7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)
-
Upload
servercentral -
Category
Technology
-
view
391 -
download
1
Transcript of 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)
![Page 1: 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)](https://reader031.fdocuments.net/reader031/viewer/2022030402/58860ba81a28ab0a3f8b77f1/html5/thumbnails/1.jpg)
The 7 Mistakes People Make During Data Center Migrations
(and how to avoid them)
Presented by
![Page 2: 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)](https://reader031.fdocuments.net/reader031/viewer/2022030402/58860ba81a28ab0a3f8b77f1/html5/thumbnails/2.jpg)
WHERE ARE WE GOING TODAY?The 7 Mistakes People Make During Data
Center Migrations - and how to avoid them!
Introduction to ServerCentral
Migration Facts, Myths & Legends
What Does a Migration Look Like?
Physical v. Virtual Migrations
The 7 Mistakes People Make
Avoiding the Mistakes
Q&A
Hello!
I’m Chris.
v: +1 (312) 829-1111
Chris RechtsteinerVice President Marketing & Products
![Page 3: 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)](https://reader031.fdocuments.net/reader031/viewer/2022030402/58860ba81a28ab0a3f8b77f1/html5/thumbnails/3.jpg)
ServerCentral
+1 (312) 829-1111
Introduction to ServerCentral
Managed IT Infrastructure for Industry Leading Companies
Privately held company - HQ in Chicago since 2000
- Entering our 16th year of operations
Strong financials- Operations focused vs. capital intensive business model
- Expansion based on organic and self-funded means
Focus on high availability infrastructure- Swift and flexible from contract to services turn up
Superior and personalized customer service and support- Trained technicians available 24/7/365 to install, configure, and troubleshoot
- Continuously manned network operation centers (NOC) by our own staff
- Onsite parts depot for emergency repairs or replacements
ServerCentral provides managed IT infrastructure solutions for leading technology, finance, healthcare, and e-commerce companies including Basecamp, ABN AMRO, UHC, and Shopify.
Since 2000 we've architected, deployed, managed and scaled mission critical solutions across our global data center footprint - including North America, Europe, and Asia.
Whether it's custom designed and managed infrastructure, private clouds, enterprise clouds, DDoS mitigation, DRaaS, backup as a service, managed network stacks, custom managed
networks, real-time remote hands, or simply colocation in one of the seven (7) most advanced data centers on the planet, ServerCentral designs the optimal solution for each client.
![Page 4: 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)](https://reader031.fdocuments.net/reader031/viewer/2022030402/58860ba81a28ab0a3f8b77f1/html5/thumbnails/4.jpg)
ServerCentral
+1 (312) 829-1111
Introduction to ServerCentral
Managed IT Infrastructure for Industry Leading Companies
ServerCentral provides managed IT infrastructure solutions for leading technology, finance, healthcare, and e-commerce companies including Basecamp, ABN AMRO, UHC, and Shopify.
Since 2000 we've architected, deployed, managed and scaled mission critical solutions across our global data center footprint - including North America, Europe, and Asia.
Whether it's custom designed and managed infrastructure, private clouds, enterprise clouds, DDoS mitigation, DRaaS, backup as a service, managed network stacks, custom managed
networks, real-time remote hands, or simply colocation in one of the seven (7) most advanced data centers on the planet, ServerCentral designs the optimal solution for each client.
All ServerCentral Managed Infrastructure solutions can be architected for
global availability Our customer’s infrastructure and applications can be
distributed across as many availability zones as your operations and
customers require.
Regardless of the number of location of availability zones, ServerCentral
solutions will always be architected, deployed, managed, scaled and
supported by unparalleled support teams team to provide 24x7x365
connectivity for your infrastructure and applications.
