AEROSPACE - BE&K Building Group...2006 – Present Dedicated to Sustainable Construction More Than...

12
Construction Management Design-Build Preconstruction Client Advisory Distribution + Logistics Consulting Technology Consulting AEROSPACE Leaders in Integrated Construction Services

Transcript of AEROSPACE - BE&K Building Group...2006 – Present Dedicated to Sustainable Construction More Than...

Page 1: AEROSPACE - BE&K Building Group...2006 – Present Dedicated to Sustainable Construction More Than $500 Million in LEED and Green Globes Projects Platinum, Gold, Silver and Certified

Construction Management

Design-Build

Preconstruction

Client Advisory

Distribution + Logistics Consulting

Technology Consulting

AEROSPACELeaders in Integrated Construction Services

Page 2: AEROSPACE - BE&K Building Group...2006 – Present Dedicated to Sustainable Construction More Than $500 Million in LEED and Green Globes Projects Platinum, Gold, Silver and Certified

2

The Boeing Company North Charleston, SC

5 million square feet

in Aerospace construction

OUR BLUEPRINT FOR SUCCESS• On Time | On Budget Results

• Aerospace Industry Recognized Expertise

• Advanced Technologies Driving Economies and Speed

• Experienced | Dedicated Professional Staff

• Repeat Clients

• Safety Culture

• Superior Sustainability

Page 3: AEROSPACE - BE&K Building Group...2006 – Present Dedicated to Sustainable Construction More Than $500 Million in LEED and Green Globes Projects Platinum, Gold, Silver and Certified

Triumph AerostructuresRed Oak, TX

3

WHO WE ARE

Award-Winning Facilities Recognized by Engineering News-Record (ENR) and Associated Builders & Contractors (ABC)

Proven Relationships with Leading Aerospace Designers

Top ABC “STEP” Award Recipient Outstanding Safety Program 2006 – Present

Dedicated to Sustainable Construction More Than $500 Million in LEED and Green Globes ProjectsPlatinum, Gold, Silver and Certified

KENNY ANDERSONAerospace

Our Center of Excellence for Aerospace is led by Kenny Anderson, Vice President for BE&K Building Group. Kenny provides more than 25 years industry experience having worked closely with notable clients such as Boeing, Gulfstream, and Honda. He has delivered over $1 billion in aerospace facilities and was recently responsible for overseeing more than 10 million work hours for Boeing with no lost time incidents.

BENEFIT Kenny provides individualized hands-on leadership that ensures the highest degree of success for our clients’ projects.

Page 4: AEROSPACE - BE&K Building Group...2006 – Present Dedicated to Sustainable Construction More Than $500 Million in LEED and Green Globes Projects Platinum, Gold, Silver and Certified

Gulfstream Aerospace CorporationSavannah, GA

4

Bell HelicopterLafayette, LA

Pope Air Force BaseFayetteville, NC

$600 million to $1 million

project size capability

Page 5: AEROSPACE - BE&K Building Group...2006 – Present Dedicated to Sustainable Construction More Than $500 Million in LEED and Green Globes Projects Platinum, Gold, Silver and Certified

55

HAECO AmericasGreensboro, NC

Page 6: AEROSPACE - BE&K Building Group...2006 – Present Dedicated to Sustainable Construction More Than $500 Million in LEED and Green Globes Projects Platinum, Gold, Silver and Certified

The Boeing Company North Charleston, SC

6

work hours on The Boeing Company’s

program over 10 years without

a lost-time incident

10 million

Page 7: AEROSPACE - BE&K Building Group...2006 – Present Dedicated to Sustainable Construction More Than $500 Million in LEED and Green Globes Projects Platinum, Gold, Silver and Certified

7

Page 8: AEROSPACE - BE&K Building Group...2006 – Present Dedicated to Sustainable Construction More Than $500 Million in LEED and Green Globes Projects Platinum, Gold, Silver and Certified

8

SITE DOCUMENTATION DRONE FLIGHTFrom site selection to ribbon cutting, manage, measure, and monitor projects with drone imagery. Apply technology to create consumable and sharable drone maps, 3D models, and photos.

JOBSITE PHOTO DOCUMENTATIONSTRUCTIONSITEUse 360 Photography to capture 360 jobsite progress photos, track installed work, and communicate with your teams. Make meetings more efficient by reviewing up-to-date conditions. Walk the jobsite from your phone, iPad, or laptop. Know exactly what’s been done and where. Share PDFs of floor plans with linked 360 photos that work completely offline.

JOBSITE ENVIRONMENTAL MONITORINGPILLAR TECHNOLOGIESFull site, 24/7 monitoring for temperature, humidity, carbon monoxide, VOCs, particulates, noise, light, and pressure. Designed to detect unsafe working conditions and potential risk problems in real-time. Drill into data by floor or area, customize reporting, and create custom alerts to your phone. Create a historical record of the conditions of your project.

