European)Spalla,on)Source))Overview)and)Project)Status)
DARMA%Annual%Mee+ng%&%Study%Visit%
9%June%2015%
%
Ma;%Tiirakari%
Director%for%Project%Support%and%Administra+on%at%ESS%
www.europeanspalla+onsource.se%
GEO SCIENCE
LIGHTNING
TAILOR MADE
MATERIALS
MEDICINE
SOLAR ENERGY
BIO FUEL
TRANSPORT
COSMETICS
FOOD
MOBILE PHONES
PACE- MAKERS
IMPLANTS
NEW MATERIALS
Proper+es%of%neutrons%for%measurements%
Charge)neutral !Deeply penetrating !
Li motion in fuel cells !
Help build electric cars!
Sca:ering%!Sensitive to light elements!
Actives sites in proteins!
Better drugs!
)Magne,c)moment)(spin)!Directly probe magnetism!
High-Tc superconductivity !
Efficient high speed trains !
Neutron%facili+es%–%reactors%and%par+cle%
driven%
Berkeley%37Oinch%cyclotron%
350%mCi%RaOBe%source%
Chadwick%
1930% 1970% 1980% 1990% 2000% 2010% 2020%
105%
1010%
1015%
1020%
1)
ISIS%
Par+cle%driven%pulsed%
ZINGKP%
ZINGKP’%KENS%
WNR%
IPNS%ILL%
XK10)
CPK2)
Fission%reactors%
HFBR)HFIR)
NRU)MTR)
NRX)
CPK1)
1940% 1950% 1960%
Effec+ve%thermal%neutron%flux%n/cm
2
Os%
(Updated%from%Neutron(Sca,ering,%K.%Skold%and%D.%L.%Price,%eds.,%Academic%Press,%1986)%%
FRMKII)SINQ)
SNS%
JKPARC%
LANSCE%
OPAL)PIK)
2030%
CARR)
CSNS%
Dhruva)IBRKII%
NIST%
RSG)LVR) JRRK3)
Par+cle%driven%steady%
state%Pulsed%reactor%
HANARO)HIFAR)SAFARIK1%
SALAM)ETERRK2)
MARIA%
HOR% JEEP)II%
ORPHEE%
Reactor)Sources) Spalla,on)Sources)
Year%
ESS%
4%
8%
LongOpulse%performance%
5%time (ms)%
Brig
htne
ss (n
/cm
2 /s/s
r/Å)% 7%
5%
x1014%
ISIS TS1!128 kW%
ISIS TS2!32 kW!
SNS!1-2 MW %
JPARC!0.3-1 MW%
ILL 57 MW%
ESS 5 MW!2015 design!
0% 1% 2% 3%
3%
4%
1%
2%
6% λ = 1.5 Å!
ESS 5 MW!2013 design (TDR)!
Possibilities of pulse shaping !
Youtube)video:)h`ps://www.youtube.com/watch?v=xJU1FxZ8oxA%
Host Countries of Sweden and Denmark ! 47,5% Construction 15% Operations" In-kind Deliverables ~3%! Cash Investment ~97%!!Non Host Member Countries! 52,5% Construction" 85% Operations" In-kind Deliverables ~ 70% ! Cash Investment ~ 30%!!
