INSPECTION AND TEST PLANFO R
OIL FILED TRANSFORMERS
S TA N D A R D S P E C I F IC AT I O N N O .
6-81-1041 Rev. 2P a g e 1 o f 5
A a - e f l i t d .
arm- 4 l i t t e i - o r
INSPECTION AND TEST PLAN
FOROIL FILLED TRANSFORMERS
sW-i• 0214n42 29.06.12 R e v i s e d a n d R e - is s u e d HVJ K C D M
1 24.12.07 R e v i s e d a n d R e - is s u e d A K G C R M M V K K V C
0 25.07.02 I s s u e d f o r i m p l e m e n t a t io n R B A K C A K B G R R
R e v.N o . D a te P u rpo s e P repa red
b yC h e c k e d
S t a n d a r d s C o m m i t te eC o n v e n o r
S t a n d a r d s B u r e a uC h a i r m a n
b yA p p r o v e d b y
C o p y r i g h t E I L — A l l r ig h t s r e s e r v e dormat N o. 8-00-0001-F7 Rev. 0
![Page 2: 6-81-1041 Rev 2](https://reader030.fdocuments.net/reader030/viewer/2022021122/577cde641a28ab9e78af0df2/html5/thumbnails/2.jpg)
7/28/2019 6-81-1041 Rev 2
http://slidepdf.com/reader/full/6-81-1041-rev-2 2/5
SW Zeta ENGINEERSleartiffier ilir INDIA LIMITED
man eneawasa ra r ia IA Goa of add, andraanni
INSPECTION AND TEST PLANFO R
OIL FILED TRANSFORMERS
STANDARD SPECIFICATION NO.
6-81-1041 Rev. 2Page 2 of 5
Abbreviations
ASBASEEFA
BISCCE or CCOECELLCIMFRC EDFTDTDPTERTL
FCRIFMFLPHICPIPIPICIGCIE CJECLPT
: Alloy Steel: British Approval Service for Electrical Equipment in Flammable
Atmospheres: Bureau of Indian Standards
Chief Controller of ExplosivesCertification Engineers International LimitedCentral Institute of Mining & Fuel ResearchCarbon EquivalentDry Film ThicknessDestructive TestingDye Penetrate TestingElectronics Regional Test Laboratory
:
Fluid Control Research InstituteFactory Mutual: Flame Proof
Hydrogen Induced CrackingInspection and Test Plan
: Ingress ProtectionInspection Certification
: Inter Granular Corrosion: International Electro technical Commission
Japanese Electro technical Committee: Liquid Penetrate Testing
MPT/MTMRT
MTCMO CNPSHNDTNEMAPOPESOPQRPR
PMIPV CQCRTTCTPI or TPIAUTULVDRWPSWPQXLPE
Magnetic Particle TestingMechanical Run Test
Material Test CertificateMaterial of ConstructionNet Positive Suction HeadNon Destructive TestingNational Electrical Manufacturers AssociationPurchase OrderPetroleum Explosive Safety OrganizationProcedure Qualification RecordPurchase Requisition
Positive Material IdentificationPoly Vinyl ChlorideQuality ControlRadiography TestingTest CertificateThird Party Inspection AgencyUltrasonic TestingUnder writer LaboratoriesVendor Data RequirementWelding Procedure SpecificationWelders Performance QualificationCross Linked Poly Ethylene
Inspection Standards Committee
Convenor : Mr. A.K. Chaudhary
Members:Mr. S.C. Gupta Mr. RK Singh Mr. MP Jain (Projects)Mr. G. Suresh Mr. Rajeev Kumar Mr. G. Poomachandra Rao
Format No. 8-00-0001-F7 Rev. 0 Cop yright EIL — All rights reserved
![Page 3: 6-81-1041 Rev 2](https://reader030.fdocuments.net/reader030/viewer/2022021122/577cde641a28ab9e78af0df2/html5/thumbnails/3.jpg)
7/28/2019 6-81-1041 Rev 2
http://slidepdf.com/reader/full/6-81-1041-rev-2 3/5
0151zie ENCJNEF_RS
$ 1tar were INDIA LIMITED1 1 1 ,man =mew A Gan of kb Uncledgking
I N S PE C T I O N A N D T E S T P L A NFO R
O I L F I L E D T R A N S F O R M E R S
S TA N D A R D S P E C I F IC AT I O N N O .
6-81-1041 Rev. 2Page 3 of 5
1.0 SCOPE
This Inspection and Test Plan covers the minimum testing & inspection requirements of Oil filled power/distribution Transformers.
2.0 REFERENCE DOCUMENTS
PO/PR & Standards referred there in /Job specifications / Approved documents.
3.0 INSPECTION AND TEST REQUIREMENTS
SLNO.
STAGE/ ACTIVITY CHARACTERISTICSQUANTUMOF CHECK
RECORDSCOPE OF INSPECTION
SUBSUPPLIER
SUPPLIER EIL/TPIA
1.0 Procedures -- -- -- -- -- --
2.0 Material Inspection
2.1
Incoming material likeCopper conductor,Insulation material,laminations, TransformerOil etc.