JOBSITE SAFETYSMARTVID.IOReduce jobsite risk and improve safety with the power of AI. Automatically detect safety hazards in jobsite photos, measure trends, and drive behavior. Capture field observations quickly. Manage safety compliance trends across projects to reduce risk. Implement a company-wide, searchable photo and video platform to ensure potential claim documentation is never lost.

PROJECT DOCUMENTATION + ISSUE MANAGEMENTBIM 360Construction Management software for drawing management, project file management, QA/QC issue creation and resolution, RFIs and submittals, and much more. Work proactively, manage quality, automate tasks, control costs, and stay on schedule.

3D COORDINATIONNAVISWORKS + REVIZTOBuild your project virtually, get it right, and then build it in the field. Use models from designers and subcontractors to identify, track, and report on clashes and constructability issues.

BE&K INTEGRATED OPERATING PLATFORM (BEKIOP)

RESULTS + BENEFITSBE&K Building Group is pushing the boundaries, innovating, and driving value into the construction experience. Technology enables a better way of delivering capital projects, making informed decisions, enhancing collaboration, and producing accurate data. It brings clarity/certainty to the most demanding projects.

• Reduced schedule due to advanced planning and quality management• 3X Technology ROI

• Faster precon cycles to better understand cost/schedule• Visual sequencing/planning to support communication• Reduced field issues through comprehensive modeling

Page 9: AEROSPACE - BE&K Building Group...2006 – Present Dedicated to Sustainable Construction More Than $500 Million in LEED and Green Globes Projects Platinum, Gold, Silver and Certified

9

BE&K INTEGRATED OPERATING PLATFORM (BEKIOP)

PROJECT SCHEDULINGSYNCHROUse project models to create, manage, and track project CPM schedules. Link models to your P6 schedule or create your project schedules in Synchro.

ACCURATE SITE CONDITIONSLASER SCANNINGCapture an accurate point-cloud of all visible conditions to validate design, verify locations of installed equipment, check floor flatness, and more. Link the point-clouds to your project models to assist with preconstruction, logistics, coordination, installation tracking, and as-built deliverables.

SPECIFICATIONS + CLOSEOUT AUTOMATIONPYPEAI that automatically creates submittal logs from specifications. Use versioning to track changes and compare specs. Provides a single portal for closeout management with powerful reporting dashboards and automation.

PROJECT DATA MANAGEMENTASSEMBLEManage the model through the web to extract data and quantities, add information, and communicate with stakeholders. View models and drawings in one seamless environment to find the information you need to make better decisions.

PROJECT INFORMATION HUBSField job boxes equipped with a suite of digital tools for accessing current project information. Each box has a large monitor loaded with BIM360, Assemble, drawings, models, and more. Now everyone on the project site can be within walking distance of real-time project information.

PROJECT 3D MODELINGREVITCreate your own 3D models for site logistics, planning, and communication. Create highly detailed virtual mock-ups to test scope detail and validate installation sequence.

VIRTUAL REALITYCommunicates the design with greater clarity whether you’re in the office or a jobsite trailer.The scale and presence of VR helps teams run QA/QC, find coordination issues, and validate designs.

APPROACHPROCESS — Throughout the project lifecycle, we support collaborative project planning and conceptual design through option analysis, financial modeling, and risk management. During preconstruction and construction, we apply advanced systems to serve each project’s unique requirements.

TECHNOLOGY — Through curated software applications and customized development for each project.

PEOPLE — We have a deep bench of industry-leading, technology-focused experts.

Page 10: AEROSPACE - BE&K Building Group...2006 – Present Dedicated to Sustainable Construction More Than $500 Million in LEED and Green Globes Projects Platinum, Gold, Silver and Certified

• Gulfstream Aerospace Corporation

• HAECO Americas

• Honda Aero

• Honda Aircraft Company

• Jet Aviation

• JetBlue

• Textron | Bell Helicopter

• The Boeing Company

• Triumph Aerostructures

• U.S. Army Corps of Engineers

Aerospace ClientsREPRESENTATIVE

The Boeing CompanyNorth Charleston, SC

10

80%of our projects

are with repeat clients

Page 11: AEROSPACE - BE&K Building Group...2006 – Present Dedicated to Sustainable Construction More Than $500 Million in LEED and Green Globes Projects Platinum, Gold, Silver and Certified

11

Honda Aircraft CompanyGreensboro, NC

The Boeing CompanyOklahoma City, OK

JetBlue UniversityOrlando, FL

Page 12: AEROSPACE - BE&K Building Group...2006 – Present Dedicated to Sustainable Construction More Than $500 Million in LEED and Green Globes Projects Platinum, Gold, Silver and Certified

Charlotte

Chicago

Dallas

Greenville

Houston

Research Triangle Park

www.bekbg.com