CAIRNS CITY COUNCIL
WORKS & SERVICES COMMITTEE
14 SEPTEMBER 2004
TABLE OF CONTENTS
1. LAKE PLACID/CARAVONICA/KAMERUNGA FLOOD MITIGATION STUDY..............................................................................................1
L.Shepherd:JMC:17/43/4-01: #833934
2. CITY WORKS & SERVICES MONTHLY REPORT FOR MONTH OF AUGUST 2004 ................................................................................................14
John Hawkes: sr: 1/3/83-01: #839309
3. MAJOR PROJECTS STATUS REPORT - PROJECT SERVICES BRANCH............................................. ................................................................117
Michael Kahler: 1/3/81: #813735v3
4. INDIAN MYNA BIRD PROJECT........................ .................................................126 Rachel Small : 13/8/1: #831867
5. 2004/2005 CAPITAL WORKS PROGRAM – NOTIONAL DIVISIONAL WORKS STATUS........................... ..............................................130
S. Averkoff: #839410v4
1
Agenda – Works & Services Committee 14/9/04 - #839659
WORKS & SERVICES COMMITTEE
14 SEPTEMBER 2004
1
LAKE PLACID/CARAVONICA/KAMERUNGA FLOOD MITIGATION STUDY
L.Shepherd:JMC:17/43/4-01: #833934
RECOMMENDATION: It is recommended that Council adopt the Lake Placi d/Caravonica/Kamerunga Flood Mitigation Study August 2004 and its recommen dations which are as follows: 1. Council agrees to proceed with the detailed desi gn of Option 4 in the
2004/05 financial year, subject to the application for Regional Flood Mitigation Program (RFMP) being successful, or in t he 2005/06 financial year if the application is unsuccessful.
2. Council investigate existing drainage issues at Kamerunga and develop solutions that could work with or without levee ban ks to a point where it is possible to develop a concept estimate of the cost of these works.
3. Council agrees to proceed with the preparation o f a Flood Management Plan regardless of the adoption of Items 1 & 2 for the p urpose of improving the existing flood warning and evacuation systems.
INTRODUCTION: Council at its Ordinary Meeting of 26th February, 2004 adopted the following recommendations: “1. Council accepts the draft study report on the Lake Placid/Caravonica/Kamerunga
Flood Mitigation Study prepared by Connell Wagner for use in the consultation process with the local community to gauge the level of support for the proposed mitigation options.
2. Improvements to the existing flood warning system be considered.” The purpose of this report is to advise on the outcome of the consultation process and the finalisation of the Study Report with the view to having Council adopt the Study Report.
2
Agenda – Works & Services Committee 14/9/04 - #839659
BACKGROUND: Process of Public Consultation A statement on the Draft Report in the form of a Fact Sheet with a covering letter was mailed to both property owners and residents within the affected area. The covering letter advised that a public information session would be held at a marquee in parkland on Lake Placid Road on Saturday, 15th May, 2004 between 12 noon and 5pm and Sunday, 16th May, 2004 between 9am and 12 noon. Representatives in attendance were Cr. Annette Sheppard (both days) and Mr. Laird Shepherd (Saturday) and Mr Helius Visser (Sunday) from Cairns City Council; Mr. Paul Pommer and Mr. Justin Riley from Connell Wagner (both days). Attendance figures for these sessions were approximately 50 people on Saturday and approximately 60 people on Sunday. Outcomes of Community Consultation The Executive Summary of the Consultation Report is provided as Attachment No.1. The recommendations are as follows: 1. Proceed with development of Option 4 including associated internal drainage
works. 2. Investigate existing drainage issues at Kamerunga and develop solutions that
could work with/without the levee banks to a point where it is possible to develop a concept estimate of the cost of the works (not previously undertaken).
The recommendations of the Consultation Report have been incorporated into the final Flood Mitigation Study Report. The Study Report’s Executive Summary is provided as Attachment No.2. The recommendations of the Flood Mitigation Study Report are as follows: 1. Council proceed with development of Option 4 including internal drainage works. 2. Council investigate existing drainage issues at Kamerunga and develop solutions
that could work with or without levee banks to a point where it is possible to develop a concept estimate of the cost of these works (not previously undertaken).
3. Council proceed with the preparation of a Flood Management Plan to provide improvements to the flood warning system and evacuation procedures. That the Plan be implemented following liaison with Council, the Bureau of Meteorology and the State Emergency Services.
COMMENT: The Community Consultation has been conducted using appropriate processes and has provided adequate opportunity, meaningful content and completeness in dealing with submissions.
3
Agenda – Works & Services Committee 14/9/04 - #839659
Comments on the Final Study Report’s recommendations are as follows: 1. Based on the feedback received, there appears to be significant community
support for Council undertaking some form of mitigation works with some 71% of the total respondents indicating their support for works. Option 4 appears to be generally favoured by the community, and strongly favoured by those who support mitigation works. A total of 55% of responses received were in support of the Option 4 mitigating works.
Some respondents did express concern in relation to funding of mitigation works.
The concern of course is that they might be made responsible for all of the costs of the mitigation works as a benefited area. The funding of works through a benefited area rate is not considered in the report.
2. It is imperative that Kamerunga’s internal drainage issues be investigated in
conjunction with the detailed design for levees on both sides of the river (Option 4). The cost of such investigation will not be part of the RFMP and will be funded separately.
3. A Flood Management Plan has real merit and should be progressed with or
without the Option 4 levee in place. Considering it will be some time before the levee is constructed it would be prudent to act on this as soon as possible.
Other comments are: (a) The investigation of internal drainage issues at Lake Placid/Caravonica may well
have been a significant issue if Option 3 had been the recommended solution. Option 4 will not interfere with local internal drainage. However, there are internal drainage issues that may impact on a proposed improvement to parkland facilities project that has a small lake as its main feature. Planning for that project should consider existing pipe outlets, the rationalisation of existing open drains in the park, and water quality matters so as to provide a healthy and sustainable water feature.
(b) Council has applied for Regional Flood Mitigation Program (RFMP) funding and it
may be a couple of months before it is known if Council has been successful. If successful, Council would fund $60,000 of an expected $180,000 expenditure for the detailed design of Option 4 in 2004/05 and $400,000 of an expected $1,200,000 expenditure in constructing Option 4 in 2005/06.
(c) The Barron River Water Supply Scheme being actioned by Cairns Water has the
requirement for a major pipeline along Lake Placid Road. Any detailed design associated with the Option 4 levee shall be in conjunction with the pipeline design.
4
Agenda – Works & Services Committee 14/9/04 - #839659
CONSIDERATIONS: Statutory: Under the Local Government Act, 1993 Council has jurisdiction to ensure good government of its area. Consistent with this is an obligation to try to mitigate flood impacts on the citizens of Cairns. Policy: Nil. Financial: If Council is successful in its application for RFMP funding, Council’s commitment of $60,000 has been allowed for in Infrastructure Management’s 2004/05 Capital Scoping. Council’s commitment to funding about $400,000 of its share of construction costs will be budgeted for in the 2005/06 Capital Works. If RFMP funding is not forthcoming, funding for the detailed design of Option 4 will be provided in the 2005/06 Budget and funding for construction will be subject to future reporting. Improvements to the Flood Warning System by the preparation of a Flood Management Plan are estimated to cost in the order of $30,000 and the cost of such can be accommodated in the 2004/05 Operational Budget. Social: The objective is to reduce the effects of flooding on the Community and provide improvements to the flood warning system.
CONSULTATION: Cr. Sheppard and officers from Infrastructure Management have played an active role in the Community Consultation process. Previous reporting has provided an awareness to Council of the intent of the investigation.
OPTIONS: 1. Agree to the Recommendations of the Study. 2. Disagree with the Recommendations of the Study.
5
Agenda – Works & Services Committee 14/9/04 - #839659
CONCLUSION: Council should resolve to adopt mitigation Option 4 as the basis on which to proceed to detailed design. The reasons for adoption are as follows: • Council understands that the two options that went to consultation would provide for
30 year ARI flood immunity because to provide for any greater immunity would impact adversely on the rest of the Barron Delta.
• The results of consultation showed clearly that Option 4 (55%) was preferred over
Option 3 (2%).
ATTACHMENTS: Attachment 1 - Executive Summary of Consultation Report, # 835028 Attachment 2 - Executive Summary of Study Report, # 837652. Laird Shepherd Infrastructure Management Project Officer Helius Visser Acting Manager Infrastructure Management John Hawkes General Manager City Works and Services
6
Agenda – Works & Services Committee 14/9/04 - #839659
ATTACHMENT NO.1 Lake Placid / Caravonica / Kamerunga Flood Mitigati on Study – Community Consultation
EXECUTIVE SUMMARY This report provides the background to the community consultation undertaken as part of the Lake Placid / Caravonica / Kamerunga Flood Mitigation Study and a summary and brief assessment of the community feedback. Public information sessions were held at a Marquee erected at Lake Placid on Saturday 15 May 2004 and on Sunday 16 May 2004. Representatives from both Cairns City Council and Connell Wagner were in attendance. Attendance figures for these sessions were approximately 50 people on the Saturday and approximately 60 people on the Sunday. There was a significant level of interaction between the public and the representatives of Council and Connell Wagner at the information sessions. A questionnaire soliciting feedback was also distributed to those attending the sessions. Council received 42 responses to this questionnaire as well as a joint submission from residents in Romney Street, Kamerunga. Based on the feedback received, there appears to be significant community support for Council undertaking some form of mitigation works with some 71% of the total respondents indicating their support for works. Option 4 appears to be generally favoured by the community, and strongly favoured by those who support mitigation works. A total of 55% of responses received were in support of the Option 4 mitigating works. Some other issues raised by respondents have been flagged in Connell Wagner’s main report as needing further addressing during detailed design (should it proceed), viz internal drainage issues in Lake Placid / Caravonica during flood events and drainage of the Kamerunga area (problems with existing inflows from external catchments) during both Barron River flood and non flood events. Council has responded to everyone that provided feedback to the public consultation. Where specific issues of concern were raised in the feedback sheets, these issues were dealt with in the response. Copies of these responses are included in Appendix D of this report. It is recommended that Council proceed with development of Option 4 including associated internal drainage works. It is recommended that Council investigate existing drainage issues at Kamerunga and develop solutions that could work with or without the levee banks to a point where it is possible to develop a concept estimate of the cost of the works (not previously undertaken).
7
Agenda – Works & Services Committee 14/9/04 - #839659
ATTACHMENT NO.2
Lake Placid/Caravonica/Kamerunga Flood Mitigation Study
EXECUTIVE SUMMARY The suburbs of Caravonica and Kamerunga are located adjacent to Lake Placid in the upper western portion of the Barron River Delta, north of the Cairns CBD area. These areas are prone to flooding, lying just downstream of the Barron River gorge, where the Barron River enters its delta. When the Barron River breaks its banks, significant flows can pass through these suburbs, as floodwaters are transferred to the Avondale Creek system via the so-called “northern breakout” (refer to Figure S-1). Historically, this breakout of flow occurred most recently during the 1970’s, specifically the flood of March 1977 (rated at about a 40 year ARI event). There was significantly less urban development in these areas during the 1970’s, hence impacts on the community were much less than if a similar size event were to occur today. A significant Barron River flood occurred in February 1999 (from Cyclone Rona), which led to an evacuation of residents from the Lake Placid area. This water level went close to, but fortunately did not break-out from the River. This recent event serves to highlight the vulnerability of this area to Barron River flooding. Cairns City Council commissioned Connell Wagner to undertake this study in order to quantify the risks of flooding in the Lake Placid/Caravonica/Kamerunga area using state-of-the-art hydraulic modelling, and to examine mitigation options to help reduce this risk. This study has involved the following key tasks: • The acquisition of additional ground survey in the upper Barron Delta in order to
construct an more detailed and up-to-date digital terrain model (DTM) of the area; • Hydrologic modelling of the Barron River catchment in order to estimate historical
and design event flows in the Lake Placid/Caravonica/Kamerunga area; • Hydraulic modelling, using a full 2-dimensional model, of the full range of design
events (from 5 year ARI to the Probable Maximum Flood) in order to quantify the risks to the area. This model was calibrated to the historical events of March 1977 and February 1999 to verify its level of accuracy;
• Development and assessment of a number of structural mitigation options involving levees and augmented floodways sized to achieve varying flood immunities; and
• Evaluation of the key non-structural mitigation option, being the improvement to the current flood warning system based on the new modelling work undertaken for this commission.
8
Agenda – Works & Services Committee 14/9/04 - #839659
The assessment of flood risk in the area indicates that the magnitude of flooding is very dependent on the condition of vegetation on the banks and floodplain of the Barron River. For example, the floods of the 1970’s occurred during a period when riparian vegetation was dense and thriving, and higher flood levels were experienced. The flood of 1999 occurred after a period of prolonged drought, when riparian vegetation was sparser and flood levels experienced were not as high for similar flows. The condition of sugar cane on the floodplain is also an important factor in influencing the ability of floodwaters to pass through paddocks. Due to this sensitivity, this study has adopted a conservative approach to design event modelling and assumed vegetation to be dense. Contrary to widely held opinion, the modelling indicated that a Barron River event of between 10 and 20 years ARI can break out from the river across Lake Placid and Brinsmead-Kamerunga Roads. It is understood that local residents held the view that a larger flood would be required to cause this break-out, however this was not based upon any rigorous analysis. During large flood events (> 20 year ARI), significant breakout occurs in the northern delta, particularly through the northern suburb of Caravonica. Should a flood of this magnitude occur, the potential impacts are very significant. In response to the potential flooding problem, a number of structural mitigation strategies involving flood levees/floodways have been assessed. The options considered have included: • Levees to provide 100 year ARI immunity to the suburbs of Caravonica and
Kamerunga (2 alternatives); • Levees to provide 50 year ARI immunity; and • Levees to provide 30 year ARI immunity (2 alternatives). The 100 and 30 year ARI options have been analysed using the hydraulic model in order to assess their hydraulic impacts elsewhere in the delta. This type of analysis is essential because if floodwaters are prevented from entering certain areas, this will merely transfer the flooding to another area and the impacts must be quantified. In addition, this type of analysis is consistent with that demanded by Council on private developers who wish to develop properties in the Barron Delta. In essence, it is critical to demonstrate “no worsening” on neighbouring properties for a development proposal to be deemed hydraulically acceptable. Modelling the levee options has demonstrated that the major levee options (i.e. 100 and 50 year ARI immunities) result in unacceptable impacts elsewhere in the delta. Accordingly these solutions are not considered viable for Council to pursue any further, unless Council is prepared to accept the impacts and deal with them rather than address the problem at Lake Placid itself.
9
Agenda – Works & Services Committee 14/9/04 - #839659
Alternatively, modelling the two options aimed at achieving the 30year ARI immunity has demonstrated impacts that are much less, and that may be acceptable to Council and the local community. The first of these options (deemed Option 3) consists of a number of discrete levees protecting pockets of houses, with Council parkland used as a formalised floodway between Lake Placid and Kamerunga Villas to convey flows to the ‘northern breakout’ (refer to Figure S-2). The second option (Option 4) makes more use of key existing roads (Lake Placid Road and the Brinsmead-Kamerunga Road) to form the northern levee (refer to Figure S-3). Minor levees south of the Barron River at Kamerunga are required for either option. Option 3 has the advantage of causing the lesser hydraulic impacts, but involves more length of levee and thus will be more expensive to construct and result in greater visual impact. Option 4 causes more hydraulic impact, in particular for smaller floods up to the overtopping event (i.e. for floods less than 30 year ARI), however construction cost and visual impact will be less. The alignments of both levee options have been examined on-the-ground by experienced civil engineers to assess the feasibility of levee construction. This exercise has confirmed that there are no significant technical issues that could not be managed during a detailed design process. Provision for local drainage and visual impact are considered to be the main technical issues apparent from this field exercise. Preliminary discussions with the Department of Natural Resources and Mines (NRM) have indicated that the levee scheme may be eligible to receive State Government funding under the Regional Flood Mitigation program, provided sufficient economic justification is provided. An application for funding has been submitting but no response has been received to date. Community consultation has been undertaken in order to: • Raise public awareness of flood risk in the Lake Placid/Caravonica/Kamerunga
area; • Gauge public support for either of the proposed levee options; and • Receive feedback from the community on the study and any issues relating to
flood risk in the area. The results of the consultation are detailed in the “Lake Placid/Caravonica/Kamerunga Flood Mitigation Study- Public Consultation Summary Report (August 2004). The consultation feedback indicated that 71% of respondents supported Council undertaking some form of mitigation works and 55% of respondents indicating a preference for Option 4. A preliminary concept cost estimate for Option 4 has been developed. Based on information to date, Option 4 is estimated to cost approximately $1.18M. It should be noted that this estimate is an indicative figure only and has been based on a number of assumptions.
10
Agenda – Works & Services Committee 14/9/04 - #839659
In addition to structural (levee) options, this study has also examined improvements to the existing flood warning system for the Barron River as a key non-structural measure. The aim is to improve the accuracy of flood predictions in the Barron Delta, including the upper Barron Delta, and to provide Counter-Disaster Planners with more accurate flood hazard mapping to help them better manage evacuations as and when they are necessary. Data from the latest flood modelling performed for this Study will provide the basis for better flood predictions, and allow the production of new flood mapping. Recommendations:
1. Council proceed with development of Option 4 inc luding associated internal drainage works.
2. Council investigate existing drainage issues at Kamerunga and develop
solutions that could work with / without the levee banks, to a point where it is possible to develop a concept estimate of the cost of these works (not previously undertaken).
3. Council proceeds with the preparation of a Flood Management Plan to
provide improvements to the flood warning system an d evacuation procedures. That the plan be implemented following liaison with Council, the Bureau of Meteorology and State Emergency Servi ces.
#837652
11
Agenda – Works & Services Committee 14/9/04 - #839659
12
Agenda – Works & Services Committee 14/9/04 - #839659
13
Agenda – Works & Services Committee 14/9/04 - #839659
14
Agenda – Works & Services Committee 14/9/04 - #839659
WORKS & SERVICES COMMITTEE
14 SEPTEMBER 2004
2 CITY WORKS & SERVICES MONTHLY REPORT FOR MONTH OF
AUGUST 2004
John Hawkes: sr: 1/3/83-01: #839309
RECOMMENDATION: That this report be noted.
INTRODUCTION: The City Works & Services Monthly Report for August includes Branch Reports from: City Works & Services – Management & Support Business Support Services Project Services Precincts & Facilities Technical Support Services Infrastructure Management It also includes the July Performance Plan Report for the Cairns Works Business Unit.
CONSIDERATIONS: Comment: This report reports on performance against the 2004/ 2005 Operational Plan. J.P. Hawkes General Manager City Works & Services
15
Agenda – Works & Services Committee 14/9/04 - #839659
ACTIVITY City Works & Services Management & Support ( CSMA ) [EAA] Aim To provide quality leadership, executive management and public consultation and
communication services to the City Works and Services Division.
Level of Service • Management of City Works and Services Division activities included under this program.
• Active participation with the Executive Management Team building the corporate framework of the organisation.
• Delivery of positive consultative and marketing services for Divisional programs, including Partnership Cairns.
Officer Responsible General Manager City Works and Services Division – John Hawkes
On Target
Operating Initiative Status Corporate Plan Link Due Date Complete
Yes No *
Monitor the effectiveness of the implementation of Precinct Management within Divisional operations, ongoing.
9.1.1 Ongoing �
Support the development of Cairns Works as an operating commercial business unit, ongoing.
9.1.1 Ongoing �
Support “Cairns Fleet”, Design Services and Survey Services as Type 3 full cost attribution business units, ongoing.
9.1.1 Ongoing �
Advance the development of a continuous improvement program across the Division, ongoing.
9.1.1 Ongoing �
Market Divisional achievements on behalf of Council, ongoing.
8.4.1 Ongoing �
* Variance Report for Initiatives not on target: * Prospective Actions for Initiatives not on target :
Performance Target Assessment ( ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating:
Variance Report Quarterly
% of Divisional operating initiative successfully completed
020406080
100
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
%
Actual Target
Corporate Plan Link: Corporate Capacity / Services & Infrastructure
Prospective Actions
16
Agenda – Works & Services Committee 14/9/04 - #839659
Performance Rating:
Variance Report Quarterly
Divisional Operating Budget Performance
0%10%20%30%40%50%60%70%80%90%
100%110%
% u
nder
or
over
bud
get
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
Revenue ExpenditureRev tolerance range 0 to -2% Exp tolerance range 0 to -5%
Corporate Plan Link: Services & Infrastructure
Prospective Actions
Performance Rating:
Variance Report Quarterly
Divisional Capital Works completions
020406080
100
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
%
Actual Target
Corporate Plan Link: Services & Infrastructure
Prospective Actions
Performance Rating:
����
Variance Report
• Indicator: Divisional lost time injury frequency rate • Target: Rate improving • Reporting Frequency: Quarterly • Performance Assessment: The Division has a higher average of incidents in
comparison to the whole of Council, but a much lower duration of time lost per incident.
