dilliifizie ENGINEERSI -ar Etiltuvar WA LIMITED
IN SPEC T ION A N D T EST PL A NF O R
D R Y T YPE L IGH T IN G T R A N SFOR M E R
S T A N D A RD S P E C I F IC A T I O N N O .
6-81-1042 Rev. 1
Page 1 of 5
rtiiS e T s t i t 4 ) 1 4 s (fleTu r t r t rawr
NSPECTION AND TEST PLAN
FORDRY TYPE LIGHTING TRANSFORMER
1 29.06.12 Revised and Re- issued RJ D DM
0 08.12.2008 Issued for implementation RB SK D SK P VC
Standards Commit tee Standards Bureau
R e v .N o.
Date PurposePrepared
by
Checkedby
C onve nor C hairm an
Approved by
F o rma t N o . 8 -0 0 -0 0 0 1 -F 7 Re v . 0 Copyright EIL — All rights reserved
7/28/2019 6-81-1042 Rev 1
http://slidepdf.com/reader/full/6-81-1042-rev-1 2/5
551aele rei E N G I N E E M I T T
nED
Jmm In Govt COMA Undenaaniv
IN SPEC T ION A N D T EST PL A NFO R
D R Y T YPE L IGH T IN G T R A N SFOR M ER
S T A N D A RD S P E C I F I C A T IO N N O .
6-81-1042 Rev. 1
Page 2 of 5
Abbreviations
AS
BASEEFA
BIS
CCE or CCOE
CELL
CIMFRC EDFT
DT
DPT
ERTL
FCRI
FMFLP
HI C
ITPIP
IC
IGCIE C
JEC
LPT
: Alloy Steel
: British Approval Service for Electrical Equipment in Flammable
Atmospheres
Bureau of Indian Standards
Chief Controller of Explosives
Certification Engineers International Limited
Central Institute of Mining & Fuel Research
Carbon Equivalent
Dry Film Thickness
Destructive Testing
Dye Penetrate Testing
: Electronics Regional Test Laboratory
Fluid Control Research Institute
: Factory Mutual
Flame Proof
Hydrogen Induced Cracking
Inspection and Test Plan
Ingress Protection
Inspection Certification
Inter Granular Corrosion
International Electro technical Commission
Japanese Electro technical Committee
Liquid Penetrate Testing
MPT/MT
MRT
MTC
MO C
NPSH
NDT
NEMA
PO
PESO
PQR
PR
PMI
PV C
QC
RT
TC
TPI or TPIA
UT
UL
VDR
WPSWPQ
XLPE
Magnetic Particle Testing
Mechanical Run Test
Material Test Certificate
Material of Construction
Net Positive Suction Head
: Non Destructive Testing
: National Electrical Manufacturers Association
Purchase Order
Petroleum Explosive Safety Organization
Procedure Qualification Record
Purchase Requisition
Positive Material Identification
Poly Vinyl Chloride
Quality Control
Radiography Testing
Test Certificate
Third Party Inspection Agency
: Ultrasonic Testing
Under writer Laboratories
Vendor Data Requirement
Welding Procedure Specification
Welders Performance Qualification
Cross Linked Poly Ethylene
Inspection Standards Comm ittee
Convenor : Mr. A.K. Chaudhary
Me mb e r s :Mr. S.C. Gupta Mr. RK Singh Mr. MP Jain (Projects)
Mr. G. Suresh Mr. Rajeev Kumar Mr. G. Poomachandra Rao
Format No. 8-00-0001-F7 Rev. 0
Copyright EIL - All rights reserved
7/28/2019 6-81-1042 Rev 1
http://slidepdf.com/reader/full/6-81-1042-rev-1 3/5
1g9E15 1VOINDIA LIMITED(A con al undertak ing)
INSPECTION AND TEST PLANFO R
DRY TYPE LIGHTING TRANSFORMER
STANDARD SPECI F I CATI ON NO.
6-81-1042 Rev. 1Page 3 o f 5
1.0 SCOPE
This Inspection and Test Plan covers the minimum testing & inspection requirements of Dry Type Lighting Transformer.
2.0 REFERENCE DOCUMENTS
PO/PR & Standards referred there in /Job specifications / Approved documents.
