ÇAKIR YAPI SAN VE TİC. A.Ş. · buildings where multiple families live, skyscrapers, etc)...
Transcript of ÇAKIR YAPI SAN VE TİC. A.Ş. · buildings where multiple families live, skyscrapers, etc)...
1
ÇAKIR YAPI SAN VE TİC.
A.Ş.
INTRODUCTORY FILE 2017
2
Contents
CONTENTS
1 GENERAL INFORMATION
2 TRADE REGISTRY INFORMATION AND DOCUMENTS
3 COMPLETED, ONGOING AND OTHER SPECIAL WORKS UNDER OUR CONTRACT
4 MACHINE EQUIPMENT PARK
5 LIST OF TECHNICAL PERSONNEL
3
Company Profile Çakır Yapı Sanayi ve Ticaret A.Ş.
ÇAKIR YAPI Sanayi ve Ticaret A.Ş. is one of the experienced Turkish contractor companies that successfully completed the Public and Private contracts and was established in Istanbul in 1983. With its own construction equipments and tools as well as its experienced and superior technical staff, it has completed successfully all the contracts it has undertaken in the construction sector on time and above the sector standards.
Mass Housing Constructions, Prison Buildings, Infrastructure Projects, Transportation Projects, Pickling and Coal Excavation + Loading and Transportation Works, Wastewater and Drinking Water Projects constitute the specialized contractual subjects/areas of ÇAKIR YAPI.
ÇAKIR YAPI has a class A contractor certificate issued by the Ministry of Public Works and has a construction/building license in unlimited quantities. It has a NATO Security document and a work completion certificate for Infrastructure projects. It has been awarded by MEYER, with Quality Management Certificates such as ISO 9001:2008, ISO 14001 and OHSAS 18001 within the scope of the projects that have been completed and continuing.
It is also a company with Energy Market Regulatory Authority Construction and Service Certificate. Chairman of the Board of Directors : Şükrü ÇAKIR Deputy Chairman of the Board of Directors : Mehmet Ali Çakır Address: Mandıra Cad. Konak İş Merkezi No:2 B Blok D:36 Hasanpaşa/Kadıköy Phone: 0216 412 95 45 E-posta: [email protected] Website: www.cakiryapi.com
4
Company Policies
ÇAKIR YAPI SAN VE TİC A.Ş. has adopted the principle of improving the quality of life of our people by providing better material assets and living standards for the generations that will come after us in our country.
In order to improve the quality of life, our company has been adopted the followings as the quality policy within the framework of management systems adopted for this purpose: To build structures that enhance not only the life quality of the customers, but also the satisfaction of the users in accordance with legal requirements and technical specifications, to ensure the employee safety, satisfaction and the environment at the maximum level in all manufacturing processes, to follow technological innovations, and to continuously improve employee and manufacturing efficiency through continuous trainings.
ÇAKIR YAPI SAN. VE TİC. A.Ş., at every step and every activity it carries out, adopts as the principle of the company to adhere to the legal obligations so that to give priority for keeping the environmental damage and pollution at a minimum level. In this regard, within the framework of the facilities provided by the project budgets, It is our environmental policy to use the most compatible materials and technology with the environment, and to ensure an environment that will provide better quality of life for future generations by maintaining continuous improvement in environmental protection and pollution prevention in each new project.
ÇAKIR YAPI SAN VE TİC A.Ş. ensures the health of employees by providing safe and secure environments, while putting its projects into practice. It aims to keep workers health and safety at the highest level, and does not refrain from the importance and rigorousness required to prevent and eliminate occupational accidents by applying technologies and methods to keep workers' health and internal safety at the optimum level in accordance with the legislation. Also it eliminates the risks that permanently endanger human health.
