7 th NFSMEC Meeting Review implementation of Kharif 2 nd September, 2011 Assam’s Perspective

12
7 th NFSMEC Meeting Review implementation of Kharif 2 nd September, 2011 Assam’s Perspective

description

7 th NFSMEC Meeting Review implementation of Kharif 2 nd September, 2011 Assam’s Perspective. ASSAM AGRICULTURE – General Profile. Financial Statement 2011-12 (Rs. in Lakh)). NFSM-Rice Physical / Financial progress, 2011-12 up to August 2011. (additional fund for the year 2010-11). - PowerPoint PPT Presentation

Transcript of 7 th NFSMEC Meeting Review implementation of Kharif 2 nd September, 2011 Assam’s Perspective

Page 1: 7 th  NFSMEC Meeting Review implementation of Kharif  2 nd   September, 2011 Assam’s Perspective

7th NFSMEC Meeting

Review implementation of Kharif

2nd September, 2011

Assam’s Perspective

Page 2: 7 th  NFSMEC Meeting Review implementation of Kharif  2 nd   September, 2011 Assam’s Perspective

ASSAM AGRICULTURE – General Profile

Geographical Area 78.44 lakh hectare

Net Cropped Area 27.53 lakh hectare (35 p.c. of Geographical Area)

Cropping Intensity 142.00 p.c. (139% at National level)

Rice area covered by HYV 65% of total Rice area.

Availability of Farm Power 0.70 HP per hectare (1.40 HP at National level)

Irrigation potential created. 13.41 lakh hectare (24% of Net Cropped Area)

No. of Small & Marginal holding 23.44 lakh (85.3% of total holdings)(81.3% at National level)

Per capita land holding 1.11 hectare

Page 3: 7 th  NFSMEC Meeting Review implementation of Kharif  2 nd   September, 2011 Assam’s Perspective

Crop Approved Plan

For the year 2011-

12

Unspent balance as on 1st April, 2011& revalidated

Release during the year 2011-

12

Fund utilized up to the 31st

August/2011

Unspent balance

Rice 2523.72 3037.81 nil 3010.00 27.81

Financial Statement 2011-12 (Rs. in Lakh))

Page 4: 7 th  NFSMEC Meeting Review implementation of Kharif  2 nd   September, 2011 Assam’s Perspective

Sl. No.

Components 2011-12 Remarks

Physical Financial (Rs. in lakh)

Target Ach % Ach

Target Ach % Ach

1 Demonstration on IPP (no.)

13000 13000 100% 325.00 325.00 100% -

2 Rice Minikit @ 5 kg per minkit.

150000 150000 100% 225.00 225.00 100%

3 Incentive for pump sets

16000 16000 100% 1600.00 1600.00 100%

4 Incentive for Conoweeder

12000 12000 100% 360.00 360.00 100%

5 Incentive for STW

4167 4167 100% 500.00 500.00 100%

Total 3010.00 3010.00

NFSM-Rice

Physical / Financial progress, 2011-12 up to August 2011. (additional fund for the year 2010-11)

Page 5: 7 th  NFSMEC Meeting Review implementation of Kharif  2 nd   September, 2011 Assam’s Perspective

Sl. No.

NAME OF SUPPLIER

Allotted (nos) Supplied (nos)

HYV

Swarna sub-1

Hybrid

DRRH-2 KRH-2/

HYV

Swarna sub-1

Hybrid

DRRH-2 KRH-2/

1 NERAMAC 32862 2000 9771 2000

2 SFCI 15000 2300

3 MSSC - 1000 861

Total 47862 1000 2000 12071 861 2000

MINIKIT SEED DISTRIBUTION FOR KHARIF DURING THE YEAR 2011-12 UNDER NFSM-RICE

Page 6: 7 th  NFSMEC Meeting Review implementation of Kharif  2 nd   September, 2011 Assam’s Perspective

)

Crop2006-07 2007-

08% increase over 2006-07

2008-09

% increase over 2007-08

2009-10

% increase over 2008-09

Autumn Rice 894 915 2.3% 982 7.3% 898 -8.6%

Winter Rice 1162 1289 10.9% 1384 7.4% 1658 19.8%

Summer Rice 1858 2125 14.4% 2141 0.8% 2264 5.7%

Total Rice 1215 1352 11.3% 1440 6.5% 1647 14.4%

Trend of Productivity of rice in NFSM-Rice districts(Productivity in Kg per hectare

Page 7: 7 th  NFSMEC Meeting Review implementation of Kharif  2 nd   September, 2011 Assam’s Perspective

Overall impact of NFSM-Rice after 3 years of Mission(Productivity in Kg per hectare)

Crop2006-07 2009-10 % increase in 3

years

Autumn Rice 894 898 0.5 %

Winter Rice 1162 1658 42.7 %

Summer Rice 1858 2264 21.9 %

Total Rice 1215 1647 35.60%

Page 8: 7 th  NFSMEC Meeting Review implementation of Kharif  2 nd   September, 2011 Assam’s Perspective

Overall productivity trend since 2006-07 to 2010-11 (Total rice) in state level since inception of NFSM

(Productivity in Kg/ha)

Crop 2006-07 2007-08 2008-09 2009-10 2010-11 Rema

rks

Autumn Rice

899 999 1084 982 1155

Winter Rice 1321 1380 1674 1824 2062

Summer Rice

2017 2267 2142 2180 2156

Total Rice 1349 1428 1638 1765 1969

Page 9: 7 th  NFSMEC Meeting Review implementation of Kharif  2 nd   September, 2011 Assam’s Perspective

Sl.no

District Target HYV Hybrid Local

1 Barpeta 62400 43680 3120 15600

2 Bongaigaon 15000 10500 750 3750

3 Darrang 40000 28000 2000 10000

4 Dhemaji 5000 3500 250 1250

5 Goalpara 29000 20300 1450 7250

6 Karbi Anglong 5000 3500 250 1250

7 Kokrajhar 31600 22120 1580 7900

8 Lakhimpur 27000 18900 1350 6750

9 Morigoan 47000 32900 2350 11750

10 Nogoan 58000 40600 2900 14500

11 Nalbari 16000 11200 800 4000

12 Sonitpur 24600 17220 1230 6150

13 Tinsukia 5000 3500 250 1250

Total 365600 255920 18280 91400

District wise Rabi programme for 2011-12 under NFSM-Rice

Page 10: 7 th  NFSMEC Meeting Review implementation of Kharif  2 nd   September, 2011 Assam’s Perspective

REQUIREMENT OF SEED

SEED % OF TOTAL AREA QUANTITY OF SEED

HYV

HYBRID

LOCAL

70.0 %

5.0 %

25.0 % 41,134.00 QTL.

2,925.00 QTL

1,02,368.00 QTL

Page 11: 7 th  NFSMEC Meeting Review implementation of Kharif  2 nd   September, 2011 Assam’s Perspective

IMPLEMENTATION OF KHARIF NFSM PROGRAMME 2011-2012

Area and Production of Rice in NFSM & Non-NFSM districts of Assam during 2011-12(target) (Area in Hectare , Production in MT)

District Autumn Rice Winter Rice

Area Production Area Production

NFSM Districts 248585 221315 1004420 1727445

Non-NFSM Districts

131415 148685 925580 1922555

Total(Assam) 380000 370000 1930000 3650000

Page 12: 7 th  NFSMEC Meeting Review implementation of Kharif  2 nd   September, 2011 Assam’s Perspective