7 - Budget Review and Related Practices - Mdfsp09

39
7 Budget Review & Related Budget Review & Related Professor M. Professor M. Asem Asem Abdul Abdul- -Malak Malak ng neer ng anagement rogr am ng neer ng anagement rogr am Faculty of Engineering and Architecture Faculty of Engineering and Architecture American Universit of Beirut American Universit of Beirut

Transcript of 7 - Budget Review and Related Practices - Mdfsp09

Page 1: 7 - Budget Review and Related Practices - Mdfsp09

8/3/2019 7 - Budget Review and Related Practices - Mdfsp09

http://slidepdf.com/reader/full/7-budget-review-and-related-practices-mdfsp09 1/39

77 Budget Review & RelatedBudget Review & Related

Professor M.Professor M. AsemAsem AbdulAbdul--MalakMalak

ng neer ng anagement rogramng neer ng anagement rogramFaculty of Engineering and ArchitectureFaculty of Engineering and Architecture

American Universit of BeirutAmerican Universit of Beirut

Page 2: 7 - Budget Review and Related Practices - Mdfsp09

8/3/2019 7 - Budget Review and Related Practices - Mdfsp09

http://slidepdf.com/reader/full/7-budget-review-and-related-practices-mdfsp09 2/39

Page 3: 7 - Budget Review and Related Practices - Mdfsp09

8/3/2019 7 - Budget Review and Related Practices - Mdfsp09

http://slidepdf.com/reader/full/7-budget-review-and-related-practices-mdfsp09 3/39

 

Control of budget is exercised by ensuring that generated cost’  

revised figure approved by the owner.

Budget review is concerned with the initial (purchase and,

weighed against maintenance and operation costs under anyvalue engineering exercise.

, ,..of installing or incorporating work items or products in thebuilt facility. The ease with which such installations take place

.

Page 4: 7 - Budget Review and Related Practices - Mdfsp09

8/3/2019 7 - Budget Review and Related Practices - Mdfsp09

http://slidepdf.com/reader/full/7-budget-review-and-related-practices-mdfsp09 4/39

 

Illustrating the scaleand relationship of thepro ect componentsc emat c es gn

DesignDevelopment

Refinement of design;establishing scope,relationships, forms,

ConstructionDocumentation

s ze, an appearance othe project

Setting forth, in detail, therequirements for

construction of the project

Page 5: 7 - Budget Review and Related Practices - Mdfsp09

8/3/2019 7 - Budget Review and Related Practices - Mdfsp09

http://slidepdf.com/reader/full/7-budget-review-and-related-practices-mdfsp09 5/39

Owner’s ConstructionOwner’s ConstructionBudgetBudget

Construction budget setby the Owner

c emat c es gn

DesignDevelopment

ConstructionDocumentation

Construction budget checks and balances by the Owner

Page 6: 7 - Budget Review and Related Practices - Mdfsp09

8/3/2019 7 - Budget Review and Related Practices - Mdfsp09

http://slidepdf.com/reader/full/7-budget-review-and-related-practices-mdfsp09 6/39

 

Detailed/DefinitiveEstimate

c emat c es gnEngineer’s

Estimate

DesignDevelopment

PreliminaryEstimate

ConstructionDocumentation

Construction cost estimate reviews/updates by the Architect/Engineer

Page 7: 7 - Budget Review and Related Practices - Mdfsp09

8/3/2019 7 - Budget Review and Related Practices - Mdfsp09

http://slidepdf.com/reader/full/7-budget-review-and-related-practices-mdfsp09 7/39

uestions to beuestions to beaddressedaddressed

c emat c es gn

DesignDevelopment1. Design Information???

ConstructionDocumentation

.

