2Q2015 Results Presentation...2Q2015 Results Presentation August 31 2015 C O N F I D E N C I A L 1....

37
2Q2015 Results Presentation August 31 2015

Transcript of 2Q2015 Results Presentation...2Q2015 Results Presentation August 31 2015 C O N F I D E N C I A L 1....

Page 1: 2Q2015 Results Presentation...2Q2015 Results Presentation August 31 2015 C O N F I D E N C I A L 1. Highlights 2. Private Public Initiatives – PPPs of Public Initiative, ANI “Fourth

2Q2015 Results Presentation

August 31 2015

Page 2: 2Q2015 Results Presentation...2Q2015 Results Presentation August 31 2015 C O N F I D E N C I A L 1. Highlights 2. Private Public Initiatives – PPPs of Public Initiative, ANI “Fourth

C O N F I D E N C I A L

1. Highlights 2. Private Public Initiatives – PPPs of Public Initiative, ANI

“Fourth Generation Concessions” 3. Private Public Initiatives – PPPs of Private Initiative

Under Development 4. Extraordinary Assembly 5. Results as of June 2015

2

Page 3: 2Q2015 Results Presentation...2Q2015 Results Presentation August 31 2015 C O N F I D E N C I A L 1. Highlights 2. Private Public Initiatives – PPPs of Public Initiative, ANI “Fourth

C O N F I D E N C I A L

Highlights

3

Page 4: 2Q2015 Results Presentation...2Q2015 Results Presentation August 31 2015 C O N F I D E N C I A L 1. Highlights 2. Private Public Initiatives – PPPs of Public Initiative, ANI “Fourth

C O N F I D E N C I A L

Highlights – Colombian Road Concessions

4

When comparing the first semester in 2015 with 1S2014, we evidence traffic and toll collection increases above economic growth; • Traffic increased 7,08%, totaling 5.921.288 vehicles (vs.

5.529.939 in 2014). • Daily Average Traffic was higher, by about 2.148 vehicles

per day, rising to 32.676 per day (vs. 30.527 in 2014). • Collections increased by 9,14% to COP $76.334 million (vs.

COP$69.943 Million in 2014).

• The concession paid dividends to its shareholders, including Odinsa, on April 14th and 16th.

• On May 25th was signed the amendment 14 for the rehabilitation of the section la Española – Calarca (8.66 km) was signed on may 25th.

• The approval of the environmental license by the ANLA for the construction of the Variante La Paz, was obtained by under the resolution No. 0785 of July 2, 2015.

AUTOPISTAS DEL CAFÉ S. A.

34.798

28.572 29.113 32.025

28.236 30.421 30.223 31.185

28.721 30.970 31.150

36.718 37.792

29.707 29.548 32.579 31.750

34.678

-

5.000

10.000

15.000

20.000

25.000

30.000

35.000

40.000

ene-

14

feb

-14

mar

-14

abr-

14

may

-14

jun

-14

jul-

14

ago

-14

sep

-14

oct

-14

no

v-1

4

dic

-14

ene-

15

feb

-15

mar

-15

abr-

15

may

-15

jun

-15

Autopistas del Café Tráfico Promedio Diario

REAL PPTO

13.178

10.289 11.504 11.948 11.539 11.485 12.234 12.394

11.440 12.403 12.083

13.757 14.382

11.302 11.787 12.806 12.866 13.191

-

5.000

10.000

15.000

20.000

ene-

14

feb

-14

mar

-14

abr-

14

may

-14

jun

-14

jul-

14

ago

-14

sep

-14

oct

-14

no

v-1

4

dic

-14

ene-

15

feb

-15

mar

-15

abr-

15

may

-15

jun

-15

Autopistas del Café Recaudo Mensual

(Cifras en millones de pesos)

INGRESO GARANTIZADO REAL PPTO

Page 5: 2Q2015 Results Presentation...2Q2015 Results Presentation August 31 2015 C O N F I D E N C I A L 1. Highlights 2. Private Public Initiatives – PPPs of Public Initiative, ANI “Fourth

C O N F I D E N C I A L

Highlights – Colombian Road Concessions

AUTOPISTAS DE LOS LLANOS S. A.

5

Comparing the fist quarter in 2015 with the same period in 2014, we evidence the following; • Traffic decreased 5,11%, totaling 4.845.037 vehicles (vs.

5.105.827 in 2014). • Daily Average Traffic was lower, by about 1,456 vehicles per

day, rising to 26.729 per day (vs. 28.185 in 2014). • Collections decreased 9,87% to COP $19.576 million (vs. COP

$21.720 Million in 2014).

• ALL is a first generation concession of 184 km on single carriageway which expired in 2014. However, on January 23 2015, an amendment was signed extending the term of the contract for an additional nine months in order to carry out the reversion process of the infrastructure.

• The reversal of the road to Cumaral is scheduled for September 8, ending operations in ALL.

• On June 8th the concessionaire handed in the roads from Villavicencio to Puerto Lopez and Granada to the National infrastructure agency ANI, terminating the contract on operations and maintenance.

32.021

26.854 27.155 28.398 27.089 27.592 27.396 28.626 27.823 29.002 28.593 31.717

33.375

27.352 27.725 27.889 27.499

16.532

-

10.000

20.000

30.000

40.000

ene-

14

feb

-14

mar

-14

abr-

14

may

-14

jun

-14

jul-

14

ago

-14

sep

-14

oct

-14

no

v-1

4

dic

-14

ene-

15

feb

-15

mar

-15

abr-

15

may

-15

jun

-15

Autopistas de los Llanos Tráfico Promedio Diario

TRÁFICO GARANTIZADO REAL PPTO

3.947 3.184

3.679 3.648 3.746 3.517 3.739 3.828 3.662 3.745 3.553 3.908 4.075 3.278 3.599 3.484 3.491

1.648

-

2.000

4.000

6.000

8.000

10.000

ene-

14

feb

-14

mar

-14

abr-

14

may

-14

jun

-14

jul-

14

ago

-14

sep

-14

oct

-14

no

v-1

4

dic

-14

ene-

15

feb

-15

mar

-15

abr-

15

may

-15

jun

-15

Autopistas de los Llanos Recaudo Mensual

INGRESO GARANTIZADO REAL

Page 6: 2Q2015 Results Presentation...2Q2015 Results Presentation August 31 2015 C O N F I D E N C I A L 1. Highlights 2. Private Public Initiatives – PPPs of Public Initiative, ANI “Fourth

C O N F I D E N C I A L

Highlights – Colombian Road Concessions

When comparing 1S2015 with 1S2014, the concession presents the following behavior; • Traffic has decreased by 3,08%, reaching 1.723.676 vehicles

(vs. 1.778.380 in 2014). • Average Daily Traffic decreased by 302 vehicles per day,

reaching 9.513 vehicles per day (vs. 9.815 in 2014). • Likewise, collection decreased 4,87%, reaching COP $17.152

Million (vs. $18.029 Million in 2014).

