2015 INTERNATIONAL MECHANICAL CODE - PIX Loginpix.ghphipps.com/projects/2016/16.0462/ProjDocs/01 -...
Transcript of 2015 INTERNATIONAL MECHANICAL CODE - PIX Loginpix.ghphipps.com/projects/2016/16.0462/ProjDocs/01 -...
HVAC GENERAL NOTESDESCRIPTIONSYMBOL
GENERAL
CONNECT NEW TO EXISTING
REFERENCE BUBBLE
REVISION NUMBER
SECTION OR ELEVATION BUBBLE
DRAWING NOTE
DEMOLITION NOTE
* SECTION NUMBER# SHEET NUMBER#
*
#
#*
* SECTION OR ELEVATION LETTER
*#
ISOMETRIC OR ELEVATION BUBBLE
# REFERENCE DRAWING NUMBER
* ISOMETRIC OR ELEVATION LETTER# REFERENCE DRAWING NUMBER
#
#
DEMOLITION NOTE, ALTERNATEX
DRAWING NOTE, ALTERNATE#
DESCRIPTIONSYMBOL
HVAC ABBREVIATIONS
ABOVEABV
AIR CONDITIONER / CONDITIONINGACABOVE FINISHED FLOORAFF
ACCESS PANELAP
ALTITUDEALT
AIR PRESSURE DROPAPDAPPROXIMATE, APPROXIMATELYAPPROX
ARCHITECT, ARCHITECTURALARCH
BELOWBLW
BRITISH THERMAL UNITS PER HOURBTUHCAPACITYCAP
CUBIC FEET PER MINUTECFM
CEILINGCLG
CHANGE IN TEMPERATURE DEGREES FAHRENHEIT∆T °FCONCRETECONC
CONTINUECONT
CONSTRUCT, CONSTRUCTIONCONST
COORDINATECOORDDIRECT DIGITAL CONTROLDDC
DIAMETERDIA
DOWNDN
ENTERING AIR TEMPERATUREEATENTERING WATER TEMPERATUREEWT
EACHEA
ELECTRICAL CONTRACTOREC
ELECTRIC, ELECTRICALELECEXISTING(E)
EXTERNAL STATIC PRESSUREESP
DEGREES FAHRENHEIT°F
FEETFTFLOORFLR
GENERAL CONTRACTORGC
GALLONS PER MINUTEGPM
HERTZHZHORIZONTALHORIZ
HORSEPOWERHP
INCHESIN
LEAVING AIR TEMPERATURELATPOUNDSLBS
LEAVING WATER TEMPERATURELWT
MAXIMUMMAX
1,000 BTUHMBHMANUFACTURERMFG
MECHANICAL CONTRACTORMC
MINIMUM CIRCUIT AMPACITYMCA
MINIMUMMINMOUNTEDMTD
NEW(N)
NORMALLY CLOSED, NOISE CRITERIANC
NORMALLY OPENNONOT TO SCALENTS
OUTSIDE AIROA
OUTSIDE AIR TEMPERATUREOAT
OPPOSED BLADE DAMPEROBDPOUNDS PER SQUARE INCH GAUGEPSIG
PRESSURE DROPPD
PRESSURE REDUCING VALVEPRV
RETURN AIRRA
REFRIGERANT LIQUIDRL
REFRIGERANT SUCTIONRS
REVOLUTIONS PER MINUTERPMROUND, PHASEØ
SUPPLY AIRSA
SEASONAL ENERGY EFFICIENCY RATINGSEER
SEA LEVELSLSTAINLESS STEELSS
TEMPERATURE CONTROL CONTRACTORTCC
TEMPERATURETEMP
TOTAL STATIC PRESSURETSPTHERMOSTATT'STAT
TYPICALTYP
VARIABLE AIR VOLUMEVAV
VARIABLE FREQUENCY DRIVEVFDVOLTSV
WATER COLUMNWC
WATER PRESSURE DROPWPD
WEIGHTWT
RELOCATED(R)
M
HVAC LEGENDALL SYMBOLS MAY NOT BE USED
DESCRIPTIONSYMBOL
SET POINT DESIGN
DUCT CRITERIA
CHWRCHWS
CHILLED WATER RETURNCHILLED WATER SUPPLY
1. REFURBISHMENT TO BE DONE BY MANUFACTURER.2. INSPECT ENTIRE UNIT AND PROVIDE ITEMIZED PRICING TO
THE OWNER FOR THE FOLLOWING COMPONENTS:3. CLEAN: CONDENSER FINS, COILS, TUBES, AND HEAT
EXCHANGER4. REPLACE ALL PIPING INSULATION.5. STRAIGHTEN CONDENSER FINS.6. REPLACE COMPRESSORS.7. CHILLER CONTROL UPGRADE8. FULL START UP ON CHILLER
PROVIDE PRICING FOR OWNER TO REVIEW REFURBISHMENTREQUIREMENTS AFTER CHILLER HAS BEEN INSPECTED.
REFURBISHMENT NOTES
S
HEATING COOLING
70° ADJ. 76° ADJ.
THERMOSTAT SETTINGS
WINTER SUMMER
-10° DB 95° DB, 62° WB
DESIGN CRITEREA
CODE NOTES
NOTES:
1. LOAD CALCULATIONS PERFORMED WITH TRACE 700 SOFTWARE UTILIZING THE TETD-TA1 METHODS FOR HEATING AND COOLING LISTED AS ACCEPTABLE
METHODS IN APPENDIX A OF ASHRAE STANDARD 183.
2. THE OUTPUT CAPACITY OF THE SCHEDULED HEATING AND COOLING EQUIPMENT SHALL NOT BE GREATER THAN THE TOTAL CALCULATED BUILDING LOAD.
3. PRINTOUTS OF THE CALCULATIONS CAN BE PROVIDED UPON REQUEST.
4. THE SCHEDULED RTU IS SINGLE PIECE OF EQUIPMENT PROVIDING BOTH HEATING AND COOLING AND SATISFIES THE LOAD REQUIREMENTS FOR AT LEAST
ONE FUNCTION AND IS THEREFORE IN COMPLIANCE WITH SECTION C403.2.2 OF 2015 IECC. WHERE THE EQUIPMENT ONLY SATISFIES ONE FUNCTION, THE
NON-SATISFYING FUNCTION HAS BEEN SELECTED AS SMALL AS POSSIBLE, WITHIN AVAILABLE EQUIPMENT OPTIONS.
5. WHERE MULTIPLE UNITS OF THE SAME EQUIPMENT TYPES HAVE BEEN PROVIDED WITH COMBINED TOTALS EXCEEDING THE TOTAL DESIGN LOAD,
CONTROLS AND SEQUENCES HAVE BEEN PROVIDED FOR EACH UNIT BASED ON LOAD.
MECHANICAL SYSTEM CALCULATED LOADSDESIGN COOLING CAPACITIES DESIGN HEATING CAPACITIES
BUILDING PEAK BUILDING BLOCK SCHEDULED BUILDING PEAK LOAD SCHEDULED
MAIN COILTONS
MAIN COILMBH
MAIN COILTONS
MAIN COILMBH
UNIT COIL MBHMAIN SYSTEM
MBHPREHEAT
MBHREHEAT
MBHTOTAL LOAD
MBHUNIT COIL MBH
SYSTEM
2912505.11291.91059.31284.61171.297.6118298.5 2351.4TOTAL
77.717.167.037.566.757.64.861.25.1 104.5
140.427.7122.963.1135.3126.010.5133.211.1 186.0
332.200315.9153.5151.112.6151.212.6 315.9
168.644.9161.093.8116.6104.48.7104.48.7 254.9
326.7108.1382.4227.9340.4301.225.1301.225.1 610.3
441.6153.4558.6321.1472.1430.835.9430.835.9 879.8
VAV ROOFTOP DISCHARGE AIR TEMPERATURES
HEATING COOLING
60° ADJ. 55° ADJ.
HEATING COOLING
90° ADJ. 55° ADJ.
HEATING COOLING
90° ADJ. 55° ADJ.
SINGLE-ZONE ROOFTOP DISCHARGE AIR TEMPERATURES
VAV BOX DISCHARGE AIR TEMPERATURES
LOW-PRESSURE DUCTWORK (EXPOSED)
AIRSTREAM VELOCITY
STATIC PRESSURE LOSS0.1 INWC/100'
1,200 FT/MIN.
LOW-PRESSURE DUCTWORK (ABOVE CEILING)
AIRSTREAM VELOCITY
STATIC PRESSURE LOSS0.1 INWC/100'
1,500 FT/MIN.
MEDIUM-PRESSURE DUCTWORK (EXPOSED)
AIRSTREAM VELOCITY
STATIC PRESSURE LOSS0.15 INWC/100'
1,500 FT/MIN.
MEDIUM-PRESSURE DUCTWORK (ABOVE CEILING)
AIRSTREAM VELOCITY
STATIC PRESSURE LOSS0.2 INWC/100'
2,000 FT/MIN.
RTU-5
RTU-6
RTU-7
RTU-8
RTU-9
RTU-10
HEATING WATER SUPPLYHWS
HEATING WATER RETURNHWR
CONDENSATE DRAIN LINED
WALL MOUNTED THERMOSTATT
UNIT MOUNTED THERMOSTATT
TEMPERATURE SENSORS
CO2 / TEMPERATURE SENSOR
SWITCHX
FIRE DAMPER
COMBINATION FIRE / SMOKE DAMPER
DDC DDC PANEL
SMOKE DAMPER
MANUAL VOLUME DAMPERWITH LOCKING QUADRANT
MOTORIZED DAMPER
DIRECTION OF FLOW
INDICATES PIPE SLOPE DOWN
PIPING CAP
PIPING UP
PIPING DOWN
BOTTOM OF PIPE CONNECTION
CONCENTRIC REDUCER
FLEXIBLE CONNECTOR
PIPING EXPANSION JOINT
COMBINATION FLOW MEASURINGDEVICE AND BALANCING VALVE
AUTOMATIC 2-WAY TEMPERATURECONTROL VALVE
AUTOMATIC 3-WAY TEMPERATURECONTROL VALVE
PRESSURE REDUCING VALVE
PRESSURE REDUCING VALVE
P/T
FLOW SWITCH
SHUT-OFF VALVE
CHECK VALVE
BUTTERFLY VALVE
BALL VALVE
HOSE END DRAIN VALVE
STRAINER WITHBLOW-OFF VALVE
STRAINER
UNION
PRESSURE GAUGE
THERMOMETER
SAFETY RELIEF VALVE
IN-LINE PUMP
MANUAL AIR VENT
RECTANGULAR SUPPLYAIR DUCT UP
RECTANGULAR SUPPLYAIR DUCT DOWN
RECTANGULAR RETURN / EXHAUSTAIR DUCT UP
RECTANGULAR RETURN / EXHAUSTAIR DUCT DOWN
ROUND DUCT UP
ROUND DUCT DOWN
BRANCH DUCT 45° TAKE-OFF
RECTANGULAR DUCT ELBOWWITH TURNING VANES
RADIUS ELBOWRECTANGULAR / ROUND DUCT
DUCT TRANSITION
FLEX CONNECTION
MANUAL VOLUME DAMPERWITH LOCKING QUADRANT
RIGID DUCTWORK WITH FLEXIBLEDUCT TAKE-OFF
24X24 CEILING RETURN GRILLE WITHSOUND BOOT
24X12 CEILING RETURN GRILLE WITHSOUND BOOT
24X24 CEILING RETURN GRILLE
24x12 CEILING RETURN GRILLE
CEILING DIFFUSER, 4-WAY THROW
CEILING DIFFUSER, 3-WAY THROWARROWS INDICATE DIRECTION OF AIRFLOW
CEILING DIFFUSER, 2-WAY THROWARROWS INDICATE DIRECTION OF AIRFLOW
CONICAL SPIN-IN FITTINGWITH DAMPER
UNDERCUT DOORUC
INDICATES ITEMS TO BE REMOVED
HEATING/CHILLED WATER SUPPLYHWS/CHWS
HEATING/CHILLED WATER RETURNHWR/CHWR
PRESSURE INDEPENDENT CONTROL VALVE
SC
1. ALL WORK SHALL COMPLY WITH APPLICABLE CODES INCLUDING 2015 IBC, 2015 IMC, AND 2015 IECC.
2. AN AIR BALANCE REPORT SHALL BE PROVIDED TO THE INSPECTOR TO ASSURE THAT PROPER AIRFLOWS AND SYSTEM BALANCE IS ACHIEVED AT
TIME OF FINAL INSPECTIONS.
3. BUILDING MECHANICAL SYSTEMS SHALL BE COMMISSIONED AS OUTLINED IN 2015 IECC SECTION C408.2.
4. A LETTER SHALL BE MADE AVAILABLE TO THE CODE OFFICIAL BY REQUEST STATING THE OWNER OR OWNERS AUTHORIZED AGENT HAS
RECEIVED PRELIMINARY COMMISSIONING DOCUMENTATION.
5. PRIOR TO THE FINAL MECHANICAL OR PLUMBING INSPECTIONS THE DESIGN PROFESSIONAL OR APPROVED AGENCY SHALL PROVIDE EVIDENCE
OF MECHANICAL SYSTEM COMMISSIONING AND COMPLETION IN ACCORDANCE WITH 2015 IECC SECTION C408.2.
6. PIPE SUPPORTS SHALL BE PROVIDED IN ACCORDANCE WITH 2015 IMC SECTION 305.4, AND ANSI/MSS SP-58.
7. ALL EQUIPMENT INSTALLED ON ELEVATED ROOFS SHALL BE LOCATED A MINIMUM OF 10'-0” FROM ROOF EDGE PER 2015 IMC SECTION 306.
8. BUILDING HEATING AND COOLING LOADS ARE PERFORMED IN ACCORDANCE WITH ASHRAE/ACCA STANDARD 183 AS DETERMINED THROUGH THE
USE OF COMPUTER LOAD CALCULATION PROCEDURES IN ACCORDANCE WITH 2015 IMC 312, AND 2015 IECC CHAPTER 3. THE METHODOLOGY
UTILIZED IN LOAD CALCULATIONS IS TETD-TA1 IN ACCORDANCE WITH ASHRAE STANDARD 183 APPENDIX A.
9. MECHANICAL VENTILATION SHALL BE IN COMPLIANCE WITH 2015 IMC CHAPTER 4, SECTION 403 FOR MECHANICAL VENTILATION.
10. ALL MATERIALS INSTALLED WITHIN A PLENUM SHALL MEET THE FLAME/SMOKE LISTED INDEXES OF 25/50 WHEN TESTED IN ACCORDANCE WITH
ASTM E84 OR UL 723, OR BE INSTALLED TO COMPLY THE WITH ASTM E84 OR UL 723, OR BE INSTALLED TO COMPLY WITH THE REQUIREMENTS OF
SECTION 703.5 OF THE IBC
11. ALL DUCTWORK SHALL BE CONSTRUCTED, INSTALLED, AND SEALED PER 2015 IMC SECTION 603.
12. DUCT AND TRANSFER OPENINGS SHALL BE INSTALLED IN ACCORDANCE WITH SECTION 607. FIRE DAMPERS, SMOKE DAMPERS, AND
COMBINATION FIRE/SMOKE DAMPERS SHALL BE INSTALLED WHERE REQUIRED IN SECTIONS 714.2 THROUGH 714.4 OF THE INTERNATIONAL
BUILDING CODE.
13. REFRIGERATION EQUIPMENT SHALL MEET THE REQUIREMENTS OF 2015 IMC SECTION 1102.
14. BUILDING PROPERTIES UTILIZED FOR BUILDING HEATING AND COOLING LOAD CALCULATIONS SHALL BE PERFORMED BASED ON DESIGN
ENVELOPE, FENESTRATION, LIGHTING, OCCUPANCY, AND WEATHER CONDITIONS AS OUTLINED ON THE CONSTRUCTION DOCUMENTS PER 2015
IECC SECTION 402. REFER TO ARCHITECTURAL AND ELECTRICAL FOR REPRESENTATIVE ENVELOPE AND LIGHTING INFORMATION.
15. BUILDING MECHANICAL HEATING AND COOLING EQUIPMENT SHALL MEET MINIMUM ENERGY EFFICIENCIES OUTLINED IN 2015 IECC SECTION C403.
16. DEMAND CONTROLLED VENTILATION SHALL BE PROVIDED FOR ALL SPACES MEETING THE REQUIREMENTS OF 2015 IECC C403.2.6.1
1. ALL INFORMATION SHOWN ON THESE DRAWINGS INCLUDING
LOCATION AND SIZES ARE BASED ON THE BEST INFORMATION
AVAILABLE. INFORMATION SHOWN IS TO INDICATE THE INTENT OF
THE MECHANICAL SYSTEM WORK BUT MAY NOT REFLECT THE
EXACT ROUTING AND LOCATION. IT IS THE RESPONSIBILITY OF
THE CONTRACTOR TO FIELD VERIFY EXISTING EQUIPMENT,
PIPING, DUCTWORK, STRUCTURE, ELECTRICAL, LIGHTING AND
ARCHITECTURAL INFLUENCES PRIOR TO INSTALLATION OF THE
NEW WORK TO AVOID ANY CONFLICTS WITH SYSTEMS REQUIRING
MODIFICATIONS. NOTIFY ENGINEER OF ANY CONFLICTS, PRIOR TO
PERFORMING WORK.
2. PROVIDE NEW EQUIPMENT, DUCTWORK, AIR DEVICES, PIPING,
CONTROLS, ETC. AS REQUIRED FOR COMPLETE AND
OPERATIONAL SYSTEMS. THE INTENT OF THE DRAWINGS IS TO
PROVIDE A COMPLETE WORKING MECHANICAL SYSTEM FOR THE
BUILDING. INCLUDE ALL ITEMS REQUIRED TO PROVIDE COMPLETE
WORKING MECHANICAL SYSTEMS.
3. ALL AIR DEVICE NECK SIZES SHALL BE SAME AS RUNOUT SIZE
UNLESS NOTED OTHERWISE.
4. ALL DUCTWORK SIZES SHOWN ARE INSIDE DIMENSIONS. FOR
DUCT INSULATION AND LINER REQUIREMENTS SEE
SPECIFICATIONS.
5. PROVIDE BELL MOUTH SPIN-IN FITTINGS FOR ALL ROUND DUCT
TAKEOFFS UNLESS ROUND RUN OUT SIZE IS WITHIN 2" OF MAIN
DUCT HEIGHT THEN PROVIDE STRAIGHT SPIN-IN FITTINGS.
6. SEE DETAILS AND SPECIFICATIONS FOR MORE INSTALLATION
INFORMATION AND REQUIREMENTS.
7. INSTALL ALL EQUIPMENT PER MANUFACTURER'S RECOMMENDED
SERVICE CLEARANCES AND INSTALLATION INSTRUCTIONS.
PROVIDE ACCESS DOORS AS REQUIRED TO PROVIDE SERVICE
AND MAINTENANCE FOR ALL EQUIPMENT.
8. REVIEW THE DETAILS, DIAGRAMS, AND CONTROLS ON SHEETS
M-500, M-501, M-502, M-510, M-600, AND M-601 PRIOR TO
INSTALLATION OF THE MECHANICAL SYSTEMS. NOT ALL DETAILS
ARE CALLED OUT BY DRAWING NOTES.
9. ALL HWS AND HWR PIPING TO VAV BOXES, HOT WATER CABINET
UNIT HEATERS AND HOT WATER UNIT HEATERS IS 3/4" UNLESS
NOTED OTHERWISE.
10. PROVIDE TRIM RING OR TRIM FRAME WHERE ROUND OR
RECTANGULAR DUCT PENETRATES A WALL AND IS EXPOSED TO
VIEW, COORDINATE FINISH OF TRIM WITH ARCHITECT.
11. PROVIDE TURNING VANES AT ALL DUCT SUPPLY AND RETURN 90°
ELBOWS.
12. DESIGN AND LAYOUT OF EQUIPMENT BASED ON MANUFACTURER
SPECIFIED IN SCHEDULES. ANY MODIFICATIONS OR ALTERATIONS
REQUIRED FOR INSTALLATION OF AN APPROVED SUBSTITUTION
TO THAT SPECIFIED IS THE RESPONSIBILITY OF THE INSTALLING
CONTRACTOR.
VENTILATION SCHEDULE2015 INTERNATIONAL MECHANICAL CODE
SYSTEM VENTILATION SCHEDULE2015 INTERNATIONAL MECHANICAL CODE
13. PRIOR TO CONSTRUCTION AIR AND WATER PRE BALANCE
READING SHALL BE TAKEN FOR ALL EQUIPMENT. INFORMATION
SHALL BE LOGGED AND SUBMITTED TO OWNER. THESE READINGS
WILL BE USED FOR VERIFICATION OF SYSTEMS AFTER
CONSTRUCTION IS COMPLETE.
ENVIS
ION
MEC
HA
NIC
AL
EN
GIN
EER
S I
NC
.
9777 P
yramid
Court, S
uit
e 1
20
Engle
wood, C
O 8
0112
Tel-
303-6
88-0
223
Fax- 303-6
88-3
584
envis
ionengrs.c
om
Proje
ct #
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATIONAPPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISEUSED WITHOUT THE WRITTEN CONSENT OF
MOA ARCHITECTURE
NOT FOR
CONSTRUCTION
AD
DIT
ION
S A
ND
RE
NO
VA
TIO
NS
016-0
09
7/29
/201
6 11
:42:
38 A
M
M-001
MECHANICALCODE SHEET
SIE
RR
A E
LE
ME
NT
AR
Y S
CH
OO
L
ANG
08.04.16
16100.00
7771
Oak
St.
Arv
ada,
CO
800
05
BID SET
JKB
REVISION DATE
NOTES:
1. REFER TO SPECIFICATIONS FOR UNIT CONSTRUCTION, OPTIONS, OPTIONS, ACCESSORIES, AND REQUIREMENTS.
2. HEATING COIL SELECTIONS BASED ON 30% PROPYLENE GLYCOL
3. COIL SELECTIONS BASED ON 95°F AMBIENT (COOLING), -10°F AMBIENT (HEATING)
REMARKS:
1. PROVIDE WITH SINGLE POWER POINT CONNECTION, VFD ON SA FAN AND EXHAUST, FACTORY ROOF CURB, 100% OSA ECONOMIZER, RA SMOKE DETECTOR.
2. PROVIDE WITH 2-WAY PRESSURE INDEPENDENT HEATING CONTROL VALVE.
3. PROVIDE WITH 2-WAY PRESSURE INDEPENDENT COOLING CONTROL VALVE.
4. COOLING COIL LAT REPRESENTS UNIT LAT. PROVIDE COOLING COIL LAT AT UNIT LAT INCLUDING MOTOR HEAT. 4. CONTRACTOR TO RELOCATE STORED UNIT LOCATED AT 3002 S. HURON ST ENGLEWOOD, CO 80110 TO JOBSITE FOR UNIT MODIFICATIONS BY THE MANUFACTURER AND INSTALLATION BY CONTRACTOR. COORDINATE WITH DANELLE BERZOZA; JEFFERSON COUNTY SCHOOL DISTRICT PROJECT MANAGER.
5. PROVIDE NEW 2-PIPE HEATING/CHILLED WATER COIL, SUPPLY FAN, EXHAUST FAN, AND ASSOCIATED MOTORS; TO REPLACE EXISTING COMPONENTS OF CARMODY UNIT LABELED AS AHU-1.