LTI Frequency Rates
0
20
40
60
80
100
Aug-03
Sep-03
Oct-03
Nov-03
Dec-03
Jan-04
Feb-04
Mar-04
Apr-04
May-04
Jun-04
Jul-04
Aug-04
Monthly Progress
LTI R
ates
Monthly
Cumulative
Prospective Actions
17
Agenda – Works & Services Committee 14/9/04 - #839659
Corporate Plan Link: Corporate Capacity
Performance Rating:
? Variance Report
• Indicator: Divisional lost time injury severity rate • Target: Rate improving • Reporting Frequency: Quarterly • Performance Assessment : The Division has a higher average of incidents in
comparison to the whole of Council, but a much lower duration of time lost per incident.
LTI Duration Rates
05
1015202530
Aug-03
Sep-03
Oct-03
Nov-03
Dec-03
Jan-04
Feb-04
Mar-04
Apr-04
May-04
Jun-04
Jul-04 Aug-04
Monthly Progress
Dur
atio
n R
ate
Monthly
Cumulative
Corporate Plan Link: Corporate Capacity
Prospective Actions
Operating Budget Assessment:
CSMA YTD Actual ($)
YTD Budget Revised
($)
Var ($) Var (%) Variance Report & Prospective
Actions (where variance is +/- 2%)
Revenue 0 10,833 (10,833) (100)
• “UNFAVOURABLE ” • Reasons: Initially revenue
collection will be one month in arreas.
• Implications / Actions : Will re-align by October
Expenditure 51,188 45,977 (5,211) (11)
• “UNFAVOURABLE ” • Reasons: Seasonality of
expenditure • Implications / Actions : Will self
correct.
18
Agenda – Works & Services Committee 14/9/04 - #839659
ACTIVITY Business Support ( CSBS ) [EBA] Aim To ensure the provision of financial, and administrative, support services to City
Works & Services Division, and logistical and emergency management support services to the whole of Council.
Level of Service OPERATIONAL. • Co-ordinate and compile the City Works and Services annual budget and
facilitate the process of monthly and tri-annual performance reviews. • Provide “day to day” administrative and financial reporting support to all
management and operational staff of the CW+S Division. • Provide a range of administrative and support services to manage the
Emergency Management response function. • Ensure the “timely across the counter” supply of all common consumables,
and maintenance spare parts, in support of Council’s normal business operations.
• Ensure all staff are trained, equipped and skilled to competently provide services.
STRATEGIC • Facilitate, through continuous review and assessment, the implementation of
improved business systems and processes.
Officer Responsible Co-ordinator Business Support – Ron Cleghorn
On Target
Operating Initiative Status Corporate Plan Link Due Date Complete
Yes No *
Assist with the completion of Service Specifications/Level Agreements with CW+S Branch Managers by June 05.
9.1.1 June 05 �
Design “by exception” financial reports and analysis tools by Jun 2005, using Business Objects application.
9.1.1 June 05 �
Interpret and complete the application of indirect costs into the Division, by June 05.
9.1.1 June 05 �
Co-ordinate the relocation and set up of the new Emergency Co-ordination Centre, by November 05.
6.5.4 November 05
�
Investigate new reporting methods for measuring ‘First Pick’ capabilities of inventory stores, by March 05.
9.1.1 March 05 �
Provide detailed job costing information for Cairns Works at the operational “activity” level by provision of a Cost Controller (position), by May 05.
9.1.1 May 05 �
* Variance Report for Initiatives not on target: Proposed new location scrapped due to cost. * Prospective Actions for Initiatives not on target : Short term temporary solution to find alternative safe location for this season only.
19
Agenda – Works & Services Committee 14/9/04 - #839659
Performance Target Assessment ( ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating:
Variance Report Not necessary to report at this time
• Indicator: Internal customer satisfaction • Target: Benchmark to be set from collection of data • Reporting Frequency: Half yearly • Performance Assessment :
Corporate Plan Link: Customer & Community
Prospective Actions
Performance Rating:
Variance Report Not necessary to report at this time
• Indicator: Inventory Turns • Target: Additional 5% increase • Reporting Frequency: Quarterly • Performance Assessment :
Corporate Plan Link: Services & Infrastructure
Prospective Actions
Performance Rating:
Variance Report Not necessary to report at this time
• Indicator: External customer satisfaction • Target: Benchmark to be set from collection of data • Reporting Frequency: Half yearly • Performance Assessment :
Corporate Plan Link: Customer & Community
Prospective Actions
20
Agenda – Works & Services Committee 14/9/04 - #839659
Operating Budget Assessment:
CSBS YTD Actual ($)
YTD Budget Revised
($)
Var ($) Var (%) Variance Report & Prospective
Actions (where variance is +/- 2%)
Revenue 20,108 57,965 (37,858) (65)
• “UNFAVOURABLE ” • Reasons: Revenue being received
behind schedule mainly from external sources.
• Implications / Actions : Will self correct over next 3 months.
Expenditure 267,045 212,049 (54,997) (26)
• “UNFAVOURABLE ” • Reasons: Employee costs are
skewed by $87K thins month due to Divisional Target saving being held in this Branch.
• Implications / Actions : Will be addressed at 4 monthly review.
21
Agenda – Works & Services Committee 14/9/04 - #839659
ACTIVITY Project Services ( CSPJ ) [ECA] Aim • To confirm the scope and client needs of programmed and emergent projects;
• To deliver projects to a standard, which satisfies client needs and effectively manages cost, time, scope and quality requirements;
• To manage the delivery of maintenance programs and contracts on behalf of Infrastructure Management Branch to achieve required service levels;
• To achieve adherence to relevant Federal, State and Council legislation and policy encompassed in planning design and construction of infrastructure;
• To establish appropriate agreements and relationships with service providers and partners to enable effective program and project delivery;
• To efficiently coordinate resources in other Branches or Divisions as necessary to ensure the effective delivery of projects and programs.
• To maintain and update Infrastructure Specifications utilised by Council to ensure the required standards of new infrastructure are achieved.
• To provide a high level of consultation and communication with all partners.
Level of Service • Delivery of Capital Works Program to required time, cost and quality standards;
• Effective management of Branch and service providers in preconstruction activities;
• Coordination of the formulation of maintenance service level agreements with Infrastructure Management Branch and Cairns Works;
• Effective coordination of Cairns Works as maintenance service providers and consistent interpretation and monitoring of service standards and performance according to adopted service specifications; and
• Monitoring and reviewing project and program status and provision of comprehensive and timely reports to General Manager City Works and Services, Manager Infrastructure Management and Manager Precincts and Facilities.
Officer Responsible Manager Project Services – Michael Kahler
On Target
Operating Initiative Status Corporate Plan Link Due Date Complete
Yes No *
Further develop effective quality systems & procedures for project delivery by June 05
9.1.1 June 05 5%
Further develop complementary relationships & agreements with other Branches in City Works & Services Division for effective program & project delivery by June 05
9.1.1 June 05 5%
Review and update infrastructure specifications, (inclusive of Council’s Development Manual), to reflect current practices and industry standards by June 05
9.1.1 June 05 5%
Audit, review & update design and construction specifications utilised for infrastructure construction, maintenance and operation within Council by June 05
9.1.1 June 05 5%
Provide the coordinating role to Infrastructure Management Branch for the continual development and implementation of the Maintenance Management System with Cairns Works including the specification of appropriate intervention levels which reflect serviceability and the relevant Asset Management Plan criteria by June 05
2.1.3, 3.1.1, 3.2.1
June 05 5%
Allocate preconstruction resources to facilitate the scoping preliminary design and
2.1.1, 3.1.1, 3.4.1, 4.1.3,
Ongoing 0%
22
Agenda – Works & Services Committee 14/9/04 - #839659
preliminary budget estimates of capital works projects approved by Infrastructure Management Branch for forward works programs (ie 05/06)
7.5.1
* Variance Report for Initiatives not on target: * Prospective Actions for Initiatives not on target :
Performance Target Assessment ( ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating:
���� Variance Report
Annual expenditure on staff training as a percentag e of total salary costs
0
0.5
1
1.5
2
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
%
Actual Target
Corporate Plan Link: Corporate Capacity
Prospective Actions
Performance Rating:
����
Variance Report
Variations (excluding changes of scope) on Capital Projects <10% of Project Cumulative Value
0
5
10
15
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr% V
aria
tion
of T
otal
V
alue
Actual Target
Corporate Plan Link: Financial Management
Prospective Actions
23
Agenda – Works & Services Committee 14/9/04 - #839659
Operating Budget Assessment:
CSPJ YTD Actual ($)
YTD Budget Revised
($)
Var ($) Var (%) Variance Report & Prospective
Actions (where variance is +/- 2%)
Revenue 92,751 118,878 (26,126) (22)
• “UNFAVOURABLE ” • Reasons: .Relates to internal
charging project. • Implications: No action required at
this time.
Expenditure 165,593 180,310 14,717 8
• “FAVOURABLE ” • Reasons: Project Services are one
employee down, hence under expenditure on salaries.
• Implications: Recruitment in progress.
24
Agenda – Works & Services Committee 14/9/04 - #839659
PROJECT DELIVERY CAIRNS WORKS
Project Delivery Cairns Works up to 6 September 2004
99%
1% 0%
Approved Bid Amount
Variations DesignRelated
Variations Client &Latent ConditionRelated
Project Delivery Cairns Works up to 6 September 2004
Series1 4409384.85 22385.6 14368 4446138.45
Approved Bid AmountVariations Design
RelatedVariations Client & Latent Condition
Total Project Cost
25
Agenda – Works & Services Committee 14/9/04 - #839659
ACTIVITY Infrastructure Management ( CSIM ) [EDA] Aim To ensure that the integrity of Council’s investment in infrastructure, and the
capacity to deliver services to meet community needs is sustained by management of Transport, Drainage and Parks and foreshore infrastructure through the following functional areas: • Management and Administration • Strategic Infrastructure Planning • Asset Accounting & Data • Asset Management, including the sub-programs of: - Transport; - Drainage; and - Parks and Foreshores. • Capital Works Programming • Emergency Planning • Risk Management • Works Investigations.
Level of Service • Manage the Transport, Drainage and Parks and Foreshores sub-programs according to annual budget and Capital Works Program allocations;
• Prepare, apply and review Strategic Plans for: - Transport; - Drainage; and - Parks & Foreshores sub-programs. • Develop forward (2005/06) Annual Capital Works Program; • Review 5 Year Capital Works Program; • Review current year Capital Works Program quarterly; • Review Service Level Agreements quarterly; • Maintain and update data in the asset register and asset inventories as per
required standards. • Apply and monitor the provisions of the Asset Management Strategy
and associated Total Management Plans (TMP’s). • Co-ordinate and apply the provisions of the Risk Management Strategy for
whole of Council
Officer Responsible Manager Infrastructure Management - Sandra Burke
On Target
Operating Initiative Status Corporate Plan Link Due Date Complete
Yes No *
Develop Total Management Plans (TMP’s) for Drainage and Parks & Foreshores Sub- Programs by June 05
1.2.4, 3.4.1 June 05 �
Prepare Drainage Strategy by March 05 3.2.1 March 05 � Commence review and update of Drainage Management Plans in accordance with Drainage Strategy by June 05
3.2.1 June 05 �
Review & update Transport Strategy by March 05
2.1.1 March 05 �
Review and update Traffic Management Plan by Dec 04
2.1.2 Dec 04 �
Develop and implement Maintenance Management System by June 05
1.2.4, 2.1.3, 3.4.1
June 05 �
Develop a Branch Risk Register and Treatment Action Plans by Dec 04
10.2.1 Dec 04 �
Workshop to be held to review the Development Manual standard in relation to inter allotment drainage by Dec 04
3.3.4 Dec 04 �
26
Agenda – Works & Services Committee 14/9/04 - #839659
* Variance Report for Initiatives not on target: Initiative should be part of Project Services Initiative for Review & Update Infrastructure Specifications (inclusive of Council’s Development Manual) * Prospective Actions for Initiatives not on target :
Performance Target Assessment ( ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating:
Variance Report
Compliance with specified service standards
0
20
40
60
80
100
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
%
Actual Target
Corporate Plan Link: Corporate Capacity / Services & Infrastructure
Prospective Actions
Performance Rating:
Variance Report
• Indicator: Timely reporting and recording on progress and completion of Capital
Works Program • Target: Reporting and recording of Capital Works Program progress to Council
and Executive on a quartely basis • Reporting Frequency: Quarterly • Performance Assessment: Not yet assessed
Corporate Plan Link: Services & Infrastructure
Prospective Actions
Performance Rating:
Variance Report
• Indicator: 2004/05 Capital Works & revised 5 Year Capital Works Program • Target: June 2005 adoption by Council • Reporting Frequency: May 2005 • Performance Assessment : Not yet assessed
Corporate Plan Link: Services & Infrastructure
Prospective Actions
27
Agenda – Works & Services Committee 14/9/04 - #839659
Performance Rating:
Variance Report
• Indicator: Asset accounting complies with audit requirements • Target: 100% compliance • Reporting Frequency: Annually • Performance Assessment : Not yet assessed
Corporate Plan Link: Services & Infrastructure
Prospective Actions
Operating Budget Assessment:
CSIM YTD Actual ($)
YTD Budget Revised
($)
Var ($) Var (%) Variance Report & Prospective
Actions (where variance is +/- 2%)
Revenue 17,741 42,671 (24,930) (58)
• “UNFAVOURABLE ” • Reasons: Relates to Capital
Scoping activities expended so far, increased level of activity expected over next 11 months.
• Implications / Actions : Nil.
Expenditure 698,477 986,444 287,967 29
• “FAVOURABLE ” • Reasons: Due to variable nature of
program. • Implications / Actions : No end of
year budget implications.
28
Agenda – Works & Services Committee 14/9/04 - #839659
ACTIVITY Precincts & Facilities Management ( 3310 ) [EEA] Aim To provide a quality level of management and support to staff within the Precincts
and Facilities branch to ensure the quality delivery of the Branch’s Operational Targets.
Level of Service • Attend to all Administration and Management requirements in a timely manner.
• Provide a professional level of management and support for the Branch’s staff and its operations.
Officer Responsible Manager Precincts and Facilities - Tony Duffy
On Target
Operating Initiative Status Corporate Plan Link Due Date Complete
Yes No *
Develop Branch Risk Register and Treatment Action Plans by Dec 04.
10.2.1 Dec 04 �
Review opportunities for the better sharing of resources between program areas in order to enhance efficiency and reduce down time by June 05.
9.1.1 June 05 �
Review the appropriateness of the current management arrangements for sporting facilities by June 05.
9.1.1 June 05 �
* Variance Report for Initiatives not on target: * Prospective Actions for Initiatives not on target :
Performance Target Assessment ( ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating:
���� Variance Report
Number of events held within Precincts and Faciliti es programs
10203040506070
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
No
Actual
Corporate Plan Link: Customer & Community
Prospective Actions
29
Agenda – Works & Services Committee 14/9/04 - #839659
Performance Rating:
����
Variance Report
Customer Satisfaction of major facilities
0153045607590
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
%
Actual Target
Corporate Plan Link: Customer & Community
Prospective Actions
Performance Rating:
����
Variance Report
• Indicator: Public participation in programs, services and other activities within the
Precincts and Facilities branch • Target: Numbers to be monitored to set benchmark • Reporting Frequency: Quarterly • Performance Assessment :
Corporate Plan Link: Customer & Community
Prospective Actions
Operating Budget Assessment:
3310 YTD Actual ($)
YTD Budget Revised
($)
Var ($) Var (%) Variance Report & Prospective
Actions (where variance is +/- 2%)
Revenue 0 0 0 n/m
Expenditure 334,623 165,498 (169,126) (102)
• “UNFAVOURABLE ” • Reasons: Varience due to
Basketball Cairns Grant treated as prepayment in error, balance of expenditure will show in August.
• Implications / Actions :
30
Agenda – Works & Services Committee 14/9/04 - #839659
ACTIVITY Natural & Cultural Resources ( PRNR ) [EEB ] Aim To manage Council’s programs and services delivery for the implementation of
Council Natural & Cultural resource responsibilities Level of Service • Undertake pest management in accordance with Councils responsibilities
under its Pest Management Plan and relevant legislation. • Identify and implement appropriate management strategies for Council’s key
conservation areas and other natural resources. • Implement a series of projects aimed at enhancing and restoring natural areas
of critical environmental ecological and social and/or cultural significance. • Provision of an appropriate level of support services to community based
groups for the delivery of projects that enhance the Cairns environmental and cultural values.
• Develop and implement strategies aimed at optimising the sustainable use of Cairns’ Natural & Cultural resources for active and passive recreation.
Officer Responsible Manager Precincts and Facilities - Tony Duffy
On Target
Operating Initiative Status Corporate Plan Link Due Date Complete
Yes No *
Develop a Natural & Cultural Resources Strategic Plan by September 2004.
4.1.1 September 04
50% �
Implement natural area plans for key sites (including fire management) by December 2004.
4.1.1, 4.2.3 December
04 20% �
Develop long-term schedule work plan for the implementation of heritage conservation projects, by Jan 05.
1.4.2 January 05 0% �
Implement Council’s endorsed Pest Management Plan and relevant supporting legislation, by Dec 04.
4.1.5 December
04 50% �
Review the operations of the Revegetation Unit particularly the capacity to facilitate the enhancement of partnerships with community groups to undertake and promote revegetation projects identified in the Strategic Plan, by March 05.
4.1.1 March 05 0% �
In conjunction with Sport and Recreation team, review opportunities for nature based recreation opportunities identified in the Sport and Recreation Strategic Plan and the possibility to implement the SEAL (supportive environments for active living) framework, by Dec 04.
4.1.1 December
04 0% �
Map weeds of significance occurring in the Cairns City Council area and send to NRM by December 2004.
4.1.5 December
04 40% �
* Variance Report for Initiatives not on target: * Prospective Actions for Initiatives not on target :
31
Agenda – Works & Services Committee 14/9/04 - #839659
Performance Target Assessment ( ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating:
���� Variance Report
# of promotional activities relating to Natural & Cultural Resource Management
0
0.5
1
1.5
2
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
No
per
quar
ter
Actual Target
Corporate Plan Link: Sustainable Growth & Development
Prospective Actions
Performance Rating:
����
Variance Report
• Indicator: Number of restoration projects on culturally significant sites within
guidelines of heritage legislation • Target: Scope and implement two projects • Reporting Frequency: Quartely • Performance Assessment :
Corporate Plan Link: Sustainable Growth & Development
Prospective Actions
Operating Budget Assessment:
PRNR YTD Actual ($)
YTD Budget Revised
($)
Var ($) Var (%) Variance Report & Prospective
Actions (where variance is +/- 2%)
Revenue 5,930 4,117 1,813 44
• “FAVOURABLE ” • Reasons: State Government
contract fully paid. • Implications / Actions : Will level
out through year
Expenditure 94,761 146,740 51,979 35
• “FAVOURABLE ” • Reasons: Seasonal variation • Implications / Actions : Will level
out through year
32
Agenda – Works & Services Committee 14/9/04 - #839659
ACTIVITY Botanic Reserves ( PRBG ) [EED] Aim • To cultivate and display tropical plant species of ornamental, economic,
cultural and conservation value and provide education programs, quality recreation opportunities and assist other scientific institutions.
• To provide management of Mt Whitfield Conservation Park in partnership with Queensland Parks & Wildlife Service in accordance with the Nature Conservation Act.
• To provide regionally significant facilities that are accessible to all residents, and visitors, of Cairns.
Level of Service • Flecker Botanic Gardens are open to the public between 7.30 am and 5.30 pm weekdays and 8.30 am and 5.30 pm weekends and public holidays.
• Sugarworld Gardens are open 7.30am to 6pm, 365 days per year. • Centenary Lakes and Mt. Whitfield is open 24 hours 365 days per year. • Maintain conservation parks to approved management plans within budget
limits. Officer Responsible Manager Precincts and Facilities - Tony Duffy
On Target
Operating Initiative Status Corporate Plan Link Due Date Complete
Yes No *
Contribute to the development of Botanical Precinct masterplan with all relevant stakeholders by Sept 04
7.5.1 Sept 04 �
Upgrade of walking tracks and revegetation of Mt Whitfield by June 05.
