    09-02-09 347865 - MANUAL CHIEF42 CB34 TITAN 30< ROOF

    TITAN CB34

    COMMERCIAL BIN

    30 

    ROOF

    ERECTION MANUAL 

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    2/100

     

    Page 1 MANUAL CHIEF42 CB34 TITAN

    INDEX

    Section 1 –  Grain Bin Specifications

    Section 2 –  Bin Erection

    Section 3 –  #34 Bin RoofA.  Part Identification

    B.  Pre-Assembly

    C.  Roof Assembly

    D.  Roof Panel AssemblyE.  Cap Flashing

    Section 4 –  Typical Roof AccessoriesA.  Top Lid

    B.  Manhole Lid

    C. 

    Working RingD.  Roof Ladders

    E.  Roof Vents

    Section 5 –  Temperature Cable Supports InstallationA.  General Consideration

    B.  Temperature Cable Supports

    Section 6 –  Sidewall and Stiffener Gauge Chart

    Section 7 – 

     Sidewall Erection A.  Sidewall Sheets and StiffenersB.  Laminated Sheet Installation

    C.  Base Angle Detail

    D.  Titan One Ring DoorE.  Bin Stiffener Anchor

    F.  Transition Stiffeners

    G.  Stiffener Upgrades for Goal Posts

    Section 8 –  Wind Rings

    Section 9 – 

     MiscellaneousA.  Maintenance Instructions

    B.  Comment Sheet

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    3/100

     

    MANUAL CHIEF42 CB34 TITAN Page 2

    Manual Revisions

     Date: Revision Made

    10-12-05 Dimension for blocking needed to compress stiffeners added

    10-19-05 Changed that all rafters must be attached to a 2 ring top stiffener10-25-05 Changed temperature cable bracket installation

    10-25-05 Changed roof ring connector

    10-26-05 Changed door installation instructions

    11-11-05 Changed 3 Stiffened Bins have Roof Ring brackets at every stiffener01-16-06 Changed to show holes added on horizontal seam of sidewall sheets between

    stiffener holes

    01-25-06 Updated gauge charts –  Removed all 20ga stiffeners

    02-17-06 Changed peak heights –  2” higher  03-28-06 Added Rafter Reinforcing Plates

    03-28-06 Updated Temperature Cable Installation03-29-06 Changed Rafters “D” & “E” –  Updated Manual09-20-06 Changed Standoff to 2 parts –  Updated Manual

    10-25-06 Updated Roof Weights

    11-06-06 Changed Bins 25 rings and taller to show additional holes in roof panel ribs.02-06-07 Changed Working Ring Brackets.

    03-13-07 Changed Door

    03-22-07 Added Section for Goal Post Upgrades05-07-07 Added Additional Rafter Reinforcing Plate

    02-28-08 Changed Wind Ring Couplers

    05-13-08 Changed Anchor Bolt Radius and Chords

    06-13-08 Changed Roof Rings to be Bolted to Eave Brackets07-18-08 Added Rafter Splice Plates

    08-28-08 Changed Roof Ladder to bolt together ladder

    09-15-08 Changed to Seismic A11-21-08 Changed Peak Ring Flashing

    12-09-08 Changed top 2 ring stiffeners from 18ga to 16ga

    04-07-09 Added wind ring placement for “Baby Bubba” Sidedraw systems.

    04-10-09 Changed Temperature Cable Attachments07-17-09 Changed Sidewall Gauges

    09-02-09 Changed Sidewall Sheet Caulking Detail

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    4/100

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    5/100

     

    MANUAL CHIEF42 CB34 TITAN Page 4

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    6/100

     

    Page 5 MANUAL CHIEF42 CB34 TITAN

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    7/100

     

    MANUAL CHIEF42 CB34 TITAN Page 6

    Section 1 –  Grain Bin Specifications

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    8/100

     

    Page 7 MANUAL CHIEF42 CB34 TITAN

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    9/100

     

    MANUAL CHIEF42 CB34 TITAN Page 8

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    10/100

     

    Page 9 MANUAL CHIEF42 CB34 TITAN

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    11/100

     

    MANUAL CHIEF42 CB34 TITAN Page 10

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    12/100

     

    Page 11 MANUAL CHIEF42 CB34 TITAN

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    13/100

     

    MANUAL CHIEF42 CB34 TITAN Page 12

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    14/100

     

    Page 13 MANUAL CHIEF42 CB34 TITAN

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    15/100

     

    MANUAL CHIEF42 CB34 TITAN Page 14

    Section 2 –  Bin Erection

    Chief Industries, Inc. will not assume any responsibility for parts damaged due to faulty  or

    improper erection procedures.

    Chief Industries, Inc. recommends that Bin Jacks be used for all bins taller than 8 rings

    and all bins larger than 30’ in diameter. 

    WARNING:

    The allowable lifting capacity of the BIN JACKS must never be exceeded. Always check Bin

    weight to insure a safe and trouble free erection.

    Grain Bin Color Codes

    Chief Grain Bins are color coded based on bin diameter. Components such as Roof Rafters,

    Wind Rings, and Base Angle will be marked with the following Color Codes to help identifythem.

    Bin Size Color Code Bin Size Color Code

    #12 Yellow/Black #22 Blue#13 Green/Black #24 Brown

    #14 Orange/Black #26 Yellow

    #16 Red #30 Green#18 Black #34 Orange

    #20 Pink

     A. 

    Suggested Erection Equipment

    Impact Wrench & Sockets Wrenches Crescent Wrench

    Vise Grips Alignment Punches Rubber Mallet

    Level Drill and Drill Bits Extension CordsLadders Bin Jacks Screw Gun

    7/16” bin bolts use 5/8” on the head of the bolt and 11/16” on the nut. 

    5/16” bin bolts use 1/2” on the head of the bolt and nut. 

    1/2” bolts in the roof structure use 3/4” on the head of the bolt and nut.

    Bolt Buckets are Color Coded with a Dot as Shown Below.

    Bolt Size Color Code

    5/16”  Blue7/16”  Red

    1/2”  Green

    5/8”  Yellow

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    16/100

     

    Page 15 MANUAL CHIEF42 CB34 TITAN

     B.  Checking Shipment

    Check your shipment at the time of pickup and delivery against the packing list furnishedwith the shipment. If a shortage exists or if any damaged material is evident, note such

    shortage or damage on the freight bill before you sign for the shipment.

    Claims of shortages will not be honored after thirty days from receipt of shipment.Parts that are short or damaged are the responsibility of the delivering carrier, not the

    manufacturer or dealer.