6. PROVIDE NEW SUPPLY FAN, EXHAUST FAN, AND ASSOCIATED MOTORS TO REPLACE EXISTING IN CARMODY UNIT LABELED AS AHU-2, COILS TO REMAIN.
7. PROVIDE NEW HEATING COIL, SUPPLY FAN, EXHAUST FAN, AND ASSOCIATED MOTORS TO REPLACE EXISTING IN CARMODY UNIT LABELED AS AHU-3, CHILLED WATER COIL TO REMAIN.8. PROVIDE NEW SUPPLY FAN, EXHAUST FAN, AND ASSOCIATED MOTORS TO REPLACE EXISTING IN CARMODY UNIT LABELED AS AHU-4, COILS TO REMAIN.
AIR COOLED CHILLER SCHEDULE - FOR REFERENCE ONLY
SYMBOL SERVICEMANUFACTURER
MODEL
NOMINAL COOLING
CAPACITY
(TONS)
MIN. EFF @ ARI
COP/IPLV
(KW/TON)GPM EWT
( ° F)
LWT
( ° F)
PD
(FT)
EVAPORATOR DATA
FOULING
FACTOR
EAT
( ° F)
CONDENSER DATA
NO. OF
FANS V / PH
ELECTRICAL DATA
MCA MOCP
NUMBER
COMP.
REFRIGERANT
TYPE LBS
WEIGHT
(LBS.)REMARKS
CHILLED
WATER130 215 56 44 11.0 .0005 95 10 460/3 306 400 2 R-22 130 9,200 1, 2
ARMSTRONG
315 5"
OUTLET
SIZE
FLANGED
DIRT AND AIR SEPARATOR SCHEDULE
SYMBOL SERVICE MODEL REMARKS
3
1, 2
HEATING
WATER
CHILLED
WATER
MANUFACTURER
ARMSTRONG
REMARKS:
1. WORKING PRESSURE OF 125 PSIG.
2. PROVIDE WITH INTERNAL STRAINER AND AUTOMATIC AIR VENT.
GPM
332AS-2
(E) AS-1 -
DAS-5-R
MAXPD
FT H20
1.3
-
INLET
SIZE
5" 5"
5"
CONNECTIONTYPE
FLANGED
SYMBOLMANUFACTURER
MODEL
CFM@
5,600'
GAS HEAT EXCHANGER
-10 119.8
EFF.
MAKE-UP AIR UNIT SCHEDULE
REMARKS:
1. SEE SPECIFICATIONS FOR OPTIONS, ACCESSORIES, AND CONTROLS.
2. GAS BURNER DATA BASED ON DIRECT-FIRED NATURAL GAS 830 BTU/CU.FT, 14 INWC.
3. EFFICIENCY BASED ON ARI CONDITIONS.
REMARKSWEIGHT
(LBS.)
1, 2, 3, 4CRAWL
627
AREA
SERVED
SPACEMAU-3
DG-110-H10
GREENHECK2,100
ESP
(IN WC)
0.28 55
LAT
( ° F )
EAT
( ° F )
130.3
INPUT
(MBH)
OUTPUT
(MBH)
92%
MOTOR DATA
3/4
HP
ELECTRICAL DATA
FRPM
1134
V / PH MCA
460/3 2.9
MOCP
15
1, 2
GLYCOL FEEDER UNIT SCHEDULE
SYMBOLTANK
GALLONSREMARKS
3NEPTUNE
G-50-1
NEPTUNE
G-50-1
SERVICE
REMARKS:
1. SEE SPECIFICATIONS FOR OPTIONS AND ACCESSORIES.
2. UNIT TO MAINTAIN 30% GLYCOL IN BUILDING SYSTEM HYDRONIC PIPING.
HP
1/4
1/4
GF-2
(E) GF-1 50
50 115/1
115/1
MANUFACTURER
MODEL V / PH
PUMP DATA SYSTEM
VOLUME
GALLONS
1,158
820
TOTAL
GLYCOL
GALLONS
347
246
WEIGHT
(LBS.)
150
150HEATING
WATER
CHILLED
WATER
TEMP
RANGE
( ° F )
DIAPHRA.
EXPANSION TANK SCHEDULE
SYMBOL REMARKS
1, 2, 3, 4
1, 2
REMARKS:
1. PROVIDE WITH FLOOR MOUNTING STAND FOR PLACEMENT ON NEW 4 INCH HOUSEKEEPING PAD.
2. APPROX. WEIGHT 100% FULL OCCURS IF BAG FAILS OR AIR CHARGE IS LOST.
ET-2
SYSTEM
VOLUME
GALLONS
1,158
820
WEIGHT
(LBS.)
450
650
12
40
INITIAL FILL
PRESSURE
PSIG
12
15
TYPE
DIAPHRA.
HEIGHT
(IN)
49
37
DIA.
(IN)
20
24
FLUID
TEMP F°TYPE
44
120
30% PG
30% PG
CAPACITY
GALLONS
48.5
53
MANUFACTURER
MODEL
B & G
B-200
ARMSTRONG
AX-100V
SERVICE
HEATING
WATER
CHILLED
WATER
WEIGHT
(LBS.)MOCP
HOT WATER CABINET UNIT HEATER SCHEDULE
REMARKS
REMARKS:
1. SELECTION BASED ON 50° F. EAT, AND 10° F WATER ∆T.
2. PROVIDE WITH MOUNTING BRACKETS, SUPPORTS, AND PANELS FOR LISTED CABINET TYPE.
V / PH
ELECTRICAL
MCA
AREA
SERVEDSYMBOL
MANUF.
MODELCONTROL
CABINETTYPE
GPMINLET / DISCHARGE
CONFIGURATION
CFM@
5,600'
OUTPUT
(MBH)
EWT
( ° F )MOTORWATTS
2010
REMARKS:
1. PROVIDE BOILER-MANUFACTURER SUPPLIED INTEGRATED CONTROL SYSTEM FOR MULTIPLE BOILER CONTROL.
2. BOILER SHALL BE DESIGNED TO FIRE ON NATURAL GAS, 830 BTU/CUFT, 14 INWC.
CONDENSING HOT WATER BOILER SCHEDULE
SYMBOL
B-2
(E) B-1
SERVICE
HEATING
WATER
HEATING
WATER
MANUF.
MODEL
AERCO
BMK-2.0
FUEL
TYPE
NATURAL
GAS
AGA GASINPUT
MBH
2,000
GASINPUT
CFH
2,410
GROSS
OUTPUT MBH
@ 5,600'
1,494
ELECTRICAL DATA
V / PH MCA MOCP
208/1
MIN.
EFF%
@ ARI
93
PD
(FT)
-
MAX
PRESSURE
RATING
160
LWT
( ° F )
120
BOILER
CAPACITY
GALLONS
-
REMARKS
1, 2, 3, 4, 5
WEIGHT
(LBS.)
1,700
PUMP SCHEDULE
SYMBOL REMARKS
3, 4, 5
3, 4, 5
REMARKS:
1. PROVIDE WITH VFD, 100% CAPACITY.
(E) HWP-2
(E) HWP-1
1, 2, 5, 6CHWP-1
WEIGHT
(LBS.)
-
-
500
MOTOR DATA
HP RPM V / PH
460/3175020
460/3175015
460/3175015
IMPELLER
DIAMETER
10.2"
10.2"
10.9"117
96
96
HEAD
FT
268
328
328
FLOW
RATE
GPM
3"
3"
3"
OUTLET
SIZE
4"
4"
4"
INLET
SIZE
MODEL
NUMBER
B & G
MANUF.
FLUID
TYPE &TEMP
30% PG
120
30% PG
120
30% PG
44
SERIES-1510
3BC
SERIES-1510
3BC
SERIES E-1510
3EB
SERVICE
HEATING
WATER
HEATING
WATER
CHILLED
WATER
SONES CONTROL
FAN SCHEDULE
SYMBOL
REMARKS:
1. PROVIDE WITH GRAVITY BACKDRAFT DAMPER, DAMPER TRAY, SOLID -STATE SPEED CONTROLLER, BIRDSCREEN, AND ROOF CURB WITH MINIMUM 12"
EF-10
EF-9
EF-11
AREA SERVED
KILN
HOOD
KINDERGARTEN
TOILET RMS
MANUFACTURER
MODEL
EF-12
EF-13
TYPECFM @
5,600'
ESP
IN WC
@5,600'
DRIVE
TYPEFRPM HP
ELECTRICALDATA
V / PH
WEIGHT
(LBS.)REMARKS
3. MINIMUM EFFICIENCY BASED ON ANSI Z21.10.3 AND IN ACCORDANCE WITH 2015 IECC C403.2.3.
TRANE
RTAA-130-
DUCT INSULATION SCHEDULE (CLIMATE ZONES 5 THRU 8)
SERVICE SIZE LOCATIONINSULATIONMATERIAL
INSULATIONTHICKNESS
REMARKS
NOTES:
1. REFER TO SPECIFICATIONS FOR INSULATION
REQUIREMENTS.
REMARKS:
1. DUCT INSULATION NOT REQUIRED UNDER 2015 IECC C403.2.9 EXCEPTION 2, WHERE
DESIGN TEMPERATURE BETWEEN INTERIOR AND EXTERIOR OF THE DUCT IS NOT
GREATER THAN 15° F.
-
-
1
-
-
-
R-6 MIN. INSTALLED
(2 INCHES)
R-6 MIN. INSTALLED
(1-1/2 - 2 INCHES)
R-6 MIN. INSTALLED
(1-1/2 - 2 INCHES)
R-6 MIN. INSTALLED
(2 INCHES)
-
GLASS FIBER
DUCT WRAP
GLASS FIBER
DUCT WRAP
ACOUSTIC
DUCT LINER
ACOUSTIC
DUCT LINER
NOT REQUIRED
INDOORCONCEALED
INDOORCONCEALED
INDOOREXPOSED
INDOOREXPOSED
INDOORCONCEALED
ALL
ALL
ALL
ALL
ALL
SUPPLY, RETURN & OUTDOOR AIRROUND
OUTDOOR AIRRECTANGULAR
SUPPLY, RETURN & OUTDOOR AIRROUND
SUPPLY & RETURNRECTANGULAR
SUPPLY & RETURNRECTANGULAR
115/1GREENHECK
G-095400 0.15 DIRECT 4.4 1043 1/8
CENTRIFUGAL
ROOF
INTERLOCK
W/ KILN STAT1
ART
CLASSROOM
GREENHECK
G-123DIRECT
CENTRIFUGAL
ROOF
WALL
SWITCH1
GREENHECK
G-095DIRECT
CENTRIFUGAL
ROOF
INTERLOCK
W/ RTU-81
GREENHECK
G-143DIRECT
CENTRIFUGAL
ROOF
INTERLOCK
W/ RTU-91
GREENHECK
G-163DIRECT
CENTRIFUGAL
ROOF
T-STAT
H-STAT1,2
97VEST.
A109A
VEST.
CUH-5
CUH-6
TRANE
FF-BB-02
VERT.
CABINET206 120
A114
4.0 37 1 120/1 2.75 15UNIT MTD.
STAT1, 2, 3, 4
VERTICAL /CABINET
PIPE INSULATION SCHEDULE
NOTES:
1. REFER TO PROJECT SPECIFICATIONS FOR ADDITIONAL INSULATION REQUIREMENTS.
2. ALL INSULATION MATERIALS INSTALLED WITHIN THE PLENUM SHALL MEET THE FLAME / SMOKE REQUIREMENTS OF 25/50 (ASTM E84)
SERVICE
INSULATION CONDUCTIVITY
CONDUCTIVITY BTU * IN / (H * FT * °F )
REMARKS:
1. FOR PIPING SMALLER THAN 1-1/2" INSTALLED WITHIN A BUILDING PARTITION WITHIN A CONDITIONED SPACE; INSULATION REDUCTION OF UP TO 1" BUT NOT
LESS THAN 1" PER IECC TABLE C403.2.1, NOTE A.
2. UPPER LIMITS FOR HEATING WATER SUPPLY AND RETURN PIPING UTILIZED FOR MINIMUM INSULATION REQUIREMENTS.
LOCATIONINSULATIONMATERIAL
VAPORBARRIER
CHILLED WATERSUPPLY & RETURN
CHILLED WATERSUPPLY & RETURN
CHILLED WATERSUPPLY & RETURN
HEATING WATERSUPPLY & RETURN
HEATING WATERSUPPLY & RETURN
INTERIOR
INTERIOR(WITHIN PARTITION)
EXTERIOR
INTERIOR
INTERIOR(WITHIN PARTITION)
GLASS FIBERWITH ASJ-SSL
GLASS FIBERWITH ASJ-SSL
GLASS FIBERWITH ASJ-SSL
GLASS FIBERWITH ASJ-SSL
GLASS FIBERWITH ASJ-SSL
YES
YES
YES
YES
YES
JACKET
NONE
NONE
ALUMINUM
NONE
NONE
OPERATINGTEMPERATURE
( ° F )
44 - 56
44 - 56
44 - 56
120
120
MEAN TEMP RATING ( ° F )
NOMINAL PIPE SIZE (IN)
0.21 - 0.27 75
0.21 - 0.27 75
0.21 - 0.27 75
0.25 - 0.29 125
0.25 - 0.29 125
REMARKS< 1 1 TO < 1-1/2 1-1/2 TO < 4 4 TO < 8 ≤ 8
0.5 1 1 1 -
0.5 1 1 1 1
0.5 1 1 1 -
1.5 2 2 2 2
1 2 2 2 1, 2
0.5
0.5
0.5
1.5
1
B & G
B & G
AERCO
BMK 3000
NATURAL
GAS3,000 3,614 2,880 208/193 120 1, 2, 32010 160 557 2,580
(E) ET-1(E) CH-1
3. SCHEDULE VALUES TAKEN FROM EXISTING DRAWINGS.
2. BASE-MOUNTED END-SUCTION PUMP CONFIGURATION.
4. SCHEDULE VALUES TAKEN FROM EXISTING DRAWINGS.
3. SCHEDULE VALUES TAKEN FROM EXISTING DRAWINGS.
57
PACKAGE ROOFTOP UNIT SCHEDULE (CARMODY REUSE)
SYMBOL
RTU-5
RTU-6
AREA
SERVED
AREA A
MUSIC ROOM
AREA B
ART, LMC
MANUFACTURER
MODEL
AAON
RN-016
CFM
@5,600'
ESP
(IN WC)OSA
CFMHP FRPM
SUPPLY FAN DATA
CFM
@5,600'
ESP
(IN WC)TYPE /
DIA (IN.)FRPM
EXHAUST FAN DATA
EAT
( ° F )
LAT
( ° F )
EWT
( ° F )
LWT
( ° F )
MBH
@5,600'GPM
WPD
(FT)
MAX APD
(IN WC)
HOT WATER HEATING COIL DATA
FC/
222,500 2.0 3 1509 2,500 0.25 707 31.6 57.6 120 90.6 77.7 2 0.1 0.1
MERV
FILTER DATA
TYPE
2" PLEAT 8
OPERATING
WEIGHT
(LBS.)REMARKS
1, 2, 3, 4, 5, 92,211
APPROX.
UNIT DIMENSIONS
L" x W" x H"
EDB
( ° F )
EWB
( ° F )
LAT
( ° F )
83.8
CHILLED WATER COOLING COIL DATA
60.9
EWT
( ° F )
55.3
LWT
( ° F )
66.7
MBH
@5,600'GPM
WPD
(FT)
APD
(IN WC)
25 2.7 0.04
RTU-7AREA A
COMMONS
RTU-8
1,200
TYPE /
DIA (IN.)
2.06
MAX.
BHP
PLENUM
HP
1 0.26
MAX.
BHP
49.644 110 X 78 X 5922
AREA B
KINDERGARTEN
AAON5,000 5 16192,100 3.6
PLENUM
24.5
5,500 5 13463,000 3.62PLENUM
27.5
4,000 5 15312,700 2.99PLENUM
24.5
2.3
2.0
2.1
FC/
225,000 0.25 11932 1.11
FC/
225,500 0.25 12972 1.41
FC/
224,000 0.25 9891 0.65
36.4 56.9 140.4 20 0.6 0.04
26.3 104.5 332.2 28 0.7 0.05
16.0 56.0 168.6 22 0.7 0.03
83.6 61.1 54.3 135.3 23 7.54 0.1756.444
84.5 61.1 54.0 153.5 30 10.35 0.254.844
86.1 61.3 54.7 116.6 15 4.76 0.1260.444
2" PLEAT 8 2,335
2" PLEAT 8 2,335
2" PLEAT 8 2,322
120 105.2
120 90.0
120 103.9
AAON
AAON
RN-016
RN-016
RN-016
PACKAGE ROOFTOP UNIT SCHEDULE
SYMBOLAREA
SERVED
MANUFACTURER
MODELCFM
@5,600'
ESP
(IN WC)OSA
CFMHP FRPM
SUPPLY FAN DATA
CFM
@5,600'
ESP
(IN WC)TYPE /
DIA (IN.)FRPM
EXHAUST FAN DATA
EAT
( ° F )
LAT
( ° F )
EWT
( ° F )
LWT
( ° F )
MBH
@5,600'GPM
WPD
(FT)
MAX APD
(IN WC)
HOT WATER HEATING COIL DATA
REMARKS:
1. PROVIDE WITH A SINGLE POWER POINT CONNECTION. PROVIDE WITH VFD ON SUPPLY AND EXHAUST FAN, 100% OSA ECONOMIZER, RA SMOKE DETECTOR, AND MANUFACTURERS ROOF CURB.
2. PROVIDE WITH 2-WAY PRESSURE INDEPENDENT HEATING COIL CONTROL VALVE.
3. PROVIDE WITH 2-WAY PRESSURE INDEPENDENT CHILLED WATER COIL CONTROL VALVE.
MERV
FILTER DATA
TYPE
OPERATING
WEIGHT
(LBS.)REMARKS
APPROX.
UNIT DIMENSIONS
L" x W" x H"
EDB
( ° F )
EWB
( ° F )
LAT
( ° F )
CHILLED WATER COOLING COIL DATA
EWT
( ° F )
LWT
( ° F )
MBH
@5,600'GPM
WPD
(FT)
APD
(IN WC)TYPE /DIA (IN.)
MAX.BHP
HPMAX.BHP
SR-1 -STEELSTANDARD
WHITESEE PLANS
520PRICE
SURFACE -
ER-1 ALUMINUMSTANDARD
WHITESEE PLANS
80PRICE
SURFACE OBD
-
OBDSCD
PRICE STANDARDWHITE
CEILINGSTEELLAY-IN
AIR DEVICE SCHEDULE
SYMBOL TYPE
DIFFUSER
SURFACE STEEL
INLETSIZE
MATERIALTYPE
DAMPERACCESSORIES REMARKSFRAME FINISH
WHITESTANDARDPRICE
SCD
-
-
-
CD-1 SEE PLANS
CD-2
-
CEILINGDIFFUSER
CG-1 ALUMINUMSTANDARD
WHITE24"x24"
80PRICE
LAY-IN - -
CG-2 ALUMINUMSTANDARD
WHITE24"x12"
80PRICE
LAY-IN - -
SEE PLANS
MANUFACTURERMODEL
REMARKS:1. SEE SPECIFICATIONS FOR OPTIONS, AND ACCESSORIES.2. PROVIDE WITH RETURN AIR SOUND BOOT.3. DUCT-MOUNTED EXPOSED DIFFUSER SECURED TO END OF RIGID SUPPLY DUCT.4. CRAWLSPACE EXHAUST REGISTER MOUNTED DIRECTLY TO RECTANGULAR DUCT.5. DUCT-MOUNTED EXPOSED REGISTER SECURED TO END OF RIGID EXHAUST DUCT.
CEILING RETURNGRILLE
CEILING RETURNGRILLE
CEILING EXHAUSTREGISTER
SIDEWALL SUPPLYREGISTER
SR-2 -STEELSTANDARD
WHITESEE PLANS
SDGEPRICE
SURFACE EXTRACTOR -DUCT MOUNTED
SUPPLY REGISTER
SG-1 -STEELSTANDARD
WHITESEE PLANS
530PRICE
SURFACE - -SIDEWALL RETURN
GRILLE
1
1
1, 2
1, 2
1
1
1
1
115/11,500 0.22 13.3 1518 1/2 91
115/1400 0.25 5.7 1209 1/8 57
GIRLS/BOYS
STAFF TLT.115/11,725 0.35 9.8 1140 1/4 92
CRAWLSPACE
VENTILATION208/12,100 0.40 11.3 995 2 100
4. PUMP GPM HAS BEEN REVISED TO 328 GPM FROM 315 GPM AND A REVISED PUMP HEAD. IMPELLER TO BE CHANGED OUT TO SCHEDULED SIZE. RE-BALANCE SYSTEM TO GPM SHOWN.
-RCD
SURFACE STEELWHITE
STANDARDPRICE-CD-3
CEILINGDIFFUSER
SEE PLANS 1, 3
ER-2 ALUMINUMSTANDARD
WHITESEE PLANS
80PRICE
SURFACE OBD -DUCT-MOUNTED
REGISTER1, 4
ER-3 ALUMINUMSTANDARD
WHITESEE PLANS
80PRICE
- OBD -DUCT-MOUNTED
REGISTER1, 5
DISCHARGE CLEARANCE ABOVE ROOF SURFACE.
EF-14
TF-1
GREENHECK
G-095DIRECT
CENTRIFUGAL
ROOFT-STAT 1
GREENHECK
SQ-75-DDIRECT
CENTRIFUGAL
INLINE3
ELEC
215A115/1250 0.12 1.9 808 1/12 57
ELEC
125A115/1200 0.16 4.4 1471 1/30 33T-STAT
SR-2 -STEELSTANDARD
WHITESEE PLANS
SDGEPRICE
SURFACE EXTRACTOR -DUCT MOUNTED
SUPPLY REGISTER1
4. INTERLOCK WITH CRAWLSPACE EXHAUST FAN, EF-13.
2. PROVIDE WITH THERMOSTAT AND HUMIDISTAT, INTERLOCK WITH MAU-3.3. PROVIDE WITH SOLID-STATE SPEED CONTROLLER, INLET GUARD, HANGERS, AND VIBRATION ISOLATORS.
STAIR
EXPS.CUH-7
97TRANE
FF-BB-02
VERT.
CABINET206 1204.0 37 1 120/1 2.75 15
UNIT MTD.
STAT1, 2, 3, 4
VERTICAL /CABINET
97TRANE
FF-BB-02
VERT.
CABINET206 1204.0 37 1 120/1 2.75 15
UNIT MTD.
