AIAA SPACE 2012 Conference & Exposition SPACE 2012 Conference & Exposition September 11, 2012 Pepper...

8
GSDO-TEMPL-0001, Rev. I, 05/21/12 Name Organization Presentation Date AIAA SPACE 2012 Conference & Exposition September 11, 2012 Pepper Phillips

Transcript of AIAA SPACE 2012 Conference & Exposition SPACE 2012 Conference & Exposition September 11, 2012 Pepper...

Page 1: AIAA SPACE 2012 Conference & Exposition SPACE 2012 Conference & Exposition September 11, 2012 Pepper Phillips National Aeronautics and Space Administration 2 GSDO manages two significant

GSDO-TEMPL-0001, Rev. I, 05/21/12

Name

Organization

Presentation Date

AIAA SPACE 2012 Conference & Exposition

September 11, 2012

Pepper Phillips

Page 2: AIAA SPACE 2012 Conference & Exposition SPACE 2012 Conference & Exposition September 11, 2012 Pepper Phillips National Aeronautics and Space Administration 2 GSDO manages two significant

2National Aeronautics and Space Administration

GSDO manages two significant

development and modernization efforts

Exploration Ground Systems (EGS) development

focuses on SLS and Orion

21st Century Space Launch Complex (21CSLC)

Initiative supports multi-use

Modernize Infrastructure

Ground Systems and Operations

GSDO Affordability Approach

Management - Lean integrated teams with accelerated decision making

Architecture Approach - Determine most affordable architecture

Operability - Infusing flexibility into designs of flight & ground systems

Acquisition Strategy - Leveraging off of existing contracts

Page 3: AIAA SPACE 2012 Conference & Exposition SPACE 2012 Conference & Exposition September 11, 2012 Pepper Phillips National Aeronautics and Space Administration 2 GSDO manages two significant

National Aeronautics and Space Administration 3JJ Bridge

P/L Transporter

Landing & Recovery

RPSF SRM Transporter Barge Terminal

MPPF

ICPS Processing

LC-39B

VAB

ML

CT-2

FR-1

C2: Integrated Vehicle/GSE

Comm: Voice/Video/Data

Hangar AF

TPSF

GSDO Architecture for SLS / Orion

OPI

VIL

C3R

Page 4: AIAA SPACE 2012 Conference & Exposition SPACE 2012 Conference & Exposition September 11, 2012 Pepper Phillips National Aeronautics and Space Administration 2 GSDO manages two significant

4National Aeronautics and Space Administration 4

Vehicle Integration and LaunchDelivery

C3 & Range

Offline Payload and

Spacecraft Processing

Offline LV Processing

•SLF

•Rail

•Turn Basin

•Over Road

Transport

•SSPF

•MPPF

•RPSF

•ARFLanding & Recovery

Integration Launch

Horizontal•SLF Hangar

Launch Pad 39A/B

SLF

•CM Recovery

•Horizontal

Landing

SLS/Orion

Commercial

Programs

Test Flight Programs

OPERATIONS AND CAPABILITIESSUPPORTED PROGRAMS

•EPF

•PHSF

Three classes of potential users through LC-39

•OPF

Vertical

•ML

•MLP

•VAB

•Crawler Transporter

•LCC

Page 5: AIAA SPACE 2012 Conference & Exposition SPACE 2012 Conference & Exposition September 11, 2012 Pepper Phillips National Aeronautics and Space Administration 2 GSDO manages two significant

Mobile Launcher

VEHICLE INTEGRATION & LAUNCH

Launch Pad

Vehicle Assembly BuildingCrawler Transporter

Small Class Vehicle

5National Aeronautics and Space Administration GSDO

Page 6: AIAA SPACE 2012 Conference & Exposition SPACE 2012 Conference & Exposition September 11, 2012 Pepper Phillips National Aeronautics and Space Administration 2 GSDO manages two significant

OFFLINE PROCESSING & INFRASTRUCTURENational Aeronautics and Space Administration 6GSDO

Spacecraft Offline Processing

Environmental & Infrastructure

Orion Production Ops

Landing & Recovery

Launch Vehicle Offline Processing

Page 7: AIAA SPACE 2012 Conference & Exposition SPACE 2012 Conference & Exposition September 11, 2012 Pepper Phillips National Aeronautics and Space Administration 2 GSDO manages two significant

COMMAND CONTROL COMMUNICATIONS & RANGE

Data

Center

?

National Aeronautics and Space Administration 7GSDO

End to End

Command and Control

Advanced Ground Systems

Maintenance

Range SystemsCommunications Systems

Page 8: AIAA SPACE 2012 Conference & Exposition SPACE 2012 Conference & Exposition September 11, 2012 Pepper Phillips National Aeronautics and Space Administration 2 GSDO manages two significant

Orion Access Demonstration at Multi-Payload

Processing Facility (MPPF)

Program Progress

2009 2010 2011 2012 Future

MCRBoard30Nov

SRR/SDRBoard30Aug

KDP-A17Jan

GSDO Program Office Stand Up

15Jun

Mobile Launcher

Construction

Firing Room 1 Completeat Launch Control Center (LCC)

Refurbishment Complete at Launch Equipment Test

Facility (LETF)

Lightning Protection Completedat Launch Pad 39B

Morpheus Flight Testing

at Shuttle Landing Facility

(SLF)

Mobile Launcher Rollout Interface Test

at Launch Pad 39B

Service Structures Demolitionat Launch Pad 39B

Basic C2 Complete

SRR/SDR Kickoff11Jul

KDP-B 25Oct

RESOLVEOperations from

FR-1

Flame Trench Refurbishment at Launch Pad 39B

Exploration Flight Test

(EFT-1)Crew Module

Recovery

EM-1 at LC-39

Platforms and

Refurbishment

of VAB High

Bay 3

EFT-1 Recovery Attach Fitting Test

at Canaveral