5
6
7
8
İSTANBUL CHAMBER OF COMMERCE OPERATING CERTIFICATE
(COMMERCE REGISTRATION COPY)
REGISTRATION NO : 196226 DATE: 1/5/2017
COMPANY : ÇAKIR YAPI SANAYİ VE TİCARET ANONİM ŞİRKETİ
ADDRESS : MANDIRA CAD. KONAK İŞMERKEZİ NO: 2 B BLOK D. 36 HASANPAŞA / KADIKÖY
FIELDS OF ACTIVITY : To contract and perform any construction works for public or private institutions in Turkey and abroad, To take long, medium and short term loans from domestic and foreign markets, to get credits by way of guarantee and guarantee credits and to establish liens on the immovable properties of the company, to terminate the same, to issue bonds, To acquire, operate, rent, lease, and when required, purchase and sell and construct all kinds of movable and immovable properties and intangible goods in order to perform company activities, To establish liens and mortgage on movable and immovable properties belonging to others in favor of the company, to register the same and to acquire any rights on them and other works stated in the amendment agreement registered on 2/3/2012.
RATE : EXCELLENT
CAPITAL : ****TL 19,158,000.00
COMMENCEMENT DATE OF THE BUSINESS
: 15/7/1983
PROFESSION GR. : 45 HOUSING CONSTRUCTION
NACE CODE :
41.20.02 Construction of Residences (construction of detached houses, buildings where multiple families live, skyscrapers, etc) (excluding construction of wooden buildings) NACE Rev.02
(Stamp)
9
10
T.R. ENERGY MARKET REGULATORY AUTHORITY
CONSTRUCTION AND SERVICE CERTIFICATE
Certificate No YHS/17420/071 Date 31/7/2003
This certificate is granted to ÇAKIR Yapı Sanayi ve Ticaret Anonim Şirketi to carry out the CONSTRUCTION activity of the facilities located in the natural gas market, except for internal installation and service lines of the city distribution network, for 10 (ten) years, by decision of the Energy Market Regulatory Board dated 31/7/2003 and numbered 174-20, in accordance with the Natural Gas Market Law no. 4646 and related legislation.
(signature) Yusuf GÜNAY
This certificate constitutes an integral entity together with its provisions attached. Chairman
11
12
13
14
15
16
17
25
Overseas Projects
TUNISIA
GOVERNOR OF THALA KASSARINE REGION ROAD CONSTRUCTION
26
Overseas Projects
KYRGYZSTAN - TARAZ-TALAS-SUSSAMYR ROAD CONSTRUCTION
27
Overseas Projects
AZERBAIJAN - DASHKESEN WATER SUPPLY, IRRIGATION SYSTEM, WASTE TREATMENT PLANT CONSTRUCTION
28
Overseas Projects
AZERBEYCAN – JALİLABAD REGION WESTERN PART WATER AND SEWERAGE CONSTRUCTION
Construction of water and sewerage networks for Western Part of Jalılabad Region has been completed.
29
Transportation Projects
Sarıyer - İstinye - Hacıosman Connection Road Construction Road with total length 3,460 m, width 18 m (2x2 lane), B.A. bridge with 208 m Prestressed Beam, 1,100 m (600/200 cm, 1,200/200 cm) B.A. Stream Rehabilitation,
30
Transportation Projects
Sarıyer - İstinye - Hacıosman Connection Road Construction
Total 15,697 m. Wastewater and Rainwater line from Ø300 mm to Ø2200 mm, and ø100 mm, ø150 mm, ø250 mm Drinking Water Line, PTT Infrastructure and Lines. 299,231 m³ Excavation, 133,750 m³ GrayWacke Filling, 414.65 m³ Stone Filling, 39,856m³ Sand Filling, 80,932 m³ Crushed Rock Substratum, 10,957 m³ Plentmix Base.