STAT1, 2, 3, 4
VERTICAL /CABINET
3. PROVIDE WITH EXTENDED END POCKET FOR CONTROL VALVE AND COIL PIPING.
110 X 78 X 59
110 X 78 X 59
110 X 78 X 59
1, 2, 3, 4, 6
1, 2, 3, 4, 7
1, 2, 3, 4, 8
5. RE-BALANCE PUMPS, EXISTING AND NEW, TO FLOW RATES SHOWN.
LD-1 -ALUMINUMSTANDARD
WHITESEE PLANS
LBPPRICE
- OBD -LINEAR
BAR GRILLE1, 3
4. PROVIDE WITH 3-WAY VALVE, RE: DETAIL 7/M-531.
9. PROVIDE WITH 3-WAY VALVE, RE: DETAIL 7/M-531.
3. SCHEDULE VALUES TAKEN FROM EXISTING DRAWINGS.
3. SCHEDULE VALUES TAKEN FROM EXISTING DRAWINGS WITH ONLY SYSTEM VOLUME AND GLYCOL GALLONS REVISED.
4. SYSTEM VOLUME HAS BEEN CALCULATED AT 820 GALLONS, AS SHOWN, REVISED FROM 920 GALLONS PLANNED IN EXISTING DRAWINGS.
6. BALANCE PUMP TO MAXIMUM CHILLER FLOW OF 215 GPM, AS SHOWN IN CHILLER SCHEDULE.
5. UPDATE PMC BOARD ON EXISTING BOILER TO ALLOW CASCADE CONTROL INTEGRATION WITH NEW BOILER.
V / PH
ELECTRICAL DATA
MCA MOCP
460/3 8 15
V / PH
ELECTRICAL DATA
MCA MOCP
460/3 33 50
460/3 43 70
460/3 12 15
460/3 13 20
460/3 13 20
REMARKS: NOTES:
1. UNIT CAPACITY BASED AT 5600' AND LISTED AIR AND WATER TEMPERATURES.1. SCHEDULE VALUES TAKEN FROM EXISTING DRAWINGS.
NOTES:
1. REFER TO SPECIFICATIONS FOR UNIT CONSTRUCTION, OPTIONS, OPTIONS, ACCESSORIES, AND REQUIREMENTS.
2. COIL SELECTIONS BASED ON 30% PROPYLENE GLYCOL
3. COIL SELECTIONS BASED ON 95°F AMBIENT (COOLING), -10°F AMBIENT (HEATING)4. COOLING COIL LAT REPRESENTS UNIT LAT. PROVIDE COOLING COIL LAT AT UNIT LAT INCLUDING MOTOR HEAT.
5. COORDINATE WITH DIVISION 26 FOR ELECTRICAL CONNECTIONS, RECEPTACLES, LIGHTS, CONTROLS AND OTHER ELECTRICAL
CONNECTIONS.
6. COORDINATE WITH DIVISION 26 FOR INTERCONNECTION OF MODULAR COMPONENTS INCLUDING CONTROLS, LIGHTS, AND RECEPTACLES.
7. REFER TO DETAILS SHEETS AND SPECIFICATIONS FOR UNIT CONFIGURATIONS.
RTU-9AREA C
CLASSROOMS
RTU-10AREA C
CLASSROOMS
12,000 15 14906,400 12.4PLENUM
30
AAON
RN-05017,000 20 17909,400 19.1
PLENUM
30
2.6
2.3
BC /
27.412,000 0.25 8042 1.08
BC /
27.417,000 0.25 10853 2.56
27.3 55.9 326.7 18 2.6 0.32
30.4 55.3 441.6 25 4.3 0.34
84.4 61.2 54.5 340.4 43 22.9 0.2360.744
83.9 61.0 54.9 472.1 60 22.1 0.460.644
2" PLEAT 8 1,2,34,061203 X 100 X 87
2" PLEAT 8 1,2,34,487203 X 100 X 87
120 81.6
120 82.7
AAON
RN-026
2. EXISTING CHILLER TO BE REFURBISHED BY MANUFACTURER. SEE REFURBISHMENT NOTES ON SHEET M001.
ENVIS
ION
MEC
HA
NIC
AL
EN
GIN
EER
S I
NC
.
9777 P
yramid
Court, S
uit
e 1
20
Engle
wood, C
O 8
0112
Tel-
303-6
88-0
223
Fax- 303-6
88-3
584
envis
ionengrs.c
om
Proje
ct #
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATIONAPPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISEUSED WITHOUT THE WRITTEN CONSENT OF
MOA ARCHITECTURE
NOT FOR
CONSTRUCTION
AD
DIT
ION
S A
ND
RE
NO
VA
TIO
NS
016-0
09
7/29
/201
6 11
:42:
38 A
M
M-002
MECHANICALSCHEDULES
SIE
RR
A E
LE
ME
NT
AR
Y S
CH
OO
L
PAF
08.04.16
16100.00
7771
Oak
St.
Arv
ada,
CO
800
05
BID SET
JKB
REVISION DATE
VARIABLE AIR VOLUME TERMINAL BOX SCHEDULE
SYMBOL AREA SERVEDMFG.
MODEL
AIR
INLET
SIZE
COOLING
AIRFLOW
@5600'
MINIMUM
AIRFLOW
@5600'
HEATING
AIRFLOW
@5600'
MIN.
SP @
INLET
AIR PD
IN WC
@ SL
NC @ 1.5" SP
RADIATED DISCHARGE
HEATING COIL DATA
MBH
@5600'GPM
COIL PD
FT WC
REMARKS
REMARKS:
1. HEATING CAPACITY BASED ON 120° F EWT, 55°F EAT, 90°F LAT AND 30% PROPYLENE GLYCOL.
2. PROVIDE WITH 2-WAY VALVE, RE: DETAIL 3 ON SHEET M-500.
3. PROVIDE WITH 3-WAY VALVE, RE: DETAIL 4 ON SHEET M-500.
VAV 5-02
VAV 5-01
VAV 6-01
MUSIC
105A, 105B
MUSIC
105
PRICE
SDV5
PRICE
SDV514"Ø
12"Ø 1,200
1,400
449
600
900
1,050 1.0
1.0
0.3
0.4
-
-
-
-
2.33.533.4
3.53.028.6 1, 2
VAV 6-02
VAV 6-03
VAV 8-02
VAV 8-03
VAV 8-04
VAV 9-01
VAV 9-02
VAV 9-03
VAV 9-04
VAV 9-05
VAV 9-06
VAV 9-07
VAV 9-08
VAV 9-09
VAV 9-10
VAV 9-11
VAV 9-12
VAV 9-13
VAV 9-14
VAV 9-15
VAV 9-16
VAV 10-01
VAV 10-02
VAV 10-03
VAV 10-04
VAV 10-05
VAV 10-06
VAV 10-07
VAV 10-08
VAV 10-09
VAV 10-10
VAV 10-11
VAV 10-12
VAV 10-13
VAV 10-14
VAV 10-15
VAV 10-16
VAV 10-17
VAV 10-18
ART
108
PRICE
SDV514"Ø 1,450 777 1,087 1.0 0.3 - - 2.53.634.5
LMC
109
PRICE
SDV512"Ø 1,250 693 937 1.0 0.6 - - 1.63.129.8
LMC
109
PRICE
SDV516"Ø 2,150 693 1612 1.0 0.6 - -
1.7
5.552.8
KINDERGARTEN
133
PRICE
SDV512"Ø 1,000 685 750 1.0 0.3 - -
4.6
2.523.8
KINDERGARTEN
132
PRICE
SDV510"Ø 1,000 683 750 1.0 0.5 - -
2.7
2.523.8
KINDERGARTEN
131
PRICE
SDV512"Ø 1,100 690 825 1.0 0.4 - -
2.9
2.726.2 1, 3
KINDERGARTEN
130
PRICE
SDV512"Ø 1,150 737 840 1.0 0.4 - -
2.4
2.826.7
1ST GRADE
129
PRICE
SDV510"Ø 850 647 647 1.0 0.4 - -
1.6
2.120.6
1ST GRADE
128
PRICE
SDV512"Ø 1,200 647 900 1.0 0.6 - -
3.5
3.029.1
1ST GRADE
127
PRICE
SDV512"Ø 1,200 647 900 1.0 0.4 - -
2.7
3.028.6 1, 3
1ST GRADE
126
PRICE
SDV510"Ø 900 651 675 1.0 0.4 - -
1.9
2.221.5
BOYS 112
GIRLS 110
PRICE
SDV59"Ø 810 243 607 1.0 0.4 - -
4.6
2.019.3
FLEX
CLASSRM 113
PRICE
SDV510"Ø 1,000 650 750 1.0 0.5 - -
2.2
2.523.8
RESOURCE RM
125
PRICE
SDV59"Ø 850 255 638 1.0 0.4 - -
1.3
2.120.3
CORRIDOR
103
PRICE
SDV59"Ø 600 210 525 1.0 0.3 - -
3.5
1.716.7
2ND GRADE
219
PRICE
SDV512"Ø 1,200 495 900 1.0 0.4 - - 3.028.6
CLASSROOM
218
PRICE
SDV512"Ø 1,200 498 900 1.0 0.4 - - 3.53.028.6
CLASSROOM
217
PRICE
SDV512"Ø 1,200 500 900 1.0 0.6 - - 1.63.029.1 1, 3
CLASSROOM
216
PRICE
SDV510"Ø 900 498 675 1.0 0.4 - - 2.72.221.5
BOYS 203
GIRLS 201
PRICE
SDV59"Ø 810 258 645 1.0 0.4 - - 2.32.120.5
FLEX
CLASSROM 204
PRICE
SDV59"Ø 750 500 562 1.0 0.3 - - 1.51.917.9
RESOURCE RM
215
PRICE
SDV59"Ø 750 270 675 1.0 0.4 - - 2.72.221.5
COORIDOR
200
PRICE
SDV57"Ø 450 137 307 1.0 0.2 - - 1.71.09.8
TEACHER
WORKRM 125
PRICE
SDV59"Ø 790 237 592 1.0 0.3 - - 1.82.018.8
3RD GRADE
118
PRICE
SDV512"Ø 1,200 653 900 1.0 0.5 - - 1.63.029.1
3RD GRADE
119
PRICE
SDV512"Ø 1,410 653 975 1.0 0.6 - - 1.83.231 1, 3
3RD GRADE
117
PRICE
SDV512"Ø 1,000 652 750 1.0 0.3 - - 2.12.523.8
3RD GRADE
120
PRICE
SDV51,200 653 900 1.0 0.6 - - 1.63.029.1
2ND GRADE
116
PRICE
SDV512"Ø 1,000 654 750 1.0 0.3 - - 2.12.523.8
2ND GRADE
122
PRICE
SDV512"Ø 1,200 653 900 1.0 0.6 - - 1.63.029.1
2ND GRADE
115
PRICE
SDV510"Ø 1,000 651 750 1.0 0.7 - - 1.42.523.8
2ND GRADE
123
PRICE
SDV512"Ø 1,200 653 900 1.0 0.6 - - 1.63.029.1
5TH GRADE
205
PRICE
SDV512"Ø 1,000 501 750 1.0 0.3 - - 2.12.523.8
4TH GRADE
213
PRICE
SDV512"Ø 1,000 502 750 1.0 0.3 - - 2.12.523.8
5TH GRADE
206
PRICE
SDV512"Ø 1,000 503 750 1.0 0.3 - - 2.12.523.8
5TH GRADE
212
PRICE
SDV512"Ø 1,000 503 750 1.0 0.3 - - 2.12.523.8
6TH GRADE
207
PRICE
SDV512"Ø 1,000 502 750 1.0 0.3 - - 2.12.523.8
6TH GRADE
210
PRICE
SDV512"Ø 1,200 503 900 1.0 0.6 - - 1.63.029.1
6TH GRADE
209
PRICE
SDV512"Ø 1,375 502 975 1.0 0.6 - - 1.83.231 1, 3
6TH GRADE
208
PRICE
SDV512"Ø 1,300 503 975 1.0 0.6 - - 1.83.231
TEACHER
WK RM 125
PRICE
SDV59"Ø 790 237 592 1.0 0.3 - - 1.82.018.8
VAV 8-01
12"Ø
VAV 6-04CORRIDOR
103
PRICE
SDV57"Ø 600 165 412 1.0 0.4 - -
2.1
1.413.1
2.8
1, 2
1, 2
1, 2
1, 2
1, 3
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
CONTROL VALVE SCHEDULE
UNIT FLUID GPM
HEATING WATER 2 - WAY 3 3/4
VALVE TYPEVALVEMAX PD(FT WC)
COILCONN.SIZE (IN)
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
HEATING WATER
2 - WAY
2 - WAY
2 - WAY
2 - WAY
3 - WAY
2 - WAY
2 - WAY
3 - WAY
2 - WAY
2 - WAY
2 - WAY
3 - WAY
2 - WAY
2 - WAY
2 - WAY
2 - WAY
2 - WAY
2 - WAY
2 - WAY
3 - WAY
2 - WAY
2 - WAY
2 - WAY
2 - WAY
2 - WAY
2 - WAY
2 - WAY
3 - WAY
2 - WAY
2 - WAY
2 - WAY
2 - WAY
2 - WAY
2 - WAY
2 - WAY
2 - WAY
2 - WAY
2 - WAY
2 - WAY
2 - WAY
3 - WAY
2 - WAY
2- WAY
3 - WAY
3 - WAY
3 - WAY
3 3/4
3 3/4
3 3/4
3 1
3 3/4
3 3/4
3 1
3 3/4
3 3/4
3 3/4
3 3/4
3 3/4
3 3/4
3 3/4
3 1
3 3/4
3 3/4
3 3/4
3 3/4
3 3/4
3 3/4
3 3/4
3 3/4
3 3/4
3 3/4
3 3/4
3 3/4
3 3/4
3 3/4
3 3/4
3 3/4
3 3/4
3 3/4
3 3/4
3 3/4
3 3/4
3 3/4
3 3/4
3 3/4
3 3/4
3 3/4
3 3/4
3 3/4
3 3/4
3 3/4
3 3/4
VAV 5-02
VAV 5-01
VAV 6-01
VAV 6-02
VAV 6-03
VAV 8-02
VAV 8-03
VAV 8-04
VAV 9-01
VAV 9-02
VAV 9-03
VAV 9-04
VAV 9-05
VAV 9-06
VAV 9-07
VAV 9-08
VAV 9-09
VAV 9-10
VAV 9-11
VAV 9-12
VAV 9-13
VAV 9-14
VAV 9-15
VAV 9-16
VAV 10-01
VAV 10-02
VAV 10-03
VAV 10-04
VAV 10-05
VAV 10-06
VAV 10-07
VAV 10-08
VAV 10-09
VAV 10-10
VAV 10-11
VAV 10-12
VAV 10-13
VAV 10-14
VAV 10-15
VAV 10-16
VAV 10-17
VAV 10-18
VAV 8-01
VAV 6-04
CUH-5
CUH-6
CUH-7
1.0
1.0
1.0
CW/HW LOOP(RTU-5)
CW LOOP(RTU-6)
CW LOOP(RTU-7)
HW LOOP(RTU-9)
HW LOOP(RTU-10)
CHILLED WATER
CHILLED WATER
HEATING WATER
HEATING WATER
25
23
30
18
25
3-WAY
DPBV
DPBV
DPBV
DPBV
- 1-1/4
- 1-1/2
- 2
- 1-1/2
- 1-1/2
CW LOOP(RTU-8)
CHILLED WATER 15 DPBV - 2
CW LOOP(RTU-9)
CHILLED WATER 43 DPBV - 2-1/2
CW LOOP(RTU-10)
CHILLED WATER 60 DPBV - 2
HW LOOP(RTU-6)
HW LOOP(RTU-7)
HW LOOP(RTU-8)
HEATING WATER
HEATING WATER
HEATING WATER
20
62
22
DPBV
DPBV
DPBV
- 1-1/2
- 1-1/2
- 1-1/2
CHILLED/HEATING
WATER
3.5
3.0
3.6
3.1
5.5
2.5
2.5
2.7
2.8
2.1
3.0
3.0
2.2
2.0
2.5
2.1
1.7
3.0
3.0
3.0
2.2
2.1
1.9
2.2
1.0
2.0
3.0
3.2
2.5
3.0
2.5
3.0
2.5
3.0
2.5
2.5
2.5
2.5
2.5
3.0
3.2
3.2
2.0
1.4
ENVIS
ION
MEC
HA
NIC
AL
EN
GIN
EER
S I
NC
.
9777 P
yramid
Court, S
uit
e 1
20
Engle
wood, C
O 8
0112
Tel-
303-6
88-0
223
Fax- 303-6
88-3
584
envis
ionengrs.c
om
Proje
ct #
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATIONAPPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISEUSED WITHOUT THE WRITTEN CONSENT OF
MOA ARCHITECTURE
NOT FOR
CONSTRUCTION
AD
DIT
ION
S A
ND
RE
NO
VA
TIO
NS
016-0
09
7/29
/201
6 11
:42:
39 A
M
M-003
MECHANICALSCHEDULES
(CONT.)
SIE
RR
A E
LE
ME
NT
AR
Y S
CH
OO
L
PAF
08.04.16
16100.00
7771
Oak
St.
Arv
ada,
CO
800
05
BID SET
JKB
REVISION DATE
TYP. 6
1
2
2
18"x
16"
RE:
MATCHLINE
MATCHLINE
M-100C
RE
:
MA
TC
HLIN
E
MA
TC
HLIN
E
M-1
00C
1 2 3 4
6
5
7 8 9 10 11 1213
E
G
K
L
J
M
D
F
H
6.5
E.A E.B
E.2
E.3
E.4
E.5
E.6
E.7
E.8
E.9
18"x12"
SR-2
350 CFM
3
10"x12"
DRAWING NOTES1. 18x16 MAKE UP AIR DUCT FROM ABOVE.
2. RUN DUCT TIGHT TO STRUCTURE IN CRAWLSPACE.
3. DUCT MOUNTED SUPPLY REGISTER, BALANCE TO AIRFLOW SHOWN.
X
ENVIS
ION
MEC
HA
NIC
AL
EN
GIN
EER
S I
NC
.
9777 P
yramid
Court, S
uit
e 1
20
Engle
wood, C
O 8
0112
Tel-
303-6
88-0
223
Fax- 303-6
88-3
584
envis
ionengrs.c
om
Proje
ct #
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATIONAPPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISEUSED WITHOUT THE WRITTEN CONSENT OF
MOA ARCHITECTURE
NOT FOR
CONSTRUCTION
AD
DIT
ION
S A
ND
RE
NO
VA
TIO
NS
016-0
09
7/29
/201
6 11
:42:
49 A
M
M-100B
UNDERFLOORMECHANICAL
PLAN - AREA B -PHASE 1A
SIE
RR
A E
LE
ME
NT
AR
Y S
CH
OO
L
CMD
08.04.16
16100.00
7771
Oak
St.
Arv
ada,
CO
800
05
BID SET
JKB
PLAN NORTH
AREA 'A'EXISTINGBUILDING
AREA 'B'
AREA 'C'
KEYPLANPLAN NORTH
1/8" = 1'-0"
UNDERFLOOR MECHANICAL LEVEL - AREA B1
REVISION DATE
1
2
RE:
MATCHLINE
MATCHLINE
M-100B
RE
:
MA
TC
HLIN
E
MA
TC
HLIN
E
M-1
00B
1 2 3 4
78
910
11 12
A
B
C
E
G
D
14"x14"
2
3
3
3
33
18"x12"
ER-2
420 CFM
18"x12"
ER-2
420 CFM
18"x12"
ER-2
420 CFM
14"x14"
18"x12"
ER-2
420 CFM
18"x12"
ER-2
420 CFM
18"x18"
18"x
18"
14"x14"
T
4
DRAWING NOTES1. 18x18 EXHAUST DUCT FROM ABOVE.
2. RUN EXHAUST DUCT TIGHT TO STRUCTURE IN CRAWLSPACE.
3. DUCT MOUNTED EXHAUST REGISTER, BALANCE TO AIRFLOW SHOWN.
4. NEW THERMOSTAT/HUMIDISTAT SENSOR, INTERLOCKED WITH EF-13 AND MAU-3.
X
ENVIS
ION
MEC
HA
NIC
AL
EN
GIN
EER
S I
NC
.
9777 P
yramid
Court, S
uit
e 1
20
Engle
wood, C
O 8
0112
Tel-
303-6
88-0
223
Fax- 303-6
88-3
584
envis
ionengrs.c
om
Proje
ct #
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATIONAPPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISEUSED WITHOUT THE WRITTEN CONSENT OF
MOA ARCHITECTURE
NOT FOR
CONSTRUCTION
AD
DIT
ION
S A
ND
RE
NO
VA
TIO
NS
016-0
09
7/29
/201
6 11
:42:
53 A
M
M-100C
UNDERFLOORMECHANICAL
PLAN - AREA C -PHASE 1A
SIE
RR
A E
LE
ME
NT
AR
Y S
CH
OO
L
CMD
08.04.16
16100.00
7771
Oak
St.