Construction cost estimate reviews/updates by the Architect/Engineer

Page 8: 7 - Budget Review and Related Practices - Mdfsp09

8/3/2019 7 - Budget Review and Related Practices - Mdfsp09

http://slidepdf.com/reader/full/7-budget-review-and-related-practices-mdfsp09 8/39

SD Estimate:SD Estimate:Governing FactorsGoverning Factors’ 

Functions/Areas Criteria/Standards

Systems/SizingScale/Massing

 

Estimate’s representation characteristics

$/m2 Combined Aggregation bysystem

 Aggregation byfunction

wner s cr er a o accep ance

In conjunctionwith other

Rates vs.EstimateComprehensive

Cost Estimate Confirmation

deliverables

Page 9: 7 - Budget Review and Related Practices - Mdfsp09

8/3/2019 7 - Budget Review and Related Practices - Mdfsp09

http://slidepdf.com/reader/full/7-budget-review-and-related-practices-mdfsp09 9/39

DD EstimateDD Estimate::Governing FactorsGoverning Factors’ 

????? ???????????????

 

Estimate’s representation characteristics

????? ???????????????

wner s cr er a o accep ance

????? ???????????????

Cost Estimate Confirmation

Page 10: 7 - Budget Review and Related Practices - Mdfsp09

8/3/2019 7 - Budget Review and Related Practices - Mdfsp09

http://slidepdf.com/reader/full/7-budget-review-and-related-practices-mdfsp09 10/39

CD Estimate:CD Estimate:Governing FactorsGoverning Factors’ 

????? ???????????????

 

Estimate’s representation characteristics

????? ???????????????

wner s cr er a o accep ance

????? ???????????????

Cost Estimate Confirmation

Page 11: 7 - Budget Review and Related Practices - Mdfsp09

8/3/2019 7 - Budget Review and Related Practices - Mdfsp09

http://slidepdf.com/reader/full/7-budget-review-and-related-practices-mdfsp09 11/39

 Value En ineerin :Definition

It is the process through which it can be

ensured that the delivered facility has beendesigned with an overall (life-cycle based) costeffectiveness taken into consideration in

built facility and the systems serving such

Page 12: 7 - Budget Review and Related Practices - Mdfsp09

8/3/2019 7 - Budget Review and Related Practices - Mdfsp09

http://slidepdf.com/reader/full/7-budget-review-and-related-practices-mdfsp09 12/39

 

Project

Financial Advisors

ManagementProfessionals

Owner Legal Advisors

TechnicalStaff 

 A/ E Consultant

on rac or

Page 13: 7 - Budget Review and Related Practices - Mdfsp09

8/3/2019 7 - Budget Review and Related Practices - Mdfsp09

http://slidepdf.com/reader/full/7-budget-review-and-related-practices-mdfsp09 13/39

’ ’ 

Relevant AIA terms:Relevant AIA terms:

§§ 2.1.32.1.3 The Architect shall consider theThe Architect shall consider the valuevalue

of alternative materials, building systems andof alternative materials, building systems andequipment, together with otherequipment, together with otherconsiderations based on program, budgetconsiderations based on program, budget

an aes e cs n eve op ng e es gn oran aes e cs n eve op ng e es gn orthe Project.the Project.

r

Page 14: 7 - Budget Review and Related Practices - Mdfsp09

8/3/2019 7 - Budget Review and Related Practices - Mdfsp09

http://slidepdf.com/reader/full/7-budget-review-and-related-practices-mdfsp09 14/39

’ ’ 

Project manager is to be expected to take an active roleProject manager is to be expected to take an active rolein overseeing the performance of the Architect’sin overseeing the performance of the Architect’s

pertaining to “value engineering”.pertaining to “value engineering”.

v r :v r :

. .. .  alternative materials, building systems andalternative materials, building systems andequipment, together with other considerations basedequipment, together with other considerations basedon program, u ge an aes e cs n eve op ng eon program, u ge an aes e cs n eve op ng e

design for the Project.design for the Project.r

Page 15: 7 - Budget Review and Related Practices - Mdfsp09

8/3/2019 7 - Budget Review and Related Practices - Mdfsp09

http://slidepdf.com/reader/full/7-budget-review-and-related-practices-mdfsp09 15/39

’ ’ 

Relevant FIDIC General Conditions of Contract forRelevant FIDIC General Conditions of Contract for

13.213.2 he Contractor ma at an time submit to thehe Contractor ma at an time submit to theEngineer a written proposal which (in the Contractor’sEngineer a written proposal which (in the Contractor’sopinion) will, if adopted, (i) accelerate completion, (ii)opinion) will, if adopted, (i) accelerate completion, (ii)

