3/14/2007 AD/Instrumentation DepartmentJim Zagel
1
MFW Update 3/14/07
• Latest problems
• RFT Looses Phase Lock– Real 53 MHz connected to the RFT at MI-10
on Feb 20, 2007.
• Needed to retime gates to BS Clock– Which had been done over the next few days– BUT…
3/14/2007 AD/Instrumentation DepartmentJim Zagel
2
MFWProblem: P-Bar Injection
First of 4 bunches is larger than the other 3.
3/14/2007 AD/Instrumentation DepartmentJim Zagel
3
P-Bars to RR•Huge P-Bar Bunches are transferred from the Accumulator into the Recycler ring.
3/14/2007 AD/Instrumentation DepartmentJim Zagel
4
Integrator Hold Time
• Integrator “Hold Time” from data valid was 200ns– Only 25ns is required for the Comet Digitizers.
• We reduced the Hold time to 100ns.
3/14/2007 AD/Instrumentation DepartmentJim Zagel
5
P-Bars RR to Tev
3/14/2007 AD/Instrumentation DepartmentJim Zagel
6
Retimed Acc to RR
3/14/2007 AD/Instrumentation DepartmentJim Zagel
7
New Problems
3/14/2007 AD/Instrumentation DepartmentJim Zagel
8
Oops!
• Apparently 2MHz digitizers really have a hard time digitizing at a 2.5MHz rate
• Recall we have 4 bunches separated by 400ns.
• We replaced the horizontal 2MHZ Comet with a borrowed 5MHz board.
3/14/2007 AD/Instrumentation DepartmentJim Zagel
9
New Horizontal 5MHz Comet
3/14/2007 AD/Instrumentation DepartmentJim Zagel
10
MFW So Far
• Have re-timed both wires.• Need to replace the Vertical 2MHz Comet with
5Mhz board.• Need to check flies on next Tev shot
– Set appropriate voltages to eliminate saturation.
3/14/2007 AD/Instrumentation DepartmentJim Zagel
11
Test Loss Monitor at A0 Update
3/14/2007 AD/Instrumentation DepartmentJim Zagel
12
Pulsed LED Signal
3/14/2007 AD/Instrumentation DepartmentJim Zagel
13
A0 Loss Monitor Test
3/14/2007 AD/Instrumentation DepartmentJim Zagel
14
36 bunches in TevUnfortunately the PMT is not Powered
3/14/2007 AD/Instrumentation DepartmentJim Zagel
15
Support For new Wire at A0• Need
– New Cables to Tunnel– New Computer– New VME Chassis– New Motor Control Hardware– PMT Power Supply
• Software– Minor modifications to generic FW code– Database Changes