    It is advisable to reorder damaged or missing parts immediately so that there will be nodelay in erecting the bin. After receiving the invoice for the reordered material, file a

    claim with the delivering carrier at once.

    The galvanized panels leave our plant in prime condition; store off the floor in a heatedroom if possible. If stored outside, place panels down, off the ground. Upon arrival of

    shipment if you are not certain whether or not moisture is present, store panels on edge or

    on end allowing 1/4“ air space between panels until dry. Exposure to trapped moisture

    can cause white rust, which will void the warranty.

    C. Stop and Study

    Before beginning erection of the bin, take the time to thoroughly study the construction

    methods in this manual. It will save you both time and money.

    Important: The peak load capacities listed under Auxiliary Roof Loads must not be exceeded. If your

    application will exceed the listed values, contact Chief Industries for recommendations.

    Chief Industries makes no warranty concerning parts, accessories or equipment notmanufactured by Chief Industries.

     D. Site Selection

    Choose a site that has good drainage away from the bin so that water will not stand around

    the bin. The soil should be firm and preferably without fill. If fill is required, water andcompact the fill material to avoid uneven settlement. A field investigation of the soil bearing conditions is recommended especially for larger grain bins where the foundation

    loads and floor pressure become large. A licensed engineering firm should be employed to

    take soil borings, determine the maximum allowable soil pressure and design the binfoundations and floor slab accordingly.

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    17/100

     

    MANUAL CHIEF42 CB34 TITAN Page 16

     E.  Bin Jack Erection

    Position the structure you provided to hold the Inner Ring at its approximate height,centering the Inner Ring on the center of the Bin.

    Use at least one Bin Jack per Sidewall Sheet. (For example, on the #18 Bin, use 18 BinJacks, etc.)

    The application of one bin jack per sidewall sheet will minimize sidewall distortion duringerection. Failure to use the proper quantity of jacks may result in inward-outward lay of the bin

    sidewall or even permanent distortion of the bin sidewall sheets.

    The recommendation of at least one Bin Jack per sidewall sheet is based on keeping the bin

    round, refer to the warning below, and make sure the lifting capacity of the jack is

    sufficient for the weight of the bin. Note that all jacks may not shift equally, Therefore

    make sure the lifting capacity rating by the jack manufacturing is met.

    WARNING:

    If it is necessary to leave the construction site for any length of time before the Bin is

    completed and anchored to the concrete, the Bin must be  securely tied down.

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    18/100

     

    Page 17 MANUAL CHIEF42 CB34 TITAN

     F.  Assembling Sidewall Sheets

    All bolts are washer head bolts with sealing washers S.A.E. Grade 8, with whiz flangenuts. Grade 8 bolts are marked with six radial lines on the bolt head as shown. If these

    descriptions do not correspond with the bolts shipped with the bin, please contact the

    customer service department immediately. Do not substitute any other Bolts.

    Bin bolts must be TIGHT. The following table contains recommended minimum and

    maximum torque values.

    BOLT DIA. TORQUE FT. LBS

    (INCHES) MINIMUM MAXIMUM

    5/16" 22 28

    7/16" 60 75  

    Tighten the bin bolts from the inside of the bin (nut end of the bolt) to eliminate “spin

    off” of the sealing washer. 

    USE ONLY THOSE BOLTS SUPPLIED BY CHIEF INDUSTRIES.

    THE SUBSTITUTION OF BOLTS FROM OTHER SOURCES IS NOT PERMITTED.

     NOTE: Proper bolting sequence MUST  be followed at all times.

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    19/100

     

    MANUAL CHIEF42 CB34 TITAN Page 18

    The Titan Sign Sheet must be installed in the second ring as shown in figures below.

    (Shown installed on a 2 stiffened bin)

    (Shown installed on a 3 stiffened bin)

    Install the Titan Sign Sheet by field drilling (6) six ½” holes in the Titan Sign Sheet and

    stiffeners as shown above. Bolt the Titan Sign Sheet to the stiffeners with (6) six 7/16” bolts. 

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    20/100

     

    Page 19 MANUAL CHIEF42 CB34 TITAN

    Assembling top ring

    Locate the proper gauge of sidewall sheets needed for the top ring from the gauge chart. Lap andcaulk sheets as shown below. Locate top stiffeners and install on top ring.

    Note: Top Sheets have special punching on the top of the sheet at the stiffener holes for therafter to attach to. Leave bolts out of top (4) stiffener holes until eave brackets are

    attached.

    Wipe off the outside ends of all  the Sidewall Sheets to remove excess oil so that the StripCaulking will adhere to the metal. Place the Strip Caulking as near to the vertical inside edge of

    sheet at every vertical seam.

    On Bins 12 gauge or heavier a horizontal strip of caulking is needed on the inside at the center

     bottom of the Sidewall sheet located on the hill near to the bottom holes. This strip of caulking

    should fit where the endlap of the next ring Sidewall Sheets bolts up to this location.

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    21/100

     

    MANUAL CHIEF42 CB34 TITAN Page 20

    G. Roof Panel Location

    The rafters need to be bolted directly behind a top 2 ring stiffener, the roof panel rib will line updirectly above the rafter from the peak to the eave. (There is 1 Rafter and 4 roof panels per

    sidewall sheet.)

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    22/100

     

    Page 21 MANUAL CHIEF42 CB34 TITAN

     H. Crane and Jack Capacities

    Crane Capacity:

    The total roof dead load for each of the respective bin roof sizes is shown in the table below.

    This weight includes the roof panels and all structural members (roof beams, compression rings, bolts, ect.)

    When determining the crane capacity necessary to erect the roof structure, the booming distancemust be considered. If the cane sizes available will not lift the roof structure (using one crane),

    two cranes may be used, utilizing a spreader bar. The spreader bar must be adequately designed

    to carry the entire roof dead weight.

    Peak Heights

    All peak heights listed below are to the bottom of the peak ring from the ground with (2) Titan

    sidewall sheet rings installed. Deduct 42 1/2” from the peak heights when only one ring of

    sidewall sheets are installed.