,,maintaining or operating the Works, (iii) improve themaintaining or operating the Works, (iii) improve theefficiency or value to the Employer of the completedefficiency or value to the Employer of the completed

or s, or v o erw se e o ene o e mp oyeror s, or v o erw se e o ene o e mp oyer

r

Page 16: 7 - Budget Review and Related Practices - Mdfsp09

8/3/2019 7 - Budget Review and Related Practices - Mdfsp09

http://slidepdf.com/reader/full/7-budget-review-and-related-practices-mdfsp09 16/39

How Are These RolesHow Are These RolesExercisedExercised

Planning

 ArchitectProject Manager

Contractor

Bidding

Design

Construction

O&M

Possibilities to consider Value Engineering prevail throughout the D-B-B process

Page 17: 7 - Budget Review and Related Practices - Mdfsp09

8/3/2019 7 - Budget Review and Related Practices - Mdfsp09

http://slidepdf.com/reader/full/7-budget-review-and-related-practices-mdfsp09 17/39

 

Planning

Bidding

Design

Construction

O&M

Page 18: 7 - Budget Review and Related Practices - Mdfsp09

8/3/2019 7 - Budget Review and Related Practices - Mdfsp09

http://slidepdf.com/reader/full/7-budget-review-and-related-practices-mdfsp09 18/39

e n ons

Page 19: 7 - Budget Review and Related Practices - Mdfsp09

8/3/2019 7 - Budget Review and Related Practices - Mdfsp09

http://slidepdf.com/reader/full/7-budget-review-and-related-practices-mdfsp09 19/39

-

 “Buildabilit is the extent to which the desi nof the building facilitates ease of construction,subject to the overall requirements for the

comp ete u ng

Page 20: 7 - Budget Review and Related Practices - Mdfsp09

8/3/2019 7 - Budget Review and Related Practices - Mdfsp09

http://slidepdf.com/reader/full/7-budget-review-and-related-practices-mdfsp09 20/39

-

 “Constructability is the optimum use of 

construction knowledge and experience inplanning, design, procurement, and fieldoperations to achieve overall project

” 

ons ruc on n us ry ns u e, – us n

Page 21: 7 - Budget Review and Related Practices - Mdfsp09

8/3/2019 7 - Budget Review and Related Practices - Mdfsp09

http://slidepdf.com/reader/full/7-budget-review-and-related-practices-mdfsp09 21/39

Definition Fer uson -1989)

 “Buildabilit is the abilit to construct a buildinefficiently, economically and to agreed qualitylevels from its constituent materials,

components, an su -assem es

Page 22: 7 - Budget Review and Related Practices - Mdfsp09

8/3/2019 7 - Budget Review and Related Practices - Mdfsp09

http://slidepdf.com/reader/full/7-budget-review-and-related-practices-mdfsp09 22/39

-

 “Constructabilit is the extent to which thedesign of the building facilitates ease of construction, subject to the requirements of 

construct on met o s

Page 23: 7 - Budget Review and Related Practices - Mdfsp09

8/3/2019 7 - Budget Review and Related Practices - Mdfsp09

http://slidepdf.com/reader/full/7-budget-review-and-related-practices-mdfsp09 23/39

 

Design

Bi ing

Construction

O&M

Page 24: 7 - Budget Review and Related Practices - Mdfsp09

8/3/2019 7 - Budget Review and Related Practices - Mdfsp09

http://slidepdf.com/reader/full/7-budget-review-and-related-practices-mdfsp09 24/39

 

PM/CM

Financial Advisors

Pro essiona s

Owner Legal Advisors

TechnicalStaff 

 A/ E Consultant

on rac or s

Page 25: 7 - Budget Review and Related Practices - Mdfsp09

8/3/2019 7 - Budget Review and Related Practices - Mdfsp09

http://slidepdf.com/reader/full/7-budget-review-and-related-practices-mdfsp09 25/39

’ ’ 

The Architect shall be the first participant toThe Architect shall be the first participant to

observe the issue of “constructability” as theobserve the issue of “constructability” as thedesign is being conceived and rendered.design is being conceived and rendered.

Observing “constructability” shall be made aObserving “constructability” shall be made arequirement in the Owner/Architect Agreement.requirement in the Owner/Architect Agreement.

