Submittal Transmittal Page 1 of 1 PROJECT SJHMC On-Call 14403-00 DATE SENT 1/14/2015 SUBJECT Dignity Healthcare Westgate - Air Curtain Resubmittals 083800- 0001-1 SUBMITTAL ID 083800-0001- 1AC TYPE Submittal TRANSMITTAL ID 00014 PURPOSE Approved as Submitted VIA Email SPEC SECTION: 08300 FROM NAME COMPANY EMAIL PHONE Phoenix Submit phoenixsubmittals@aeien g.com TO NAME COMPANY EMAIL PHONE MMondejar@archsolte am.com MMondejar@archsolteam. com REMARKS: AEI Reviews Air Curtain Resubmittal Approved as Submitted. - Charlie McGowan CONTENTS QUANTITY: 1 DATED: 1/9/2015 NUMBER: DESCRIPTION: Air Curtain Submittal Revised.PDF ACTION: REMARKS: COPIES: Charlie McGowan (Affiliated Engineers, Inc.) Jeff Cordell (Affiliated Engineers, Inc.) Phoenix Submit Architect's Notes: 1. Submittal reviewed for Physical Curtain only 2. ARCHSOL review stamp is on page 3 of this submittal 3. Samples are noted as NO EXCEPTIONS TAKEN. 4. See additional notations below

Transcript of Air Curtain Submittal Revised - kitchellftp.com

Submittal Transmittal

Page 1 of 1

PROJECT SJHMC On-Call14403-00

DATE SENT 1/14/2015

SUBJECT Dignity Healthcare Westgate - Air Curtain Resubmittals 083800-0001-1

SUBMITTAL ID 083800-0001-1AC

TYPE Submittal TRANSMITTAL ID 00014

PURPOSE Approved as Submitted VIA Email

SPEC SECTION: 08300

FROM

NAME COMPANY EMAIL PHONE

Phoenix Submit [email protected]

TO

NAME COMPANY EMAIL PHONE

[email protected]

[email protected]

REMARKS: AEI Reviews Air Curtain Resubmittal Approved as Submitted.- Charlie McGowan

CONTENTSQUANTITY: 1 DATED: 1/9/2015 NUMBER:

DESCRIPTION:Air Curtain Submittal Revised.PDF

ACTION:REMARKS:

COPIES:

Charlie McGowan (Affiliated Engineers, Inc.) Jeff Cordell (Affiliated Engineers, Inc.) Phoenix Submit

Architect's Notes:1. Submittal reviewed for Physical Curtain only2. ARCHSOL review stamp is on page 3 of this submittal3. Samples are noted as NO EXCEPTIONS TAKEN.4. See additional notations below

Date: ______________Project #: _____________________________________Submittal #: ________________Submittal Name : _____________________________________

These documents have been reviewed and approved for general conformancewith the Contract Documents. The approval is not to be construed as direction from the Contractor to the Subcontractor to deviate from the requirements of the Contract Documents.

Resubmitted as NotedNot in Compliance with Drawings and Specifications

Submittal Review

By : __________________________________George Zakar

Reviewed

Date: ______________Project #: _____________________________________Submittal #: ________________Submittal Name : _____________________________________

These documents have been reviewed and approved for general conformancewith the Contract Documents. The approval is not to be construed as direction from the Contractor to the Subcontractor to deviate from the requirements of the Contract Documents.

Resubmitted as NotedNot in Compliance with Drawings and Specifications

Submittal Review

By : __________________________________George Zakar

Reviewed

001-083800-01 1-9-15Air Door and Curtain Strips

X

Project #:

Review is only for the limited purpose of checking for conformance with information given and the design concept expressed on the Contract Documents. Review is not conducted for the purpose of determining the accuracy or completeness of other details such as dimensions or quantities or for substantiating instructions for installation or performance of equipment or systems designed by the Contractor, all of which remain the responsibility of the Contractor. Review or acceptance of a specific item shall not indicate approval of an assembly of which the item is a component. Review neither extends nor alters any contractual obligations of the Architect or Contractor and review shall not relieve the Contractor of responsibility for any deviation from the requirements of the Contract Documents.

Accepted Accepted as Noted

Revise and Resubmit Rejected

Review Not Needed

By: Date:

14005023 - SJWMC Air Curtain & Physical Curtain

Martin Mondejar 01/30/15

Architect's Notes:1. Reviewed for Physical Curtain only2. As discussed during OAC meeting on 01/29/15, provide Standard Header Mountphysical door hardware and install as tight to door jamb as possible. Install the physicalcurtain as to eliminate the gaps between the curtain strips and the door jambs, as wellas between the strips and the the door threshold in order to aid in the effort to keepundesired exterior elements out of the interior space while the overhead door is open3. See additional notes below

Architect's Notes:As discussed during OAC meeting on 01/29/15, install thephysical curtain as to eliminate the gaps between the curtainstrips and the door jambs, as well as between the strips andthe the door threshold in order to aid in the effort to keepundesired exterior elements out of the interior space while theoverhead door is open

Architect's Notes:ACCEPTED. As discussed during OAC meeting on01/29/15, provide Standard Header Mount physical doorhardware and install as tight to door jamb as possible.Install the physical curtain as to eliminate the gapsbetween the curtain strips and the door jambs, as well asbetween the strips and the the door threshold in order toaid in the effort to keep undesired exterior elements out ofthe interior space while the overhead door is open