Columns
32
750
375
520
Capital 9
275
730
500
254
Capital 10
BASE 02
310
17
47
10
71
07
10
15
2
380
CAP 08
COL 02
305
254
6
6
6
6
Type 2
10
80
102
12
9
290
CAP 01
BASE 01
COL 01
290
225
175
Type 1
86
BASE 03
COL 03
428
2177
149
380
CAP 03
318
260
6
6
6
6
Type 3
645
315
549
549
549
549
549
549
600
165
375
700
CAP O4
COL 04
BASE 04
450
Type 4
CAPS 9 & 10 OPTIONAL
All column order codes also include for the respectivecapital and base(s) all joints taken to be 6mm
Columns
33
BASE 05
380
14
81
78
6148
294
400
CAP 05
COL 05
245
300
Type 5
BASE 05
380
148
1616
148
380
CAP 05
COL 06
245
300
Type 6
80
BASE 06
COL 07
420
21
42
510
35
5
CAP 07
250
300
Type 72
17
68
6
BASE 03
350
20
0
15
0
COL 08
CAP 06
428
254
305
Type 8
CL CL
400
2300
400
27
75
30
0
37
5
816 8161201
1270
INSITU RC RING BEAM BY OTHERS.
IMPOSED OUTLINE OF STRUCTURAL CORE TO COLUMNS, BY OTHERS.
5mm COMPRESSIBLE LAYEROF POLYSTYRENE OR SIMILAR.
110mm DIA INSITU RC CORE TO COLUMN.
6
2545
1270
FRONT ELEVATION
RECTANGULAR ON PLAN
A1
A
6 6
666
Portico
34
Type A
375
300
148
1786
2100
148
294
220
150
150
BASE
PEDESTAL400mm SQUARE
COLUMN
CAPITAL
ARCHITRAVE
COPING
CORNICE
TYPICAL WALLCONSTRUCTION
900
FFL
TYPICAL WALLCONSTRUCTION
400900
75
325 836
10426
6
6
6
6
6
6
CAPITAL, COLUMN AND BASE TO BE LINED WITH 5mm COMPRESSIBLE LAYER OFPOLYSTYRENE OR SIMILAR.
WARNING ! IF COMPRESSIBLELAYER IS OMITTED, COLUMNMAY CRACK DUE TO DIFFERENTIAL RATES OFEXPANSION AND CONTRACTION.
110mm DIA CORE HANDPACKED WITH C25GRADE CONCRETE.
FOUNDATION DESIGN BY OTHERS
8mm STAINLESSSTEEL LUGS @ 450mm CENTRESCAST INTO ARCHITRAVE
CAST STONE SOFFIT OPTIONAL
SECTION THROUGH A, A1
SIDE ELEVATIONCL
245
325
CL
1270
720 720 720
400 400
900
1050
75
85306
1270
2545
720 720
160
720
100
BEAM & SOFFIT PLAN
Portico
35
Type A
A TWISTED STEEL BAR BY OTHERS
FRONT ELEVATION
RECTANGULAR ON PLAN
6 6 6
4002300
375
390 881
889
816
6 6
A1
400
889
881 390
375
816
INSITU RC RINGBEAM BY OTHERS.
IMPOSED OUTLINE OF STRUCTURAL CORE TO COLUMNS, BY OTHERS.
5mm COMPRESSIBLELAYER OF POLYSTYRENEOR SIMILAR.
110mm DIA INSITURC CORE TO COLUMN.
6
61270
1201
6
CL CL
1270
6
Portico
36
Type B
SIDE ELEVATION
6
400
900
375
325
390 628
636
8366
TYPICAL WALL CONSTRUCTION
CL
6 6
900
CAPITAL, COLUMN AND BASE TO BE LINED WITH 5mm COMPRESSIBLE LAYER OFPOLYSTYRENE OR SIMILAR.
WARNING! IF COMPRESSIBLELAYER IS OMITTED, COLUMNMAY CRACK DUE TO DIFFERENTIAL RATES OFEXPANSION AND CONTRACTION.