Financing%includes%cash%and%deliverables%
Construc+on%investment%
Sweden%
Denmark%
Germany%
United%
Kingdom%
France%
Italy%
Spain%
Switzerland%
Norway%
Poland%
Czech%Republic%
Hungary%
Estonia%
To%be%
determined%
! 0.75)%))))(~3.0)%)*)%
*%Includes%PreOconstruc+on%Costs%
Sweden) 35.0)%)Denmark)*) 12.5)%)Germany)*) 11.0)%)United)Kingdom) 10.0)%)
France) 8.0)%)Italy) 6.0)%)Spain)*) 5.0)%)Switzerland) 3.5)%)Norway) 2.5)%)Poland) 2.0)%)Czech)Republic) 2.0)%)
Hungary) 1.5)%)Estonia) 0.25)%)
Total) 99.25)%)
Iceland) tbd((0.25)(Latvia) tbd((0.25)(Lithuania) tbd((0.45)(
Netherlands) tbd((2.0)(
Belgium) tbd((2.0)(Greece)) tbd((1.0)(
ESS%Organiza+on%
PROJECT SUPPORT & ADMINISTRATION DIRECTORATE (4000) M. Tiirakari
ADMIN DIRECTOR
DEPUTY DIRECTOR T. WelanderPERSONAL ASSISTANT M. HerbstSTEERING COMMITTEE & BOARD SECRETARY M. Powell
LEGAL DIVISION (4090)
O. Graber-SoudryHEAD OF DIVISION
K. BörjessonE. Jönsson (C)
F. LivendahlJ. LångbergI. Persson
C. San Inocencio
HUMAN RESOURCES DIVISION (4020)L. Petersson (L),
A. Säfström Lanner (A)HEAD OF DIVISION
I. Hansen
SUPPLY, PROCUREMENT &
LOGISTICS DIVISION (4060)
M. ShireyHEAD OF DIVISION
S. BabanzadehG. BarbieruM. De Silva
J. Lundin (C)M. MeningaL. OrtegaL. Zander
WAREHOUSE & LOGISTICS
GROUPVacant
GROUP LEADER
PROJECT SUPPORT DIVISION (4030/4080)
J. BrisforsHEAD OF DIVISION
M. PaladeDEPUTY HEAD OF
DIVISION & PROGRAMME CONTROLLER
Jörgen AnderssonRISK MANAGER
I. PerssonINSURANCE OFFICER & TEAM ASSISTANT
K. JonsdottirIT PROJECT MANAGER
INFORMATION TECHNOLOGY DIVISION (4040)
H. BjörkmanHEAD OF DIVISION
C. AndreassonA. Berglund Dacke
T. Dahil (C)K. MyramS. Lind (C)T. Lindqvist J. OlaussonJ-Å. PerssonA. Tenggren
GENERAL SERVICES DIVISION (4010)
T. Welander (I)HEAD OF DIVISION
M. DagnegårdT. Hadfield
M. TolfL. Wijkström
OPERATIONS & SUPPORT GROUP (4041)
J. Olander GROUP LEADER
Å. BejramJ. Bomelin
H. HagenrudM. Johansson
J. Kjellman
RECRUITMENT & RELOCATION GROUP (4021)
A. Säfström LannerGROUP LEADER
K. BacosJ. Kvarnhammar
C. OlssonL. Sima (L)N. Åsvatne
FINANCE GROUP (4081)
M. Palade (I)GROUP LEADER
M. Coquard (C)L. Friström (L)A. HalepovicE. Hellberg
L. Lindkvist (L)I. Viberg EusepI
A. UrbanejaG. Åstrand
SPECIALIZED TECHNICAL SERVICES
GROUP (3012)J. Weisend II
GROUP LEADER
M. ConlonW. Hees
G. JacobssonF. Jensen
G. LanfrancoA. Lundmark
E. Vaena
CRYOGENIC SECTION (3121)
P. ArnoldSECTION LEADER
A. FarsianJ. FydrychJ. JurnsX. Su
X. Wang
VACUUM SECTION (3122)
P. LaddSECTION LEADER
G. HullaM. Juni Ferreira
H. Spoelstra
CF SUPPORT SECTION (5121)
M. ÅbergSECTION LEADER
E. ChristensenT. Marthinsson
J. MattssonL. Persson
F. Österberg