Arv
ada,
CO
800
05
BID SET
JKB
PLAN NORTH
AREA 'A'EXISTINGBUILDING
AREA 'B'
AREA 'C'
KEYPLANPLAN NORTH
1/8" = 1'-0"
UNDERFLOOR MECHANICAL LEVEL - AREA C1
REVISION DATE
DNDN
2
M-301
(E)AC-1
(E)ZC4-5250 CFM
(E)ZC4-4175 CFM
(E)ZC4-3560 CFM
(E)ZC4-61,575 CFM
(E)CD(E)CD
(E)CG
(E)CD(E)CD
(E)ER
(E)ER
(E)CD(E)CD
(E)CD
(E)CG
(E)14"x12"
(E)6"ø(E)6"ø
(E)3
8"x2
4"
(E)38"x24"
(E)8"x8"(E)8"x8"(E)8"x8"(E)22"x10"
(E)2
0"x1
8"
(E)20"x20"
(E)38"x24"(E)20"x14"
(E)14"x20"
(E)1
2"x1
4"(E
)18"
x14"
(E)2
6"x1
4"
(E)26"x14"
(E)CD(E)CD
(E)CG
(E)CG
(E)6"ø(E)8"ø(E)8"ø
(E)8"ø(E)8"ø
(E)CD(E)CD
(E)CD
(E)CG
(E)10"x8"(E)10"x8"(E)2
0"x1
2"
(E)10"x10"
(E)8"x6"(E)8"x6"(E)8"x6"
(E)8"x6"(E)8"x6"
(E)14"x14"
(E)8"x6"(E)8"x6"
(E)8"x6"
(E)ER(E)ER
(E)ER(E)ER
(E)18"x10"
(E)ER
(E)ZC4-2900 CFM
(E)32"x26"UP TO (E)RTU-4
UP TO (E)RTU-4
DOWN TO CRAWLSPACE BELOW
UP TO (E)MAU-2
(E)26"x18"
(E)6"ø(E)6"ø
(E)ZC4-1825 CFM
(E)CUH-2
(E)CD
(E)CD
(E)CD(E)CD(E)CD
(E)10"x10" (E)8"x10"
(E)6"ø (E)6"ø(E)6"ø(E)6"ø(E)6"ø
(E)CG
(E)42"x12"
(E)4
2"x1
2"
(E)12"x8"
(E)6"ø
(E)10"ø
(E)CD
(E)CD
(E)CD(E)CD
(E)6"ø(E)6"ø
(E)CUH-3
(E)CD
(E)CD
(E)30"x24"UP TO (E)RTU-1
(E)CUH-1
(E)CG (E)CD
(E)CD (E)CD
(E)CD
(E)CD
(E)CD
(E)CG
(E)CD
(E)CG(E)CD
(E)ER
24"x16"
(E)SR
24"x16"
(E)SR24"x16"
(E)SR
24"x16"
(E)SR24"x16"
(E)SR
24"x16"
(E)SR
(E)22"ø (E)28"ø (E)36"ø
(E)36"øDN TO (E)RTU-2
(E)ZC1-2405 CFM
(E)ZC1-3175 CFM
(E)ZC1-4300 CFM
(E)ZC1-5950 CFM
(E)ZC1-6175 CFM
(E)ZC1-7175 CFM
(E)ZC1-1470 CFM
(E)ZC1-8620 CFM
(E)16"x12"(E)20"x16"
(E)1
4"x1
0"
(E)2
0"x1
6"
(E)10"x10"
(E)8"x6"
(E)8"x6"
(E)1
0"x1
0"
(E)20"x16"(E)24"x16"
(E)3
0"x2
4"
(E)16"x14"(E
)16"
x14"
(E)12"x12"
(E)8"ø
(E)8"ø
(E)8"ø(E)8"ø
(E)CG
(E)CD
42"x12"
(E)SG
42"x12"
(E)SG
42"x12"
(E)SG
42"x12"
(E)SG
(E)CD
(E)CG
(E)CD
(E)ER (E)CD
(E)CD
(E)CG
(E)CD
(E)CG
(E)CD(E)CD
(E)CG
(E)CD
(E)CG
(E)1
6"x1
4"
(E)12"ø
(E)12"ø
(E)10"ø
(E)10"x12"
(E)6"ø (E)6"ø
(E)6"ø
(E)8"ø
(E)6"ø(E)6"ø
(E)3
6"x1
6"(E
)36"
x16"
(E)30"x30"
(E)6"ø(E)6"ø
(E)6"ø
(E)3
8"x2
4"
(E)10"ø
(E)10"ø
(E)42"x12"
(E)3
2"x2
0"
RE
:
MA
TC
HLIN
E
MA
TC
HLIN
E
M-1
01B
RE
:
MA
TC
HLIN
E
MA
TC
HLIN
E
M-1
01B
6
5
13
E
K
L
J
M
F
H
6.5
(E)UH-6
(E)UH-2
E.A E.B E.C E.D E.E E.F E.G
E.H
E.J
E.1
E.2
E.3
E.4
E.5
E.6
E.7
E.8
E.9
E.10
VAV-5-011,200 CFM
VAV-5-020 CFM
16"x
14"
16"x14"
14"ø
12"ø
1
24"x14"
SG-1
8"x14"
SR-2
420 CFM
8"x14"
SR-2
420 CFM
8"x14"
SR-2
420 CFM
8"x14"
SR-2
420 CFM
(E)ER
(E)TG
(E)TG
(E)CD
8"x14"
SR-2
420 CFM
8"x14"
SR-2
420 CFM
18"ø
2
3
3
3
3
(E)ZC3-11,500 CFM
(E)2
2"x1
4"
(E)ZC3-24,200 CFM
24"x14"
5
4
T(E)ZC3-1
6
T
5S c
S c
VAV-5-01
VAV-5-02
COOLERS
135C
STORAGE &RECEIVING
136
UNISEX TOILET
135B
KITCHEN
135
STORAGE
106C
OUTDOORSTORAGE
107
CHAIRSTORAGE
106B
FACILITYMANAGER
OFFICE
101N
OFFICE
106A
MUSIC
105
PRINCIPAL
101A
CLOSET
101B
CLINIC
101L
ASSIST.PRIN.
101G
UNISEX
101H
UNISEX
101M
STORAGE
101K
CONF.
101C
RESOURCEROOM
101D
OFFICE
101E
TEST
102A
TOILET
102B
MDF ROOM
143
CHALLENGE
102
STORAGE
102F
WORKROOM
102E
CORRIDOR
101J
CONFERENCE
102C
VESTIBULE
100
MECHANICAL
141
JAN.
139
VESTIBULE
142
ELECTRICAL
140
STORAGE
134A
GIRLS
138
BOYS
137
MULTI-PURPOSEGYMNASIUM
106
TOILET
102D
RECEPTION
101
DRY STORAGE
135D
VESTIBULE
104
KITCHENOFFICE
135A
WAITING
101F
8"ø
(R)CD
250 CFM
8"ø
(R)CD
150 CFM
CG-1
(R)CG
PHASE 1B
RTU-5 ABOVE
10"ø
CD-1
350 CFM
10"ø
CD-1
250 CFM
10"ø
CD-1
250 CFM
10"ø
CD-1
250 CFM
CG-1
10"ø
CD-1
250 CFM
8"ø
CD-1
200 CFM
10"ø
CD-1
350 CFM
10"ø
CD-1
350 CFM
10"ø
CD-1
350 CFM
CG-1
CG-1
10"x10"
28"x12"1
2
3
18"ø
18"x
12"
8"ø
10"ø
10"ø
10"ø10"ø
10"x12"
10"ø10"ø10"ø10"ø
(E)ZC1-8
(E)ZC1-7
T
4
DP6
7
7
7
T
T
T
T
T
T
T
T
T
T
T
T
T
T
(E)CUH-2
(E)ZC1-6
(E)ZC1-4
T(E)ZC3-2
(E)AC-1
(E)ZC4-6
(E)ZC4-4
(E)ZC4-5
(E)ZC4-3
(E)ZC4-2
(E)ZC4-1
(E)ZC1-2
(E)ZC1-3
T
(E)CUH-1
T(E)CUH-3
HALL
103
HALL
103
HALL
103B
HALL
103A
8
8
DRAWING NOTES1. RETURN GRILLE AT 12' AFF. TRANSFER DUCT PER DETAIL 6/M-501.
2. NEW 22"Ø SUPPLY DUCT TO EXTEND TO EXISTING CAFETERIA. RE: M-101B FORCONTINUATION.
3. CONTRACTOR TO DISCONNECT AND FIX-OPEN EXISTING FIRE-SMOKE DAMPER.
4. 32x20 SUPPLY DUCT TO BE LEFT OPEN TO STORAGE ROOM FOR SUPPLY IN PLENUM FROMRTU-3.
5. 20x22 RETURN DUCT TO BE LEFT OPEN TO STORAGE ROOM FOR RETURN TO RTU-3.
6. RELOCATED THERMOSTAT TO BE PLACED IN PLENUM FOR ZC3-1.
7. RESECURE RETURN AIR DUCT LINER IN UNIT.
8. USE SHEET METAL TO CAP DUCT AT WALL. REINSTALL GRILLE ON WALL.
X
DRAWING NOTES1. 16x14 SUPPLY DUCT UP THROUGH ROOF TO RTU-5.
2. 32x14 RETURN DUCT UP THROUGH ROOF TO RTU-5.
3. RETURN AIR DUCT SOUND ELBOW, RE: DETAIL 3/M-501.
4. RELOCATED THERMOSTAT FROM NORTH WALL OF WAITING ROOM TO WEST WALL OF OFFICE.
5. RELOCATED THERMOSTAT FROM NORTH WALL OF RESOURCE ROOM TO WEST WALL.
6. DUCT PRESSURE SENSOR LOCATION SET POINT AT 1.2" W.C.
X
GENERAL NOTES1. RE-BALANCE EXISTING AIR AND WATER SYSTEMS TO VALUES RECORDED PRIOR TO
CONSTRUCTION. INFORMATION SHALL BE LOGGED AND SUBMITTED TO OWNER.
ENVIS
ION
MEC
HA
NIC
AL
EN
GIN
EER
S I
NC
.
9777 P
yramid
Court, S
uit
e 1
20
Engle
wood, C
O 8
0112
Tel-
303-6
88-0
223
Fax- 303-6
88-3
584
envis
ionengrs.c
om
Proje
ct #
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATIONAPPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISEUSED WITHOUT THE WRITTEN CONSENT OF
MOA ARCHITECTURE
NOT FOR
CONSTRUCTION
AD
DIT
ION
S A
ND
RE
NO
VA
TIO
NS
016-0
09
7/29
/201
6 11
:42:
59 A
M
M-101A
FIRST FLOORMECHANICAL
PLAN - AREA A -PHASES 1A & 1B
SIE
RR
A E
LE
ME
NT
AR
Y S
CH
OO
L
CMD
08.04.16
16100.00
7771
Oak
St.
Arv
ada,
CO
800
05
BID SET
JKB
PLAN NORTHPLAN NORTH
AREA 'A'EXISTINGBUILDING
AREA 'B'
AREA 'C'
KEYPLAN 1/8" = 1'-0"
FIRST FLOOR MECHANICAL PLAN - AREA A1
REVISION DATE
5
VAV 9-04900 CFM
VAV 9-031,200 CFM
VAV 9-021,200 CFM
VAV 9-01850 CFM
VAV 8-041,150 CFM
VAV 8-011,000 CFM
VAV 8-031,100 CFM
CG-1
CG-1
CG-1
CG-1
CG-1
8"ø
CD-1
225 CFM
8"ø
CD-1
225 CFM
8"ø
CD-1
225 CFM8"ø
CD-1
225 CFM
8"ø
CD-1
300 CFM8"ø
CD-1
300 CFM
8"ø
CD-1
300 CFM
8"ø
CD-1
300 CFM
8"ø
CD-1
300 CFM
8"ø
CD-1
300 CFM
8"ø
CD-1
300 CFM
8"ø
CD-1
300 CFM
8"ø
CD-1
210 CFM
8"ø
CD-1
210 CFM
8"ø
CD-1
210 CFM
8"ø
CD-1
220 CFM
8"ø
CD-1
230 CFM
8"ø
CD-1
230 CFM
8"ø
CD-1
230 CFM
8"ø
CD-1
230 CFM
14"x12"
14"x
12"
10"x
12"
12"x
12"
16"x
12"
16"x12"
12"x
12"
16"x
12"
16"x12"
10"x
12"
14"x
12"
14"x12"
RE:
MATCHLINE
MATCHLINE
M-101C
RE
:
MA
TC
HLIN
E
MA
TC
HLIN
E
M-1
01C
RE
:
MA
TC
HLIN
E
MA
TC
HLIN
E
M-1
01A
RE
:
MA
TC
HLIN
E
MA
TC
HLIN
E
M-1
01A
1 2 3 4
6
5
7 8 9 10 11 1213
E
G
K
L
J
M
D
F
H
6.5
E.A E.B
E.4
E.5
E.6
E.7
E.8
E.9
18"x16"
24"x16"
18"x16"
18"x16"10"x10"
VAV 9-05810 CFM
20"x20"
12"ø
12"ø10"ø
10"ø
9"ø
8"x8"
SG-1
60 CFM
8"ø
CD-2
150 CFM
8"ø
CD-2
150 CFM
12"x
12"
8"ø
8"ø
12"x12"
6"ø
18"x16"
12"x12"
ER-1
100 CFM
6"ø
CD-2
50 CFM
8"x8"
SR-1
30 CFM
6"ø
8"ø
16"x
12"
16"x12"
10"x
12"
8"ø 8"ø
6"ø
8"ø
8"ø
8"x8"
SG-1
30 CFM
18"x
16"10"ø
CD-1
75 CFM
6"ø
CD-1
75 CFM
10"x
12"
6"ø
10"ø
10"x14"
10"ø12"ø
CG-1
8"ø
CD-1
230 CFM8"ø
CD-1
230 CFM
8"ø
CD-1
230 CFM8"ø
CD-1
230 CFM
12"x12"
ER-1
100 CFM6"ø
CD-2
50 CFM
8"x8"
SG-1
30 CFM
6"ø
CD-2
50 CFM6"ø
CD-2
50 CFM
8"ø
CD-1
230 CFM8"ø
CD-1
230 CFM
8"ø
CD-1
230 CFM8"ø
CD-1
230 CFM8"ø
CD-1
255 CFM
8"ø
CD-1
255 CFM8"ø
CD-1
255 CFM
8"ø
CD-1
255 CFM
8"x8"
SG-1
30 CFM
12
14
13
10
CG-1 CG-1
VAV 6-011,450 CFM
18"x16"
18"x16"
11
10"x10"10"x10"
10"x10"
15
12"x12"
ER-1
160 CFM
12"x12"
ER-1
200 CFM
12"x12"
ER-1
160 CFM
12"x12"
ER-1
200 CFM
14"x14"
8"ø
8"ø
8"ø
8"ø6"ø6"ø
6"ø
7
VAV 8-021,000 CFM
CUH-5206 CFM
2
3
RTU-7 ABOVE
1
4
6
12"x12"
ER-3
500 CFM8"ø
CD-1
160 CFM
8"ø
CD-1
160 CFM
8"ø
CD-1
160 CFM
12"x12"
ER-3
500 CFM
12"x12"
ER-3
500 CFM
8"ø
CD-1
160 CFM 8"ø
CD-1
160 CFM
8"ø
CD-1
160 CFM
8"ø
CD-1
160 CFM
8"ø
CD-1
160 CFM
16"x16"
16"x16"
16"x16"
16"x14"
12"x12"
28"ø
30"x
20"
18"ø 22"ø
8
9
8
8
8 8
8"x14"
SR-2
420 CFM
8"x14"
SR-2
420 CFM
8"x14"
SR-2
420 CFM
8"x14"
SR-2
420 CFM
16
16
RTU-8 ABOVE
18
17
17
19
24"x14"
8"ø
8"ø
8"ø
8"ø
8"ø
8"ø8"ø
8"ø
24"x14"
SG-1
10"ø
CD-1
200 CFM
20
OPENTO
ABOVE
OPENTO
ABOVE
12"x12"
ER-1
100 CFM12"x12"
ER-1
100 CFM
18"x16"
16"x12"
8"ø
8"ø
16"x
12"
16"x
12"
16"x12"
10"x12"10"x12"
8"ø8"ø6"ø
6"ø
10"x10" 6"ø6"ø
8"x8"6"ø 6"ø 8"ø
8"ø 8"ø
8"ø
8"ø
6"ø
6"ø
6"ø
16"x12"
16"x
12"
8"ø
8"x8"
6"ø6"ø6"ø
18"x
16"
CG-1
CG-1
CG-1
CG-1
8"ø8"ø
8"ø8"ø
8"ø
CD-2
150 CFM
8"ø
CD-2
150 CFM
22
21
CG-1
CG-1
CG-1
16
16
18"x16"
6"ø
1616
S cVAV 8-01
S cVAV 8-04
S c
VAV 9-01
S c
S cVAV 9-03
VAV 9-02
S cVAV 8-03 S c
VAV 8-02
S cVAV 9-04
CG-1T
16
T
12"x12"
SR-1
70 CFM
8"x8"
SR-1
50 CFM
8"x8"
SR-1
50 CFM
23
24
24
24
6"ø
6"ø
6"ø
1680 CFM
2520 CFM
16"x14"14"ø
RTU-7
6"ø 6"ø
8"ø8"ø
8"ø
10"x12"
12"ø
12"ø
8"ø 8"ø
8"ø 8"ø
8"ø8"ø
8"ø 8"ø
VAV 9-05
S c
S cVAV 6-02
VAV 6-03
14"x14"
SG-1
14"x14"
SG-1
8"øCD-1
150 CFM
CUH-5
12"x12"
ER-1
80 CFM
CLASSROOM
126
BOYS
112
CLASSROOM
127
CLASSROOM
128
CLASSROOM
129
KINDERGARTEN
130
KINDERGARTEN
131
KINDERGARTEN
132
KINDERGARTEN
133
COMMONS
134
ART
108
STORAGE
130B
STORAGE
131B
RR
131A
STORAGE
132B
RR
132A
RR
133B
STORAGE
133A
LIBRARY MEDIACENTER
109
GIRLS
110
CUST.
111
KILN
108A
STORAGE
108B
CORRIDOR
103
OFFICE
109B
VESTIBULE
109A
STAIR 1
S1.1
VESTIBULE
106D
S c
10"x10"
SG-1
DP
25
T
T
HALL
103
BREAKOUT
103D
DRAWING NOTES1. 10x10 EXHAUST DUCT UP THROUGH ROOF TO EF-9.
2. 4"Ø KILN VENT UP FROM KILN THROUGH ROOF. RE: M-121B FOR CONTINUATION.
3. 16x16 EXHAUST DUCT UP THROUGH ROOF TO EF-10.
4. RETURN GRILLE AT 12' AFF. TRANSFER DUCT PER DETAIL 3/M-501.
5. 48x48 KILN HOOD INSTALLED OVER KILN, RE: DETAIL 1/M-500.
6. PROVIDE FLOOR-MOUNTED CABINET UNIT HEATER.
7. 14"Ø FROM ABOVE TO VAV BOX, RE: M-102B FOR CONTINUATION.
8. ROUTE DUCTWORK TIGHT TO STRUCTURE.
9. 30x20 ABOVE CORRIDOR CEILING, THROUGH COMMONS WALL, TRANSITION TO 28"Ø.
10. 20x16 SUPPLY AIR UP THROUGH ROOF TO RTU-8.
11. 26x20 RETURN UP THROUGH ROOF TO RTU-8.
12. 18x16 DUCT DOWN IN CHASE TO CRAWLSPACE, RE: M-100B FOR CONTINUATION.
13. 10x10 UP THROUGH ROOF TO EF-11.
14. 18x16 UP THROUGH ROOF TO MAU-3.
15. 14x14 EXHAUST DUCT UP TO FLOOR ABOVE, RE: M-102B FOR CONTINUATION.
16. TRANSFER DUCT ABOVE CEILING TYPICAL. RE: DETAIL 6/M-501.
17. RETURN AIR DUCT SOUND ELBOW, RE: DETAIL 3/M-501. ROUTE ABOVE SUPPLY DUCT.
18. 44x12 RETURN UP THROUGH ROOF TO RTU-7.
19. 30x20 SUPPLY AIR UP THROUGH ROOF TO RTU-7.
20. 10"Ø FROM ABOVE TO VAV BOX, RE: M-102B FOR CONTINUATION.
21. 22x20 SUPPLY DUCT TO EXTEND TO AREA C. RE: M-101C FOR CONTINUATION.
22. 22"Ø SUPPLY DUCT TO EXTEND TO EXISTING CAFETERIA. RE: M-101A FOR CONTINUATION.
23. 12x12 DUCT RISE UP THRU STRUCTURE.
24. COORDINATE DUCT RUN WITH STRUCTURE.
25. DUCT PRESSURE SENSOR LOCATION. SET POINT OF 1.2" W.C.
X
ENVIS
ION
MEC
HA
NIC
AL
EN
GIN
EER
S I
NC
.
9777 P
yramid
Court, S
uit
e 1
20
Engle
wood, C
O 8
0112
Tel-
303-6
88-0
223
Fax- 303-6
88-3
584
envis
ionengrs.c
om
Proje
ct #
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATIONAPPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISEUSED WITHOUT THE WRITTEN CONSENT OF
MOA ARCHITECTURE
NOT FOR
CONSTRUCTION
AD
DIT
ION
S A
ND
RE
NO
VA
TIO
NS
016-0
09
7/29
/201
6 11
:43:
07 A
M
M-101B
FIRST FLOORMECHANICAL
PLAN - AREA B -PHASE 1A
SIE
RR
A E
LE
ME
NT
AR
Y S
CH
OO
L
CMD
08.04.16
16100.00
7771
Oak
St.
Arv
ada,
CO
800
05
BID SET
JKB
PLAN NORTH
AREA 'A'EXISTINGBUILDING
AREA 'B'
AREA 'C'
KEYPLANPLAN NORTH
1/8" = 1'-0"
FIRST FLOOR MECHANICAL PLAN - AREA B1
REVISION DATE
VAV 10-031,410 CFM
VAV 10-021,200 CFM
30"x24"
22"x
20"
14"x14"
VAV 10-041,000 CFM
VAV 10-051,200 CFM
VAV 10-01790 CFM
VAV 10-061,000 CFM
VAV 10-081,000 CFMVAV 10-09
1,200 CFM
VAV 10-071,200 CFM
16"x12"
16"x
12"
12"x
12"
10"ø
CD-1
300 CFM
10"ø
CD-1
300 CFM
10"ø
CD-1
300 CFM
10"ø
CD-1
300 CFM
CG-1
CG-1
CG-1
CG-1
CG-1
CG-1
CG-1
CG-1
CG-1
S cVAV 10-02
S cVAV 10-03
VAV 10-05 S c
S c
VAV 10-04
12"ø
12"ø
10"ø
CD-1
300 CFM
10"ø
CD-1
325 CFM
10"ø
CD-1
325 CFM
10"ø
CD-1
300 CFM
16"x14"
16"x
14"
12"x
12"
10"x
12"
14"x12"
14"x
12"
12"x
12"
16"x
12"
16"x12"
12"x
12"
16"x
12"
16"x12"
TVAV 10-01
14"x12"
14"x
12"
10"x
12"
10"ø
CD-1
250 CFM
10"ø
CD-1
250 CFM
10"ø
CD-1
250 CFM10"ø
CD-1
250 CFM
S cVAV 10-06
10"ø
CD-1
250 CFM
10"ø
CD-1
250 CFM
10"ø
CD-1
250 CFM
10"ø
CD-1
250 CFM
10"x
12"
14"x
12"
14"x12"
16"x12"
16"x
12"
12"x
12"
10"ø
CD-1
300 CFM
10"ø
CD-1
300 CFM
10"ø
CD-1
300 CFM
10"ø
CD-1
300 CFM
S c
VAV 10-09
S cVAV 10-07
10"ø
CD-1
250 CFM
10"ø
CD-1
250 CFM
10"ø
CD-1
250 CFM10"ø
CD-1
250 CFM
10"ø
CD-1
300 CFM
10"ø
CD-1
300 CFM
10"ø
CD-1
300 CFM
10"ø
CD-1
300 CFM
10"ø
CD-1
300 CFM
10"ø
CD-1
300 CFM
10"ø
CD-1
300 CFM
10"ø
CD-1
300 CFM
10"ø10"ø
10"ø10"ø
10"ø
10"ø
10"ø10"ø
10"ø10"ø
10"ø10"ø
10"ø
10"ø
10"ø10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø10"ø
10"ø10"ø
10"ø
10"ø
10"ø10"ø
12"ø 12"ø
9"ø
12"ø
8"ø
CD-1
140 CFM
8"ø
CD-1
140 CFM
12"ø12
"x14
"
12"ø10"ø
8"ø
CD-1
170 CFM
8"ø
CD-2
170 CFM
8"ø
8"ø
8"ø
8"ø
10"ø
30"x
20"
30"x
20"
S c
VAV 10-08
22"x
20"
8"ø
CD-1
170 CFM
RE:
MATCHLINE
MATCHLINE
M-101B
RE
:
MA
TC
HLIN
E
MA
TC
HLIN
E
M-1
01B
10"ø
CD-1
250 CFM
10"ø
CD-1
250 CFM
10"ø
CD-1
250 CFM
10"ø
CD-1
250 CFM
VAV 9-061,000 CFM
S c
VAV 9-06
14"x12"
14"x
12"
10"x
12"
1 2 3 4
78
910
11 12
A
B
C
E
G
D
12"x12"
7
6
5
2
VAV 9-07850 CFM
VAV 9-08600 CFM
32"x28"
32"x
28"
2
28"x
20"
18"x16"
6"ø
CD-2
50 CFM
12"x12"
ER-1
100 CFM
8"x8"
SR-1
260 CFM
6"ø
8"x8"
SG-1
130 CFM12"x12"
SG-1
170 CFM
CG-1 10"ø
CD-1
250 CFM
10"ø
CD-1
250 CFM
8"x8"
6"ø6"ø
10"ø
10"ø
18"x16"
18"x16"
6"ø
6"ø
20"x
20"
30"x
20"
16"x
14"
18"x16"
18"x16"
24"x20"
18"x16"
20"x20"
CUH-6206 CFM
1
4
3
3
4
6"ø
CD-1
170 CFM
3
3
3
3
3
CG-1
CG-1
CG-1
CG-1
CG-1
CG-1
CG-1
CG-1 3
CG-1
3
8
12"ø
S c
VAV 9-07
T
12"x12"9
8"ø
CD-1
170 CFM
8"x8"
SG-1
160 CFM
8"ø
8"ø
10"ø
14"x12"
12"x8"
8"x8"12"x8"
CUH-6
10
11
10
TF-1
14"x14"
14"x14"
T CUH-7
CUH-7206 CFM
3
18"x16"
9"ø
CLASSROOM
119
CLASSROOM
118
CLASSROOM
117
CLASSROOM
116
CLASSROOM
122
CLASSROOM
120
CLASSROOM
123
CLASSROOM
115
FLEXCLASSROOM
113
RESOURCEROOM
125
TEACHERWORK ROOM
121
STAFF RR
124
ELEC.