390325
628
110mm DIA CORE HANDPACKED WITH C25GRADE CONCRETE.
FOUNDATION DESIGN BY OTHERS.
SECTION THROUGH A, A1
8mm STAINLESS STEELLUGS @450mmCENTRES CAST INTOARCHITRIVE
PEDESTAL400mm SQUARE
375
148
6
1786
2100
148
150
294
220
200
6101139
956
66
66
66
BASE
COLUMN
CAPITAL
ARCHITRAVE
CORNICE
PLINTH
BALUSTER
COPING
WATER PROOFING AND DRAINAGEDESIGN BY CONTRACTOR
325
325
CL
245 75 104266
1270
720 720 720
400 4009
00
10
50
75
85306
1270
2545
720 720
160
720
100
BEAM & SOFFIT PLAN
30
0
FFL
Portico
37
Type B
A
A1
400
2300
2545
66
3035
400
1270
INSITU RC RINGBEAM BY OTHERS.
IMPOSED OUTLINE OF STRUCTURAL CORE TO COLUMNS, BY OTHERS.
5mm COMPRESSIBLELAYER OF POLYSTYRENEOR SIMILAR.
110mm DIA INSITURC CORE TO COLUMN.
CLCL
FRONT ELEVATION
6 6 6
1270
Portico
38
Type C
400
900
37
514
817
86
2100
148
29415
0
BASE
PEDESTAL400mm SQUARE
COLUMN
CAPITAL
ARCHITRAVE
COPING
CORNICE
TYPICAL WALLCONSTRUCTION
150
75
TYPICAL WALLCONSTRUCTION
6
6
6
6
CAPITAL, COLUMN AND BASE TO BE LINED WITH 5mm COMPRESSIBLE LAYER OFPOLYSTYRENE OR SIMILAR.
WARNING ! IF COMPRESSIBLELAYER IS OMITTED, COLUMNMAY CRACK DUE TO DIFFERENTIAL RATES OFEXPANSION AND CONTRACTION.
110mm DIA CORE HANDPACKED WITH C25GRADE CONCRETE.
FOUNDATION DESIGN BY OTHERS
SECTION THROUGH A, A1
SIDE ELEVATIONCL
CL
245
1270
720 720 720
400 400
900
1050
75
85306
1270
2545
720 720
160
720
100
BEAM & SOFFIT PLAN
8mm STAINLESS�STEEL LUGS �@ 450mm CENTRES�CAST INTO ARCHITRAVE
30
0
FFL
Portico
39
Type C
A
A1
400
2300
8196 6
6
6 6 6
400
462 1044 1044 462894
896 819
992 992
1270 1270
6
6
INSITU RC RINGBEAM BY OTHERS.
IMPOSED OUTLINE OF STRUCTURAL CORE TO COLUMNS, BY OTHERS.
5mm COMPRESSIBLELAYER OF POLYSTYRENEOR SIMILAR.
110mm DIA INSITURC CORE TO COLUMN.
CLCL
FRONT ELEVATION
RECTANGULAR ON PLAN
Portico
40
Type D
TYPICAL WALLCONSTRUCTION
375
148
1786
2100
148
294
144
144
150
90
90 90 9216
BASE
PEDESTAL400mm SQUARE
COLUMN
CAPITAL
ARCHITRAVE
UPSTAND COPING
COPING
CORNICE
WATER PROOFING AND DRAINAGE�DESIGN BY CONTRACTOR
400900
392 791
6
850 403
6
6
6
6
6
6
6
6
CAPITAL, COLUMN AND BASE TO BE LINED WITH 5mm COMPRESSIBLE LAYER OFPOLYSTYRENE OR SIMILAR.
WARNING! IF COMPRESSIBLELAYER IS OMITTED, COLUMNMAY CRACK DUE TO DIFFERENTIAL RATES OFEXPANSION AND CONTRACTION.
110mm DIA CORE HANDPACKED WITH C25GRADE CONCRETE.