4.1.1 June 05 �
Prepare marketing material for promotion of Sugarworld by Dec 04.
7.4.1 Dec 04 �
Prepare masterplan for development of Sugarworld Gardens by June 05.
1.2.4, 7.4.1 June 05 �
Develop MOU with the Friends of the Botanic Gardens by Oct 04.
7.3.1 Oct 04 �
* Variance Report for Initiatives not on target: Nil * Prospective Actions for Initiatives not on target : Nil
Performance Target Assessment ( ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating:
���� Variance Report Number increasing due to visitor season. Possibly more domestic visitors due to threats of terrorism internationally.
Visitor Numbers 2004/05
0
50000
100000
150000
200000
250000
300000
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Pro
gres
sive
tota
l
Actual Annual Target
Corporate Plan Link: Sustainable growth & development
Prospective Actions
33
Agenda – Works & Services Committee 14/9/04 - #839659
Performance Rating:
����
Variance Report Good due to income & donations
Revenue 2004/05
0
10000
20000
30000
40000
50000
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Pro
gres
sive
Tot
al
Actual Annual Target
Corporate Plan Link: Sustainable growth & development
Prospective Actions None
Performance Rating:
Variance Report Numbers of school groups varies with school semester
Number of guided walks for School Groups
0
100
200
300
400
500
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
No of Walks No of Children
Corporate Plan Link: Customer & Community
Prospective Actions Continue promotion of calender of events & investigate school ciriculum
Performance Rating:
Variance Report Increase in interest possibly more interest in visitors.
# of participants in Guided walks for the public
05
10152025303540
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Participants Target
Corporate Plan Link: Customer & Community
Prospective Actions None
34
Agenda – Works & Services Committee 14/9/04 - #839659
Operating Budget Assessment:
PRBG YTD Actual ($)
YTD Budget Revised
($)
Var ($) Var (%) Variance Report & Prospective
Actions (where variance is +/- 2%)
Revenue 17,623 17,420 203 1
• “FAVOURABLE ” • Reasons: Increase revenue due to
stall holders fees from Carnival on Collins
Expenditure 209,021 201,475 (7,546) (4)
• “UNFAVOURABLE ” • Reasons: Over expenditure within
internal charges, Garden Admin • Implications / Actions : Investigate
reason
35
Agenda – Works & Services Committee 14/9/04 - #839659
ACTIVITY Cemeteries ( PRCE ) [EEE] Aim To provide an adequate supply of burial opportunities for the City and maintain
cemeteries to the high standard expected by the people of Cairns. Level of Service • Cemeteries are provided for use at Babinda, Gordonvale, White Rock and
Cairns • 100% of burial plots are prepared to time as requested • Requests for advice are responded to within 5 working days of receipt
Officer Responsible Manager Precincts and Facilities - Tony Duffy
On Target
Operating Initiative Status Corporate Plan Link Due Date Complete
Yes No *
Review, in conjunction with Strategic Planning the future land and service requirements for cemeteries in the central areas of Cairns (ie. Edmonton to Ellis Beach), with the view of acquiring additional land in the next two to three years; by March 05.
1.2.2 March 05 5% �
* Variance Report for Initiatives not on target: * Prospective Actions for Initiatives not on target :
Performance Target Assessment ( ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating:
?
Variance Report
Average installation time for Plaques
0
1
2
3
4
5
6
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Day
s
Actual Target
Corporate Plan Link: Customer & Community
Prospective Actions
36
Agenda – Works & Services Committee 14/9/04 - #839659
Performance Rating:
���� Variance Report
% of Requests responded to within 5 days
020406080
100
Jul Aug Sep Nov Dec Jan Feb Mar Apr May Jun
%
Actual Target
Corporate Plan Link: Customer & Community
Prospective Actions
Performance Rating:
����
Variance Report
Customer Satisfaction
75
80
85
90
95
100
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
%
Actual Target
Corporate Plan Link: Customer & Community
Prospective Actions
Operating Budget Assessment:
PRCE YTD Actual ($)
YTD Budget Revised
($)
Var ($) Var (%) Variance Report & Prospective
Actions (where variance is +/- 2%)
Revenue 7,816 15,289 (7,472) (49)
• “UNFAVOURABLE ” • Reasons: Revenue lower due to
seasonal conditions, re burials Implications / Actions :
Expenditure 161,081 167,605 6,524 4 • “FAVOURABLE ” • Reasons: • Implications / Actions :
37
Agenda – Works & Services Committee 14/9/04 - #839659
ACTIVITY Inner City Infrastructure Operations ( PRI C ) [EFA] Aim To provide a well presented, safe and secure Inner City (City Place to the
Esplanade) for the community of and visitors to Cairns.
Level of Service • Provide security services that meet the required service level to ensure the Inner City is a safe environment for all. Security services operate 24 hours per day, 365 days per year.
• Maintain all Inner City facilities and street landscapes to a high standard.
Officer Responsible Manager Precincts and Facilities - Tony Duffy
On Target
Operating Initiative Status Corporate Plan Link Due Date Complete
Yes No *
Provide increased monitoring of CCTV City Safe Cameras to improve effectiveness of operations by Mar 05.
6.2.2 March 05 100% �
Prepare Memorandum Of Understanding with Queensland Police Service (to assist in limiting number of incidents of unacceptable behaviour by) Dec 04.
6.2.2 Dec 04 10% �
Investigate additional sites for CCTV City Safe Cameras and assist in coordinating their installation by May 05
6.2.2 May 05 20% �
Develop a Waste Management Plan for the Inner City precinct by Dec 04
4.3.1 Dec 04 0% �
Adopt a Precinct Management approach towards development of a precinct wide programmed maintenance schedule by June 05
9.1.1 June 05 5% �
* Variance Report for Initiatives not on target: * Prospective Actions for Initiatives not on target :
Performance Target Assessment ( ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating:
Variance Report
Satisfaction with presentation & maintenance of inner city, Esplanade & Lagoon gardens
0
20
40
60
80
100
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
% o
f sur
veye
d us
ers
Poor Average Good or higher Target
Corporate Plan Link: Customer & Community
Prospective Actions Quarterly surveys
38
Agenda – Works & Services Committee 14/9/04 - #839659
Performance Rating:
Variance Report
Residents & visitors believe that there is a securi ty presence & feel safe in the inner city
020406080
100
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr% o
f sur
veye
d us
ers
Esplanade Day Esplanade Night City Place Day
City Place Night Target
Corporate Plan Link: Customer & Community
Prospective Actions
Operating Budget Assessment:
PRIC YTD Actual ($)
YTD Budget Revised
($)
Var ($) Var (%) Variance Report & Prospective
Actions (where variance is +/- 2%)
Revenue (2,805) 32,521 (35,325) (109)
• “UNFAVOURABLE” • Reasons: Sale of assets, proceeds
on disposal cleared out to $27k • Implications / Actions : Assett
Accountant still reconciling accounts for July will be connected by September.
Expenditure 528,615 620,880 95,264 15
• “FAVOURABLE ” • Reasons: Contracted security costs
not paid, will balance out over year.
39
Agenda – Works & Services Committee 14/9/04 - #839659
ACTIVITY City Place ( PRPL ) [EFB] Aim To provide a sense of place in the central business district and encourage people
to utilise this space, by staging a wide range of activities that are entertaining, and educational in a relaxed and safe environment.
Level of Service • Free public entertainment is provided in City Place from Wednesday – Friday. • Free community performances are encouraged. • Public safety services are provided in the CBD by security personnel on
contract. • Manage the needs of City Place stakeholders.
Officer Responsible Manager Precincts and Facilities - Tony Duffy
On Target
Operating Initiative Status Corporate Plan Link Due Date Complete
Yes No *
Integrate the Esplanade and City Place entertainment to reflect one Inner City Entertainment Program and promote this through What’s On Boards and newsletter, by Sep 04.
6.6.1 Sep 04 100% �
Further develop the entertainment program to incorporate alternative types of performances/activities attracting a diverse audience, by Dec 04.
6.6.1 Dec 04 40% �
Increase community use of City Place through the Your Place in the City program by Dec 04
6.6.3 Dec 04 40% �
Review and re-develop City Place Markets by Dec 04
6.6.1 Dec 04 20% �
* Variance Report for Initiatives not on target: Nil * Prospective Actions for Initiatives not on target : Nil
Performance Target Assessment ( ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating:
���� Variance Report
Monthly newsletter distribution
0
500
1000
1500
2000
2500
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
No
dist
ribut
ed
Actual Target
Corporate Plan Link: Customer & Community
Prospective Actions Reviewing mailout database and postal mailing lists.
40
Agenda – Works & Services Committee 14/9/04 - #839659
Performance Rating:
����
Variance Report
Visitations to City Place
1200370062008700
1120013700162001870021200
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
# of
vis
itatio
ns
2004/05 Actual 2003/04 Actual
Corporate Plan Link: Customer & Community
Prospective Actions
Performance Rating:
����
Variance Report
• Indicator: Number of market stall holders • Target: 10% increase • Reporting Frequency: Monthly • Performance Assessment : • Stalls Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May June
Target - - - 4 88 60 13 13 13 13 22 89 Actual 92 110
Corporate Plan Link: Customer & Community
Prospective Actions
Operating Budget Assessment:
PRPL YTD Actual ($)
YTD Budget Revised
($)
Var ($) Var (%) Variance Report & Prospective
Actions (where variance is +/- 2%)
Revenue 47,164 43,397 3,768 9
• “FAVOURABLE " • Reasons: Increase in revenue hire
Stall fees. • Implications / Actions :
Expenditure 54,760 76,133 21,373 28
• “FAVOURABLE” • Reasons: Employee costs and
entertainment cost down. • Implications / Actions : Will
balance out over year.
41
Agenda – Works & Services Committee 14/9/04 - #839659
ACTIVITY The Esplanade ( 3545 ) [EFC] Aim To provide aquatic and entertainment facilities and parklands that are well
maintained and presented in a safe environment that can be enjoyed by the local residents and visitors to Cairns.
Level of Service • Provide entertainment and facilities to cater for a range of activities to reflect community interest.
• Provide a safe and attractive environment for all participants and visitors to the Esplanade precinct.
• Provide a free, accessible and safe Esplanade swimming lagoon from 6am to 10pm between October and March, and 7am to 9pm between April and September (hours may vary due to demand and maintenance)
Officer Responsible Manager Precincts and Facilities - Tony Duffy
On Target
Operating Initiative Status Corporate Plan Link Due Date Complete
Yes No *
Further develop and expand the range of an entertainment/activity events that will utilise a number of areas around the Esplanade Lagoon and Fogarty Park, encouraging greater use of the whole area and managing the impact of wear and tear in specific areas, by Sep 04.
6.6.1 Sep 04 80% �
Further develop ‘hire kit’ and associated promotions program to facilitate greater use of facilities by Sept 04.
6.6.1 Sep 04 80% �
Develop and promote a program of activities that contribute to health and well being by, Sep 04
6.4.2 Sep 04 80% �
* Variance Report for Initiatives not on target: * Prospective Actions for Initiatives not on target :
Performance Target Assessment ( ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating:
���� Variance Report
Number of visitors to the Lagoon
0150003000045000600007500090000
105000120000135000150000
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
No
per
mon
th
Target Actual
Corporate Plan Link: Customer & Community
Prospective Actions
42
Agenda – Works & Services Committee 14/9/04 - #839659
Performance Rating:
?
Variance Report
No of Activities/ Performances held Annually
0
200
400
600
800
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
No
Actual Target
Corporate Plan Link: Customer & Community
Prospective Actions
Performance Rating:
���� Variance Report
• Indicator: Number of markets being held on the Esplanade • Target: Twice a month – Minimum 12 stall holders • Reporting Frequency: Monthly • Performance Assessment : Stalls Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May June
Target 24 24 24 24 24 24 24 24 24 24 24 24 Actual 145 136
Corporate Plan Link: Customer & Community
Prospective Actions
Performance Rating:
���� Variance Report
• Indicator: Number of people in attendance at Healthy Activities • Target: Increase by 10% • Reporting Frequency: Monthly • Performance Assessment : Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May June
Actual 348 441 Corporate Plan Link: Customer & Community
Prospective Actions
Operating Budget Assessment:
3545 YTD Actual
($) YTD Budget Revised ($)
Var ($) Var (%) Variance Report & Prospective Actions
(where variance is +/- 2%)
Revenue 47,757 36,583 11,174 31
• “FAVOURABLE " • Reasons: Venue fees and stall fees up
$16,000 on YTD • Implications / Actions :
Expenditure 281,207 399,477 58,271 17
• “FAVOURABLE ” • Reasons: Employee costs down,
unfilled positions ($40K) • Implications / Actions : Costs will even
out over year.
43
Agenda – Works & Services Committee 14/9/04 - #839659
ACTIVITY Regulated Parking ( PRRP ) [EFD] Aim To provide affordable, convenient and secure off street and on street parking
facilities that best serves the community as a whole. Level of Service • 354 covered bays provided in the Lake St Parking Station.
• 558 off street bays provided in Old Library Carpark, Grafton St and the Southern Esplanade car parks.
• 1269 metered, 250 ‘Pay and Display’ ticketed and 2481 un-metered parking bays provided in on-street parking in the central business district. Parking meters and ticket machines operate from 8.30 am – 5 pm Monday to Friday and 8.30 am – 11.30 pm Saturday.
Officer Responsible Manager Precincts and Facilities - Tony Duffy
On Target
Operating Initiative Status Corporate Plan Link Due Date Complete
Yes No *
Increase usage of parking facilities by improving customer service and satisfaction by Dec04
2.1.4 Dec 04 �
Implement the management of the expanded Cairns Traffic Area by Sept 04
2.1.4 Sep 04 �
* Variance Report for Initiatives not on target: * Prospective Actions for Initiatives not on target :
Performance Target Assessment ( ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating:
? Variance Report Pay & Display commenced operation in the old library carpark & Grafton Street carpark on 16/8/04 which brought the hourly fee from $2 per day to .50c an hour. Less vehicles are now parking in these 2 locations.
Usage of off street parking facilities
50
60
70
80
90
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
%
Actual Target
Corporate Plan Link: Customer & Community
Prospective Actions Advertsising campaign of the old library carpark and Grafton Street carpark.
44
Agenda – Works & Services Committee 14/9/04 - #839659
Performance Rating:
���� Variance Report
Usage of Lake Street parking station
50
70
90
110
130
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
%
Actual Target
Corporate Plan Link: Customer & Community
Prospective Actions
Performance Rating:
����
Variance Report
Usage of Southern Esplanade carpark
7880828486889092
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
%
Actual Target
Corporate Plan Link: Customer & Community
Prospective Actions
Operating Budget Assessment:
PRRP YTD Actual ($)
YTD Budget Revised
($)
Var ($) Var (%) Variance Report & Prospective
Actions (where variance is +/- 2%)
Revenue 607,111 534,804 72,307 14
• “FAVOURABLE ” • Reasons: Increase is being
affected by times meter parking commences and also increases in paid parking areas.
• Implications / Actions :
Expenditure 227,631 311,022 83,391 27
• “FAVOURABLE ” • Reasons: Expenditure will be
incurred during the year. • Implications / Actions :
45
Agenda – Works & Services Committee 14/9/04 - #839659
ACTIVITY Technical Support – General Administration ( 3800 ) [EKA] Aim To provide management and engineering support for all technical, maintenance
and repair activities. Level of Service Management, engineering advice and supervision provided for fleet operations,
facilities maintenance, design, survey and systems support services, in support of best value services.
Officer Responsible Manager Technical Support Services - Keith Morris
On Target
Operating Initiative Status Corporate Plan Link Due Date Complete
Yes No *
Risk Management – develop Branch Risk Registers and Treatment Action Plans by Dec04
10.2.1 Dec 04 0% �
Asset management – develop and implement management systems for Facilities Maintenance and Fleet by Jun 05.
9.1.1 June 05 30% �
Cairns Fleet – Implement Best Value Fleet Review Project recommendations by June 05.
9.1.1 June 05 0% �
* Variance Report for Initiatives not on target: * Prospective Actions for Initiatives not on target :
Performance Target Assessment ( ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating:
���� Variance Report
% of branch operating initiatives successfully completed
020406080
100
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
%
Actual Target
Corporate Plan Link: Corporate Capacity
Prospective Actions
46
Agenda – Works & Services Committee 14/9/04 - #839659
Operating Budget Assessment:
3800 YTD Actual ($)
YTD Budget Revised
($)
Var ($) Var (%) Variance Report & Prospective
Actions (where variance is +/- 2%)
Revenue 0 0 0 n/m N/A
Expenditure 13,875 14,092 217 2
“FAVOURABLE” • Reason: Combination of plus and
minus factors including fuel charged incorrectly.
47
Agenda – Works & Services Committee 14/9/04 - #839659
ACTIVITY Fleet Operations ( TSFO ) [EKC]
Aim To provide vehicle and plant hire services to the whole of Council, using a full cost
pricing Type 3 business structure model under National Competition Policy requirements.
Level of Service • Any commercially available vehicles or plant provided within 24 hours of request;
• Replacement vehicle always provided during servicing, if needed; • Vehicles maintained to roadworthy condition; • Vehicles maintained in a commercial time frame. • Plant maintained to working condition; • Metal fabrication undertaken to quoted price and timeframe.
Officer Responsible Manager Technical Support Services - Keith Morris
On Target
Operating Initiative Status Corporate Plan Link Due Date Complete
Yes No *
Implement recommendations of the Fleet Best Value Review Project by June 05.
9.1.1 June 05 0% �
Negotiate service level agreements with all customers by March 05
9.1.1 March 05 0% �
* Variance Report for Initiatives not on target: Part of Fleet Best Value Review. * Prospective Actions for Initiatives not on target : Implementation of approved fleet review recommendations.
Performance Target Assessment ( ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating:
���� Variance Report Info not available.
Vehicle or plant provided within 24 hours of request
0
500
1000
1500
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
No
Pro
vide
d
Actual > 24 hrs Actual within 24 hrs
Corporate Plan Link: Customer & Community
Prospective Actions
48
Agenda – Works & Services Committee 14/9/04 - #839659
Performance Rating:
����
Variance Report
Metal fabrication to service level
0
20
40
60
80
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
No
of J
obs
Actual > Service Level Actual to Service Level
Corporate Plan Link: Customer & Community
Prospective Actions
Performance Rating:
����
Variance Report Information not available.
Vehicle/Plant downtime for repairs
0
0.2
0.4
0.6
0.8
1
1.2
Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun
Ave
rage
Hrs
Heavy Plant Light Plant
Corporate Plan Link: Customer & Community
Prospective Actions Benchmark to be set.
Performance Rating:
����
Variance Report Not yet reported.
Customer satisfaction
50
60
70
80
90
100
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
%
Actual Target
Corporate Plan Link: Customer & Community
Prospective Actions
49
Agenda – Works & Services Committee 14/9/04 - #839659
Operating Budget Assessment:
TSFO YTD
Actual ($)
YTD Budget
Revised ($) Var ($) Var (%)
Variance Report & Prospective Actions
(where variance is +/- 2%)
Revenue 1,999,658 2,488,088 (488,430) (20)
“UNFAVOURABLE” Reason: Main reason for lack of revenue is lack of work in construction. Note that revenue and expenditure are down 20% but the relationship is correct.
Expenditure 1,990,292 2,540,260 549,967 22
“FAVOURABLE” • Reason: Many plus and minus
Fleet Hire plus $262K, Fleet Mechanical Services minus $160K due to internal lack of revenue repair & maintenance, Fleet Assets even minus $8K.
50
Agenda – Works & Services Committee 14/9/04 - #839659
ACTIVITY Facilities Maintenance ( TSFM ) [EKE]
Aim To provide maintenance and repair services for all Council buildings, electrical
systems, communication systems, air-conditioning systems, fire safety systems, emergency power systems, CCTV systems and flood alert systems (excluding Cairns Water facilities and systems).
Level of Service • Building, electrical and air-conditioning facilities and systems maintained consistent with budget provisions, lease agreements and best value practice.
• Fully maintained fire safety, emergency power systems, CCTV, flood alert and communications systems.
• All emergency call-outs attended. • Council’s CCTV surveillance system kept operational 24 hours per day. • Council’s PABX and TMR communications systems kept operational 24 hours
per day. • Council’s flood alert system kept operational 24 hours per day.