GLOBAL REACH
![Page 5: 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)](https://reader031.fdocuments.net/reader031/viewer/2022030402/58860ba81a28ab0a3f8b77f1/html5/thumbnails/5.jpg)
Data Center Migrations
The Facts, The Myths, The Legends
![Page 6: 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)](https://reader031.fdocuments.net/reader031/viewer/2022030402/58860ba81a28ab0a3f8b77f1/html5/thumbnails/6.jpg)
100%Data Center Migrations are a Pain In The A__
Source: ServerCentral
![Page 7: 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)](https://reader031.fdocuments.net/reader031/viewer/2022030402/58860ba81a28ab0a3f8b77f1/html5/thumbnails/7.jpg)
>50%Migrations Exceed Budget,
Exceed Migration Windows, Result in Disruption
Sources: Gartner
![Page 8: 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)](https://reader031.fdocuments.net/reader031/viewer/2022030402/58860ba81a28ab0a3f8b77f1/html5/thumbnails/8.jpg)
>60%Companies Have Delayed a
Migration After Planning
Sources: 451 Research, Gartner, IDC
![Page 9: 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)](https://reader031.fdocuments.net/reader031/viewer/2022030402/58860ba81a28ab0a3f8b77f1/html5/thumbnails/9.jpg)
Sources: 451 Research, Gartner, IDC, ServerCentral
50% Concerns About Downtime
40% Lack of Resources
20% Lack of a Plan
20% Lack of a Migration Expertise
15% Cost
![Page 10: 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)](https://reader031.fdocuments.net/reader031/viewer/2022030402/58860ba81a28ab0a3f8b77f1/html5/thumbnails/10.jpg)
Data Center Migration
![Page 11: 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)](https://reader031.fdocuments.net/reader031/viewer/2022030402/58860ba81a28ab0a3f8b77f1/html5/thumbnails/11.jpg)
What Does a Migration Look Like?
![Page 12: 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)](https://reader031.fdocuments.net/reader031/viewer/2022030402/58860ba81a28ab0a3f8b77f1/html5/thumbnails/12.jpg)
ServerCentral
+1 (312) 829-1111
Start at the Beginning…
What is a Data Center Migration?
A Proven Process
Executed by an Experienced Staff
Utilizing Proven Technologies
![Page 13: 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)](https://reader031.fdocuments.net/reader031/viewer/2022030402/58860ba81a28ab0a3f8b77f1/html5/thumbnails/13.jpg)
ServerCentral
+1 (312) 829-1111
DISCOVERY
01PLANNING DEVELOPMENT VALIDATION MIGRATION MANAGEMENT SCALE
02 04 06
03 05 07
The Data Center Migration Process
Proven Processes Executed by Experienced Staff Utilizing Proven Technologies
- Define Project Objectives
- Define Success Criteria
- Infrastructure Assessment
- Budget Requirements
- 1-5 Year Strategy
![Page 14: 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)](https://reader031.fdocuments.net/reader031/viewer/2022030402/58860ba81a28ab0a3f8b77f1/html5/thumbnails/14.jpg)
ServerCentral
+1 (312) 829-1111
DISCOVERY
The Data Center Migration Process
Proven Processes Executed by Experienced Staff Utilizing Proven Technologies
![Page 15: 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)](https://reader031.fdocuments.net/reader031/viewer/2022030402/58860ba81a28ab0a3f8b77f1/html5/thumbnails/15.jpg)
ServerCentral
+1 (312) 829-1111
DISCOVERY
01PLANNING DEVELOPMENT VALIDATION MIGRATION MANAGEMENT SCALE
02 04 06
03 05 07
The Data Center Migration Process
Proven Processes Executed by Experienced Staff Utilizing Proven Technologies
- Define Project Objectives
- Define Success Criteria
- Infrastructure Assessment
- Budget Requirements
- 1-5 Year Strategy
![Page 16: 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)](https://reader031.fdocuments.net/reader031/viewer/2022030402/58860ba81a28ab0a3f8b77f1/html5/thumbnails/16.jpg)
ServerCentral
+1 (312) 829-1111
DISCOVERY
01PLANNING DEVELOPMENT VALIDATION MIGRATION MANAGEMENT SCALE
- Define Project Objectives
- Define Success Criteria
- Infrastructure Assessment
- Budget Requirements
- 1-5 Year Strategy
02 04 06
03 05 07
The Data Center Migration Process
Proven Processes Executed by Experienced Staff Utilizing Proven Technologies
![Page 17: 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)](https://reader031.fdocuments.net/reader031/viewer/2022030402/58860ba81a28ab0a3f8b77f1/html5/thumbnails/17.jpg)
ServerCentral
+1 (312) 829-1111
DISCOVERY
Most Common Mistake
Lack of a complete infrastructure assessment.
Resolution
Develop a complete infrastructure map including
physical infrastructure, virtual infrastructure, network
topography. Include operational and technical
dependencies.