Page 26: 7 - Budget Review and Related Practices - Mdfsp09

8/3/2019 7 - Budget Review and Related Practices - Mdfsp09

http://slidepdf.com/reader/full/7-budget-review-and-related-practices-mdfsp09 26/39

’ ’ 

Project manager is to be expected to take an activeProject manager is to be expected to take an active

role in overseein the erformance of the Architect’srole in overseein the erformance of the Architect’sservices and in enforcing those agreement termsservices and in enforcing those agreement termspertaining to “Constructability”.pertaining to “Constructability”.

 reviews, starting as early as possible into the projectreviews, starting as early as possible into the projectimplementation schedule.implementation schedule.

Page 27: 7 - Budget Review and Related Practices - Mdfsp09

8/3/2019 7 - Budget Review and Related Practices - Mdfsp09

http://slidepdf.com/reader/full/7-budget-review-and-related-practices-mdfsp09 27/39

’ ’ 

instrumental in judging the degree to which theinstrumental in judging the degree to which the

desi n has been conceived withdesi n has been conceived with “constructability” in mind. “constructability” in mind.

he drawback lies in the mechanism throughhe drawback lies in the mechanism throughwhich the judgment of the Contractor may bewhich the judgment of the Contractor may be

..

Page 28: 7 - Budget Review and Related Practices - Mdfsp09

8/3/2019 7 - Budget Review and Related Practices - Mdfsp09

http://slidepdf.com/reader/full/7-budget-review-and-related-practices-mdfsp09 28/39

Where Are These RolesWhere Are These RolesExercisedExercised

Planning

 Architect

Project ManagerContractor

Bidding

Design

Construction

O&M

Possibilities to consider Constructability prevail throughout the D-B-B process

Page 29: 7 - Budget Review and Related Practices - Mdfsp09

8/3/2019 7 - Budget Review and Related Practices - Mdfsp09

http://slidepdf.com/reader/full/7-budget-review-and-related-practices-mdfsp09 29/39

Considerations durinConsiderations durinPlanningPlanning

Constructability program is an integral part of project execution.

Project planning involves construction knowledge andexperience.

Early construction involvement is considered in development of contracting strategy.

Project schedules are construction-sensitive. Basic design approaches consider major construction methods. . Project team participants responsible for constructability are

identified early on.  Advanced information technolo ies are a lied throu hout

project.

Page 30: 7 - Budget Review and Related Practices - Mdfsp09

8/3/2019 7 - Budget Review and Related Practices - Mdfsp09

http://slidepdf.com/reader/full/7-budget-review-and-related-practices-mdfsp09 30/39

Considerations durinConsiderations durinDesign and ProcurementDesign and Procurement

Design and procurement schedules are construction sensitive.

es gns are con gure o ena e e c en cons ruc on.

Design elements are standardized.

Construction efficiency is considered in specification.

Module/preassembly designs are prepared to facilitatefabrication, transport, and installation.

,

material, and equipment. Designs facilitate construction under adverse weather

conditions.

Design and construction sequencing should facilitate system

turnover and start-up.

Page 31: 7 - Budget Review and Related Practices - Mdfsp09

8/3/2019 7 - Budget Review and Related Practices - Mdfsp09

http://slidepdf.com/reader/full/7-budget-review-and-related-practices-mdfsp09 31/39

Desi n and rocurement schedules areconstruction sensitive

Procurement, other than for lead times, has moderate

segment of the overall schedule. Design is a complexand demanding process, but frequently is the most

ruit u area in optimizing t e entire project sc e u e.

Page 32: 7 - Budget Review and Related Practices - Mdfsp09

8/3/2019 7 - Budget Review and Related Practices - Mdfsp09

http://slidepdf.com/reader/full/7-budget-review-and-related-practices-mdfsp09 32/39

Desi ns are confi ured to enable efficientconstruction

Simplicity is a desirable element of any constructabledesign. Flexibility for the field construction forces to

highly desirable. Sequencing of installation is as mucha design consideration as it is a procurement and

.skills should be minimized in all cases, along with onesthat are highly labor intensive.