Officer Responsible Manager Technical Support Services - Keith Morris
On Target
Operating Initiative Status Corporate Plan Link Due Date Complete
Yes No *
Asset management – develop and implement management systems for Facilities Maintenance by June 05
9.1.1 June 05
* Variance Report for Initiatives not on target: Nil * Prospective Actions for Initiatives not on target : Nil
Performance Rating:
Variance Report
• Indicator: Facilities maintenance as per the capital budget • Target: Majority finished by 30 June 2005 • Reporting Frequency: Monthly • Performance Assessment :
Corporate Plan Link: Customer & Community
Prospective Actions
51
Agenda – Works & Services Committee 14/9/04 - #839659
Performance Target Assessment ( ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating:
? Variance Report
Annual building maintenance program completion
75
85
95
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
% c
ompl
ete
Actual Target
Corporate Plan Link: Service & Infrastructure
Prospective Actions
Performance Rating:
Variance Report
• Indicator: Electrical maintenance work request completions • Target: 100% within 7 days of program • Reporting Frequency: Quarterly • Performance Assessment :
Corporate Plan Link: Customer & Community
Prospective Actions
Performance Rating:
Variance Report
• Indicator: Air-conditioning maintenance work request completions • Target: 100% within 7 days of program • Reporting Frequency: Quarterly • Performance Assessment :
Corporate Plan Link: Customer & Community
Prospective Actions
52
Agenda – Works & Services Committee 14/9/04 - #839659
Performance Rating:
���� Variance Report
Emergency call-outs attended
0
5
10
15
20
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May JunNo
of c
all-o
uts
requ
este
d
Not attended Attended
Corporate Plan Link: Customer & Community
Prospective Actions Slight variance due to reduction in vandalism.
Performance Rating:
����
Variance Report
Council’s CCTV surveillance system kept opertional
0
5000
10000
15000
20000
25000
30000
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
No
of H
ours
Not Operational Operational
Corporate Plan Link: Customer & Community
Prospective Actions Nil
53
Agenda – Works & Services Committee 14/9/04 - #839659
Performance Rating:
����
Variance Report
Council’s PABX and TMR communications systems kept operational 24 hrs per day (720 hours/ month)
0
100
200
300
400
500
600
700
800
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
No
of H
ours
Not Operational Operational
Corporate Plan Link: Customer & Community
Prospective Actions
54
Agenda – Works & Services Committee 14/9/04 - #839659
Performance Rating:
����
Variance Report 1 unit down for entire month
Council’s flood alert system kept operational 24 hr s per day (13680 operation hours/ month)
0250050007500
100001250015000
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
No
of H
ours
Not Operational Operational
Corporate Plan Link: Customer & Community
Prospective Actions Russel River is being repaired in August/September
Performance Rating:
����
Variance Report
Council’s fire safety and emergency power systems kept operational (2160 operational hours / month)
0
50
100
150
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
%
Fire Systems Emergency Power Systems Target
Corporate Plan Link: Customer & Community
Prospective Actions Nil
Operating Budget Assessment:
TSFM YTD
Actual ($)
YTD Budget
Revised ($) Var ($) Var (%)
Variance Report & Prospective Actions
(where variance is +/- 2%)
Revenue 92,845 82,500 345 0
• “FAVOURABLE ” • Reasons: • Implications / Actions :
Expenditure 406,209 427,927 21,718 5
• “FAVOURABLE ” • Reasons: Some accounts/charges
for May/June have hit this months accounts
• Implications / Actions :
55
Agenda – Works & Services Committee 14/9/04 - #839659
ACTIVITY Design Services ( 3830 ) [EKG] Aim To provide certified engineering, GIS and landscape design services to the whole
of Council and other government agencies, using a full cost pricing Type 3 business structure model under National Competitive Policy requirements.
Level of Service • Investigative, preliminary and detailed designs for traffic, roads, recreation, drainage and public lighting infrastructure undertaken to quoted price and timeframe.
Officer Responsible Manager Technical Support Services - Keith Morris
On Target
Operating Initiative Status Corporate Plan Link Due Date Complete
Yes No *
Complete development of service level agreements by Dec 04.
9.1.1 Dec 04 �
Investigate external design opportunities with other government agencies subject to resource availability by June 05.
9.1.1 June 05 �
* Variance Report for Initiatives not on target: Documentation to be completed by Dec 04. * Prospective Actions for Initiatives not on target :
Performance Target Assessment (3 = Satisfactory, 2 = Marginal, 1 = Unsatisfactory)
Performance Rating:
����
Variance Report
0
0.5
1
1.5
2
2.5
3
3.5
Jul
Aug Sep OctNov Dec Ja
nFeb M
ar AprM
ay Jun
To quoted price
WithinTime
Corporate Plan Link: Customer & Community
Prospective Actions
56
Agenda – Works & Services Committee 14/9/04 - #839659
Performance Rating:
����
Variance Report
Customer satisfaction
0
20
40
60
80
100
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
%
Actual Target
Corporate Plan Link: Customer & Community
Prospective Actions
Operating Budget Assessment:
3830 YTD
Actual ($)
YTD Budget
Revised ($) Var ($) Var (%)
Variance Report & Prospective Actions
(where variance is +/- 2%)
Revenue 51,699 126,378 (74,678) (59)
• “UNFAVOURABLE ” • Reasons: Full cost recovery being
implemented • Implications / Actions : Rates
increase agreed & input into system.
Expenditure 134,997 129,059 (5,938) (5)
• “UNFAVOURABLE ” • Reasons: • Implications / Actions :
57
Agenda – Works & Services Committee 14/9/04 - #839659
ACTIVITY Survey Services ( 3831 ) [EKI]
Aim To provide engineering survey services to the whole of Council and other
customers, using a full cost pricing Type 3 business structure model under National Competition Policy requirements.
Level of Service • Investigative and detailed surveys, construction set-out and “As Constructed” survey data undertaken to quoted price and timeframe.
Officer Responsible Manager Technical Support Services - Keith Morris
On Target
Operating Initiative Status Corporate Plan Link Due Date Complete
Yes No *
Full implementation of type 3 business structure and full cost recovery by Dec 04
9.1.1 Dec 04 Complete
Refine Survey best practice and WH&S procedures with the use of robotic total station equipment by June 05
9.1.1 June 05 20% �
Sell Survey Services to external sources including government agencies (subject to resource availabilities and Council Policy) by June 05.
9.1.1 June 05 5% �
* Variance Report for Initiatives not on target: Nil * Prospective Actions for Initiatives not on target :
Performance Target Assessment ( ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating:
���� Variance Report
Survey projects undertaken to quoted price and negotiated timeframe
05
1015202530
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
No
of P
roje
cts
To timeframe As Quoted
Corporate Plan Link: Customer & Community
Prospective Actions
58
Agenda – Works & Services Committee 14/9/04 - #839659
Performance Rating:
����
Variance Report
Customer satisfaction
0102030405060708090
100
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
%
Actual Target
Corporate Plan Link: Customer & Community
Prospective Actions
Operating Budget Assessment:
3831 YTD
Actual ($)
YTD Budget
Revised ($) Var ($) Var (%)
Variance Report & Prospective Actions
(where variance is +/- 2%)
Revenue 93,902 90,755 3,147 3
• “FAVOURABLE” • Reason: Increases from 1917-
Internal Revenue
Expenditure 100,826 92,789 (8,037) (9)
• “UNFAVOURABLE” • Reason: No annual leave and sick
leave taken for one month, thus salaries and wages are higher than budgeted. Business support will also check for other factors
• Implications / Actions :
59
Agenda – Works & Services Committee 14/9/04 - #839659
ACTIVITY Systems Support Services ( TSES ) [EKM]
Aim To provide effective environmental, safety and quality systems support to the
operations of City Works & Services Division Level of Service • Environmental permitting support undertaken at customer request.
• Safety support undertaken at customer request and in accordance with Council’s SafePlan system.
• Cairns Works quality system maintained to audit requirements. • Continuous improvement of all systems undertaken with customer
consultation.
Officer Responsible Manager Technical Support Services - Keith Morris
On Target
Operating Initiative Status Corporate Plan Link Due Date Complete
Yes No *
Full implementation of Divisional (WH&S) Rectification Action Plan by March 05.
9.3.2 March 05 �
Support development of corporate environmental policy systems by June 05.
4.4.1 June 05 �
Complete development of Divisional quality system framework by March 05.
9.1.1 March 05 �
* Variance Report for Initiatives not on target: * Prospective Actions for Initiatives not on target :
Performance Target Assessment ( ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating:
���� Variance Report
Number of Environmental permits and annual returns logged with relevant agencies within
timeframes
0
5
10
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
No.
Log
ged
Outside Timeframe Within Timeframe
Corporate Plan Link: Customer & Community
Prospective Actions
60
Agenda – Works & Services Committee 14/9/04 - #839659
Performance Rating:
Variance Report
• Indicator: Cairns Works QA system certification • Target: Accreditation maintained • Reporting Frequency: Annually • Performance Assessment :
Corporate Plan Link: Services & Infrastructure
Prospective Actions
Performance Rating:
����
Variance Report
Process Improvement Projects Completed Target 20 / Year
0
2
4
6
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
No
Actual Target
Corporate Plan Link: Customer & Community
Prospective Actions
Performance Rating:
����
Variance Report
Customer satisfaction
0
20
40
60
80
100
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
%
Actual Target
Corporate Plan Link: Customer & Community
Prospective Actions
61
Agenda – Works & Services Committee 14/9/04 - #839659
Operating Budget Assessment:
TSES YTD
Actual ($)
YTD Budget
Revised ($) Var ($) Var (%)
Variance Report & Prospective Actions
(where variance is +/- 2%)
Revenue 100 0 100 n/m
• “FAVOURABLE ” • Reasons: Insignificant costs • Implications / Actions : Nil
Expenditure (2,145) 16,231 18,375 113
• “FAVOURABLE ” • Reasons: Staff issue. • Implications / Actions : Nil
62
Agenda – Works & Services Committee 14/9/04 - #839659
ACTIVITY Street Lighting ( 3855 ) [EKN]
Aim To ensure that street lighting standards and operation comply with code
provisions and community needs.
Level of Service • Street lighting provided to relevant code standards; • Maintenance and operation of street lighting conforms with budget and
relevant intervention criteria.
Officer Responsible Manager Technical Support Services - Keith Morris
On Target
Operating Initiative Status Corporate Plan Link Due Date Complete
Yes No *
Implement maintenance management system for Council controlled street lighting by June 05
2.1.3 June 05
* Variance Report for Initiatives not on target: * Prospective Actions for Initiatives not on target :
Performance Target Assessment ( ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating:
����
Variance Report
• Indicator: Instances of non-compliance with code standards for new installations • Target: 100% compliance • Reporting Frequency: Monthly • Performance Assessment : Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Compliance Non- comp 2 2
Corporate Plan Link: Services & Infrastructure
Prospective Actions
Performance Rating:
����
Variance Report
• Indicator: Number of reported street lighting outages • Target: % reduction to be determined • Reporting Frequency: Quarterly • Performance Assessment : 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
Number
Corporate Plan Link: Services & Infrastructure
Prospective Actions
63
Agenda – Works & Services Committee 14/9/04 - #839659
Operating Budget Assessment:
3855 YTD
Actual ($)
YTD Budget
Revised ($) Var ($) Var (%)
Variance Report & Prospective Actions
(where variance is +/- 2%)
Revenue 1,203 1,667 (463) (28) • “UNFAVOURABLE” • Reasons: Insignificant costs • Implications / Actions : Nil
Expenditure 11,244 254,078 242,834 96
• “FAVOURABLE " • Reasons: Internal cost transfer
Implications / Actions : Investigate costings
64
Agenda – Works & Services Committee 14/9/04 - #839659
ACTIVITY Road Infrastructure ( 3758 ) [EMA]
Aim To ensure that Council’s road infrastructure is efficiently and effectively
maintained and operated, and refurbished / renewed / constructed in accordance with Total Management Plan for Transport.
Level of Service Maintain the serviceability, safety and functionality of all roads infrastructure by the application of systematic programs for refurbishment / renewal / construction and maintenance and operation of :
- sealed roads; - unsealed roads - road shoulders - streetscapes.
Officer Responsible Manager Infrastructure Management - Sandra Burke
On Target
Operating Initiative Status Corporate Plan Link Due Date Complete
Yes No *
Refine service standards based on maintenance and operational criteria by June 05
2.1.3 June 05 �
Refine maintenance management system and pavement management systems for roads by June 05
2.1.3 June 05 �
* Variance Report for Initiatives not on target: * Prospective Actions for Initiatives not on target :
Performance Target Assessment ( ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating:
Variance Report Not yet assessed
Road maintenance expenditure per laned kilometre (sealed roads)
050
100150200250
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
$ pe
r K
M
Average per quarter 03/04 Actual 04/05
Corporate Plan Link: Services & Infrastructure
Prospective Actions
65
Agenda – Works & Services Committee 14/9/04 - #839659
Performance Rating:
Variance Report Not yet assessed.
• Indicator: Percentage of sealed roads resealed - based on area calculation –
needs to account for both asphalt and stone seals. • Target: Rated against industry standards • Reporting Frequency: Annually via DLGP • Performance Assessment :
Corporate Plan Link: Services & Infrastructure
Prospective Actions
Performance Rating:
?
Variance Report Not yet assessed
Road maintenance expenditure per laned kilometre (unsealed roads)
0
200
400
600
800
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
$ pe
r K
M
Average per quarter 03/04 Actual 04/05
Corporate Plan Link: Services & Infrastructure
Prospective Actions
Performance Rating:
Variance Report
• Indicator: Number of reported accidents on arterial, sub-arterial and collector
roads • Target: % reduction benchmark to be determined • Reporting Frequency: Quarterly • Performance Assessment : Corporate Plan Link: Services & Infrastructure
Prospective Actions
Operating Budget Assessment:
3758 YTD
Actual ($)
YTD Budget
Revised ($) Var ($) Var (%)
Variance Report & Prospective Actions
(where variance is +/- 2%)
Revenue 375,040 98,210 276,830 282
• “FAVOURABLE ” • Reasons: • Implications / Actions : Early
receipt of revenue, no implications for end of year budget.
Expenditure 2,037,139 2,074,493 37,354 2
• “FAVOURABLE ” • Reasons: • Implications / Actions : No
implication for end of year budget.
66
Agenda – Works & Services Committee 14/9/04 - #839659
ACTIVITY Kerb & Channel Infrastructure ( 3759 ) [EM C] Aim To ensure that Council’s kerb and channel infrastructure is efficiently and
effectively maintained and refurbished / renewed / constructed in accordance with Total Management Plan for Transport.
Level of Service Maintain the serviceability and capacity of all kerb and channel infrastructure by the application of systematic programs for refurbishment / renewal / construction and maintenance.
Officer Responsible Manager Infrastructure Management - Sandra Burke
On Target
Operating Initiative Status Corporate Plan Link Due Date Complete
Yes No *
Refine service standards based on maintenance and operational criteria by June 05
2.1.3 June 05 �
Develop a program for retrofit of new K & C in older suburbs by Dec 04
2.1.3 Dec 04 �
Implement maintenance management system for K & C by June 05
2.1.3 June 05 �
* Variance Report for Initiatives not on target: Nil. * Prospective Actions for Initiatives not on target : Nil.
Performance Target Assessment ( ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating:
���� Variance Report Not yet assessed
Maintenance expenditure per 100 metres of kerb and channel
0369
121518
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
$
$ per 100m
Corporate Plan Link: Services & Infrastructure
Prospective Actions
67
Agenda – Works & Services Committee 14/9/04 - #839659
Performance Rating:
Variance Report Not yet assessed
• Indicator: Number of reported complaints on serviceability of K & C • Target: % reduction benchmark to be determined • Reporting Frequency: Quarterly • Performance Assessment :
Corporate Plan Link: Services & Infrastructure
Prospective Actions
Operating Budget Assessment:
3759 YTD
Actual ($)
YTD Budget
Revised ($) Var ($) Var (%)
Variance Report & Prospective Actions
(where variance is +/- 2%)
Revenue 0 0 0 n/m
• “FAVOURABLE ” • Reason : • Implications :
Expenditure 701,585 251,445 (450,413) (179)
• “UNFAVOURABLE” • Reason : Due to seasonal nature of
program. • Implications : No implications
68
Agenda – Works & Services Committee 14/9/04 - #839659
ACTIVITY Bridges Infrastructure ( 3760 ) [EME] Aim To ensure that Council’s bridge infrastructure is efficiently and effectively
maintained and regularly inspected, and refurbished / renewed / constructed in accordance with Total Management Plan for Transport.
Level of Service Maintain the serviceability and safety of all bridges by the application of systematic programs for refurbishment / renewal / construction and maintenance and inspection to provide that all bridges are capable of carrying legal loads. The functions under this activity are as follows : - Concrete Bridges - Timber Bridges - Footbridges
Officer Responsible Manager Infrastructure Management - Sandra Burke
On Target
Operating Initiative Status Corporate Plan Link Due Date Complete
Yes No *
Refine service standards based on maintenance and operational criteria by June 05
2.1.3 June 05 �
Implement maintenance management system for bridges by June 05
2.1.3 June 05 �
* Variance Report for Initiatives not on target: Nil. * Prospective Actions for Initiatives not on target : Nil.
Performance Target Assessment ( ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating:
Variance Report
• Indicator: Maintenance expenditure per square metre of concrete of:
- conctrete bridge - timber bridge - foot bridge
• Target: Benchmark to be determined. • Reporting Frequency: Quarterly • Performance Assessment : Not yet assessed
Corporate Plan Link: Services & Infrastructure
Prospective Actions
Operating Budget Assessment:
3760 YTD
Actual ($)
YTD Budget
Revised ($) Var ($) Var (%)
Variance Report & Prospective Actions
(where variance is +/- 2%)
Revenue (18,122) 0 (18,122) n/m • “UNFAVOURABLE” • Reason: Incorrect transaction,
under investigation.
Expenditure 72,179 103,794 31,615 30
• “FAVOURABLE ” • Reason: Due to nature of program • Implications: No end of year
budget implications
69
Agenda – Works & Services Committee 14/9/04 - #839659
ACTIVITY Footpaths / Cycleways Infrastructure ( 376 1 ) [EMG] Aim To ensure that Council’s footpaths and cycleways infrastructure is efficiently and
effectively maintained and regularly inspected, and refurbished / renewed / constructed in accordance with Total Management Plan for Transport.
Level of Service Maintain the serviceability and safety of all footpaths and cycleways by the systematic application of refurbishment / renewal / construction and maintenance and inspection programs.
Officer Responsible Manager Infrastructure Management - Sandra Burke
On Target
Operating Initiative Status Corporate Plan Link Due Date Complete
Yes No *
Refine service standards based on maintenance and operational criteria by June 05
2.1.3 June 05 �
Implement Cairns Pedestrian Movement & Cycle Travel Strategy by Sep 04
2.4.1 Sep 04 Completed
Implement maintenance management system by June 05
2.1.3 June 05 �
* Variance Report for Initiatives not on target: Nil. * Prospective Actions for Initiatives not on target : Nil.
Performance Target Assessment ( ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating:
���� Variance Report Not yet assessed
Maintenance expenditure per square metre of footpath/cycleway with data from the Financial Repo rts
00.25
0.50.75
1
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
$
$ per Square Metre
Prospective Actions
Corporate Plan Link: Services & Infrastructure
70
Agenda – Works & Services Committee 14/9/04 - #839659
Performance Rating:
Variance Report Not yet assessed
• Indicator: Number of reported defects due to surface irregularities • Target: % reduction benchmark to be determined • Reporting Frequency: Quarterly • Performance Assessment :
Corporate Plan Link: Services & Infrastructure
Prospective Actions
Operating Budget Assessment:
3761 YTD
Actual ($)
YTD Budget
Revised ($) Var ($) Var (%)
Variance Report & Prospective Actions
(where variance is +/- 2%)
Revenue 0 0 0 n/m
• “FAVOURABLE ” • Reason: Unbudgeted revenue • Implications/Actions: Slightly
improved revenue position.
Expenditure 261,009 179,621 (81,388) (45)
• “UNFAVOURABLE ” • Reason: Due to seasonal
nature of program. • Implications/Actions: No end of
year budget implications.
71
Agenda – Works & Services Committee 14/9/04 - #839659
ACTIVITY Traffic Facilities ( 3762 ) [EMK] Aim To ensure that Council’s traffic facilities are efficiently and effectively maintained
and regularly inspected, and refurbished / renewed / constructed in accordance with Total Management Plan for Transport.
Level of Service Maintain the serviceability and capacity for all traffic facilities with the application of systematic programs for refurbishment / renewal / construction and maintenance and operation, including the specific provisions of : - Maintenance of traffic signal infrastructure; - Line marking and island kerbs are kept clearly visible; - Street sweeping is undertaken on regular basis and as required.