FOUNDATION DESIGN BY OTHERS
245
SECTION THROUGH A, A1SIDE ELEVATION
462
392
CL
CL
70 10476
CAST STONE SOFFIT OPTIONAL
1270
720 720 720
400 400
900
1050
75
85306
1270
2545
720 720
160
720
100
BEAM & SOFFIT PLAN
8mm STAINLESS�STEEL LUGS �@ 450mm CENTRES�CAST INTO ARCHITRAVE
30
0
FFL
Portico
41
Type D
FRONT ELEVATION
IMPOSED OUTLINE OF STRUCTURAL CORE TO COLUMNS, BY OTHERS.
5mm COMPRESSIBLE LAYER OF POLYSTYRENE OR SIMILAR.
110mm DIA INSITU RC CORE TO COLUMN.
INSITU RC RINGBEAM BY OTHERS.
A1
A
6 6
CLCLCLCL
RADIUS ON PLAN
6666
6 6
Portico
42
Type E
ARCHITRAVE PLAN
375
148
1786
146
220
BASE
PEDESTAL400mm SQUARE
COLUMN
RADIAL COPING
TYPICAL WALL CONSTRUCTION
RADIAL CORNICE
RADIAL ARCHITRAVE
ARCHITRAVE BUILT INTO100mm BRICKWORK
FOUNDATION DESIGN BY OTHERS
SECTION THROUGH A,A1
SIDE ELEVATION
CAPITAL
150
66
66
6
220
325
294
6
245
WATER PROOFING AND DRAINAGE DESIGN BY CONTRACTOR
CL
CL
CLCL
SOFFIT SUPPLIED BY OTHERS
CAPITAL, COLUMN, AND BASETO BE LINED WITH 5mm COMPRESSIBLE LAYER OF POLYSTYRENE OR SIMILAR.WARNING! IF COMPRESSIBLELAYER IS OMMITED, COLUMNMAY CRACK DUE TO DIFFERENTIAL RATES OF EXPANSION AND CONTRACTION.
110mm DIA CORE HAND PACKED WITH C25 GRADE CONCRETE
300 400 300 200
R12
00
R1128
R13
73
SOFFIT BY OTHERS
Portico
43
Type E
FRONT ELEVATION
6
6
6
6
6
6
50
75
528
865
287
259
805
414
6
300
400
152
174
1786
294
144
190
75
294
2505
IMPOSED OUTLINE OF STRUCTURAL CORE TO COLUMNS, BY OTHERS.
5mm COMPRESSIBLE LAYER OF POLYSTYRENE OR SIMILAR.
110mm DIA INSITU RC CORE TO COLUMN.
470470 1036 1036
971
795 795
6
971
1270
971
410
741
INSITU RC RINGBEAM BY OTHERS.
2300
1270
574
CL CLRECTANGULAR ON PLAN
Portico
44
Type JFeature lions head can be omitted if required.
COPING
COPINGCORNICE
ARCHITRAVE
COLUMN
PEDESTAL400mm SQUARE
FOUNDATION DESIGN BY OTHERS
BASE
CAPITAL
INFILL PANEL
620 620
6120
144
294
375
152
174
75
756
6
SIDE ELEVATION
75
635
2430
294
144
220
110 mm DIA CORE HAND PICKED WITH C25 GRADE CONCRETE
SECTION THROUGH CENTRE LINE OF COLUMN & PEDIMENT
80 140
6
6
6
6
400
FFL
146
CL
450
505
570
325
1270 1270
2546
6
32
5
ARCHITRAVE PLAN
8mm STAINLESS STEELLUGS @450mmCENTRES CAST INTOARCHITRIVE
1786
CAPITAL, COLUMN AND BASE TO BE LINED WITH A COMPRESSIBLE LAYER OF POLYSTYRENE OR SIMILARWARNING! IF COMPRESSIBLE LAYER IS OMITTED, COLUMN MAY CRACK DUE TO DIFFERENTIAL RATES OF EXPANSION AND CONTRACTION
Portico
45
Type J
775 FROM BRICK WORK
TO COLUMN CENTRE
842
991
150
TIMBER SOFFIT BY OTHERS
SECTION THROUGH ARCHITRAVE & SOFFIT
3 layers of felt overlay
MASTER BOARD SOFFITform hole for rainwater
outlet as required
1800 BETWEEN COLUMN CENTRES
6
6
6
62045
148
21
00
29
0
17
86
14
8
250
250
6
6
6
863
863
COPING
HEAD
COLUMN CAPITAL
COLUMN SHAFT
Calder Style Portico
46
Calder Style
The Calder Portico is simple to erect and will certainlyprovide the classical finishing touch to any new orexisting property.