CONVENTIONAL FACILITIES DIVISION
(5010)K. Hedin
HEAD OF DIVISIONO. Larsson (C)
SENIOR ADVISOR
K. Breimer (C)L. Landén
L. Lavesson (C)A. Thonäng
K. Wennerholm (L)
E. Szreder (C)TEAM ASSISTANT
DESIGN GROUP (5011)
J. Molander (C)GROUP LEADER
F. Bergstedt (C)E. Hadziefendic (C)
M. Hellström (C)B. Kildetoft (C)R. Sjöholm (L)
K. SvedinI. Wihlborg (C)
CONSTRUCTION GROUP (5012)
M. Eneroth GROUP LEADER
CONSTRUCTION C101-1 SECTION
(5122)E. Segerstedt
SECTION LEADER
L. HedenkloJ. Lundgren
U. HammarlundTEAM ASSISTANT
CONSTRUCTION C101-2 SECTION
(5123)M. Jakobsson
SECTION LEADER
D. EgermayerB. Hedén
H. MånssonK. Sjöstrand
ENERGY GROUP (5020)
T. ParkerGROUP LEADER
F. Indebetou (C)E. Lindström
SCIENTIFIC PROJECTS DIVISION
(2010)R. Connatser
HEAD OF DIVISION
P. Sångberg
NEUTRON INSTRUMENTSDIVISION (2020)
K. AndersenHEAD OF DIVISION
M. StroblDEPUTY HEAD OF
DIVISION
P. P. DeenH. Heimonen
P. HenryA. Jackson
R. Lechner (C)E. Oksanen (L)W. Schweika
M. SharpH. WacklinR. Woracek
SCIENTIFIC ACTIVITIES
DIVISION (2040)A. Hiess
HEAD OF DIVISION
B. LinnenbergTEAM ASSISTANT
H. Bordallo (C)M. EverettZ. FischerM. GuthrieS. Hall (C)
M. Meissner (C)A. Petersson
P. Schurtenberger (C) C. Theroine
DATA MANAGEMENT & SOFTWARE
CENTER DIVISION (2050)
M. HagenHEAD OF DIVISION
P. Aulin PROJECT COORDINATOR
T. LarsenADMINISTRATIVE
ASSISTANT
D. Adonis (L)ADMINISTRATIVE
ASSISTANT
DETECTOR GROUP (2031)
R. Hall-WiltonGROUP LEADER
M. AnastasopoulosR. BebbT. Brys
M. EtxegaraiJ. Freita RamosA. Gulyachkina
C. HöglundK. Kanaki
A. KhaplanovT. Kittelmann
S. KolyaD. PfeifferF. Piscitelli
L. RobinsonS. Schmidt
I. Stefanescu
MOTION CONTROL &
AUTOMATION GROUP (2033)
T. GahlGROUP LEADER
P. BarronT. Bögershausen
D. FitzgeraldM. Larsson
A. SandströmJ. Schmidt
NEUTRON OPTICS &
SHIELDING GROUP (2035)
P. BentleyGROUP LEADER
E. BrydevallN. Cherkashyna
C. Cooper-JensenD. Di Julio
D. RodriguezV. SantoroC. Zendler
INSTRUMENT TECHNOLOGIESDIVISION (2030)
O. KirsteinHEAD OF DIVISION
R. Hall-WiltonDEPUTY HEAD OF DIVISION
M. Dell Anno BoultonS. Ghatnekar Nilsson
Z. HelyesN. Tsapatsaris
CHOPPERS GROUP (2034)
I. SuttonGROUP LEADER
N. HolmbergE. NilssonM. OlssonD. Zielinski
MACHINE DIRECTORATE (3000)R. Garoby
TECHNICAL DIRECTOR
DEPUTY DIRECTOR J. Haines (I)PERSONAL ASSISTANT H. Fröderberg
BEAM INSTRUMENTATION
GROUP (3011)A. Jansson
GROUP LEADER
B. CheymolI. Dolenc Kittelmann (L)
M. DonnaL. EspositoV. Grishin
H. HassanzadeganM. Jarosz
H. KocevarD. PhanC. RooseT. Shea
L. TchelidzeC. Thomas
INTEGRATION GROUP
(3015)D. McGinnis
GROUP LEADER
N. GazisE. Tanke
BEAM PHYSICS GROUP (3013)
H. DanaredGROUP LEADER
C. DarveR. De PriscoS. M. EshraqiY. I. LevinsenR. Miyamoto