The Data Center Migration Process
Proven Processes Executed by Experienced Staff Utilizing Proven Technologies
![Page 18: 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)](https://reader031.fdocuments.net/reader031/viewer/2022030402/58860ba81a28ab0a3f8b77f1/html5/thumbnails/18.jpg)
ServerCentral
+1 (312) 829-1111
DISCOVERY
01PLANNING DEVELOPMENT VALIDATION MIGRATION MANAGEMENT SCALE
- Define Project Objectives
- Define Success Criteria
- Infrastructure Assessment
- Budget Requirements
- 1-5 Year Strategy
- Infrastructure Design
- Infrastructure Review
- Infrastructure Revisions
- Final Infrastructure Review
02 04 06
03 05 07
The Data Center Migration Process
Proven Processes Executed by Experienced Staff Utilizing Proven Technologies
![Page 19: 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)](https://reader031.fdocuments.net/reader031/viewer/2022030402/58860ba81a28ab0a3f8b77f1/html5/thumbnails/19.jpg)
ServerCentral
+1 (312) 829-1111
DISCOVERY
01PLANNING DEVELOPMENT VALIDATION MIGRATION MANAGEMENT SCALE
- Define Project Objectives
- Define Success Criteria
- Infrastructure Assessment
- Budget Requirements
- 1-5 Year Strategy
- Infrastructure Design
- Infrastructure Review
- Infrastructure Revisions
- Final Infrastructure Review
02 04 06
03 05 07
The Data Center Migration Process
Proven Processes Executed by Experienced Staff Utilizing Proven Technologies
![Page 20: 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)](https://reader031.fdocuments.net/reader031/viewer/2022030402/58860ba81a28ab0a3f8b77f1/html5/thumbnails/20.jpg)
ServerCentral
+1 (312) 829-1111
PLANNING
Most Common Mistake
Lack of a clear leadership.
Resolution
Designate an impartial data center migration project
lead. This is someone with the ability to understand
and accurately represent each group’s requirements
– and someone who also has the authority to hold
everyone accountable.
The Data Center Migration Process
Proven Processes Executed by Experienced Staff Utilizing Proven Technologies
![Page 21: 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)](https://reader031.fdocuments.net/reader031/viewer/2022030402/58860ba81a28ab0a3f8b77f1/html5/thumbnails/21.jpg)
ServerCentral
+1 (312) 829-1111
DISCOVERY
01PLANNING DEVELOPMENT VALIDATION MIGRATION MANAGEMENT SCALE
- Define Project Objectives
- Define Success Criteria
- Infrastructure Assessment
- Budget Requirements
- 1-5 Year Strategy
- Infrastructure Design
- Infrastructure Review
- Infrastructure Revisions
- Final Infrastructure Review
- Build Infrastructure
- Infrastructure Spec Review
- Finalize Support Processes
- Infrastructure Sign-Off02 04 06
03 05 07
The Data Center Migration Process
Proven Processes Executed by Experienced Staff Utilizing Proven Technologies
![Page 22: 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)](https://reader031.fdocuments.net/reader031/viewer/2022030402/58860ba81a28ab0a3f8b77f1/html5/thumbnails/22.jpg)
ServerCentral
+1 (312) 829-1111
DISCOVERY
01PLANNING DEVELOPMENT VALIDATION MIGRATION MANAGEMENT SCALE
- Define Project Objectives
- Define Success Criteria
- Infrastructure Assessment
- Budget Requirements
- 1-5 Year Strategy
- Infrastructure Design
- Infrastructure Review
- Infrastructure Revisions
- Final Infrastructure Review
- Build Infrastructure
- Infrastructure Spec Review
- Finalize Support Processes
- Infrastructure Sign-Off02 04 06
03 05 07
The Data Center Migration Process
Proven Processes Executed by Experienced Staff Utilizing Proven Technologies
![Page 23: 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)](https://reader031.fdocuments.net/reader031/viewer/2022030402/58860ba81a28ab0a3f8b77f1/html5/thumbnails/23.jpg)
ServerCentral
+1 (312) 829-1111
DEVELOPMENT
The Data Center Migration Process
Proven Processes Executed by Experienced Staff Utilizing Proven Technologies
Most Common Mistake
Upgrading parts of the infrastructure during the data
center migration without understanding the
interdependencies.
Resolution
Migrations are a fantastic time to upgrade, too.
Proper Discovery and Planning will highlight
interdependencies, minimizing development issues.