Officer Responsible Manager Infrastructure Management - Sandra Burke
On Target
Operating Initiative Status Corporate Plan Link Due Date Complete
Yes No *
Refine service standards based on maintenance and operational criteria by June 05
2.1.3 June 05 �
Implement Memorandum of Understanding with DMR on maintenance of traffic signals by Dec 04
2.1.5 Dec 04 �
* Variance Report for Initiatives not on target: Nil. * Prospective Actions for Initiatives not on target : Nil.
Performance Target Assessment ( ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating:
Variance Report Not yet assessed
Maintenanceexpenditure per signal location
0
0.5
1
1.5
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
$
$ per facility
Corporate Plan Link: Services & Infrastructure
Prospective Actions
72
Agenda – Works & Services Committee 14/9/04 - #839659
Performance Rating:
Variance Report Not yet assessed
Maintenance expenditure per 100 metres of kerb & li nemarking
0
0.5
1
1.5
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
$
$ per 100m
Corporate Plan Link: Services & Infrastructure
Prospective Actions
Performance Rating:
Variance Report Not yet assessed
Total hours of traffic signal outage
0
0.5
1
1.5
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
Hou
rs
Hours of outage
Corporate Plan Link: Services & Infrastructure
Prospective Actions
Performance Rating:
Variance Report Not yet assessed
Number of street sweeping complaints
0
0.5
1
1.5
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
Num
ber
# of Complaints
Corporate Plan Link: Services & Infrastructure
Prospective Actions
73
Agenda – Works & Services Committee 14/9/04 - #839659
Operating Budget Assessment:
3762 YTD
Actual ($)
YTD Budget
Revised ($) Var ($) Var (%)
Variance Report & Prospective Actions
(where variance is +/- 2%)
Revenue 0 0 0 n/m
• “FAVOURABLE ” • Reasons: • Implications / Actions :
Expenditure 601,704 264,476 (337,228) (128)
• “UNFAVOURABLE” • Reasons: Due to seasonal nature
of program. • Implications / Actions : Will self
correct. No implications.
74
Agenda – Works & Services Committee 14/9/04 - #839659
ACTIVITY Transport Facilities ( 3763 ) [EMM] Aim To ensure that Council’s transport facilities are efficiently and effectively
maintained and regularly inspected, and refurbished / renewed / constructed in accordance with Total Management Plan for Transport.
Level of Service Maintain the serviceability and safety of road transport facilities with the application of systematic programs for refurbishment / renewal / construction and maintenance and inspection, including the specific provisions of: - bus shelters are cleaned and inspected on a regular basis; - boat ramp and car/trailer parking areas are inspected on a regular basis
and repaired/cleaned as required; - dredging of channels are undertaken as required.
Officer Responsible Manager Infrastructure Management - Sandra Burke
On Target
Operating Initiative Status Corporate Plan Link Due Date Complete
Yes No *
Refine service standards based on maintenance and operational criteria by June 05
2.1.3 June 05 �
Implement maintenance management system by Dec 04
2.1.3 Dec 04 �
* Variance Report for Initiatives not on target: Nil. * Prospective Actions for Initiatives not on target : Nil.
Performance Target Assessment ( ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating:
���� Variance Report Not yet assessed
Maintenance expenditure per bus shelter and sq metr e of boat ramp
0100200300400500600
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
$
$ per Bus Shelter $ per square mtre boat ramp
Corporate Plan Link: Services & Infrastructure
Prospective Actions
75
Agenda – Works & Services Committee 14/9/04 - #839659
Performance Rating:
Variance Report Not yet assessed
• Indicator: Number of complaints on servicesability of bus shelters and sq metre of
boat ramp and & trailer parking • Target: % reduction benchmark to be determined • Reporting Frequency: Quarterly • Performance Assessment : 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
Bus shelter Boat ramp Corporate Plan Link: Services & Infrastructure
Prospective Actions
Operating Budget Assessment:
3763 YTD
Actual ($)
YTD Budget
Revised ($) Var ($) Var (%)
Variance Report & Prospective Actions
(where variance is +/- 2%)
Revenue 5,283 3,600 1,683 47
• “FAVOURABLE ” • Reasons: Implications / Actions :
Slightly favourable revenue position.
Expenditure 19,814 30,186 10,372 34
• “FAVOURABLE” • Reasons: Due to seasonal
nature of program • Implications/Actions: No end
of year budget implications
76
Agenda – Works & Services Committee 14/9/04 - #839659
ACTIVITY Roads Ancillary ( 3764 ) [EMO] Aim To ensure that Council’s roads ancillary facilities are efficiently and effectively
maintained and regularly inspected, and refurbished / renewed / constructed in accordance with Total Management Plan for Transport.
Level of Service Maintain the serviceability and safety for all roads ancillary facilities with the application of systematic programs for refurbishment / renewal / construction and maintenance and Inspection to enhance the amenity of the local area with specific attention to the following : • Presentation of street furniture, and • Emptying street litter bins in a cycle.
Officer Responsible Manager Infrastructure Management - Sandra Burke
On Target
Operating Initiative Status Corporate Plan Link Due Date Complete
Yes No *
Refine service standards based on maintenance and operational criteria by June 05
2.1.3 June 05 �
Implement maintenance management system by Dec 04 2.1.3 Dec 04 �
* Variance Report for Initiatives not on target: Nil.
* Prospective Actions for Initiatives not on target : Nil.
Performance Target Assessment ( ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating:
���� Variance Report Not yet assessed
• Indicator: Turnaround time for street litter bins emptying. • • Target: CBD - 1 day, General - 2 days • Reporting Frequency: Quarterly • Performance Assessment :
1st Quarter 2 nd Quarter 3 rd Quarter 4 th Quarter Central City Central General
Corporate Plan Link: Services & Infrastructure
Prospective Actions
Performance Rating:
Variance Report Not yet assessed
• Indicator: Number of complaints on presentation & functionality of street furniture • • Target: % reduction benchmark to be determined • Reporting Frequency: Quarterly • Performance Assessment :
Corporate Plan Link: Services & Infrastructure
Prospective Actions
77
Agenda – Works & Services Committee 14/9/04 - #839659
Operating Budget Assessment:
3764 YTD
Actual ($)
YTD Budget
Revised ($) Var ($) Var (%)
Variance Report & Prospective Actions
(where variance is +/- 2%)
Revenue 0 0 0 n/m
Expenditure 247,269 253,969 6,700 3
• "FAVOURABLE ” • Reasons: Due to variable nature of
activity. • Implications/ Actions: Nil.
78
Agenda – Works & Services Committee 14/9/04 - #839659
ACTIVITY Natural Disaster Response ( 3765 ) [EMQ] Aim Planning to mitigate Natural Disaster impacts and restoration of transport,
drainage and parks infrastructure following a natural disaster.
Level of Service Planning and restoration of assets occurs on a timely basis and to the pre-existing standard.
Officer Responsible Manager Infrastructure Management - Sandra Burke
On Target
Operating Initiative Status Corporate Plan Link Due Date Complete
Yes No *
Establish Natural Disaster Mitigation Plans for Transport, Drainage, Parks & Foreshores by June 05
6.5.3 June 05 �
Prepare brochure on the ‘Realities of Living with Disaster Risk’ by June 05
6.5.2 June 05 �
* Variance Report for Initiatives not on target: Initiative should be part of CW & S Business Support * Prospective Actions for Initiatives not on target : Transfer of activity to CW & S Business Support at next Operational Plan Review.
Performance Target Assessment ( ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating:
Variance Report Not yet assessed
• Indicator: Time taken for restoration of all assets • Target: Benchmark to be determined • Reporting Frequency: As required • Performance Assessment :
Corporate Plan Link: Service & Infrastructure/ Customer & Community
Prospective Actions
Operating Budget Assessment:
3765 YTD
Actual ($)
YTD Budget
Revised ($) Var ($) Var (%)
Variance Report & Prospective Actions
(where variance is +/- 2%)
Revenue 0 200,000 (200,000) (100)
• “UNFAVOURABLE” • Reasons: • Implications / Actions :
Expenditure 0 266,666 266,666 100
• “FAVOURABLE” • Reasons: No disaster has occured • Implications / Actions : Nil
79
Agenda – Works & Services Committee 14/9/04 - #839659
ACTIVITY Underground Drainage ( 3767 ) [EOC] Aim To ensure that Council’s underground drainage infrastructure is efficiently and
effectively maintained and refurbished / renewed / constructed, and the drainage network is regularly inspected to ensure operation at design capacity.
Level of Service Maintain the serviceability, capacity and structural integrity of the underground drainage network by the systematic application of refurbishment / renewal / construction and maintenance and inspection programs.
Officer Responsible Manager Infrastructure Management - Sandra Burke
On Target
Operating Initiative Status Corporate Plan Link Due Date Complete
Yes No *
Refine intervention levels to optimise service delivery from approved budget June 05
3.4.1 June 05 �
Revaluation of Drainage assets by June 05 3.4.1 June 05 � Implement maintenance management system by June 05
3.4.1 June 05 �
* Variance Report for Initiatives not on target: Nil. * Prospective Actions for Initiatives not on target : Nil.
Performance Target Assessment ( ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating:
���� Variance Report Not yet assessed
Operational costs per 100 sq metres of underground drainage
0
15
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
$
$ per 100 sq. metres
Corporate Plan Link: Services & Infrastructure
Prospective Actions
80
Agenda – Works & Services Committee 14/9/04 - #839659
Performance Rating:
Variance Report Not yet assessed
• Indicator: Number of reported incidents on inundation to habitable floor levels due
to system surcharge • Target: % reduction benchmark to be determined • Reporting Frequency: Quarterly • Performance Assessment :
Corporate Plan Link: Service & Infrastructure/ Customer & Community
Prospective Actions
Operating Budget Assessment:
3767 YTD
Actual ($)
YTD Budget
Revised ($) Var ($) Var (%)
Variance Report & Prospective Actions
(where variance is +/- 2%)
Revenue 56,657 22,600 34,057 151
• “FAVOURABLE” • Reasons: • Implications / Actions : None for
end of year.
Expenditure 565,844 598,436 32,592 5
• “FAVOURABLE ” • Reasons: Due to seasonal nature
of program. • Implications / Actions : Nil
81
Agenda – Works & Services Committee 14/9/04 - #839659
ACTIVITY Lined Drains ( 3768 ) [EOE] Aim To ensure that Council’s lined drainage infrastructure is efficiently and effectively
maintained and refurbished / renewed / constructed, and the drainage network is regularly inspected to ensure operation at design capacity.
Level of Service Maintain the serviceability, capacity and structural integrity of lined drains by the systematic application of refurbishment / renewal / construction and maintenance and inspection programs, including the specific provision of: - vegetation control - debris / silt removal - repairs to damaged lining.
Officer Responsible Manager Infrastructure Management - Sandra Burke
On Target
Operating Initiative Status Corporate Plan Link Due Date Complete
Yes No *
Refine intervention levels to optimise service delivery from approved budget June 05
3.4.1 June 05 �
Refine maintenance management system by June 05
3.4.1 June 05 �
* Variance Report for Initiatives not on target: Nil. * Prospective Actions for Initiatives not on target : Nil.
Performance Target Assessment ( ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating:
���� Variance Report Not yet assessed
Operational costs per 100 sq metres of lined drain
0
0.5
1
1.5
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
$
$ per 100 sq. metres
Corporate Plan Link: Services & Infrastructure
Prospective Actions
82
Agenda – Works & Services Committee 14/9/04 - #839659
Performance Rating:
Variance Report Not yet assessed
• Indicator: Number of reported complaints on visual amenity of lined drains • Target: % reduction benchmark to be determined • Reporting Frequency: Quarterly • Performance Assessment :
Corporate Plan Link: Service & Infrastructure/ Customer & Community
Prospective Actions
Operating Budget Assessment:
3768 YTD
Actual ($)
YTD Budget
Revised ($) Var ($) Var (%)
Variance Report & Prospective Actions
(where variance is +/- 2%)
Revenue 0 0 0 n/m
Expenditure 174,899 173,140 (1,758) (1)
• “UNFAVOURABLE ” • Reasons: Due to variable nature of
program • Implications / Actions : Nil
83
Agenda – Works & Services Committee 14/9/04 - #839659
ACTIVITY Unlined Channels ( 3769 ) [EOG]
Aim To ensure that Council’s unlined drainage channels are efficiently and effectively maintained and refurbished / renewed / constructed, and the drainage network is regularly inspected to ensure operation at design capacity.
Level of Service Maintain the serviceability, capacity and basic structural integrity of unlined channels and keep free from obstruction by the systematic application of refurbishment / renewal / construction and maintenance and inspection programs, including the specific provision of:
- vegetation control - debris / silt removal - repairs to damaged structural components.
Officer Responsible Manager Infrastructure Management - Sandra Burke
On Target
Operating Initiative Status Corporate Plan
Link Due Date Complete
Yes No * Refine intervention levels to optimise service delivery from the approved budget by June 05 3.4.1 June 05 �
Refine maintenance management system by June 05 3.4.1 June 05 �
* Variance Report for Initiatives not on target: Nil. * Prospective Actions for Initiatives not on target: Nil.
Performance Target Assessment ( ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating:
���� Variance Report Not yet assessed
Operational costs per 100 sq metres of unlined chan nel
0
0.5
1
1.5
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
$
$ per 100 squ metre
. Corporate Plan Link: Services & Infrastructure
Prospective Actions
Operating Budget Assessment:
3769 YTD Actual
($) YTD Budget Revised ($)
Var ($) Var (%) Variance Report & Prospective Actions
(where variance is +/- 2%) Revenue 0 0 0 n/m
Expenditure 125,846 172,849 47,003 27
• “FAVOURABLE ” • Reasons: Due to variable nature of
program. • Implications / Actions : No
implications.
84
Agenda – Works & Services Committee 14/9/04 - #839659
ACTIVITY Flood Mitigation ( 3770 ) [EOI] Aim To ensure that:
• the CBD area of Cairns City is protected from damage and inconvenience due to the overflow of sea-water from high tide events: and
• the drainage network is maintained at design capacity to cater for controlled flows and to minimise the risk of property damage due to stormwater overflow.
Level of Service • Minimise the entry of seawater into the CBD drainage network from extreme
tidal events by the systematic application of refurbishment / renewal / construction and maintenance and operational programs.
• Maintain stormwater detention basins at design capacity by the systematic application of refurbishment / renewal / construction and maintenance and inspection programs.
Officer Responsible Manager Infrastructure Management - Sandra Burke
On Target
Operating Initiative Status Corporate Plan Link Due Date Complete
Yes No *
Complete CBD Flood Mitigation investigation and report by March 05
3.3.1 March 05 �
Complete Beachtown Access Road Flood Mitigation investigation & report by June 05
3.3.1 June 05 �
Comments on Initiative:
Performance Target Assessment ( ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating:
���� Variance Report Not yet assessed
• Indicator: Number of reported incidents on inundation to habitable floor levels due
to flooding • Target: % reduction benchmark to be determined • Reporting Frequency: Quarterly • Performance Assessment :
1st quarter 2 nd quarter 3 rd quarter 4 th quarter # reported
Corporate Plan Link: Sustainable Growth & Development
Prospective Actions
Operating Budget Assessment:
3770 YTD
Actual ($)
YTD Budget
Revised ($) Var ($) Var (%)
Variance Report & Prospective Actions
(where variance is +/- 2%) Revenue 0 0 0 n/m
Expenditure 17,516 30,130 12,614 42
• “FAVOURABLE” • Reasons: Due to variable nature
of program. • Implications / Actions : No
implications.
85
Agenda – Works & Services Committee 14/9/04 - #839659
ACTIVITY Water Quality Infrastructure ( 3771 ) [EOK ] Aim To develop programs and standards for the improvement of stormwater
discharged to natural outlets as prescribed in the relevant sections of State and Federal legislation.
Level of Service Implement Urban Stormwater Quality Management Plan to ensure stormwater discharge meets specified standards and refurbishment / renewal / maintenance, inspection and cleaning of gross pollutant traps and other water quality management devices occurs to sustain the relevant standards.
Officer Responsible Manager Infrastructure Management - Sandra Burke
On Target
Operating Initiative Status Corporate Plan Link Due Date Complete
Yes No *
Commence implementation of Urban Stormwater Quality Management Plan by Dec 04
3.1.1 Dec 04 �
Design water quality monitoring program by June 05
3.1.1 June 05 �
Implement maintenance management system for water quality devices by June 05
3.4.1 June 05 �
* Variance Report for Initiatives not on target: * Prospective Actions for Initiatives not on target :
Performance Target Assessment ( ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating:
Variance Report Not yet assessed
• Indicator: Percentage of pollutant traps and water quality management devices
maintained, inspected and cleaned • Target: 95% • Reporting Frequency: Quarterly • Performance Assessment :
1st quarter 2 nd quarter 3 rd quarter 4 th quarter Number
Corporate Plan Link: Services & Infrastructure/Sustainable Growth & Development
Prospective Actions
Operating Budget Assessment:
3771 YTD
Actual ($)
YTD Budget
Revised ($) Var ($) Var (%)
Variance Report & Prospective Actions
(where variance is +/- 2%)
Revenue 30,140 0 30,140 n/m • “FAVOURABLE”
Expenditure 0 1,910 1,910 100
• “FAVOURABLE” • Reason: No expense against
budget Implications/ Actions: Nil
86
Agenda – Works & Services Committee 14/9/04 - #839659
ACTIVITY Parks Infrastructure ( 3772 ) [EQA] Aim To ensure that Council’s parks and open space infrastructure is efficiently and
effectively maintained and inspected, and refurbished / renewed / constructed to the standards nominated in the Total Management Plan for Parks and Foreshores.
Level of Service Maintain the serviceability and safety for all parks infrastructure with the application of systematic programs for refurbishment / renewal / construction and maintenance and inspection with specific attention to seasonally based programmed maintenance for :
• Parks vegetation control; • Parks tree maintenance; • Parks equipment/facility maintenance; • Public toilets.
Officer Responsible Manager Infrastructure Management - Sandra Burke
On Target
Operating Initiative Status Corporate Plan Link Due Date Complete
Yes No *
Refine intervention levels to optimise service delivery from approved budget by June 05
1.2.4 June 05 �
Refine maintenance management system by Dec 04
1.2.4 Dec 04 �
* Variance Report for Initiatives not on target: * Prospective Actions for Initiatives not on target :
Performance Target Assessment ( ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating:
Variance Report Not yet assessed
Maintenance and inspection expense per hectare of p ark & foreshore maintained
0200400600800
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
$
$ per ha
Corporate Plan Link: Services & Infratstructure
Prospective Actions
87
Agenda – Works & Services Committee 14/9/04 - #839659
Performance Rating:
Variance Report Not yet assessed
• Indicator: Number of reported defects of parks equipment/facilities • Target: % reduction benchmark to be determined • Reporting Frequency: Quarterly • Performance Assessment :
1st quarter 2 nd quarter 3 rd quarter 4 th quarter Defects
Corporate Plan Link: Services & Infrastructure/Sustainable Growth & Development
Prospective Actions
Operating Budget Assessment:
3772 YTD
Actual ($)
YTD Budget
Revised ($) Var ($) Var (%)
Variance Report & Prospective Actions
(where variance is +/- 2%)
Revenue (123,849) (137,142) 13,293 10
• “FAVOURABLE ” • Reasons: Incorrect coding to
Parks Infrastructure. Revenue for Foreshore Promonade should go to Precincts & Facilities will be corrected in June 04.
• Implications / Actions : No implications for year end budgets.
Expenditure 747,562 899,654 152,092 17
• “FAVOURABLE ” • Reason: Due to seasonal nature of
program • Implications/ Actions: No end of
year budget implications
88
Agenda – Works & Services Committee 14/9/04 - #839659
ACTIVITY Foreshore Infrastructure ( 3773 ) [EQB] Aim To ensure that Council’s foreshore infrastructure is efficiently and effectively
maintained and inspected, and refurbished / renewed / constructed to the standards nominated in the Total Management Plan for Parks and Foreshores.
Level of Service Maintain the serviceability and safety for all foreshore infrastructure with the application of systematic programs for refurbishment / renewal / maintenance, operation, inspection and construction with specific attention to the following:
• Beach cleaning • Foreshore vegetation control • Foreshore equipment/facility maintenance.
Officer Responsible Manager Infrastructure Management - Sandra Burke
On Target
Operating Initiative Status Corporate Plan Link Due Date Complete
Yes No *
Refine intervention levels to optimise service delivery from approved budget by June 05
1.2.4 June 05 �
Implement maintenance management system by June 05
1.2.4 June 05 �
* Variance Report for Initiatives not on target: Nil. * Prospective Actions for Initiatives not on target : Nil.