M. Munoz
RF GROUP (3014)
A. SunessonGROUP LEADER
S. CalicR. Montano
R. Zeng
POWER CONVERTERS SECTION (3142)
C. De Almeida Martins
SECTION LEADER
G. Göransson
RF SOURCES SECTION (3141)
M. R. F. Jensen SECTION LEADER
C. MarrelliR. Yogi
SYSTEMS ENGINEERING DIVISION (3050)
R. DuperrierHEAD OF DIVISION
INTEGRATED CONTROL SYSTEM
DIVISION (3020)G. Trahern
HEAD OF DIVISION
M. RescicDEPUTY PROJECT
MANAGER
T. KorhonenCHIEF ENGINEER
T. Friedrich SYSTEMS ENGINEER
A. Gillberg (C)TEAM ASSISTANT
N. Claesson (C)B. Folsom (C)R. Mudingay
A. Söderqvist (C)
CS INFRASTRUCTURE
GROUP (3024)G. Trahern (I)
GROUP LEADER
PROTECTION SYSTEMS GROUP
(3023)A. Nordt
GROUP LEADER
R. AnderssonS. Birch
A. Monera MartinezD. Paulic
M. Zaera-Sanz
CS HW & IS GROUP (3022)
D. Piso FernandezGROUP LEADER
J. Cereijo Garcia
CS SW & SVCs GROUP (3021)
S. GysinGROUP LEADER
F. Amand (C)D. Dezman(C)
R. FearnR. FernandesL. FernandezB. Kranjc (C)
E. LafaceM. Novak (C)K. Rathsman
M. Sekoranja (C) ENGINEERING & INTEGRATION
SUPPORT DIVISION (3040)
P. RådahlHEAD OF DIVISION
J. PerssonSTANDARD COMPONENT
MANAGER
S. WahlgrenTEAM ASSISTANT
SURVEY ALIGNMENT & METROLOGY GROUP (3042)
F. ReyGROUP LEADER
PLM & PROCESS SUPPORT GROUP
(3041)H. Lindblad
GROUP LEADER
C. Affelin (C)A. Ehn (L)
H. Limborg (C)J. Lindstrii Ingvarsson (C)
J. Meyes (C)A. Nanda
G. Svensson (C)C. Vejedal (C)
A. Zahr (C)
INTEGRATION GROUP (3044)
X. PermanyerGROUP LEADER
M. Andersson (C)C-J Hårdh (C)
D. Lundgren (C)A. Nilsson (C)M. Pålsson (C)
E. Zografos
ELECTRICAL AND I&C
SECTION (3043)
R. Jansson (C)J. Widing (C)
MECHANICAL SECTION – PLANT &
PROCESS (3043)Vacant
SECTION LEADER
M. Andersson (C)C. Ansheden (C)
L. Emås (C)C. Dybowski (C)J. Harborn (C)
A. Lundgren (C) I. Olsson (C)J. Persson
O. Persson (C)J. Ringnér (C)
MECHANICAL SECTION – MACHINE &
COMPONENTS (3043)
Z. LazicSECTION LEADER
M. Andersson (C)G. ApriglianoR. Blum (C)B. Davidge
N. EliasP. Erterius (C)T. GrandsaertT. Hedlund (C)
R. Holmberg (C)B. Jönsson (C)J. Kalmteg (C)
G. LaszloC. I. Lopez
R. Peterson (C)S. Pullen
M. Schmidt (C)S. Vareskic (C)L. Åström (C)
ANALYSIS SECTION (3043)
VacantSECTION LEADER
E. LundhM. Möller (C)A. Olsson (C)
P. Tereszkowski (C)
DESIGN & ENGINEERING GROUP (3043)
M. TäcklindGROUP LEADER
( A ) Acting( I ) Interim( C ) Contracted Staff( L ) Leave
SCIENCE DIRECTORATE (2000)D. Argyriou
SCIENCE DIRECTOR
DEPUTY DIRECTOR O. KirsteinSENIOR ADVISOR S. Petersson ÅrsköldPERSONAL ASSISTANT D. Adonis (A)
M. Lindberg (L)
MEDIA COORDINATION
GROUP (4072) Allen Weeks (I)GROUP LEADER
K. McFaulR. ErikssonP. Reinerfelt
EUROPEAN SPALLATION SOURCE, AB BOARDS. Landelius, CHAIRB. Smith, VICE-CHAIR
