2nd Qatar BIM User Day Case Study #1

38
Global Data Consulting Data Centre in the Desert 2 nd October 2012 Mike Edwards, Arup Associates Doha

description

Speaker: Mike Edwards -Design technology at a desert data center About the Qatar BIM User Day: Qatar University, HOCHTIEF ViCon and Teesside University proudly take the initiative to facilitate modern and innovative methods in the Gulf construction industry. The focus is Building Information Modeling (BIM), and our aim is to establish a knowledge platform with government, research and industry experts. The User Day aims to help people to share knowledge, discuss new technologies, and identify new potentials for BIM. More information: www.bimuserday.com Follow BUD on Twitter @bimuserday

Transcript of 2nd Qatar BIM User Day Case Study #1

Page 1: 2nd Qatar BIM User Day Case Study #1

Global Data Consulting

Data Centre in the Desert2nd October 2012

Mike Edwards, Arup Associates Doha

Page 2: 2nd Qatar BIM User Day Case Study #1

Global Data Consulting Mike Edwards, Arup Associates Doha

Page 3: 2nd Qatar BIM User Day Case Study #1

Global Data Consulting

Leadership in Data Centre Design

Mike Edwards, Arup Associates Doha

Page 4: 2nd Qatar BIM User Day Case Study #1

Global Data Consulting

Page 5: 2nd Qatar BIM User Day Case Study #1

Global Data Consulting

Page 6: 2nd Qatar BIM User Day Case Study #1

Global Data Consulting

Page 7: 2nd Qatar BIM User Day Case Study #1

Global Data Consulting

Qatar is different...

• Approvals, approvals, approvals...!

• Format, specific requirements and 2-d

deliverable

• Contractor adoption of BIM

• Common consistent platform for data sharing

• Little BIM – BIM not client requirement

Design Team only used Revit so not BIG BIM...

Mike Edwards, Arup Associates Doha

Page 8: 2nd Qatar BIM User Day Case Study #1

Global Data Consulting

An integrated process

Mike Edwards, Arup Associates Doha

Page 9: 2nd Qatar BIM User Day Case Study #1

Global Data Consulting

An integrated process

Project data set

Mike Edwards, Arup Associates Doha

Page 10: 2nd Qatar BIM User Day Case Study #1

Global Data Consulting

An intelligent model

Mike Edwards, Arup Associates Doha

Page 11: 2nd Qatar BIM User Day Case Study #1

Global Data Consulting

Embedded informationAttribute Value

Space type Office

Condition type Heat & Cool

Construction type 4B

Target lighting level 400 Lux

HVAC heating load 50 W/m2

HVAC cooling load 200 W/m2

Small power load 13 W/m2

Occupancy 20

CCTV strategy D

Mike Edwards, Arup Associates Doha

Page 12: 2nd Qatar BIM User Day Case Study #1

Global Data Consulting

BIM Considerations

Roles and responsibilities

Level of development

Standards based

Coordination strategy

Handover methods

Mike Edwards, Arup Associates Doha

Page 13: 2nd Qatar BIM User Day Case Study #1

Global Data Consulting

Roles & responsibilities

Client

Project Director

Project Manager

Technical lead

Engineers &

technicians

BIM Coordinator

BIM Manager

Information management

and coordination

Information creation and

extraction

Client BIM

interface

Supply chain

BIM interface

Contractor

Mike Edwards, Arup Associates Doha

Page 14: 2nd Qatar BIM User Day Case Study #1

Global Data Consulting

Level of development

Inception Concept / Design development Construction Post-contract

Sketches Hand

Sketchup

CAD

Building models Revit models

2D CAD details and schematics

Civil works models InRoads models

Building models Revit models

Export to Tekla/CAD-MEP

etc. for fabrication

2D CAD details and

schematics

ARTRA model

Civil works models InRoads models

FM models Revit models

updated to as-built

ARTRA model

Intranet FM system Maintenance

planning

Document

management

Geometric

representationEmbedded

information

Authorised

use

At each stage an

appropriate level

is defined for:

Mike Edwards, Arup Associates Doha

Page 15: 2nd Qatar BIM User Day Case Study #1

Global Data Consulting

Standards based

No single standard process

British standards | Information management

American standards | Level of detail

ISO standards | Object properties

UK Guidance | Modelling standards

Our global experience

Bespoke but reliable solution

Mike Edwards, Arup Associates Doha

Page 16: 2nd Qatar BIM User Day Case Study #1

Global Data Consulting

Coordination strategy

Architectural

model

Services

model

Structural

model

Civils model

Sta

ndard

s a

nd p

roto

cols

Project

Information

Repository

QA processes

Coordination

processes

Client

Interface

Issued

information

Construction

Operation

Mike Edwards, Arup Associates Doha

Page 17: 2nd Qatar BIM User Day Case Study #1

Global Data Consulting

Handover methods

Mike Edwards, Arup Associates Doha

Page 18: 2nd Qatar BIM User Day Case Study #1

Global Data Consulting

Desert Data Centre Design;

• ASMEP disciplines on Revit platform

• AutoCAD cuts and development

for details and approvals

• Through the design process...