125A
STAIR 2
S2.1
VESTIBULE
114
CLASSROOM
126
12"x8"
8"ø
6"ø
6"ø6"ø
T
DP
12
DP12
1
HALL
103E
HALL
103E
12"x12"9
DRAWING NOTES1. PROVIDE FLOOR-MOUNTED CABINET UNIT HEATER.
2. 32x28 RETURN AIR DUCT UP TO FLOOR ABOVE, SEE M-102C FOR CONTINUATION.
3. TRANSFER DUCT ABOVE CEILING TYPICAL. RE: DETAIL 6/M-501.
4. RETURN AIR DUCT OPEN TO PLENUM.
5. 18x16 EXHAUST DUCT IN CHASE, RE: M-100C FOR CONTINUATION BELOW, RE: M-102C FORCONTINUATION ABOVE.
6. 30x24 SUPPLY DUCT UP TO FLOOR ABOVE, RE: M-102C FOR CONTINUATION.
7. 30x20 SUPPLY DUCT UP TO FLOOR ABOVE, RE: M-102C FOR CONTINUATION.
8. 22x20 SUPPLY DUCT TO EXTEND TO AREA B, RE: M-101B FOR CONTINUATION.
9. 12x12 TRANSFER DUCT INTO ADJACENT PLENUM SPACE.
10. 8x8 DUCT TO RISE UP TO RUN ABOVE RETURN DUCT.
11. 6"Ø EXHAUST DUCT TO RISE UP TO RUN ABOVE RETURN DUCT.
12. DUCT PRESSURE SENSOR LOCATION. SET POINT OF 1.2" W.C.
X
ENVIS
ION
MEC
HA
NIC
AL
EN
GIN
EER
S I
NC
.
9777 P
yramid
Court, S
uit
e 1
20
Engle
wood, C
O 8
0112
Tel-
303-6
88-0
223
Fax- 303-6
88-3
584
envis
ionengrs.c
om
Proje
ct #
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATIONAPPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISEUSED WITHOUT THE WRITTEN CONSENT OF
MOA ARCHITECTURE
NOT FOR
CONSTRUCTION
AD
DIT
ION
S A
ND
RE
NO
VA
TIO
NS
016-0
09
7/29
/201
6 11
:43:
11 A
M
M-101C
FIRST FLOORMECHANICAL
PLAN - AREA C -PHASE 1A
SIE
RR
A E
LE
ME
NT
AR
Y S
CH
OO
L
CMD
08.04.16
16100.00
7771
Oak
St.
Arv
ada,
CO
800
05
BID SET
JKB
PLAN NORTH
AREA 'A'EXISTINGBUILDING
AREA 'B'
AREA 'C'
KEYPLANPLAN NORTH
1/8" = 1'-0"
FIRST FLOOR MECHANICAL PLAN - AREA C1
REVISION DATE
LIBRARY MEDIACENTER
109
BOY'S
203
CLASSROOM
216
CLASSROOM
217
CLASSROOM
218
4TH GRADE
219
GIRLS
201
CUSTODIAL
202
STAIR 1
S1.2
VAV-9-12900 CFM
VAV 9-111,200 CFM
VAV 9-101,200 CFM
VAV 9-091,200 CFM
2
RE:
MATCHLINE
MATCHLINE
M-102C
RE
:
MA
TC
HLIN
E
MA
TC
HLIN
E
M-1
02C
CG-1
CG-1
CG-1
CG-1
8"ø
CD-1
300 CFM
8"ø
CD-1
300 CFM
8"ø
CD-1
300 CFM8"ø
CD-1
300 CFM
8"ø
CD-1
225 CFM8"ø
CD-1
225 CFM
8"ø
CD-1
225 CFM8"ø
CD-1
225 CFM
8"ø
CD-1
300 CFM8"ø
CD-1
300 CFM
8"ø
CD-1
300 CFM8"ø
CD-1
300 CFM
8"ø
CD-1
300 CFM8"ø
CD-1
300 CFM
8"ø
CD-1
300 CFM8"ø
CD-1
300 CFM
16"x12"
16"x
12"
12"x
12"
16"x12"
16"x
12"
12"x
12"
14"x12"
14"x
12"
10"x
12"
8"ø8"ø
8"ø8"ø
8"ø8"ø
8"ø8"ø
8"ø8"ø
8"ø8"ø
8"ø 8"ø
8"ø8"ø
12"x
12"
16"x
12"
16"x12"
12"ø
12"ø
12"ø
10"ø
S c
VAV 9-09
S cVAV 9-10
S cVAV 9-11
S cVAV-9-12
1 2 3 4
6
5
7 8 9 10 11 1213
E
G
K
L
J
M
D
F
H
6.5
E.A E.B
E.2
E.3
E.4
E.5
E.6
E.7
E.8
E.9
VAV-6-032,150 CFM
VAV-9-13810 CFM
BREAKOUT
200A
8"ø
CD-2
150 CFM
8"x8"
SG-1
60 CFM
8"ø
CD-2
150 CFM
MAU-3
EF-11
3
12"x12"
ER-1
200 CFM
12"x12"
ER-1
160 CFM
12"x12"
ER-1
200 CFM12"x12"
ER-1
160 CFM
10"x10"10"x10"
10"x10"
14"x14"
8"ø
6"ø
14"x
12"
8"ø
14"x12"
20"x20"
30"x
20"
20"x20"
24"x16"
18"x16"
10"x10"
18"x16"
10"x10"
1
15
4
RTU-6ABOVE
6
7
14"x12"
8
14"ø
16"ø
12"ø
14"ø
18"ø
12"ø
RTU-8
RTU-7
EF-9
EF-10
6"ø
CD-1
130 CFM
1
8"ø
CD-2
150 CFM
8"ø
CD-2
150 CFM
CG-1
CG-1
1
CG-1
CG-1
9
10"ø
CD-3
350 CFM
10"ø
CD-3
350 CFM 10"ø
CD-3
350 CFM
10"ø
CD-3
350 CFM10"ø
CD-3
350 CFM 10"ø
CD-3
350 CFM
14"ø
14"ø
10"ø
CD-3
350 CFM
10"ø
10"ø
8"ø
CD-1
150 CFM
8"ø
1
1
10"x10"
SR-2
150 CFM10"x10"
SR-2
150 CFM
VAV 6-04600 CFM
10"ø
CD-3
150 CFM10"ø
CD-3
150 CFM10"ø
10"ø
10"ø
VAV 6-021,250 CFM12"x12"
ER-1
80 CFM
9"ø
S c
S c
10"ø
LD-1
350 CFM
10"ø
LD-1
350 CFM
16"x14"
7"ø
24"x12"
SG-1
24"x12"
SG-1
DP10
TVAV-9-13
HALL
200
34"x
26"
17
11
11
DRAWING NOTES1. TRANSFER DUCT ABOVE CEILING TYPICAL. RE: DETAIL 6/M-501.
2. 14x14 EXHAUST DUCT FROM FIRST FLOOR, UP THROUGH ROOF TO EF-12.
3. 14"Ø DOWN ALONG WALL, RE: M-101B FOR CONTINUATION.
4. 32x18 RA DUCT UP THROUGH ROOF TO RTU-6.
5. 22x20 SA UP THROUGH ROOF TO RTU-6.
6. RETURN AIR DUCT SOUND ELBOW, RE: DETAIL 3/M-501. ROUTE RETURN DUCT ABOVE SUPPLYDUCT.
7. ROUTE DUCTWORK TIGHT TO STRUCTURE.
8. 10"Ø DOWN ALONG WALL, RE: M-101B FOR CONTINUATION.
9. 30x20 SUPPLY DUCT TO EXTEND TO AREA C, RE: M-102C FOR CONTINUATION.
10. DUCT PRESSURE SENSOR LOCATION. SET POINT OF 1.2" W.C.
11. INSTALL VAV BOX AT ACCESSIBLE AND SERVICIBLE HEIGHT ABOVE ACT CEILING GRID REFER TOARCHITECTURAL FOR CEILING HEIGHT IN THIS AREA.
X
ENVIS
ION
MEC
HA
NIC
AL
EN
GIN
EER
S I
NC
.
9777 P
yramid
Court, S
uit
e 1
20
Engle
wood, C
O 8
0112
Tel-
303-6
88-0
223
Fax- 303-6
88-3
584
envis
ionengrs.c
om
Proje
ct #
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATIONAPPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISEUSED WITHOUT THE WRITTEN CONSENT OF
MOA ARCHITECTURE
NOT FOR
CONSTRUCTION
AD
DIT
ION
S A
ND
RE
NO
VA
TIO
NS
016-0
09
7/29
/201
6 11
:43:
19 A
M
M-102B
SECOND FLOORMECHANICAL
PLAN - AREA B -PHASE 1A
SIE
RR
A E
LE
ME
NT
AR
Y S
CH
OO
L
CMD
08.04.16
16100.00
7771
Oak
St.
Arv
ada,
CO
800
05
BID SET
JKB
PLAN NORTH
AREA 'A'EXISTINGBUILDING
AREA 'B'
AREA 'C'
KEYPLANPLAN NORTH
1/8" = 1'-0"
SECOND FLOOR MECHANICAL PLAN - AREA B1
REVISION DATE
CLASSROOM
209
CLASSROOM
208
CLASSROOM
207
CLASSROOM
206
CLASSROOM
205
FLEXCLASSROOM
204
RESOURCEROOM
215
ELEC.
215A
CLASSROOM
213
CLASSROOM
212
CLASSROOM
210
TEACHERWORK ROOM
211
STAFF RR
214
STAIR 2
S2.2
VAV 10-161,375 CFM
VAV 10-171,300 CFM
VAV 10-141,000 CFM
VAV 10-151,200 CFM
VAV 10-18790 CFM
VAV 10-101,000 CFM
VAV 10-121,000 CFM
VAV 10-111,000 CFM
VAV 10-131,000 CFM
S c
S c
S c
S cVAV 10-17
VAV 10-14
VAV 10-15
VAV 10-16
14"x
14"
8"ø
CD-1
160 CFM
10"ø
CD-1
300 CFM
10"ø
CD-1
300 CFM
10"ø
CD-1
325 CFM
10"ø
CD-1
300 CFM
10"ø
CD-1
325 CFM
10"ø
CD-1
325 CFM
10"ø
CD-1
325 CFM
10"ø
CD-1
325 CFM
10"ø
CD-1
250 CFM
10"ø
CD-1
250 CFM
10"ø
CD-1
250 CFM
10"ø
CD-1
250 CFM
10"ø
CD-1
250 CFM
10"ø
CD-1
250 CFM
10"ø
CD-1
250 CFM
10"ø
CD-1
250 CFM
10"ø
CD-1
250 CFM
10"ø
CD-1
250 CFM
10"ø
CD-1
250 CFM
10"ø
CD-1
250 CFM
10"ø
CD-1
250 CFM
10"ø
CD-1
250 CFM
10"ø
CD-1
250 CFM10"ø
CD-1
250 CFM
10"ø
CD-1
250 CFM
10"ø
CD-1
250 CFM
10"ø
CD-1
250 CFM
10"ø
CD-1
250 CFM
10"ø
CD-1
300 CFM10"ø
CD-1
300 CFM
10"ø
CD-1
300 CFM10"ø
CD-1
300 CFMCG-1
CG-1
CG-1
CG-1
8"ø
CD-2
160 CFM
14"x
12"
10"ø
8"ø
8"ø
8"ø
CD-1
150 CFM
8"ø
CD-1
150 CFM
8"ø
8"ø
16"x
12"
12"x
12"
16"x12"
16"x12"
16"x
12"
12"x
12"
16"x12"
16"x
12"
12"x
12"
RE:
MATCHLINE
MATCHLINE
M-102B
RE
:
MA
TC
HLIN
E
MA
TC
HLIN
E
M-1
02B
14"x12"
14"x
12"
10"x
12"
14"x12"
14"x12"
14"x
12"
10"x
12"
CG-1
CG-1
14"x
12"
10"x
12"
14"x12"
14"x12"
14"x
12"
10"x
12"
10"x
12"
14"x
12"
CG-1
S cVAV 10-13
VAV 10-11S c
S c
S c
VAV 10-10
VAV 10-12
VAV 9-14750 CFM
10"ø
CD-1
190 CFM
10"ø
CD-1
180 CFM
10"ø
CD-1
190 CFM
10"ø
CD-1
190 CFM
10"x
12"
14"x
12"
14"x12"
S cVAV 9-14
10"ø
10"ø
10"ø
10"ø
10"ø10"ø
10"ø10"ø
9"ø
12"ø
12"ø
10"ø
10"ø
10"ø
10"ø
10"ø10"ø
10"ø
10"ø
10"ø
10"ø
10"ø10"ø
10"ø10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø10"ø
9"ø
12"ø
12"ø
12"ø
12"ø
CG-1
CG-1
1 2 3 4
78
910
11 12
A
B
C
E
G
D
7
12
5
62"x
26"
10
11
17
4
6
VAV 9-15750 CFM
6"ø
8"x8"
10"ø
10"ø
1
10"ø
CD-1
250 CFM
10"ø
CD-1
250 CFM
CG-1
16"x16"
SG-1
200 CFM
14"x12"
12"x12"
ER-1
100 CFM
6"ø
CD-2
50 CFM
6"ø
30"x
20"9
28"x
20"
26"x
20"
12"x12"
18"x16"
18"x16" 18"x16"
18"x16"
18"x16"
18"x16"
VAV 9-16450 CFM
3
2
2
8
8"x8"
SR-1
160 CFM
8"ø
CD-1
160 CFM
30"x
20"
2
2
2
2
2
18"x16"
2
2
2
CG-1
CG-1
CG-1
CG-1
CG-1
CG-1
CG-1
CG-1
CG-1
13
14
TVAV 10-18
12"x12"
T
15
10"x10"
ER-1
250 CFM
8"x8"
SG-1
150 CFM
8"ø
8"ø
CD-1
170 CFM
30"x
20"
8"ø
36"x
26"
12"ø
46"x26"
18"x16"18"x16"
12"x8"
8"ø
8"x8"
34"x26"
16
9"ø
12"ø
12"ø
12"x8"
8"ø
S cVAV 9-15
STAIR 3
S3.2
HALL
200
HALL
200
50"x26"
30"x24"
34"x
26"
32"x28"
17
DRAWING NOTES1. 32x28 RETURN AIR DUCT DOWN TO FIRST FLOOR, SEE M-101C FOR CONTINUATION.
2. TRANSFER DUCT ABOVE CEILING TYPICAL. RE: DETAIL 6/M-501.
3. 34x26 RETURN AIR DUCT TRANSITION TO HEIGHT IN CORRIDOR CEILING PLENUM.
4. 30x24 DUCT DOWN TO FIRST FLOOR PLENUM, RE: M-101C FOR CONTINUATION.
5. 50x40 DUCT UP THROUGH ROOF TO RTU-10, TRANSITION WITHIN ROOF CURB FOR UNIT CONNECTION.
6. 62x26 RETURN DUCT UP THROUGH ROOF TO RTU-10, TRANSITION WITHIN ROOF CURB FOR UNITCONNECTION.
7. 46x26 DUCT UP THROUGH ROOF TO RTU-9, TRANSITION WITHIN ROOF CURB FOR UNIT CONNECTION.
8. RETURN AIR DUCT TRANSITION FROM 50x28 TO 34x26.
9. 50x26 RETURN DUCT UP THROUGH ROOF TO RTU-9, TRANSITION WITHIN ROOF CURB FOR UNITCONNECTION.
10. 30x26 DUCT DOWN TO FIRST FLOOR, RE: M-101C FOR CONTINUATION.
11. 18x16 EXHAUST DUCT IN CHASE UP THROUGH ROOF TO EF-13, RE: M-101C FOR CONTINUATIONBELOW.
12. 30x20 DUCT DOWN TO FIRST FLOOR, RE: M-101C FOR CONTINUATION.
13. 30x20 DUCT TO EXTEND TO AREA B, RE: M-102B FOR CONTINUATION.
14. ROUTE RETURN DUCT ABOVE SUPPLY DUCT.
15. 10x10 EXHAUST DUCT UP THROUGH ROOF TO EF-14. RE: M-121C FOR CONTINUATION ABOVE.
16. 30x26 RETURN DUCT RUN ABOVE 28x20 SUPPLY DUCT. COORDINATE IN CEILING SPACE.
17. 36x26 RETURN AIR DUCT OPEN TO PLENUM, WITH MANUAL BALANCING DAMPER.
X
ENVIS
ION
MEC
HA
NIC
AL
EN
GIN
EER
S I
NC
.
9777 P
yramid
Court, S
uit
e 1
20
Engle
wood, C
O 8
0112
Tel-
303-6
88-0
223
Fax- 303-6
88-3
584
envis
ionengrs.c
om
Proje
ct #
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATIONAPPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISEUSED WITHOUT THE WRITTEN CONSENT OF
MOA ARCHITECTURE
NOT FOR
CONSTRUCTION
AD
DIT
ION
S A
ND
RE
NO
VA
TIO
NS
016-0
09
7/29
/201
6 11
:43:
24 A
M
M-102C
SECOND FLOORMECHANICAL
PLAN - AREA C -PHASE 1A
SIE
RR
A E
LE
ME
NT
AR
Y S
CH
OO
L
CMD
08.04.16
16100.00
7771
Oak
St.
Arv
ada,
CO
800
05
BID SET
JKB
PLAN NORTH
AREA 'A'EXISTINGBUILDING
AREA 'B'
AREA 'C'
KEYPLANPLAN NORTH
1/8" = 1'-0"
SECOND FLOOR MECHANICAL PLAN - AREA C1
REVISION DATE
DNDN
2
M-301
(E)CUH-2
(E)AC-1
(E)ZC4-50.5 GPM
(E)ZC4-31.0 GPM
(E)ZC4-40.5 GPM
(E)ZC4-62.3 GPM(E)ZC4-2
1.1 GPM
(E)ZC4-11.3 GPM
(E)ZC1-21.6 GPM
(E)ZC1-32.8 GPM
(E)ZC1-41.2 GPM
(E)ZC1-53.7 GPM
(E)ZC1-61.0 GPM
(E)ZC1-71.6 GPM
(E)ZC1-82.4 GPM
(E)ZC1-11.8 GPM
(E)CUH-1
(E)CUH-3
(E)LVR
(E)ZC3-12.3 GPM
(E)UH-61.5 GPM
(E)UH-2
RE
:
MA
TC
HLIN
E
MA
TC
HLIN
E
M-1
11B
RE
:
MA
TC
HLIN
E
MA
TC
HLIN
E
M-1
11B
6
5
13
K
L
J
M
F
H
6.5
E.A E.B E.C E.D E.E E.F E.G
E.H
E.J
E.1
E.2
E.3
E.4
E.5
E.6
E.7
E.8
E.9
E.10
12
3
4
54"4"5"5"
HWRHWS
CHWRCHWS
WAITING
101F
OFFICE
101E
KITCHENOFFICE
135A
COOLERS
135C
STORAGE &RECEIVING
136
UNISEX TOILET
135B
KITCHEN
135
STORAGE
106C
OUTDOORSTORAGE
107
CHAIRSTORAGE
106B
FACILITYMANAGER
OFFICE
101N
OFFICE
106A
MUSIC
105
PRINCIPAL
101A
CLOSET
101B
CLINIC
101L
UNISEX
101H
UNISEX
101M
STORAGE
101K
ASSIST.PRIN.
101G
RESOURCEROOM
101D
TEST
102A
TOILET
102B
MDF ROOM
143
CHALLENGE
102
STORAGE
102F
WORKROOM
102E
CORRIDOR
101J
CONFERENCE
102C
VESTIBULE
100
MECHANICAL
141
JAN.
139
VESTIBULE
142
ELECTRICAL
140STORAGE
134A
GIRLS
138
BOYS
137
CORRIDOR
103
TOILET
102D
RECEPTION
101
DRY STORAGE
135D
CORRIDOR
103A
CORRIDOR
103B
VESTIBULE
104
MULTI-PURPOSEGYMNASIUM
106
(E)2"(E)2"
(E)5"(E)5"
(E)3/4"(E)3/4"
(E)1 1/2"(E)1 1/2"
(E)1 1/4"(E)1 1/4"
(E)3/4"(E)3/4"
(E)3/4"(E)3/4"
(E)3/4"(E)3/4"
(E)1"(E)1"
VAV-5-013.0 GPM
VAV-5-023.5 GPM
PHASE 1B
1
6
6
2
3
RTU-5ABOVE
T
S c
S c
VAV-5-01
VAV-5-02
TZC3-1
7
5
(E)ZC3-26.4 GPM
(E)ZC1-7T
4
1"1"
3/4"3/4"
3/4"3/4"
1 1/4"1 1/4"
6
6
8
8
8
8
8
8
8
8
8
8
8
88
8
8
8
DRAWING NOTES1. HWS/HWR AND CHWS/CHWR DOWN ALONG WALL FROM HIGH COMMONS STRUCTURE TO
ADJACENT CEILING PLENUM.
2. ROUTE PIPING TIGHT TO STRUCTURE.
3. NEW 4-PIPE HWS/HWR AND CHWS/CHWR INTO BOILER ROOM, RE: 2/M-301 FOR CONTINUATION.
4. EXISTING 2-PIPE HYDRONIC PIPING FROM BOILER ROOM TO REMAIN.
5. HWS/HWR & CHWS/CHWR TO ROUTE TIGHT TO STRUCTURE IN COMMONS. RE: M-111B FORCONTINUATION.
6. EXISTING PIPING NOT SHOWN TO REMAIN.
7. RELOCATED THERMOSTAT TO BE PLACED IN PLENUM. FOR ZC3-1.
8. REBALANCE COIL WATER FLOW TO PRE READING RECORDED PRIOR TO CONSTRUCTION.
X
DRAWING NOTES1. 2" HWS/HWR TO CONNECT TO EXISTING 2" HWS/HWR.
2. 1-1/4" HWS/HWR UP THROUGH ROOF TO RTU-5.
