Crews are replacing an old six-inch water line along the east side of 500 East, between 1700 South and Blaine Avenue. The new underground line will be 12 inches in diameter to improve reliability in water service. Over the next two weeks, expect crews to trench in front of residences as they work on this task, which will follow the southbound direction towards 2100 South. Crews will provide neighbors prior notice before access to driveways is temporarily restricted. This task is scheduled to be completed by mid-June. 500 East is open to southbound local traffic only. Drivers are encouraged to use 300 East and 700 East. Travelers in the area are advised to follow instructions from signs, flaggers and equipment operators. Utah Transit Authority rerouted their buses along 400 East until construction is complete. Please visit https://www.rideuta.com/Rider-Info/Detours for more information. If you need special accommodations or have other needs, please let us know using the contact information below. 500 EAST RECONSTRUCTION- FROM 1700 SOUTH TO 2100 SOUTH MAY 22 WORK ACTIVITIES SAFETY Contact Us Condie Construction On-Site Superintendent: Dave Martindale (801) 420-7479 Salt Lake City Engineer: Eric Casperson (801) 535-7995 Email: [email protected] General Inquiries: (801) 535-6251 Website: https://www.slc.gov/mystreet/ or scan QR code Follow us on Facebook and Twitter: @SLCMoves using: #500EastSLC *The schedule of the project is subject to change due to weather or unforeseen circumstances.

Transcript of 500 East Update - May 22 FINAL (2)...Condie Construction On-Site Superintendent: Dave Martindale...

Page 1: 500 East Update - May 22 FINAL (2)...Condie Construction On-Site Superintendent: Dave Martindale (801) 420-7479 Salt Lake City Engineer: Eric Casperson (801) 535-7995 Email: 500east@slcgov.com

Crews are replacing an old six-inch water line along the east side of 500 East, between 1700 South andBlaine Avenue. The new underground line will be 12 inches in diameter to improve reliability in waterservice. Over the next two weeks, expect crews to trench in front of residences as they work on this task, whichwill follow the southbound direction towards 2100 South.Crews will provide neighbors prior notice before access to driveways is temporarily restricted. This taskis scheduled to be completed by mid-June.

500 East is open to southbound local traffic only. Drivers are encouraged to use 300 East and 700 East. Travelers in the area are advised to follow instructionsfrom signs, flaggers and equipment operators.Utah Transit Authority rerouted their buses along 400East until construction is complete. Please visithttps://www.rideuta.com/Rider-Info/Detours for moreinformation. If you need special accommodations or have otherneeds, please let us know using the contactinformation below.

500 EAST RECONSTRUCTION- FROM 1700 SOUTH TO 2100 SOUTHMAY 22

WORK ACTIVITIES

SAFETY

Contact UsCondie Construction On-Site Superintendent: Dave Martindale (801) 420-7479Salt Lake City Engineer: Eric Casperson (801) 535-7995Email: [email protected] General Inquiries: (801) 535-6251Website: https://www.slc.gov/mystreet/ or scan QR codeFollow us on Facebook and Twitter: @SLCMoves using: #500EastSLC

*The schedule of the project is subject to change due to weather or unforeseen circumstances.