Incorporating solid traditional Tuscan columns, corniceand architrave, the Calder Portico requires no additionalreinforcement or insitu concrete, thereby making it adesirable feature that can now be added cost effectivelyto any development.
190m
m
Polystyrene isolation
67.5mm
Portico Construction Guidefor most Types excluding Calder Style
Coping set in 1:2:9 cement, lime, sandmortar, recessed and pointed up withmatching mortar colour. Each coping with 2no. 6mm S/S pins site drilled and resinanchored.
Cornice set as coping but allow 14days for r.c. beam to mature before drilling.
Sequence of erection for main columns and beams.
1. Set out column at desired distance apart andaway from building wall, excavate forappropriate sized footings, set up 20mm dia Lshaped bar with threaded end at top to finish150mm above top of circular column baseunit and central to the core.
2. Set square section pedestal units parallel tohouse wall and central to core position in1:2:9 mortar, 6mm joints, line core withpolystyrene and hand fill with 25 gradeconcrete with small gravel aggregate and allowto set, checking plumb and level of unit. Fixsplice connector.
3. Set column base unit in 6mm 1:2:9 mortar,check centre, and level, line core withpolystyrene, hand fill with 25 grade concreteand leave to set.
4. Line main column with polystyrene, hoist intoposition set in 1:2:9 mortar joint 6mm thickand plumb up checking centres across the top.Compensate for taper of column with 27mmblock below neck to check plumb. Prop and
edge column on 4 sides, insert main 20mmdia column bar and screw tight, hand packbottom 300mm of column with 25 gradeconcrete, check plumb, leave 24 hrs to set.
5. Fill concrete column cores to within 200mmof top and allow to set. Bed column capital in1:2:9 mortar with 6mm joint onto top ofcolumn, check for square with 6mm jointonto top of column, check for square withbuilding and level top. Ensure bar spliceconnector is fitted prior to bedding on thecapital. Fit short angle shaped 20mm dia steelbar, tighten up and fix bar splice to main beamend. Hand pack concrete to top of capital,leave 24 hrs.
6. Scaffold around columns, fully acro prop andsupport 250x50 timber soffit support to frontand side beams, level 6mm above capital tops.Full width of J beam MUST be supported.Hoist and set side beams, then front beamsinto place, forming soft joint between top ofcapital and underside of J beam, check leveland square, install 20mm dia main beam bars,min 1000 overlap, and combined corner /side beam bars, min 900 return into frontbeam. Hoist precast soffit units and set on1:2:9 mortar (ensure slots in wall min 300tall) leave to set, ensure all joints filled and endof beam stopped. Fill beam with 25 gradeconcrete, leave support 14 days.
47
This drawing is the copyright of Elegant Stone Ltd andmust not be reproduced without prior consent
48
All Elegant Stone products comply with thespecification for cast stone as defined by BS: 1217:1997.
Mean Dry Density: Approximately 2250 kg/m3
Compressive strength: The average crushingstrength of three cubes as tested in accordancewith BS1881 part 116 shall be no less than35N/mm2 with no individual unit less than28N/mm2.
Water absorption: Components shall not exceed 1.0mg/mm2 for CapillaryAbsorption Test (CAT) as defined byBS1217:1997.
