40 Avenue NE Bridge Replacement...In the interim, traffic will need to use the Snell Isle Boulevard...

8
40 th Avenue NE Bridge Replacement http://www.40thavenuebridge.com/ Engineering & Capital Improvements Project Number: 18032-110

Transcript of 40 Avenue NE Bridge Replacement...In the interim, traffic will need to use the Snell Isle Boulevard...

Page 1: 40 Avenue NE Bridge Replacement...In the interim, traffic will need to use the Snell Isle Boulevard NE Bridge just south Of the closure or Bayou Grande Boulevard via 62nd Avenue N.

40th Avenue NE Bridge Replacement

http://www.40thavenuebridge.com/

Engineering & Capital Improvements

Project Number: 18032-110

Page 2: 40 Avenue NE Bridge Replacement...In the interim, traffic will need to use the Snell Isle Boulevard NE Bridge just south Of the closure or Bayou Grande Boulevard via 62nd Avenue N.

Summary of Events

03/15/18 City Council approval of:

Acknowledgment of the selection of Cardno, Inc. as the most qualified firm

Authorization of preliminary services

Website Development Completed

Temporary Traffic Flow Recommendations In Process of implementation

Pedestrian Accessibility In Design

Page 3: 40 Avenue NE Bridge Replacement...In the interim, traffic will need to use the Snell Isle Boulevard NE Bridge just south Of the closure or Bayou Grande Boulevard via 62nd Avenue N.

Project Website Completed 05/22/18

http://www.40thavenuebridge.com/

Page 4: 40 Avenue NE Bridge Replacement...In the interim, traffic will need to use the Snell Isle Boulevard NE Bridge just south Of the closure or Bayou Grande Boulevard via 62nd Avenue N.

Temporary Traffic Flow RecommendationsIn process of implementation (Completion on 06/06/18)

Page 5: 40 Avenue NE Bridge Replacement...In the interim, traffic will need to use the Snell Isle Boulevard NE Bridge just south Of the closure or Bayou Grande Boulevard via 62nd Avenue N.

Pedestrian AccessibilityIn Design

Develop design which allows pedestrian and bicycle access:

Coordinate with contractors for constructability

Provide improvements which can be incorporated during the Maintenance of Traffic

Can be maintained during construction to provide continuous access to residents

Page 6: 40 Avenue NE Bridge Replacement...In the interim, traffic will need to use the Snell Isle Boulevard NE Bridge just south Of the closure or Bayou Grande Boulevard via 62nd Avenue N.

Requested Approval

Authorization of the First Amendment to the Agreement

Public involvement,

Geotechnical engineering services,

Topographic survey,

Bridge Hydraulics Report,

Bridge Development Report,

Necessary Services for compliance with National Environmental Policy Act (NEPA).

Page 7: 40 Avenue NE Bridge Replacement...In the interim, traffic will need to use the Snell Isle Boulevard NE Bridge just south Of the closure or Bayou Grande Boulevard via 62nd Avenue N.
Page 8: 40 Avenue NE Bridge Replacement...In the interim, traffic will need to use the Snell Isle Boulevard NE Bridge just south Of the closure or Bayou Grande Boulevard via 62nd Avenue N.

40th Avenue NE Bridge Replacement