ALCANTARILLADO Yanacancha

download ALCANTARILLADO  Yanacancha

of 21

description

YANA

Transcript of ALCANTARILLADO Yanacancha

  • MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE E INSTALACION DEL SERVICIO DE DESAGUE Y TRATAMIENTO DE AGUAS RESIDUALES EN LOS BARRIOS CENTRO, LOS INCAS Y C.P. ACHIPAMPA, DISTRITO DE YANACANCHA - CHUPACA - JUNIN

    MEMORIA DE CALCULO MUNICIPALIDAD DISTRITALDE YANACANCHA

    PROYECTO:

    UBICACIN: Localidad: Barrio Centro y Los incas Distrito: YANACANCHA Provincia: CHUPACA Regin: JUNIN

    CALCULO DEL CAUDAL DE DISEO

    POBLACION ACTUAL (Po) 1636.00 hab

    TASA DE CRECIMIENTO 1.06 %

    PERIODO DE DISEO (t) 20 aos

    POBLACION FUTURA

    Pf = Po * (1+r*t/100) 1982.83 hab.

    DOTACION 100.00 Lt/hab/dia

    LONGITUD TOTAL DE LA RED 14,437.69 ml

    CAUDAL DE AGUAS RESIDUALES

    Qprom = 0,80 * Pob * Dot/1000 158.62656 m3/d

    CAUDAL MAXIMO HORARIO (m3/seg)

    Qmx horario = 1.5 * 2 * Qprom 0.00477 m3/seg

    CAUDAL DE INFILTRACION

    - Nmero de buzones de la red 183 Buzones

    - Qinf. = 380 Lt/buzn x da x N buzones 0.00080 m3/seg

    CAUDAL DE DISEO 0.00558 m3/seg 5.5783 lt/seg

    CAUDAL UNITARIO 0.00000039 m3/seg 0.00039 lt/seg

    MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE E INSTALACION DEL SERVICIO DE DESAGUE Y TRATAMIENTO DE AGUAS RESIDUALES EN LOS BARRIOS CENTRO, LOS INCAS Y C.P. ACHIPAMPA, DISTRITO DE

    YANACANCHA - CHUPACA - JUNIN

  • MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE E INSTALACION DEL SERVICIO DE DESAGUE Y TRATAMIENTO DE AGUAS RESIDUALES EN LOS BARRIOS CENTRO, LOS INCAS Y C.P. ACHIPAMPA, DISTRITO DE YANACANCHA - CHUPACA - JUNIN

    MEMORIA DE CALCULO MUNICIPALIDAD DISTRITAL DE YANACANCHA

    PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE E INSTALACION DEL SERVICIO DE DESAGUE Y TRATAMIENTO DE AGUAS RESIDUALES EN LOS BARRIOS CENTRO, LOS INCAS Y C.P. ACHIPAMPA, DISTRITO DE YANACANCHA - CHUPACA - JUNIN

    UBICACIN: Localidad: Barrio Centro y Los incas Distrito: YANACANCHA Provincia: CHUPACA Regin: JUNINCALCULO DE LA RED DE ALCANTARILLADO

    DATOS GENERALES: longitud total 14,603.25 mllongitud emisor_01 402.20 ml

    Descripcionlongitud emisor final ml

    Longitud contribuyente Qunit. 14,201.05 ml (Solo colectores) Red a proyectar

    CONSIDERACIONES: Q total en la red 5.5783456 lt/s (Caudal de Diseo)Q unitario = 0.000393 lt/s/ml

    n = 0.01Vmim. = 0.3 m/s (evita sedimentacion)Vmx. = 6 m/s (evita erosion)

    OrdenDESCRIP. BUZON DESCRIPCION LONGITUD Q arriba Q marcha Q abajo COTA DE TERRENO PROFUNDIDAD COTA DE FONDO DESNIVEL (/) PENDIENTE Asumido Tirante Area Perimetro VELOCIDAD CONDICIN PENDIENTE