    Model Peak Height

    CB18 20’ - 8 7/8” CB20 22’ –  6 5/16” 

    CB22 24’ –  3 3/4” 

    CB24 26’ –  1 1/8” 

    CB26 27’ –  10 9/16” 

    CB30 31’ –  5 7/16” CB34 35’ –  0 5/16” 

    WARNING!! OVERLOADING CRANE CAPCITY CAN RESULT IN

    SUBSTANCIAL PROPERTY DAMAGE OR SEVERE PERSONAL INJURY.ALWAYS CHECK CRANE CAPACITY PRIOR TO LIFTING ROOF

    STRUCUTRE

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    23/100

     

    MANUAL CHIEF42 CB34 TITAN Page 22

    #34 #30 #26 #24 #22 #20 #18

    Single Rafter  660 550 400 300 250 230 200

    2 Rafter 1,450 1,200 850 700 600 550 450

    3 Rafters 2,300 1,825 1,350 1,075 950 850 675

    Total Roof w/o Roof Panels 31,250 23,650 15,350 11,925 9,900 8,525 5,750

    Total Roof w/ Roof Panels 50,000 38,400 26,600 21,000 17,500 15,000 11,000

    Weight in Pounds (lbs.)

     

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    24/100

     

    Page 23 MANUAL CHIEF42 CB34 TITAN

    Section 3 - #34 Bin Roof

     A.  Part Identification

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    25/100

     

    MANUAL CHIEF42 CB34 TITAN Page 24

     B. Pre-Assembly

    After the top two rings of the bin are built and stiffeners are added, brackets need attached to thesidewall and rafters, pre-assemble these brackets on the ground before raising the roof will speed

    up erection time.

    Top Angle

    Attach top angle to inside of top ring as shown with 5/16” x 3/4” Bin Bolts.

     Note: there is (1) piece of top angle per top sidewall sheet. Ex: CB34 = 34 top angle

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    26/100

     

    Page 25 MANUAL CHIEF42 CB34 TITAN

    Roof Ring Bracket

    Attach roof ring brackets to inside of top sidewall sheet behind 1 ring top stiffeners with (4)7/16” x 1-1/2” bin bolts. (Place bolts with heads on inside of bin.)

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    27/100

     

    MANUAL CHIEF42 CB34 TITAN Page 26

    C. Roof Assembly

    Pre-assemble rafter sections together as shown on flat surface. Rafter to rafter connections

    should be tightened before raising rafters into place. Raise the peak ring to the correct height as

    shown and begin attaching rafter to the peak ring and eave brackets with 1/2” x 1-1/2” bolt with

    washers on the brackets. Attach 4 sets of rafters equally spaced around the bin and check toinsure peak ring is level, and then install all other beams. Leave all ring segment and strut bolts

    loose in the structure until all rafters and ring segments and struts are installed.

    Refer to the drawing below for sequence of beams.

    Refer to the part identification page at the beginning of this section to determine proper rafters.

    All r after to rafter connections are 1/2” x 1-1/2” bolts. 

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    28/100

     

    Page 27 MANUAL CHIEF42 CB34 TITAN

    Rafter Clips

    Attach the long clips to every rafter as shown for ring segments; using 1/2” x 1-1/2” bolts. 

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    29/100

     

    MANUAL CHIEF42 CB34 TITAN Page 28

    Rafter Reinforcing Plates

    Bolt reinforcing plates to rafters as shown with 1/2” x 1-1/2” bolts. 

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    30/100

     

    Page 29 MANUAL CHIEF42 CB34 TITAN

    Detail at Peak

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    31/100

     

    MANUAL CHIEF42 CB34 TITAN Page 30

    Detail at Eave

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    32/100

     

    Page 31 MANUAL CHIEF42 CB34 TITAN

    Cross Members

    After all rafters are installed, begin installing cross members to the long clips that are bolted tothe rafters as shown. Install cross members with 1/2” x 1-1/2” bolts with washers against the

    cross members.

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    33/100

     

    MANUAL CHIEF42 CB34 TITAN Page 32

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    34/100

     

    Page 33 MANUAL CHIEF42 CB34 TITAN

    Roof Struts

    Attach upper Roof Strut with 1/2” x 1-1/2” bolts between center set of holes on Rafters “E” asshown. An Upper Roof Strut is placed between every rafter as shown below.

    Attach Middle Roof Strut with 1/2” x 1-1/2” bolts to back side of upper ring segment and centerset of holes on Rafters “D” and “E” as shown. A Upper Roof Strut is placed on every upper ring

    segment as shown below.

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    35/100

     

    MANUAL CHIEF42 CB34 TITAN Page 34

    Attach Lower Roof Strut with 1/2” x 1-1/2” bolts to inside of lower ring segment and center set

    of holes on Rafters “D” and “C” as shown. A lower roof strut is placed on every lower ring

    segment as shown below.

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    36/100

     

    Page 35 MANUAL CHIEF42 CB34 TITAN

    Eave Brackets

    Attach Left Hand and Right Hand Eave Brackets to the inside of the top sidewall sheet behindthe 2 ring top stiffener, with 7/16” x 1-1/2” bin bolts with bolt head inside the bin, as shown.

    (Note: one L.H. and one R.H. Eave Bracket per sidewall sheet equally spaced around the bin)

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    37/100

     

    MANUAL CHIEF42 CB34 TITAN Page 36

    Roof Ring

    After all the structure is assembled, attach roof rings to eave brackets between every rafter.Attach roof rings loosely to rafter clips with ½” x 2” bolts, add shims between plates on roof ring

    and eave brackets as needed, so roof rings are tight against rafters all around bin. When

    tightening roof rings to rafters, check that rafters are being held straight. Add additional shims asneeded to keep rafters straight.

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    38/100

     

    Page 37 MANUAL CHIEF42 CB34 TITAN

     D. Roof Panel Assembly

    Lower Roof Panel Assembly

    Install bottom standoff angle centered on top side of ring segment as shown. Place row or strip

    caulking on standoff angle where the lower roof sheets will be attached. Use 5/16” x 1-1/4” bin bolts (heads on outside of bin) to attach upper end of lower sheets to bottom standoff angle and

    ring segment. Align roof sheet so that rib is inline with rafter. Bolt wide end of lower roof panel

    to top angle

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    39/100

     

    MANUAL CHIEF42 CB34 TITAN Page 38

    Always working to the right around the bin, place strip caulking on right rib of the previously

    installed roof panel (top only). Placing roof panel in a vertical position, lock the left rib of the

     panel being installed over the right rib of the previously installed panel. Tip the roof panel down.As each roof panel is set into place, insert a lining punch through the hole in the rib at the bottom

    of each roof panel. Temporarily clamp the two roof panels together with vise grips so that the

     punch can be removed and a 5/16” x 3/4” bolt inserted and hand tightened. Continuedinstallation of roof panels as described in preceding steps.

    All bins are equipped with one manhole and a roof ladder as standard. Extra manholes should bespaced evenly around the bin.

