NFSM DISTRICTSWHEAT PULSES
7 5
AMBALA
BHIWANI
ROHTAK
GURGAON
JHAJJAR
MAHENDERGARH
YAMUNANAGAR
HISAR
BHIWANI
ROHTAK
SIRSA
SONEPAT
-ALL DISTRICTS FROM
KHARIF-2010 2
WHEATArea – 000 Ha Prod. – 000 Tonnes Yield – Kg/Ha
District 2011-12Target Ach.
Area Prod. Yield Area
Bhiwani 155 698 4,500 146
Rohtak 105 483 4,600 106
Jhajjar 100 455 4,550 101
Ambala 85 361 4,250 86
Yamunanagar 85 391 4,600 85
Mahendergarh 45 212 4,700 47
Gurgaon 50 238 4,750 50
Total 625 2,838 4,541 621Other Districts 1,875 8,997 4,798 1,884
State 2,500 11,835 4,735 2,505 3
4
GRAM
District 2011-12
Target Ach.Area Prod. Yield Area
Bhiwani 75 83 1,105 63
Hisar 25 30 1,200 18
Mahendergarh 13 14 1,100 15
Sirsa 10 13 1,250 12
Rohtak 1 1 1,200 2
Total 124 141 1,137 110Other districts 6 7 1,167 4
State 130 148 1,140 114
Area – 000 Ha Prod. – 000 Tonnes Yield – Kg/Ha
Area, Production and Productivity Wheat
2006-07 to 2010-11
Year NFSM State
Area Prod Yield Area Prod Yield
2006-07 573 2267 3956 2377 10059 4232
2007-08 605 2235 3694 2461 10232 4158
2008-09 609 2517 4133 2462 11360 4614
2009-10 627 2487 3967 2488 10488 4215
2010-11 629 2774 4410 2515 11630 4624
• Area increased by 56000 ha and productivity increased by 454 Kg/ha. in NFSM districts since 2006-07.
• Area and productivity also increased in non-NFSM districts.
Area – 000 Ha Prod. – 000 Tonnes Yield – Kg/Ha
Area, Production and Productivity Gram
2006-07 to 2010-11
Year NFSM State
Area Prod Yield Area Prod Yield
2006-07 95 77 811 107 90 841
2007-08 94 46 489 107 54 505
2008-09 108 112 1037 124 129 1040
2009-10 78 57 731 84 62 735
2010-11 98 95 969 112 110 982
• Area of Gram depends on Kharif rainfall as Gram is generally grown on conserved soil moisture.
• Productivity of Gram increased by 178 kg/hect. in NFSM districts since 2006-07. However, higher productivity (1037 Kg/ha) was achieved during 2008-09.
Area – 000 Ha Prod. – 000 Tonnes Yield – Kg/Ha
Area, Production and Productivity Other Pulses
2006-07 to 2010-11
Year NFSM State
Area Prod Yield Area Prod Yield
2006-07 37 27 730 61 46 754
2007-08 37 26 720 65 47 723
2008-09 35 27 771 60 49 817
2009-10 27 19 704 48 36 750
2010-11 64 48 750 64 48 750
• Arhar & Moong are the main other pulses in the State.
• Some area is also occupied by Urd and lentil.
Area – 000 Ha Prod. – 000 Tonnes Yield – Kg/Ha
FINANCIAL DETAILS2011-12
NFSM Allocation Unspent balance
Funds released
Total Likely Exp.
Require-ment
1 2 3 4 5 6 7
Wheat 2,127.96 65.63 1,437.45 1,503.08 2,127.96 624.88
Pulses Addl. Allo.
448.23532.00
62.46 128.45 532.00
190.91532.00
448.23532.00
257.32
A3P 372.00 48.03 332.00 380.03 380.03 0
Total 3,480.19 176.12 2,429.9 2,606.02 3,488.22 889.20
` in lakh
8
• Funds allocated will be fully utilized by 31.3.2012.
• Additional allocation of Rs.5.32 crore will be utilized for covering additional units of Summer Moong under A3P.
PHYSICAL & FINANCIAL PROGRESS OF WHEAT
UPTO DECEMBER 2011
S. No.
Component Unit Physical Financial
Target Ach. Allo. Exp.
1 Demonstrations No. 2,500 2,500 50.00 35.00
2 Seed Distribution Qtl. 1,00,000 62,568 500.00 312.84
3 Seed Minikits No. 13,613 13,109 0 0
4 Micronutrients Ha. 1,00,000 84,688 285.00 211.72
5 Gypsum * ,, 50,000 15,143 250.00 113.57
6 Zero Till Seed Drills No. 450 132 67.50 19.80
7 Rotavators ,, 100 93 30.00 27.90
` in lakh
9
• Availability of Gypsum has not been satisfactory.
• Demand of Rotavators is high.