EUROPEAN SPALLATION SOURCE (ESS) (1000) J. Yeck
DIRECTOR GENERAL AND CHIEF EXECUTIVE OFFICER (CEO)
SENIOR EXECUTIVE ASSISTANT K. HélèneSTRATEGIC PROJECT ADVISOR P. KinhultSENIOR ADVISOR C. Vettier (C)SENIOR ADVISOR J.T. Hernani (C)
In-Kind Review CommitteeM. Marazzi, Chair
Administration & Finance CommitteeM. Scharff, Chair
EUROPEAN SPALLATION SOURCE STEERING COMMITTEEL. Börjesson, CHAIR
HOST COUNTRIES: SWEDEN AND DENMARK
ES&H Advisory CommitteeP. Berkvens, Chair
Annual ReviewM. Nessi, Chair
Science Advisory CommitteeA. Meyer, Chair
S. McClain, Co-Chair
Conventional Facilities Advisory CommitteeM. Fallier, Chair
TECHNICAL COORDINATION GROUP (1000)
M. AraiS. Kennedy
F. Mezei
COMMUNICATIONS AND EXTERNAL RELATIONS
DIVISION (4070)A. Weeks
HEAD OF DIVISION
M-L. Ainalem (L)J. TierneyJ. Öberg
C. HolgerssonPERSONAL ASSISTANT
EXTERNAL RELATIONS & EU PROJECTS GROUP (4071)
U. GunsenheimerGROUP LEADER
L. Chen (C)D. Mihai
A. SchmidliV. Winter
Technical Advisory CommitteeP. LeBrun, Chair
ENVIRONMENT, SAFETY & HEALTH
DIVISION (5030)P. Jacobsson
HEAD OF DIVISION
U. AgnvikD. Ene
T. HanssonF. Jörud
L. SpanierP. Persson
J E. Presteng (C)B. Winér
OPERATIONS, ES&H and QA (1010)
P. CarlssonASSOCIATE DIRECTOR
E. LagreliusPERSONAL ASSISTANT
QA DIVISION (1020)
M. SkafarGROUP LEADER
L. Bendroth (C)C. Tillman (C)
OPERATIONS GROUP
VacantGROUP LEADER
WASTE GROUP
T. Hansson (C, I)GROUP LEADER
ACCELERATORDIVISION (3010)
M. LindroosHEAD OF DIVISION
H. DanaredDEPUTY HEAD OF
DIVISION
J. Weisend IIDEPUTY HEAD OF
ACCELERATOR PROJECTS
D. McGinnisCHIEF ENGINEER
S. Peggs (C)
A. JanssonSAFETY & RELIABILITY
MANAGER
C. PrabertPERSONAL ASSISTANT
S. AasTEAM ASSISTANT
IN-KIND GROUP (4061)
G. NémethGROUP LEADER
GENERAL HR GROUP (4022)
S. HaveliusGROUP LEADER
A. CarlekrantzA. MellsvedT. Nilsson
TARGET PHYSICS GROUP (3035)
G. MuhrerGROUP LEADER
R. BevilacquaJ-P Sievers (C)
MONOLITH & HANDLING
GROUP (3032)R. Linander
GROUP LEADER
N. de la CourM. Göhran
C. Kharoua (C)M. Kickulies
D. LynghU. Odén
M. PucilowskiK. Sjögreen
NEUTRONICS GROUP (3031)
L. ZaniniGROUP LEADER
K. BatkovZ. Kokai (C)A. Takibayev
FLUID SYSTEMS GROUP (3033)
H. CarlssonGROUP LEADER
P. NilssonA. Polato
TARGET CONTROLS
GROUP (3036)L. Coney
GROUP LEADER
A. Sadeghzadeh
MATERIALS GROUP (3034)
Y. LeeGROUP LEADER
M. Hartl
TARGET DIVISION (3030)
J. HainesHEAD OF DIVISION
E. PitcherDEPUTY HEAD OF
DIVISION
C. BlixtADMINISTRATIVE
ASSISTANT
ENGINEERING SECTION (3151)
S. Molloy SECTION LEADER
I. AlonsoE. BargalloA. Ponton
E. Sargsyan
PLANNING GROUP (4082)
M. JakobssonGROUP LEADER
J. AnderssonG. Aspinall
D. BergenholtzL. Gunnarsson (C)