    ARRIBA ABAJO (AV JR) m (t/s) (t/s) (t/s) B-ARRIBA B-ABAJO B-ARRIBA B-ABAJO B-ARRIBA B-ABAJO BUZONES m/m Pulgadas mm cm cm2 cm m/s V>Vmim. V

  • MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE E INSTALACION DEL SERVICIO DE DESAGUE Y TRATAMIENTO DE AGUAS RESIDUALES EN LOS BARRIOS CENTRO, LOS INCAS Y C.P. ACHIPAMPA, DISTRITO DE YANACANCHA - CHUPACA - JUNIN

    MEMORIA DE CALCULO MUNICIPALIDAD DISTRITAL DE YANACANCHA

    PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE E INSTALACION DEL SERVICIO DE DESAGUE Y TRATAMIENTO DE AGUAS RESIDUALES EN LOS BARRIOS CENTRO, LOS INCAS Y C.P. ACHIPAMPA, DISTRITO DE YANACANCHA - CHUPACA - JUNIN

    UBICACIN: Localidad: Barrio Centro y Los incas Distrito: YANACANCHA Provincia: CHUPACA Regin: JUNINCALCULO DE LA RED DE ALCANTARILLADO

    DATOS GENERALES: longitud total 14,603.25 mllongitud emisor_01 402.20 ml

    Descripcionlongitud emisor final ml

    Longitud contribuyente Qunit. 14,201.05 ml (Solo colectores) Red a proyectar

    CONSIDERACIONES: Q total en la red 5.5783456 lt/s (Caudal de Diseo)Q unitario = 0.000393 lt/s/ml

    n = 0.01Vmim. = 0.3 m/s (evita sedimentacion)Vmx. = 6 m/s (evita erosion)

    OrdenDESCRIP. BUZON DESCRIPCION LONGITUD Q arriba Q marcha Q abajo COTA DE TERRENO PROFUNDIDAD COTA DE FONDO DESNIVEL (/) PENDIENTE Asumido Tirante Area Perimetro VELOCIDAD CONDICIN PENDIENTE

    ARRIBA ABAJO (AV JR) m (t/s) (t/s) (t/s) B-ARRIBA B-ABAJO B-ARRIBA B-ABAJO B-ARRIBA B-ABAJO BUZONES m/m Pulgadas mm cm cm2 cm m/s V>Vmim. V

  • MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE E INSTALACION DEL SERVICIO DE DESAGUE Y TRATAMIENTO DE AGUAS RESIDUALES EN LOS BARRIOS CENTRO, LOS INCAS Y C.P. ACHIPAMPA, DISTRITO DE YANACANCHA - CHUPACA - JUNIN

    MEMORIA DE CALCULO MUNICIPALIDAD DISTRITAL DE YANACANCHA

    PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE E INSTALACION DEL SERVICIO DE DESAGUE Y TRATAMIENTO DE AGUAS RESIDUALES EN LOS BARRIOS CENTRO, LOS INCAS Y C.P. ACHIPAMPA, DISTRITO DE YANACANCHA - CHUPACA - JUNIN

    UBICACIN: Localidad: Barrio Centro y Los incas Distrito: YANACANCHA Provincia: CHUPACA Regin: JUNINCALCULO DE LA RED DE ALCANTARILLADO

    DATOS GENERALES: longitud total 14,603.25 mllongitud emisor_01 402.20 ml

    Descripcionlongitud emisor final ml

    Longitud contribuyente Qunit. 14,201.05 ml (Solo colectores) Red a proyectar

    CONSIDERACIONES: Q total en la red 5.5783456 lt/s (Caudal de Diseo)Q unitario = 0.000393 lt/s/ml

    n = 0.01Vmim. = 0.3 m/s (evita sedimentacion)Vmx. = 6 m/s (evita erosion)

    OrdenDESCRIP. BUZON DESCRIPCION LONGITUD Q arriba Q marcha Q abajo COTA DE TERRENO PROFUNDIDAD COTA DE FONDO DESNIVEL (/) PENDIENTE Asumido Tirante Area Perimetro VELOCIDAD CONDICIN PENDIENTE