![Page 24: 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)](https://reader031.fdocuments.net/reader031/viewer/2022030402/58860ba81a28ab0a3f8b77f1/html5/thumbnails/24.jpg)
ServerCentral
+1 (312) 829-1111
DISCOVERY
01PLANNING DEVELOPMENT VALIDATION MIGRATION MANAGEMENT SCALE
- Define Project Objectives
- Define Success Criteria
- Infrastructure Assessment
- Budget Requirements
- 1-5 Year Strategy
- Infrastructure Design
- Infrastructure Review
- Infrastructure Revisions
- Final Infrastructure Review
- Network
- Security & Compliance
- Compute
- Storage
- Build Infrastructure
- Infrastructure Spec Review
- Finalize Support Processes
- Infrastructure Sign-Off02 04 06
0503 07
The Data Center Migration Process
Proven Processes Executed by Experienced Staff Utilizing Proven Technologies
![Page 25: 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)](https://reader031.fdocuments.net/reader031/viewer/2022030402/58860ba81a28ab0a3f8b77f1/html5/thumbnails/25.jpg)
ServerCentral
+1 (312) 829-1111
DISCOVERY
01PLANNING DEVELOPMENT VALIDATION MIGRATION MANAGEMENT SCALE
- Define Project Objectives
- Define Success Criteria
- Infrastructure Assessment
- Budget Requirements
- 1-5 Year Strategy
- Infrastructure Design
- Infrastructure Review
- Infrastructure Revisions
- Final Infrastructure Review
- Network
- Security & Compliance
- Compute
- Storage
- Build Infrastructure
- Infrastructure Spec Review
- Finalize Support Processes
- Infrastructure Sign-Off02 04 06
03 05 07
The Data Center Migration Process
Proven Processes Executed by Experienced Staff Utilizing Proven Technologies
![Page 26: 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)](https://reader031.fdocuments.net/reader031/viewer/2022030402/58860ba81a28ab0a3f8b77f1/html5/thumbnails/26.jpg)
ServerCentral
+1 (312) 829-1111
VALIDATION
The Data Center Migration Process
Proven Processes Executed by Experienced Staff Utilizing Proven Technologies
Most Common Mistake
Skipping business validation.
Resolution
Be certain to include a business validation step as
technology teams are not the only teams that need
to validate the infrastructure and application
components.
![Page 27: 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)](https://reader031.fdocuments.net/reader031/viewer/2022030402/58860ba81a28ab0a3f8b77f1/html5/thumbnails/27.jpg)
ServerCentral
+1 (312) 829-1111
DISCOVERY
01PLANNING DEVELOPMENT VALIDATION MIGRATION MANAGEMENT SCALE
- Define Project Objectives
- Define Success Criteria
- Infrastructure Assessment
- Budget Requirements
- 1-5 Year Strategy
- Infrastructure Design
- Infrastructure Review
- Infrastructure Revisions
- Final Infrastructure Review
- Network
- Security & Compliance
- Compute
- Storage
- Build Infrastructure
- Infrastructure Spec Review
- Finalize Support Processes
- Infrastructure Sign-Off
- Final App Migration Plan
- Final Data Migration Plan
- Test Migration
- Migration02 04 06
03 05 07
The Data Center Migration Process
Proven Processes Executed by Experienced Staff Utilizing Proven Technologies
![Page 28: 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)](https://reader031.fdocuments.net/reader031/viewer/2022030402/58860ba81a28ab0a3f8b77f1/html5/thumbnails/28.jpg)
ServerCentral
+1 (312) 829-1111
DISCOVERY
01PLANNING DEVELOPMENT VALIDATION MIGRATION MANAGEMENT SCALE
- Define Project Objectives
- Define Success Criteria
- Infrastructure Assessment
- Budget Requirements
- 1-5 Year Strategy
- Infrastructure Design
- Infrastructure Review
- Infrastructure Revisions
- Final Infrastructure Review
- Network
- Security & Compliance
- Compute
- Storage
- Build Infrastructure
- Infrastructure Spec Review
- Finalize Support Processes
- Infrastructure Sign-Off
- Final App Migration Plan
- Final Data Migration Plan
- Test Migration
- Migration02 04 06
03 05 07
The Data Center Migration Process
Proven Processes Executed by Experienced Staff Utilizing Proven Technologies
![Page 29: 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)](https://reader031.fdocuments.net/reader031/viewer/2022030402/58860ba81a28ab0a3f8b77f1/html5/thumbnails/29.jpg)
ServerCentral
+1 (312) 829-1111
MIGRATION
The Data Center Migration Process
Proven Processes Executed by Experienced Staff Utilizing Proven Technologies
Most Common Mistake
Detailed (realistic) understanding of the actual
migration time.