3.0INSPECTION AND TEST REQUIREMENTS
SL
NOSTAGE/ ACTIVITY CHARACTERISTICS
QUANTUM
OF CHECKRECORD
SCOPE OF INSPECTION
SUBSUPPLIER EIL/TPIA
SUPPLIER
1. 0 Procedures -- -- -- -- -- --
2.0 Material Inspection
2.1
Incoming Raw Material
like Marshalling box,
cables, fasteners and bolts,
copper flexible, insulators,
dials and gauges etc
Material Identification
Dimensional and Operational checks
Physical, Chemical, Electrical properties (as
applicable)
Calibration checks (as applicable
100%
Material Test
Certificates /
Test records
II H/R
R
(for major
items only)
3.0 Inprocess Inspection
3.1 Transformer Assembly Visual, Dimensions, Bill of materials. 100% Test Records - H -
Format N o. 8 -00-0001-F7 Rev . 0 Copyr igh t EIL—N I r igh ts reserved
7/28/2019 6-81-1042 Rev 1
http://slidepdf.com/reader/full/6-81-1042-rev-1 4/5
laRziet E N G IN E E RSLI I k i llarg'S INDIA LIMITED
IA Goad India undertaking)
IN SPEC T ION A N D T EST PL A NFO R
D R Y T YPE L IGH T IN G T R A N SFOR M ER
S T A N D A R D S P E C I F IC A T I O N N O .
6-81-1042 Rev. 1
Pa g e 4 of 5
SL
N O .STAGE/ ACTIVITY CHARACTERISTICS
QUANT
OFCHECK
UMRECORD
SCOPE OF INSPECTION
SUB
SUPPLIERSUPPLIER EIL/TPIA
4.0 Final Inspection
4.1Transformer (Routine
Tests)
Physical and dimensional check.
Check calibration status of all testing
equipment.
Verification of Bill of material.
Measurement of winding resistance
Measurement of voltage ratio and check of
voltage vector relationship
Measurement of impedance voltage, short-
circuit impedance and load loss.
Measurement of no-load loss and current
Separate —source voltage withstand test (HV
test)
Measurement of Insulation Resistance before
and after HV test.
Induced over voltage withstand test
Noise level check.
100%Inspection test
records- H H/W
4.2 Transformer (Special Test) Temperature rise
One sample
from each
type/rating
Inspection test
records- H H/W
4 1 Transformer (Type Test)
Short circuit testImpulse Withstand Test.
One sample
from eachInspection test
- H RPartial Discharge Measurement.
Degree of Protection of Enclosure.type/rating
recoras
5.0 Painting
Copyright Ell — A ll r ights reservedormat No. 5-00-0001-F7 Rev. 0
7/28/2019 6-81-1042 Rev 1
http://slidepdf.com/reader/full/6-81-1042-rev-1 5/5
a4 2 1 Eq re ENGINEERS5 9 lefilariV INDIA LIMITED
e l e a r e a m a a c r w l (A GoN of Ind ia Unciwtakmg)
INSPECTION AND TEST PLANFO R
DRY TYPE LIGHTING TRANSFORMER
S T A N D A R D S P E C I F IC A T I O N N O .
6-81-1042 Rev. 1Page 5 of 5
SL
N O .STAGE/ ACTIVITY CHARACTERISTICS
QUANT
OFCHECK
UMRECORD
SCOPE OF INSPECTION
SUBEIL/TPIAUPPLIER
SUPPLIER
5.1 Painting of Transformers Pre treatment, primer and final paint, shade,thickness
100% Test records - H --
6.0 Documentation and IC
6.1 Documentation and IC • Review of Internal Test Reports.
IC issuance100%
Supplier's Test
Records /
Inspection
Certificate (IC)
- H H
Legends: H- Hold (Do not proceed without approval), Random -10%, R-Review, RW-Random witness, W- Witness (Give due notice, work may proceed
aeschedueddae
NOTES (As applicable):Wherever W/R or H/W is indicated, Inspection Engineer shall decide the option to be exercised for the particular stage and supplier
In case of conflict between purchase specification, contract documents and ITP, more stringent conditions shall be applicable.
This document describes generally the requirements pertaining to all types of the item. Requirements specific to PO and the item are only applicable.
Acceptance Norms for all the activities shall be as per PO/PR/ Standards referred there in/ Job specifications /Approved documents