3121-3162erpc.gov.in/wp-content/uploads/2020/08/REA-July2020.pdf · 3djh 1r 3($. 2))b3($. 3($....

17
3121-3162

Transcript of 3121-3162erpc.gov.in/wp-content/uploads/2020/08/REA-July2020.pdf · 3djh 1r 3($. 2))b3($. 3($....

Page 1: 3121-3162erpc.gov.in/wp-content/uploads/2020/08/REA-July2020.pdf · 3djh 1r 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. ,qvwdoohg &dsdflw\ 0: 1rupdwlyh $8;

3121-3162

Page 2: 3121-3162erpc.gov.in/wp-content/uploads/2020/08/REA-July2020.pdf · 3djh 1r 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. ,qvwdoohg &dsdflw\ 0: 1rupdwlyh $8;
Page 3: 3121-3162erpc.gov.in/wp-content/uploads/2020/08/REA-July2020.pdf · 3djh 1r 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. ,qvwdoohg &dsdflw\ 0: 1rupdwlyh $8;

Page No. 2 / 14

PEAK OFF_PEAK PEAK OFF_PEAK PEAK OFF_PEAK PEAK OFF_PEAK PEAK OFF_PEAK

1 Installed Capacity (MW) :

2 Normative AUX as per CERC Tariff Order 2019-24(%) :

3 Ex-Bus Normative Capacity at 100% availability (MW) :

4 Average DC for the month (ex-bus) in MW: 1038.82 1023.22 618.28 602.47 300.29 308.27 161.11 159.91 634.21 635.64

5 Plant Availability Factor for Month - PAFM ( %): 83.945 82.685 90.590 88.274 84.614 86.862 21.481 21.321 102.499 102.730

6 Cumulative DC (FY:2019-20) up to the preceeding month (%): 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

7 Cumulative DC (FY:2019-20) including the current month --PAFY (%): 83.945 82.685 90.590 88.274 84.614 86.862 21.481 21.321 102.499 102.730

8 Total Schduled Generation for the current month (MWH) : 119097.824 460336.717 52324.992 197182.739 39309.951 137415.553 17975.256 100924.015 75189.620 357142.174

9 Total Schduled Generation Excluding STOA/IER Exchange (MWH) : 118818.929 460065.955 52188.384 196891.016 39309.951 137415.553 17975.256 100924.015 75177.981 356494.908

10 Cumulative Schduled Ex-bus Generation upto the preceding month (MWH) : 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

11 Cumulative Schduled Ex-bus Generation including the current month (MWH) : 118818.929 460065.955 52188.384 196891.016 39309.951 137415.553 17975.256 100924.015 75177.981 356494.908

12 Plant Load Factor for the current month ( % ) : 77.613 59.998 61.828 46.599 89.325 62.451 19.328 21.704 97.999 93.097

13 Cumulative Plant Load Factor including the current month ( % ) : 77.613 59.998 61.828 46.599 89.325 62.451 19.328 21.704 97.999 93.097

14 Cumulative Norm. Scheduled Energy beyond which incentive payable (MWH) : 130432.500 652162.500 71935.500 359677.500 37406.460 187032.300 79050.000 395250.000 65216.250 326081.250

15 Net Energy Scheduled to Virtual Anciliary Entity (VAE) for the month: -475.778 -3838.672 -94.750 -4926.130 458.810 -140.830 0.000 -87.000 -39.750 405.910

16 Net Energy Scheduled to Virtual SCED Entity for the month(*): -6707.600 -35569.060 -174.155 -29145.235 344.998 2216.593 66.205 1530.795 -444.068 19264.098

17 Cumulative Scheduled Generation to be con. for incentive upto preceding month 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

18 Cumulative Scheduled Generation to be considered for incentive upto current month 126002.306 499473.687 52457.289 230962.381 38506.144 135339.791 17909.051 99480.220 75661.798 336824.900

19 Cumulative Energy eligible for incentive including current month (MWH) : 0.000 0.000 0.000 0.000 1099.684 0.000 0.000 0.000 10445.548 10743.650

20 Cumulative Energy eligible for incentive upto preceding month ( MWH ) : 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

21 Energy eligible for incentive in the current month ( MWH ) : 0.000 0.000 0.000 0.000 1099.684 0.000 0.000 0.000 10445.548 10743.650

Member Secretary(I/C)

EASTERN REGIONAL POWER COMMITTEE :: KOLKATA

REGIONAL ENERGY ACCOUNTING FOR THE MONTH OF JULY- 2020 (High Demand Season of ER)

1320

6.25000

1237.50

750

9.00000

682.50

S.No NTPC POWER STATIONS Nabinagar STPP

(1X660)

Darlipalli STPS-I

(1X800)

MTPS STAGE-II

(2X195)

BARH STPS STAGE-II

(2X660)

BRBCL

(3X250)

660

6.25000

618.75

390

9.00000

354.90

800

6.25000

750.00

Page 4: 3121-3162erpc.gov.in/wp-content/uploads/2020/08/REA-July2020.pdf · 3djh 1r 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. ,qvwdoohg &dsdflw\ 0: 1rupdwlyh $8;

Page No. 1 / 14

PEAK OFF_PEAK PEAK OFF_PEAK PEAK OFF_PEAK PEAK OFF_PEAK PEAK OFF_PEAK

1 Installed Capacity (MW) :

2 Normative AUX as per CERC Tariff Order 2019-24(%) :

3 Ex-Bus Normative Capacity at 100% availability (MW) :

4 Average DC for the month (ex-bus) in MW: 1489.61 1562.65 444.45 451.39 700.93 699.28 1007.94 1015.88 964.99 906.97

5 Plant Availability Factor for Month - PAFM ( %): 99.873 104.770 99.808 101.365 91.697 91.482 71.676 72.240 103.818 97.577