    When the last roof panel is placed, it will have to be interlocked by using a rubber mallet.Starting at the top and working down, tap the vertical rib until it is sealed to the other panel.

    Align roof panel holes and insert 5/16” x 3/4” bolts in the same manner as previously described. 

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    40/100

     

    Page 39 MANUAL CHIEF42 CB34 TITAN

    Upper Roof Panel Installation

    Attach flashing clips to peak ring with 7/16” x 1-1/4” bin bolts. Place plastic foam around peakring under flashing clips.

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    41/100

     

    MANUAL CHIEF42 CB34 TITAN Page 40

    Roof Panel flashing extensions

    The extensions come in 4 equal pieces install clockwise around the peak and attach with 7/16” x1-1/4” bin bolts. (Note: Flashing Extensions must be started as shown to properly align roof

     panels, Center first extension on hole that is aligned with rafter and flashing hole in peak ring.

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    42/100

     

    Page 41 MANUAL CHIEF42 CB34 TITAN

    Place Foam on edge of extension to seal between extensions.

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    43/100

     

    MANUAL CHIEF42 CB34 TITAN Page 42

    Roof Panel Installation

    1.  Install strip caulking between top end of roof panels and roof panel flashing. Use 5/16” x3/4” bolts at top end of panel. Bolt roof panels standoff ring with 5/16” x 1-1/4” bin bolts.

    Align upper roof panel so the rib is inline with the rafter.

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    44/100

     

    Page 43 MANUAL CHIEF42 CB34 TITAN

    Install top standoff angle to inside of bottom standoff angle and attach angles together with 5/16”

    x ¾” bin bolts as shown. Place strip caulking on top side of top standoff angle where upper

    sheets will to attached to top standoff angle.

    Place strip caulking around standoff splice and install to inside of top and bottom standoff angles

    as shown. Attach to standoff with 5/16” x ¾” bin bolts. 

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    45/100

     

    MANUAL CHIEF42 CB34 TITAN Page 44

    Proceed by installing additional roof panels in the following manner: Always working to the

    right around the bin, place strip caulking on right rib of the previously installed roof panel

    (top only). Placing roof panel in a vertical position, lock the left rib of the panel beinginstalled over the right rib of the previously installed panel. Tip the roof panel down. As each

    roof panel is set into place, insert a lining punch through the hole in the rib at the bottom of

    each roof panel. Temporarily clamp the two roof panels together with vise grips so that the punch can be removed and a 5/16” x 3/4” bolt inserted and hand tightened. Continued installation of roof panels as described in preceding steps.

    When the last roof panel is placed, it will have to be interlocked by using a rubber mallet.Starting at the top and working down, tap the vertical rib until it is sealed to the other panel.

    Align roof panel holes and insert 5/16” x 3/4” bolts in the same manner as previously

    described.

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    46/100

     

    Page 45 MANUAL CHIEF42 CB34 TITAN

    Special Note:

    Bins 25 rings and taller will have roof panels with additional holes in the roof sheet ribs. Field

    drill hole in ribs using pre-punched hole on adjacent rib as template, Attached roof panels ribstogether with 5/16” x 3/4” bin bolts and washer as shown.

    Roof Panels installation for bins 25 rings and taller

    .

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    47/100

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    48/100

     

    Page 47 MANUAL CHIEF42 CB34 TITAN

     E. Cap Flashing

    The cap flashing comes in 8 equal pieces; install the cap flashing to the peak ring with the 7/16”x 1” bin bolts. After cap flashing pieces are attached to the peak ring drill screw cap flashing

    together where it overlaps with #12 x 1-1/4” self -drilling screws.

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    49/100

     

    MANUAL CHIEF42 CB34 TITAN Page 48

    Section 4 –  Typical Roof Accessories 

     A. Top Lid  

    (1) 

    Apply strip caulking around the top of the peak ring.

    (2) Install top lid using twenty 7/16” x 1” bolts (bolt heads on top). Securely tighten bolts. 

     B. 

     Manhole Lid

    (1) Install manhole lid as shown below. Note that manhole hinge should be installed toward

    top of bin.

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    50/100

     

    Page 49 MANUAL CHIEF42 CB34 TITAN

    NOTE: Leaf to lid and hinge to roof panel bolts are to be installed with heads inside.

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    51/100

     

    MANUAL CHIEF42 CB34 TITAN Page 50

    C. Working Ring

    Field locate and Install the working ring to the roof panels as shown, with 5/16” x 3/4” Bin bolts.The working ring clips are to be evenly spaces around the ring. Connect the working ring

    segments together with the connectors as shown below. Expand the connector as needed.

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    52/100

     

    Page 51 MANUAL CHIEF42 CB34 TITAN

     D.  Roof Ladder

    The roof ladder should be located adjacent to the manhole and next to a roof beam.

    Roof Ladder are shipped broke down, and need assembled on the roof panels.

    Refer to Chart for rails needed for roof size.

    4.5' RAIL 6' RAIL 7.5' RAIL 9' RAIL

    CB12 4CB13 2 2 2

    CB14 2 2 2

    CB16 2 4

    CB18 6

    CB20 2 4 2

    CB22 UPR 2 2

    CB22 LWR 2 4

    CB24 UPR 4

    CB24 LWR 2 4

    CB26 UPR 2 2

    CB26 LWR 2 4 2CB30 UPR 2 4

    CB30 LWR 2 4

    CB34 UPR 6

    CB34 LWR 2 4 2

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    53/100

     

    MANUAL CHIEF42 CB34 TITAN Page 52

    Attached rails to roof panels by field drilling holes into roof panels and bolt rails to panels with5/16” x ¾” bin bolt. Attached rungs to rails with 5/16” x ¾” bin bolts.  

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    54/100

     

    Page 53 MANUAL CHIEF42 CB34 TITAN

    Overlap rails as shown and attach together with 5/16” x ¾” bin bolts. 

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    55/100

     

    MANUAL CHIEF42 CB34 TITAN Page 54

     E. Roof Vents

    A.  Goose Neck Vent Installation

    1.  Refer to the bulletin that comes with the vent for installation procedures

    2.  Locate Goose Neck Vent on the desired roof sheet. Typically slide Goose Neck Vent up theroof sheet (Toward the small end) until the corners of the base intersect the roof sheet ribs.

    3.  Using the base as a template, mark and drill the 11/32” diameter mounting holes.

    4.  Apply (2) two beads of butyl sealant or mastic sealant as shown, between the Goose Neck

    Vent base and roof sheet. Leave a 1” gap at the lower side of the outside bead. 