Resolution
Do the math! How long does it take to migrate a
cabinet or an application or replicate a SAN?
![Page 30: 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)](https://reader031.fdocuments.net/reader031/viewer/2022030402/58860ba81a28ab0a3f8b77f1/html5/thumbnails/30.jpg)
ServerCentral
+1 (312) 829-1111
MIGRATION
The Data Center Migration Process
Proven Processes Executed by Experienced Staff Utilizing Proven Technologies
5 TB
Assumptions:- Full throughput
- Reads at network speed
- Writes at network speed
10.4 hrs1Gbe
1.1 hrs10Gbe
100TB
Assumptions:- Full throughput
- Reads at network speed
- Writes at network speed
8.6 days1Gbe
20.7 hrs10Gbe
![Page 31: 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)](https://reader031.fdocuments.net/reader031/viewer/2022030402/58860ba81a28ab0a3f8b77f1/html5/thumbnails/31.jpg)
ServerCentral
+1 (312) 829-1111
DISCOVERY
01PLANNING DEVELOPMENT VALIDATION MIGRATION MANAGEMENT SCALE
- Define Project Objectives
- Define Success Criteria
- Infrastructure Assessment
- Budget Requirements
- 1-5 Year Strategy
- Infrastructure Design
- Infrastructure Review
- Infrastructure Revisions
- Final Infrastructure Review
- Network
- Security & Compliance
- Compute
- Storage
- Build Infrastructure
- Infrastructure Spec Review
- Finalize Support Processes
- Infrastructure Sign-Off
- Final App Migration Plan
- Final Data Migration Plan
- Test Migration
- Migration
- Post Migration Transition
- 24/7/365 Support
- Proactive Monitoring &
Response
02 04 06
03 05 07
The Data Center Migration Process
Proven Processes Executed by Experienced Staff Utilizing Proven Technologies
![Page 32: 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)](https://reader031.fdocuments.net/reader031/viewer/2022030402/58860ba81a28ab0a3f8b77f1/html5/thumbnails/32.jpg)
ServerCentral
+1 (312) 829-1111
DISCOVERY
01PLANNING DEVELOPMENT VALIDATION MIGRATION MANAGEMENT SCALE
- Define Project Objectives
- Define Success Criteria
- Infrastructure Assessment
- Budget Requirements
- 1-5 Year Strategy
- Infrastructure Design
- Infrastructure Review
- Infrastructure Revisions
- Final Infrastructure Review
- Network
- Security & Compliance
- Compute
- Storage
- Build Infrastructure
- Infrastructure Spec Review
- Finalize Support Processes
- Infrastructure Sign-Off
- Final App Migration Plan
- Final Data Migration Plan
- Test Migration
- Migration
- Post Migration Transition
- 24/7/365 Support
- Proactive Monitoring &
Response
02 04 06
03 05 07
The Data Center Migration Process
Proven Processes Executed by Experienced Staff Utilizing Proven Technologies
![Page 33: 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)](https://reader031.fdocuments.net/reader031/viewer/2022030402/58860ba81a28ab0a3f8b77f1/html5/thumbnails/33.jpg)
ServerCentral
+1 (312) 829-1111
MANAGEMENT
The Data Center Migration Process
Proven Processes Executed by Experienced Staff Utilizing Proven Technologies
Most Common Mistake
Set it and forget it.
Resolution
Allow 48-72 hours, post migration, to have all hands,
eyes and ears on everything to be sure you’re right
where you want to be. This includes both business
and technology teams.