Total 29,500 m ø80 cm and ø65 cm Bored Pile, Total 7,950 m² (1,218 m in length) Reinforced Earth Wall, 7,804 m³ (627 m in length) Stone Wall,
31
Transportation Projects Istanbul- Maltepe Büyükyalı Deresi Başıbüyük – Kayışdağı, Road
and Common Infrastructure Construction
32
Transportation Projects Istanbul- Maltepe Büyükyalı Deresi Başıbüyük – Kayışdağı, Road
and Common Infrastructure Construction
291 m. Coastal Road-TCDD Railway Transient Prestressed Beam VIADUCK, Viaduct Sub-bases Course 8,742 m. 80 cm Bored Pile, 4,889 m Ø100 cm Bored Pile and Anchoring for Environmental Bracing, 740 m² Reinforced Earth WALL for Coastal Road Approach Arms, 520 m. (1,200/200 cm.) B.A. Closed Section Stream Remediation. 1,000 m. (ø800 mm. and ø1,000 mm.) Wastewater Line
33
Transportation Projects İSTANBUL- Maltepe Büyükyalı Deresi and Coastal Road E–5 Link
Road Construction
Coastal Road-TCDD Railway Transient VIADUCK, Viaduct Prestressed Bridge Beams, Viaduct Expansion Joints, Road Concretes, 154 kV High Voltage Line by taking underground, Construction of High Voltage Pylon 40 m. in Height, Transmission Systems Providing Transformer Salt Field, 1,200/200 cm B.A. closed Section Stream Remediation
34
Transportation Projects
İSTANBUL- Maltepe Büyükyalı Deresi and Coastal Road E–5 Link Road Construction
35
Transportation Projects
6 Pedestrian and Vehicle Underpass Construction Work for Metropolitan Municipality of Kayseri
Construction Works including Pedestrian and Vehicle Underpass in front of the Metropolitan Municipality Building, Sivas Ave.-Fuzuli Crossing Vehicle Underpass, Vehicle Underpass in front of MKP. Boulevards Swimming Pool Vehicle Underpass in front of MKP. Boulevards Gültepe Park Vehicle Underpass in front of MKP. Boulevards Buzkan Pedestrian Subway between Sivas Ave. and Orduevi-Okburcu
36
Transportation Projects
6 Pedestrian and Vehicle Underpass Construction Work for Metropolitan Municipality of Kayseri
37
Transportation Projects
6 Pedestrian and Vehicle Underpass Construction Work for Metropolitan Municipality of Kayseri
A total 46,000 m of Bored pile production, 137 forecasts (16-36mt) were used.
38
Transportation Projects
6 Pedestrian and Vehicle Underpass Construction Work for Metropolitan Municipality of Kayseri
39
Transportation Projects
İstanbul Nato Road - Küçüksu Connection Continue Road and
Common Infrastructure Construction
Sub-base course Graywacke Filler, Crushed Stone Substratum (PLENT-MIX), Road Coating Concrete (with Wire Mesh), Concrete Border and Paving Stone Trottoirs,
40
Transportation Projects
İstanbul Nato Road - Küçüksu Connection Continue Road and
Common Infrastructure Construction
330,000 m³ Excavation, 700 m² (230 m length) Reinforced Earth Wall, 2,200 m³ (450 m length) Stone Wall, 2,600 m. (300/200 cm. B.A. Closed section, 700/250 cm. and 1,000/250 cm. B.A. Open Section) B.A. Stream Remediation, 6,900 m. (between ø300 mm. and ø2,200 mm.) Wastewater and Rainwater line
41
Transportation Projects
Artworks and Superstructure Works in "A" Road coming down to Emirgan and in Underpasses K1, K2 and K3 Crossroad in front of
IMKB for Maslak - Istinye Park For Entrance - Exit Connection Road
Works for 60,000m³ digging, 18,000m³ tunnel excavation, 14,836 m ø100 cm Bored Pile, 8,925 m³ C25 B.A. Concrete, 1,973 tons B.A. Iron, 7,000 m² Precast Facade Coating, 173 m³ Prefabricated Beam and Junction, for traffic regulations in the direction of Maslak - Istinye.
42
Transportation Projects
Artworks and Superstructure Works in "A" Road coming down to Emirgan and in Underpasses K1, K2 and K3 Crossroad in front of
IMKB for Maslak - Istinye Park For Entrance - Exit Connection Road
K1 CROSSROAD: Double lane one way crossroad with a single entrance with two outlets totaling 400 m in length in the direction of Maslak - İstinye and Maslak - Pınar Mah. K2 CROSSROAD: One-way double-lane crossroad of 250 m length between İstinye ABC Road - Istinye. Moreover, all the landscaping works between k1 and k2 crossroads are made by us.