3. 3/4" HWS/HWR TO VAV BOX. RE: DETAIL 3/M-501
4. RELOCATED THERMOSTAT FROM NORTH WALL OF WAITING ROOM TO WEST WALL OF OFFICE.
5. RELOCATED THERMOSTAT FROM NORTH WALL OF RESOURCE ROOM TO WEST WALL.
6. CAP EXISTING HWS/HWR PIPING.
X
GENERAL NOTES1. PRIOR TO CONSTRUCTION AIR AND WATER PRE-BALANCE READINGS SHALL BE TAKEN FOR ALL
EQUIPMENT. INFORMATION SHALL BE LOGGED AND SUBMITTED TO OWNER. THESE READINGS WILLBE USED FOR VERIFICATION OF SYSTEMS AFTER CONSTRUCTION IS COMPLETE.
ENVIS
ION
MEC
HA
NIC
AL
EN
GIN
EER
S I
NC
.
9777 P
yramid
Court, S
uit
e 1
20
Engle
wood, C
O 8
0112
Tel-
303-6
88-0
223
Fax- 303-6
88-3
584
envis
ionengrs.c
om
Proje
ct #
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATIONAPPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISEUSED WITHOUT THE WRITTEN CONSENT OF
MOA ARCHITECTURE
NOT FOR
CONSTRUCTION
AD
DIT
ION
S A
ND
RE
NO
VA
TIO
NS
016-0
09
7/29
/201
6 11
:43:
28 A
M
M-111A
FIRST FLOORMECHANICALPIPING PLAN -
AREA A - PHASES1A & 1B
SIE
RR
A E
LE
ME
NT
AR
Y S
CH
OO
L
CMD
08.04.16
16100.00
7771
Oak
St.
Arv
ada,
CO
800
05
BID SET
JKB
PLAN NORTH
AREA 'A'EXISTINGBUILDING
AREA 'B'
AREA 'C'
KEYPLANPLAN NORTH
1/8" = 1'-0"
FIRST FLOOR MECHANICAL PIPING PLAN - AREA A1
REVISION DATE
HWR
RE
:
MA
TC
HLIN
E
MA
TC
HLIN
E
M-1
11C
RE:
MATCHLINE
MATCHLINE
M-111C
RE
:
MA
TC
HLIN
E
MA
TC
HLIN
E
M-1
11A
RE
:
MA
TC
HLIN
E
MA
TC
HLIN
E
M-1
11A
VAV 8-032.7 GPM
VAV 8-042.8 GPM
VAV 8-012.5 GPM
VAV 9-012.1 GPM
VAV 9-042.2 GPM
VAV 9-033.0 GPM
VAV 9-023.0 GPM
1 2 3 4
6
5
7 8 9 10 11 1213
E
G
K
L
J
M
D
F
H
6.5
E.A E.B
E.2
E.3
E.4
E.5
E.6
E.7
E.8
E.9
VAV 9-052.0 GPM
VAV 6-013.6 GPM
CUH-51.0 GPM
HWSCHWR
CHWS
RTU-7 ABOVE
VAV 8-022.5 GPM
RTU-8ABOVE
5
1
3 4
3
6
7
2
8
9
HW
SH
WR
3/4"3/4"
3/4"3/4"
3/4"3/4"
HW
SH
WR
HWR
CHWRHWS
CHWS
4"4"5"5"
4"4"5"5"
CHWSCHWRHWS
HWR
1 1/2"1 1/2"1 1/4"1 1/4"
24.5 GPM
14.7 GPM
1 1/4"1 1/4"
3"3"3"3"
HW
RH
WS
CH
WR
CH
WS
2 1/2"2 1/2"
4"4"4"4"
4"4"5"5"
3/4"3/4"
3/4"3/4"
1 1/2"1 1/2"HWR
HWS
4
4
10
11
1213
12 12
13
12
12
12
12
S cS c
S c
S c
S c
S c S c
S cVAV 9-04VAV 9-03
VAV 9-02
VAV 8-04
VAV 9-01
VAV 8-01
VAV 8-02VAV 8-03
3/4"
3/4"
(E)UH-2
CLASSROOM
126
BOYS
112
CLASSROOM
127
CLASSROOM
128
CLASSROOM
129
KINDERGARTEN
130
KINDERGARTEN
131KINDERGARTEN
132
KINDERGARTEN
133
COMMONS
134
ART
108
STORAGE
130B
RR
130A
STORAGE
131B
RR
131A
STORAGE
132B
RR
132A
RR
133BSTORAGE
133A
LIBRARY MEDIACENTER
109
GIRLS
110
CUST.
111
CORRIDOR
103
OFFICE
109B
VESTIBULE
109A
STAIR 1
S1.1
KILN
108A
STORAGE
108B
VESTIBULE
106D
1 1/2"1 1/2"1 1/2"1 1/2"
CH
WS
CH
WR
HW
SH
WR
1 1/2"1 1/2" 1 1/2"1 1/2"
3/4"3/4"3/4"3/4"
2"2"
CUH-5 T
T VAV 9-05
15
1"1"
12
8
M-501
8
M-501
10 GPM 14
DRAWING NOTES1. NEW 3" PIPING UP TO SECOND FLOOR, RE: M-112B FOR CONTINUATION.
2. NEW 1-1/4" CHWS/CHWR PIPING UP TO SECOND FLOOR, RE: M-112B FOR CONTINUATION.
3. HWS/R AND CHWS/CHWR RISE ALONG WALL FROM HIGH COMMONS STRUCTURE TO LEVEL OFADJACENT CEILING PLENUM.
4. ROUTE PIPING TIGHT TO STRUCTURE.
5. COORDINATE PIPING WITH DUCTWORK, RE: M-101B FOR DUCTWORK.
6. 1-1/2" HWS/HWR & 2" CHWS/CHWR UP THROUGH ROOF TO RTU-7 WITHIN UNIT CURB.
7. 1-1/2" HWS/HWR & 1-1/2 CHWS/CHWR UP THROUGH ROOF TO RTU-8 WITHIN UNIT CURB.
8. NEW 1-1/2" HWS/HWR PIPING UP TO SECOND FLOOR, RE: M-112B FOR CONTINUATION.
9. NEW 3/4" PIPING DOWN WALL TO CUH-5, RE: DETAIL 4/M-500.
10. 5" HWS/HWR & 4" CHWS/CHWR TO AREA A. SEE SHEET M-111A FOR CONTINUATION.
11. 2" HWS/HWR TO AREA C. SEE SHEET M-111C FOR CONTINUATION.
12. 3/4" HWS/HWR TO VAV BOX. RE: DETAIL 3/M-500.
13. 3/4" HWS/HWR TO VAV BOX. RE: DETAIL 4/M-500.
14. PROVIDE DPBV BALANCE @ 15 GPM, RE: SHEET M-502.
15. PROVIDE DPBV BALANCE @ 25 GPM, RE: SHEET M-502.
X
ENVIS
ION
MEC
HA
NIC
AL
EN
GIN
EER
S I
NC
.
9777 P
yramid
Court, S
uit
e 1
20
Engle
wood, C
O 8
0112
Tel-
303-6
88-0
223
Fax- 303-6
88-3
584
envis
ionengrs.c
om
Proje
ct #
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATIONAPPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISEUSED WITHOUT THE WRITTEN CONSENT OF
MOA ARCHITECTURE
NOT FOR
CONSTRUCTION
AD
DIT
ION
S A
ND
RE
NO
VA
TIO
NS
016-0
09
7/29
/201
6 11
:43:
34 A
M
M-111B
FIRST FLOORMECHANICALPIPING PLAN -
AREA B - PHASE1A
SIE
RR
A E
LE
ME
NT
AR
Y S
CH
OO
L
CMD
08.04.16
16100.00
7771
Oak
St.
Arv
ada,
CO
800
05
BID SET
JKB
PLAN NORTH
AREA 'A'EXISTINGBUILDING
AREA 'B'
AREA 'C'
KEYPLANPLAN NORTH
1/8" = 1'-0"
FIRST FLOOR MECHANICAL PIPING PLAN - AREA B1
REVISION DATE
VAV 10-033.2 GPM
RE
:
MA
TC
HLIN
E
MA
TC
HLIN
E
M-1
11B
RE:
MATCHLINE
MATCHLINE
M-111B
VAV 9-062.5 GPM
VAV 10-082.5 GPM
VAV 10-093.0 GPM
VAV 10-073.0 GPM
VAV 10-062.5 GPM
VAV 10-012.0 GPM
VAV 10-042.5 GPM
VAV 10-023.0 GPM
VAV 10-053.0 GPM
1 2 3 4
78
910
11 12
A
B
C
E
G
D
VAV 9-072.1 GPM
VAV 9-081.7 GPM
CUH-61.0 GPM
1
HW
RH
WS
2"2"
2"2"
HW
RH
WS
3/4"3/4"
2"2"
2"2"
2"2"
5
2
2
2
2
2
4
2
2
S c
S c
S c
S c
T
S c
S cS c
S c
S cS c
VAV 9-06
VAV 9-07
VAV 10-08
VAV 10-09
VAV 10-07
VAV 10-01
VAV 10-04
VAV 10-05
VAV 10-03
VAV 10-02
VAV 10-06
3/4"3/4"3/4"3/4"
3/4"3/4"
3/4"3/4"
3/4"3/4"
3/4"3/4"
3/4"3/4"
3/4"3/4"
3/4"3/4"
3/4"3/4"
3/4"3/4"3/4"3/4"
CUH-71.0 GPM
CUH-7
CLASSROOM
119
CLASSROOM
118
CLASSROOM
117
CLASSROOM
116
CLASSROOM
122
CLASSROOM
120
CLASSROOM
123
CLASSROOM
115
FLEXCLASSROOM
113
RESOURCEROOM
125
TEACHERWORK ROOM
121
STAFF RR
124
ELEC.
125A
STAIR 2
S2.1 VESTIBULE
114
CLASSROOM
126
2"2"
T
CUH-6
T
8
M-501
40 GPM
T
1
3
2
2
2
2
DRAWING NOTES1. NEW 3/4" PIPING DOWN WALL TO CABINET UNIT HEATER, RE: DETAIL 4/M-500.
2. 3/4" HWS/HWR TO VAV BOX. RE: DETAIL 3/M-500.
3. PROVIDE DPBV BALANCE @ 40 GPM, RE: SHEET M-502.
4. 3/4" HWS/HWR TO VAV BOX. RE: DETAIL 4/M-500.
5. 2" HWS/HWR TO AREA B. RE: M-111B FOR CONTINUATION.
X
ENVIS
ION
MEC
HA
NIC
AL
EN
GIN
EER
S I
NC
.
9777 P
yramid
Court, S
uit
e 1
20
Engle
wood, C
O 8
0112
Tel-
303-6
88-0
223
Fax- 303-6
88-3
584
envis
ionengrs.c
om
Proje
ct #
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATIONAPPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISEUSED WITHOUT THE WRITTEN CONSENT OF
MOA ARCHITECTURE
NOT FOR
CONSTRUCTION
AD
DIT
ION
S A
ND
RE
NO
VA
TIO
NS
016-0
09
7/29
/201
6 11
:43:
37 A
M
M-111C
FIRST FLOORMECHANICALPIPING PLAN -
AREA C - PHASE1A
SIE
RR
A E
LE
ME
NT
AR
Y S
CH
OO
L
CMD
08.04.16
16100.00
7771
Oak
St.
Arv
ada,
CO
800
05
BID SET
JKB
PLAN NORTH
AREA 'A'EXISTINGBUILDING
AREA 'B'
AREA 'C'
KEYPLANPLAN NORTH
1/8" = 1'-0"
FIRST FLOOR MECHANICAL PIPING PLAN - AREA C1
REVISION DATE
EF-9
EF-10
MAU-3
LIBRARY MEDIACENTER
109
BOY'S
203
CLASSROOM
216
CLASSROOM
217
CLASSROOM
218
4TH GRADE
219
GIRLS
201
CUSTODIAL
202
CORRIDOR
200
STAIR 1
S1.2
EF-11
RE:
MATCHLINE
MATCHLINE
M-112C
RE
:
MA
TC
HLIN
E
MA
TC
HLIN
E
M-1
12C
VAV-9-122.2 GPM
VAV 9-113.0 GPM
VAV 9-103.0 GPM
VAV 9-093.0 GPM
VAV-6-035.5 GPM
1 2 3 4
6
5
7 8 9 10 11 1213
E
G
K
L
J
M
D
F
H
6.5
E.A E.B
E.2
E.3
E.4
E.5
E.6
E.7
E.8
E.9
VAV-9-132.1 GPM RTU-6
ABOVE
RTU-7
RTU-8
1
2
3
18.7 GPM
HWRHWS
1 1/4"1 1/4"
3/4"3/4"
3/4"3/4"
1 1/4"1 1/4"
2"2" 3"3"
3/4"3/4"
CH
WS
HW
SC
HW
R
S c
S c
S c S cVAV-9-12
VAV 9-11
VAV 9-10
VAV 9-09
6
6
6
4
6
7
6
3"3"3"3"
4
1"1"
8
VAV 6-041.4 GPM
1 1/2"1 1/2"1 1/4"1 1/4"
VAV 6-023.1 GPM
6
1 1/2"1 1/2"
3/4"3/4"
3"3"
TVAV-9-13
5
103 GPM
79.5 GPM
10 GPM
25 GPM
9
DRAWING NOTES1. NEW 3" CHWS/CHWR AND HWS/HWR PIPING DOWN TO FIRST FLOOR, RE: M-111B FOR
CONTINUATION.
2. NEW 1-1/4" CHWS/CHWR PIPING DOWN TO FIRST FLOOR, RE: M-111B FOR CONTINUATION.
3. NEW 1-1/2" HWS/HWR PIPING DOWN TO FIRST FLOOR, RE: M-111B FOR CONTINUATION.
4. 3/4" HWS/HWR TO VAV BOX. RE: DETAIL 4/M-500.
5. PROVIDE DPBV BALANCE @ 25 GPM, RE: SHEET M-502.
6. 3/4" HWS/HWR TO VAV BOX. RE: DETAIL 3/M-500.
7. 3" HWS/HWR & 3" CHWS/CHWR TO CONTINUE TO AREA C. RE: M-112C FOR CONTINUATION.
8. 1-1/4" HWS/HWR & 2" CHWS/CHWR UP THROUGH ROOF TO RTU-6 WITHIN CURB.
9. PROVIDE DPBV BALANCE @ 15 GPM, RE: SHEET M-502.
X
ENVIS
ION
MEC
HA
NIC
AL
EN
GIN
EER
S I
NC
.
9777 P
yramid
Court, S
uit
e 1
20
Engle
wood, C
O 8
0112
Tel-
303-6
88-0
223
Fax- 303-6
88-3
584
envis
ionengrs.c
om
Proje
ct #
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATIONAPPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISEUSED WITHOUT THE WRITTEN CONSENT OF
MOA ARCHITECTURE
NOT FOR
CONSTRUCTION
AD
DIT
ION
S A
ND
RE
NO
VA
TIO
NS
016-0
09
7/29
/201
6 11
:43:
43 A
M
M-112B
SECOND FLOORMECHANICALPIPING PLAN -
AREA B - PHASE1A
SIE
RR
A E
LE
ME
NT
AR
Y S
CH
OO
L
CMD
08.04.16
16100.00
7771
Oak
St.
Arv
ada,
CO
800
05
BID SET
JKB
PLAN NORTH
AREA 'A'EXISTINGBUILDING
AREA 'B'
AREA 'C'
KEYPLANPLAN NORTH
1/8" = 1'-0"
Overall Second Floor Mechanical Plan1
REVISION DATE
CLASSROOM
209
CLASSROOM
208
CLASSROOM
207
CLASSROOM
206
CLASSROOM
205
FLEXCLASSROOM
204
RESOURCEROOM
215
ELEC.
215A
CLASSROOM
213
CLASSROOM
212
CLASSROOM
210
TEACHERWORK ROOM
211
STAFF RR
214
STAIR 2
S2.2
CORRIDOR
200
RE
:
MA
TC
HLIN
E
MA
TC
HLIN
E
M-1
12B
RE:
MATCHLINE
MATCHLINE
M-112B
VAV 9-141.9 GPM
VAV 10-102.5 GPM
VAV 10-122.5 GPM
VAV 10-142.5 GPM
VAV 10-173.2 GPM
VAV 10-163.2 GPM
VAV 10-153.0 GPM
VAV 10-182.0 GPM
VAV 10-132.5 GPM
VAV 10-112.5 GPM
1 2 3
78
910
11 12
A
B
C
E
G
D
VAV 9-152.2 GPM
VAV 9-161.0 GPM
3"3"3"3"
CH
WS
CH
WS
2 1/2"2 1/2"2 1/2"2 1/2"
2 1/2"2 1/2"2 1/2"2 1/2"
2 1/2"2 1/2"
3/4"3/4"
3/4"3/4"
3/4"3/4"
3/4"3/4"
3/4"3/4"
3/4"3/4"
3/4"3/4"3/4"3/4"
3/4"3/4"
3/4"3/4"
3/4"3/4"
21
34
S c
S cS c
S c
S c
S c
S c
S c
S c
8
6
6
VAV 10-17
VAV 10-14VAV 10-16
VAV 10-15
3/4"3/4"
6
5
6
6
6
6
6
VAV 10-13
VAV 10-11
VAV 10-10
VAV 10-12
TVAV 10-18
S cVAV 9-15
VAV 9-14
6
6
6
HW
SH
WR
7
9
8
M-501
79.5 GPM
40 GPM
45 GPM
25 GPM
DRAWING NOTES1. NEW 2" CHWS/CHWR PIPING UP THROUGH ROOF TO RTU-9 WITHIN CURB.
2. NEW 1-1/2" HWS/HWR PIPING UP THROUGH ROOF TO RTU-9 WITHIN CURB.
3. NEW 2-1/2" CHWS/CHWR PIPING UP THROUGH ROOF TO RTU-10 WITHIN CURB.
4. NEW 1-1/2" HWS/HWR PIPING UP THROUGH ROOF TO RTU-10 WITHIN CURB.
5. 3/4" HWS/HWR TO VAV BOX. RE: DETAIL 4/M-500.
6. 3/4" HWS/HWR TO VAV BOX. RE: DETAIL 3/M-500.
7. PROVIDE DPBV BALANCE @ 45 GPM, RE: SHEET M-502.
8. 3" HWS/HWR & 3" CHWS/CHWR TO CONTINUE TO AREA B. RE: M-112B FOR CONTINUATION.
9. PROVIDE DPBV BALANCE @ 40 GPM, RE: SHEET M-502.
X
ENVIS
ION
MEC
HA
NIC
AL
EN
GIN
EER
S I
NC
.
9777 P
yramid
Court, S
uit
e 1
20
Engle
wood, C
O 8
0112
Tel-
303-6
88-0
223
Fax- 303-6
88-3
584
envis
ionengrs.c
om
Proje
ct #
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATIONAPPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISEUSED WITHOUT THE WRITTEN CONSENT OF
MOA ARCHITECTURE
NOT FOR
CONSTRUCTION
AD
DIT
ION
S A
ND
RE
NO
VA
TIO
NS
016-0
09
7/29
/201
6 11
:43:
48 A
M
M-112C
SECOND FLOORMECHANICALPIPING PLAN -
AREA C - PHASE1A
SIE
RR
A E
LE
ME
NT
AR
Y S
CH
OO
L
CMD
08.04.16
16100.00
7771
Oak
St.
Arv
ada,
CO
800
05
BID SET
JKB
PLAN NORTH
AREA 'A'EXISTINGBUILDING
AREA 'B'
AREA 'C'
KEYPLANPLAN NORTH
1/8" = 1'-0"
SECOND FLOOR MECHANICAL PIPING PLAN - AREA C1
REVISION DATE
(E)MAU-1
(E)EF-1
(E)EF-6
(E)EF-8
(E)EF-2
(E)EF-7
(E)EF-5
(E)EF-4
(E)EF-3
(E)MAU-2
(E)RTU-1
(E)RTU-2
(E)CU-1
(E)RTU-4
(E)RTU-3
(E)CU-2
(E)50"x24"
(E)DRYERVENT
UP TO (E)36"Ø
RE
:
MA
TC
HLIN
E
MA
TC
HLIN
E
M-1
21B
RE
:
MA
TC
HLIN
E
MA
TC
HLIN
E
M-1
21B
(E)RL
(E)RL
(E)R
S
(E)R
S
6
5
13
E
K
L
J
M
F
H
6.5
E.A E.B E.C E.D E.E E.F E.G
E.H
E.J
E.1
E.2
E.3
E.4
E.5
E.6
E.7
E.8
E.9
E.10
RTU-5
3
(E)FLUE
1
2
2
2
2
22
2
2
2
2
2
2
2
2
2
1
PHASE 1B
2
5
6
4
6
5
7
7
7
7
7
7
3
DRAWING NOTES1. PROVIDE NEW VFD FOR SUPPLY FAN AND RETURN FAN, REBALANCE RTU-3 TO 2,500 CFM.
2. EXISTING EQUIPMENT TO REMAIN.
3. NEW 8"Ø FLUE UP FROM FLOOR BELOW. RE: 2/M-301 FOR CONTINUATION. RE: DETAIL 16/M-500FOR FLUE DETAIL.
4. PIPING TO BE INSULATED IN PIPING CHASE WHERE INSULATION HAS BEEN REMOVED.
5. RETURN AIR FAN ALIGNMENT OF SHEAVES SHOULD BE CHECKED, MOTOR TO BE SECURED,BEARINGS TO BE GREASED AND BELT TENSION TO BE ADJUSTED.
6. RTU COILS TO BE CLEANED AND INTERIOR OF UNIT TO BE VACUUMED.
7. REBALANCE UNIT TO PRE READINGS RECORDED PRIOR TO CONSTRUCTION.
X
DRAWING NOTES1. NEW ROOFTOP UNIT ON NEW 12" MINIMUM CURB.
2. 1-1/2" HWS/CHWS & HWR/CHWR FROM BELOW UP TO RTU-5.
3. MAINTAIN A MINIMUM DISTANCE OF 10' TO NEAREST PARAPET.
X
GENERAL NOTES1. PRIOR TO CONSTRUCTION AIR AND WATER PRE-BALANCE READINGS SHALL BE TAKEN FOR ALL
EQUIPMENT. INFORMATION SHALL BE LOGGED AND SUBMITTED TO OWNER. THESE READINGS WILLBE USED FOR VERIFICATION OF SYSTEMS AFTER CONSTRUCTION IS COMPLETE.
ENVIS
ION
MEC
HA
NIC
AL
EN
GIN
EER
S I
NC
.
9777 P
yramid
Court, S
uit
e 1
20
Engle
wood, C
O 8
0112
Tel-
303-6
88-0
223
Fax- 303-6
88-3
584
envis
ionengrs.c
om
Proje
ct #
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATIONAPPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISEUSED WITHOUT THE WRITTEN CONSENT OF
MOA ARCHITECTURE
NOT FOR
CONSTRUCTION
AD
DIT
ION
S A
ND
RE
NO
VA
TIO
NS
016-0
09
7/29
/201
6 11
:43:
51 A
M
M-121A
ROOFMECHANICAL
PLAN - AREA A -PHASES 1A & 1B
SIE
RR
A E
LE
ME
NT
AR
Y S
CH
OO
L
CMD
08.04.16
16100.00
7771
Oak
St.