    5.  Assemble Goose Neck Vent to roof sheet using 5/16” x 3/4” hex bin bolts and nuts. Tightenall bolts and check sealant along upper end of Goose Neck vent base for any gaps or pockets.

    Apply extra sealant as required.

    6.  Peen up edge on inside of Goose Neck Vent to make a water tight seal. The lip should beapproximately 1” all the way around.

    7.  Do Not Weld Goose neck vent to roof as rusting will result.

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    56/100

     

    Page 55 MANUAL CHIEF42 CB34 TITAN

    B.  Low Profile Roof Vents

    1.  Install the Screen and clips on the roof vent body using 5/16” x 3/4” bin bolts, nuts and flatwashers as shown below. The bolt heads should be on the outside of the vent with the

    washers and nuts on the inside (against the screen).

    2.  Locate the roof vent assembly on the roof panel (over the manhole) by aligning the holes inthe clips with the corresponding holes in the lower end of the roof panel.

    3.  Mark the outline of the roof vent with a marking pencil so that the vent can be returned to the

    same position after the caulking is applied.

    4.  Remove the vent from the roof panel, turn upside down, and apply caulking to the mounting

    surface of the sides and top.

    5.  At this time, install and tighten three 5/16” x 3/4” bin bolts and nuts in the holes directly

    above and below the manhole (in the roof panel to prevent leakage).

    6.  Locate the roof vent on the roof panel in its original position and attach with the #14 x 3/4”

    self-drilling screws provided. If a screw gun is not available, use the holes in the vent as a

    guide and drill 3/8” holes through the vent and roof panel, and attach with 5/16” x 3/4” bin bolts and nuts.

    7.  Install 5/16” x 3/4” bin bolts and nuts in the clips and bottom of screen as shown in detail on

     previous page.

    8.  Tighten all bolts securely.

     NOTE: Roofs with structural beams may require field installation of angles between beams at both top and bottom of manhole opening if 20 PSF or 30 PSF live loading is required.

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    57/100

     

    MANUAL CHIEF42 CB34 TITAN Page 56

    C.  Mushroom Vent Installation

    1.  Refer to the bulletin that comes with the vent for installation procedures

    2.  Mushroom vents are attached to pre-punched roof sheets with holes at the lower end of

    the sheets.

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    58/100

     

    Page 57 MANUAL CHIEF42 CB34 TITAN

    Section 5 – Temperature Cables

     A. 

    General Considerations

    Follow temperature cable manufacturer’s recommendations for installation of temperaturecables. Be sure to allow adequate clearance for sweep augers or other internal equipment.

    All temperature cables should be stabilized at floor level, to prevent cables from drifting out

    towards the sidewall as bin is being filled. The use of light twine or monofilament linedouble wrapped and secured to a recessed anchor, is a common practice.

    Provide adequate sealant where temperature cable leads exit the bin.

    Support of temperature cables by any means other than Chief Industries’ recommended

     brackets may cause structural damage to the bin roof and will nullify the Chief Grain Bin

    Warranty.

    Note: Structured Roo fs are designed for a maximum load of 2,000 lbs. per

    temperature cable. If this lo ad is exceeded, this may cause structural damage to

    the bin ro of and wi l l nul l i fy the Chief Grain Bin Warranty.

    #34 Temperature Cables

    Bin

    Size

    Total #Temp.

    Cables

    Temp. Cables

    #/Radius

    #34 24 4/8'-10"

    8/27'-2"

    12/44'-3"

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    59/100

     

    MANUAL CHIEF42 CB34 TITAN Page 58

     B.  Temperature Cable Brackets (15 Rings and Shorter)

    (1) Install temperature cable bracket as shown below. Do not install more than onetemperature cable per roof beam.

    (2) 

    Attach temperature cables to rafters per temperature cable manufacture’s instructions 

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    60/100

     

    Page 59 MANUAL CHIEF42 CB34 TITAN

    #34 Bin Temperature Cable Layout (15 Rings and Shorter)

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    61/100

     

    MANUAL CHIEF42 CB34 TITAN Page 60

    C. Temperature Cable Brackets (16 Rings and Taller)

    (1) Install temperature cable brackets as shown below.

    (2) Attach support beams to bottom of rafters

    (3) Attach temperature cables to support beams per temperature cable manufacture’s

    instructions

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    62/100

     

    Page 61 MANUAL CHIEF42 CB34 TITAN

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    63/100

     

    MANUAL CHIEF42 CB34 TITAN Page 62

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    64/100

     

    Page 63 MANUAL CHIEF42 CB34 TITAN

    Section 6 –  Sidewall Sheet and Stiffener Gauge Chart

     Note: All Sidewall and Stiffener gauges in the charts below are for standard bins. If bins are

    designed for High Load/Unload rates, concrete pits or Seismic Conditions, Contact Chief

    Industries, Inc. for gauge chart needed.

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    65/100

     

    MANUAL CHIEF42 CB34 TITAN Page 64

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    66/100

     

    Page 65 MANUAL CHIEF42 CB34 TITAN

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    67/100

     

    MANUAL CHIEF42 CB34 TITAN Page 66

    Sidewall Sheet Gauge Color 

    20 White

    18 Orange

    17 Light Blue

    16 Green

    14 Yellow

    14 Transition Yellow/Black

    13 Brown

    12 Dark Blue

    11 Pink

    10 Black

    9 Light Green

    8 Red

    Note: Sidewall Sheets for Top Ring are also

    color coded with GOLD

    Section 7 –  Sidewall Erection 

     A. 

    Sidewall Sheets and Stiffeners

    NOTE: All sheets must be installed with color code right side down as shown below. Check theedges of the sheet for traces of the shop color code. The shop color code is always located on the

     bottom edge of the sheet. The color codes and their corresponding gauges are listed in the table

     below.

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    68/100

     

    Page 67 MANUAL CHIEF42 CB34 TITAN

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    69/100

     

    MANUAL CHIEF42 CB34 TITAN Page 68

    NOTE: Proper Bolting Sequence Must Be Followed At All Times.

    (1) Tighten bolts in top 2 rings and top stiffeners.

    (2) Select sheets of the proper gauge for the 3rd ring of the bin. Select proper gauge and

    length of stiffeners.

    (3) Install stiffener splice plates, to both ends of stiffeners with (2) 7/16” x 1-1/4” Bin

    Bolts and whiz flange nuts per splice before securing the stiffener to the bin. Note: On

    top stiffeners, splice plate is only required on the bottom end of the stiffener.

