935 Evalena Road Project File ZR2015-014, Location and Extent Planning Commission Staff Report - Page 2 of 16
C. Project Description The property owner, Promenade at Castle Rock Metropolitan District No. 2, is requesting approval of an L & E application for the construction of a regional stormwater detention facility at 935 Evalena Road. The project includes two detention ponds on two parcels zoned Agricultural One (A1). The Promenade at Castle Rock is in the process of purchasing a portion of the Grace Chapel property for the proposed project. The proposed stormwater ponds have a footprint of 2.72 acres and a volume of 15.23 acre-feet. The two ponds will treat and detain captured stormwater runoff before releasing runoff to an existing downstream culvert that conveys drainage under I-25. Construction is scheduled for July 2015 to September 2015. During construction it is estimated that 15 vehicles will be on site per day. Pond improvements include a micropool, trash rack and orifice plate, outlet structure, and overflow spillway. The operation of the facility does not require mechanical equipment. The ponds will each include 12-foot maintenance paths to provide access to the bottom of the basin and access to the outlet structures and micropools. The ponds will be reseeded with native seed. After construction, no significant traffic is expected, with only 1-2 trips per month for maintenance and any required repairs.
III. CONTEXT
A. Background This proposed regional detention facility is immediately upstream of an existing stormwater culvert that conveys drainage under I-25. The applicant has indicated that this proposed facility is in general conformance with the Phase III Drainage Report for Grace Chapel detention facility, prepared for the Town of Castle Rock. An L & E for a detention pond north of the site was approved by the Planning Commission in February 2015. This detention pond was also proposed as a regional detention facility to serve the Promenade of Castle Rock development on the west side of I-25.
B. Adjacent Land Uses and Zoning The following table reflects those zone districts and land uses directly surrounding the proposal.
Zoning Land Use NORTH Agricultural One (A1) Vacant; Previously-approved regional
detention facility for Pomenade at Castle Rock, 4233 Home Street
SOUTH Suburban Residential (SR) Silver Heights single-family residential EAST Agricultural One (A1)
Suburban Residential (SR) Silver Heights Water and Sanitation District; Silver Heights single-family residential
WEST I-25; Town of Castle Rock Commercial development within the Town of Castle Rock
IV. PHYSICAL SITE CHARACTERISTICS
A. Site Characteristics and Constraints
The 2.72-acre regional detention facility is located primarily on the southern 2.55-acre parcel owned by the Promenade at Castle Rock LLC. The Promenade at Castle Rock Metropolitan District is in the process of purchasing a portion of the Grace Chapel
935 Evalena Road Project File ZR2015-014, Location and Extent Planning Commission Staff Report - Page 3 of 16
property. The property boundary shown on the exhibit may be redrawn to accommodate the necessary setbacks for the church parking lot and building. No existing conditions on the property constrain installation of the new regional detention facility. The Promenade at Castle Rock LLC will transfer the property to the Promenade at Castle Rock Metropolitan District at a future date.
B. Access
The site will be accessed by an existing paved access drive off of Evalena Drive as well as a proposed access drive between the two detention ponds from Harvey Street. Also proposed are 12-foot wide maintenance paths for access to the bottom of each of the ponds and access to the outlet structures and micropools.
C. Drainage and Erosion Control
A Phase III Drainage Report was submitted to Engineering Services for review and acceptance. The Phase III Drainage Report, a Grading Erosion Sediment Control (GESC) plan and report, and construction plans must be accepted by Engineering Services prior to permits being issued for the proposed improvements.
V. PROVISION OF SERVICES
A. Fire Protection The Castle Rock Fire and Rescue Department provides firefighting and emergency medical services to the site. As of the writing of the staff report, no response had been received from Castle Rock Fire and Rescue Department.
B. Sheriff Services The Douglas County Sheriff’s Office (DCSO) provides emergency services to the site. DCSO provided a “no comment” response on the application. At the writing of the staff report, no response had been received from the Office of Emergency Management, the DCSO Hazmat, or the DSCO E911.
C. Water and Sanitation The proposed regional detention facility does not require any water or sewer services.
D. Utilities Referrals were sent to the utility service providers, CenturyLink (telephone), Black Hills Energy (gas), Intermountain Rural Electric Association (IREA) (electric), and Silver Heights Water and Sanitation District. IREA provided a referral response indicating that existing utilities are located within the project area and that an additional 15-foot easement will be needed for underground electric feeders to service the Promenade development. The applicant will work directly with IREA to provide the necessary easements, which will be dedicated by separate instrument. No response from CenturyLink or the Silver Heights Water and Sanitation District had been received at the writing of this staff report.