43
Transportation Projects
Flyover Junction Construction in Kumburgaz
Reinforced Earth wall with 3,500 m² approach walls and 7 spans 2 * 2 viaduct prestressed beam, 3951 m² / 2 * 2 approach roads, 540 m Ø 100 bored pile, rain water channel (closed box section) from 200/120 to 240/500 540 m, 1,453 m main road, 2 * 2-2 * 2150 m 2 * 2 lane road
44
Transportation Projects
Flyover Junction Construction in Kumburgaz
45
Transportation Projects
Construction of Underpass and flyover junction at Mevlana
Intersection
In this scope of work, the followings are manufactured and mounted: 58,000 m³ excavation, 14,000 m³ B.A Curtain and Base, 115 ad L = 18,40 m prestressed bridge beam The side roads of the junction were reconstructed. - 487 m Ø 1,400 drinking water pipeline has been displaced. - 435 m Ø (2,00 x 1,80) Waste water Box - 475 m Ø (2,00 x 1,50) Rainfall Box - 1,240 m Ø 800 Rain water canal
46
Transportation Projects
Construction of Underpass and flyover junction at Mevlana Intersection
2,788 m Rainwater collector, 385 m Ø 1,400 mm steel drinking water pipe, Vehicle underpass and lighting of the junction, Junction landscaping, traffic signs and signalization
47
Transportation Projects
Work of Kartal Flyover Junction Construction on Eskişehir Transition (Kütahya Exit) Road
48
Infrastructure Projects
Onuncu Yıl (Sur Dışı) Stream Rehabilitation Construction
1,475 m 450/250; 710 m 1,000/170 B.A. Box Section Stream Rehabilitation 1,750 m 0 200 mm,2321 m 0 300 mm, 2,083mt 0400mm, 1370mt 0500 mm, 1795 m 0 600mm, 1,668mt 0 700 mm,850mt 0800mm, 1,898 m 01000 mm ,1916 m 01200 mm Waste water canal.
49
Infrastructure Projects
Onuncu Yıl (Sur Dışı) Stream Rehabilitation Construction
514 m 0 800 mm Steel Drinking water line, 12,417 m 080 cm Jet Grout soil treatment, 9,450 m2 Steel Palplanj lining, 9,280 m 080 cm Bored Pile lining and 8,756 m Anchor (with 3 * 0.5 steel rope), 38,290 m3 of reinforced concrete, 236,285 m3 excavation, 79,620 m3 sand filler, 32,950 m3 stone filler and 36,415 m3 greywack filler.
50
Infrastructure Projects Florya-Küçükçekmece Wastewater Collectors and Lifting Center
Construction
45,500 m² Palplanj, 96,700 m³ Excavation, 27,400 m³ Crushed stone filler, 3,500 m B.A Pipe laying, 6,000 m Miflu B. Pipe laying. For the connection to Marmara Main Collector by bringing Avcılar coastal collector to the South-Küçükçekmece Pre-Treatment Elavation Center.
51
Infrastructure Projects
Florya-Küçükçekmece Wastewater Collectors and Lifting Center
Construction
On the Avcılar Coastal Collector and Side connection channels; 3,500 m Ø 2,600, Ø 2,400, Ø 2,200, Ø 1,800, Ø 1,600, Ø 1,000 and Ø 800mm reinforced concrete pipe (in the collector); 5,990 m Ø 500, Ø 400, Ø 300 mm bellmouth concrete pipe (in the wastewater channel) are laid. In order to do this work, 96,700 m³ of excavation, 45,500 m² of sheet piling, 27,400 m³ of crushed stone and stabilized filler has been made.
52
Pickling and Earth Moving Projects
General Directorate of Turkey Coal Enterprises, YLI Enterprise Directorate
11,022,084 m³ Pickling Construction
Work to be Made in A-4 Panel
Top Cover Pickling and Coal Transportation Works
53
Pickling and Earth Moving Projects
Rehabilitation
In the scope of this work; the berm slope excavation in 825,000 m³ left coast (dry area) by using an explosive, and the base scanning with and without using explosive material in 175,000 m³ water has been realized.
