GROSVENOR PROJECT DEVELOPMENT OF COAL MINE DRIFTS UTILISING A TUNNEL BORING MACHINE

Transcript of Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

Page 1: Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

GROSVENOR PROJECTDEVELOPMENT OF COAL MINE DRIFTS UTILISING A TUNNEL BORING MACHINE

Page 2: Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

OVERVIEW

•Site project description

•TBM Specifications

•Methodology

•Drift construction

•Advantages & achievements

•Conclusions

Page 3: Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

SITE AND PROJECT DESCRIPTION

•Project overview

•Geology

•QLD Mine Regulations

•Options Considered

Page 4: Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

4

SITE AND PROJECT DESCRIPTIONProject overview

Page 5: Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

5

SITE AND PROJECT DESCRIPTIONProject overview

Longwall Panels- 300m Wide- 6200m Long

Man & Materials Drift- 1:8 Decline- 1,100m Long

Conveyor Drift- 1:6 Decline- 900m Long

Page 6: Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

6

SITE AND PROJECT DESCRIPTIONGeology Overview – Conveyor Drift

Chainage Description Classification

0 – 118 Box Cut -

118 – 220 Cainozoic Sediments Soft Ground

220 – 230 Tertiary - Weathered Basalt Soft Ground

230 – 300 Tertiary Sediments Soft Ground

300 – 880 Permian – Siltstone / Sandstone Hard Ground

880 – 914 GM Seam Coal Soft Ground

Page 7: Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

7

SITE AND PROJECT DESCRIPTIONGeology Overview – Man and Material Drift

Chainage Description Classification

0 – 142 Box Cut -

142 – 180 Cainozoic Sediments Soft Ground

180 – 250 Tertiary - Weathered Basalt Soft Ground

250 – 350 Tertiary Sediments Soft Ground

350 – 580 Permian – Siltstone / Sandstone Hard Ground

580 – 700 Permian – P Seam Coal Soft Ground

700 – 1050 Permian Siltstone / Sandstone Hard Ground

1050 – 1154 GM Seam Coal Soft Ground

Page 8: Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

8

SITE AND PROJECT DESCRIPTION

QLD Mine Regulations

• TBM’s have been sporadically used within Coal Mining:

• TBM proposal new to QLD Coal Mining

• Risk Assessment to determine ERZ1/NERZ

• NERZ = CH4 < 0.5%

• ERZ1 = 0.5% < CH4 < 2.0%

Page 9: Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

9

SITE AND PROJECT DESCRIPTIONOptions Considered

• Summary of project conditions

• Variable/mixed ground conditions

• Project schedule

• Cost implications

• QLD Coal Mining Legislation

• Options Considered

• Drill and Blast techniques

• Conventional road header

• Earth Pressure Balance Machine

Page 10: Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

10

SITE AND PROJECT DESCRIPTIONOptions Considered

Options Considered• Excavation Rate• Cutting Profile / Accuracy• Tunnel design parameters• Ground support• Work Environment• Capital cost• Operating cost

Page 11: Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

11

SITE AND PROJECT DESCRIPTIONOptions Considered

Options Considered• Excavation Rate• Cutting Profile / Accuracy• Tunnel design parameters• Ground support• Work Environment• Capital cost• Operating cost

In comparison to conventional drill and blast operations or roadheader the TBM was more favorable.

Page 12: Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

TBM SPECIFICATIONS

•EPBM (dual mode)

•Gas Compliance

Page 13: Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

13

TBM SPECIFICATIONSEPBM (dual mode)

TBM Design Criteria:

• Purpose built TBM to cope with Grosvenor specific

conditions

• Compliant with QLD Coal Mining Regulations

• Capability to complete multiple drifts (no exit point)

Page 14: Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

14

TBM SPECIFICATIONSEPBM (dual mode)

Drift Layout:

• Vertical Curve – 400m radius

• Segmental lining ID 7.0m

• Consists of steel-fiber reinforced lining (universal

ring 5 + 1 key segments)

• Additional flat segment placed at invert level to

allow transit along the tunnel

Page 15: Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

15

TBM SPECIFICATIONSEPBM (dual mode)

TBM Specifications – Robbins Hybrid / Dual Mode

Bore Diameter (m) 8 Cutterhead Mixed ground / convertible

Total Length (m) 135 Cutters 17” disc / Knife Edge

TBM Weight (t) 994 Cutterhead Power (kW) 12 x 330 kW (3,960 kW)

UCS (MPa) 100 (Max) Cutterhead Speed (RPM) 0 – 6.4

Hydrostatic Pressure (Bar) 3 Maximum Thrust (kN) 22,619

Screw Conveyor Double, shafted Number of Segments 5 + 1 key + invert

Methane Monitors 6 x locations Segment Width (m) 1.4

Explosion-Proof EPB Sensors 10 x locations Segment Thickness (m) 0.35

Segment Backfill Bi-component grout

Page 16: Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

16

TBM SPECIFICATIONSEPBM (dual mode)