935 Evalena Road Project File ZR2015-014, Location and Extent Planning Commission Staff Report - Page 4 of 16
VI. OTHER PROCESSES AND PERMITS In addition to L & E approval, the following permits and approvals are required prior to commencement of construction:
· A Phase III Drainage Report, Grading Erosion Sediment Control (GESC) plan, GESC report, and construction plans must be finally accepted by Engineering Services prior to permits being issued for the proposed improvements.
· A backup drainage easement to be dedicated to Douglas County is needed for pond access and maintenance.
VII. PUBLIC NOTICE AND INPUT
Courtesy notices of an application in process were sent to adjacent property owners. At the preparation of the staff report, no comments or concerns in response to courtesy notices had been received. Referral responses were sent to required referral agencies on April 24, 2015. Referral responses are due at the conclusion of the referral period on May 8, 2015 or prior to the Planning Commission hearing. Agency responses that have been received to date are included as an attachment to this staff report. Any additional responses received after the date of this staff report will be provided to the Planning Commission prior to the hearing and added to the project record.
VIII. STAFF ASSESSMENT
Staff has evaluated all of the information above, the plan exhibit, referral comments, and public input. In staff’s assessment, the L & E request may be approved, as subject to additional information that may be presented at the Planning Commission hearing.
Attachments page Douglas County Land Use Application ........................................................................................... 6 Location and Extent Narrative and Report ..................................................................................... 7 Zoning and Vicinity Map .................................................................................................................. 9 Aerial Map ..................................................................................................................................... 10 Referral Agency Response Report ............................................................................................... 11 Referral Agency Responses ......................................................................................................... 14 Location and Extent Plan Exhibit .................................................................................................. 16
935 Evalena Road Project File ZR2015-014, Location and Extent Planning Commission Staff Report - Page 5 of 16
935 Evalena Road Project File ZR2015-014, Location and Extent Planning Commission Staff Report - Page 6 of 16
935 Evalena Road Project File ZR2015-014, Location and Extent Planning Commission Staff Report - Page 7 of 16
935 Evalena Road Project File ZR2015-014, Location and Extent Planning Commission Staff Report - Page 8 of 16
N INTERSTATE 25E ALLEN ST
N US HIGHWAY 85
MEADOWS PKWY
FRONT ST
HARVEY ST
EVALENA RD
L ARIAT DR
N ALLEN ST
CASTLE PINES DR SOU
TH
BETT
Y ST
HIGHWAY 85 BARR ANCA DR
PA
WNEE TRL
CASTLEGATE DR WEST
LIMELIGHT AVE
SAPPHIRE POINTE BLVD
LEMANS CTC OLLINS S T
C A NYON LN
A TRIUM DR
LORRAWAY
DR
RU
BY TRUST DR
BREW
ER C
T
METZLER DR
SAPPHIRE DR
GA LAX Y DR
R
E ID T RL
FACTORY SHOPS BLVD
AR G OSY WAY
FOUNDERS PKWY
W ALLEN ST
GENOA WAY
ALEXANDER PL
TRE MOLIT
E DRRE
D PA
SS LN
NOVA PL
ATRIUM LN
N INTERSTATE 25
935 Evalena RoadLocation & Exent
ZR2015-014ZONING & VICINITY MAP
Path: O:\Planning\CZeiler\GIS\MXDs\15.05.01_Carol Kuhn_ZR2015-014_935 Evalena Road_L&E_Map.mxd 5/1/2015 2:55:38 PM
May 2015Douglas CountyDepartment of
Community Development
0 970 1,940 2,910485Feet
LegendProject Site
RoadsMajor RoadsOther Roads
Zone DistrictsA1 - AGRICULTURAL ONELRR - LARGE RURAL RESIDENTIALRR - RURAL RESIDENTIALER - ESTATE RESIDENTIALLSB - LIMITED SERVICE BUSINESSB - BUSINESSC - COMMERCIALLI - LIGHT INDUSTRIALGI - GENERAL INDUSTRIALZONED OPEN SPACE CONSERVATIONNF -NATIONAL FORESTCMTY - SEDALIA COMMUNITYSUBURBAN RESIDENTIALD - SEDALIA DOWNTOWNMI - SEDALIA MIXED INDUSTRIALPLANNED DEVELOPMENTINCORPORATED AREAS
Ü
935 Evalena Road Project File ZR2015-014, Location and Extent Planning Commission Staff Report - Page 9 of 16
N INTERSTATE 25 HARVEY ST
BETT
Y ST
N ALLEN ST
EVALENA RD
HOME ST
WELLS ST
COLLIN S S T