6 Cumulative DC (FY:2020-21) up to the preceeding month of season (%): 0.000 0.000 0.000 0.000 0.000 0.000 75.453 77.387 0.000 0.000

7 Cumulative DC (FY:2020-21) including the current month of season --PAFY (%): 99.873 104.770 99.808 101.365 91.697 91.482 73.534 74.771 103.818 97.577

8 Total Schduled Generation for the current month (MWH) : 140711.600 548468.117 49792.998 177722.795 84775.315 371569.332 123588.878 567011.126 115946.198 513733.660

9 Total Schduled Generation Excluding STOA/IER Exchange (MWH) : 140670.831 548449.953 47020.722 176346.920 84747.583 371265.679 123588.878 566295.028 115459.225 509310.224

10 Cumulative Schduled Ex-bus Generation upto the preceding month (MWH) : 0.000 0.000 0.000 0.000 0.000 0.000 123975.234 525112.966 0.000 0.000

11 Cumulative Schduled Ex-bus Generation including the current month (MWH) : 140670.831 548449.953 47020.722 176346.920 84747.583 371265.679 247564.112 1091407.994 115459.225 509310.224

12 Plant Load Factor for the current month ( % ) : 76.083 59.311 90.175 64.371 89.439 78.402 70.875 65.034 100.597 89.145

13 Cumulative Plant Load Factor including the current month ( % ) : 76.083 59.311 90.175 64.371 89.439 78.402 72.595 63.796 100.597 89.145

14 Cumulative Norm. Scheduled Energy beyond which incentive payable (MWH) : 157204.100 786020.500 46935.674 234678.370 80567.760 402838.800 291656.250 1458281.250 97969.300 489846.500

15 Net Energy Scheduled to Virtual Anciliary Entity (VAE) for the month: 2557.188 3738.813 0.000 0.000 851.128 3577.913 1446.978 3529.103 465.250 5788.470

16 Net Energy Scheduled to Virtual SCED Entity for the month(*): 3295.433 -10680.083 4082.623 10834.748 4143.760 49088.700 6093.595 36010.835 4124.038 101107.963

17 Cumulative Scheduled Generation to be con. for incentive upto preceding month 0.000 0.000 0.000 0.000 0.000 0.000 111675.457 484014.682 0.000 0.000

18 Cumulative Scheduled Generation to be considered for incentive upto current month 134818.211 555391.223 42938.100 165512.172 79752.696 318599.067 227723.763 1010769.773 110869.937 402413.792

19 Cumulative Energy eligible for incentive including current month (MWH) : 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 12900.637 0.000

20 Cumulative Energy eligible for incentive upto preceding month ( MWH ) : 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

21 Energy eligible for incentive in the current month ( MWH ) : 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 12900.637 0.000

Note:

1. FSTPP Stg-III capacity of 475 MW has been considered w.e.f 00.00 hrs of 01.12.2019 as per ERPC share allocation order dated 29.11.19.

2. Darlipalli STPS-I , Unit #1 (800 MW) has been declared under Commercial Operation w.e.f 00.00 hrs of 01.03.2020

3. CERC (Terms & Conditions of tariff) Regulations 2019-24 have been full fledgely implemented w.e.f 01.04.2020 such as peak and off-peak accounting.

4. High Demand Season (HDS) for Eastern Region would be July,August & September,2020 for F.Y-20-21.

5. Major share allocation of Kshtpp-II STPP is with Northern Region,therefore it would follow the seasonal and hours(peak & offpeak) pattern of NR.

High Demand Season (HDS) for Northern Region is for the months June,July & August,2020 for F.Y-20-21. Member Secretary(I/C)

929.50

7.05000

1000

6.78125

1600

1406.25

6.25000

1500

764.40

9.00000

840

1491.50

500

6.25000

468.75

(4X210)

REGIONAL ENERGY ACCOUNTING FOR THE MONTH OF JULY- 2020 (High Demand Season of ER)

TSTPS STAGE-I

(2X500)(1X500) NTPC POWER STATIONS S.No

FSTPS STAGE-I&II

(3X200+2X500)

FSTPS STAGE-III

EASTERN REGIONAL POWER COMMITTEE :: KOLKATA

KhSTPS STAGE-II

(3X500)

KhSTPS STAGE-I

Page 5: 3121-3162erpc.gov.in/wp-content/uploads/2020/08/REA-July2020.pdf · 3djh 1r 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. ,qvwdoohg &dsdflw\ 0: 1rupdwlyh $8;

Page No. 3/14

FSTPS STAGE-I&II (3X200+2X500)

ENTITLE MENT, INCENTIVE( IF ANY) & DRAWL SCHEDULE OF BENEFICIARIES

WT AVG SHARE CUMULATIVE CUMULATIVE QUANTUM OF

ALLOCATION ENTITLE MENT DRAWAL ENTITLE MENT DRAWAL SCHUDULE

BENEFICIARIES OF OF THE SCHEDULE OF THE SCHEDULE BELOW 85% OF

CURRENT MONTH BENEFICIARIES BENEFICIARIES ENTITLEMENT

( % ) (MWH) (MWH) (MWH) (MWH) (MWH)

ER:

BIHAR # 31.397866 347447.625 242659.142 347447.625 242659.142 52671.339JHARKHAND 8.574292 94877.588 68590.947 94877.588 68590.947 12055.003ODISHA 13.630000 150826.745 46939.874 150826.745 46939.874 81262.859ODISHA (COAL POWER - AFTAB) 0.099049 6125.618 1863.654 6125.618 1863.654 3343.121ODISHA (COAL POWER - DADRI) 0.082937ODISHA (COAL POWER - Rajasthan) 0.275736ODISHA (COAL POWER - Faridabad) 0.095840WEST BENGAL 31.930000 353330.738 176238.832 353330.738 176238.832 124092.295West Bengal (COAL POWER - Rajasthan) 0.919117 10170.757 4006.105 10170.757 4006.105 4639.038SIKKIM 1.630000 18037.241 12079.860 18037.241 12079.860 3251.795SUB-TOTAL 88.634837 980816.312 552378.414 980816.312 552378.414

SR:

TELANGANA (NSM-II) 0.751558 8316.585 7763.407 8316.585 7763.407 0.000TAMILNADU 1.290000 14274.872 13841.580 14274.872 13841.580 0.000SUB-TOTAL 2.041558 22591.457 21604.987 22591.457 21604.987

NR:

UTTAR PRADESH 2.080000 23016.847 36228.708 23016.847 36228.708 0.000HARYANA 0.690000 7635.396 24809.493 7635.396 24809.493 0.000RAJASTHAN 0.690000 7635.396 5209.549 7635.396 5209.549 1280.538J & K 0.850000 9405.923 6492.869 9405.923 6492.869 1502.166DELHI 1.390000 15381.451 10633.973 15381.451 10633.973 2440.260SUB-TOTAL 5.700000 63075.013 83374.592 63075.013 83374.592

NER :

ASSAM 2.455737 28186.345 22146.318 28186.345 22146.318 1812.075ASSAM (COAL POWER - Rajasthan) 0.091912MEGHALAYA 0.000000NAGALAND 0.429803 4700.383 3890.237 4700.383 3890.237 105.089ARUNACHAL PRADESH 0.191917 2124.005 1939.475 2124.005 1939.475 0.000MIZORAM 0.141736 1568.689 1522.314 1568.689 1522.314 0.000SUB-TOTAL 3.311105 36579.422 29498.344 36579.422 29498.344

NVVN POWER - A/C BPDB 0.312500 3458.060 3353.096 3458.060 3353.096 0.000

VSCED(UP) 20012.570 20012.570VSCED(DOWN) 27397.220 27397.220VAE (UP) 7595.900 7595.900VAE (DOWN) 1299.900 1299.900GRAND TOTAL 100.000000 1106520.264 689120.783 1106520.264 689120.783

# Please refer to Annexure

Member Secretary(I/C)

EASTERN REGIONAL POWER COMMITTEE :: KOLKATA

REGIONAL ENERGY ACCOUNTING FOR THE MONTH OF JULY- 2020 (High Demand Season of ER)

Page 6: 3121-3162erpc.gov.in/wp-content/uploads/2020/08/REA-July2020.pdf · 3djh 1r 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. ,qvwdoohg &dsdflw\ 0: 1rupdwlyh $8;

Page No. 4/14

FSTPS STAGE-III (1X500)

CAPACITY CHARGES, INCENTIVE, IF ANY & ENERGY CHARGES BILLING

WT AVG SHARE CUMULATIVE CUMULATIVE QUANTUM OF

ALLOCATION ENTITLE MENT DRAWAL ENTITLE MENT DRAWAL SCHUDULEBENEFICIARIES OF OF THE SCHEDULE OF THE SCHEDULE BELOW 85% OF

CURRENT MONTH BENEFICIARIES BENEFICIARIES ENTITLEMENT

( % ) (MWH) (MWH) (MWH) (MWH) (MWH)

ER:

BIHAR # 21.517874 72019.073 56586.857 72019.073 56586.857 4629.355JHARKHAND 16.948474 56725.557 47078.640 56725.557 47078.640 1138.083ODISHA 16.620000 55626.174 22472.993 55626.174 22472.993 24809.255ODISHA (COAL POWER - DADRI) 0.162663 1773.052 635.196 1773.052 635.196 871.898ODISHA (COAL POWER - Rajasthan) 0.183824ODISHA (COAL POWER - Raj-II SunTech) 0.091912ODISHA (COAL POWER - Faridabad) 0.091354WEST BENGAL 37.638940 125975.344 77950.353 125975.344 77950.353 29128.689West Bengal (COAL POWER - Rajasthan) 0.643382 3076.231 1357.354 3076.231 1357.354 1257.442West Bengal (COAL POWER- Raj-II SunTech) 0.275735SIKKIM 0.000000SUB-TOTAL 94.174158 315195.431 206081.393 315195.431 206081.393

SR:

TELANGANA (NSM-II) 0.733930 2456.421 2069.455 2456.421 2069.455 18.503SUB-TOTAL 0.733930 2456.421 2069.455 2456.421 2069.455

NER :

ASSAM (COAL POWER - Rajasthan) 0.091912 307.624 299.424 307.624 299.424 0.000SUB-TOTAL 0.091912 307.624 299.424 307.624 299.424

VSCED(UP) 19296.280 19296.280VSCED(DOWN) 4378.910 4378.910VAE (UP) 0.000 0.000VAE (DOWN) 0.000 0.000GRAND TOTAL 95.000000 317959.476 223367.642 317959.476 223367.642

# Please refer to Annexure

Member Secretary(I/C)

REGIONAL ENERGY ACCOUNTING FOR THE MONTH OF JULY- 2020 (High Demand Season of ER)

EASTERN REGIONAL POWER COMMITTEE :: KOLKATA

Page 7: 3121-3162erpc.gov.in/wp-content/uploads/2020/08/REA-July2020.pdf · 3djh 1r 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. ,qvwdoohg &dsdflw\ 0: 1rupdwlyh $8;

Page No. 5 / 14

KhSTPS STAGE-I (4X210)

