  • ASCP - 101A Beginners Guide toImplementing ASCP

    Sandeep GandhiIndependent Consultant

  • *AgendaScopeASCP v/s MRPASCP Data FlowSetupsItem AttributesPlan OptionsExecute PlanQ&A

  • *Advanced Supply Chain Planning Oracle Advanced Supply Chain Planning (ASCP) is a comprehensive planning solution that decides when and where supplies should be deployed within an extended supply chain.Key CapabilitiesPlan all supply chain facilities simultaneouslyShort-term detailed scheduling and long-term aggregate planning are supported within a single planPlans that consider both resource and material constraintsConfigure Oracle ASCP to optimize specific business criteriaAllows many types of changes to supply, demand and resources to simulate changing business conditionsIntegrated solution

  • *ASCP v/s MRPOracles focus productProductivity enhancing UIQOH shown in supply/demand screenMulti-level peggingAbility to define queries and publish to plannersVertical Plan / Gnatt ChartPlan alt. sources and alt. resourcesPlan with optimization rules (inv turns / ontime delivery) and penalty factorsConstrained plan (ECC / EDD / lead time constraints)VMI SupportNew reportsPowerful simulationsDifferent calendars for shipping / manufacturing / receivingMultiple instance planning

  • *ASCP Data Flow

    Application Data Store(ADS)Items, BOM, Routing, Sales Orders,MDS, Forecast, Inventory

    Planning Data Pull

    Staging tables

    Planning ODS Load

    Operation Data Store(ODS)

    Custom programs

    Cleaned upOperation Data Store(ODS)

    Plan Run

    Planning Data Store(PDS)

    Release Recommendations

    WIP Mass Load /Requisition Import / Reschedule PO / Reschedule Requisitions

    Create Requisitions / Discrete JobsReschedule PO/Reqs/Jobs

  • *Initial Setups

    Decide configurationCentralized v/s DistributedApply latest Rollup Patches(Note 223026.1)Collections RUP #25 (patch #6751704) Planning Engine RUP #30 (patch # 7286961)Get responsibilitiesAdvanced Supply Chain Planner Advanced Planning Administrator

  • *Initial Setups Contd.

    Define InstanceDefine OrgsAssign Collection Groups

  • *Initial Setups contd.Run full data collection

  • *Initial Setups contd.Gather schema stats on MSCGrant Org access

  • *Key Item Attributes

  • *Key Item Attributes Contd.

  • *Collecting Sales OrdersDefine Demand classDefine Master Demand Schedule (MDS)Refresh MDS

  • *Define Plan

  • *Plan Options Main Tab

  • *Plan Options Org tab

  • *Plan Options Constraints Tab

  • *Execute PlanRefresh MDSRun Data CollectionRun Custom Data Cleanup ProgramsRun planConsider creating request setAccess Planners workbench

  • *Planners Workbench

  • *Release

  • *GotchyasSales order demand duplicatedInactive items coming over to planCan not release configured itemsPlanning Data Pull very slowRun Refresh Collection Snapshots oftenRun Net change collectionODS Load takes a long timeSet MSC:Purge Stg Tbl Cntrl to YesPlan takes a long time to runSet MSC: Share Plan Partitions to NoFile space issuesSet MSC:Write MBP Flat Files to YesSchema stats

  • *Q&A

    Sandeep [email protected]

    *Comprehensive : Planning, Scheduling, GOP, Inventory Optimization, Demand Planning**Centralized => less overhead, licensing fees where as Distributed=> upgrade to R12, support multiple instances, can be optimized for ascp performance, no peak load*Main instance types = Discrete, Process, Discrete & Process*Source type supplier / inventory . Order modifier => need 75 tomorrow, 50 day after tomorrow*Plan types > Mfg plan, production plan, master plan