    (3) Wipe excess oil from ends of the sheets and apply caulking as shown below  

    (4) Loosely assemble 3rd

     ring

    (5)  Loosely install stiffeners of the proper gauge to the exterior of the bin with 7/16” bin

     bolts. Stiffener bolts are always placed with heads inside the bin. Using large

    alignment punch, force stiffener up so that splices are tightly compressed. Tighten (4)four bolts in 3

    rd ring to keep stiffeners compressed. Loosely install the (2) 7/16” x 1-

    1/4” bolts connecting the stiffener splices to the stiffener splice plate above.

    Note:

    Blocks may be used to place under the stiffener splices to compress the stiffener splices.

    Note:

    Install bolts on sidewall sheets seam that are in the center of stiffener holes before installing

    next stiffener.

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    70/100

     

    Page 69 MANUAL CHIEF42 CB34 TITAN

    (6) Lower the bin on to the foundation. This will force the 2 ring stiffeners in 2nd

     and 3rd

     ring up to splices.

    (7) Tighten stiffeners to sheets and stiffener splice to stiffener splice bolts.

    (8) Tighten bolts in vertical seams in 3nd

     ring.

    (9) Tighten bolts in horizontal seams between 2nd

     and 3rd

     ring beginning at center of sheetand working both ways.

    (10) Add ladder sections as required (See separate Ladder Manual)

    (11) Repeat steps 1 thru 10 to add 4th

     ring and each additional ring. Proper bolting

    sequence must be followed at all times to assure proper assembly.

    NOTE: Use 7/16”x1 1/4” bin bolts at bottom sidelap of transition sheets. Use 5/16”x3/4” bin bolts at the top sidelap at vertical seams of transition sheet.

    NOTE: All bins have all 2 ring bottom stiffeners at the bottom, a 1 ring stiffener must be

    placed at every other stiffener line in the 3rd

     ring.

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    71/100

     

    MANUAL CHIEF42 CB34 TITAN Page 70

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    72/100

     

    Page 71 MANUAL CHIEF42 CB34 TITAN

     B.  Laminated Sheet Installation

    (1). All rings, which require laminated sheets (indicated in the sheet and stiffener charts)must be installed with the endlaps interlapped as shown in the endlap detail below.

    (2). Select the proper sheet gauge for each ring of the bin as indicated in the stiffener andgauge chart.

    Laminated Sheet Endlap

    (3). Lap the bin sheets so that the outside ring of sheets follow this sequence: The right end of

    each sheet is always on the outside of the bin and the left end is always on the inside

    (looking from the outside). Refer to the endlap detail.

    NOTE: This sequence is the same as the single sheet sequence.

    (4). Lap the inner ring of the bin sheet so that they follow the same lapping sequence as theoutside ring of sheets. Refer to the endlap detail for lapping sequence.

    (5). Follow the bolt installation procedure for bin sheet endlaps and sidelaps.

    (6). Install stiffeners as outlined.

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    73/100

     

    MANUAL CHIEF42 CB34 TITAN Page 72

    C.  Base Angle Detail

    (1) Bolt the base angle to the bottom of the bottom sheet as shown, with either 5/16” x 3/4“ with

    a 3/8” flat washer between the whiz nut and the base angle or 7/16” bin bolts.

    (2) Seal base angle to concrete, using plastic cement or tar sealant. (NOTE: Sealant not supplied

     by Chief Industries, Inc.)

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    74/100

     

    Page 73 MANUAL CHIEF42 CB34 TITAN

     D. Titan One Ring Door

    1. Place expandable foam around edges of frames as shown below.

    2. Bolt the inner and outer frame to the bin sidewall with 7/16” x 3” bin bolts, making sure toonly place bolts in the holes shown in the detail below. The top eyebrow on the outer frame is to be placed behind the sheet above the door. The bottom eyebrow is to be placed on the outside of

    the sheet below the door. Bolt the inner and outer frames together with (10) 7/16 x 2” bin bolts

    with whiz flange nuts.

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    75/100

     

    MANUAL CHIEF42 CB34 TITAN Page 74

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    76/100

     

    Page 75 MANUAL CHIEF42 CB34 TITAN

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    77/100

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    78/100

     

    Page 77 MANUAL CHIEF42 CB34 TITAN

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    79/100

     

    MANUAL CHIEF42 CB34 TITAN Page 78

    2 Ring Door Installation (optional)

    Place expandable foam around edges of frames as shown below.

    1.  Bolt the inner and outer frame to the bin sidewall with 7/16” x 3” bin bolts, making sure

    to only place bolts in the holes shown. Bolt the inner and outer frames together with (10)

    7/16 x 2” bin bolts with whiz flange nuts. 

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    80/100

     

    Page 79 MANUAL CHIEF42 CB34 TITAN

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    81/100

     

    MANUAL CHIEF42 CB34 TITAN Page 80

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    82/100

     

    Page 81 MANUAL CHIEF42 CB34 TITAN

    3 STIFFENED TANK

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    83/100

     

    MANUAL CHIEF42 CB34 TITAN Page 82

    2 STIFFENED TANK

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    84/100

     

    Page 83 MANUAL CHIEF42 CB34 TITAN

    IMPORTANT: All anchors

    must be bearing firmly upon

    concrete or shimmed to

    develop full bearing contact

    with concrete foundation

     E. Heavy Bin Stiffener Anchor

    (1) All bins will have ALL 2 ring bottom stiffeners. Stiffened bins may have two or threeStiffeners per sidewall sheet depending upon bin size and height.

    (2) Bolt anchor brackets to 2-ring bottom stiffeners. DO NOT fully tighten, only finger

    tighten at this time.

    (3) After the bottom ring is attached, lower the bin carefully, placing all anchor bracketsover the anchor bolts.

    (4) When full weight of the bin is on the concrete, shim the anchors as necessary bysliding shim plates between the concrete and anchor bracket. All anchors must be

     bearing upon the concrete or shimmed so that full bearing of the anchor is developed.

    NOTE: Anchors placed over aeration trenches must be supported from the bottom of the

    trench.

    After all anchors brackets are shimmed snuggly, place two square washers over theanchor bolt and tighten.

    Plastic cement or tar sealant should be applied from inside the bin to seal the bottom ring

    to concrete. (NOTE: Sealant is not furnished by Chief Industries, INC.)

