6-Nov-06 FALC Resource Board
Global Design Effort 1
Report from the GDE
Barry Barish
Caltech / GDE
6-Nov-06
6-Nov-06 FALC Resource Board Global Design Effort 2
Outline
• Progress Since Last Meeting– Last FALC Resource Group Mtg– FALC report –May-06– Vancouver status – July 06– Design Cost Optimization for RDR (Valencia)– GDE Coordination of Global R&D Program
• Plans for Valencia Meeting
• Plans for Completing Reference Design Report
• Longer Term Issues and Plans (Resources)
6-Nov-06 FALC Resource Board Global Design Effort 3
Report– Feb 06 – Baseline Achieved
6-Nov-06 FALC Resource Board Global Design Effort 4
Next Steps Outlined
6-Nov-06 FALC Resource Board Global Design Effort 5
Reorganized for Reference Design
6-Nov-06 FALC Resource Board Global Design Effort 6
Our Plan as Reported at Feb Meeting
6-Nov-06 FALC Resource Board Global Design Effort 7
FALC Report – May 06
6-Nov-06 FALC Resource Board Global Design Effort 8
FALC Report – May 06
6-Nov-06 FALC Resource Board Global Design Effort 9
FALC Report – May 06
6-Nov-06 FALC Resource Board Global Design Effort 10
FALC Report – May 06
6-Nov-06 FALC Resource Board Global Design Effort 11
FALC Report – May 06
6-Nov-06 FALC Resource Board Global Design Effort 12
FALC Report – May 06
6-Nov-06 FALC Resource Board Global Design Effort 13
FALC Report – May 06
6-Nov-06 FALC Resource Board Global Design Effort 14
FALC Report – May 06
6-Nov-06 FALC Resource Board Global Design Effort 15
The ‘S’ R&D Task Forces
S0High-Gradient Cavities
S1High-Gradient Cryomodule
S2Test Linac
S3Damping Ring
S4Beam Delivery
S5…Sn
To address priority R&D items, RDB has convened several ‘task forces’.
S0-S3 will report on Friday AM GDE plenary
6-Nov-06 FALC Resource Board Global Design Effort 16
The ‘S’ R&D Task Forces
• Addresses current ‘poor’ yield for EP cavities
• Primary goal: establish parameters for routinely producing 35 MV/m EP’d cavities– required 80% yield
S0High-Gradient Cavities
S1High-Gradient Cryomodule
S2Test Linac
S3Damping Ring
S4Beam Delivery
S5…SnH. Hayano, T. Higo, L. Lilje, J. Mammosser, H. Padamsee, M. Ross, K. Saito
6-Nov-06 FALC Resource Board Global Design Effort 17
Baseline to a RDR
Jan July Dec 2006
Freeze ConfigurationOrganize for RDR
Bangalore
Review Design/Cost Methodology
Review InitialDesign / Cost Review Final
Design / CostRDR Document
Design and Costing PreliminaryRDR
Released
Frascati Vancouver Valencia
6-Nov-06 FALC Resource Board Global Design Effort 18
System July 18, 2006 - Cost Estimates received for Regionaldescription common e- e+ DR RTML ML BDS Exp Am Asia Eure- Source √e+ Source √DR √RTML √Main LinacBDS √Com, Op, ReliabControl System √ √ √ √ √ √ √Cryogenics √ √ √ * √ √ √ *Convent. Facilities √ √ √ √ √ √ √ * √ √ √ √Installation √ √ √ √ √ √ √Instrumentation √ √ √ √ √ √ √Cavities √ √ √Cryomodules √ √ √ √ √ √ √RF √ √ √ √ √ √ √ √ √Magnets & PS √ * √ *Dumps & Collim √ √ √ √ √Vacuum √ √ √ √ √ √Accel Phys
√ = complete, √ * = almost complete, missing something minor
Vancouver Cost Data
6-Nov-06 FALC Resource Board Global Design Effort 19
ILC Estimate by Area Systems -17july06
Main Linac DRs Beam Deliv RTML e+ Source Exp. Halls e- Source General
Costs by Area System
6-Nov-06 FALC Resource Board Global Design Effort 20
ILC Estimate by Technical & Global Systems - 22july06
Conventional Facilities
Dumps & Collimators
CM & Cavities
Instrumentation
RF
Vacuum
Installation
Magnets
Cryogenics
Controls
Costs by Technical & Global System
6-Nov-06 FALC Resource Board Global Design Effort 21
Vancouver Valencia
CostReduction
Design Scope
Component Costs
Physics ScopeNo big ticket items!
Just lots of 1% effects
6-Nov-06 FALC Resource Board Global Design Effort 22
Design Changes Under Consideration
RDR MB CCB
214mr IRs supported central injectors supported Removal of service tunnel rejected
conventional e+ source rejected
RF unit modifications (24 26 cav/klys) supported submitted
reduced RF in DR (6 9mm z) supported in prep
DR race-track lattice (CFS) supported in prep
reduced static cryo overhead supported in prep
removal linac RF overhead supported in prep
single-stage bunch compressor rejected
e- source: common pre-accelerator supported in prep
6-Nov-06 FALC Resource Board Global Design Effort 23
Potential Physics Scope Cuts
• Nobody want's to do this but it may still be necessary– We must wait and see our new "Bottom Line"
• If we are still too expensive, then need to consider 'physics reach‘:– Energy reach: re-defining 500 GeV– Peak Luminosity
• Single IR (push-pull)– not directly a physics scope issue
• These will need to be fully discussed and coordinated with the Physics Community– Physics Parameter Group– MDI panel– (WWS)
6-Nov-06 FALC Resource Board Global Design Effort 24
Plans until Beijing (Feb. '07)
November December January February
Valencia
Further cost consolidationCCR preparation & submission
Cost & Design Freeze 30/11
Prepare for Full Cost Review
SLAC Cost Review 14-16/12
MAC 10-12/01/07
Final cost corrections and documentation
Agency cost briefings
Beijing: RDR draft published
RDR final editing
RDR prepare 1st drafts
2006 2007
6-Nov-06 FALC Resource Board Global Design Effort 25
What Happens after Beijing?
• Public Release of Draft RDR and Preliminary Costing at Beijing– Cost Reviews, etc– Finalize RDR by Summer 2007?
• Enter into Engineering Design Phase– Planning underway internally– Design will evolve through value engineering
and R&D program– General Goal is to have Construction Proposal
ready by 2010
6-Nov-06 FALC Resource Board Global Design Effort 26
Summary• Status of Costing
– First costing available at Vancouver (July)– Cost to performance optimization
• Component level cost reduction (requirements) • Machine design changes• Changes effecting physics performance
• Status & Plans for design modifications– Several proposals accepted and some rejected– Changes having physics impact (Valencia)– Complete RDR by Beijing Meetings
• Global planning for critical R&D beginning– Formation of ‘S’ task forces