Check of Physical, Chemical and Electricalproperties. 100%
Material TestCertificates /Test records
H H/RR
(For majoritems only)
Bought out accessories likeMarshalling box, Relays,Current Transformer
Review of Manufacturer's test certificates.Functional check on accessories.
Material Test2 .2
MOG, Bushings andInsulator, PRVs andOLTC.
Degree of protection, IR,HV for Marshalling box100% Cel Li flbctICS /
Test recordsH H/R R
Copyright EIL — All rights reservedormat N o. 8-00-0001-F7 Rev. 0
![Page 4: 6-81-1041 Rev 2](https://reader030.fdocuments.net/reader030/viewer/2022021122/577cde641a28ab9e78af0df2/html5/thumbnails/4.jpg)
7/28/2019 6-81-1041 Rev 2
http://slidepdf.com/reader/full/6-81-1041-rev-2 4/5
la1151ziedik ENGNEF_RSg aWg erINDIA LIMITE D
OM k9eaw
INSPECTION AND TEST PLANFOR
OIL FILED TRANSFORMERS
S TA N D A R D S P E C I F IC AT I O N N O .
6-81-1041 Rev. 2
Page 4 of 5
SLN O .
STAGE/ ACTIVITY CHARACTERISTICSQUANTUMOF CHECK
RECORDSCOPE OF INSPECTION
SUBSUPPLIER
EIL/TPIAUPPLIER
3.0 Inprocess Inspection
3.1Tank and radiatorfabrication(Before painting)
DimensionalPressure test, one of each typeVacuum test, one of each type
100% Test Records H H R
4.0 Final Inspection
4.1Transformer (RoutineTests)
Physical Verification, Dimensional Check andverification of BoM
Voltage ratio and PolarityVoltage vector relationshipWinding resistanceInsulation resistance before and After H.VPolarization IndexMagnetic Balance testNo load loss and CurrentImpedance voltage/Short circuit impedance(Principal tapping) and load lossInduced over voltageSeparate Source Voltage Withstand Test.
Tests on OLTC/control panel (if applicable)111 ,/, IR and Functional Test on Marshalling BoxOil rzakagetnessute rest/BDV on transformer oilMeasurement of Power taken by fans and oilpumps. (On sample basis for one transformer)Noise Level.Tan Delta.
100% recordsInspection test - H 11/W
C o p y r i g h t E l L — A l l r ig h t s r e s e r v e dormat No. 8-00-0001-F7 Rev. 0
![Page 5: 6-81-1041 Rev 2](https://reader030.fdocuments.net/reader030/viewer/2022021122/577cde641a28ab9e78af0df2/html5/thumbnails/5.jpg)
7/28/2019 6-81-1041 Rev 2
http://slidepdf.com/reader/full/6-81-1041-rev-2 5/5
ia5rUe INDIA UM TEDG . , 0 ,4,641Under44.9)
I N S PE C T I O N A N D T E S T P L A NFO R
O I L F I L E D T R A N S F O R M E R S
STANDARD SPECIFICATION NO.
6-81-1041 Rev. 2Page 5 of 5
SLNO.
STAGE/ ACTIVITY CHARACTERISTICSQUANTUMOF CHECK
RECORDSCOPE OF INSPECTION
SUB EIL/TPIAUPPLIERSUPPLIER
4. 2Transformer (Type andSpecial Tests)
Temperature rise.Dissolved Gas Analysis( As Applicable)Impulse withstand testShort circuit level a) Through fault
b) Primary TerminalsDegree of protection for Marshalling Box,Cable box , Transformer Adaptor Chamber etc.
One samplefrom eachtype/rating
Inspection testrecords - H
5.0 Painting
5.1 Painting of TransformersPre treatment, primer and final paint, shade,
thickness100% Test records - H --
6.0 Documentation and IC
6.1 Documentation and IC • Review of Internal Test Reports.IC issuance
100%
Supplier's TestRecords /Inspection
Certificate (IC)
- H H
* Only those Type/Special Tests as specified in the Specifications/ Data Sheet will be witnessed by EIL/TPIA Otherwise Supplier to submit Type Tested Reports for reviewby EIL/TPIA
Legends: H- Hold (Do not proceed without approval), Random -10% , R-Review, RW-Random witness, W- Witness (Give due notice, work may proceeda e s cheduedda e
NOTES (As applicable):Wherever W/R or H/W is indicated, Inspection Engineer shall decide the option to be exercised for the particular stage and supplierIn case of conflict between purchase specification, contract documents and TIP, more stringent conditions shall be applicable.
This document describes generally the requirements pertaining to all types of the item. Requirements specific to PO and the item are only applicable.Acceptance Norms for all the activities shall be as per PO/PR/ Standards referred there in/ Job specifications /Approved documents
Copyright El L— A l lrights reservedormat No. 8-00-0001-F7 Rev. 0