Cutterhead Details:

• EPB:

• Rock mode:

EPB Mode – Bi-directional Rock Mode – Single direction Mixed Ground Mode – Bi-directional

Page 17: Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

17

TBM SPECIFICATIONSEPBM (dual mode)

Double Screw Conveyor:

Forward Shield:

• Inner shield - Removed

• Outer Shield – Remain insitu

Page 18: Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

18

TBM SPECIFICATIONSGas Compliance

Sources of Gas:

• Expected: Methane release from carbonaceous

inclusions

• Unexpected: Hydrocarbons released from greases

and foams

Page 19: Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

19

TBM SPECIFICATIONSGas Compliance

Principal Method of Gas Control:

• Pre-cast concrete linings

• Fully grouted into place as shield advances, sealing

from ingress of water or gas

Page 20: Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

20

TBM SPECIFICATIONSGas Compliance

Page 21: Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

21

TBM SPECIFICATIONSGas Compliance

Page 22: Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

METHODOLOGY

•Box Cut

•EPBM Assembly OFTA

•Conveyor Drift

•Retrieval / Relocation

•Man & Materials Drift

Page 23: Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

23

METHODOLOGYBox Cut

Page 24: Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

24

METHODOLOGYBox Cut

Page 25: Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

25

METHODOLOGYEPBM Assembly OFTA

Onsite First Time Assembly (OFTA):

Page 26: Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

26

METHODOLOGYConveyor Drift

Conveyor Drift Performance

Total Length (m) 798 Average Rings / Day 3.8

Total Rings (number) 578 Maximum Rings / Day 13

Duration (days) 153Average Production

(m/week)40

TBM Mode (%)100% - Mixed Ground

Configuration

Average TBM Availability

(%)67

Page 27: Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

27

METHODOLOGYRetrieval / Relocation

Retrieval Requirements:

• TBM to be used in multiple drifts

• TBM to disassembled

• TBM to be retracted

Design Features:

• Cutterhead inner and outer

• Forward and rear shields

• Cutterhead core

• Self-propelled walking dolly system

• Back-up gantries fitted with jacks to provide anti-slide

Page 28: Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

28

METHODOLOGYRetrieval / Relocation

Retrieval Requirements:

• TBM to

CH

Segments

CH core

Inner Shield

Outer

Shield

CHS

CHS Dolly

Front Dolly Bridge

Dolly

Sliding

Track

Segment

ErectorBridgeScrew Conveyor

5.8m

Lift Jacks

Inner Shield

Page 29: Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

29

METHODOLOGYRetrieval / Relocation

Page 30: Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

30

METHODOLOGYRetrieval / Relocation

Front Dolly Frame on Surface Launching Slab

Page 31: Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

31

METHODOLOGYCommence inseam coal Mining Operations

Free face available to commence Development Operations

Page 32: Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

32

METHODOLOGYRetrieval / Relocation

SPMT For Transport to the Man and Materials Drift

Page 33: Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

33

METHODOLOGYRetrieval / Relocation

SPMT For Transport to the Man and Materials Drift

Page 34: Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

34

METHODOLOGYMan & Materials Drift

Man & Materials Drift Performance

Total Length (m) 988 Average Rings / Day 7.7

Total Rings (number) 732 Maximum Rings / Day 18

Duration (days) 95Average Production

(m/week)70

TBM Mode (%)63% - Scrapper / Knife bits

37% - Full cutter disc

Average TBM Availability

(%)78

Page 35: Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

DRIFT CONSTRUCTION

•Modifications through “Lessons Learnt”

Conveyor drift

•Performance Comparison – Conveyor Drift vs..

Man & Materials Drift

Page 36: Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

36

DRIFT CONSTRUCTIONModifications

Modifications:

• Operational

• Mechanical

• Foam System – redesign to increase capacity

• Cutter Head Configuration – modifications to grizzly

bar / mixing paddle

• Grouting – revised design for mixing chambers and

auto flushing

• Conveyor System – revise design to improve

efficiencies

Page 37: Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

37

DRIFT CONSTRUCTIONPerformance Comparison

Conveyor Drift Man & Materials Drift

Total Length (m) 798 988

Total Rings (number) 578 732

Duration (days) 153 95

Rings / Day (Average and Max) 3.8 (13) 7.7 (18)

Average (m/week) 40 70

TBM Availability (%) 67 78

Page 38: Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

ADVANTAGES & ACHIEVEMENTS

Page 39: Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

39

ADVANTAGES

Advantages:

• Improved working conditions

• Increased penetration rates

• Durable concrete lining constructed during boring

process

Page 40: Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

40

ACHIEVEMENTThe End Product

Page 41: Adam Foulstone - Anglo America - The Grosvenor TBM Mine project

41

TBM Breakthrough – Man & Materials Drift

CONCLUSIONS