Performance Target Assessment ( ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating:
���� Variance Report Not yet assessed
Maintenance and inspection expense per kilometre of foreshore maintained
02000400060008000
10000
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
$
$ per KM
Corporate Plan Link: Service & Infrastructure
Prospective Actions
89
Agenda – Works & Services Committee 14/9/04 - #839659
Performance Rating:
Variance Report Not yet assessed
• Indicator: Number of reported defects of foreshore equipment/facilities • Target: % reduction benchmark to be determined • Reporting Frequency: Quarterly • Performance Assessment :
1st quarter 2 nd quarter 3 rd quarter 4 th quarter Defects
Corporate Plan Link: Services & Infrastructure/Sustainable Growth & Development
Prospective Actions
Operating Budget Assessment:
3773 YTD
Actual ($)
YTD Budget
Revised ($) Var ($) Var (%)
Variance Report & Prospective Actions
(where variance is +/- 2%)
Revenue 19,841 0 19,841 n/m • “FAVOURABLE ”
Expenditure 74,893 146,171 71,279 49
• “FAVOURABLE ” • Reasons: Due to seasonal nature
of activity. • Implications/ Actions: No
implications for year end budgets.
90
Agenda – Works & Services Committee 14/9/04 - #839659
PERFORMANCE PLAN REPORT 2004 / 2005
Reporting Period: August 2004
91
Agenda – Works & Services Committee 14/9/04 - #839659
1. INTRODUCTION
This report has been prepared to describe achievements against requirements nominated in the Cairns Works Business Unit Performance Plan 2004 /2005.
The Cairns Works Business Unit Performance Plan forms part of the Council’s Operational Plan and was endorsed as an agreement for Cairns City Council and Cairns Works to apply for the financial year 2004 /2005.
The Cairns Works Business Unit Performance Plan nominates:
� Council support will be provided for Cairns Works in its early years of operation;
� It is intended to apply commercial rigours to the functions undertaken by Cairns Works; and
� Financial performance targets for Cairns Works should recognise the effort required to mirror a commercial market environment.
The aim of this report is to provide information to Council and Senior Management on the performance of Cairns Works against agreed targets. It is also hoping to demonstrate a commercial approach to service delivery.
This new style of reporting will be progressively explained to Council so an appreciation of the links with Infrastructure Management and operational outputs based on customer standards will be achieved.
2. NATURE AND SCOPE OF BUSINESS UNDERTAKINGS
Cairns Works commenced operation as a type 2 business in June 2003.
The Branch establishment level was 217 (full time) staff as at that date.
Cairns Works undertakes the core functions of:
� Road and stormwater drainage construction;
� Road and stormwater drainage maintenance;
� Parks maintenance and construction;
� Other infrastructure and facilities construction and maintenance.
� Operational Activities such as street bin servicing and toilet cleaning. 3. STATEMENT OF BUSINESS INTENT
Cairns Works has embarked on a program of continuous improvement for service delivery and productivity. The intention is to demonstrate productivity by performance measures that will be refined over time.
92
Agenda – Works & Services Committee 14/9/04 - #839659
4. FINANCIAL PERFORMANCE 4.1 Cairns Works Activity (Summary of all Cairns wo rks Activities).
These figures include all of the Cairns Works Activities. These include management, construction, maintenance and RMPC. Details of individual activities are given within this report.
Performance Indicators (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory) Performance
Rating: ����
Variance Report Underspent by 20%. The under expenditure is primarily in the construction area.
Cairns Works Overall Expenditure 2004/2005
$0
$10,000,000
$20,000,000
$30,000,000
$40,000,000
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Actual Budget
Prospective Actions Construction expenditure will increase as more projects are released.
YTD Actual ($)
YTD Budget Revised
($)
Var ($) Var (%) Variance Report & Prospective
Actions (where variance is +/- 2%)
Revenue $4,650,446 $6,169,169 [$1,518,724] [25%]
• UNFAVOURABLE The majority of this revenue is internal revenue from Infrastructure Management. As expenditure is below budget, revenue is also lower.
Expenditure $4,951,906 $6,169,169 $1,217,263 20% • FAVOURABLE Expenditure is below budget.
Net [$301,460] $0 [$301,460]
93
Agenda – Works & Services Committee 14/9/04 - #839659
4.1 Cairns Works Management Activity
Cairns Works Management includes the functions of Cairns Works Management, Depot Facilities and the home cost centre which represents the construction activities to date.
The home cost centre actual expenditure should balance the actual revenue. If this is not the case. The reason needs investigation.
Performance Indicators (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating:
? Variance Report Expenditure higher than budget forecast.
Cairns Works Management Expenditure 2004/2005
$0
$2,000,000
$4,000,000
$6,000,000
$8,000,000
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Actual Budget
Prospective Actions Review this activity.
YTD Actual ($)
YTD Budget Revised
($)
Var ($) Var (%) Variance Report & Prospective
Actions (where variance is +/- 2%)
Revenue $845,189 $931,451 [$86,262] [9%]
• UNFAVOURABLE This activity is primarily a holding account for Cairns Works. Will review over next month.
Expenditure $1,305,541 $1,161,017 [$144,525] [12%] • UNFAVOURABLE Refer to above comments.
Net [$460,352] [$229,565] $230,787
94
Agenda – Works & Services Committee 14/9/04 - #839659
4.2 Cairns Works Construction Activity
As a Business Unit, Cairns Works will trade profitably on all construction projects, being reimbursed on initial quotations basis rather than actual costs. Cairns Works is required to recover all corporate overheads to be paid to Council with a 2% Rate of Return on total turnover.
The chart represents actual works completed with an anticipated full year program estimated at $9million value.
In the event of a loss on an individual project, the balance is to be sourced from the surpluses of other projects.
Performance Indicators (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating: ����
Variance Report Expenditure lower than budget. Expenditure will increase as more projects are released for construction.
Construction Expenditure 2004/2005
$0
$5,000,000
$10,000,000
$15,000,000
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Actual Budget
Prospective Actions Continue Program.
YTD Actual ($)
YTD Budget Revised
($)
Var ($) Var (%) Variance Report & Prospective
Actions (where variance is +/- 2%)
Revenue $1,153,161 $2,201,791 [$1,048,630] [48%]
• UNFAVOURABLE The majority of this revenue is internal revenue from Infrastructure Management. As expenditure is below budget, revenue is also lower.
Expenditure $1,016,962 $1,983,905 $966,943 49% • FAVOURABLE Expenditure lower than budget forecast.
Net $136,199 $217,886 [$81,687]
95
Agenda – Works & Services Committee 14/9/04 - #839659
4.3 Cairns Works RMPC Activity
This activity shows the expenditure and revenue to Council associated with the Road Maintenance Performance Contract (RMPC) with Main Roads. The actual contract runs from September to September.
This activity will show a lag between revenue and expenditure due to timing of invoices.
Performance Indicators (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating: ����
Variance Report Expenditure lower than budget forecast.
RMPC Expenditure 2004/2005
$0
$200,000
$400,000
$600,000
$800,000
$1,000,000
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Actual Budget
Prospective Actions Continue RMPC Program. The next RMPC is currently being negotiated with Main Roads.
YTD Actual ($)
YTD Budget Revised
($)
Var ($) Var (%) Variance Report & Prospective
Actions (where variance is +/- 2%)
Revenue 116,805 $143,305 [$26,499] [18%]
• UNFAVOURABLE As this activity displays progress on the RMPC, the primary assessment is actual revenue against actual expenditure. On this basis, the RMPC is on track.
Expenditure $94,112 $131,625 $37,513 28% • FAVOUABLE Refer to above comments.
Net $22,693 $11,679 $11,013
96
Agenda – Works & Services Committee 14/9/04 - #839659
4.4 Cairns Works Maintenance Activity
This activity details the total road, park and drainage maintenance budget. Currently Expenditure is below the budget that you would expect at this time of year. Maintenance Expenditure is recovered from Infrastructure Management on a dollar for dollar basis.
Performance Indicators (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating: ����
Variance Report Mtce underspent. This is normal for this time of year.
Total Maintenance Expenditure 2004/2005
$0
$5,000,000
$10,000,000
$15,000,000
$20,000,000
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Actual Budget
Prospective Actions Continue maintenance program.
YTD Actual ($)
YTD Budget Revised
($)
Var ($) Var (%) Variance Report & Prospective
Actions (where variance is +/- 2%)
Revenue $2,535,290 $2,892,623 [$357,332] [12%]
• UNFAVOURABLE This revenue is internal revenue from Infrastructure Management. As expenditure is below budget, revenue is also lower.
Expenditure $2,535,290 $2,892,623 $357,332 12% • FAVOURABLE Continue Program
Net $0 0 [0
97
Agenda – Works & Services Committee 14/9/04 - #839659
4.4.1 Maintenance Expenditure Details
The following charts depict activity in the functional areas. Straight-line forecasts for expenditure will be refined to match program trends. Measurement initially will be by financial report.
Performance Indicators (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating: ����
Variance Report Nil.
Transport Infrastucture Maintenance Expenditure 2004/2005
$0
$2,000,000
$4,000,000
$6,000,000
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Actual Budget
Prospective Actions Continue Program.
Performance Target Assessment (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating: ����
Variance Report Nil
K&C Maintenance Expenditure 2004/2005
$0
$200,000
$400,000
$600,000
$800,000
$1,000,000
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Actual Budget
Prospective Actions Continue Program.
98
Agenda – Works & Services Committee 14/9/04 - #839659
Performance Indicators (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory) Performance
Rating: ����
Variance Report Nil
Traffic Facilities Maintenance Expenditure 2004/2005
$0
$500,000
$1,000,000
$1,500,000
$2,000,000
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Actual Budget
Prospective Actions Continue Program.
Performance Indicators (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating: ����
Variance Report Nil.
Street Sweeping Expenditure 2004/2005
$0
$200,000
$400,000
$600,000
$800,000
$1,000,000
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Actual Budget
Prospective Actions Continue Program
Performance Indicators (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating: ����
Variance Report Under expenditure
Bridge Mtce Expenditure 2004/2005
$0$50,000
$100,000$150,000$200,000$250,000$300,000
Jul
Aug Sep OctNov Dec Ja
nFeb Mar Apr
May Jun
Actual Budget
Prospective Actions Annual Bridge program being developed with Roadtek.
99
Agenda – Works & Services Committee 14/9/04 - #839659
Performance Indicators (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating: ����
Variance Report Nil
Footpath Mtce Expenditure 2004/2005
$0
$200,000
$400,000
$600,000
$800,000
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Actual Budget
Prospective Actions Continue program.
Performance Indicators (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating:
? Variance Report Under Expenditure.
Transport Facilities Mtce Expenditure 2004/2005
$0
$50,000
$100,000
$150,000
$200,000
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Actual Budget
Prospective Actions Bus Shelter Mtce Program being developed.
Performance Indicators (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory) Performance
Rating:
? Variance Report Under expenditure.
Underground Drainage Mtce Expenditure 2004/2005
$0
$100,000
$200,000
$300,000
$400,000
$500,000
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Actual Budget
Prospective Actions Continue programs.
100
Agenda – Works & Services Committee 14/9/04 - #839659
Performance Indicators (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating: ����
Variance Report Nil
Lined Drains Mtce Expenditure 2004/2005
$0
$100,000
$200,000
$300,000
$400,000
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Actual Budget
Prospective Actions Continue Program.
Performance Indicators (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating: ����
Variance Report Slight Under expenditure
Unlined Drains Mtce Expenditure 2004/2005
$0$200,000$400,000$600,000$800,000
$1,000,000$1,200,000
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Actual Budget
Prospective Actions Unlined drain cleaning program being developed.
Performance Indicators (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating: ����
Variance Report Slightly underspent.
Parks Infrastructure Mtce Expenditure 2004/2005
$0
$1,000,000
$2,000,000
$3,000,000
$4,000,000
$5,000,000
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Actual Budget
Prospective Actions Expenditure should be lower at this time of year. Continue Program.
101
Agenda – Works & Services Committee 14/9/04 - #839659
Performance Indicators (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating: ����
Variance Report Underspent.
Foreshore Infrastructure Mtce Expenditure 2004/2005
$0
$200,000
$400,000
$600,000
$800,000
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Actual Budget
Prospective Actions Sand replenishment at Holloway’s beach to commence shortly.
Performance Indicators (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)
Performance Rating:
���� Variance Report Nil.
Cleansing Expenditure 2004/2005
$0
$500,000
$1,000,000
$1,500,000
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Actual Budget
Prospective Actions Continue Program
102
Agenda – Works & Services Committee 14/9/04 - #839659
5. OPERATING INITIATIVES
On Target Operating Initiative Status
Corporate Plan Link Due Date Complete
Yes No *
1. Participate with Project Services and Infrastructure Management Branches to continuously develop and implement Service Level Agreements, (SLAs).
9.3.1 Jun 2005 17% √
2. Assist development and Implement Service Specifications and workload indicators for the maintenance operation
9.3.1 Jun 2005 17% √
3. Develop and undertake customer satisfaction surveys for the maintenance and construction operations as required in the key performance indicators.
8.1.2 January 2005
15% √
4. Complete an environmental audit of Cairns works Operations and depots.
4.4.1 Mar 2005 40% √
5. Implement findings of the Cairns Works Development program conducted on the construction Branch.
9.1.2 June 2005 0% √
6. Conduct and start implementation of a development program through the maintenance operation.
9.1.2 Jun 2005 0% √
7 Prepare tenders for civil construction projects in the external marketplace, and compare performance with internal projects. Tenders submitted in accordance with Council Policy.
9.1.2 Jun 2005 17% √
8 Develop Branch Risk Register and Treatment action plans.
10.2.1 December 2004
0% √
9 Continue development and implementation of the computerised maintenance management system
10.2.1 Jun 2005 17% √
10 Complete a comprehensive list of the standing offer arrangements for Cairns Works Operations.
9.1.2 Jun 2005 17% √
11 Investigate opportunities to improve operational efficiency through the use of new technology and products.
9.1.2 Jun 2005 17% √
12 In consultation with Precincts and Facilities, identify services provided by community groups.
9.1.2 March 2005 17% √
Comments detailing progress on each of these initia tives is given over page.
103
Agenda – Works & Services Committee 14/9/04 - #839659
OPERATING INITIATIVES CONTINUED
Operating Initiative Operating Initiative Status
1. Participate with Project Services and Infrastructure Management Branches to continuously develop and implement Service Level Agreements, (SLAs).
Maintenance and Construction SLA’s have been distributed to Coordinators for comment and to provide opportunity for feedback (Jun04). Feedback received from Coordinators (Aug04).
2. Assist development and Implement Service Specifications and workload indicators for the maintenance operation
Work method statements for the maintenance operations have been drafted that include quality, safety and environmental requirements. Comments are being sought from Coordinators. (June 04). Comments have been received from Coordinators and documents altered (Aug04).
3. Develop and undertake customer satisfaction surveys for the maintenance and construction operations as required in the key performance indicators.
Jim Foley and Dalitta Ash will commence work on this shortly. (Jun04). The internet was searched and documents from other Council’s obtained (Aug04).
4. Complete an environmental audit of Cairns works Operations and depots.
The audit protocol has been developed and the audit on the Babinda and Gordonvale depot’s undertaken. (June04). Stratford depot has also been audited (Aug 04).
5. Implement findings of the Cairns Works Development program conducted on the construction Branch.
Waiting for report to be delivered (Aug04).
6. Conduct and start implementation of a development program through the maintenance operation.
Has not yet commenced. (Aug04).
7 Prepare tenders for civil construction projects in the external marketplace, and compare performance with internal projects. Tenders submitted in accordance with Council Policy.
Tenders have been successful for the following external projects: Conduiting for Main Roads ($600,000), Construction of concrete road off Yarrabah Road ($85,000), a rural crossing ($3,800), a frontage in Pembroke St, a frontage in Grafton St ($3,400) (Jun04). Quotes prepared for Cairns Water projects (Aug04).
8 Develop Branch Risk Register and Treatment action plans.
Waiting for Divisional Risk Register to be finalised prior to commencement (Aug04).
9 Continue development and implementation of the computerised maintenance management system
The two Maintenance Management System Project Officers have been preparing for the upcoming road reseal program. They will now return to the task of measuring the amount of grass mowed in each District. (Jun04). Precinct areas now measured and report submitted to General Manager (Aug04).
10 Complete a comprehensive list of the standing offer arrangements for Cairns works Operations.
The existing standing offer arrangements were recalled late last financial year as required. The following new annual supply contracts have been identified: traffic control services, herbiciding, kerb and channel cleaning, provision of plants, turf, tree maintenance, trade services. The mowing of specific areas in the Central District is current advertised. (Jun04). Mowing tender analysed and report to general manager, turf SOA documentation prepared for advertising in September (Aug04).
11 Investigate opportunities to improve operational efficiency through the use of new technology and products.
Recent products and services investigated include: A rubber speed hump has been installed at Martyn St depot as a trial, a number of different guideposts are being tested at the Gordonvale Depot, two road crack sealing companies have been tried, staff are inspecting a 3m wide mulching mower owned by Centrogen. (Jun04). The use of polymer modified bitumen in this year’s reseal program (Aug04).
12 In consultation with Precincts and Facilities, identify services provided by community groups.
A draft spreadsheet of services has been developed. This spreadsheet will grow over the year as more items are collected (Aug04).
104
Agenda – Works & Services Committee 14/9/04 - #839659
6. KEY PERFORMANCE INDICATORS AND SERVICE STANDARDS
The Cairns Works Business Unit Response Plan lists the following Key Performance Indicators and the associated targets.
KEY PERFORMANCE INDICATORS FOR CAIRNS WORKS
2004/2005
Measure Target Source of Data Measurement Frequency
Financial Required Rate of Return calculated on operational full cost for Cairns Works.
2.0% Financial reports Quarterly (See Section 15 below)
Resident Requests Response Times: Resident Requests received by telephone, mail or in person, Customer Satisfaction: Treatment of customers making requests. Precinct Mowing Street sweeping
90% of all requests completed within 3 months of being received by Jun 2005. External customer satisfaction to be 70% by June 2005. Cycle times completed to ensure 85% compliance with Service Level Requirements for mowing. Completed as required by Service level agreement.
Records of resident requests. Customer surveys. Crew Run Sheets Crew Run Sheets
Monthly Half yearly
survey format to be developed.
Quarterly Quarterly
Construction Labour Productivity Value Generated per construction employee.
Minimum of $200,000
Financial/Staff Reports
Quarterly – First measure by December 2004
Accuracy of construction resource based estimates versus actual time and cost.
Variance between estimate and actual costs. Resource based estimates from detailed plans for projects and programs.
Maximum variation of 10% (excluding customer approved variations) by June 2005
Financial reports. Quarterly – First measure by December 2004
105
Agenda – Works & Services Committee 14/9/04 - #839659
Northern District Report. In the northern district the MMS Project Officer has been working on the completion of measurement of the Northern District Precinct Areas, which is now complete. I have also been working on an inspection of all bus shelters for the northern district, I am currently filling the vacant position of RMPC and Resource Co-Ordinator for the next month which will delay road inspection until I can return to normal duties. On the road and drainage side a formal inspection of Machans Beach was conducted on the 8/06/2004 with 28 defects found, these has been entered into Northern District Defect database and the works have been scheduled into the Stratford’s Maintenance works program, 3 of these defects were rectified in the month of August, with a total of 24 defects been completed of those identified.
Northern District Works Maintenance Officer Identif ied Defects
28
0 00
21
3
0
5
10
15
20
25
30
Jun Jul Aug Sept Oct Nov Dec
Num
ber
Identified
Completed
106
Agenda – Works & Services Committee 14/9/04 - #839659
Percentage RRS Completed per Month for Northern District
99.04%
98.36%
97.10%
97.24%
96.20%
100.00%
65.48%
35.92%
0.00%
0.00%
0.00%
0.00%
90.49%
0.00%
20.00%
40.00%
60.00%
80.00%
100.00%
120.00%
209
183
241
145
184
92 84 103
0 0 0 0 1241
Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Total
This graph compares as a percentage how many Resident Response Notes have been completed from those received for the month. The number of responses received for the month is displayed above the month name. The graph for the Northern District shows that they have completed 90.49% of notes received for the Year to end of August, this now show an improvement on July’s figures of 88.51%. This is due the process being reviewed by the Stratford DMC and improvements being implemented. It is expected that further improvements will occur in the coming months.