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    85/100

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    86/100

     

    Page 85 MANUAL CHIEF42 CB34 TITAN

     F. Transition Stiffeners

    Aeration Trough Transition Stiffener Installations (for flush-floor aeration systems with two ormore fans)

    (1) 

    The formed concrete dimensions and the anchor bolt placement are important for the correctinstallation of the transition stiffeners. When forming the concrete, the aeration troughs

    should be located as specified in Chief’s aeration layout. The anchor bolt locations for the bin

    need to be oriented to make sure that the number of anchors over the aeration trough isminimized. When installing the anchor bolts, the bolt radius and bolt chord must be correct

    and they must also be placed according to the details below.

    IMPORTANT NOTE: Do NOT install the anchor bolts inside the aeration trench at this

    time.

    2 Stiffener/Sheet Bins 3 Stiffener/Sheet Bins

    (2) When the bin is erected and located correctly (as illustrated above), insert the transition in the

    aeration trough. Using the hole in the anchor bracket as a guide, drill a 3/4” hole through the

    top of the transition. Slide the transition stiffener inside the transition and line it up with the previously drilled hole. Loosely install the 5/8” x 1-1/2” A325 bolt. Rotate the transition

    stiffener body so that it is centered under the bin wall anchor. See installation detail that

    follows.

    (3) 

    The transition stiffener must be attached to the foundation with two (2) 5/8” x 6” expansion-type anchor bolts. The holes for these anchor bolts should now be located. With an acetylene

    torch, cut two holes in the bottom of the transition using the holes in the transition stiffener base plate as guides. (This would mark the location of the anchor bolts in the concrete as

    well.)

    (4) Remove the transition stiffener and the transition.

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    87/100

     

    MANUAL CHIEF42 CB34 TITAN Page 86

    Aeration Trough Transition Stiffener Installation Detail

    (5) Locate the two anchor bolt locations (from cutting the holes in the bottom of the transition).Set the transition stiffener over the locations to insure that the holes line up. Also, check to

    insure that the transition stiffener is directly under and in line with the anchor. Make

    adjustments if necessary. Drill the two holes for the 5/8” x 6” anchor bolts.

    IMPORTANT NOTE: Do NOT install anchor bolts at this time.

    (6) Enlarge the two holes in the bottom of the transition to 1” diameter.

    (7) Reinstall the transition and slide the transition stiffener into position Loosely install the 5/8”

    x 1-1/2” A325 bolt and rectangular washers at the anchor bracket location. The two 5/8” x 6”expansion-type anchor bolts should now be installed and securely tightened the 5/8” bolts at

    the anchor bracket. Caulking should be applied to seal the transition.

    IMPORTANT NOTE: Transition stiffeners support the bin anchors. The transition must also

     be supported inside the bin. See Chief’s aeration layout for supporting the transition.

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    88/100

     

    Page 87 MANUAL CHIEF42 CB34 TITAN

    G. Stiffener Upgrades for Goal Post (Optional)

    When a goal post is being attached to bin, an extra layer of stiffeners are laminated over standardstiffeners at goal post location from eave to base, as been is being erected.

    Chief recommends that goal post be uniformly attached to at least the top 2 rings of tank at thestiffeners from bottom of 2

    nd ring to top of 1

    st ring.

     Note: Listed below are the maximum loads that can be applied to upgraded stiffener columns.16GA stiffener upgrade = 5,000 lbs. per column

    14GA stiffener upgrade = 6,000 lbs. per column

    2 stiffeners per sidewall

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    89/100

     

    MANUAL CHIEF42 CB34 TITAN Page 88

    2 stiffeners per sidewall sheet

    3 stiffeners per sidewall sheet

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    90/100

     

    Page 89 MANUAL CHIEF42 CB34 TITAN

    Section 8 –  Wind Rings

     A. Wind Rings

    Consult the Chief catalog for the quantity of wind rings required for your bin. The quantity ofwind rings depends on the size of the bin and the application of any accessories (such as a

    sidedraw system). For quantities and placement of wind rings required when a Sidedraw System

    is installed on the bin, refer to the charts in this manual. The wind rings will be attached to thesidewall using one bracket per stiffener spaced 58-5/16” apart (38-7/8” on 3 stiffened bins). The

     brackets are specially formed and prepunched to bolt directly to the sidewall stiffener holes. The

    wind ring segments will be joined together using a bolted coupler.

     NOTE: All wind ring segments are 248” long, and may need field cut to keep couplers in

     between brackets. Always cut segments on end opposite end with pre-punched hole.

    (1) 

    Working from outside the bin, determine the proper location for installation of the first windring.

    (2) Bolt the first wind ring bracket to the sidewall stiffener holes as shown in Detail below using(2) of the stiffener attachment bolts and nuts with bolt heads on the inside. (Note: Wind ring

     brackets may be installed below the endcaps if desired to allow for clearance of ladders and

     platforms.)

    (3) Move right to the next stiffener and repeat step 2.

    (4) When 4 wind ring brackets have been installed, slide the first ring segment through the four

     brackets leaving approximately 29 inches of the segment projection past the last bracket.

    Insert coupler over end of wind ring segment, and attach with 5/8” x 4” bolt. 

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    91/100

     

    MANUAL CHIEF42 CB34 TITAN Page 90

    (5) Repeat step 2 through 3 until four more brackets have been installed.

    (6) Slide another connector into the end of the previously installed ring segment. Slide the nextring segment through the four brackets and butt it firmly against the previous segment.

    (7) Repeat steps 5 and 6 until only one ring segment remains to be installed. Installing the

    final ring segment requires special procedures.

    (8) Attach coupler to end of last wind ring segment.

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    92/100

     

    Page 91 MANUAL CHIEF42 CB34 TITAN

    (9) Slide coupler attach to segment over end of 1st segment so segments are bolted together.

    (10) Field cut other end of segment so segments are flush.

    (11) Slide last coupler and brackets over segments.

    (12) Hold segments flush and slide coupler over joint and attach with 5/8” x 4” bolts. Attach

     brackets to stiffeners

    (15)  Check to see that all bolts in the complete wind ring are tight

    (16)  Repeat steps 1 through 13 for the remaining wind rings.