SANTA MARTA PARAGUACHON S. A.

6

• These decreases are directly influenced by the slowdown in trade with Venezuela.

• The works in Muchachitos ended in 2014, however, on April 28th 2015 the receipt document of the works of marine protection with the ANI was subscribed.

12.523

9.258 8.939 10.075

8.694 9.403 9.623 9.194 8.677 8.770 9.177 10.736 10.858

8.878 9.001 9.456 9.179 9.707

- 2.000 4.000 6.000 8.000

10.000 12.000 14.000

ene-

14

feb

-14

mar

-14

abr-

14

may

-14

jun

-14

jul-

14

ago

-14

sep

-14

oct

-14

no

v-1

4

dic

-14

ene-

15

feb

-15

mar

-15

abr-

15

may

-15

jun

-15

Santa Marta Paraguachón Tráfico Promedio Diario

REAL

3.805

2.755 2.933 2.971 2.662 2.903

3.212 3.114 2.901 2.884 2.859 3.167 3.255

2.580 2.830 2.773 2.940 2.773

-

1.000

2.000

3.000

4.000

ene-

14

feb

-14

mar

-14

abr-

14

may

-14

jun

-14

jul-

14

ago

-14

sep

-14

oct

-14

no

v-1

4

dic

-14

ene-

15

feb

-15

mar

-15

abr-

15

may

-15

jun

-15

Santa Marta Paraguachón Recaudo Mensual

(Cifras en millones de pesos)

REAL

Page 7: 2Q2015 Results Presentation...2Q2015 Results Presentation August 31 2015 C O N F I D E N C I A L 1. Highlights 2. Private Public Initiatives – PPPs of Public Initiative, ANI “Fourth

C O N F I D E N C I A L

Vías de las Américas – 33,34%

By the end of June the closing of the transaction through which Grupo Odinsa transferred its shareholding in Via de las Americas to Construcciones el Condor was completed. Grupo Odinsa transferred its participation to Construcciones el Condor as an exchange for the subrogation of credits worth $ 37.290 and a cash figure.

Highlights – Colombian Road Concessions

Page 8: 2Q2015 Results Presentation...2Q2015 Results Presentation August 31 2015 C O N F I D E N C I A L 1. Highlights 2. Private Public Initiatives – PPPs of Public Initiative, ANI “Fourth

C O N F I D E N C I A L

Highlights – Colombian Road Concessions

Comparing 1S2015 with 1S2014 we notice the following; • Total traffic increased 7,51%, reaching 6,640,983 vehicles vs.

6.177.077 in 2014. • Daily Average Traffic was higher by about 2,059 vehicles per day,

reaching 36,894 vehicles per day (vs. 34,317 in 1S2014). • In 2015, collections increased by 11,83% to reaching $35,836

Million (vs. $ 32.046 Million in 2014). • The contract has a variable period depending on the expected

income. As of April 2015 the 71.22% of it was achieved. At the current rate, the expected income would be reached in October 2020, within the contractual deadlines.

• The electronic toll collection system ("Quick Pass"), started its operation since April 2014, and the number of users continues growing.

• Also, the works in Barbosa Pradera remain as scheduled. Load test where performed in the bridge Fundadores which allowed its delivery by may. We remain on the construction for bridges 1, 2, 3 and 4.

• The concession paid dividends to its shareholders, including Odinsa, on May 6TH

HATOVIAL S.A.S

8

38.378 35.557 34.973 35.488 36.568

39.109

-

10.000

20.000

30.000

40.000

50.000

Ene Feb Mar Abr May Jun Jul Ago Sep Oct Nov Dic

Hatovial Tráfico Promedio Diario

2015 2014 2013

$ -

$ 2.000.000.000

$ 4.000.000.000

$ 6.000.000.000

$ 8.000.000.000

Ene Feb Mar Abr May Jun Jul Ago Sep Oct Nov Dic

Hatovial Recaudo Mensual

(Cifras en millones de pesos)

2015 2014 2013

Page 9: 2Q2015 Results Presentation...2Q2015 Results Presentation August 31 2015 C O N F I D E N C I A L 1. Highlights 2. Private Public Initiatives – PPPs of Public Initiative, ANI “Fourth

C O N F I D E N C I A L

Highlights – Colombian Road Concessions

On June 3rd, the ANI awarded the first concession project led by Grupo Odinsa under the government´s 4G program. The concessionaire has the following composition: Grupo Odinsa (25%), Mincivil (21,15%), Construcciones El Cóndor (21,15%), Termotécnica Coindustrial (13,5%), Icein (9,20%) and Portugal's largest construction company Mota Engil Engenharia e Construcao (10%). The concession contract between the ANI and the concessionaire La Pintada SAS was signed on September 11 and the initiation document on November 11 2014. This date marked the beginning of major contractual milestones of the concession, such as the start of operations and the maintenance of existing roads, financial closure and the final designs for the construction. Consequently, the financial closure should occur in October and the start of construction in November 2015. Up to now the concessionaire has received $19,384 Millions in equity contributions, where $4,846 Millions came from Odinsa. The financial closure is $1,2 billions.

CONEXIÓN PACIFICO 2

9

Page 10: 2Q2015 Results Presentation...2Q2015 Results Presentation August 31 2015 C O N F I D E N C I A L 1. Highlights 2. Private Public Initiatives – PPPs of Public Initiative, ANI “Fourth

C O N F I D E N C I A L

Highlights – Colombian Road Concessions

April 6, as we announced in the last presentation of results, the ANI conducted the Hearing Deadline for the reception of expressions of interest of the Project Malla Vial del Meta. Nevertheless, because there were no expressions of interest from third parties, the ANI proceeded to issue a resolution to award this IP to the originating group, as required by the APP Act. In accordance with this approval, on May 5th 2015 was signed the concession contract with the ANI in Villavicencio, with the presence of President and Vice President of Colombia. The new concessionaire, called Concesión Vial de Los Llanos S.A.S., is proceeding with all the milestones established in the

contract for the beginning of the concession, especially in obtaining financial closure and the final designs of the project. On June 9, the concession began operations, receiving the roads from Villavicencio to Puerto Lopez and Granada. Currently, the concessionaire has received contributions from Equity amounting $108,000 million, of which $ 55.1 million were incurred by Odinsa.