In the area where the Bartın river flows into the Black Sea, because of the narrowness of the existing bed section, which is the result of falling rains over seasonal norms, the bed section has been expanded to 40 m in order to prevent floods in Bartın Province.
54
Marina Projects
Construction of Pendik Shopping Center and Marina
Construction Works including marina of 750 yacht-capacity, approximately 100,000 m² Shopping Center with 40,000 m² indoor parking area, approximately 10,000 m² of take-off area and hangar building, restaurant, yacht club and various social complexes, besides the Pendik IDO Pier designed to meet the need for yacht harbor on the Anatolian side of Istanbul
55
Marina Projects
Construction of Pendik Shopping Center and Marina
The Shopping Center, which is designed as Basement + 3 floors, will have cinema halls and 1 hypermarket together with 150 shops. It is planned as a shopping complex, where both the people living in the Pendik region and those who use the yacht harbor can meet all their needs.
56
Marina Projects
Construction of Pendik Shopping Center and Marina
It is composed of breakwater and floating scaffolds. There are various social complexes with yacht club on breakwater. There will be a restaurant building at the end of the floating scaffold.
57
Marina Projects
Construction of Pendik Shopping Center and Marina
Fill area: 80,000 m2 Shopping Center sub-base course piles (total): = 38,500 m Shopping Center base area: = 40,000 m2 Shopping Center total area: = 100,000 m2 Dry dock area: = 10,000 m2 Marina Capacity: 750 yacht capacity
58
Mass Housing Projects Çatalca-Hadımköy Başak Social Mass Housing Estate 2nd Stage,
3rd Region "572 Housing and Social Facility Buildings" Construction Work
The project has a total construction area of 70,589.11 m² and is planned as two types of blocks (11 Blocks).
59
Mass Housing Projects Çatalca-Hadımköy Başak Social Mass Housing Estate 2nd Stage,
3rd Region "572 Housing and Social Facility Buildings" Construction Work
Each apartment is 95 m² and the project consists of 572 flats and an elementary school with 9,000 m² area. 7 Blocks ( 2B.K + Z.K + 11.N.K ) 4 Blocks ( B.K + Z.K + 12. N.K )
60
Mass Housing Projects
Küçükçekmece-Sefaköy Başak Social Mass Housing Estate 1st Region "416 Housing and Social Facility (Bazaar-Administration
Building)” Construction Works
Construction works of 416 independent sections in A-type blocks and common areas, as well as of Bazaar Administration Building and Infrastructure and Landscaping works. It consists of 10 separate blocks. 7 blocks ( BK+ZK+10 NK) 2 blocks ( BK+ZK+ 9 NK ) 1 block ( BK+ZK+ 6NK )
61
Mass Housing Projects
Küçükçekmece-Sefaköy Başak Housing Estate 1st Region "416 Housing and Social Facility (Bazaar-Administration Building)”
Construction Works
Total Construction Area: 65,714 m²
High-rise, centrally heated and environmentally-friendly residences having elevators that are constructed with tunnel form-work system. Waste water / Rain water, vehicle and pedestrian roads and cobblestone pavements, Ambient Lighting and Electric building feed works.
It consists of 8 indoor parking garage of 8,500 m² in total and one Bazaar and Administration Building of 256 m².
62
Mass Housing Projects
Istanbul Hadımköy 3rd Region Construction of 696 Housing Units, Commercial Center, Mosque, Water Tank With Fountain, Trade Center and related General Infrastructure & Landscaping
Construction Works
There are one Commercial Center (359 m²), Mosque, Water Tank with Fountain (197 m²) in Hadımköy 3rd Region Construction made with tunnel form-work system, consisting of 32 blocks with 4 different types. Total Construction Area: 96,094 m²
63
Mass Housing Projects
Istanbul Hadımköy 3rd Region Construction of 696 Housing Units, Commercial Center, Mosque, Water Tank With Fountain, Trade Center and related General Infrastructure & Landscaping
Construction Works
64
Mass Housing Projects
Istanbul Hadımköy 3rd Region Construction of 696 Housing Units, Commercial Center, Mosque, Water Tank With Fountain, Trade Center and related General Infrastructure & Landscaping
Construction Works
The residences have been constructed with tunnel form-work system and social fittings with conventional system.
