AIAA SPACE 2012 Conference & Exposition SPACE 2012 Conference & Exposition September 11, 2012 Pepper...
Transcript of AIAA SPACE 2012 Conference & Exposition SPACE 2012 Conference & Exposition September 11, 2012 Pepper...
GSDO-TEMPL-0001, Rev. I, 05/21/12
Name
Organization
Presentation Date
AIAA SPACE 2012 Conference & Exposition
September 11, 2012
Pepper Phillips
2National Aeronautics and Space Administration
GSDO manages two significant
development and modernization efforts
Exploration Ground Systems (EGS) development
focuses on SLS and Orion
21st Century Space Launch Complex (21CSLC)
Initiative supports multi-use
Modernize Infrastructure
Ground Systems and Operations
GSDO Affordability Approach
Management - Lean integrated teams with accelerated decision making
Architecture Approach - Determine most affordable architecture
Operability - Infusing flexibility into designs of flight & ground systems
Acquisition Strategy - Leveraging off of existing contracts
National Aeronautics and Space Administration 3JJ Bridge
P/L Transporter
Landing & Recovery
RPSF SRM Transporter Barge Terminal
MPPF
ICPS Processing
LC-39B
VAB
ML
CT-2
FR-1
C2: Integrated Vehicle/GSE
Comm: Voice/Video/Data
Hangar AF
TPSF
GSDO Architecture for SLS / Orion
OPI
VIL
C3R
4National Aeronautics and Space Administration 4
Vehicle Integration and LaunchDelivery
C3 & Range
Offline Payload and
Spacecraft Processing
Offline LV Processing
•SLF
•Rail
•Turn Basin
•Over Road
Transport
•SSPF
•MPPF
•RPSF
•ARFLanding & Recovery
Integration Launch
Horizontal•SLF Hangar
Launch Pad 39A/B
SLF
•CM Recovery
•Horizontal
Landing
SLS/Orion
Commercial
Programs
Test Flight Programs
OPERATIONS AND CAPABILITIESSUPPORTED PROGRAMS
•EPF
•PHSF
Three classes of potential users through LC-39
•OPF
Vertical
•ML
•MLP
•VAB
•Crawler Transporter
•LCC
Mobile Launcher
VEHICLE INTEGRATION & LAUNCH
Launch Pad
Vehicle Assembly BuildingCrawler Transporter
Small Class Vehicle
5National Aeronautics and Space Administration GSDO
OFFLINE PROCESSING & INFRASTRUCTURENational Aeronautics and Space Administration 6GSDO
Spacecraft Offline Processing
Environmental & Infrastructure
Orion Production Ops
Landing & Recovery
Launch Vehicle Offline Processing
COMMAND CONTROL COMMUNICATIONS & RANGE
Data
Center
?
National Aeronautics and Space Administration 7GSDO
End to End
Command and Control
Advanced Ground Systems
Maintenance
Range SystemsCommunications Systems
Orion Access Demonstration at Multi-Payload
Processing Facility (MPPF)
Program Progress
2009 2010 2011 2012 Future
MCRBoard30Nov
SRR/SDRBoard30Aug
KDP-A17Jan
GSDO Program Office Stand Up
15Jun
Mobile Launcher
Construction
Firing Room 1 Completeat Launch Control Center (LCC)
Refurbishment Complete at Launch Equipment Test
Facility (LETF)
Lightning Protection Completedat Launch Pad 39B
Morpheus Flight Testing
at Shuttle Landing Facility
(SLF)
Mobile Launcher Rollout Interface Test
at Launch Pad 39B
Service Structures Demolitionat Launch Pad 39B
Basic C2 Complete
SRR/SDR Kickoff11Jul
KDP-B 25Oct
RESOLVEOperations from
FR-1
Flame Trench Refurbishment at Launch Pad 39B
Exploration Flight Test
(EFT-1)Crew Module
Recovery
EM-1 at LC-39
Platforms and
Refurbishment
of VAB High
Bay 3
EFT-1 Recovery Attach Fitting Test
at Canaveral