Page 33: 7 - Budget Review and Related Practices - Mdfsp09

8/3/2019 7 - Budget Review and Related Practices - Mdfsp09

http://slidepdf.com/reader/full/7-budget-review-and-related-practices-mdfsp09 33/39

 

Specific advantages of standardization include:

(1) increased productivity from repetitive fieldoperations,

,

(3) simplified material procurement,

4 sim lified materials mana ement

(5) reduced design time, and

(6) greater interchangeability of spare parts duringmaintenance operations.

Page 34: 7 - Budget Review and Related Practices - Mdfsp09

8/3/2019 7 - Budget Review and Related Practices - Mdfsp09

http://slidepdf.com/reader/full/7-budget-review-and-related-practices-mdfsp09 34/39

Construction efficienc is considered inspecification development

Sufficient time is allowed to develop complete,cons s en , an error- ree spec ca ons. ar y ssought as one of the prime characteristics of a good

specification. A single construction specification coversall appropriate aspects of a single subject orcomponent. The cost saving potential of “or equal” 

.

Specifications are maintained in order to include themost current cost-effective state-of-the-practiceec n ques an ma er a s.

Page 35: 7 - Budget Review and Related Practices - Mdfsp09

8/3/2019 7 - Budget Review and Related Practices - Mdfsp09

http://slidepdf.com/reader/full/7-budget-review-and-related-practices-mdfsp09 35/39

Module/ pre-assembly designs are

,transport , and installat ion

Once the decision has been made to use modularization,

addressed during design and procurement to ensure theirsuccessful implementation. Designers should first consider where

the fabrication is to be performed. If the vendor’s shop is undercontrolled conditions, tolerances can be more stringent.Module/preassembly designs add requirements for transportingand handling large assemblies. These activities form a revised

scope for the project and introduce key physical or schedulerestraints based on the availability of transportation and handlingequipment. Finally, the installation method of modules must be

, ,and design of underground services and foundations.

Page 36: 7 - Budget Review and Related Practices - Mdfsp09

8/3/2019 7 - Budget Review and Related Practices - Mdfsp09

http://slidepdf.com/reader/full/7-budget-review-and-related-practices-mdfsp09 36/39

Designs promote construction

, ,equipment

Specific issues that should be considered include:(1) sequencing of work,

(2) delivery schedules for major pieces of equipment,

(3) laydown areas on congested sites,

(4) e very rou es,

(5) use of permanent elevators for personnel lifts,

traversed later by heavy equipment, and

(7) type, location, and required opening size forequipment.

Page 37: 7 - Budget Review and Related Practices - Mdfsp09

8/3/2019 7 - Budget Review and Related Practices - Mdfsp09

http://slidepdf.com/reader/full/7-budget-review-and-related-practices-mdfsp09 37/39

Page 38: 7 - Budget Review and Related Practices - Mdfsp09

8/3/2019 7 - Budget Review and Related Practices - Mdfsp09

http://slidepdf.com/reader/full/7-budget-review-and-related-practices-mdfsp09 38/39

Design and construction sequencing

start-up

it is important that the overall start-up planningprocess begin early in the facility delivery process. The

-up problems that result in increased costs and delays.

The longer the overlap between the start-up phase andthe construction phase, the more important earlyintegration of start-up into the overall project planbecomes. Of e ual im ortance to inte rated ro ect

planning is the need to identify start-up requirementsthat have a direct impact on design, such as: special

, ,electrical power requirements.

Page 39: 7 - Budget Review and Related Practices - Mdfsp09

8/3/2019 7 - Budget Review and Related Practices - Mdfsp09

http://slidepdf.com/reader/full/7-budget-review-and-related-practices-mdfsp09 39/39

Considerations durinConsiderations durinField OperationsField Operations

Constructability is enhanced w hen innovativeconstruction methods are utilized, which

(1)(1) the sequencing of field tasks,the sequencing of field tasks,

 

(3)(3) use of hand tools,use of hand tools,

(4)(4) use of construction equipment,use of construction equipment,

(5)(5) constructorconstructor--optional preoptional pre--assembly, andassembly, and(6)(6) postpost--bid constructor preferences relevant to thebid constructor preferences relevant to the

ayou , es gn, an se ec on o permanenayou , es gn, an se ec on o permanenmaterials.materials.