10

The PPP was awarded to Odinsa by the National Government on April 6th 2015. This includes: 1. By-pass road around Villavicencio and Access roads. 2. Corridors Villavicencio – Granada y Villavicencio -Puerto

López – Puerto Gaitán – Puente Arimena. 3. 354 km. In roads under administration, operation and

maintenance.

It consists on the construction of 46 Km of double lane roads (Villavicencio - Acacias y Villavicencio – Apiay) and improvement and construction of 71 Km of single lane roads. Capex will be Cop$1,2 Trillion, in addition to Cop$225.000 Million contributed in kind by the Meta Department.

Malla Vial del Meta

Page 11: 2Q2015 Results Presentation...2Q2015 Results Presentation August 31 2015 C O N F I D E N C I A L 1. Highlights 2. Private Public Initiatives – PPPs of Public Initiative, ANI “Fourth

C O N F I D E N C I A L

Highlights – International Road Concessions

AUTOPISTAS DEL NORDESTE (REP. DOMINICANA)

• The main source of income for this concession remains the Guaranteed Minimum Income being (GMI) paid by the government.

• In the first semester of 2015, total traffic increased by 18,21%, reaching 1.739.761 vehicles (vs. 1.471.805 in 2014). TPD increased by 1.479 vehicles per day, reaching 9.606 vehicles (vs. 8.126 in 2014)

• As a consequence of higher traffic, the collections in Dominican pesos and Dollars increased by 14,97% • The Stand – by credit letters were issued on May 25 as a guarantee for the Guaranteed Minimum Income in the concessions that take

place in the Dominican Republic. In the case ADN the SBLC is US$10.2. • In the first quarter, the unpaid bills by the Dominican Government amount US$7.719.430,69.

11

8.484 7.767 8.189 8.832

7.926 7.560

8.727 8.396 7.525

7.718

8.313 9.600 10.062

9.142 9.337

10.320 9.626

9.147

0

2.000

4.000

6.000

8.000

10.000

12.000

ene-

14

feb

-14

mar

-14

abr-

14

may

-14

jun

-14

jul-

14

ago

-14

sep

-14

oct

-14

no

v-1

4

dic

-14

ene-

15

feb

-15

mar

-15

abr-

15

may

-15

jun

-15

Autopistas del Nordeste Tráfico Promedio Diario

TPD

871.821 772.427

886.751 947.560

867.878

795.795

898.724 893.101 781.251

826.728

846.158

1.009.947 1.044.985

871.953 992.920

1.053.188 1.007.507 928.706

-

200.000

400.000

600.000

800.000

1.000.000

1.200.000

ene-

14

feb

-14

mar

-14

abr-

14

may

-14

jun

-14

jul-

14

ago

-14

sep

-14

oct

-14

no

v-1

4

dic

-14

ene-

15

feb

-15

mar

-15

abr-

15

may

-15

jun

-15

Autopistas del Nordeste Recaudo Mensual

(Cifras en dólares)

REAL

Page 12: 2Q2015 Results Presentation...2Q2015 Results Presentation August 31 2015 C O N F I D E N C I A L 1. Highlights 2. Private Public Initiatives – PPPs of Public Initiative, ANI “Fourth

C O N F I D E N C I A L

Highlights – International Road Concessions

BOULEVARD TURISTICO DEL ATLANTICO (REP. DOMINICANA)

• This project counts mainly on the Guaranteed Minimum Income (GMI) paid by the government.

• In the first semester of 2015, total traffic increased by 10,13%, reaching 705.301 vehicles (vs. 640.404 in 2014). TPD increased by 355 vehicles per day, reaching 3.894 (vs. 3.539 in 2014), this is due to the economic growth in the Dominican Republic since 2013. it reached a total of 352,879 vs 328.016 in 1Q2014 for an increase of 7.58%.

• The Stand – by credit letters were issued on May 25 as a guarantee for the Guaranteed Minimum Income in the concessions that take

place in the Dominican Republic. In the case of BTN the SBLC is US$12.0 million. • In the first quarter, the unpaid bills by the Dominican Government amount US$9.406.106,66

12

3.699 3.584 3.645 3.904

3.298 3.101

3.528 3.736

2.927 2.806

3.503 3.747

3.994 3.749

4.003 3.943 3.912 3.762

490

449

485 598 453 402 481 533

371 360 433 449 615 514 504

655 498 463

-

500

1.000

1.500

2.000

2.500

3.000

3.500

4.000

4.500

ene-

14

feb

-14

mar

-14

abr-

14

may

-14

jun

-14

jul-

14

ago

-14

sep

-14

oct

-14

no

v-1

4

dic

-14

ene-

15

feb

-15

mar

-15

abr-

15

may

-15

jun

-15

Boulevard Turistico del Atlántico Tráfico Promedio Diario

TPD TPD PAGANDO

188.858

165.750

199.731

232.365

185.724

159.373

199.529 220.538

151.952 150.048 166.694

180.812

239.499

190.106 201.071

252.353

201.563 184.940

-

50.000

100.000

150.000

200.000

250.000

300.000

ene-

14

feb

-14

mar

-14

abr-

14

may

-14

jun

-14

jul-

14

ago

-14

sep

-14

oct

-14

no

v-1

4

dic

-14

ene-

15

feb

-15

mar

-15

abr-

15

may

-15

jun

-15

Boulevard Turistico del Atlántico Recaudo Mensual

(Cifras en dólares)

REAL

Page 13: 2Q2015 Results Presentation...2Q2015 Results Presentation August 31 2015 C O N F I D E N C I A L 1. Highlights 2. Private Public Initiatives – PPPs of Public Initiative, ANI “Fourth

C O N F I D E N C I A L

On July 22, 2015 we begun the works of dismantling and cleaning the sector of the second road between the intersection Sero Tijshi and Mahuma Intersection, continuing the excavation works started during the Pre-Work. This concession goes until 2030; once the construction phase (26 months) is completed the concession will continue with a contract of maintenance where the government will make quarterly payments. On July 24, 2015 the financial closure of the project was formalized with the signing of the credit agreement between: Caribbean Infrastructure Company NV-CIC, Grupo Odinsa SA subsidiary, AIB Bank NV as the administrative agent, AIB Bank NV as guarantees agent, and Deutsche Bank, as initial lender. The loan was for an amount of US $ 58.7 million, with a term of 18 years and a very competitive rate. Currently, Odinsa has made equity contributions and subordinated debt by US$3.6 million.

