Spain at CERN - GS/ASETuesday 28th October 2014

EDMS 1427743

Page 2: Agenda Structure & Activities Key projects in the future 2 Spain at CERN – GS/ASE 28 th October 2014 EDMS 1427743.

2

Agenda• Structure & Activities• Key projects in the future

Spain at CERN – GS/ASE28th October 2014

EDMS 1427743

Page 3: Agenda Structure & Activities Key projects in the future 2 Spain at CERN – GS/ASE 28 th October 2014 EDMS 1427743.

GS/ASE StructureGroup LeaderChristophe Delamare

ACAccess Control

Rui Nunes

Didier ChapuisSerge Di LucaGrégory GodineauBoris MorandNino RamaTono Riesco HernandezVitor RiosFranck SchmittGrégory SmithDidier Vaxelaire

ASAlarm Systems

Silvia Grau

Nicolas BrocaMichaël DoleDamien JolivetMickaël JouaudHenrik NissenDavid PeyronDenis Raffourt

EDSEngineering Databases and Systems

Stéphan Petit

Pablo Del Castro GalanHernan Diaz RodriguezGriselda Garcia ArzaMichal LaskowskiSonia Mallon AmerigoPedro MartelKrzysztof PaterLukasz PaterAnna SuwalskaAleksandra WardzinskaIvan Zapevalov

EPSEngineering Processes Support

David Widegren

Rachel BrayPer-Olof FrimanMarta Garcia CarneroPer Gunnar JonssonTahar KlabiTsvetelin KrastevBenoit LepoittevinFrédéric LuizRobin MartiniMichal MlynarcykFrancis SorianoBruno Vercoutter

SSESafety Systems Engineering

Pierre Ninin

Matthias BraegerTimo HakulinenLouis HammoutiFrédéric HavartJean-Francois JugetEmmanuel KoufakisTomasz LadzinskiMiriam Munoz CodoceoPascal OserEva Sanchez-CorralFrancesco ValentiniIgnacio Vilches Calvo

DeputyPierre Ninin

Admin Assistance Véronique AngeliniMarguerite Maitrel

3

62 persons+ 121 contractors

Spain at CERN – GS/ASE28th October 2014

EDMS 1427743

Page 4: Agenda Structure & Activities Key projects in the future 2 Spain at CERN – GS/ASE 28 th October 2014 EDMS 1427743.

4

Access Control (AC)• Operation & Maintenance of the Access Systems ZORA & SUSI• ZORA = ZOne RAdiologique = PS, SPS, LHC Access Systems

• O & M – Strong impact on the lab core activities (beam & non-beam periods)

• Evolution of the ZORA Access Systems in collaboration with the SSE section (e.g PS, LHC)

• SUSI = SUrveillance de SIte = Site Access Control Systems• Not lab “Core” activity but highly visible to the whole CERN Community• “Traditional” systems with equipped and monitored doors + badge

readers• Video surveillance and required recording• Systems recently introduced

• electronic locks/cylinders (Salto)• key cabinets (Traka)• Plate recognition (Altaïr)• Pedestrian+bike turnstiles

Spain at CERN – GS/ASE28th October 2014

EDMS 1427743

Page 5: Agenda Structure & Activities Key projects in the future 2 Spain at CERN – GS/ASE 28 th October 2014 EDMS 1427743.

5

Access Control (AC) - Stats

Spain at CERN – GS/ASE28th October 2014

EDMS 1427743

Page 6: Agenda Structure & Activities Key projects in the future 2 Spain at CERN – GS/ASE 28 th October 2014 EDMS 1427743.

6

Alarm Systems (AS)• Fire Detection and Evacuation Systems

• Includes Beam Imminent Warning issues• O & M – Strong impact on the underground activities (beam & non-beam periods)• Critical activity: no Evacuation => no access; no BIW => no beam

• Flammable Gas and ODH Detection Systems• Critical activity: no ODH => no access; no flammable gas detection => no physics

• Red (emergency) Telephones• Alarm Transmission

• CERN Safety Alarm Monitoring – CSAM• CERN Hardwired Alarm Monitoring Network – CHAMN• Critical activity: no CSAM => no access in the concerned area

• LHC Exp. SNIFFER• Combined fire and gaz air sampling detection• Critical activity: If SNIFFER not available, no access in the area

• New works• According to risk analysis and/or HSE spec.• Validated by HSE

• Strong collaboration with Fire Brigade

Spain at CERN – GS/ASE28th October 2014

EDMS 1427743

Page 7: Agenda Structure & Activities Key projects in the future 2 Spain at CERN – GS/ASE 28 th October 2014 EDMS 1427743.

7

Alarm Systems (AS)Fire detectors Break-the-glass devices

Sirens Gas sensors

Spain at CERN – GS/ASE28th October 2014

EDMS 1427743

Page 8: Agenda Structure & Activities Key projects in the future 2 Spain at CERN – GS/ASE 28 th October 2014 EDMS 1427743.

8

Engineering Databases and Systems (EDS)

• Systems• Product Lifecycle Management (PLM)• Computerized Maintenance Management (CMMS)

• Infor EAM• Traceability of radioactive equipment and waste

• Reporting (BusinessObjects) & Datawarehousing• …

• Development and 3rd line support• DB integrations

• ADaMS (Access Distribution “hub”)• Evolynx (LHC Access DB)• CATIA-Smarteam-PLM• Service Management (S-now) and Cern Control Center• Radio-Protection• …

Spain at CERN – GS/ASE28th October 2014

EDMS 1427743

Page 9: Agenda Structure & Activities Key projects in the future 2 Spain at CERN – GS/ASE 28 th October 2014 EDMS 1427743.