A. IngelsM. Israelsson
L. LariS. Ossowski (L)
REQUIREMENTS & ARCHITECTURE ENGINEERING
J. WaldeckGROUP LEADER
F. Hermodsson (C)S. Wright (C)
IVV PLANNING AND REPORTING
VacantGROUP LEADER
SAFETY ENGINEERING
F. JavierGROUP LEADER
LOGISTICS ENGINEERING
VacantGROUP LEADER
INSTRUMENT DATA GROUP
(2052)J. Taylor
GROUP LEADER
DATA ANALYSIS & MODELLING GROUP (2051)
T. Holm RodGROUP LEADER
T. NielsenP. Willendrup
DATA SYSTEMS GROUP (2053)
VacantGROUP LEADER
J. R. Selknes
DATA MANAGEMENT GROUP (2054)
T. RichterGROUP LEADER
310%employees%represen+ng%
41%different%na+onali+es!%
ESS%AB%to%transi+on%into%European%Research%
Infrastructure%Consor+um%(ERIC)%
• Hosts%Sweden%and%Denmark,%Hungary,%and%Norway%(observer)%applied%to%the%European%
Commission%(EC)%to%establish%a%European%Research%Infrastructure%Consor+um%(ERIC)%for%ESS.%%
EC%approval%expected%at%the%beginning%of%July%2015.%
• Goal%is%to%establish%the%European%Spalla+on%Source%ERIC%at%the%earliest%possible%date%with%as%
many%founding%members%as%possible.%%Full%transi+on%from%ESS%AB%to%the%ERIC%organiza+on%will%
be%completed%by%the%end%of%2015.%
European%Spalla+on%
Source%
ERIC%Council%
%
%TimeOplan%for%Transfer%ESS%AB%–%ESS%ERIC%%
March%
%
Apr%
%
May%
%
Jun%
%
July% Sept%
%
2014)Construc,on)work)starts)on)the)site)
2009)Decision:)ESS)will)be)built)in)Lund)
2025)ESS)construc,on)complete)
2003)First)European)design)effort)of)ESS)completed)
2012)ESS)Design)Update)phase)complete)
2019)First)neutrons)on)instruments)
2023)ESS)starts)user)program)
Road%to%realising%the%world’s%leading%
facility%for%research%using%neutrons%
ESS%looking%towards%MAX%IV%
ESS%target%building%
Progress%on%civil%construc+on%
Project%execu+on%strategy%
• Deliver%on%the%Technical%Design%Report%performance%and%Steering%Commi`ee%
commitments%
– 5)MW)accelerator)capability)– Cost)Book)construc,on)cost)of)1,843)B€2013)– Cost)Book)annual)opera,ons)cost)target)of)140)M€2013)– 22)“public”)instruments)(16)included)in)the)construc,on)budget))
• Start%w/%unconstrained%resources%(technically%limited%schedule)%and%develop%
credible%project%execu+on%plans%
• Comprehensive%review%of%project%baseline%and%execu+on%plans%
• Secure%funding%and%resources%and%align%schedules%with%the%available%
resources%
€%36,5%
€%101%
€%228%
€%382%
€%36,5%
€%54%
€%122%
€%128%
€%0,0%
€%100,0%
€%200,0%
€%300,0%
€%400,0%
€%500,0%
€%600,0%
IKC% Cash%
Construc+on%cost: %€%1,84%Billion%
InOkind: %€%747.5%Million%
Accelerator%Instruments%(NSS)%Target%Controls%
65%)
50%)
65%)
75%)
€%510%M%
€%350%M%
€%155%M%
€%73%M%
ESS%InOkind%Goals%
ESS%schedule%baseline%–%external%
milestones%
Thanks%for%Your%A`en+on!%
19%