Activating the Assessment Ppt 1.4
-
Upload
bojan-kovacevic -
Category
Documents
-
view
217 -
download
0
Transcript of Activating the Assessment Ppt 1.4
-
8/9/2019 Activating the Assessment Ppt 1.4
1/11
Activating and Managing anActivating and Managing an
AssessmentAssessment
1
-
8/9/2019 Activating the Assessment Ppt 1.4
2/11
-
8/9/2019 Activating the Assessment Ppt 1.4
3/11
TimetabTimetab
leleScheduled Activities
leading to theassessment report
Compl
etionDate
Formation of CoordinationTeam, Collection ofBaseline data
)-*+ay
Orientation Training onmethodology
,-.+ay
Mobilie sector teams .-+ay
Field visits by sector
teams
+ay
to 0 1uneData Analysis andpreparation of sectoralreports
2-3 1une
Finaliation of the sector
anne!es and the mainreport
)-2
1une 3
-
8/9/2019 Activating the Assessment Ppt 1.4
4/11
4hy# 5hat and 5hat for: T67 8&AT9OA;78 (5hore
7?plain that assessment is: – a process (protocol of engagement and di@erentiate tasks
and responsibilities># based on three general principles:
government led# internally and e?ternally coordinated (avoidduplication and repetition># based on national demand
– a tool (ho5 to determine the post disaster re
4
AB - C7&STA9' DC&DOS7A EA;C7 A7 OF ASS7SS+7T
-
8/9/2019 Activating the Assessment Ppt 1.4
5/11
DA# $ %&O' TO
CO(D)CTA(ASS*SSM*(
T
– 7?plain concepts and deGnitions
– Cniform language# understanding andpurpose
– &especting each institutions / agency /participating basic mandates and skills
– Assessment is built from sectors with a
cross cutting perspective
–Tailored to:• National institutional structure
responsible to assess and developrecovery response, not thehumanitarian response cluster orhumanitarian response frame
• Technical capacities of stakeholders / assessors involved
• Identifying and complementingnational capacities / structures
5
-
8/9/2019 Activating the Assessment Ppt 1.4
6/11
A""+CATO( OF T&*
ASS*SSM*(T(ST-)M*(
T
• Hy means of the groups formed – From the pre disaster baseline /
e?isting conte?t
– To the Dost disaster• 4ork in groups
– aligned 5ith sectors:
• Transport
• 7nergy
• Agriculture
• 6ousing and ;ocal 9nfrastructure
• ;ivelihoods and employment
• 4ater and Sanitation
– %overing cross cutting issues• 'ender
• 7nvironment and risk management
• Security
6
-
8/9/2019 Activating the Assessment Ppt 1.4
7/11
7?pected outcome of thetraining:
-Familiari"ation 5ith tool to be used(damage# loss and needs assessmentincluding human recovery considerations>
- Formation of thematic and sector groupsthat 5ill undertake the preparation ofthematic/sector reports
- Hreakout sessions of groups to determinetheir agenda and analyse the informationneeds and determine need for Geld visits$
7
-
8/9/2019 Activating the Assessment Ppt 1.4
8/11
8
Steps / components of theassessment
9nfrastructure9nfrastructure
damaged assetsdamaged assets
% Service and delivery of% Service and delivery ofgoods and servicesgoods and services
% .overnance% .overnance
% -is/ evolution% -is/ evolution
-
8/9/2019 Activating the Assessment Ppt 1.4
9/11
– 9dentify and
-
8/9/2019 Activating the Assessment Ppt 1.4
10/11
10
From DA to a &ecoveryFrame5ork
-
8/9/2019 Activating the Assessment Ppt 1.4
11/11
DiscussionDiscussion
Questions?
11