![Page 34: 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)](https://reader031.fdocuments.net/reader031/viewer/2022030402/58860ba81a28ab0a3f8b77f1/html5/thumbnails/34.jpg)
ServerCentral
+1 (312) 829-1111
DISCOVERY
01PLANNING DEVELOPMENT VALIDATION MIGRATION MANAGEMENT SCALE
- Define Project Objectives
- Define Success Criteria
- Infrastructure Assessment
- Budget Requirements
- 1-5 Year Strategy
- Infrastructure Design
- Infrastructure Review
- Infrastructure Revisions
- Final Infrastructure Review
- Build Infrastructure
- Infrastructure Spec Review
- Finalize Support Processes
- Infrastructure Sign-Off
- Final App Migration Plan
- Final Data Migration Plan
- Test Migration
- Migration
- Annual Plan
- Quarterly Review
- Ad-Hoc Requirements
- Post Migration Transition
- 24/7/365 Support
- Proactive Monitoring &
Response
02 04 06
03 05 07- Network
- Security & Compliance
- Compute
- Storage
The Data Center Migration Process
Proven Processes Executed by Experienced Staff Utilizing Proven Technologies
![Page 35: 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)](https://reader031.fdocuments.net/reader031/viewer/2022030402/58860ba81a28ab0a3f8b77f1/html5/thumbnails/35.jpg)
ServerCentral
+1 (312) 829-1111
DISCOVERY
01PLANNING DEVELOPMENT VALIDATION MIGRATION MANAGEMENT SCALE
- Define Project Objectives
- Define Success Criteria
- Infrastructure Assessment
- Budget Requirements
- 1-5 Year Strategy
- Infrastructure Design
- Infrastructure Review
- Infrastructure Revisions
- Final Infrastructure Review
- Build Infrastructure
- Infrastructure Spec Review
- Finalize Support Processes
- Infrastructure Sign-Off
- Final App Migration Plan
- Final Data Migration Plan
- Test Migration
- Migration
- Annual Plan
- Quarterly Review
- Ad-Hoc Requirements
- Post Migration Transition
- 24/7/365 Support
- Proactive Monitoring &
Response
02 04 06
03 05 07- Network
- Security & Compliance
- Compute
- Storage
The Data Center Migration Process
Proven Processes Executed by Experienced Staff Utilizing Proven Technologies
![Page 36: 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)](https://reader031.fdocuments.net/reader031/viewer/2022030402/58860ba81a28ab0a3f8b77f1/html5/thumbnails/36.jpg)
ServerCentral
+1 (312) 829-1111
SCALE
The Data Center Migration Process
Proven Processes Executed by Experienced Staff Utilizing Proven Technologies
Most Common Mistake
We’re done!
Resolution
Schedule regular quarterly reviews of infrastructure
and app-specific requirements - even for steady-
state apps and infrastructure.
![Page 37: 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)](https://reader031.fdocuments.net/reader031/viewer/2022030402/58860ba81a28ab0a3f8b77f1/html5/thumbnails/37.jpg)
ServerCentral
+1 (312) 829-1111
DISCOVERY
01PLANNING DEVELOPMENT VALIDATION MIGRATION MANAGEMENT SCALE
- Define Project Objectives
- Define Success Criteria
- Infrastructure Assessment
- Budget Requirements
- 1-5 Year Strategy
- Infrastructure Design
- Infrastructure Review
- Infrastructure Revisions
- Final Infrastructure Review
- Build Infrastructure
- Infrastructure Spec Review
- Finalize Support Processes
- Infrastructure Sign-Off
- Final App Migration Plan
- Final Data Migration Plan
- Test Migration
- Migration
- Annual Plan
- Quarterly Review
- Ad-Hoc Requirements
- Post Migration Transition
- 24/7/365 Support
- Proactive Monitoring &
Response
02 04 06
03 05 07- Network
- Security & Compliance
- Compute
- Storage
The Data Center Migration Process
Proven Processes Executed by Experienced Staff Utilizing Proven Technologies
![Page 38: 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)](https://reader031.fdocuments.net/reader031/viewer/2022030402/58860ba81a28ab0a3f8b77f1/html5/thumbnails/38.jpg)
A goal without a plan is just a wish. Antoine de Saint-Exupéry
![Page 39: 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)](https://reader031.fdocuments.net/reader031/viewer/2022030402/58860ba81a28ab0a3f8b77f1/html5/thumbnails/39.jpg)
Questions?
Comments?
![Page 40: 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)](https://reader031.fdocuments.net/reader031/viewer/2022030402/58860ba81a28ab0a3f8b77f1/html5/thumbnails/40.jpg)
Learn more by visiting
http://www.servercentral.com/services/data-center-migration
![Page 41: 7 Mistakes People Make During Data Center Migrations (And How to Avoid Them)](https://reader031.fdocuments.net/reader031/viewer/2022030402/58860ba81a28ab0a3f8b77f1/html5/thumbnails/41.jpg)
The 7 Mistakes People Make During Data Center Migrations
(and how to avoid them)
Presented by