65
Mass Housing Projects
Istanbul Hadımköy 3rd Region Construction of 696 Housing Units, Commercial Center, Mosque, Water Tank With Fountain, Trade Center and related General Infrastructure & Landscaping
Construction Works
66
Mass Housing Projects Çatalca-Hadımköy Başak Social Mass Housing Estate 3rd Region
"528 Housing Units, Commercial Center- Mosque Construction Works
The Mass Housing Project, including of 528 housing units, consists of 12 blocks as one type. ( BK+ZK+10NK) Commercial Center, Mosque, Infrastructure & Landscaping Construction Works Total Construction Area: 53,521 m2
67
Mass Housing Projects Çatalca-Hadımköy Başak Social Mass Housing Estate 3rd Region
"552288 Housing Units and Commercial Center- Mosque Construction Works
68
Mass Housing Projects
Balıkesir 2nd Stage, 1st Region 766 Housing Units and General Inland Infrastructure and Landscaping Construction Works
The project consisting of 26 Blocks and 766 Housing units was built with Tunnel Form-work System. Total Construction Area: 87,264 m²
69
Mass Housing Projects
Balıkesir 2nd Stage, Construction of 766 Housing Units and related General Infrastructure & Landscaping Works
B Block ( ZK + 7 NK )
C Block ( ZK + 11NK) H Block ( ZK + 12NK)
82
Hospital Projects Silivri - Selimpasa Emergency Service and Traumatology Hospital
The hospital, where the capacity can be increased from 50 beds to 100 beds, consists of 1 Nurse Block, 1 Lodging Building with 10 Flats and one Hospital Block. , . Carcass Structure, Roof is made of pantile lining over free Wood standing roof.
70
Municipal Social Service Projects
The building has 11,000 m² construction area consisting of A and B Blocks; is a Reinforced Concrete Building with 380 units Bored Pile (16m - Ø 65) based on 4,500 m² Raft foundation. Alaturka tiles were made on A Block Steel Roof and Sandwich Panel was made on B Block Space system.
0
71
Municipal Social Service Projects
Kağıthane Municipality Cultural Center Buildings Construction.
A BLOCK: consists of 1 Kindergarten, 1 Wedding/Marriage Hall, 1 Library, 1 Guest House, 1 Public Education Hall. B BLOCK: consists of Multi-Purpose Hall with 600 Person-Capacity and Parking Garage with 100-vehicle capacity and Outdoor Parking Lot with 200-vehicle capacity
72
Municipal Social Service Projects Construction of Lüleburgaz Municipality Market Place and District Center
Total area of 38,806 m² including 570 tons Steel Skeleton Construction, 15,574.5 m² Curved Metal Shell Roof, 10,759 m² Parking Lot, 7,209 m² Walking Road, 3,183 m² Green Area, 2,533 m² Reinforced Concrete Indoor Area.
73
Municipal Social Service Projects
74
Social Service Projects
Adnan Saygun Ave. Junction, Around of Alman Deresi and Sanatçılar Park Landscape and Afforestation Work
75
Municipal Social Service Projects
Adnan Saygun Ave. Junction, Around of Alman Deresi and Sanatçılar Park Landscape and Afforestation Work
76
Public Service Buildings
Istanbul Ümraniye T Type Detention House/Prison and Visitor Waiting Building Construction Work
Detention House/Prison Building: It consists of 4 blocks. There are a total of 616 prisoner wards in a 2-floor building. - 72 wards with 8 persons capacity - One single ward with 40 persons capacity
77
Public Service Buildings
Istanbul Ümraniye T Type Detention House/Prison and Visitor Waiting Building Construction Work
The Visitor Waiting Building is a single-floor building and has a 650 m² construction area. It includes 500 tons of water depot and one transformer building.
