31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder...

24
31 ACEC/NCDOT Spliced Girder Workshop Spliced Concrete Girder Projects Continuous Spans Bow River Bridge, AB Main St. Viaduct, Pueblo, CO Rosebank-Patiki Interchange, NZ Palm Valley Bridge, FL Moore Haven Bridge, FL Route 33 Bridges, West Point, VA

Transcript of 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder...

Page 1: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank

31

ACEC/NCDOT Spliced Girder Workshop

Spliced Concrete Girder Projects

Continuous Spans• Bow River Bridge, AB• Main St. Viaduct, Pueblo, CO• Rosebank-Patiki Interchange, NZ• Palm Valley Bridge, FL• Moore Haven Bridge, FL• Route 33 Bridges, West Point, VA

Page 2: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank

32

ACEC/NCDOT Spliced Girder Workshop

Continuous Span Projects

Bow River Bridge, AB• Built in 2002• 4 spans: 2 at 174 ft, 2 at 213 ft• One segment per span• 211 ft beams weighed 268,000 lb.• Beams 9.2 ft deep with 6.9 in. web• 11.65 ft beam spacing• Very high live load requirements• Concrete saved 10% over steel girders

Page 3: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank

33

ACEC/NCDOT Spliced Girder Workshop

Bow River Bridge, AB

Longest known singlepiece girders shippedby truck at 211 ft long

Page 4: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank

34

ACEC/NCDOT Spliced Girder Workshop

Continuous Span Projects

Main Street Viaduct, Pueblo, CO• Built in 1995• 734 ft spliced girder structure• 5 spans with 174 ft max. span• 7 segments with 154 ft max.• 72 in. deep girder haunched to 96 in. over

2 piers• End block section used over 1 pier

Page 5: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank

35

ACEC/NCDOT Spliced Girder Workshop

Continuous Span Projects

Main Street Viaduct, Pueblo, CO• Erected on falsework & strongbacks• Spliced to achieve greater spans with

restricted pier placement• Very tight schedule and budget• Aesthetics, durability and low

maintenance costs were considered• 8 Girders spaced at 10'-6"• Overall deck width = 80'-0"

Page 6: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank

36

ACEC/NCDOT Spliced Girder Workshop

Main Street Viaduct, Pueblo, CO

Page 7: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank

37

ACEC/NCDOT Spliced Girder Workshop

Main Street Viaduct, Pueblo, COConstant depth Weband thickened BottomFlange

Page 8: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank

38

ACEC/NCDOT Spliced Girder Workshop

Main Street Viaduct, Pueblo, CO

Strongbacks at splicesinstead of towers

Page 9: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank

39

ACEC/NCDOT Spliced Girder Workshop

Main Street Viaduct, Pueblo, CO

Page 10: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank

40

ACEC/NCDOT Spliced Girder Workshop

Rosebank-Patiki Interchange, NZ• Built in 1997• 2 - 435 ft spliced girder structures• Curved ramps with 492 ft radius• 4 spans with 138 ft max. span• 6 segments with 2 pier segments• 71 in. deep girders• Integral cap to provide continuity

between sub- and superstructure

Continuous Span Projects

Page 11: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank

41

ACEC/NCDOT Spliced Girder Workshop

Rosebank-Patiki Interchange, NZ

Spliced Unit

PierSegments

Splice at Pier

Page 12: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank

42

ACEC/NCDOT Spliced Girder Workshop

Rosebank-Patiki Interchange, NZ

Integral Cap Strongback

Page 13: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank

43

ACEC/NCDOT Spliced Girder Workshop

Continuous Span Projects

Palm Valley Bridge, FL• Built in 2002• 3 spans (210' – 290' – 210' = 710')• 5 segments in each girder line• Designed as spliced girder by

consultant• Barge delivery of segments• Erected on falsework• Full-length post-tensioned

Page 14: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank

44

ACEC/NCDOT Spliced Girder Workshop

Palm Valley Bridge, FLHaunched pier segment:• Special forms & bed

for 15' depth• 8" web for 3" diam. PT

ducts

Strut for pretensionedstrands in top flange

Page 15: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank

45

ACEC/NCDOT Spliced Girder Workshop

Palm Valley Bridge, FL

• Haunched pier segment- Variable web depth to 15' total depth at pier- Bottom flange depth varies slightly

Page 16: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank

46

ACEC/NCDOT Spliced Girder Workshop

• Pier segments: 15' deep, 141' long, 125 tons• End segments: 81" deep, 139' long, 100 tons• Drop-in segment: 96" deep, 148' long, 103 tons• 1'-0" field closure pour between all segments

Palm Valley Bridge, FL

Page 17: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank

47

ACEC/NCDOT Spliced Girder Workshop

Palm Valley Bridge, FL

To maintain unobstructed channel• Temporary towers in back spans• Strong-backs at splices between segments

Page 18: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank

48

ACEC/NCDOT Spliced Girder Workshop

Continuous Span Projects

Moore Haven Bridge, FL• Built in 2000• 3 spans with 320 ft max. (RECORD)• 5 segments with 15 ft deep haunched

pier segments• Barge delivery of segments• Erected on falsework• Spliced girder selected by contractor

Page 19: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank

49

ACEC/NCDOT Spliced Girder Workshop

Moore Haven Bridge, FL

3 span unit320'

Page 20: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank

50

ACEC/NCDOT Spliced Girder Workshop

Continuous Span Projects

Route 33 Bridges, West Point, VA• 2 bridges: Mattaponi and Pamunkey Rivers• Currently under construction• Each bridge has two 4-span units with

200'-240'-240'-200' spans• 8 ft deep girders haunched to 10'-6" deep

at piers• Barge delivery of segments• Erected on falsework supported by footings

Page 21: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank

51

ACEC/NCDOT Spliced Girder Workshop

Route 33 Bridges at West Point, VA

Seven segments to formthe 4 spansGirders and decks arelightweight concrete

Page 22: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank

52

ACEC/NCDOT Spliced Girder Workshop

Route 33 Bridges at West Point, VALightweight concrete bulb tee girders

• f'c = 8,000 psi with max. density of 125 pcfLightweight concrete deck

• f'c = 5,000 psi with max. density of 120 pcf

Lightweight concrete was used to reducefoundation loads

• Estimated 10% reduction in piles formain piers

• Also reduced foundation sizeVTRC performing material tests and observingconstruction

Page 23: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank

53

ACEC/NCDOT Spliced Girder Workshop

NCHRP Report 517 completed October 2003• Download from

http://gulliver.trb.org/publications/nchrp/nchrp_rpt_517.pdf

Selected results of research• List of Spliced Girder Bridges• Design Examples• Proposed revisions to LRFD

Specs

NCHRP Project 12-57Extending Span Ranges of

Precast Prestressed Concrete Girders

Page 24: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank

54

ACEC/NCDOT Spliced Girder Workshop

Initial Findings

Most design options for extending spanranges involve incremental changes tocurrent design methods and materials

• Design options need to be identified• Additional design guidance not required

Spliced girders provide significantlyincreased span ranges for precastprestressed concrete girders

• Information is lacking• Focus of most of the activity in the study

•Continue