Arv
ada,
CO
800
05
BID SET
JKB
PLAN NORTH
AREA 'A'EXISTINGBUILDING
AREA 'B'
AREA 'C'
KEYPLANPLAN NORTH
1/8" = 1'-0"1
ROOF MECHANICAL PLAN - AREA A
REVISION DATE
EF-9
EF-10
EF-11
EF-12
MAU-3
RE
:
MA
TC
HLIN
E
MA
TC
HLIN
E
M-1
21A
RE
:
MA
TC
HLIN
E
MA
TC
HLIN
E
M-1
21A
RE
:
MA
TC
HLIN
E
MA
TC
HLIN
E
M-1
21C
RE:
MATCHLINE
MATCHLINE
M-121C
1 2 3 4
6
5
7 8 9 10 11 1213
E
G
K
L
J
M
D
F
H
6.5
E.A E.B
E.2
E.3
E.4
E.5
E.6
E.7
E.8
E.9
RTU-8
RTU-7
RTU-6
6
2
1
9
8
3
7
5
4
10
10
11
12
10
13
14
15
16
ROOF HATCH
DRAWING NOTES1. 10x10 EXHAUST DUCT FROM BELOW TO EF-9, TRANSITION WITHIN CURB TO FAN CONNECTION.
2. 12x12 EXHAUST DUCT FROM BELOW TO EF-10, TRANSITION WITHIN CURB TO FAN CONNECTION.
3. 4"Ø KILN VENT UP FROM KILN. RE: DETAIL 10/M-501 FOR TERMINATION.
4. 26x20 RETURN DUCT UP FROM CEILING SPACE BELOW TO RTU-8, TRANSITION WITHIN CURB TOUNIT CONNECTION.
5. 20x16 DUCT UP FROM CEILING SPACE BELOW TO RTU-8, TRANSITION WITHIN CURB TO UNITCONNECTION.
6. 10x10 EXHAUST DUCT FROM BELOW TO EF-11, TRANSITION WITHIN CURB TO FAN CONNECTION.
7. NEW GAS-FIRED MAKE-UP AIR UNIT ON NEW 12" MINIMUM CURB.
8. 44x12 RETURN DUCT UP FROM CEILING SPACE BELOW TO RTU-7, TRANSITION WITHIN CURB TOUNIT CONNECTION.
9. 30x20 DUCT UP FROM CEILING SPACE BELOW TO RTU-7, TRANSITION WITHIN CURB TO UNITCONNECTION.
10. NEW ROOFTOP UNIT ON NEW 12" MINIMUM CURB.
11. 32x14 RETURN DUCT UP FROM CEILING SPACE BELOW TO RTU-6, TRANSITION WITHIN CURB TOUNIT CONNECTION.
12. 36x30 UP FROM CEILING SPACE BELOW TO RTU-6, TRANSITION WITHIN CURB TO UNITCONNECTION.
13. 14x14 EXHAUST DUCT FROM BELOW TO EF-12, TRANSITION WITHIN CURB TO FANCONNECTION.
14. 1-1/2" HWS/HWR & 1-1/2" CHWS/CHWR FROM BELOW TO RTU-8.
15. 1-1/2" HWS/HWR & 1-1/2" CHWS/CHWR FROM BELOW TO RTU-6.
16. 1-1/2" HWS/HWR & 2" CHWS/CHWR FROM BELOW TO RTU-7.
X
ENVIS
ION
MEC
HA
NIC
AL
EN
GIN
EER
S I
NC
.
9777 P
yramid
Court, S
uit
e 1
20
Engle
wood, C
O 8
0112
Tel-
303-6
88-0
223
Fax- 303-6
88-3
584
envis
ionengrs.c
om
Proje
ct #
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATIONAPPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISEUSED WITHOUT THE WRITTEN CONSENT OF
MOA ARCHITECTURE
NOT FOR
CONSTRUCTION
AD
DIT
ION
S A
ND
RE
NO
VA
TIO
NS
016-0
09
7/29
/201
6 11
:43:
56 A
M
M-121B
ROOFMECHANICAL
PLAN - AREA B -PHASE 1A
SIE
RR
A E
LE
ME
NT
AR
Y S
CH
OO
L
CMD
08.04.16
16100.00
7771
Oak
St.
Arv
ada,
CO
800
05
BID SET
JKB
PLAN NORTH
AREA 'A'EXISTINGBUILDING
AREA 'B'
AREA 'C'
KEYPLANPLAN NORTH
1/8" = 1'-0"
ROOF MECHANICAL PLAN - AREA B1
REVISION DATE
EF-13
RE:
MATCHLINE
MATCHLINE
M-121B
RE
:
MA
TC
HLIN
E
MA
TC
HLIN
E
M-1
21B
1 2 3 4
78
910
11 12
A
B
C
E
G
D
RTU-10
RTU-9
3
4
1
5
6
1
2
EF-14
7
9
8
ROOF HATCH
DRAWING NOTES1. NEW ROOFTOP UNIT ON NEW 12" MINIMUM CURB.
2. 18x16 EXHAUST DUCT FROM BELOW TO EF-13, TRANSITION WITHIN CURB TO FANCONNECTION.
3. 50x26 RA FROM CEILING SPACE BELOW TO RTU-9. PROVIDE BLANK OFF PANELS AT UNITCONNECTION AND TRANSITION WITH ROOF CURB. RE: M102C FOR CONTINUATION.
4. 46x26 SA FROM CEILING SPACE BELOW TO RTU-9. PROVIDE BLANK OFF PANELS AT UNITCONNECTION AND TRANSITION WITHIN ROOF CURB. RE: M102C FOR CONTINUATION.
5. 62x26 RA DUCT FROM CEILING SPACE BELOW TO RTU-10. PROVIDE BLANK OFF PANELS AT UNITCONNECTION AND TRANSITION WITH ROOF CURB. RE: M102C FOR CONTINUATION.
6. 50x40 SA DUCT UP FROM CEILING SPACE BELOW TO RTU-10, PROVIDE BLANK OFF PANELS ATROOFTOP UNIT CONNECTION AND TRANSITION WITH ROOF CURB. RE: M102C FOR CONTINUATION.
7. 10x10 EXHAUST DUCT FROM BELOW TO EF-14. TRANSITION WITHIN CURB TO FAN CONNECTION.
8. 1-1/2" HWS/HWR & 2-1/2" CHWS/CHWR FROM BELOW UP TO RTU-10.
9. 1-1/2" HWS/HWR & 2-1/2" CHWS/CHWR FROM BELOW UP TO RTU-9.
X
ENVIS
ION
MEC
HA
NIC
AL
EN
GIN
EER
S I
NC
.
9777 P
yramid
Court, S
uit
e 1
20
Engle
wood, C
O 8
0112
Tel-
303-6
88-0
223
Fax- 303-6
88-3
584
envis
ionengrs.c
om
Proje
ct #
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATIONAPPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISEUSED WITHOUT THE WRITTEN CONSENT OF
MOA ARCHITECTURE
NOT FOR
CONSTRUCTION
AD
DIT
ION
S A
ND
RE
NO
VA
TIO
NS
016-0
09
7/29
/201
6 11
:43:
59 A
M
M-121C
ROOFMECHANICAL
PLAN - AREA C -PHASE 1A
SIE
RR
A E
LE
ME
NT
AR
Y S
CH
OO
L
CMD
08.04.16
16100.00
7771
Oak
St.
Arv
ada,
CO
800
05
BID SET
JKB
PLAN NORTH
AREA 'A'EXISTINGBUILDING
AREA 'B'
AREA 'C'
KEYPLANPLAN NORTH
1/8" = 1'-0"
ROOF MECHANICAL PLAN - AREA C1
REVISION DATE
(E)30"x16"
(E)22"x10"
(E)2
2"x1
0"
(E)1
8"x1
4" (E)22"x14"
(E)28"x14"
(E)32"x20"
(E)3
2"x2
0"
(E)3
2"x2
0"
(E)2
2"x1
4"
(E)12"x12"
(E)1
2"x1
2"
(E)1
0"ø(E
)10"
ø(E)10"ø
(E)CD(E)CD
(E)CD
(E)CD
(E)CD
(E)CD
(E)CD
(E)CD
(E)CD
(E)B-1
(E)HWP-2
(E)HWP-1
(E)CG (E)CG
(E)30"x16"UP TO (E)MAU-1
(E)12"x12"UP TO (E)EF-5
DRYER VENT(E)4"ø
(E)CD
(E)6"ø
(E)1
4"x6
"
(E)6
"ø
(E)6
"ø
(E)6
"ø
(E)8
"ø
(E)6
"ø
(E)6
"ø(E)6"ø
(E)6"ø
(E)6
"ø
(E)6
"ø
(E)6"ø
(E)6"ø
(E)8"ø
(E)CH-1
(E)10"x22"UP TO (E)EF-4
(E)50"x24"UP TO (E)RTU-3
(E)10"x10"UP TO (E)EF-3
(E)GWH-2
(E)GWH-1
RE: PLUMBING
RE: PLUMBING
(E)GF-1
(E)ET-1
DRYER VENT
(E)H-2
(E)H-1
E.B E.C E.D E.E E.F
E.1
E.2
E.3
E.4
(E)TRANSFORMER
(E)GAS METER
(E)UH-1
(E)UH-3
(E)8"ø
(E)AS-1
2
4 (E) CV-1
(E) CV-2
(E)FF-1
HW/CHWS
HW
/CH
WR
1
3
5
6
6
7
89
10
11
12
13
13
14
14
1516
17
17
18
19
(E)CHWS
(E)CHWS
HW/CHWR
HW/CHWS
HW
/CH
WS
HW
/CH
WS
20
21
(E)B-1B-2
(E)HWP-2
(E)HWP-1
(E)30"x16"
(E)22"x10"
(E)2
2"x1
0"
(E)22"x14"
(E)28"x14"
(E)3
2"x2
0"
(E)32"x20"
(E)3
2"x2
0"
(E)2
2"x1
4"
(E)12"x12"
(E)1
2"x1
2"
UP TO (E)MAU-1(E)30"x16"
(E)50"x24"UP TO (E)RTU-3
(E)CG(E)CG
(E)CD
(E)CD
(E)CD
(E)CD(E)CD
(E)CD
(E)CD
(E)CD
(E)CD
(E)1
8"x1
4"
(E)12"x12"UP TO (E)EF-5
(E)10"x22"UP TO (E)EF-4
(E)10"ø
(E)1
0"ø
(E)1
0"ø
(E)4"øDRYER VENT
(E)CH-1
(E)10"x10"UP TO (E)EF-3
(E)GWH-2
(E)GWH-1
RE: PLUMBING
RE: PLUMBING
(E)GF-1
(E)ET-1
(E)H-2
(E)H-1
L
M
6.5
E.B E.C E.D E.E E.F
E.1
E.2
E.3
E.4
(E)TRANSFORMER
(E)GAS METER
(E)UH-1
(E)UH-3
2
3
AS-2
GF-2
ET-2
(E)AS-1
(E)C
HW
S(E)CHWS
(E)CHWR
(E)C
HW
R
(E)H
WS
4
5
1
(E)CD
(E)ER
(E)CD
(E)CD
(E)ER
(E)CD
(E)FF-1
CHWP-1
(E)C
HW
S
(E)C
HW
R
(E)CHWR
(E)CHWS
(E)C
HW
R
(E)C
HW
S
(E)C
HW
S
(E)C
HW
R
HW
S
HWR
HW
S
HW
/CH
WS
HW
/CH
WR
8"ø
6
7
8
9
10
11
14
13
12
15
16
17
18
19
20
8"ø
8"ø
8"ø
8"ø
8"ø
22
23
24
2125
26
3
26
27
DEMOLITION NOTES1. REMOVE EXISTING PIPING DROP TO (E)HWP-1 AND (E)HWP-2 AS SHOWN.
2. EXISTING WATER HEATER FLUE AND COMBUSTION AIR UP THROUGH ROOF.
3. DEMOLISH EXISTING CHWR PIPING AND HOLD PIPE HANGERS FOR REUSE.
4. CONTRACTOR TO DISCONNECT AND FIX-OPEN EXISTING FIRE-SMOKE DAMPER.
5. EXISTING FILTER FEEDER (E)FF-1 TO REMAIN.
6. REMOVE EXISTING 2-PIPE CONTROL VALVE.
7. EXISTING EXPANSION TANK (E)ET-1 TO REMAIN.
8. EXISTING GLYCOL FEEDER (E)GF-1 TO REMAIN.
9. REMOVE EXISTING 5" BOILER BYPASS PIPING AS SHOWN INCLUDING INSULATION AND HANGERS.
10. REMOVE HW/CHWS PIPING TO ELBOW UP TO (E)RTU-3.
11. EXISTING 5" HW/CHWS TO REMAIN, RE: DRAWING 1 THIS SHEET FOR NEW CONNECTIONS.
12. EXISTING 5" HW/CHWR TO REMAIN, RE: DRAWING 1 THIS SHEET FOR NEW CONNECTIONS.
13. REMOVE EXISTING CAP ON HWS/R PIPING.
14. REMOVE 5" HW/CHWS PIPING FROM POINT SHOWN TO BOILER ROOM WALL, INCLUDINGINSULATION. MAINTAIN STUB AT WALL ADEQUATE FOR RECONNECTION, AND HOLD PIPEHANGERS FOR REUSE.
15. EXISTING BOILER (E)B-1 TO REMAIN.
16. EXISTING AIR SEPARATOR (E)AS-1 TO REMAIN FOR REUSE IN HW LOOP.
17. EXISTING PRIMARY LOOP PUMPS (E)HW/CHWP-1 AND (E)HW/CHWP-2 TO REMAIN.
18. REMOVE EXISTING 5" CHILLER BYPASS PIPING AS SHOWN INCLUDING ALL INSULATION AND HANGERS.
19. REMOVE 1" HW/CHWS PIPING AS SHOWN, RE: DRAWING 2 THIS SHEET FOR NEW CONNECTIONS.
20. EXISTING 4" HWR DROP TO BOILER TO REMAIN.
21. HW/CHW SUPPLY AND RETURN PIPING UP TO RTU-3.
XDRAWING NOTES1. CONTRACTOR TO DISCONNECT AND FIX-OPEN EXISTING FIRE-SMOKE DAMPER.
2. CONNECT NEW 4" CHWR TO EXISTING 5" CHWR.
3. CONNECT NEW HWS TO EXISTING HWP-1 & HWP-2.
4. NEW 8"Ø BOILER FLUE UP THROUGH ROOF. RE: M-121A FOR CONTINUATION.
5. ROUTE NEW 8"Ø EXHAUST FLUE AS REQUIRED BELOW EXISTING DUCTWORK AND RISE ALONGWALL TIGHT TO STRUCTURE.
6. EXISTING TMV ASSEMBLY TO REMAIN, RE: PLUMBING.
7. EXISTING BOILER CONTROL PANEL TO REMAIN.
8. PROVIDE BRIDGE IN SECTION OF REMOVED 5" PIPE, MATCH EXISTING PIPE SIZE ANDINSULATION THICKNESS.
9. CONNECT NEW 1" HW/CHWS TO EXISTING, SERVING UNIT HEATERS.
10. CONTINUE 5" HWS PIPING AND INSULATION THROUGH BOILER ROOM WALL TO 4-PIPE SYSTEM, RE:M-101A FOR CONTINUATION.
11. CONTINUE 5" HW/CHWS PIPING AND INSULATION TO EXISTING 2-PIPESYSTEM, RE: M-101A FOR CONTINUATION.
12. CONTINUE 4" CHWR PIPING AND INSULATION FROM 4-PIPE SYSTEM THROUGH BOILER ROOM WALL,RE: M-101A FOR CONTINUATION.
13. CONTINUE 4" CHWS PIPING AND INSULATION THROUGH BOILER ROOM WALL TO 4-PIPE SYSTEM, RE:M-101A FOR CONTINUATION.
14. CONTINUE 5" HWR PIPING AND INSULATION FROM 4-PIPE SYSTEM THROUGH BOILER ROOM WALL,RE: M-101A FOR CONTINUATION.
15. PROVIDE NEW BOILER B-2 ON NEW HOUSEKEEPING PAD EXTENSION, RE: DIAGRAM 1/M-600 FORTRIM AND CONTROLS. RE: DETAIL 7/M-501 FOR CONDENSATE NEUTRALIZATION.
16. PROVIDE AND INSTALL NEW AIR SEPARATOR AS-2 FOR CHW SYSTEM TIGHT TO STRUCTURE.
17. CONNECT NEW AS-2 TO EXISTING 5" CHWS PIPING.
18. CAP EXISTING 5" HWS PIPING AND INSULATE.
19. PROVIDE 8" COMBUSTION AIR TERMINATION THROUGH EXTERIOR WALL. RE: DETAIL 4/M-501.
20. CONNECT NEW 4" HS PIPING WITH TRANSITION TO EXISTING 5" PIPING.
21. CONNECT NEW 4" HR PIPING TO EXISTING 4" HR RISE FROM EXISTING BOILER B-1.
22. PROVIDE NEW EXPANSION TANK ET-2 ON NEW 4" HOUSEKEEPING PAD, RE: DETAIL 5/M-501.
23. PROVIDE NEW GLYCOL FEEDER GF-2 ON MANUFACTURER SUPPORT STAND, RE: DETAIL 7/M-500.
24. PROVIDE NEW CHILLED WATER PUMP CHWP-1 ON NEW 4" HOUSEKEEPING PAD,RE: DETAIL 18/M-500.
25. PROVIDE NEW 2-POSITION MIXING VALVE FOR SERVICE TO EXISTING 2-PIPE CHANGEOVERSYSTEM. RE: 1/M-600, 3/M-600, AND M-502.
26. PUMP IMPELLERS TO BE CHANGED, RE: SCHEDULE.
27. VERIFY PRE-CHARGE AIR PRESSURE OF EXISTING TANK
X
ENVIS
ION
MEC
HA
NIC
AL
EN
GIN
EER
S I
NC
.
9777 P
yramid
Court, S
uit
e 1
20
Engle
wood, C
O 8
0112
Tel-
303-6
88-0
223
Fax- 303-6
88-3
584
envis
ionengrs.c
om
Proje
ct #
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATIONAPPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISEUSED WITHOUT THE WRITTEN CONSENT OF
MOA ARCHITECTURE
NOT FOR
CONSTRUCTION
AD
DIT
ION
S A
ND
RE
NO
VA
TIO
NS
016-0
09
7/29
/201
6 11
:44:
03 A
M
M-301
ENLARGEDMECHANICAL
PLANS - PHASE 1A
SIE
RR
A E
LE
ME
NT
AR
Y S
CH
OO
L
CMD
08.04.16
16100.00
7771
Oak
St.
Arv
ada,
CO
800
05
BID SET
JKB
PLAN NORTH
AREA 'A'EXISTINGBUILDING
AREA 'B'
AREA 'C'
KEYPLAN
PLAN NORTH
1/4" = 1'-0"
ENLARGED MECHANICAL DEMOLITION PLAN - BOILER ROOM & KITCHEN1 1/4" = 1'-0"
ENLARGED MECHANICAL PLAN - BOILER ROOM & KITCHEN2
PLAN NORTH
REVISION DATE
METAL ROOF DECK
RIGID INSUL.
WOOD BLKG.
SPLASH BLOCK
RIGID INSUL.
MEMBRANE FLASHING
WOOD BLOCKING
ROOF CURB BY EQUIP. MFR.
FLASHING
TRAP COIL CONDENSATEPIPING AT UNIT & RUN FULL
SIZE TO SPLASH BLOCK
STEEL JOIST OR STEELANGLE UNDER
PLATFORM. SEE STRUCT.
DUCT SIZE
KILN
EXHAUST FAN
KILN
HOOD
TOP OF HOODFLUSH W/FINISHED
CEILING
16 GAUGEGALVANIZED
SHEET METAL
2" HEMMEDEDGE FLANGE
TYP. 4 SIDES
NUT ANDWASHER TOPAND BOTTOMTYP. 4 PLCS.
2" HEMMEDEDGE FLANGETYP. 4 SIDES
CENTERHOODOVER KILN
WELDINSIDE OFCORNERSAIR TIGHT
1"x1" ANGLE IRON WELDED TO TOP OF HOOD
SECURE ALLTHREAD TOSTRUCTURE
4'-0" 4'-0"
2'-0"
MOUNT DIFFUSER FORDISCHARGE AT 30°FROM HORIZONTALTOWARDS FLOOR
WASHER
NUT
SUPPORT THREADED RODFROM STRUCTURE
1" WIDE DUCT STRAPSAME GAUGE AS DUCTWORK
DAMPER/EXTRACTOR
DUCT MOUNTEDDRUM LOUVER SEE
PLANS FOR SIZE
ROUND SUPPLY DUCT,SEE PLANS FOR SIZE
PARALLEL FLOW BRANCH
AIR FLOW
VD
SUPPLY DUCT BRANCH TAKE-OFF
90°
D
20" TO 36" 2" 1" 2 1/8"
36" ANDLARGER
BA 4" 2" 3 1/4"
W
W A B D
L = 1/4 W, 4"MIN.
MAIN DUCT
AIR FLOW
45°L
DUCTVOLUME DAMPER
BRANCH
RADIUS ELBOWS FOR
W= 12" OR LESS
.50 .73 R
EXHAUST AND/OR RETURN BRANCH DUCT
MAIN DUCT
45°
BRANCH DUCT
AIR FLOW
MANUAL VOLUME
DAMPER
L=W/4, 4"MIN.
L
SYMMETRICAL WYE
Q
TW
T
Wb
Qb
R = 1-1/2W
ba T
W
R
a
Q a
A=15° MAX.
UNLESS DICTATED
BY JOB CONDITIONS.
SINGLE VANE ELBOW FOR
W= 14" TO 20"
A
A A
R=W
R
W
.25
.40
.45
.30
.35
.20
.10
.15
.87 R
.80 R
1.08 R
.96 R
1.45 R
1.24 R
2.31 R
1.77 R
R/W
.05 3.59 R
S
W
S
R
4 1/2"
FOR W= 14 OR LARGER, SQUARETHROAT ELBOW WITH VANES MAY BE
PROVIDED
Q = Q = 1/2 Q
STANDARD RADIUSELBOW
STANDARD RADIUSELBOW
TYPICAL DUCTWORK TRANSITION
3 SIDES STRAIGHT
PYRAMIDAL
DOUBLE VANE ELBOW FORWW = GREATER THAN 20"
TURNING VALVE
W
90°
3 1/4"
W
W
W
NOTE: MITERED ELBOWS WITH TURNING VANES
AND SHORT RADIUS ELBOWS MAY BE SUBSTITUTED
FOR STANDARD RADIUS ELBOWS SHOWN.
ROOFTOP UNIT
DUCTWORK
FLEXIBLE CONNECTION
INSUL. SEE MECH.
FRAME OPENING IN DECK ASREQUIRED
SUPPLY DUCT
HAND DAMPER
DRAW BAND WITH SILICONE SEALER
CEILING DIFFUSER
CEILING
FLEX DUCT SIZESHALL MATCH NECKSIZE
FLEX DUCT MAX.5'-0"
COLLAR
PROVIDE BELL MOUTHSPIN-IN FITTINGS FOR ALL ROUND DUCT TAKEOFFS
D
24"
2/3(D)
CEILINGAIR DEVICE
SUPPORT FROMSTRUCTURE (TYP)
GALVANIZED DUCT W/1" ACOUSTICAL DUCT
LINING OR 1" DUCTBOARD
LOWPRESSUREDUCT
DUCTWORK
AIRFLOW
FLEX DUCTPER SPECS.