13

GREEN CORRIDOR

Hechos Destacados – Concesiones Viales Internacionales

Page 14: 2Q2015 Results Presentation...2Q2015 Results Presentation August 31 2015 C O N F I D E N C I A L 1. Highlights 2. Private Public Initiatives – PPPs of Public Initiative, ANI “Fourth

C O N F I D E N C I A L

As for the El Dorado International Airport the total number of passengers reached over $14,3 million (vs. 12,7 Millions in 2014) an increase of 12,23% compared to 1S2014; This figure increased 11.9% in domestic passengers and 8.66% in international passengers who pay airport tax.

In the 1S2015 regulated and non-regulated revenues increased by 38.32% and 31.3% respectively.

A new credit contract was signed between OPAIN and a group of banks including Bancolombia S.A., BNP Paribas Securities Corp., HSBC Securities (USA), Sumitomo Mitsui Banking Corporation y Bancolombia Panamá S.A on May 8, 2015. The purpose of this facility is to: replace the debt with multilaterals, contributions from shareholders and to finance the completion of some works. The total facility is US$500 million, effective until 2025. The repayment will start in 2016 until the end of 2025. This credit allowed the payment of subordinated debt/ dividends to shareholders by $ 40 million. Odinsa used this amount to repay debt.

14

OPAIN S.A. (35%)

Highlights – Airport Concessions

25.006.925 27.533.895

12.736.377 14.331.621

-

5.000.000

10.000.000

15.000.000

20.000.000

25.000.000

30.000.000

2013 2014 1S2014 1S2015

Total number of passengers

Pasajeros pasan Aeropuerto

7.395.787 8.033.298

3.681.471 4.119.646

2.834.518 3.116.638

1.475.040 1.602.726

-

2.000.000

4.000.000

6.000.000

8.000.000

10.000.000

12.000.000

2013 2014 1S2014 1S2015

Number of passengers paying Airport Tax

Nacionales Internacionales

Page 15: 2Q2015 Results Presentation...2Q2015 Results Presentation August 31 2015 C O N F I D E N C I A L 1. Highlights 2. Private Public Initiatives – PPPs of Public Initiative, ANI “Fourth

C O N F I D E N C I A L

Aeropuerto de Quito

• Odinsa reached an agreement to acquire 50% of the company that owns 93% of the economic rights of the Concessionaire's Mariscal Sucre International Airport.

• Among the steps to be headed to formalize the sale, we are in the process of the authorizations of government agencies in Ecuador (Superintendencia de Control de Poder de Mercado) and current project lenders.

• This important acquisition will be financed with a credit facility of US $ 182 million, granted by Itaú BBA.

• Mariscal Sucre Airport, was inaugurated on February 20, 2013, constructed in an area of 1,500 hectares. It is a terminal that has a track of 4,100 m long and 50,000 m2, which mobilized 5.6 million passengers and about 180,000 tons of cargo in 2014.

• With this this major acquisition, Odinsa will enter Ecuador´s market as part of its strategic expansion in Latin America and the Caribbean, in a country with strong growth prospects.

Highlights – Airport Concessions

Page 16: 2Q2015 Results Presentation...2Q2015 Results Presentation August 31 2015 C O N F I D E N C I A L 1. Highlights 2. Private Public Initiatives – PPPs of Public Initiative, ANI “Fourth

C O N F I D E N C I A L

Highlights – Sea Port Concessions

Sociedad Portuaria de Santa Marta – SPSM (11,94%)

16

As we can see in the graphic coal volumes increased by 105.86% compared to 2014, reflecting new cargo volumes negotiations with new customers. However, other items have decreased volumes, except for Teus container (I & E). In the framework of the summit of sustainable maritime port terminals, chaired by the OEA and the CIP, which was held in Mar del Plata, Argentina, the Port of Santa Marta was presented once again as a success case in the continent for protecting the environment and working with communities. The Partial Plan of the Port of Santa Marta ranks third in the 100 Latin American Infrastructure 2015 report prepared by the firm CG LA Infrastructure, being highlighted as one of the most strategic projects for the region and for the country. The Partial Plan of the Port of Santa Marta, estimates a total investment of $ 550,000 million for an urban project, which includes the consolidation of the areas that currently have port vocation but are outside the port. It also includes urban renewal and improvement of the entire perimeter area of the harbor, which today is impaired, as a contribution to the competitiveness and tourism in the city. PPP Variante Férrea: on May 14, 2015 the studies required for feasibility are filed before the ANI.

1.837.155

1.713.359

85.315

163.675

301.427

43.141

159.553

1.589.800

1.776.223 92.465

101.674

243.308

60.206

160.524

Carbón

Granel Solido

Banano

Carga General

Granel Liquido I&E

Vehículos

Teus (I&E)

Volúmenes de Carga (Millones de Tons, Teus y Unidades)

2014 2013

736.087

948.924

48.968

165.823

129.241

29.722

40.423

1.566.440

941.154 44.233

119.903

118.266

19.899

35.582

Carbón

Granel Solido

Banano

Carga General

Granel Liquido I&E

Vehículos

Teus (I&E)

Volúmenes de Carga (Millones de Tons, Teus y Unidades)

1S2015 1S2014

Page 17: 2Q2015 Results Presentation...2Q2015 Results Presentation August 31 2015 C O N F I D E N C I A L 1. Highlights 2. Private Public Initiatives – PPPs of Public Initiative, ANI “Fourth

C O N F I D E N C I A L

Highlights – Mass Transportation Systems

CONFASE

Currently, this contract is in its second year of maintenance. In February 2015, the failure of the first arbitration tribunal was obtained. In it, Confase was recognized with $16,227,176,016 the initial claim was of $50,685,405,511. The IDU brought an action for annulment against this decision. On April 28, the attorney for Confase filed opposition to this action of annulment and we are waiting for the decision of the Council of State, which has two months to issue a ruling. Therefore, failure is expected by the end of 2015. Likewise, Confase maintains another arbitration claim against the IDU and TRANSMILENIO, for claims of $ 19,000 Million. This claim was filed in June 2014. After presenting the updated designs approved by the IDU and unit prices for unforeseen activities with the work schedule for the next 14 months, on may 5, 2015 the Bicentennial Park project. Addendum No. 7 implies that CONFASE S.A. must run the approximate value of $ 14,000 million in 14 months to complete the works for the Bicentennial Park, according to the approved project designs. For this, CONFASE S.A. signed with the IDU and amendment to the amendments number 1 on May 11, 2015, in which i) terms where extended as requested by CONFASE, so that the works must be submitted by July 10, 2016, ii) the scope of the Addendum No. 7 was clarified and iii) the technical specifications that must be accomplished by the contractor were included.