    ARRIBA ABAJO (AV JR) m (t/s) (t/s) (t/s) B-ARRIBA B-ABAJO B-ARRIBA B-ABAJO B-ARRIBA B-ABAJO BUZONES m/m Pulgadas mm cm cm2 cm m/s V>Vmim. V

  • MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE E INSTALACION DEL SERVICIO DE DESAGUE Y TRATAMIENTO DE AGUAS RESIDUALES EN LOS BARRIOS CENTRO, LOS INCAS Y C.P. ACHIPAMPA, DISTRITO DE YANACANCHA - CHUPACA - JUNIN

    MEMORIA DE CALCULO MUNICIPALIDAD DISTRITAL DE YANACANCHA

    PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE E INSTALACION DEL SERVICIO DE DESAGUE Y TRATAMIENTO DE AGUAS RESIDUALES EN LOS BARRIOS CENTRO, LOS INCAS Y C.P. ACHIPAMPA, DISTRITO DE YANACANCHA - CHUPACA - JUNIN

    UBICACIN: Localidad: Barrio Centro y Los incas Distrito: YANACANCHA Provincia: CHUPACA Regin: JUNINCALCULO DE LA RED DE ALCANTARILLADO

    DATOS GENERALES: longitud total 14,603.25 mllongitud emisor_01 402.20 ml

    Descripcionlongitud emisor final ml

    Longitud contribuyente Qunit. 14,201.05 ml (Solo colectores) Red a proyectar

    CONSIDERACIONES: Q total en la red 5.5783456 lt/s (Caudal de Diseo)Q unitario = 0.000393 lt/s/ml

    n = 0.01Vmim. = 0.3 m/s (evita sedimentacion)Vmx. = 6 m/s (evita erosion)

    OrdenDESCRIP. BUZON DESCRIPCION LONGITUD Q arriba Q marcha Q abajo COTA DE TERRENO PROFUNDIDAD COTA DE FONDO DESNIVEL (/) PENDIENTE Asumido Tirante Area Perimetro VELOCIDAD CONDICIN PENDIENTE

    ARRIBA ABAJO (AV JR) m (t/s) (t/s) (t/s) B-ARRIBA B-ABAJO B-ARRIBA B-ABAJO B-ARRIBA B-ABAJO BUZONES m/m Pulgadas mm cm cm2 cm m/s V>Vmim. V

  • 80.0080.0080.0080.0080.0080.0055.7670.4670.4670.4657.9757.9769.8752.2352.2359.2459.5059.5059.5068.3063.7563.7580.0080.0080.0080.0080.0080.0080.0080.0080.0080.0080.0080.0054.0054.0080.0080.0080.0080.0082.0080.0080.0078.7180.0080.0080.0080.0080.0081.2180.0080.0080.0080.0080.0080.0080.0080.0080.0080.0080.0056.0056.0075.4575.4585.0085.0062.0085.0085.00

  • 85.0085.0085.0085.0085.0085.0085.0066.0066.0097.8350.0080.0080.0080.0080.0080.0080.0080.0080.0080.0080.0084.5084.5084.5084.5079.5478.6374.1584.5084.5084.5084.5084.5084.5086.9086.9086.9086.9086.9086.9086.9086.9086.9086.9086.9086.9086.9086.9086.9086.9060.0060.0097.4046.6568.2568.2550.8895.0095.0080.0080.0080.0080.0080.0080.0080.0080.0080.0080.0080.0080.00

  • 80.0080.2080.0080.0084.6784.6784.6784.6784.6784.6784.6784.6784.6784.6784.6784.6784.6784.6789.50100.0080.0060.0060.0046.3084.2884.2867.0270.0070.0060.0074.2080.0080.0039.9866.0952.5452.5450.2650.2640.0066.2952.5452.5433.4971.8433.5271.6371.6371.6382.7082.8680.0080.0080.0080.0080.00

    15003.25

  • bz inicial bz final longitud profundidad1 2 520 2

  • METRADO DE BUZONES EN COLECTORES

    Descripcion:

    Buzones a proyectar

    Futura ampliacion de Buzones

    BUZONES A PROYECTAR

  • METRADO DE BUZONES EN EMISORES

    Descripcion

    Buzones a proyectar

    Futura ampliacion de Buzones

    BUZONES A PROYECTAR

  • METRADO DE BUZONES

    1.0 Buzon H

  • Total concreto = 1.76 m3 1.95b) acero

    Losa

    Diametro Parcial Sub total Total

    3/8 2 1.640 0.560 1.837 0.092 1.929 3/8 4 1.620 0.560 3.629 0.181 3.810 3/8 4 1.430 0.560 3.203 0.160 3.363 3/8 4 1.120 0.560 2.509 0.125 2.634 3/8 4 0.480 0.560 1.075 0.054 1.129 12.865

    paredes

    Diametro Parcial Sub total Total

    Vert. 3/8 17 2.000 0.560 19.040 0.952 19.99Horiz. 3/8 7 4.541 0.560 17.801 0.890 18.69 38.683

    tapa

    Diametro Parcial Sub total Total

    3/8 4 1.280 0.560 2.867 0.143 3.011 3/8 4 1.030 0.560 2.307 0.115 2.423 3/8 4 0.470 0.560 1.053 0.053 1.105 1/2 8 1.280 0.994 10.179 0.509 10.6875 17.226

    74.978Total acero = 68.775 Kg

    c) Encofradomuros

    Diametro largo Alto No veces Area 1.20 3.77 1.5 1 5.65 m2

    Total encofrado = 5.65 m2 6.79d) Tarrajeo

    muros interioresDiametro largo Alto No veces Area

    1.20 3.77 1.5 1 5.65 m2

    Total tarrajeo = 5.65 m2 6.79

    1.0 Buzon H

  • tapa

    Diametro Parcial Sub total Total

    3/8 4 1.280 0.560 2.867 0.143 3.011 3/8 4 1.030 0.560 2.307 0.115 2.423 3/8 4 0.470 0.560 1.053 0.053 1.105 1/2 8 1.280 0.994 10.179 0.509 10.6875 17.226

    Total acero = 74.978 Kg 79.113c) Encofrado

    murosDiametro largo Alto No veces Area

    1.20 3.77 1.8 1 6.79 m2

    Total encofrado = 6.79 m2 7.54d) Tarrajeo

    muros interioresDiametro largo Alto No veces Area

    1.20 3.77 1.8 1 6.79 m2

    Total tarrajeo = 6.79 m2 7.54

    2.0 Buzon H

  • d) Tarrajeomuros interiores

    Diametro largo Alto No veces Area 1.20 3.77 2 1 7.54 m2

    Total tarrajeo = 7.54 m2

    3.0 Buzon H

  • murosDiametro largo Alto espesor Volumen

    1.35 4.24 2.8 0.15 1.78

    tapaDiametro area espesor Volumen

    1.50 1.77 0.20 0.35

    Total concreto = 2.59 m3b) acero

    losa

    Diametro Parcial Sub total Total

    3/8 2 1.640 0.560 1.837 0.092 1.929 3/8 4 1.620 0.560 3.629 0.181 3.810 3/8 4 1.430 0.560 3.203 0.160 3.363 3/8 4 1.120 0.560 2.509 0.125 2.634 3/8 4 0.480 0.560 1.075 0.054 1.129 12.865

    paredes

    Diametro Parcial Sub total Total

    Vert. 3/8 17 3.300 0.560 31.416 1.571 32.99Horiz. 3/8 12.2 4.541 0.560 31.025 1.551 32.58 65.563

    tapa

    Diametro Parcial Sub total Total

    3/8 4 1.280 0.560 2.867 0.143 3.011 3/8 4 1.030 0.560 2.307 0.115 2.423 3/8 4 0.470 0.560 1.053 0.053 1.105 1/2 8 1.280 0.994 10.179 0.509 10.6875 17.226