9

Engineering Processes Support (EPS)

• Systems• PLM• CMMS Infor EAM• CAD tools (CATIA-Smarteam)

• 2nd and 3rd line support• Training, Methodology, Consulting

• CERN-wide

• Desktop Computing

Created: ~200.000 Completed: ~125.000

Work Orders: Last 12 Months

Spain at CERN – GS/ASE28th October 2014

EDMS 1427743

Page 10: Agenda Structure & Activities Key projects in the future 2 Spain at CERN – GS/ASE 28 th October 2014 EDMS 1427743.

10

Safety Systems Engineering (SSE)

• Large Projects Engineering section• Functional Safety Systems

• Major projects• LHC Access 2004-2008• PS Access 2009-2015• SPS Access ~LS2 (and before)

• Evolution of the ZORA Access Systems in collaboration with the AC section• Current examples: PS, LHC

• Participation to other projects• Better Access Point integration with Radio-Protection• Pre-studies and risk analysis

• new machines (CENF, ITER); Evolutions (Ions Beams North Hall); Experiences (EAR1, EAR2); Light ADAM and CERN-MEDICIS

• Virtualization and Safety Systems Monitoring• Technical Infrastructure Monitoring – TIM

• Very reliable and flexible system based• Big Data• Collaboration with BE Department

Spain at CERN – GS/ASE28th October 2014

EDMS 1427743

Page 11: Agenda Structure & Activities Key projects in the future 2 Spain at CERN – GS/ASE 28 th October 2014 EDMS 1427743.

11

Agenda• Structure & Activities• Key projects in the future

Spain at CERN – GS/ASE28th October 2014

EDMS 1427743

Page 12: Agenda Structure & Activities Key projects in the future 2 Spain at CERN – GS/ASE 28 th October 2014 EDMS 1427743.

12

SPS Personnel Safety System• Scope

• Replacement of the obsolete access system• For both access control and access safety functions• Primary zones

• Why• Reliability; Availability (spare parts)• Commitment towards Nuclear Authorities

• From risk assessment to installation & validation • Dismantling• 16 Access Points; more than 200 doors• Support required from many groups

• Schedule• Installation centered on the LS2• Starting now: specification, tendering, contract, test

platform

2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025LHCInjectors LS2 LS3LS1 Run 2 Run 3

Spain at CERN – GS/ASE28th October 2014

EDMS 1427743

Page 13: Agenda Structure & Activities Key projects in the future 2 Spain at CERN – GS/ASE 28 th October 2014 EDMS 1427743.

13

SPS Fire Safety Improvement• Scope

• On-going analysis and list of proposal(s) to improve the control of a developed fire in the SPS

• Sprinklers, confinement, safe evacuation, FB intervention, radiation safe zone

• Same spirit as for the PS Fire Safety improvements LS1 (PS Ring fire doors)

• Support from other groups• Cooling & Ventilation• Civil Engineering• Integration• …

2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025LHCInjectors LS2 LS3LS1 Run 2 Run 3

Spain at CERN – GS/ASE28th October 2014

EDMS 1427743

Page 14: Agenda Structure & Activities Key projects in the future 2 Spain at CERN – GS/ASE 28 th October 2014 EDMS 1427743.

14

Experimental Areas PSS• Scope

• Primary zones and Secondary zones is no longer sufficient to define PSS functions• The Experimental Areas are today more complex with a large set of risks (higher

intensity radiation from beam, sources, laser, etc.)• Use functional safety methodology as done for the LHC and PS

• Starting with Preliminary Risk Analysis, def. of physical barriers, safety functions -> Safety Files

• Set up a product catalog and test platform to design and validate Exp. Areas PSS

• Time scale• On-going, studies already started, not linked to LS2

2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025LHCInjectors LS2 LS3LS1 Run 2 Run 3

Spain at CERN – GS/ASE28th October 2014

EDMS 1427743

Page 15: Agenda Structure & Activities Key projects in the future 2 Spain at CERN – GS/ASE 28 th October 2014 EDMS 1427743.

15

Site Access Evolutions• Scope

• Review the Access Control to the surface buildings & site entrances

• Part of the physical barriers of a PSS

• Review the video-surveillance of the CERN sites

• Plate recognition – mobility & parking• Electronic locks for racks• Associated services with the access

cards• bike & car sharing; payments

2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025LHCInjectors LS2 LS3LS1 Run 2 Run 3

Spain at CERN – GS/ASE28th October 2014

EDMS 1427743

Page 16: Agenda Structure & Activities Key projects in the future 2 Spain at CERN – GS/ASE 28 th October 2014 EDMS 1427743.

16

Alarm Systems• Fire Detection and Evacuation Systems

• Our activity depends on the CERN projects• Technical galleries

• Project «Centrale de mise en sécurité incendie» (Fire Safety Central Control)

• Flammable Gas and ODH Detection Systems• Our activity depends on the CERN projects

• Alarm Transmission• Internal review of CSAM User

Requirements• Preparing next generation

Spain at CERN – GS/ASE28th October 2014

EDMS 1427743