107
Agenda – Works & Services Committee 14/9/04 - #839659
PARKS PRECINCTS FOR NORTHERN DISTRICT
This graph shows the Northern Districts Precinct Maintenance Parks areas and crews. There are four precincts in the Northern District with a sub depot at Buchans Point and one to open shortly at Trinity Beach. The Holloways crew maintains the areas of Machans Beach, Holloways Beach, parts of Smithfield and parts of Caravonica. The Trinity Beach Crew maintains the areas of Trinity Beach, Trinity Park, parts of Smithfield and Yorkeys Knob. The Buchans Point crew maintain the areas of Ellis Beach, Buchans Point, Palm Cove, Clifton Beach and Kewarra Beach. The Redlynch crew maintains the areas of Crystals Cascades, Redlynch, Kamerunga, Lake Placid and parts of Caravonica. A toolbox talk was conducted on the 19th of August with the all the precinct crews on the how, what and why we have set up the precinct runs and all crews have now begun filling in run sheets. The Redlynch mowing crew had already started their sheets and this is represented in the above grass. At this stage with the slow grass growth mowing and ground crews have combined to tackle some of the tasks that cannot be done during the growth period eg upgrading of fences, playground repairs. The crews are still ensuring that normal maintenance is carried out where required.
Precinct Mtce - NorthernParks Crews - time cycle 2004
please update dates as necessary. July Aug Sept
Crew activity
Holloways BeachGround Crew Ongoing Cycle
Mowing Ongoing Cycle
Trinity BeachGround Crew Finalizing Precinct run and areas except to start run middle of August Ongoing Cycle
Mowing Finalizing Precinct run and areas except to start run middle of August Ongoing Cycle
Buchans PointGround Crew Finalizing Precinct run and areas except to start run middle of August Ongoing Cycle
Mowing Finalizing Precinct run and areas except to start run middle of August Ongoing Cycle
RedlynchGround Crew Ongoing Cycle
Mowing 4 weeks 2 days offline Ongoing Cycle
SlashersTrinity to Buchan's Point Slasher Driver on holidays run to start middle of August Ongoing Cycle
Holloways to Redlynch Slasher Driver on holidays run to start middle of August Ongoing Cycle
30 62 9 16 235 12 19 26
108
Agenda – Works & Services Committee 14/9/04 - #839659
This above time cycle shows the program for the Northern District Sweeper for the rest of the year. In the program, the sweeper does Palm Cove Esplanade and Trinity Beach Esplanade once per fortnight, the Esplanades of Clifton, Yorkeys Knob, Holloways and Machans Beach once per month. The Suburban sweeping run starts at Machans Beach goes north up the coast to Buchans Point and then comes back down on the western side of the highway back to Aeroglen via Redlynch. At the start of September the sweeper is up to Smithfield heading north. The above time cycle is a proposed cycle and other factors eg (Reseals) may change the time line but the sequence order will remain the same. The sweeper has fallen slightly behind due to reseal preparation for the Northern District.
Stratford Sweeper Program 2004Programmed
Actual
2-Ja
n-04
4-Ju
n-04
11-J
un-0
4
18-J
un-0
4
25-J
un-0
4
2-Ju
l-04
9-Ju
l-04
16-J
ul-0
4
23-J
ul-0
4
30-J
ul-0
4
6-A
ug-0
4
13-A
ug-0
4
20-A
ug-0
4
27-A
ug-0
4
3-S
ep-0
4
10-S
ep-0
4
17-S
ep-0
4
FortnightlyPalm Cove EsplanadeTrinity Beach EsplanadeMonthlyClifton Beach EsplanadeYorkey's Knob EsplanadeHolloways Beach EsplanadeMachan's Beach EsplanadeSuburban SweepMachan's Beach Holloways Beach Yorkey's KnobSmithfield EastTrinity ParkTrinity Beach Kewarra BeachClifton BeachPalm CoveBuchans PointClifton WestKewarra WestTrinity WestSmithfieldCaravonicaLake PlacidKamerungaRedlynchStratfordAeroglenOffline Works Reseals
109
Agenda – Works & Services Committee 14/9/04 - #839659
Southern District Report. This graph details the activity breakdown for the works maintenance for the Southern District for the month of August. There has been some work on concrete path repairs, and drain cleaning during the dry spell. The Southern crews have been busy on reseal preparation work for the month of August and this is reflected in the lower number of defects completed for August. With reseals preparations nearly completed crews will be going back to routine maintenance.
Southern District Works Mtce Defects Completed for Month of August
3
9
3
0
1
3
0
0
1
1
0 2 4 6 8 10 12
Stormw ater Pipe
Reseals
Pothole Lamination
Pavement Sw eeping
K&C Repairs
K&C Cleaning
Guide Posts
Drain Cleaning
Concrete Path Repairs
Typ
e O
f Def
ect
Number Of Defects
RoutineRRS
110
Agenda – Works & Services Committee 14/9/04 - #839659
This graph compares as a percentage how many Resident Response Notes have been completed from those received for the month. The number of responses received for the month is displayed above the month name. The graph for the Southern District shows that they have completed 97.30% of notes received for the Year to end of August. The Southern District is completing 100% of Notes received for a month in a three months period as stated in previous reports.
Percentage RRS Completed per Month for Southern District
100.00%
100.00%
100.00%
100.00%
98.84%
92.31%
91.23%
87.32%
0.00%
0.00%
0.00%
0.00%
97.30%
0.00%
20.00%
40.00%
60.00%
80.00%
100.00%
120.00%
110
119
159
74 86 65 57 71 0 0 0 0 741
Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Total
Month and Total Received
Per
cent
age
Com
plet
ed
111
Agenda – Works & Services Committee 14/9/04 - #839659
Parks Precincts for Southern Districts .
This graph shows the time cycles for the Southern District Precinct Maintenance Parks run. The graphs now is starting to show a regular pattern with most crews, the mowing crew for the Pharaohs has now been split in two from the start of June due to the large area of mowing and this will be represented in future time cycle graphs. At the end of June a toolbox talk was conducted with the precinct crews on how to fill in the run sheets and the reasons why we need this information recorded eg. (Legal reason to prove when areas were mowed if someone was injured in a park, etc). This has cleared up some confusion and should result in more regular time cycles for all the crews. The mowing crews for the Centurions and the Pharaohs mower 1 are currently offline and assisting the ground crews with maintenance and other duties. The contractor for Pharaohs Mower 2 has been stood down while the grass growth is slow and will be put back on in the growth season.
Precinct Mtce - Southern Parks Crews - time cycle 2004 please update dates as necessary.
June Crew activity
Centurions Ground
Crew 2 weeks 4 days
3 weeks 3 weeks 2 days
ongoing cycle
Mowing 1
2 weeks 3 days
2 weeks 2 weeks 1 day
2 weeks 3 days
offline they are assisting Ground Crew
Mowing 2
2 weeks 2 days
2 weeks 2 weeks 1 day
2 weeks 3 days
offline they are assisting Ground Crew McKinnon's
Clan Ground Crew
3 week 1 days 3 weeks 4 days
3 weeks 4 days
ongoing cycle
Mowing
3 weeks 2 day
3 weeks 4 days
3 weeks 4 days
ongoing cycle Pharao
hs Ground Crew
6 weeks 12 days other work
ongoing cycle
Mowing 1
5 days off line 2 weeks offline they are assisting Ground Crew
Mowing 2
2 weeks 1 day
2 weeks 3 days
Offline contractor not required at moment due to slow growth period Flintston
es Ground Crew
3weeks 4 days
6 weeks 2 weeks other work
ongoing cycle
Mowing
2 weeks 4 days
offline 2 weeks 3 days
offline 2 weeks ongoing cycle Babinda
Colts Ground Crew
5 weeks 2 days
3 weeks 2 days
ongoing cycle
Mowing
3 weeks 3 weeks 4 days
ongoing cycle
July 5 12 19 26 28 7 14 21 6 13 20
Aug Sept 9 16 23 30 2
112
Agenda – Works & Services Committee 14/9/04 - #839659
The above time cycle show the program for the Southern Sweeper, the sweeper is about two week behind schedule on is suburban sweep and this is due part to preparation work on the reseal, with the reseals finishing in September more time will also be spent on reseal work in September so it is not expected that he will catch up on the Suburban cycle until October.
Dates shown are for week ending 2-
Jan-
04
21-M
ay-0
4
28-M
ay-0
4
4-Ju
n-04
11-J
un-0
4
18-J
un-0
4
25-J
un-0
4
2-Ju
l-04
9-Ju
l-04
16-J
ul-0
4
23-J
ul-0
4
30-J
ul-0
4
6-A
ug-0
4
13-A
ug-0
4
20-A
ug-0
4
27-A
ug-0
4
3-S
ep-0
4
WeeklyGordonvale CBDEdm onton CBD service Sick
Mulgrave Rd rdo
Babinda AreaSugar W orld rdo
Bi-W eekendlyAloom ba School
Ham bledon School
Bentley Pk School
St Teresa's School
Trinity Anglican School
W hite Rock School
St Mary's School
St Gerard Mesella School
Balaclava Rd
Toogood Rd
Robert Rd Ishm ael Rd
Mt Peter Rd
W alker Rd Hardy rd
Supply Rd Industrial Area
Swallow Rd Industrial Area
Kern St Industrial Area
Kate St Industrial Area
Roundabouts by 7 2 4
Roundabouts by 7 3 4 4
Roundabouts by 7 7 4 4
9 W eekly Gordonvale
Edm onton
Bentley Park
Mt Sheridan
W hite Rock
Forest Gardens
Bayview
W oree
Earlville
Funeral on the 19/06
113
Agenda – Works & Services Committee 14/9/04 - #839659
The above tables show the number and type of defects completed in the Central District for the year so far.It also shows the number of defects identified compared to completed. The number of defects completed for the month is lower than normal due to the amount of crews assigned to preparation work for the reseals. It is expected that the reseals will be completed in the next week or two depending on the weather. This will allow crews to get back onto programmed maintenance.
0 10 20 30 40 50 60
Number of defects completed
Completed For Month
Bus Shelter Maint
Conc Path Repairs
K&C Cleaning
K&C Repairs
Pothole patching
Segmental Paver Repairs
Street and park litter collection
Unlined Drain Cleaning
Central District Works Mtce Defects Completed For Month of August
Central District Works Mtce Officer Identified Defects
050
100150200250300350
Jan
Feb Mar
Apr
May
June
July
Aug
ust
Num
ber
Identified Completed
114
Agenda – Works & Services Committee 14/9/04 - #839659
The above table shows as a percentage the number of R.R.S. complaints completed for each month and total for the year so far for the Central District. It shows a big improvement of total completed for the year from 84.06% to 93.92%. The crews have been spending a lot of their time on preparation work for the reseals, it is planned in the coming months to complete a higher number of outstanding R.R.S’s once the reseals are finished. The big improvement in R.R.S.s completed is due to the relevant forepersons making an extra effort to clear out old R.R.Ss.
Percentage RRS Completed per Month for Central District
97.30%
97.87%
95.20%
94.35%
96.10%
98.92%
86.91%
74.11%
0.00%
0.00%
0.00%
0.00%
93.92%
0.00%
20.00%
40.00%
60.00%
80.00%
100.00%
120.00%
444
469
542
301
308
185
191
224
0 0 0 0 2664
Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Total
Month and Total Received
Per
cent
age
Com
plet
ed
115
Agenda – Works & Services Committee 14/9/04 - #839659
The above table shows the time cycles of each of the precinct crews in the Central District and also offers explanations for cycles that are taking longer or shorter periods than normal. With the growth of the grass continuing to slow most crews are attending to park and playground maintenance and complaints.
Precinct Mtce - CentralParks Crews - time cycle
July Augustcrew activity
The CannonsGround Crew 5 weeks 3 days undergoing
Mowing 1.5 weeks 2 weeks 3 days undergoing
The EelsGround Crew 3 weeks 3 days undergoing
Mowing 4 weeks 2 days undergoing
The JetsGround Crew 4 weeks 2 weeks 2 days undergoing
Mowing 4 weeks 3 weeks 3 days undergo
The LakersGround Crew 4 weeks 4 days undergoing
Mowing 2 weeks 3 days 2 weeks 1 day undergoing
The RoosGround Crew 6 weeks 2 days undergoing
Mowing 3 weeks 4 days 2 week 3 days undergoin
The RoadrunnersGround Crew 5 dys 6 dys 1 week 5 days 1 week 1 week undergoing
Mowing 5 dys 6 dys 1 week 6 days undergoing
Wide Deck Mower
Mowing 1.5 weeks 1.5 weeks 1.5 weeks 1.5 weeks 1 wk undergoin
1619 26 2 9 23 305 12
116
Agenda – Works & Services Committee 14/9/04 - #839659
Programmed
Actual
Dates shown are for week ending 16
-Apr
-04
23-A
pr-0
4
30-A
pr-0
4
7-M
ay-0
4
14-M
ay-0
4
21-M
ay-0
4
28-M
ay-0
4
4-Ju
n-04
11-J
un-0
4
18-J
un-0
4
25-J
un-0
4
2-Ju
l-04
9-Ju
l-04
16-J
ul-0
4
23-J
ul-0
4
30-J
ul-0
4
6-A
ug-0
4
13-A
ug-0
4
20-A
ug-0
4
27-A
ug-0
4
3-S
ep-0
4
10-S
ep-0
4
17-S
ep-0
4
24-S
ep-0
4
WeeklyCairns CBD (Swept Every Night)
Sites below swept every FridayMcCormack St (Traders Lane)
Resevoir Rd (Shops)
Koch St (Festival Faire)
Hoare St (Shops)
Eureka & Gatton St ( Tafe College)
Anderson St (Ambulance)
Little St (Cominos House)
Sheridan St (Cairns High 4 sides)
Martyn st Depot
Botanical Gardens (Once a week)
Bi-MonthlyFreshwater
Brinsmead
Whitfield
Kanimbla
Edge Hill
Manoora
Mooroobool
Manunda
Westcourt
Parramatta
Bungalow
Portsmith
North Cairns
The above table shows the expected date of a service (sweep) of a suburb and is indicative only.The time between sweeps of suburbs is 7 weeks, with R.R.S. complaints attended to as they arise.The specific sights listed above are swept every Friday with the exception being the C.B.D. which is swept every night.
Central Sweeper Program 2004 By Weeks
117
Agenda – Works & Services Committee 14/9/04 - #839659
WORKS & SERVICES COMMITTEE
14 SEPTEMBER 2004
3
MAJORMAJORMAJORMAJOR PROJECTS STATUS REP PROJECTS STATUS REP PROJECTS STATUS REP PROJECTS STATUS REPORT ORT ORT ORT ---- PROJECT SE PROJECT SE PROJECT SE PROJECT SERVICES BRANCHRVICES BRANCHRVICES BRANCHRVICES BRANCH
Michael Kahler: 1/3/81: #813735v3
RECOMMENDATION: It is recommended that the report be noted.
INTRODUCTION: The following update is provided on current major projects being managed by Project Services.
Project: REDDEN CREEK BRIDGE Superintendent: Michael Kahler Project Officer Preconstruction: John Burton Project Officer Project Delivery: Bob Campbell Principal Contractor: Total Construction Services Pty Ltd Design Consultant: GHD Pty Ltd Scope of Works: Replacement of the existing timber bridge across
Redden Creek with reinforced concrete bridge. Key Achievements (Construction Phase)
- Construction work commenced late August 2004. - Current works include the procurement of concrete piles and beams from Rocla
Pipelines and the construction of the temporary detour road around the bridge.
118
Agenda – Works & Services Committee 14/9/04 - #839659
Issues
- None identified at this time.
Future Milestones
- Commence piling 28 September 2004. - Commence bridge deck installation 26 October 2004. - Contract date for Practical Completion 17 December 2004. - Target date for Practical Completion 6 December 2004.
Financial Data
MONTHLY REPORT SEPTEMBER 2004 REDDEN CREEK BRIDGE CONTRACT 55144
Contract Amount 1,063,010.00 Projected Variations 20,000.00 Projected Deductions for Service Relocations -$40,000.00 Total Contract Cost
$1,043,010.00
Cost of concrete piles and beams purchased by Council 185,030.00 Bridge lighting 10,000.00 Embankment Treatment to approaches – Relocation and Reinstatement of existing water and sewer mains by Cairns Water
50,000.00
Projected Contract Admin Cost 30,000.00 Design and Administration expenditure to date 83,000.00 Project Total Project Cost
$1,406,040.00
Budget Allocation
$1,370,000.00
Project: HOLLOWAYS BEACH COASTAL PROTECTION WORKS - STAGE 2
Project Manager: Michael Kahler Principal Contractor: CEC Constructions Pty Ltd
Design Consultant & Superintendent: GHD Pty Ltd
Scope of Works: Design and construction of a rock wall from Lot 47 RP42753 to Cassia Street, Holloways Beach (or part of). Cost of works to be recovered through Benefited Area Rate for extent of private property frontages.
119
Agenda – Works & Services Committee 14/9/04 - #839659
Key Achievements
- Works on Stage 2A (No. 26 – 40 Hibiscus Lane) completed. - EPA approval has been obtained for the Stage 2A & 2B works. - Works on Stage 2B (2-24 Hibiscus Lane) underway. All land owners have
agreed to participate, inclusive of those with existing approved rock walls. Works are almost complete.
Issues
- Final contract amounts to be calibrated with Special Rate repayment amounts. - Sand source and relevant permits to be secured for Stage 3 works,
investigations currently underway by GHD. - Stage 3 will not be completed before 2004/05 cyclone season. - Delays have occurred on site, some tidal related, some contractor related.
Future Milestones
- Complete Stage 2B mid September 2004. - Complete Stage 3 design and documentation in November 2004. - Stage 3 Contract award will be targeted for April 2005.
Financial Data
- Total project allocation Stage 2 $1,200,000.00 (majority of which to be recovered via Benefited Area Rate).
- Total project allocation for Stage 3 is approximately $1,100,000. Project: BOTANIC GARDENS/TANKS REDEVELOPMENT
ENGAGEMENT OF CONSULTANTS FOR MASTER PLAN DEVELOPMENT
Project Manager: Michael Kahler Project Steering Group: Kathryn Cogger, Tony Duffy, Leslie Sparkes Superintendent: Michael Kahler Principal Consultant: EDAW Gillespies
(Formerly Landplan Landscaping Architects) Contract Award Date: 3 November 2003 Scope of Works: Preparation of a Master Plan for the Botanic Gardens
Precinct.
120
Agenda – Works & Services Committee 14/9/04 - #839659
Recent Key Achievements
- Landplan engaged as principal consultant. Consultancy fee $135,000.00. Pre-start meeting undertaken at Council offices.
- Landplan have undertaken consultation with Council staff in relevant sections. - Briefing provided to CEOs, Councillors on Steering Committee by Landplan
Project Team on 27.11.03. - Background research and concept development ongoing. - Consultation with all stakeholders ongoing. - Area Master Plan has been adopted in principal by the Project Steering Group.
Issues
- Precinct Master Plans to be prepared. - Scope of works for Phase 1 of the area Master Plan confirmed by Project
Steering Committee to include closure of MacDonnell Street, realignment of Collins Avenue and construction of a visitor centre and administration buildings.
- All stakeholder requirements must be clearly defined and incorporated into project charter of successful consultant.
- Negotiations have commenced with regard to the purchase of Whitfield House. Future Milestones
- Precinct Master Plans to be presented to Project Steering Committee in September 2004.
- Second stage of public communications to commence in September 2004. - Preliminary costings and staging plan to be presented back to Steering
Committee in September 2004. - Master Plan due for completion November 2004.
Financial Data Grafton Arts
- Total project allocation of $1,700,000.00 (PCP5050) for the relocation of
Graft’n’Arts to the Botanic Gardens. - Consultancy cost awarded $135,000.00. - Preconstruction cost to date approximately $25,000.00.
Botanic Gardens
- Total project allocation $3,900,000.00.
121
Agenda – Works & Services Committee 14/9/04 - #839659
Project: GATEWAYS MEDIAN PROJECT Project Manager: Michael Kahler Project Officer: Andrew Baxter Principal Contractor: Cairns Works Head Consultant: N/A Scope of Works: Upgrading of Mulgrave Road – Henley to Kelly Street
(Stage 3). Key Achievements (Construction)
- DMR has agreed to fund some kerb replacement and drainage works. - Works almost complete on Mulgrave Road – Henley to Kelly Street.
Issues - DMR have advised they do not want any banners or signage (advertising) in
central median – this may impact on funding sources from businesses. Future Milestones
- None identified at this time with exception of installation of Main Roads crash barrier near Clarkes Creek.
