Alberta-NWT Bilateral Water Management Agreement · Alberta-NWT Bilateral Water Management...

10
Alberta-NWT Bilateral Water Management Agreement Progress Update Erin Kelly (NWT) and Brian Yee (Alberta) Mackenzie River Basin Board Meeting November 17-18, 2015 Whitehorse, Yukon 1

Transcript of Alberta-NWT Bilateral Water Management Agreement · Alberta-NWT Bilateral Water Management...

Page 1: Alberta-NWT Bilateral Water Management Agreement · Alberta-NWT Bilateral Water Management Agreement ... BILATERAL WATER MANAGEMENT AGREEMENT ... WQT-3 WQT-5 WQT-6

Alberta-NWT Bilateral Water

Management Agreement

Progress Update

Erin Kelly (NWT) and Brian Yee (Alberta)

Mackenzie River Basin Board Meeting November 17-18, 2015

Whitehorse, Yukon

1

Page 2: Alberta-NWT Bilateral Water Management Agreement · Alberta-NWT Bilateral Water Management Agreement ... BILATERAL WATER MANAGEMENT AGREEMENT ... WQT-3 WQT-5 WQT-6

MACKENZIE RIVER BASIN BILATERAL WATER MANAGEMENT AGREEMENT

Between the

Government of Alberta

And the

Government of the Northwest Territories

Page 3: Alberta-NWT Bilateral Water Management Agreement · Alberta-NWT Bilateral Water Management Agreement ... BILATERAL WATER MANAGEMENT AGREEMENT ... WQT-3 WQT-5 WQT-6

3

Bilateral Technical Tasks: • A Learning Plan for the Hay River

• State of the Aquatic Knowledge Report

• A Learning Plan for the Slave River • Update the 2012 MRB Hydraulic Model

Page 4: Alberta-NWT Bilateral Water Management Agreement · Alberta-NWT Bilateral Water Management Agreement ... BILATERAL WATER MANAGEMENT AGREEMENT ... WQT-3 WQT-5 WQT-6

4

Bilateral Technical Tasks: • The development of interim triggers for mercury

for the Hay and Slave Rivers

• Development of the first AB-NWT BWMA Ministerial/Public Annual Report

Page 5: Alberta-NWT Bilateral Water Management Agreement · Alberta-NWT Bilateral Water Management Agreement ... BILATERAL WATER MANAGEMENT AGREEMENT ... WQT-3 WQT-5 WQT-6

Multi-Jurisdictional Tasks 1. Develop a classification system for

transboundary waters

2. Discuss climate change research needs for the MRB

3. Select biological indicators for transboundary waters

4. Establish mechanism(s) for prior notification between jurisdictions

5. Collaborate on the development of site specific water quality triggers and objectives for transboundary waters

Page 6: Alberta-NWT Bilateral Water Management Agreement · Alberta-NWT Bilateral Water Management Agreement ... BILATERAL WATER MANAGEMENT AGREEMENT ... WQT-3 WQT-5 WQT-6

Establishment of Water Quality Triggers • We have agreed to utilize water quality triggers (WQTs)

and water quality objectives (WQOs) to aid with the management of transboundary waters

• WQOs have not yet been established

• “interim” WQTs have been agreed upon (AB-NWT), need to agree upon and finalize methods

Page 7: Alberta-NWT Bilateral Water Management Agreement · Alberta-NWT Bilateral Water Management Agreement ... BILATERAL WATER MANAGEMENT AGREEMENT ... WQT-3 WQT-5 WQT-6

Multi-Jurisdictional Opportunity • NWT is hosting meetings on classification of water

bodies and development of triggers/objectives with participation by multiple experts from across Canada in Feb 2016

• We propose that we use this opportunity to gain a

mutual understanding of the statistical and policy options that can be used to set WQTs/WQOs

• Improved understanding of available options and preferences will help guide determination of methodology for WQTs/WQOs for all bilateral agreements

Page 8: Alberta-NWT Bilateral Water Management Agreement · Alberta-NWT Bilateral Water Management Agreement ... BILATERAL WATER MANAGEMENT AGREEMENT ... WQT-3 WQT-5 WQT-6

WQT-2

Water quality data set

WQT-3 WQT-5 WQT-6

NWT AB YT BC

Comparison of methods and values

Discuss results at workshop

Water Quality Trigger/Objective Development Options

DoE&CC HC

SK

WQT-4 WQT-1 WQT-7

Page 9: Alberta-NWT Bilateral Water Management Agreement · Alberta-NWT Bilateral Water Management Agreement ... BILATERAL WATER MANAGEMENT AGREEMENT ... WQT-3 WQT-5 WQT-6

Key Features of the proposal

Overall, we believe that this will create a shared understanding of the issues around setting effective triggers (and, eventually, water quality objectives).

• Objective process • Minimal bias • Allows parties to

work through a real case example

Page 10: Alberta-NWT Bilateral Water Management Agreement · Alberta-NWT Bilateral Water Management Agreement ... BILATERAL WATER MANAGEMENT AGREEMENT ... WQT-3 WQT-5 WQT-6

Questions/Comments?