N INTERSTATE 25
935 Evalena RoadLocation & Extent
ZR2015-014AERIAL MAP
Path: O:\Planning\CZeiler\GIS\MXDs\15.05.01_Carol Kuhn_ZR2015-014_935 Evalena Road_L&E_Map.mxd 5/1/2015 2:30:29 PM
May 2015Douglas CountyDepartment of
Community Development
0 200 400 600100Feet
LegendProject Site
RoadsMajor RoadsOther Roads
Ü
935 Evalena Road Project File ZR2015-014, Location and Extent Planning Commission Staff Report - Page 10 of 16
Referral Agency Response Report Page 1 of 3 Project Name: 935 Evalena Drive Project File #: ZR2015-014 Date Sent: 04/24//2015 Date Due: 05/08/2015
Agency Rec’d Agency Response Response Resolution AT&T Long Distance - ROW 04/29/2015 Received. No comment. No response necessary
Addressing Analyst 04/28/2015 Although only a reference, please remove "east" from Harvey Street.
The street name will be corrected with the resubmittal.
Black Hills Energy (Aquila) 04/27/2015 Received. No comment. No response necessary
Building Services Awaiting referral response
Castle Pines Homes Association
Awaiting referral response
Castle Rock Fire and Rescue Dept
Awaiting referral response
CenturyLink Awaiting referral response
Cherry Creek Basin Water Quality Authority
Awaiting referral response
City of Castle Pines Awaiting referral response
Colorado Department Of Transportation CDOT-Region # 1
Awaiting referral response
Comcast Awaiting referral response
E-470 Public Highway Authority
Awaiting referral response
Engineering Services Awaiting referral response
Happy Canyon HOA Awaiting referral response
935 Evalena Road Project File ZR2015-014, Location and Extent Planning Commission Staff Report - Page 11 of 16
IREA 05/04/2015 Received. Verbatim response: The
Association has reviewed the contents in the above-referenced referral response packet. We reviewed the project for maintaining our existing facilities, utility easements, electric loading, and service requirements. We are advising you of the following concerns and comments: The Association has existing underground/overhead electric facilities on the subject property. The Association will maintain these existing utility easements and facilities unless otherwise requested by the applicant to modify them under the Association's current extension policies. The Association is requesting a fifteen-foot (15') utility easement to accommodate the installation of electric facilities in this project, and the relocation of existing overhead electric facilities. Also, IREA submitted a redlined set of plans which indicated a need for a 15-foot easement for underground feeders to serve the Promenade development.
The applicant will work directly with the association to determine the location of any necessary easements, which will be recorded by separate instrument.
Office of Emergency Management
Awaiting referral response
Sheriff's Office 04/28/2015 No Comment: No response necessary
Sheriff's Office E911 Awaiting referral response
Sheriff's Office Hazmat Team
Awaiting referral response
Silver Heights Water & San District
Awaiting referral response
Town of Castle Rock Awaiting referral response
935 Evalena Road Project File ZR2015-014, Location and Extent Planning Commission Staff Report - Page 12 of 16
Urban Drainage & Flood Control District - Floodplain
05/04/2015 Received. See attached letter for detail. Summary of response: Development not MEP eligible.
No response necessary
Xcel Energy-Right Of Way & Permits
Awaiting referral response No response necessary
935 Evalena Road Project File ZR2015-014, Location and Extent Planning Commission Staff Report - Page 13 of 16
UDFCD Maintenance Eligibility Program Referral Review Comments Project: Grace Chapel Pond/Promenade at Castle Rock This letter is in response to your request for our comments concerning the referenced project. We appreciate the opportunity to review this proposal. We have reviewed this proposal only as it relates to major drainage features. We have the following comments to offer:
1. We have no objection to the concept. 2. UDFCD supports regional detention. 3. This development is located outside of the UDFCD boundary, therefore it is not eligible
for inclusion within the Maintenance Eligibility Program (MEP).
Please feel free to contact me with any questions or concerns. Thank you, Mike S. Mike Sarmento, SET Senior Construction Manager Floodplain Management Program Urban Drainage and Flood Control District