78
Public Service Buildings
Construction of Istanbul Atatürk Airport International Arrivals and Departure Floors Renovation
79
Public Service Buildings
Construction of Firüzköy Industrial Site Section 1
80
Public Service Buildings
Büyükçekmece – Kumburgaz 30 Classroom Primary Education School Construction
81
Public Service Buildings
Silivri Police Lodging Building of 30 Flats
83
Special Projects
No. THE TITLE OF THE PROJECT
1 Çakır Yapı San. ve Tic. A.Ş. Acarkent Villas / Acarkent İstanbul
2 Çakır Yapı San. ve Tic. A.Ş. Temsis Houses / Ortaköy İstanbul
3 Çakır Yapı San. ve Tic. A.Ş. Istinye Park Project Construction of Junction and Link Roads
84
Special Projects
Acarkent Villas
consist of 1,452 villas with private garden, 80 apartments, 1,512 studio apartments and 2 social commercial facilities.
85
Special Projects
ACARKENT VILLAS
A Type Villa Properties Gross Land Share: 2,084 m2 Gross Villa Size 770 m2 Number of villas constructed: 16
There are two private swimming pools including one outdoor and one indoor, garages, gardens between 1,000 and 2,000 m² in A and B Type Villas consisting of Garden Floor, Ground Floor, 1st Floor and Roof Floor.
86
Special Projects
Ortaköy Temsis Houses
LAND AREA : 14,000 m2
TOTAL CONSTRUCTION AREA
: 15,000 m2
CONSTRUCTION PROPERTIES
: Reinforced concrete
87
Special Projects
Ortaköy Temsis Houses
The site, consisting of 80 luxurious apartments, includes 6 blocks. The buildings which are constructed as 5 floors are 3 types according to the floors and there are 3 apartments on each floor.
88
Special Projects
Ortaköy Temsis Houses
LAND AREA : 14,000 m2
TOTAL CONSTRUCTION AREA
: 15,000 m2
CONSTRUCTION PROPERTIES
: Reinforced concrete
89
Special Projects
Ortaköy Temsis Houses
The site, consisting of 80 luxurious apartments, includes 6 blocks. The buildings which are constructed as 5 floors are 3 types according to the floors and there are 3 apartments on each floor.
90
Machine Park
Some Examples From Our Machine Park
92
Machine List
RANK NO
MANUFACTURE DATE
TYPE OF MACHINE BRAND MODEL CAPACITY
1 2000 DOZER CAT D9R 410Hp
2 1988 PALLETIZED
LOADER CAT 963 2.80 M3
3 2006 EXCAVATOR HITACHI ZX670LCH-BE 4.50 M3
4 2006 EXCAVATOR DOOSAN DAEWO DX 300 LC 2.40 M3
5 2006 EXCAVATOR DOOSAN DAEWO DX 300 LC 2.40 M3
6 1997 CYLINDER BOMAG BW 216 D-2 158 Hp
7 2006 CYLINDER BOMAG BW 216 D 162Hp
8 2003 GRADER CAT 140 H 185HP
9 2005 CRUSHING SIFT
TAS. TES. SYNTHESIS RK 139 350T/H
10 2005
IVECO
EUROTRUCK MP380 E 37 H 40 TONS
IVECO
EUROTRUCK MP380 E 37 H 40 TONS
TRUCK 5 PCS IVECO
EUROTRUCK MP380 E 37 H 40 TONS
IVECO
EUROTRUCK MP380 E 37 H 40 TONS
IVECO
EUROTRUCK MP380 E 37 H 40 TONS
11 2006 WRECKER IVECO AT720T42TH 420 HP
12 1997 SPRINKLER FARGO AS 950 15 TONS
13 1998 DIESEL FUEL TRUCK MERCEDES
BENZ 3031B 20 TONS
93
ÇAKIR YAPI SAN. VE TİC. A.Ş.
Mandıra Cd. Konak İş Merkezi No: 2 B Blok D:36 Hasanpaşa - Kadıköy / İSTANBUL
Phone: +90 216 412 95 45 | Fax: +90 216 412 95 52 www.cakiryapi.com
E-posta : [email protected]