- Complete construction in July/August 2004 with the exception of works near Clarkes Creek, which are on hold pending arrival of Main Roads crash barrier assembly to be installed at this location.
- Barrier is expected to arrive from America in September 2004. Financial Data
- Project Budget (Stage 3) in the vicinity of $800,000 (this fully expends all funds for 2003/04 budget) for Gateways projects.
Project: REED ROAD UPGRADE Project Manager: Michael Kahler Project Officer: Andrew Baxter Design Consultant: GHD Pty Ltd Scope of Works: Upgrading of Reed Road to a combination of 4
and 2 lanes in response to new subdivision works.
122
Agenda – Works & Services Committee 14/9/04 - #839659
Key Achievements
- Design contract let to GHD Pty Ltd. - Meeting held with GHD Pty Ltd to discuss suitable concepts. - Initial and second round of community consultation undertaken. - Discussions held with Holy Cross School on the impact of works. - Road configuration options being analysed. - Preliminary designs have been developed and ready for approval by General
Manager City Works & Services before proceeding to detailed design stage. Issues
- Concept discussions have highlighted considerable traffic concerns at the proposed Bluewater Canal Development entry area involving boat ramp and carparking – issue is being investigated and progressed by Infrastructure Management.
- Desire to have works substantially complete within 12 months due to Bluewater Canal project although not essential.
Future Milestones
- Design works to be finalised in September 2004. - Construction works anticipated to be constructed in 3 stages being
November/December 2004, and March/April 2005 with the final stage expected to commence in July 2005 subject to funding.
Financial Data
- Significant funds for the works have been collected through developer contributions.
- Some shortfalls of funding likely as not all development contributions have been received with monies coming in as lots are subdivided.
Project: SOUTHERN CORRIDOR SPORTING ACTIVITIES Project Manager: Michael Kahler Project Officer: Alexandra Atkins Principal Contractor: N/A Head Consultant: N/A
123
Agenda – Works & Services Committee 14/9/04 - #839659
Scope of Works: Fuller Park (QSR F-026-00074) Existing park facility. Surface improvements to cricket oval, drainage, install irrigation and safety fence. Johnson Park (QSR F-026-00075) Existing park facility. Surface improvements, drainage and installation of irrigation. Luisa/Farmer Street Park (QSR F-026-00077) Greenfield site. Construct one football field with lighting, two junior fields, clubhouse and car parking area.
Key Achievements
- A Register of Issues for each Park updated 1 September 2004 (#792092). Basis of ongoing tracking of progress (lists of all issues raised, responsibilities and deadlines).
- Schedule/Gantt chart developed outlining the scope of the works and the deadlines for all three parks. (#813899, 813903, 813905).
- Consultancy PS17/2004 “Detailed Survey” completed 22.7.2004. - Consultancy PS18/2004 “Soil & Turf Advice” – awarded to NQ Sports Turf
Management Pty Ltd for 3 parks for $17,680.00 Total Lump Sum Fee. Completed mid August 2004. Results are:
1. File Number 26/7/34-01 - #828351, 831365, 831473, 836857, 836858 Compilation of these documents by Alex Atkins is #836183v2.
Information organised in tables for ease of use by engineering consultants (PS21/2004).
2. Awarded Engineering Design and Documentation Consultancy
PS21/2004 to GHD on 30 August 2004. Evaluation #829962v3 – 5 submissions received.
Should have Tender Documents ready by end of October 2004 for tendering November/December 2004. Hope to begin construction after wet season for Luisa/Farmer and Johnson before wet season for Fuller Park.
Luisa/Farmer Park PCP6500 $31,900.00 Fuller Park PCP6510 $14,672.50 Johnson Park PCP6520 $14,672.50 Lump Sum Fee $61,245.00
124
Agenda – Works & Services Committee 14/9/04 - #839659
- Schedule C Stage 3 Compliance was due 27 August 2004. Status is:
STATUS ITEM
COMMENTS JOHNSON FULLER LUISA/FARMER
C12
Architect Letter
N/A
N/A
Extended to 15 October 2004
C13 Development Approval
N/A N/A Extended to 26 November 2004
C14 Building Approval
N/A N/A Extended to 26 November 2004*
C15 Tender Documentation
Extended to 15 October 2004
Extended to 15 October 2004
Extended to 12 October 2004*
C16 Pre-Tender Extended to 15 October 2004
Extended to 15 October 2004
Extended to 12 October 2004
C17
Cashflow
Approved
Approved
Approved
C18
Tendering
Extended to 15 October 2004
Extended to 15 October 2004
15 October 2004
* Asked for 15 October 2004 in letter dated 17 August 2004 #811858. - PS21/2004 documents for tendering should be available mid to end October
2004. Once ready, get all of Stage 3 items approved, then claim expenses from SRQ.
- Monthly progress and cost reports sent 30 August 2004 for August 2004. (To SRQ).
Issues
- Cannot claim expenses from SRQ until Stage 3 compliance documents approved
- The Luisa/Farmer Park application to SRQ did not adequately deal with field dimensions and orientation and the available area of the chosen site. As a result this park is on hold and awaiting advice from Precincts & Facilities Branch following discussions with Education Queensland regarding the lease/acquisition of land adjacent to this area. This has a major impact on the scope of works, costs and deadlines advised to SRQ for this project. Awaiting further information from P&F. GHD will do Master Plan Stage until this is resolved (includes SRQ feedback).
- Site Management Plans are required for Fuller and Johnson Parks due to the land previously being landfill sites. (Required as a condition of approval by EPA).
125
Agenda – Works & Services Committee 14/9/04 - #839659
Future Milestones
- Received EPA response (to #812800) dated 17 August 2004 #832663. - Require an SMP for Johnson and Fuller Park to be approved by EPA. GHD
included this in their price. - EQ land deal to be finalised after Master Plan Stage. - SRQ funding subsidy status check after informing SRQ of EQ land. - EQ letter received dated 20 August 2004 #835170 stating will enter into an
agreement for land use at Luisa/Farmer Street Park.
Financial Data
- No expenses can be claimed from SRQ until all Schedule C Stage 3 compliance issues have been approved, which won’t be until October/December 2004.
- Consultancy PS21/2004 Engineering, Design and Documentation will produce tender documents ready for tender process in November/December 2004.
- Construction after wet Luisa/Farmer and Johnson, before wet Fuller Park. Project Budgets:
PARK CAIRNS CITY
COUNCIL QSR 50% SUBSIDY
TOTAL BUDGET
JOHNSON
$384,900
$384,900
$769,800
FULLER PARK
$105,000
$105,000
$210,000
LUISA/FARMER
$490,000
$434,750*
$924,750
TOTALS
$979,900
$924,650
$1,904,550
NOTE: These figures were incorrect on previous report.
Luisa/Farmer was supposed to be CCC:SRQ 50/50 $490K each. Total $980K but SRQ took off carpark etc costs and downgraded subsidy to $434,750.
*Some items not included in the subsidy
MICHAEL KAHLER Manager Project Services JOHN HAWKES General Manager City Works & Services
126
Agenda – Works & Services Committee 14/9/04 - #839659
WORKS & SERVICES COMMITTEE
14 SEPTEMBER 2004
4
INDIAN MYNA BIRD PROJECT
Rachel Small : 13/8/1: #831867
RECOMMENDATION: Council note the progress of the Indian Myna bird m inimisation trial, and advise to Hon. Warren Entsch Federal Member for Leichhardt that future funding should be directed toward roost trap trials.
INTRODUCTION: Issues regarding the abundance of Indian Myna birds in Cairns has received extensive media coverage in recent times. Requests for an eradication program to be implemented are regularly received from the public. Council first became involved when (then Councillor) Jason O’Brien designated funding from his discretionary fund for the purchase of two traps. Council has since been approached by the Hon. Warren Entsch Federal Member for Leichhardt who is very enthusiastic for a program to be developed and launched. Given the circumstances, there was a need for Council to investigate the appropriateness of becoming the main proponent of a trapping program, determine how successful it would be in reducing the Myna bird population and any other trapping options which should be explored in terms of population reduction.
BACKGROUND: Mr Entsch has briefed the Federal Minster for Environment & Heritage the Hon. Ian Campbell MP of the Myna bird problem in the Far North, and advised him that a targeted management program is warranted. In addition, his office has coordinated a stakeholder meeting to discuss how to progress a Myna bird minimisation program. Council is now in the receipt of four traps. In investigating the likelihood of success, Council in conjunction with Cairns Water made a commitment to implement a three week trial trapping program based at the Northern Sewage Treatment Plant and a residential property. Localities were chosen due to accessibility, presence of birds, observation opportunity and security. The purpose of the trial was for Council’s Pest Management Unit to investigate options and document the procedure for capture and euthanising Mynas. This trial was to refine the methodology to suit the North Queensland environment and bird population, and gain “in-house” understanding of trap operation.
127
Agenda – Works & Services Committee 14/9/04 - #839659
During the stakeholder forum, Mr Entsch gave an undertaking to seek further Federal government funding for a program which would enable a Myna bird minimisation program to be delivered to the greater Cairns community. Mr Entsch has formally requested that Council coordinate the program using the proposed program funds. At a broader scale, the stakeholder group recognised that the use of small traps may have short comings in reducing bulk numbers. In this respect, the development of a roost trap trial was also discussed.
COMMENT: Council’s trial period is drawing to a close. Information strongly suggests that the Myna bird traps are ineffective. This fact has little to do with the design of the traps, but more the environmental factors which cannot be controlled in the Far North. This specifically relates to the abundance of a natural food supply in all seasons, as opposed to other areas which have a distinct winter season and hence less food. In simple terms, the birds do not have to risk accessing a trap to obtain food. Further, native birds such as the Spangled Drongo and Sacred Ibis have excluded the Myna birds as they are a more dominant and aggressive species. In the meantime, the Federal government is considering an option to expand the trial into two activities. Activity 1 Continue Localised Trapping: Over seven months, develop a system to identify where the Myna bird “hot spots” are located. In these areas raise the awareness of residents in terms of the impact of Mynas, and as a follow-on develop their relationship with government, local environment and interest groups and corporate entities to implement trapping. At this stage, there has been no indication that funding is forthcoming from the Federal government via Mr Entsch. Activity 2 Research and Trial of Roost Traps in Cairns: Whilst it is reported that the small traps have the capacity to hold up to 50 birds, a roost trap would lure large numbers into a sheltered area, which would then act as the capture and euthanaising chamber. It is reputed that this may have the capacity to hold up to 500 birds. Roost research has been scoped, however the Australian National University has indicated that its willingness to implement a working trial exclusively in the Far North would require significant financial support. Based on current evidence, Council officers are quite concerned that activity 1 will be costly to deliver, and only provide a limited/ token impact on the Myna bird population. For this reason it is recommended that Council suggest to Mr Entsch that all resources should be focussed on a roost trapping program rather than residential trap coordination and support.
128
Agenda – Works & Services Committee 14/9/04 - #839659
CONSIDERATIONS: Statutory: Indian Myna Birds are not classed as pests under the Department of Natural Resources & Mines, Land Protection Pest and Stock Route Management Act (2002). As such Council has no authority to issue control or eradication notices for Myna Birds under this Act or any other legislation. In this case, similarities may be drawn between these birds and Pigeons. Policy: Council’s Pest Management Plan identifies Myna Birds as having a threatening effect on the environment – however only attracting a medium priority level for control measures. Financial: There has been a funding impost for Council in the initial trial period, however as Council agreed to the use of the discretionary fund to purchase traps in the first instance, then this is to be expected. At the outset, there was no indication as to how intensively this project would be implemented, or which area of Council would take on the (un-resourced) responsibility of project implementation to any extent. Council’s Pest Management Unit have taken on the responsibility to implement the trial, during which time every attempt has been made to not neglect legislative duties. All costs associated with the project will be collated. Should activity 1 be adopted then Council’s involvement is expected to be fully funded. If activity 2 is supported (without the possible redirection of Federal funds), then the roost trap trial is expected to be partly privately funded. In this respect it has been suggested by the office of the Member for Leichhardt that a contribution would be sought from Council and others (eg. Cairns Port Authority) for the project to occur in Cairns. Social: Via publicity generated by the office of the Member for Leichhardt, Cairns Water have developed a database of interested people and groups which has now reached significant proportions. Further, resident response to Cairns Post articles and local radio programs is quite high, which indicates that the abundance of Myna Birds is a concern to many people. There has been an expectation generated through the community that a control program will occur.
CONSULTATION: A stakeholder group has been formed and consists of representatives from the office of the Member for Leichhardt, Cairns Water, Cairns City Council, Cairns Port Authority (Airport), Bird Observers Club of Australia, Wildlife Preservation Society of Qld, Far North Qld Birdlife Rescue, Kookaburra Alliance and Mareeba Wetlands.
129
Agenda – Works & Services Committee 14/9/04 - #839659
A presentation was made to the Far North Queensland Regional Pest Advisory Forum on 27th August 2004, to ensure that elected representatives and officers from other agencies are aware of the projects and possible implications should Council’s elect to implement a similar program.
OPTIONS: Given preliminary results of the trial and the proposal for other programs to occur, Council have the option to: 1. Commit to undertaking activity 1 of the program should Federal funds become
available; 2. Indicate to Hon. Warren Entsch Federal Member for Leichhardt that as per activity
2, future funding be directed toward roost trap trials; 3. Undertake a very reduced role in the proposal to minimise Mynas in Cairns – only
acting in an advisory role, allowing the stakeholder groups and commercial pest management companies assume the greater role.
CONCLUSION: Myna birds are present in extremely high populations in Cairns and the surrounding environment. Whilst the use of small traps may have a desirable impact on very local populations in a back yard environments, it is expected that this will just result in a vacuum situation whereby others will simply move into this void. To achieve results of any significance to the environment and Cairns as a whole, funding would be best directed toward a major trapping program.
ATTACHMENTS: Nil Rachel Small Team Leader, Natural and Cultural Resource Manageme nt Tony Duffy Manager, Precincts and Facilities John Hawkes General Manager, City Works and Services
130
Agenda – Works & Services Committee 14/9/04 - #839659
WORKS & SERVICES COMMITTEE
14 SEPTEMBER 2004
5
2004/2005 CAPITAL WORKS PROGRAM – NOTIONAL DIVISIONAL
WORKS STATUS
S. Averkoff: #839410v4
RECOMMENDATION: It is recommended that Council: 1. Note the general status of 2004/05 Capital Works Program – Notional
Divisional Works 2. Approve the listing of projects under ‘Further R ecommended Notional
Divisional Works’ categories as shown in Table 2 of the report
INTRODUCTION: This report is to further advise Council, on the status of 2004/05 Capital Works Program - Notional Divisional Works, since initially reported to Council at the Works & Services Committee Meeting August 2004.
BACKGROUND: During budget deliberations in late 2003/04 for the 2004/05 Capital Works Program, Councillors were advised that certain Capital Works Budget items could be used to fund projects requested by Councillors. Certain Capital Works Budget items were nominated as ‘Notional Divisional Works’. A memo (27th May 2004) was subsequently circulated to Councillors, to submit their requests for funding of projects identified as ‘Notional Divisional Works’ The categories and associated allocations for ‘Notional Divisional Projects’ for 2004/05 are as follows:
1. Sealing of Rural Roads $ 75,000 2. Gateways $400,000 3. Kerb & Channel – New $110,000 4. LATM – New $100,000 5. Road Widening (Rural Roads Safety Issues) $110,000 6. New Works identified in Cairns Pedestrian Movement & Cycle Travel Strategy
$300,000
7. SEP – Shoulder sealing $500,000 $1,595,000
131
Agenda – Works & Services Committee 14/9/04 - #839659
It was also agreed that Councillors had until 30th June, 2004 to make their submissions after which assessment and ranking of submissions would be undertaken (in July/August 2004) and presented to Council for adoption as part of the 2004/05 Capital Works Program.
Table 1 – Projects previously approved by Council ( August W & S Committee)
Notional Divisional Works
Category Budget
Project
Div.
Estimate
Comment
1. Sealing of Rural Roads
$75,000 Sealing of Connaughton Rd, Bartle Frere
1 $58,000 Note that estimate has been revised and is now $113,000. Therefore there is no unallocated budget remaining for this category.
Gateway Works at Gordonvale & Babinda
1 $150,000 2. Gateways $400,000
Continuation of Gateway Works, Sheridan St, & Mulgrave Rd
Var. $250,000
6. New Works as per Cairns Pedestrian & Cycle Travel Strategy
$300,000
Cycleway/Footpath Redlynch Intake Rd (Rice’s Gully to Redlynch State School
12 $40,000 Contribution to match TIDS allocation refer report (#828386) to Works & Services Committee (on this Agenda)
COMMENT: Submissions from Councillors have been received and are being processed (confirmation of scope and estimate) by Infrastructure Management and Project Services for Council endorsement. For projects that fit under the ‘Notional Divisional Works’ category, a revised scope and estimate has been developed with the exception of Category 4 – New LATM and Category 5 Rural Road Widening. Projects have also been ranked in general accordance with Council’s adopted procedure – “Initiation, Evaluation and Ranking of Capital Works Projects”. A prioritised list of projects has been derived for each category according to overall rank and budget allocation. The prioritised projects are presented in Table 2 below for Council approval and to proceed to detailed design and construction. Refer to Table 1 for list of projects previously approved by Council. Please note that the scoping estimates provided are conditional on no complicating issues such as service alterations or similar which will have significant budget impact.
132
Agenda – Works & Services Committee 14/9/04 - #839659
Table 2 – Further Recommended Notional Divisional W orks Notional Divisional Works Category Budget
Available
Project
Div.
Estimate
David Street, Machans Beach - Kerb & Channel
10 $86,000
Christiansen Street, Machans Beach – Kerb & Channel
10 $24,000
3. Kerb & Channel New
$110,000
Total $110,000 Robert Road west side from Kangaroo To Cintra footpath
2 $42,000
Bicentennial Road – Footpath east side McLaughlin Rd to No. 54 Bicentennial
2 $57,500
Marr Street, Edmonton – Footpath west side No. 13 to No. 75 Stokes Street
2 $29,500
McLaughlin Road, - Shared Path east side No. 59 to Wessel Street
3 $28,000
Poolwood Road, Kewarra Beach – Footpath (TAS college to Cabarita Cl) west side
11 $47,000
Poolwood Road, Kewarra Beach – On-road Bikelane, K&C and Shoulder Seal (TAS college to Cabarita Cl) west side
11 $56,000
6. New Works Identified in Cairns Pedestrian Movement and Cycle Travel Strategy
$260,000
Total $260,000 SEP Hardy Road – Path east side (complete missing link)
3 $35,000
Headrick Street, Manunda - seal shoulders
6 $60,000
Varley Street, Yorkeys Knob - K&C, Shoulder Sealing from No. 554 to Adair Street – east side
10 $35,000
SEP - Upper Richardson Street extend 03/04 works
8 $80,000
SEP - Oxley Street extend 03/04 works 8 $12,000 Commercial/Industrial - Shoulder Sealing 50/50
$45,000
SEP - Templeton St - Church to Griffin -Shoulder Sealing
1 $88,000
SEP – No. 129/131 Buchan St – Shoulder Seal
5 $5,000
SEP - Heavey Crescent - K&C, Shoulder Sealing
8 $25,000
SEP - Lake Placid Carpark – minor extension and overlay
12 $30,000
Oak Street, Holloways Beach - Shoulder Sealing.
10 $70,000
Shoulder sealing of parking areas adjacent proposed log barrier fence by QT in Spence Street.
$15,000
7. SEP - Shoulder Sealing
$500,000
Total $500,000
133
Agenda – Works & Services Committee 14/9/04 - #839659
CONSIDERATIONS: Policy: A process of evaluation and prioritisation of projects has been employed to shortlist the projects under each category of ‘Notional Divisional Works’ (as per Council’s adopted Procedure – Initiation, Evaluation and Ranking of Capital Works Process) Financial: Council has previously allocated budgets for each category. This report matches specific projects lists to these allocations.
CONSULTATION: Preliminary consultation has occurred at this stage with Councillors by seeking their nomination of projects under ‘Notional Divisional Works’ categories. Prioritisation of list of projects was undertaken by input from the following:
• Chair Works & Services Committee • General Manager City Works & Services • Manager Infrastructure Management • Manager Project Services • Co-ordinator Pre-construction • Senior Project Leader • Project Officer Capital Works
CONCLUSION: It is recommended that Council note the status of progress of ‘Notional Divisional Works’ and approve the prioritised projects as shown in Table 2.
ATTACHMENTS: Nil Helius Visser Acting Manager Infrastructure Management John Hawkes General Manager City Works & Services