settings by clicking its start buttonChoose the mode of each Twin-TRE , usually in our network we leave at the default which is Dual TRE

Page 22: Alcatel Lucnet bts offline commissioning

• Hardware check by clicking its start buttonthe Suma card will start to check the HW available inside the BTS through the RI-Cable

Page 23: Alcatel Lucnet bts offline commissioning

• INIT _ALL_SECT by clicking its start button the SUMA card will power on all the combiners and TRES to check their operation

Page 24: Alcatel Lucnet bts offline commissioning

Choose End commissioning ,Stop commissioning window will appear choose ok after moving all the modules in the selected module windowWait for the BTS to restart itself SW and then connect the Abis cable.

Page 25: Alcatel Lucnet bts offline commissioning

• Finally restart the BTS HW the SUMA led status should be as following :Abis & OML are solidO&M Flashing as the BTS loading its data and RSLs from the BSC

Page 26: Alcatel Lucnet bts offline commissioning

• The loading process will take 15 to 20 Minutes ,after that the O&M Led will be solid and the SUMA will initialize the BTS sectors (Combiners & TRES)

Page 27: Alcatel Lucnet bts offline commissioning

• The BTS Terminal program will start to load the BTS Data Take snapshots and check with OMC

Page 28: Alcatel Lucnet bts offline commissioning

Thank You