ENTITLE MENT, INCENTIVE( IF ANY) & DRAWL SCHEDULE OF BENEFICIARIES

WT AVG SHARE CUMULATIVE CUMULATIVE QUANTUM OF

ALLOCATION ENTITLE MENT DRAWAL ENTITLE MENT DRAWAL SCHUDULEBENEFICIARIES OF OF THE SCHEDULE OF THE SCHEDULE BELOW 85% OF

CURRENT MONTH BENEFICIARIES BENEFICIARIES ENTITLEMENT

( % ) (MWH) (MWH) (MWH) (MWH) (MWH)

ER:

BIHAR # 41.858038 213054.733 186737.135 213054.733 186737.135 0.000JHARKHAND 3.200751 16313.415 13647.786 16313.415 13647.786 218.617DVC 0.000000ODISHA 15.240000 77577.372 21008.772 77577.372 21008.772 44931.994ODISHA (COAL POWER - DADRI) 0.082268 2722.901 633.156 2722.901 633.156 1681.310ODISHA (COAL POWER - AFTAB) 0.098249ODISHA (COAL POWER - Rajasthan) 0.275736ODISHA (COAL POWER - Faridabad) 0.078653WEST BENGAL 6.070000 30898.599 25165.212 30898.599 25165.212 1098.597West Bengal (COAL POWER - Rajasthan) 0.919117 4678.654 3826.053 4678.654 3826.053 150.803SIKKIM 1.550000 7890.087 6384.521 7890.087 6384.521 322.053SUB-TOTAL 69.372812 353135.761 257402.635 353135.761 257402.635

SR:

TELANGANA (NSM-II) 0.682150 3472.402 3791.746 3472.402 3791.746 0.000TAMILNADU 0.700000 3563.265 3563.265 3563.265 3563.265 0.000SUB-TOTAL 1.382150 7035.667 7355.011 7035.667 7355.011

NR:

UTTAR PRADESH 9.120000 46424.254 40683.684 46424.254 40683.684 0.000HARYANA 3.040000 15474.751 22424.169 15474.751 22424.169 0.000RAJASTHAN 3.040000 15474.751 14086.410 15474.751 14086.410 0.000J & K 3.680000 18732.594 11611.634 18732.594 11611.634 4311.071DELHI 6.070000 30898.599 24304.957 30898.599 24304.957 1958.852SUB-TOTAL 24.950000 127004.949 113110.854 127004.949 113110.854

NER :

ASSAM 2.104847 11170.235 10141.351 11170.235 10141.351 0.000ASSAM (COAL POWER - Rajasthan) 0.091912NAGALAND 0.424446 2088.193 1864.578 2088.193 1864.578 0.000ARUNACHAL PRADESH 0.191747 985.052 924.567 985.052 924.567 0.000MIZORAM 0.141610 729.235 729.235 729.235 729.235 0.000SUB-TOTAL 2.954562 14972.715 13659.731 14972.715 13659.731

POWERGRID(PUSAULI) 0.150000 763.557 763.557 763.557 763.557 0.000

NVVN POWER - A/C BPDB 1.190476 6059.974 6059.974 6059.974 6059.974 0.000

VSCED(UP) 56372.920 56372.920VSCED(DOWN) 3140.460 3140.460VAE (UP) 5862.270 5862.270VAE (DOWN) 1433.230 1433.230GRAND TOTAL 100.000000 508972.623 456013.262 508972.623 456013.262

# Please refer to Annexure

Member Secretary(I/C)

EASTERN REGIONAL POWER COMMITTEE :: KOLKATA

REGIONAL ENERGY ACCOUNTING FOR THE MONTH OF JULY- 2020 (High Demand Season of ER)

Page 8: 3121-3162erpc.gov.in/wp-content/uploads/2020/08/REA-July2020.pdf · 3djh 1r 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. ,qvwdoohg &dsdflw\ 0: 1rupdwlyh $8;

Page No. 6/14

HDSKhSTPS STAGE-II (3X500)

ENTITLE MENT, INCENTIVE( IF ANY) & DRAWL SCHEDULE OF BENEFICIARIES

WT AVG SHARE CUMULATIVE CUMULATIVE QUANTUM OF

ALLOCATION ENTITLE MENT DRAWAL ENTITLE MENT DRAWAL SCHUDULE

BENEFICIARIES OF OF THE SCHEDULE OF THE SCHEDULE BELOW 85% OF

CURRENT MONTH BENEFICIARIES BENEFICIARIES ENTITLEMENT

( % ) (MWH) (MWH) (MWH) (MWH) (MWH)

ER:

BIHAR # 4.979865 37480.749 34627.402 76069.952 69707.973 0.000JHARKHAND 1.248565 9397.273 7987.973 19072.461 16609.536 0.000ODISHA 2.050000 15429.240 3666.583 31314.784 7527.621 19089.945ODISHA (COAL POWER - AFTAB) 0.106629 4294.725 870.811 8716.462 2006.190 5402.803ODISHA (COAL POWER - DADRI) 0.089285ODISHA (COAL POWER - Rajasthan) 0.275736ODISHA (COAL POWER - Faridabad) 0.098967West Bengal (COAL POWER - Rajasthan) 0.919117 6917.696 5755.333 14039.976 11440.590 493.390SIKKIM 0.330000 2483.731 2436.619 5040.916 4712.657 0.000SUB-TOTAL 10.098164 76003.414 55344.721 154254.551 112004.567

SR:

TELANGANA (NSM-II) 0.763112 5743.531 5927.624 11656.921 11807.599 0.000SUB-TOTAL 0.763112 5743.531 5927.624 11656.921 11807.599 0.000

WR:

CHHATTISGARH 2.000000 15052.918 16318.327 30551.010 24217.099 1751.260GUJARAT 9.400000 70748.712 57467.613 143280.485 136740.046 0.000MADHYA PRADESH 4.930000 37105.442 40161.927 75308.239 57528.863 6483.140MAHARASTRA 9.870000 74286.148 66407.529 150769.233 136397.528 0.000DADRA & NAGAR HAVELI 0.200000 1505.292 1505.292 3055.101 2882.892 0.000DAMAN & DIU 0.130000 978.440 978.440 1985.816 1928.595 0.000SUB-TOTAL 26.530000 199676.952 182839.128 404949.884 359695.023

NR:

UTTAR PRADESH 16.730000 125917.655 102870.830 255559.195 183535.208 33690.108HARYANA 4.580000 34471.181 35227.193 69961.812 68535.428 0.000RAJASTHAN 7.110000 53513.122 48866.091 108608.839 91494.311 823.202J & K 5.560000 41847.111 26137.171 84931.807 52081.153 20110.883HIMACHAL PRADESH 1.530000 11515.482 6118.171 23371.522 10935.230 8930.564DELHI 10.490000 78952.552 66301.470 160240.045 126630.879 9573.159PUNJAB 8.020000 60362.199 58327.083 122509.548 112917.613 0.000UTTARAKHAND 1.870000 14074.478 10086.133 28565.194 19690.232 4590.183CHANDIGARH 0.200000 1505.292 1505.292 3055.101 3055.101 0.000SUB-TOTAL 56.090000 422159.072 355439.434 856803.063 668875.155

NER :

ASSAM 5.093479 39027.631 33217.213 79209.465 65743.857 1584.188ASSAM (COAL POWER - Rajasthan) 0.091912SUB-TOTAL 5.185391 39027.631 33217.213 79209.465 65743.857

NVVN POWER - A/C BPDB 1.333333 10035.276 10035.276 20367.335 20367.335 0.000

VSCED(UP) 46876.150 102626.120VSCED(DOWN) 4771.720 14937.240VAE (UP) 6194.080 15620.040VAE (DOWN) 1218.000 2830.350GRAND TOTAL 100.000000 752646.000 689883.906 1527241.219 1338972.106

# Please refer to Annexure

Member Secretary(I/C)

EASTERN REGIONAL POWER COMMITTEE :: KOLKATA

REGIONAL ENERGY ACCOUNTING FOR THE MONTH OF JULY- 2020 (High Demand Season of ER)

Page 9: 3121-3162erpc.gov.in/wp-content/uploads/2020/08/REA-July2020.pdf · 3djh 1r 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. ,qvwdoohg &dsdflw\ 0: 1rupdwlyh $8;

Page No. 7/14

TSTPS STAGE-I (2X500)

ENTITLE MENT, INCENTIVE( IF ANY) & DRAWL SCHEDULE OF BENEFICIARIES

WT AVG SHARE CUMULATIVE CUMULATIVE QUANTUM OF

ALLOCATION ENTITLE MENT DRAWAL ENTITLE MENT DRAWAL SCHUDULEBENEFICIARIES OF OF THE SCHEDULE OF THE SCHEDULE BELOW 85% OF

CURRENT MONTH BENEFICIARIES BENEFICIARIES ENTITLEMENT

( % ) (MWH) (MWH) (MWH) (MWH) (MWH)

ER:

BIHAR # 41.245379 275529.388 263295.059 275529.388 263295.059 0.000JHARKHAND 7.667664 51228.940 44972.719 51228.940 44972.719 0.000DVC 0.000000 0.000 0.000 0.000 0.000 0.000ODISHA 31.800000 212435.249 79698.910 212435.249 79698.910 100871.052ODISHA (COAL POWER - AFTAB) 0.099049 3635.349 1433.550 3635.349 1433.550 1656.497ODISHA (COAL POWER - DADRI) 0.082937ODISHA (COAL POWER - Rajasthan) 0.275736ODISHA (COAL POWER - Faridabad) 0.086460WEST BENGAL 9.210000 61526.058 57949.130 61526.058 57949.130 0.000West Bengal (COAL POWER - Rajasthan) 0.919117 6140.027 5742.271 6140.027 5742.271 0.000SIKKIM 2.400000 16032.849 16298.278 16032.849 16298.278 0.000SUB-TOTAL 93.786342 626527.860 469389.917 626527.860 469389.917

SR:

ANDHRA PRADESH 0.000000TELANGANA (NSM-II) 0.712870 4762.224 5605.227 4762.224 5605.227 0.000KARNATAKA 0.000000TAMILNADU 0.850000 5678.301 5678.301 5678.301 5678.301 0.000KERALA 0.000000PONDICHERRY 0.000000SUB-TOTAL 1.562870 10440.525 11283.528 10440.525 11283.528

NR:

DELHI (De-comm of Badarpur TPS ) 0.200000 1336.071 884.730 1336.071 884.730 250.930SUB-TOTAL 0.200000 1336.071 884.730 1336.071 884.730 250.930

NER :

ASSAM 2.095419 14613.985 17020.575 14613.985 17020.575 0.000ASSAM (COAL POWER - Rajasthan) 0.091912MEGHALAYA 0.000000NAGALAND 0.424823 2720.670 2529.233 2720.670 2529.233 0.000ARUNACHAL PRADESH 0.196898 1315.705 1230.011 1315.705 1230.011 0.000MIZORAM 0.141736 947.204 947.204 947.204 947.204 0.000SUB-TOTAL 2.950788 19597.564 21727.023 19597.564 21727.023

NVVN POWER - A/C BPDB 1.500000 10020.531 10020.531 10020.531 10020.531 0.000

VSCED(UP) 107393.350 107393.350VSCED(DOWN) 2161.350 2161.350VAE (UP) 7866.530 7866.530VAE (DOWN) 1634.810 1634.810GRAND TOTAL 100.000000 667922.551 624769.449 667922.551 624769.449

