5. 11.2015
Model-based EstimatingOlli SeppänenProfessor of PracticeOperations Management in ConstructionDepartment of Civil and Structural Engineering
![Page 2: 5. 11.2015 Model-based Estimating Olli Seppänen Professor of Practice Operations Management in Construction Department of Civil and Structural Engineering.](https://reader034.fdocuments.net/reader034/viewer/2022051710/5a4d1aca7f8b9ab05996f451/html5/thumbnails/2.jpg)
BIM > another step change for estimating
As the technology continually improves, one thing does not change….
The need for an Estimator!
![Page 3: 5. 11.2015 Model-based Estimating Olli Seppänen Professor of Practice Operations Management in Construction Department of Civil and Structural Engineering.](https://reader034.fdocuments.net/reader034/viewer/2022051710/5a4d1aca7f8b9ab05996f451/html5/thumbnails/3.jpg)
Evolutionary Estimating
Target €
€ / M2
€ / SYS
€ / Element
€ / Activit
y
€ / Unit
![Page 4: 5. 11.2015 Model-based Estimating Olli Seppänen Professor of Practice Operations Management in Construction Department of Civil and Structural Engineering.](https://reader034.fdocuments.net/reader034/viewer/2022051710/5a4d1aca7f8b9ab05996f451/html5/thumbnails/4.jpg)
Why use BIM in estimating?
Decision Support &
Superior Interaction
Improve Efficiency &
Reduce Design, Cost &
Schedule Risk
Make Life Easy
for GCs / Subs
Win Business+
Reduce RiskMake Life Easy for
Owners/Designers
![Page 5: 5. 11.2015 Model-based Estimating Olli Seppänen Professor of Practice Operations Management in Construction Department of Civil and Structural Engineering.](https://reader034.fdocuments.net/reader034/viewer/2022051710/5a4d1aca7f8b9ab05996f451/html5/thumbnails/5.jpg)
BIM ties disciplines together: Quality-Schedule-Cost
CAD/
BIM
ENTERPRISE
Actual Cost, Quantity & Production data mining
SchedulePlanning
ProductionControl4D
CostPlanning
CostControl5D
Build toDesign
Design toBuild 3D
2D/
2D/3D Design
ProjectAccounting
ChangeMgmt
QuantityTakeoff
CostEstimating
ProjectScheduling
BidMgmt
CostControl
ProductionControl
ConstructabilityAnalysis
BIM to FieldIntegration
VisualPrez
Biz Dev OperationsPreconstruction
![Page 6: 5. 11.2015 Model-based Estimating Olli Seppänen Professor of Practice Operations Management in Construction Department of Civil and Structural Engineering.](https://reader034.fdocuments.net/reader034/viewer/2022051710/5a4d1aca7f8b9ab05996f451/html5/thumbnails/6.jpg)
Concrete
Rebar
Formwork
Cladding; Surface Finish
TOIsTakeoff Items
$/Qty
TOQsTakeoff Quantities
$/QtyResources
$/Qty
Column ‘Type 1’
Equipment
Labor
Materials
LBS
2/3D Design 5D Cost 4D Time
Integrated BIM+Estimating+Scheduling
Gantt Chart4D Simulations
Procurement Demand
Cash FlowResource Graphs
Flowline
![Page 7: 5. 11.2015 Model-based Estimating Olli Seppänen Professor of Practice Operations Management in Construction Department of Civil and Structural Engineering.](https://reader034.fdocuments.net/reader034/viewer/2022051710/5a4d1aca7f8b9ab05996f451/html5/thumbnails/7.jpg)
Cost Planning Integrated Workflow
Model Elements
Takeoff Items
Cost Components
Cost Assemblies
Element Properties
Formula
![Page 8: 5. 11.2015 Model-based Estimating Olli Seppänen Professor of Practice Operations Management in Construction Department of Civil and Structural Engineering.](https://reader034.fdocuments.net/reader034/viewer/2022051710/5a4d1aca7f8b9ab05996f451/html5/thumbnails/8.jpg)
Estimate Progression - 1
![Page 9: 5. 11.2015 Model-based Estimating Olli Seppänen Professor of Practice Operations Management in Construction Department of Civil and Structural Engineering.](https://reader034.fdocuments.net/reader034/viewer/2022051710/5a4d1aca7f8b9ab05996f451/html5/thumbnails/9.jpg)
Estimate Progression - 2
![Page 10: 5. 11.2015 Model-based Estimating Olli Seppänen Professor of Practice Operations Management in Construction Department of Civil and Structural Engineering.](https://reader034.fdocuments.net/reader034/viewer/2022051710/5a4d1aca7f8b9ab05996f451/html5/thumbnails/10.jpg)
Estimate Progression - 3
![Page 11: 5. 11.2015 Model-based Estimating Olli Seppänen Professor of Practice Operations Management in Construction Department of Civil and Structural Engineering.](https://reader034.fdocuments.net/reader034/viewer/2022051710/5a4d1aca7f8b9ab05996f451/html5/thumbnails/11.jpg)
Estimate Progression - 4
![Page 12: 5. 11.2015 Model-based Estimating Olli Seppänen Professor of Practice Operations Management in Construction Department of Civil and Structural Engineering.](https://reader034.fdocuments.net/reader034/viewer/2022051710/5a4d1aca7f8b9ab05996f451/html5/thumbnails/12.jpg)
Estimate Progression - 5
![Page 13: 5. 11.2015 Model-based Estimating Olli Seppänen Professor of Practice Operations Management in Construction Department of Civil and Structural Engineering.](https://reader034.fdocuments.net/reader034/viewer/2022051710/5a4d1aca7f8b9ab05996f451/html5/thumbnails/13.jpg)