A-Cubed MMP Project Closing Report 2015-07-17. Project Overview.

19
A-Cubed MMP Project Closing Report 2015-07-17

Transcript of A-Cubed MMP Project Closing Report 2015-07-17. Project Overview.

Page 1: A-Cubed MMP Project Closing Report 2015-07-17. Project Overview.

A-Cubed MMPProject Closing Report

2015-07-17

Page 2: A-Cubed MMP Project Closing Report 2015-07-17. Project Overview.

Project Overview

Page 3: A-Cubed MMP Project Closing Report 2015-07-17. Project Overview.

Confidential

Project Overview

Name : A-Cubed MMP ( Minimum Marketable Product ) Project

Period : 2015-03-02 ~ 2015-07-20

Resource :

14

Page 4: A-Cubed MMP Project Closing Report 2015-07-17. Project Overview.

Confidential

< A-Cubed features word cloud >

Project Overview

Page 5: A-Cubed MMP Project Closing Report 2015-07-17. Project Overview.

Confidential

Major Keywords

Analysis SystemData

Big Data Big Data analysis Automate and adaptive

A3

(A-Cubed)

Project Overview

Page 6: A-Cubed MMP Project Closing Report 2015-07-17. Project Overview.

Confidential

Analyze

Automate

Adapt

Smart Manufacturing

Using A-Cubed we can make

something with data so

understanding and looking for

the correlation of different

data points

and using that information to

make an

intelligent decisions

which allows us to

control our process also

predict what is going

to happen without human

intervention

and manage that to be able to

optimize that process.

Make things better

Project Overview

Page 7: A-Cubed MMP Project Closing Report 2015-07-17. Project Overview.

Confidential

Project Overview

Page 8: A-Cubed MMP Project Closing Report 2015-07-17. Project Overview.

Project Result

Page 9: A-Cubed MMP Project Closing Report 2015-07-17. Project Overview.

Confidential

Already exist

Done in previous step

This step scope

A-Cubed MMP Project Purpose

Page 10: A-Cubed MMP Project Closing Report 2015-07-17. Project Overview.

Confidential

To get the opportunity,

we should introduce our product to the customer in a short term.

To introduce our software and get attraction, we should find MMP values.

MVP : Minimum viable productMMP : Minimum marketable product

( Minimum Marketable Product )

A-Cubed MMP Project Purpose

Page 11: A-Cubed MMP Project Closing Report 2015-07-17. Project Overview.

Confidential

A-Cubed Value add to Customer

New Customer

UXIntuitive and self explanatoryWTWR (Wait time waste reduction)

Tool Compare

Increase new sales

Existing Customer

UXLower usage barrier

ReporteDL+EES Integration (Start of YiEES)

Increase customer satisfactionIncrease repeat sales

A-Cubed MMP Project Purpose

Page 12: A-Cubed MMP Project Closing Report 2015-07-17. Project Overview.

Confidential

A-Cubed MMP Project Result

Page 13: A-Cubed MMP Project Closing Report 2015-07-17. Project Overview.

Confidential

Project Purpose and Completeness

The project purpose is marketable product and get Users’ attraction.

And many companies are interested in the A-Cubed and want to see more details.

Page 14: A-Cubed MMP Project Closing Report 2015-07-17. Project Overview.

Test Result

Page 15: A-Cubed MMP Project Closing Report 2015-07-17. Project Overview.

Confidential

Known Limitation

As the project purpose covers minimum marketable features to get users’ attractions

1. It does not support all of the web browsers.

2. The performance of data manipulation is not faster than current EES

Page 16: A-Cubed MMP Project Closing Report 2015-07-17. Project Overview.

Known Limitation

Page 17: A-Cubed MMP Project Closing Report 2015-07-17. Project Overview.

Software test result

Page 18: A-Cubed MMP Project Closing Report 2015-07-17. Project Overview.

If you have further question, please contact [email protected], or visit www.bistel-inc.com.