17

Page 18: 2Q2015 Results Presentation...2Q2015 Results Presentation August 31 2015 C O N F I D E N C I A L 1. Highlights 2. Private Public Initiatives – PPPs of Public Initiative, ANI “Fourth

C O N F I D E N C I A L

GENA (59,66%) - PANAMA

Highlights – Electricity Generation

18

• GENA is a thermoelectric plant generating 150 MW located in Panama.

• In the first half of 2015 Termocolón generated 9,901 MWh.

• While very few offices were held in the first half of the year, the lowest prices in the spot market has allowed us to maintain profit margins without affecting the operation of the plant, while contracts are normally dispatched and GENA serves its contractual obligation delivering energy through purchases in the spot market.

• The gross margin was US$18,05 this result is 2.4% higher than

reported in the same period of 2014. This result is explained by the low prices on the spot market, which have helped compensate offset by purchases on the spot, the low generation of the year.

• The low generation has also had a positive impact in depreciation, since there was no generation and therefore no expenses, with a positive impact in operational income, which reached US$13,48Millones, higher by 41.9% on those reported in the same period of 2014. Net income reached US $8.04 million, 50.7% above the results in June 2014.

Page 19: 2Q2015 Results Presentation...2Q2015 Results Presentation August 31 2015 C O N F I D E N C I A L 1. Highlights 2. Private Public Initiatives – PPPs of Public Initiative, ANI “Fourth

C O N F I D E N C I A L

GENPAC (51,25%) - CHILE

Highlights – Electricity Generation

19

• GENPAC is a plat based on supporting power and system security to attend contingencies in the north of the SIC, in particular node Cardone. It is a plant of 96 MW of thermoelectric generation.

• In June 2015, the plant certified 85.98 MW as base power, which means an increase of 14.1% vs. the recognized value by the system for the period 2014-2015. This allows a higher level of revenues for the concept of this charge.

• In the first half of 2015, Termopacífico has produced 1778 MWh. The accumulated operation for the first six months of 2015 is only 41 hours, with 18 starts.

• GENPAC´s operation generated in 1S2015 under IFRS a Net Income of US$1,042,616 higher by 48.6% to the value obtained in 2014.

Generación Bruta

Consumo Propio

Horas de Operación

Arranques Consumo Combustible

Eficiencia (kwh/lt)

Mes: Junio 2015

853.06 MWh

178.02 MWh

19.59 7 229.49 m3

3.72

Acumulado 1778 MWh 856.54 MWh

41.30 18 459.54 m3

Page 20: 2Q2015 Results Presentation...2Q2015 Results Presentation August 31 2015 C O N F I D E N C I A L 1. Highlights 2. Private Public Initiatives – PPPs of Public Initiative, ANI “Fourth

C O N F I D E N C I A L

GENPAC - CHILE

• The photovoltaic generation project of 14 MW, is under construction. The project requires an investment of nearly US $25 million and will boost sales revenue from energy sales with insignificant marginal costs. On March 2, the contract was signed in Urumqi - China, with TBEA -. On July 9 were received from the contractor, the Bank guarantees for the proper Use of Advance payment for US $2,017,568 and proper operation of the equipment amounting to US $ 4,035,137.

• We are in the process of closing a loan of US $ 19 million with the Bank of Chile, to a term of nine years, to finance 100% of this project.

• To date, the following works have been performed as part of this project:

• Construction of additional protections for the curtain wall located in the lot.

• Implementation of the initial aspects of the turnkey contract with TBEA.

Highlights – Electricity Generation

Page 21: 2Q2015 Results Presentation...2Q2015 Results Presentation August 31 2015 C O N F I D E N C I A L 1. Highlights 2. Private Public Initiatives – PPPs of Public Initiative, ANI “Fourth

C O N F I D E N C I A L

Odinsa Proyectos e Inversiones (100%)

21

In 2014, all the activities of the Concession Agreement No. 250 of 2011 between the Invias and Odinsa Proyecto e Inversiones S.A., for the operation, exploitation, organization and total management of the 39 toll stations located along the national road network run by the Instituto Nacional de Vías. As of May 4, 2015, three new toll stations where added: Cano, Daza and El Placer, located in the corridor Rumichaca - Pasto - Cano. Therefore up to June 2015 we have 42 toll stations.

Contrato Invias No. 250 de 2011

Corte a Junio 30 de 2015

Estaciones de Peaje 42

Recaudo Acumulado 1.556.139.816.316

Avance en Ejecución 84,51%

Contrato Invias No. 250 de 2011

Enero a Junio de 2015

Estaciones de Peaje 42

Recaudo Acumulado 194.831.316.972

Contract information from Jan –Jun 2015

Estimated life of the contract up to June 2015

Highlights – Toll Collection Operation

Page 22: 2Q2015 Results Presentation...2Q2015 Results Presentation August 31 2015 C O N F I D E N C I A L 1. Highlights 2. Private Public Initiatives – PPPs of Public Initiative, ANI “Fourth

C O N F I D E N C I A L

Private Public Initiatives – PPPs of Public Origin, ANI “Fourth Generation Concessions”

22

Page 23: 2Q2015 Results Presentation...2Q2015 Results Presentation August 31 2015 C O N F I D E N C I A L 1. Highlights 2. Private Public Initiatives – PPPs of Public Initiative, ANI “Fourth

C O N F I D E N C I A L

PPPs of Public Initiative – “Fourth Generation Concessions”

23

Since our last presentation in June, seventeen concessions were awarded by the ANI under the " 4G Concessions" program. Three offers where received for the concession Autopistas al Mar 2. This project closes the second wave of 4G Concessions. Odinsa didn’t submit an offer in 8 tenders, having decided to concentrate more on PPPs of private. Odinsa was awarded the Concesion Pacifico 2 after being the only bidder. In this case Odinsa could earn 100% of future funds available to the project. Odinsa will consider the projects of the Third Wave once they are presented to the market by the ANI. The ANI announced that there was an update in data from projects Cucuta - Pamplona, Barbosa - Bucaramanga and Bucaramanga - Pamplona. In October the tender for these sections would begin.