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    93/100

     

    MANUAL CHIEF42 CB34 TITAN Page 92

    Titan Commercial Bins 5 thru 15 Rings Tall

    Drawing is for illustrative purpose only. The quantity and location of wind rings required

    depends on the application of any accessories (EX: sidedraw system). On Standard Bins placewind rings as shown in figure above. Refer to chart on following page for qty. of wind rings

    required on standard tanks. (Ex. If only one wind ring is required place on 2nd

     ring from eave, if

    2 req’d place on 2nd

     and 5th

     ring, if 3 req’d place on 2nd

    , 5h, and 8

    th and so on)

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    94/100

     

    Page 93 MANUAL CHIEF42 CB34 TITAN

    Titan Commercial Bins 16 thru 30 Rings Tall

    Drawing is for illustrative purpose only. The quantity and location of wind rings requireddepends on the application of any accessories (EX: sidedraw system). On Standard Bins place

    wind rings as shown in figure above. Refer to chart on following page for qty. of wind rings on

    standard tanks. (Ex. If only one wind ring is required place on 3rd

     ring from eave, if 2 req’d placeon 3

    rd and 6

    th ring, if 3 req’d place on 3

    rd, 6

    th, and 9

    th, and so on)

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    95/100

     

    MANUAL CHIEF42 CB34 TITAN Page 94

    BIN

    HEIGHT 18 20 22 24 26 30 34

    8 0 1 1 1 1 1 19 0 1 1 1 2 2 2

    10 1 1 1 1 2 2 2

    11 1 1 2 2 2 2 2

    12 1 1 2 2 2 2 2

    13 1 1 2 2 2 2 2

    14 1 1 2 2 2 2 3

    15 1 1 2 2 2 2 3

    16 1 1 2 2 2 2 3

    17 2 2 2 2 2 2 3

    18 2 2 2 2 2 2 3

    19 2 2 2 2 2 2 320 2 2 2 2 3 3 3

    21 2 2 2 3 3 3 3

    22 2 2 2 3 3 3 4

    23 2 2 2 3 3 3 4

    24 2 2 2 3 3 3 4

    25 2 2 3 3 3 4 4

    26 2 2 3 3 3 4 5

    27 2 3 3 3 3 5 5

    28 3 3 3 3 3 5 NA

    29 3 3 3 4 3 5 NA

    30 3 3 3 4 3 5 NA

    BIN SERIES

    Wind rings required on standard Commercial Titan Bins

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    96/100

     

    Page 95 MANUAL CHIEF42 CB34 TITAN

    Wind Ring Placement with Sidedraw Systems

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    97/100

     

    MANUAL CHIEF42 CB34 TITAN Page 96

    Standard Total

    Bin Ring Wind Rings Wind

    Size Height Quantities Rings

    10 10 - 18 0 + 1 1

    11 10 - 18 0 + 1 1

    11 19 - 20 0 + 2 2

    12 10 - 18 0 + 1 1

    12 19 - 22 0 + 2 2

    13 10 - 18 0 + 1 1

    13 19 - 23 0 + 2 2

    14 10 - 18 0 + 1 1

    14 19 - 24 0 + 2 2

    16 10 - 15 0 + 1 1

    16 16 - 18 1 + 1 2

    16 19 - 26 1 + 2 3

    18 10 - 16 1 + 1 2

    18 17 - 21 2 + 1 3

    18 22 - 27 2 + 2 418 28 3 + 2 5

    20 10 - 16 1 + 1 2

    20 17 - 21 2 + 1 3

    20 22 - 26 2 + 2 4

    20 27 - 29 3 + 2 5

    22 10 1 + 1 2

    22 11 - 21 2 + 1 3

    22 22 - 24 2 + 2 4

    22 25 - 28 3 + 2 5

    24 10 1 + 1 2

    24 11 - 20 2 + 1 3

    24 21 - 24 3 + 1 424 25 - 28 3 + 2 5

    24 29 - 30 4 + 2 6

    26 10 - 15 2 + 1 3

    26 16 - 19 2 + 2 4

    26 20 - 23 3 + 2 5

    26 24 - 29 3 + 3 6

    26 30 3 + 4 7

    30 10 - 15 2 + 1 3

    30 16 - 19 2 + 2 4

    30 20 - 24 3 + 2 5

    30 25 4 + 2 6

    30 26 4 + 3 7

    30 27 - 30 5 + 3 8

    34 10 - 13 2 + 1 3

    34 14 - 17 3 + 1 4

    34 18 - 21 3 + 2 5

    34 22 - 25 4 + 2 6

    34 26 - 27 5 + 2 7

     Additional

    with

    Sidedraw System

     

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    98/100

     

    Page 97 MANUAL CHIEF42 CB34 TITAN

    Section 9 –  Miscellaneous

     A. Maintenance Instructions

    ROOF: Annual inspection of the roof structure should be made to be sure there is

    no holes in the roof panels and all connections are water tight. If leaksshould occur apply weatherproof caulk in the area of concern.

    SIDEWALL: Sidewall inspection must also be conducted at least annually. Should leaks

    occur apply caulk to area of concern.

    Should spoilage occur, thoroughly clean surfaces. If oxidation is present,

    remove oxidation and apply corrosive resistance paint.

    BASE: Inspect base as often as possible for spoilage, as this is a direct indication

    of excess moisture. If spoilage is present, thoroughly clean surface. Ifoxidation is present, remove oxidation and apply corrosive resistance paint. After paint has dried, apply base sealer to effected area.

    DOORS: Inspect doors and manholes as often as possible to be sure proper seal ismaintained.

    DECALS: Be sure all warning decals are installed in proper locations. Replace alldamaged or unreadable warning decals.

  • 8/20/2019 347865 CB34 Manual 30DG J RIB Manual

    99/100

     

    MANUAL CHIEF42 CB34 TITAN Page 98

     B. Comment Sheet

    Dear Erector:

    In an effort to better serve and please you, list below any problems you may have encountered

    with your product or the erection procedures in this manual. Also list any suggestions you mayhave for improvements.

    Erection Manual Problems: ____________________________________________________________ _____________________________________________________________________________________ 

     _____________________________________________________________________________________  _____________________________________________________________________________________  _____________________________________________________________________________________  __________________________________________________

    Recommended Solutions:

     ____________________________________________________________ _____________________________________________________________________________________ 

     _____________________________________________________________________________________  _____________________________________________________________________________________ 

     _____________________________________________________________________________________  __________________________________________________

    Product Problems: ____________________________________________________________ _____________________________________________________________________________________  _____________________________________________________________________________________  _____________________________________________________________________________________  _____________________________________________________________________________________  __________________________________________________

    Product Improvements Suggestions:

     ____________________________________________________________ _____________________________________________________________________________________  _____________________________________________________________________________________  _____________________________________________________________________________________  _____________________________________________________________________________________  __________________________________________________

    Thank you for your time and reason. All responses will be reviewed by our engineering staff.

    Please detach this page and send to: Agri Engineering DepartmentChief Industries, Inc.

    P.O. Box 848

    Kearney, NE 68848-0848