8 Multi-crop Planters ,, 10 - 1.50 0
9 Seed Drills ,, 400 109 60.00 16.35
10 Laser Land Leveller ,, 5 3 7.50 4.50
11 Sprinkler sets Ha. 7,290 700 546.75 52.50
12 Knap Sack Sprayers No. 6,000 440 27.00 1.98
13 Farmers Training (FFS) ,, 125 125 21.25 5.00
14 Local Initiative Ha. 43,586 8,960 217.93 44.80
15 Award for district 5.00 0
16 Misc. Exp. District Level 44.66 3.00
17 State Level 13.87 2.00
Total 2,127.96 850.96
cont.
10
• Allocation for Laser Land Levellers should be increased.
PHYSICAL & FINANCIAL PROGRESS OF PULSES
UPTO DECEMBER, 2011 S. No
Component Unit Physical Financial
Tar. Ach. Allo. Exp.
1 Purchase of Breeder Seed Qtl. 10 3.10 0.60 0.28
2 Prod. Of Foundation Seed ,, 200 - 2.00 0
3 Prod. Of Certified Seed ,, 1,500 - 15.00 0
4 Certified Seed Distribution ,, 6,000 3,083 72.00 36.99
5 Gypsum Ha. 10,000 7,073 75.00 53.05
6 Micronutrients ,, 10,000 8,320 28.50 20.80
7 Bio-fertilizer ,, 10,000 17,900 10.00 8.95
8 Integrated Pest Management
,, 3,000 750 22.50 5.62
9 PP Chemicals ,, 4,000 1,150 20.00 5.50
10 Weedicides ,, 2,000 100 10.00 0.50
` in lakh
11
11 Knap Sack Sprayers No. 4,000 1,900 18.00 8.55
12 Zero Till Seed Drills ,, 140 100 21.00 15.00
13 Seed Drills ,, 100 50 15.00 7.50
14 Rotavators ,, 100 95 30.00 28.50
15 Laser Land Leveler ,, 5 2 7.50 3.00
16 Sprinkler Sets Ha. 460 - 34.50 0
17 Pipes for Carrying Water No. 50 - 7.50 0
18 Farmers Training (FFS) ,, 50 34 8.50 3.40
19 Training for Trainers ,, 1 - 1.00 0
20 Award for District 5.00 0
21 Misc. Exp. District Level 38.35 10.00
22 State Level 6.28 1.00
Total 448.23 208.64
cont.
12
ACCELERATED PULSES PRODUCTION (A3P)
upto December, 2011
Season Crop Units District Allo. Exp.
Kharif Arhar 2 RohtakSonepat
108.00 64.37
Rabi Gram 3 BhiwaniHisarSirsa
264.00 118.15
Summer Moong 2 - -
Total 7 372.00 182.52
` in lakh
13
PEST SURVEILLANCE UNDER A3P
• Programme implemented in 2 units on Arhar in Sonepat & Rohtak districts during Kharif 2011.
• Program run in 3-units in Bhiwani, Hisar & Sirsa districts during Rabi 2011-12.
• Disaster Management Groups have been constituted.
• 30 Scout Farmers have been selected.14
Planning for utilization of additional allocation and savings under A3P
• Savings under A3P during Kharif and Rabi seasons and additional allocation of 5.32 crore has been planned to be utilized on Moong during ensuing Summer 2012.
• About 15 units of A3P on Moong will be implemented during ensuing Summer 2012.
• About 1.00 lakh hect. area will be covered under Moong during coming summer season.
Experience in implementation of A3P
• Arhar crop may not be taken under A3P in Haryana.
• Unit under A3P should be kept 1 acre instead of 1 hect. as farmers generally not taking Pulses in 1 hect. area in Haryana State.
• Summer Moong has good potential in the State. More units should be allocated for Summer Moong under A3P.
Status of Wheat seed minikts
Agency Variety Allocation Supply
NSC DBW-17 6,000 5,999
PBW-621 500 500
HD-2697 500 -
Total 7,000 6,499
SFCI PBW-590 6,613 6,610
Total 13,613 13,109
Online submission of Progress Report
• Now progress reports are being uploaded online on the portal of the Mission at district as well as State level.
• Districts are being advised regularly to remove the shortcomings in the progress reports.
Project Management Team
• One consultant engaged in Sonepat district.
• Two Technical Assistants engaged at the State HQ.
• PMTs will be constituted at the start of 2012-13 as per the guidelines of the Mission for 12th Plan.
ISSUES• Inclusion of all Districts under NFSM-wheat.
• Incidence of Yellow Rust is a serious problem. Adequate availability of seed of resistant varieties should be ensured in the next season.
• Adequate No. of minikits of wheat variety HD-2967 & PBW-621 should be allocated during next year & size of minikit should be minimum half acre.
• Population of blue bull reached to a serious proportion & become most limiting factor in Pulse production. Some strategy to check this menace should be devised.
• Arhar has good potential in the State provided short duration & dwarf varieties of Arhar are developed which can fit well in the cropping system.
• Straw-reaper should be included under the Mission.
• There is a huge demand of lazer leveler, so more funds should be provided this resource conserving implements.
20