Grupo Corredor Valor Km. Estado Adj. 1 * Honda - P. Salgar - Girardot $ 995 200 Adj. 03/06/2014

2 Mulalo - Loboguerrero $ 1.200 32 Adj. 05/12/2014

3 Perimetral Oriente $ 1.200 153 Adj. 23/07/2014

4 * Cartagena - Barranquilla $ 995 153 Adj. 02/07/2014

5 Autopista Conexión Norte $ 980 145 Adj. 17/10/2014

6 * Río Magdalena 2 $ 1.370 144 Adj. 22/10/2014

7 * Conexión Pacífico 1 $ 1.790 49 Adj. 03/06/2014

8 * Conexión Pacífico 2 $ 910 98 Adj. 22/05/2014 9 Conexión Pacífico 3 $ 1.290 142 Adj. 15/07/2014

10 P. del Hierro - Cruz del Viso $ 448 175 Adj. 19/05/2015

11 Sisga - El Secreto $ 491 137 Adj. 25/05/2015

12 Villavicencio - Yopal $ 1.800 260 Adj. 01/06/2015

13 * Santa Ana - Mocoa $ 1.500 476 Adj. 09/06/2015

14 * S. de Quilichao - Popayán $ 1.100 76 Adj. 16/06/2015

15 * Autopista al Mar 1 $ 1.560 110 Adj. 30/06/2015

16 Barranca - Bucaramanga $ 1.700 261 Adj. 06/07/2015

17 * Autopista al Mar 2 $ 1.460 135 Ofertas 18/08/2015

18 * Pasto - Rumichaca $ 1.516 89 Adj. 24/07/2015

Total ====> $ 22.305 2.835

Page 24: 2Q2015 Results Presentation...2Q2015 Results Presentation August 31 2015 C O N F I D E N C I A L 1. Highlights 2. Private Public Initiatives – PPPs of Public Initiative, ANI “Fourth

C O N F I D E N C I A L

Private Public Initiatives – PPPs of Private Origin Under Development

24

Page 25: 2Q2015 Results Presentation...2Q2015 Results Presentation August 31 2015 C O N F I D E N C I A L 1. Highlights 2. Private Public Initiatives – PPPs of Public Initiative, ANI “Fourth

C O N F I D E N C I A L

Proposals for Public Private Partnerships of Private Initiative under Development

In June we reported a new PPP called APP Vias del NUS S.A.S – VINUS. In this opportunity we inform that one of the PPPs for the Improvements in the air side of El Dorado Airport is no longer being considered by the ANI. Below we include a status update of each of these: 1. For the Design, Construction, Operation and Maintenance of the road corridor La Paila – El Alambrado - La Herradura - Barcelona – La

Española - Calarcá - Cajamarca, for the so-called "Ruta del Privilegio". Feasibility. The ANI is still reviewing the feasibility studies. Subsequently, It will be presented to the MHCP and DNP to begin with the adjudication process. We believe this will go until the end of July.

2. Improvements Air Side El Dorado Airport: Private Initiative Project for the improvement of airside infrastructure at Bogota Eldorado Airport, in line with the existing master plan for the Airport. Pre Feasibility.

3. Private Initiative Project for the Design, Construction, Financing, Operation, rehabilitation, Maintenance and Reversal of roads under concession NUS SAS -VINUS-. Feasibility. ANI approved Pre Feasibility and asked for the feasibility studies in order to be approved.

25

Capex - Cop$Millions Approval Stage % Odinsa1 La Paila Cajamarca - "Ruta del Privilegio" 1.063.000$ In Feasibility (Pre-feasibility approved) 100,0%2 Improvement Air Side El Dorado Airport 811.264$ Pre-feasibility submitted 100,0%3 Vías del NUS S.A.S – VINUS 1.184.000$ In Feasibility (Pre-feasibility approved) 22,2%

Total ====> 3.058.264$

Page 26: 2Q2015 Results Presentation...2Q2015 Results Presentation August 31 2015 C O N F I D E N C I A L 1. Highlights 2. Private Public Initiatives – PPPs of Public Initiative, ANI “Fourth

C O N F I D E N C I A L

Proposals for Public Private Partnerships of Private Ruta del Privilegio

Concession Agreement under the Public Private Partnership scheme Private Initiative that requires no expenditure of public resources in accordance with the regulations in Law 1508 of 2012 and its implementing regulations. Processes Completed: • Approval from the Autoridad Nacional de Licencias Ambientales de los Diagnósticos Ambientales de Alternativas for new sections (April

2015) • Studies and Design Review by the evaluator of the project (April-May 2015) • Budget Review with the evaluator of the project (June-July 2015) • Final Filing of Project in feasibility (August 19, 2015) Pending processes: Presentation and approval from Ministry of Finance and Public Credit, Presentation and approval from the National Planning Department, Presentation and approval by the Cabinet, Approval from the CONPES (Publication in SECOP, award, contract signature) It is estimated that the project will begin in the first quarter of 2016

Calarcá

El Alambrado

La Herradura Barcelona

La Española

La Paila

Cajamarca

Hacia Cartago Hacia Pereira

Hacia Buga

Zona Franca

Peaje Corozal

(Existente)

Peaje La Española (Nuevo)

Peaje Cajamarca (Existente

)

1

2 3

4

5

6 8 9

7

Studies, design, construction, operation, maintenance, social, farm and environmental management from the corridor La Paila - Calarcá - Cajamarca, called «Ruta del Privilegio». Total length: 142.8 Km Estimated value of the project: 2.5 billion Initial Term of the agreement: 30 years.

Page 27: 2Q2015 Results Presentation...2Q2015 Results Presentation August 31 2015 C O N F I D E N C I A L 1. Highlights 2. Private Public Initiatives – PPPs of Public Initiative, ANI “Fourth

C O N F I D E N C I A L 27

Scope: Private Initiative for the studies, design, financing, construction, operation (collection) and maintenance of the airside infrastructure, and operation (collection) and routine maintenance of the existing infrastructure in the airside of El Dorado Airport in Bogota Type of initiative: Proposal for Public-Private Partnership of private initiative, without application of public resources. Remuneration: from the collection of fees applicable in the Track Law. Consideration to the state: 20% of gross collection Estimated time of the concession: 20 years. This concession would begin once finished the priority projects proposed for the eventual concession. Scope: Maintenance includes the existing infrastructure, such as new infrastructure proposed in the PPP A, and the new infrastructure in the PPP B. Capex: $ 800,000 million approx.