Mike Edwards, Arup Associates Doha

Page 19: 2nd Qatar BIM User Day Case Study #1

Global Data Consulting Mike Edwards, Arup Associates Doha

Page 20: 2nd Qatar BIM User Day Case Study #1

Global Data Consulting

Tender Issue:

Mike Edwards, Arup Associates Doha

Page 21: 2nd Qatar BIM User Day Case Study #1

Global Data Consulting Mike Edwards, Arup Associates Doha

Page 22: 2nd Qatar BIM User Day Case Study #1

Global Data Consulting

• Early stage design

• BIM process with many software tools

• Example of optimisation

• Parallel to BIM model

Optimisation of Data and Building

Typical pressure

distribution under a

raised floor

Optimised air flow

Mike Edwards, Arup Associates Doha

Page 23: 2nd Qatar BIM User Day Case Study #1

Global Data Consulting

Optimisation of Data and Building

• Above floor airflow management

:

Typical problems with open frames

– Open network frames cause breakdown of the

Hot-Aisle/Cold Aisle concept.

– Hot exhaust air from server racks recirculates

around the network equipment causing

overheat.

New layout

– Hot exhaust air from server racks is captured

by ceiling plenum.

– Network equipment in open frames is cooled

successfully.

Hot Cold ColdHot ColdHot Hot

Cold ColdHot ColdHotCold ColdMike Edwards, Arup Associates Doha

Page 24: 2nd Qatar BIM User Day Case Study #1

Global Data Consulting

Initial Studies:

For space

planning and

building form.

Revit dynamically

reported the room

properties for

outline MEP calcs

and to minimise

the building

footprint.

Mike Edwards, Arup Associates Doha

Page 25: 2nd Qatar BIM User Day Case Study #1

Global Data Consulting

Concept Stage

Creation of new

families of content,

working with

CIBSE and other

industry bodies for

consistency

Mike Edwards, Arup Associates Doha

Page 26: 2nd Qatar BIM User Day Case Study #1

Global Data Consulting Mike Edwards, Arup Associates Doha

Page 27: 2nd Qatar BIM User Day Case Study #1

Global Data Consulting Mike Edwards, Arup Associates Doha

Page 28: 2nd Qatar BIM User Day Case Study #1

Global Data Consulting

Concept Design Stage

Upload content through the Family

Browser.

This contains “Controlled” and

“Uncontrolled” Families.

Personalised content to share with team

Mike Edwards, Arup Associates Doha

Page 29: 2nd Qatar BIM User Day Case Study #1

Global Data Consulting

Revit challenge;

To make objects

look like traditional

drawings for

approvals etc….!

Mike Edwards, Arup Associates Doha

Page 30: 2nd Qatar BIM User Day Case Study #1

Global Data Consulting Mike Edwards, Arup Associates Doha

Page 31: 2nd Qatar BIM User Day Case Study #1

Global Data Consulting

Design Development – added detail and embedded data

Mike Edwards, Arup Associates Doha

Page 32: 2nd Qatar BIM User Day Case Study #1

Global Data Consulting

Design & Documentation – Schedule driven analysis

Mike Edwards, Arup Associates Doha

Page 33: 2nd Qatar BIM User Day Case Study #1

Global Data Consulting

Design & Documentation – Graphical system checking

Mike Edwards, Arup Associates Doha

Page 34: 2nd Qatar BIM User Day Case Study #1

Global Data Consulting

Design & Documentation – System properties

Mike Edwards, Arup Associates Doha

Page 35: 2nd Qatar BIM User Day Case Study #1

Global Data Consulting

Design & Documentation – Drawing presentation

Mike Edwards, Arup Associates Doha

Page 36: 2nd Qatar BIM User Day Case Study #1

Global Data Consulting

Design & Documentation – Graphical display of room data

Mike Edwards, Arup Associates Doha

Page 37: 2nd Qatar BIM User Day Case Study #1

Global Data Consulting

Coordination – 3D maintenance strategies

Mike Edwards, Arup Associates Doha

Page 38: 2nd Qatar BIM User Day Case Study #1

Global Data Consulting

Data Centre in the Desert

Summary

•Revit used for ASMEP design development•Now on site with the contractor using 3-d model too•Benefits to the project with better coordination with

scheduling and design data flow•Approvals unable to use the model•2d deliverable produced and Revit model unused beyond

design•A better building!!!