# Please refer to Annexure

Member Secretary(I/C)

EASTERN REGIONAL POWER COMMITTEE :: KOLKATA

REGIONAL ENERGY ACCOUNTING FOR THE MONTH OF JULY- 2020 (High Demand Season of ER)

Page 10: 3121-3162erpc.gov.in/wp-content/uploads/2020/08/REA-July2020.pdf · 3djh 1r 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. ,qvwdoohg &dsdflw\ 0: 1rupdwlyh $8;

Page No. 8/14

BARH STPS STAGE-II (2X660)

ENTITLE MENT, INCENTIVE( IF ANY) & DRAWL SCHEDULE OF BENEFICIARIES

WT AVG SHARE CUMULATIVE CUMULATIVE QUANTUM OF

ALLOCATION ENTITLE MENT DRAWAL ENTITLE MENT DRAWAL SCHUDULEBENEFICIARIES OF OF THE SCHEDULE OF THE SCHEDULE BELOW 85% OF

CURRENT MONTH BENEFICIARIES BENEFICIARIES ENTITLEMENT

( % ) (MWH) (MWH) (MWH) (MWH) (MWH)

ER:

BIHAR # 90.736309 692466.732 569415.807 692466.732 569415.807 19180.915JHARKHAND 7.081288 54041.832 42240.754 54041.832 42240.754 3694.803ODISHA 0.000000 0.000 0.000 0.000 0.000 0.000WEST BENGAL 0.000000SIKKIM 1.318009 10058.568 8586.401 10058.568 8586.401 0.000SUB-TOTAL 99.135606 756567.132 620242.962 756567.132 620242.962

SR:

TELANGANA (NSM-II) 0.675000 5151.356 4376.414 5151.356 4376.414 2.239SUB-TOTAL 0.675000 5151.356 4376.414 5151.356 4376.414

POWERGRID (ALIPURDUAR) 0.189394 1445.387 856.618 1445.387 856.618 371.961

VSCED(UP) 14104.760 14104.760VSCED(DOWN) 56381.420 56381.420VAE (UP) 3095.750 3095.750VAE (DOWN) 7410.200 7410.200GRAND TOTAL 100.000000 763163.875 578884.884 763163.875 578884.884

# Please refer to Annexure

Member Secretary(I/C)

REGIONAL ENERGY ACCOUNTING FOR THE MONTH OF JULY- 2020 (High Demand Season of ER)

EASTERN REGIONAL POWER COMMITTEE :: KOLKATA

Page 11: 3121-3162erpc.gov.in/wp-content/uploads/2020/08/REA-July2020.pdf · 3djh 1r 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. ,qvwdoohg &dsdflw\ 0: 1rupdwlyh $8;

Page No. 9/14

BRBCL (3X250)

ENTITLE MENT, INCENTIVE( IF ANY) & DRAWL SCHEDULE OF BENEFICIARIES

WT AVG SHARE CUMULATIVE CUMULATIVE QUANTUM OF

ALLOCATION ENTITLE MENT DRAWAL ENTITLE MENT DRAWAL SCHUDULE

BENEFICIARIES OF OF THE SCHEDULE OF THE SCHEDULE BELOW 85% OF CURRENT MONTH BENEFICIARIES BENEFICIARIES ENTITLEMENT

( % ) (MWH) (MWH) (MWH) (MWH) (MWH)

BIHAR # 10.000 43740.808 25034.416 43740.808 25034.416 12145.271

RAILWAY drawn in ER:DVC 15.469 67662.655 45433.981 67662.655 45433.981 12079.276BIHAR 14.063 61512.698 40090.590 61512.698 40090.590 12195.203SUB-TOTAL 29.532 129175.353 85524.571 129175.353 85524.571

RAILWAY drawn in WR:MADHYA PRADESH 7.031 30754.162 15381.997 30754.162 15381.997 10759.041MAHARASTRA 16.875 73812.613 45859.873 73812.613 45859.873 16880.848SUB-TOTAL 23.906 104566.775 61241.870 104566.775 61241.870

RAILWAY drawn in NR:UTTAR PRADESH (ISTS Points) 7.735 33833.515 7208.937 33833.515 7208.937 21549.551UTTAR PRADESH (STU Points) 18.281 79962.570 76318.360 79962.570 76318.360 0.000HARYANA 2.109 9224.936 5857.327 9224.936 5857.327 1983.869PUNJAB 4.922 21529.225 15881.031 21529.225 15881.031 2418.810RAJASTHAN 1.406 6149.958 3604.280 6149.958 3604.280 1623.184DELHI 0.703 3074.979 1999.622 6149.958 3604.280 1623.184SUB-TOTAL 35.156 153775.183 110869.557 156850.162 112474.215

RAILWAY drawn in SR:

KARNATAKA 1.406 6149.958 749.256 6149.958 749.256 4478.208

SUB-TOTAL 1.406 6149.958 749.256 6149.958 749.256

VSCED(UP) 4829.700 4829.700VSCED(DOWN) 34149.090 34149.090VAE (UP) 507.950 507.950VAE (DOWN) 5528.830 5528.830GRAND TOTAL 100.000 437408.077 249079.400 440483.056 250684.058

# Please refer to Annexure

Member Secretary(I/C)

EASTERN REGIONAL POWER COMMITTEE :: KOLKATA

REGIONAL ENERGY ACCOUNTING FOR THE MONTH OF JULY- 2020 (High Demand Season of ER)

Page 12: 3121-3162erpc.gov.in/wp-content/uploads/2020/08/REA-July2020.pdf · 3djh 1r 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. ,qvwdoohg &dsdflw\ 0: 1rupdwlyh $8;