Proposals for Public Private Partnerships of Private El Dorado - B

Page 28: 2Q2015 Results Presentation...2Q2015 Results Presentation August 31 2015 C O N F I D E N C I A L 1. Highlights 2. Private Public Initiatives – PPPs of Public Initiative, ANI “Fourth

C O N F I D E N C I A L 28

Proposals for Public Private Partnerships of Private El Dorado

1 UF 1 Pista 13L - Ampliación 11 UF 4 Calle Romeo 22 UF 5 Conector Papa 38 UF 4 Pista Norte

2 UF 3 Pista 13R 12 UF 4 Calle Delta 23 UF 5 Conector Charlie (ente alfa y pista) 39 UF 5 CR Alfa

3 UF 1 Plataforma de despegue 13L W 13 A UF 4 Calle Foxtrot - Complemento 26 UF 5 Conector Bravo-1 40 UF 4 CR Foxtrot

4 UF 4 Plataforma de despegue 13L E 13 UF 3 Calle Foxtrot - Ampliación 27 UF 5 Conector Juliet 41 UF 5 Conex Uniform

5 UF 5 Plataforma de despegue 13R E 14 UF 5 Calle Mike 2 A 28 UF 5 Conector Lima 42 UF 5 Conex Bravo

6 UF 5 Plataforma de despegue 13R W 15 UF 5 Calle mike 2 B 29 UF 5 Conector Charlie (ente alfa y foxtrot)

7 UF 2 Calle alfa - Ampliacion 16 UF 5 Calle Victor 32 UF 5 Salida rápida Juliet

8 UF 5 Calle mike 18 UF 4 Ampliación margenes calle foxtrot 33 UF 5 Salida ráipda Charlie

9 UF 5 Calle Uniform 19 UF 5 Ampliación margenes calle alfa 34 UF 5 Salida rápida Delta

10 UF 4 Calle Sierra 20 UF 5 Conector Tango 35 UF 5 Salida rápida Quebec

Intervención y Mantenimiento del

sistema de Drenaje del Lado AireUF 345

Page 29: 2Q2015 Results Presentation...2Q2015 Results Presentation August 31 2015 C O N F I D E N C I A L 1. Highlights 2. Private Public Initiatives – PPPs of Public Initiative, ANI “Fourth

C O N F I D E N C I A L

Propuestas de APP de Iniciativa Privada

Vías del NUS S.A.S – VINUS

The Proposal aims to give continuity to the dual carriageway which is currently being built and operated by the Hatovial SAS concession to connect Medellin, in a faster and more direct manner, to the northeast of Antioquia and especially to make this the route that connects Antioquia to the Ports on the Atlantic coast and the populations on the northern part of the country, using the Ruta del Sol concession through Puerto Berrio, making this corridor one of the most important highways of the country. In addition to these investments, VIAS DEL NUS S.A.S has planned activities for operation and maintenance of the road and track maintenance of the roads currently managed by the concession Hatovial from 2021. The estimated Capex of this project is $ 1.2 billion. At the request of the ANI, we are studying the possibility of incorporating the project maintenance of vía Porcesito - Vegachí, where a toll booth will be installed.

Page 30: 2Q2015 Results Presentation...2Q2015 Results Presentation August 31 2015 C O N F I D E N C I A L 1. Highlights 2. Private Public Initiatives – PPPs of Public Initiative, ANI “Fourth

C O N F I D E N C I A L

Extraordinary Assembly

30

Page 31: 2Q2015 Results Presentation...2Q2015 Results Presentation August 31 2015 C O N F I D E N C I A L 1. Highlights 2. Private Public Initiatives – PPPs of Public Initiative, ANI “Fourth

C O N F I D E N C I A L

On August 14 we had the Extraordinary Assembly. It is worth noticing that shareholders elected new directors in the assembly as follows; (the new members are highlighted in red) Summary of the Curriculum Vitae of the new directors of Grupo Odinsa S.A.:

Independent Members Jorge Andres Botero

Sergio Restrepo

Non Independent Members José Alberto Vélez

Alejandro Piedrahita Luz Maria Correa

Ricardo Mejia Samuel Rueda

Asamblea Extraordinaria – Elección de Nueva Junta Directiva

Page 32: 2Q2015 Results Presentation...2Q2015 Results Presentation August 31 2015 C O N F I D E N C I A L 1. Highlights 2. Private Public Initiatives – PPPs of Public Initiative, ANI “Fourth

C O N F I D E N C I A L

1) Elimination of substitutions on the Board of Directors of the company: At present, Article 19 of the Bylaws of Grupo Odinsa S.A. determines that the composition of the Board shall consist of seven (7) principal members each with his personal deputy. The Code of Best Business Practices 2014 (called Country Code) presented by the Superintendencia Financiera and became effective since 1 January 2015. It establishes in "Chapter III. Board of Directors. Measure No. 15: Dimension of the Board "which:

“In order to revitalize the performance of the Board, it has to address a critical aspect of it, such as its size, since it is proven that Boards that are overly broad in its member significantly lose its effectiveness and excessively small Boards hinder the creation of committees. “

Likewise, Law 964 of 2005, Stock Market Law Article 44 states that issuers may provide in their Bylaws that there will be no substitutions in the Board. Therefore, to adopt Grupo Odinsa S.A. the best corporate practices worldwide established in the Country Code and endorsed by the Stock Market Law is proposed to delete personal substitutions of members of the Board of Directors

Asamblea Extraordinaria – Reforma a los Estatutos

Page 33: 2Q2015 Results Presentation...2Q2015 Results Presentation August 31 2015 C O N F I D E N C I A L 1. Highlights 2. Private Public Initiatives – PPPs of Public Initiative, ANI “Fourth

C O N F I D E N C I A L

2. Qualities of Board members:

To accept what is established in the Measures No. 16 and 18 of the Country Code, mentioned before; the procedure, the identification and definition of the functional and personal profiles of the Board members shall be specified in the internal rules of the society (Bylaws and Code of Good Governance).

3. Place of meetings of the Board:

Currently it is not defined in the Bylaws of the society where the Board can hold sessions. It is proposed to leave explicit in the bylaws that the same Board has the opportunity to meet in the place the Board determine.

Asamblea Extraordinaria – Reforma a los Estatutos

Page 34: 2Q2015 Results Presentation...2Q2015 Results Presentation August 31 2015 C O N F I D E N C I A L 1. Highlights 2. Private Public Initiatives – PPPs of Public Initiative, ANI “Fourth

C O N F I D E N C I A L

Results for 1S2015

34

Page 35: 2Q2015 Results Presentation...2Q2015 Results Presentation August 31 2015 C O N F I D E N C I A L 1. Highlights 2. Private Public Initiatives – PPPs of Public Initiative, ANI “Fourth

C O N F I D E N C I A L 35

Results as of March 2015

Grupo Odinsa reports a strong operational performance over 2Q2015, as evidenced by the strength of its various business lines, allowing it to report revenue in line with 2014 results (under IFRS):

• Concessions are still the main source of income that contributes to the generation of Odinsa´s EBITDA. In 2014, the absolute amount was of $239,452 Million. The contribution Margin up to June 2015 was $112.713 Million which is in line with previous results.