Dimensional tolerances:Up to 600mm ± 2601 to 1000mm ± 31001 to 2500mm ± 42501 to 4000mm ± 5over 4000mm ± 6
Flatness of plane: Maximum permittedvariation from plane = 0.3% of the maximumdimension of the item or 2mm whichever is the greater.
Thermal conductivity: 1.70w/mk
Aggregates: To BS882:1992 and BS3797:1990
Cement: To BS12:1996
Pigments: To BS1014:1975
Elegant Stone products are subject tocomprehensive internal quality controlprocedures and are regularly independentlytested to ensure all components aremanufactured to the highest standards.
As with natural stone, cast stone may be subjectto slight shade variations.
Technical Specification
Packing
Quality Control Procedures
Ordering and DeliveryAll orders should clearly state the following;
• Product code and size• Colour• Exact quantities• Week commencing
delivery date• Full delivery address• Any specific delivery
instructions or requirementsi.e. mechanical offloading,24 hours prior notice etc.
All orders are acknowledged inwriting and subject to Elegant Stone’sterms and conditions of trade.
Deliveries are made on shrink-wrapped, free of charge, non-returnable pallets with componentsclearly coded for ease of identificationon site.
Acknowledgments1. James Allen Construction2. Chiltern Construction Ltd3. Ellmer Homes Ltd4. Mr and Mrs Michael Griffin
Delivery
49
1. Pallets should be stored on firm level ground.
2. Never stack pallets on top of each other.
3. Ensure scaffolding poles, timber and all other objects do not come into contact with pallets inallocated storage area.
4. Always ensure when moving pallets that forks are extended as wide as possible to ensure base ofpallet does not deflect, thereby cracking lower units.
5. Lifting components directly with chains or slings is both dangerous and can lead to damage ofthe units.
6. When using grabs, always ensure they grip the pallet and not the stone.
7. Individual units should have suitable protection between faces to reduce the possible damage.
8. Components must be supported by timber bearers which should be positioned to preventpoint loading.
9. When removing polythene shrink-wrapping, do not burst open or tear off as this may damageedges and corners of components. Carefully cut open polythene using a sharp knife, taking carenot to damage units within.
10. Never drag or slide units across each other.
11. Components should be handled and stored in the plane to which they are designed tobe installed.
12. Once in place, components should be protected from damage or contamination fromfollowing trades, by covering with timber or heavy gauge polythene sheeting.
Bath
Site Practice and HandlingEfflorescenceEfflorescence or “lime bloom” is a temporary, naturally occurringphenomenon that can affect cast stone as well a other cement based products. Alightening of the surface may occur which may be more prevalent in dampconditions. Efflorescence in no way effects the structural integrity of the caststone and in most cases will disappear in time with normal weathering.
Repairs and CleaningCast stone products should be handled with care and protected at all times tominimise damage, subsequent remedial work and cleaning. However, repairscan be undertaken using a suitable mix supplied direct from our factory.Depending on the nature and extent of the damage incurred, repairs may becarried out by site operatives.
DisclaimerAs Elegant Stone operate a policy of continual product development, theinformation and details provided in this brochure may be subject to changewithout prior notice.
Minster Pennine Chester Portland Windsor
StoneworkARCHITECTURAL CAST STONE DRESSINGS
Inspirational
ELEGANT STONE
400 300 200
R12
00
R1128
R13
73
150/300
29
0
260
75
160
215
215
842
991
1506
62045
29
0
250
250
6
6
863
863
ARCHITECTURAL CAST STONE DRESSINGS
350
20
0
15
0
254
300
6
6R25
6
2027
215
9447
200
1270 1270
2546
6
325
ARCHITRAVE PLAN
Unit 1 Moor End Works, Cleckheaton, West Yorkshire, BD19 3TT • Tel - 01274 874360 • Fax - 01274 851025 Email - [email protected] • www.elegantstoneltd.co.uk
ELEGANT STONE
January 2008
C1/SfBFf3
1231_ElegantStoneCover_resaved_Layout 1 21/06/2011 14:13 Page 1