Page No. 10/14

MTPS STAGE-II (2X195)

ENTITLE MENT, INCENTIVE( IF ANY) & DRAWL SCHEDULE OF BENEFICIARIES

WT AVG SHARE CUMULATIVE CUMULATIVE QUANTUM OF

ALLOCATION ENTITLE MENT DRAWAL ENTITLE MENT DRAWAL SCHUDULEBENEFICIARIES OF OF THE SCHEDULE OF THE SCHEDULE BELOW 85% OF

CURRENT MONTH BENEFICIARIES BENEFICIARIES ENTITLEMENT

( % ) (MWH) (MWH) (MWH) (MWH) (MWH)

ER:

BIHAR # 74.972 167930.364 148062.313 167930.364 148062.313 0.000JHARKHAND 3.433 7689.603 6835.920 7689.603 6835.920 0.000DVC 2.600 5823.760 1863.963 5823.760 1863.963 3086.233ODISHA 8.527 19099.693 2520.197 19099.693 2520.197 13714.542WEST BENGAL 9.635 21581.511 12675.711 21581.511 12675.711 5668.573SIKKIM 0.554 1240.909 1307.718 1240.909 1307.718 0.000SUB-TOTAL 99.721 223365.840 173265.822 223365.840 173265.822

SR:

TELANGANA (NSM-II) 0.279 624.934 580.112 624.934 580.112 0.000SUB-TOTAL 0.279 624.934 580.112 624.934 580.112

VSCED(UP) 3849.250 3849.250VSCED(DOWN) 1287.660 1287.660VAE (UP) 2200.460 2200.460VAE (DOWN) 1882.480 1882.480GRAND TOTAL 100.000 223990.774 176725.504 223990.774 176725.504

# Please refer to Annexure

Member Secretary(I/C)

REGIONAL ENERGY ACCOUNTING FOR THE MONTH OF JULY- 2020 (High Demand Season of ER)

EASTERN REGIONAL POWER COMMITTEE :: KOLKATA

Page 13: 3121-3162erpc.gov.in/wp-content/uploads/2020/08/REA-July2020.pdf · 3djh 1r 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. ,qvwdoohg &dsdflw\ 0: 1rupdwlyh $8;

Page No. 11/14

Nabinagar STPP (1X660)

ENTITLE MENT, INCENTIVE( IF ANY) & DRAWL SCHEDULE OF BENEFICIARIES

WT AVG SHARE CUMULATIVE CUMULATIVE QUANTUM OF

ALLOCATION ENTITLE MENT DRAWAL ENTITLE MENT DRAWAL SCHUDULEBENEFICIARIES OF OF THE SCHEDULE OF THE SCHEDULE BELOW 85% OF

CURRENT MONTH BENEFICIARIES BENEFICIARIES ENTITLEMENT

( % ) (MWH) (MWH) (MWH) (MWH) (MWH)

ER:

BIHAR # 84.766 384539.370 355947.145 384539.370 355947.145 0.000JHARKHAND 3.276 14861.513 13297.762 14861.513 13297.762 0.000SIKKIM 0.546 2476.919 2468.615 2476.919 2468.615 0.000SUB-TOTAL 88.588 401877.802 371713.522 401877.802 371713.522

NR:

Uttar Pradesh 11.412 51770.324 40773.177 51770.324 40773.177 3231.598SUB-TOTAL 11.412 51770.324 40773.177 51770.324 40773.177

VSCED(UP) 25578.340 25578.340VSCED(DOWN) 6758.310 6758.310VAE (UP) 2047.200 2047.200VAE (DOWN) 1681.040 1681.040GRAND TOTAL 100.000 453648.126 431672.889 453648.126 431672.889

# Please refer to Annexure

Member Secretary(I/C)

EASTERN REGIONAL POWER COMMITTEE :: KOLKATA

REGIONAL ENERGY ACCOUNTING FOR THE MONTH OF JULY- 2020 (High Demand Season of ER)

Page 14: 3121-3162erpc.gov.in/wp-content/uploads/2020/08/REA-July2020.pdf · 3djh 1r 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. ,qvwdoohg &dsdflw\ 0: 1rupdwlyh $8;

Page No. 12/14

Darlipalli STPS-I (1X800)

WT AVG SHARE CUMULATIVE CUMULATIVE QUANTUM OF

ALLOCATION ENTITLE MENT DRAWAL ENTITLE MENT DRAWAL SCHUDULEBENEFICIARIES OF OF THE SCHEDULE OF THE SCHEDULE BELOW 85% OF

CURRENT MONTH BENEFICIARIES BENEFICIARIES ENTITLEMENT

( % ) (MWH) (MWH) (MWH) (MWH) (MWH)

ER:

BIHAR # 11.860 14101.451 13510.947 14101.451 13510.947 0.000JHARKHAND 9.220 10962.511 10866.216 10962.511 10866.216 0.000ODISHA 58.820 69936.539 69749.039 69936.539 69749.039 0.000WEST BENGAL 18.350 21818.012 21202.020 21818.012 21202.020 0.000SIKKIM 1.750 2080.737 2061.049 2080.737 2061.049 0.000SUB-TOTAL 100.000 118899.250 117389.271 118899.250 117389.271 0.000

VSCED(UP) 1597.000 1597.000VSCED(DOWN) 0.000 0.000VAE (UP) 0.000 0.000VAE (DOWN) 87.000 87.000GRAND TOTAL 100.000 118899.250 118899.271 118899.250 118899.271

# Please refer to Annexure

Member Secretary(I/C)

EASTERN REGIONAL POWER COMMITTEE :: KOLKATA

REGIONAL ENERGY ACCOUNTING FOR THE MONTH OF JULY- 2020 (High Demand Season of ER)