• Energy Business is the second most important business line. In 2015 first semester, this line reports a contribution margin of $49,299 Million, higher than the trend of $62,691 Million reported on December 2014.

• The Operation Business, which corresponds mainly to the toll collection operation of INVIAS, still shows a high contribution perceptual margin, despite the decrease in the absolute amount, as a result of the reversal of various toll stations to the INVIAS.

• Up to June 2015, Construction Business contribution margin reached $18,199 Million, which represents a solid performance of this business line due to construction advances in “Autopistas del Cafe”, Odinsa principal construction consortium.

4Q2014 4Q2014 2Q2015

Col GAAP IFRS IFRS

Ingresos por Concesiones Viales 252.678$ 255.074$ 116.981$

Costos por Concesiones Viales 15.622$ 15.622$ 4.268$

Margen de Contribución 237.056$ 239.452$ 112.713$

Margen de Contribución % 93,82% 93,88% 96,35%

Ingresos por Negocio Energía 379.267$ 379.267$ 124.138$

Costos por Negocio Energía 316.576$ 316.576$ 74.839$

Margen de Contribución 62.691$ 62.691$ 49.299$

Margen de Contribución % 16,53% 16,53% 39,71%

Ingresos por Operación 83.867$ 83.867$ 39.331$

Costos por Operación 37.791$ 35.623$ 19.816$

Margen de Contribución 46.076$ 48.244$ 19.515$

Margen de Contribución % 54,94% 57,52% 49,62%

Ingresos por Constuccion 170.293$ 86.080$ 55.142$

Costos por Constuccion 118.084$ 47.394$ 36.943$

Margen de Contribución 52.209$ 38.687$ 18.199$

Margen de Contribución % 30,66% 44,94% 33,00%

Ingresos por Otros Servicios 33.800$ 33.998$ 14.114$

Costos por Otros Servicios 2.070$ 2.061$ 1.149$

Margen de Contribución 31.730$ 31.936$ 12.965$

Margen de Contribución % 93,88% 93,94% 91,86%

Page 36: 2Q2015 Results Presentation...2Q2015 Results Presentation August 31 2015 C O N F I D E N C I A L 1. Highlights 2. Private Public Initiatives – PPPs of Public Initiative, ANI “Fourth

C O N F I D E N C I A L

In 2Q2015, Odinsa generated an EBITDA of $143,781 Million explained by:

• A Contribution Margin of $212,690 Million. • Operating expenses for 2Q2015 are proportionately higher

than those reported in 2014 as a result of higher maintenance costs in Autopistas del Café, which have treatment under IFRS in Opex and not in Capex as it had previously.

In 2Q2015, EBIT shows consistence with EBITDA previously presented. This is a result of lower levels of depreciation and amortization reported. Depreciation decreased as a result of lower levels of generation and amortization decreased considerably in the absence of deferred assets in the IFRS conversion.

In 2Q2015, after EBIT parties turned to a Net Income of $59.920 Million. Those are explained below;

• Net Financial Expenses: Reported $25.691 Million. In this expense, stands out the reduction on financial expenses of Odinsa Holding and “Generadora del Pacifico”.

• Corporate Tax: Increases proportionally to the $36,000 Millions received from taxable dividends in “Autopistas del Cafe”.

• Minority Interest Result: This item increases as a result of the improved performance of the company during the period.

36

Results as of March 2015

4Q2014 4Q2014 1Q2015

Col GAAP IFRS IFRS

Ingresos Totales 919.906$ 835.715$ 173.446$

Costos Totales 490.143$ 414.705$ 66.347$

Margen de Contribución 429.763$ 421.010$ 107.099$

Margen de Contribución % 46,72% 50,38% 61,75%

Gastos Operativos 106.693$ 107.521$ 27.644$

EBITDA 323.070$ 313.489$ 79.454$

Margen EBITDA % 35,12% 37,51% 45,81%

Depreciacion y Amortización 126.346$ 98.933$ 24.599$

EBIT - Utilidad Operacional 196.724$ 214.556$ 54.856$

Margen EBIT % 21,39% 25,67% 31,63%

Resultado Inv. No Controladas 1.474$ 320$

Gasto Financiero Neto 66.476$ 65.742$ 13.537$

Otros Ingresos / Egresos 30.181$ 45.817$ 1.043$

Utilidad antes de Impuestos 161.903$ 194.951$ 42.362$

Impuestos de Sociedades 24.961$ 34.169$ 18.166$

Beneficio Grupo Odinsa 136.942$ 160.782$ 24.196$

Resultado Interes Minoritario 34.742$ 52.081$ 13.114$

Beneficio Neto Grupo Odinsa 102.200$ 108.701$ 11.082$

Margen Neto % 11,11% 13,01% 6,39%

Page 37: 2Q2015 Results Presentation...2Q2015 Results Presentation August 31 2015 C O N F I D E N C I A L 1. Highlights 2. Private Public Initiatives – PPPs of Public Initiative, ANI “Fourth

C O N F I D E N C I A L

Although the information contained in this presentation is provided under the highest professional standards in the generation of these forecasts, GRUPO ODINSA does not guarantee future performance. The Company specifically disclaims all warranties express or implied with respect to the use of this information or any results with respect thereto and it does not assume any liability with respect to any information included here. This material has been prepared solely for informational purposes and should not be construed as a solicitation or an offer to buy or sell any securities and should not be relied upon as advice to potential investors. This material should not be regarded by recipients as a substitute for the exercise of their own judgment. This presentation has statements about the Company future plans and prospects that constitute forward-looking statements. However, these projected financial statements should not be considered to be a presentation to forecast future results. Actual results may differ materially from those indicated by these forward-looking statements as a result of various factors and undue reliance should not be placed on these forward-looking statements. Indeed, there will usually be differences between projected and actual results because events and circumstances frequently do not occur as expected, and those differences may be material. Accordingly, these projections represent the management’s best estimates only as of today and should not be relied upon as representing the Company’s estimates as of any subsequent date. While GRUPO ODINSA may decide to update these forward-looking statements in the future, it disclaims any obligation to do so, even if the estimates change.

37