    Total acero = 95.655 Kgc) Encofrado

    murosDiametro largo Alto No veces Area

    1.20 3.77 2.8 1 10.56 m2

    Total encofrado = 10.56 m2d) Tarrajeo

    muros interioresDiametro largo Alto No veces Area

    1.20 3.77 2.8 1 10.56 m2

    Total tarrajeo = 10.56 m2

    4.0 Buzon H

  • 3/8 4 1.120 0.560 2.509 0.125 2.634 3/8 4 0.480 0.560 1.075 0.054 1.129 12.865

    paredes

    Diametro Parcial Sub total Total

    Vert. 3/8 17 3.500 0.560 33.320 1.666 34.99Horiz. 3/8 13 4.541 0.560 33.060 1.653 34.71 69.699

    tapa

    Diametro Parcial Sub total Total

    3/8 4 1.280 0.560 2.867 0.143 3.011 3/8 4 1.030 0.560 2.307 0.115 2.423 3/8 4 0.470 0.560 1.053 0.053 1.105 1/2 8 1.280 0.994 10.179 0.509 10.6875 17.226

    Total acero = 99.790 Kgc) Encofrado

    murosDiametro largo Alto No veces Area

    1.20 3.77 3 1 11.31 m2

    Total encofrado = 11.31 m2d) Tarrajeo

    muros interioresDiametro largo Alto No veces Area

    1.20 3.77 3 1 11.31 m2

    Total tarrajeo = 11.31 m2

    4.0 Buzon H

  • Total acero = 110.128 Kgc) Encofrado

    murosDiametro largo Alto No veces Area

    1.20 3.77 3.5 1 13.19 m2

    Total encofrado = 13.19 m2d) Tarrajeo

    muros interioresDiametro largo Alto No veces Area

    1.20 3.77 3.5 1 13.19 m2

    Total tarrajeo = 13.19 m2

    3.0 Buzon H

  • 3.0 Buzon H
  • b) acerolosa

    Diametro Parcial Sub total Total

    3/8 2 1.640 0.560 1.837 0.092 1.929 3/8 4 1.620 0.560 3.629 0.181 3.810 3/8 4 1.430 0.560 3.203 0.160 3.363 3/8 4 1.120 0.560 2.509 0.125 2.634 3/8 4 0.480 0.560 1.075 0.054 1.129 12.865

    paredes

    Diametro Parcial Sub total Total

    Vert. 3/8 17 5.500 0.560 52.360 2.618 54.98Horiz. 3/8 21 4.541 0.560 53.404 2.670 56.07 111.052

    tapa

    Diametro Parcial Sub total Total

    3/8 4 1.280 0.560 2.867 0.143 3.011 3/8 4 1.030 0.560 2.307 0.115 2.423 3/8 4 0.470 0.560 1.053 0.053 1.105 1/2 8 1.280 0.994 10.179 0.509 10.6875 17.226

    Total acero = 141.144 Kgc) Encofrado

    murosDiametro largo Alto No veces Area

    1.20 3.77 5 1 18.85 m2

    Total encofrado = 18.85 m2d) Tarrajeo

    muros interioresDiametro largo Alto No veces Area

    1.20 3.77 5 1 18.85 m2

    Total tarrajeo = 18.85 m2

    4.0 Buzon H

  • Diametro Parcial Sub total Total

    3/8 4 1.280 0.560 2.867 0.143 3.011 3/8 4 1.030 0.560 2.307 0.115 2.423 3/8 4 0.470 0.560 1.053 0.053 1.105 1/2 8 1.280 0.994 10.179 0.509 10.6875 17.226

    Total acero = 151.482 Kgc) Encofrado

    murosDiametro largo Alto No veces Area

    1.20 3.77 5.5 1 20.73 m2

    Total encofrado = 20.73 m2d) Tarrajeo

    muros interioresDiametro largo Alto No veces Area

    1.20 3.77 5.5 1 20.73 m2

    Total tarrajeo = 20.73 m2

    N piezas

    Longitud (m)

    w (Kg/ml)

    5% Desp.

    Diseo CaudalMETRADO TUBERIA CORREGIDOHoja3Hoja1BUZO COLECT. POR ALTURASBUZONES EMISORESMetrado Buzones