Page 15: 3121-3162erpc.gov.in/wp-content/uploads/2020/08/REA-July2020.pdf · 3djh 1r 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. ,qvwdoohg &dsdflw\ 0: 1rupdwlyh $8;

Page No. 13/14

A. STATION : RANGIT HPS (3 X 20 MW)

1 Installed Capacity ( MW ) : 60

2 Auxliary Energy Consumption (AUX) in ( % ) : 1.2

3 Normative Plant Availability Factor - NAPAF ( % ) : 90

4 Annual Design Energy in MU : 338.61

5 Free Energy for Home State - FEHS ( % ) : 12

6 Annual Saleable Energy in MU 294.4010784[ { DE x ( 100 - AUX ) x ( 100 - FEHS ) / 10000 } ]

7 Scheduled Energy ( ex-bus ) of the month (MWH) : 31663.800

8 Free Energy (ex-bus) of the month (MWH) : 3799.656

9 Saleable Energy ( ex-bus) of the month (MWH): 27864.144

10 Cumulative Schedule Energy up to preceding month (MWH) : 86451.21

11 Cumulative Schedule Energy including current month (MWH) : 118115.010

12 Plant Availability Factor (PAFM) achieved during the month ( % ) : 88.13

BILLING STATEMENT :

SHARE DRAWAL SCHUDULEALLOCATION OF THE

BENEFICIARIES FOR THE BENEFICIARIESCURRENT MONTH

( % ) (MWH)

BIHAR # 35.000 11082.330JHARKHAND 13.330 4220.785DVC 10.000 3166.380ODISHA 0.000 0.000WEST BENGAL 28.340 8973.521SIKKIM 13.330 4220.785TOTAL 100.000 31663.801

# Please refer to Annexure

Member Secretary(I/C)

EASTERN REGIONAL POWER COMMITTEE :: KOLKATA

REGIONAL ENERGY ACCOUNTING FOR THE MONTH OF JULY- 2020 (High Demand Season of ER)

Page 16: 3121-3162erpc.gov.in/wp-content/uploads/2020/08/REA-July2020.pdf · 3djh 1r 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. ,qvwdoohg &dsdflw\ 0: 1rupdwlyh $8;

ANNEXURE

FOR THE MONTH OF JULY,2020

SHARE SHARE

ALLOCATION ALLOCATION DRAWAL DRAWAL NAME OF OF OF SCHUDULE SCHUDULE

POWER STATION CURRENT MONTH CURRENT MONTH

( % ) ( % ) (MWH) (MWH)NBPDCL ( 46 % ) SBPDCL ( 54 % ) NBPDCL ( 46 % ) SBPDCL ( 54 % )

NTPC :FSTPS I & II 14.443018 16.954848 111623.205320 131035.936680FSTPS III 9.898222 11.619652 26029.954317 30556.902893KhSTPS I 19.254697 22.603341 85899.082308 100838.053144KhSTPS II 2.290738 2.689127 15928.604987 18698.797158TSTPS I 18.972874 22.272505 121115.727310 142179.332060BARH STPS II 41.738702 48.997607 261931.271142 307484.535688BRBCL 4.600000 5.400000 11515.831360 13518.584640MTPS-II 34.487120 40.484880 68108.663980 79953.649020NPGC 38.992360 45.773640 163735.686484 192211.458046RANGIT 14.000000 21.000000 4432.932000 6649.398000TEESTA-V 8.504000 12.756000 30806.292800 46209.439200

Member Secretary(I/C)

EASTERN REGIONAL POWER COMMITTEE :: KOLKATA

# BREAK-UP OF REGIONAL ENERGY ACCOUNTING OF BIHAR AMONG NBPDCL AND SBPDCL

Page 17: 3121-3162erpc.gov.in/wp-content/uploads/2020/08/REA-July2020.pdf · 3djh 1r 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. 3($. 2))b3($. ,qvwdoohg &dsdflw\ 0: 1rupdwlyh $8;

Page No. 14/14

B. STATION : TEESTA STAGE - V HPS (3 X 170 MW)

1 Installed Capacity ( MW ) : 510

2 Auxliary Energy Consumption (AUX) in ( % ) : 1.2

3 Normative Plant Availability Factor - NAPAF ( % ) : 87

4 Annual Design Energy in MU : 2572.67

5 Free Energy for Home State - FEHS ( % ) : 12

6 Annual Saleable Energy in MU : 2236.782205[ { DE x ( 100 - AUX ) x ( 100 - FEHS ) / 10000 } ]

7 Scheduled Energy ( ex-bus ) of the month (MWH) : 362256.50

8 Free Energy ( ex-bus) of the month : 43470.780

9 Saleable Energy ( ex-bus ) of the month : 318785.720

10 Cumulative Schedule Energy up to preceding month (MWH) : 834199.540

11 Cumulative Schedule Energy including current month (MWH) : 1196456.040

12 Plant Availability Factor achieved during the month - PAFM ( % ) : 99.845

BILLING STATEMENT :

SHARE DRAWAL SCHUDULEALLOCATION OF THE

BENEFICIARIES FOR THE BENEFICIARIESCURRENT MONTH

( % ) (MWH)BIHAR # 21.260 77015.732JHARKHAND 12.340 44702.452DVC 8.640 31298.962ODISHA 20.590 74588.613WEST BENGAL 23.980 86869.109SIKKIM 13.190 47781.632TOTAL 100.000 362256.50

# Please refer to Annexure

Member Secretary(I/C)

EASTERN REGIONAL POWER COMMITTEE :: KOLKATA

REGIONAL ENERGY ACCOUNTING FOR THE MONTH OF JULY- 2020 (High Demand Season of ER)