TRANSITION TOINLET SIZE OF BOX
ROUND TAKEOFFAS REQUIRED
GALVANIZED SHEET METALDUCTWORK. SEE VAVSCHEDULE FOR DUCT SIZE.
SUPPLY AIR MAIN. SEEMECHANICAL PLANS FORSIZE & LOCATION.
DUCT ACCESSDOOR FOR COILACCESS
HOT WATER COILVAV BOX
1"
2"
DRAIN PAN
DRAIN LINE SHALL BE AT LEAST THESAME SIZE AS THE NIPPLE ON THE DRAIN
PAN
PITCH DOWN TO ROOF
EXIT CONE
ROOF SUPPORTASSEMBLY WITHVENTILATED THIMBLE
VENT FLASHING
ROOFING
BOILER STACK
ROOF
MIN. 3'0" ABOVE FLAT ROOFAND 2'-0" ABOVE HIGHEST
POINT WITHIN 10'-0"HORIZONTAL
HWR
HWS
COIL
3/4"
AIR VENT
CABINET
HWS/ HWR MAINS
HANGER ROD
BAND HANGER PERSPECIFICATIONS
VAPOR BARRIERINSULATION
LOCKING NUT
HANGER ROD
HEAVY DUTYCLEVIS HANGER
VAPOR BARRIERINSULATION
12"LONG x 180° BEND RIGIDINSULATION OF SAME
THICKNESS AS PIPE INSULATION
16 GA. ZINC COATEDSHEET STEEL SADDLE
@ LEAST 12" LONG x180° BEND
NUT AND BOLT
SUPPORT NUT
LOCKING NUT
3/4" TO PUMP SUCTION
3/4" TO PUMP DISCHARGE
3/4" DRAIN TO F.S.
REMOVABLE SCREW TOP W/ GASKET
UNION
BALL VALVE (TYP.)
FLOW INDICATOR
FILTER FEEDER (MIN. OF 5-GAL., CAPACITY)
MOUNT ON WALL
UNION
TO AIRSEPERATOR
50 GAL. POLY TANKWITH COVER
CONTROL PANEL
30% GLYCOL SOLUTION
LOW LEVEL FLOATPVC FLOAT SWITCH
STEEL STAND
Y-STRAINER/DRAIN
POWER CORD 115V-60HZ-1∅
HOUSEKEEPINGCONCRETE PAD BY GC
1/3 HP PUMP
PVC BALL VALVE TYP.
CHECK VALVE
PRESSURE SWITCH
PRESSURE GAUGE
FLOOR
INERTIA BASE
BASE MOUNTED PUMP
COUPLING GUARD FILL PUMP BASEWITH NON-SHRINKGROUT
HOUSEKEEPINGCONCRETE PADBY GC
PIPESUPPORT
SUCTION DIFFUSER.REMOVE TEMPORARY
STRAINER AFTER 30DAYS OF OPERATION
SPRING ISOLATORS
PIPEHANGERS
RE: PLANS
*
*HWR
HWRP/T
HWSAIR
FLOW
P/T
* 2-1/2" AND LARGER
3/4"
HWS MAIN
HWR MAIN
1. ARRANGE PIPING TO ALLOW FOR COIL REMOVAL2. DETAIL IS DIAGRAMATIC . PROVIDE PIPINGCONNECTIONS TO COIL CONNECTION LOCATIONSPER MANUFACTURERS INSTALLATIONINSTRUCTIONS.
*HWR
HWS
HWR
NO
P/TC
HWSAIR
FLOW
P/T
NC
3/4"
*
2-1/2" AND LARGER
HWS MAIN
HWR MAIN
1. ARRANGE PIPING TO ALLOW FOR COIL REMOVAL2. DETAIL IS DIAGRAMATIC . PROVIDE PIPINGCONNECTIONS TO COIL CONNECTION LOCATIONSPER MANUFACTURERS INSTALLATIONINSTRUCTIONS.
NOTE: FOR OPENINGS LESS THAN 12"
OMIT STL. JOIST OR ANGLE.
ROOF
VENT CAP
PLASTIC SEALER
STORM COLLAR
TALL CONE FLASHING
COUNTER FLASHING
DUCTWORK RE: PLANS
24" ABOVE FLAT ROOF OR 2'-0"ABOVE HIGHEST POINT WITHIN 10'-0" HORIZ.
1 KILN HOOD DETAILNOT TO SCALE
12 DIFFUSERS ON ROUND DUCT DETAILNOT TO SCALE 2 DUCT CONNECTION DETAILS
NOT TO SCALE
5 ROOFTOP UNIT INSTALLATION DETAILNOT TO SCALE
9 TYPICAL DIFFUSER CONNECTION DETAILNOT TO SCALE
10 SOUND ELBOW DETAILNOT TO SCALE
14 VAV BOX INSTALLATION DETAILNOT TO SCALE
11 ROOFTOP UNIT DRAIN TRAP DETAILNOT TO SCALE16 BOILER/WATER HEATER FLUE DETAIL
NOT TO SCALE
8 HOT WATER CABINET HEATER PIPING DETAILNOT TO SCALE
17 BAND HANGER DETAILNOT TO SCALE (UN-INSULATED PIPE)
13 CLEVIS HANGER DETAILNOT TO SCALE
6 CHEMICAL FILTER FEEDER DETAILNOT TO SCALE
7 GLYCOL FEEDER DETAILNOT TO SCALE
18 END SUCTION PUMP PIPING WITH INERTIA BASE DETAILNOT TO SCALE 3 VAV BOX/FAN COIL HOT WATER COIL PIPING DETAIL (2-WAY VALVE)
NOT TO SCALE
4 VAV BOX HOT WATER COIL PIPING DETAIL (3-WAY VALVE)NOT TO SCALE
15 GOOSENECK DETAILNOT TO SCALE
ENVIS
ION
MEC
HA
NIC
AL
EN
GIN
EER
S I
NC
.
9777 P
yramid
Court, S
uit
e 1
20
Engle
wood, C
O 8
0112
Tel-
303-6
88-0
223
Fax- 303-6
88-3
584
envis
ionengrs.c
om
Proje
ct #
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATIONAPPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISEUSED WITHOUT THE WRITTEN CONSENT OF
MOA ARCHITECTURE
NOT FOR
CONSTRUCTION
AD
DIT
ION
S A
ND
RE
NO
VA
TIO
NS
016-0
09
7/29
/201
6 11
:44:
03 A
M
M-500
MECHANICALDETAILS
SIE
RR
A E
LE
ME
NT
AR
Y S
CH
OO
L
ANG
08.04.16
16100.00
7771
Oak
St.
Arv
ada,
CO
800
05
BID SET
JKB
REVISION DATE
(D)
TRANSFER DUCT SIZE PER PLANS
WALL
24"2(D)
GALVANIZED DUCT WITH 1"ACOUSTICAL LINING FOR RATEDWALLS OR 1" DUCT BOARD FORNON-RATED WALLS
RETURN AIR SOUND ELBOW DETAILNOT TO SCALE3
ROOF DECKFROM RTU
3'-0"
LEAVE DUCT ENDOPEN
RA DUCTRE: PLANS
1-1/2" FIBERGLASSDUCT LINER FORSOUND ATTENUATION
NOT TO SCALE
CONDENSATE PIPING DETAILNOT TO SCALE
GAS WATER HEATER FLUE
BOILER
3/4" CONDENSATE TUBINGCONDENSATE TRAP FURNISHEDWITH BOILER
3/4" CONDENSATE TUBING; 6" MAX LENGTH
NEW HOUSEKEEPING PAD ADJUSTABLE SUPPORT STANDSECURED TO FLOOR
TRANSITION TO 3/4" CPVCRIGID TUBING PRIOR TOELBOW; EXTEND RIGIDTUBING TO NEUTRALIZATIONKIT
NOTES:
LOOPS SHOWN ARE BASED ON "METRAFLEX"
FLEXIBLE EXPANSION LOOPS.
REFER TO SPECIFICATIONS FOR EXPANSION
LOOP SIZING CRITERIA.
SIZE, SUPPORT, ANCHOR, GUIDE, AND INSTALL
LOOPS PER MANUFACTURERS
RECOMMENDATIONS.
PROVIDE WITH UNIONS/FLANGES AT PIPING
SYSTEM CONNECTIONS.
1.
2.
3.
4.
RIGID 360 DEGREEINSULATION INSERT
VAPOR BARRIER INSULATION
PIPE CLAMP
HANGER ROD
WASHER & DBL. HEX NUTS
UNISTRUT TYPE CHANNEL
20 GA. GALV. SHIELD12" LONG, 180°
AS-X
ET-X
FLOOR
SUCTIONCONNECTION TOPUMP
AUTOMATIC AIR VENT
SIZE TO MATCH TANK INLET
THERMAL TRAP 12" MINIMUM HEIGHT
HOUSEKEEPINGCONCRETE PADBY GC
CHARGING VALVE
LOW CAPACITY AIR VENT
MAKEUP WATERFROM GLYCOL FEEDER
EXTERIOR WALL
BOILER/ WATERHEATER COMBUSTION
AIRRE: PLANS
WALL SLEEVE/ THIMBLE
BIRD SCREEN
TERMINATION WITHWEATHER HOOD
SEAL WEATHER-TIGHT ALL SIDES PERMANUFACTURER'S RECOMMENDATIONS
NOT TO SCALE
NOTE: THIS PIPING ISOMETRIC IS DIAGRAMATIC.
CONTRACTOR SHALL REFERENCE SPECIFICATIONS
FOR ALL REQUIRED PIPING SPECIALTIES.PROVIDE
SLEEVES AROUND ALL PIPE PENETRATIONS. SLEEVE
SHALL EXTEND 6" ABOVE ROOF. SEAL WATER TIGHT
BETWEEN SLEEVE AND ROOF.
UNION (TYP OF 2)
AIR VENT (TYP OF 2)
P & T
COMBINATIONISOLATION ANDBALANCE VALVESTRAINER
ISOLATION VALVE
PROVIDE SLEEVES AROUND ALL PIPE ATVESTIBULE FLOOR PENETRATION. SLEEVESHALL EXTEND 6" ABOVE FLOOR. SEAL WATERTIGHT BETWEEN SLEEVE AND FLOOR. SEAL THEANNULAR SPACE BETWEEN PIPE AND SLEEVEWITH WATER PROOF CAULK
VESTIBULE FLOOR BY RTUMANUFACTURER SEALED
WATER TIGHT AND SLOPEDTOWARDS DRAIN
DRAIN TO OUTSIDE OFRTU CABINET WITH TRAPBY M.C.
PRESSURE INDEPENDENT CONTROL VALVE.NORMALLY OPEN FOR HEATING COILS ANDNORMALLY CLOSED FOR COOLING COILS
BALL VALVE
UNION
HIGH CAPACITY AUTOMATIC AIR VENT.HOFFMAN MODEL 792. PIPE DISCHARGETO 12" ABOVE VESTIBULE FLOOR.
'L' TRANSFER DUCT DETAIL6
7
8 EXPANSION LOOP DETAILNOT TO SCALE
2 TRAPEZE HANGER DETAILNOT TO SCALE
5 DIAPHRAGM EXPANSION TANK DETAILNOT TO SCALE
4 COMBUSTION AIR THRU WALL DETAILNOT TO SCALE
SINGLE COIL RTU VESTIBULE PIPING DETAIL1
(D)
TRANSFER DUCT SIZE PER PLANS
WALL
24"2(D)
GALVANIZED DUCT WITH 1"ACOUSTICAL LINING FOR RATEDWALLS OR 1" DUCT BOARD FORNON-RATED WALLS
RETURN AIR SOUND ELBOW DETAILNOT TO SCALE3
ROOF DECKFROM RTU
3'-0"
LEAVE DUCT ENDOPEN
RA DUCTRE: PLANS
1-1/2" FIBERGLASSDUCT LINER FORSOUND ATTENUATION
NOT TO SCALE
CONDENSATE PIPING DETAILNOT TO SCALE
GAS WATER HEATER FLUE
BOILER
3/4" CONDENSATE TUBINGCONDENSATE TRAP FURNISHEDWITH BOILER
3/4" CONDENSATE TUBING; 6" MAX LENGTH
NEW HOUSEKEEPING PAD ADJUSTABLE SUPPORT STANDSECURED TO FLOOR
TRANSITION TO 3/4" CPVCRIGID TUBING PRIOR TOELBOW; EXTEND RIGIDTUBING TO NEUTRALIZATIONKIT
NOTES:
LOOPS SHOWN ARE BASED ON "METRAFLEX"
FLEXIBLE EXPANSION LOOPS.
REFER TO SPECIFICATIONS FOR EXPANSION
LOOP SIZING CRITERIA.
SIZE, SUPPORT, ANCHOR, GUIDE, AND INSTALL
LOOPS PER MANUFACTURERS
RECOMMENDATIONS.
PROVIDE WITH UNIONS/FLANGES AT PIPING
SYSTEM CONNECTIONS.
1.
2.
3.
4.
RIGID 360 DEGREEINSULATION INSERT
VAPOR BARRIER INSULATION
PIPE CLAMP
HANGER ROD
WASHER & DBL. HEX NUTS
UNISTRUT TYPE CHANNEL
20 GA. GALV. SHIELD12" LONG, 180°
AS-X
ET-X
FLOOR
SUCTIONCONNECTION TOPUMP
AUTOMATIC AIR VENT
SIZE TO MATCH TANK INLET
THERMAL TRAP 12" MINIMUM HEIGHT
HOUSEKEEPINGCONCRETE PADBY GC
CHARGING VALVE
LOW CAPACITY AIR VENT
MAKEUP WATERFROM GLYCOL FEEDER
EXTERIOR WALL
BOILER/ WATERHEATER COMBUSTION
AIRRE: PLANS
WALL SLEEVE/ THIMBLE
BIRD SCREEN
TERMINATION WITHWEATHER HOOD
SEAL WEATHER-TIGHT ALL SIDES PERMANUFACTURER'S RECOMMENDATIONS
NOT TO SCALE
NOTE: THIS PIPING ISOMETRIC IS DIAGRAMATIC.
CONTRACTOR SHALL REFERENCE SPECIFICATIONS
FOR ALL REQUIRED PIPING SPECIALTIES.PROVIDE
SLEEVES AROUND ALL PIPE PENETRATIONS. SLEEVE
SHALL EXTEND 6" ABOVE ROOF. SEAL WATER TIGHT
BETWEEN SLEEVE AND ROOF.
UNION (TYP OF 2)
AIR VENT (TYP OF 2)
P & T
COMBINATIONISOLATION ANDBALANCE VALVESTRAINER
ISOLATION VALVE
PROVIDE SLEEVES AROUND ALL PIPE ATVESTIBULE FLOOR PENETRATION. SLEEVESHALL EXTEND 6" ABOVE FLOOR. SEAL WATERTIGHT BETWEEN SLEEVE AND FLOOR. SEAL THEANNULAR SPACE BETWEEN PIPE AND SLEEVEWITH WATER PROOF CAULK
VESTIBULE FLOOR BY RTUMANUFACTURER SEALED
WATER TIGHT AND SLOPEDTOWARDS DRAIN
DRAIN TO OUTSIDE OFRTU CABINET WITH TRAPBY M.C.
PRESSURE INDEPENDENT CONTROL VALVE.NORMALLY OPEN FOR HEATING COILS ANDNORMALLY CLOSED FOR COOLING COILS
BALL VALVE
UNION
HIGH CAPACITY AUTOMATIC AIR VENT.HOFFMAN MODEL 792. PIPE DISCHARGETO 12" ABOVE VESTIBULE FLOOR.
2"x2"x1/4" ANGLE x 6" LG
1 1/2"∅ PIPE STAND
WELD
6"x6"x1/4" STEEL PLATEANCHOR BOLT
WELD FASTEN ANGLETO STAND
LOOSE FITTING "U" CLAMP
CONCRETE FLOOROF OPEN ENCLOSURE
NOTE: PIPE SUPPORT TO
BE PAINTED.
20 GA. GALV. SHIELD12" LONG, 180°
RIGID 360 DEGREEINSULATION INSERT
ALL SERVICE JACKET
'L' TRANSFER DUCT DETAIL6
7
8 EXPANSION LOOP DETAILNOT TO SCALE
2 TRAPEZE HANGER DETAILNOT TO SCALE
5 DIAPHRAGM EXPANSION TANK DETAILNOT TO SCALE
4 COMBUSTION AIR THRU WALL DETAILNOT TO SCALE
SINGLE COIL RTU VESTIBULE PIPING DETAIL1
9 CHW PIPE SUPPORT DETAILNOT TO SCALE
ENVIS
ION
MEC
HA
NIC
AL
EN
GIN
EER
S I
NC
.
9777 P
yramid
Court, S
uit
e 1
20
Engle
wood, C
O 8
0112
Tel-
303-6
88-0
223
Fax- 303-6
88-3
584
envis
ionengrs.c
om
Proje
ct #
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATIONAPPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISEUSED WITHOUT THE WRITTEN CONSENT OF
MOA ARCHITECTURE
NOT FOR
CONSTRUCTION
AD
DIT
ION
S A
ND
RE
NO
VA
TIO
NS
016-0
09
7/29
/201
6 11
:44:
04 A
M
M-501
MECHANICALDETAILS (CONT.)
SIE
RR
A E
LE
ME
NT
AR
Y S
CH
OO
L
ANG
08.04.16
16100.00
7771
Oak
St.
Arv
ada,
CO
800
05
BID SET
JKB
REVISION DATE
DPBV BALANCE @ 40 GPM
3/4
HWS
HWS
(E) ET-1
HWS
HWR
HW
R HW
S
SLOPE
P
HW
S
P
SLOPE
HW
R
18
M-500
6
M-500
(E)PUMPHWP-1
(E)PUMPHWP-2
(E)FF-1
5'-10"MIN.
1/2" MANUALVENT VALVE
5"
4"4" 4"4"
5"5"
5"
1-1/2"1"5"5" 5"5"
5"
(E) GF-1
AS-1
5
M-501
5
M-501
CH
WS
CHWSCHWR
AS-2
CH
WS
CH
WS
ET-2
GF-2
(E) CH-1
5
M-501
7
M-500
CHWS
PUMP
CHWP-1
4"
(E)
HW
/CH
WS
HW
/CH
WR
1"
3/4"1"
5"
HW
/CH
WS
HW
/CH
WR
HW/CHWSHW/CHWR
B-2BOILER (E) BOILER
B-1
HW
/CH
WR
5"
CHWR
HW/CHWS
HW
/CH
WS
RTU-7
28 GPM HW
30 GPM CHW
RTU-8
22 GPM HW
15 GPM CHW
HWSHWR
CHWSCHWR
3" HWS/R UP TOSECOND FLOOR
3" CHWS/R UP TOSECOND FLOOR
CHWSCHWR
HWSHWR
HW
SH
WR
HW
S
HW
R
RTU-10
25 GPM HW
60 GPM CHW
HW
SH
WR
3" HWS/R DOWN TOSECOND FLOOR
3" CHWS/R DOWN TOSECOND FLOOR
RTU-9
18 GPM HW
43 GPM CHW
RTU-6
20 GPM HW
23 GPM CHW
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"3/4"3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
1"
1"
3/4"
1"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4" 1"
BALANCE @ 15 GPM
BALANCE @ 17.9 GPM
3/4"
3/4"
1-1/4"
1"
1-1/4"
1-1/2"
2-1/2"
2-1/2"
2-1/2"
BALANCE @ 15 GPM
BALANCE @ 79.5 GPM
BALANCE @ 108 GPM
1-1/2"
2-1/2"
2-1/2"
2-1/2"
3"
2-1/2"
3"
3"
1-1/2"
1"
4"
4" 4"
4"
2"
1-1/2"
1-1/2"
2"
2"
2"
2 "
2"
2"
2"
1-1/2"
1-1/2"
2-1/2"
4"
4"
5"5"
5"
HW
SH
WR
CH
WS
CH
WR
HWSHWR
HWS HWS
CHWS CHWSCHWRCHWR
HW/CHWR
CH
WS
HWSHWR
CHWSCHWR
HW
SH
WR
CH
WS
CH
WR
HW
SH
WR
CH
WS
CH
WR
4"
2"
1-1/2"
3/4"
DPBV BALANCE @ 45 GPM
DPBV BALANCE @ 40 GPM
PHASE 1B
DPBV BALANCE@ 25 GPM
DPBVBALANCE@ 25 GPM
DPBV BALANCE@ 10 GPM
DPBV BALANCE@ 10 GPM
1-1/2"1"
3/4"
1-1/4"
3/4"
3/4""
2-1/2"
2-1/2"
5"
4"
3/4"
4"
5"
3/4"
5"
4"4"
1"
5"
MECHANICAL/BOILER ROOM
COOLING TOWER ENCLOSURE
(E) ZC 3-26.4 GPM
1"
(E) ZC 3-12.3 GPM
(E) RTU-47.5 GPM HW
7.5 GPM CHW
(E) RTU-227.5 GPM HW
27.5 GPM CHW
(E) RTU-316.7 GPM HW
16.7 GPM CHWCP-3
(E) CUH-32.5 GPM
(E) ZC 4-21.1 GPM
(E) ZC 4-11.3 GPM
(E) CP-4
(E) CUH-22.5 GPM
(E) ZC 4-50.5 GPM
(E) ZC 4-31 GPM (E) ZC 4-4
0.5 GPM
(E) ZC 4-62.3 GPM
(E) CP-2(E) ZC 1-21.6 GPM
(E) ZC 1-32.8 GPM
(E) ZC 1-61 GPM
(E) ZC 1-41.2 GPM
(E) ZC 1-71.6 GPM
(E) ZC 1-53.7 GPM
(E) ZC 1-11.8 GPM
(E) ZC 1-82.4 GPM
(E) CUH-12.5 GPM
(E) UH-61.5 GPM
(E) UH-21.5 GPM
(E) UH-11.5 GPM
(E) UH-31.5 GPM
VAV 5-2
3.5 GPM
VAV 5-1
3.0 GPM
VAV 6-1
3.6 GPM
VAV 8-4
2.8 GPM
VAV 8-2
2.5 GPM
VAV 8-3
2.7 GPM
VAV 9-1
2.1 GPM
VAV 9-3
3.0 GPM
VAV 9-2
3.0 GPM
VAV 9-4
2.2 GPM
VAV 9-8
1.7 GPM
VAV 9-5
2.0 GPM
VAV 6-2
3.1 GPM
VAV 6-3
5.5 GPM
VAV 9-6
2.5 GPM
VAV 9-7
2.1GPM
VAV 10-9
3.0 GPM
VAV 10-8
2.5 GPM
VAV 10-7
3.0 GPM
VAV 10-6
2.5 GPM
VAV 10-01 2.0 GPM
VAV 10-05
3.0GPM
VAV 10-04
2.5 GPM
VAV 10-03
3.2 GPMVAV 10-02
3.0 GPM
CUH-5
1.0 GPMCUH-6
1.0 GPM
VAV 9-9
3.0 GPM
VAV 9-11
3.0 GPM
VAV 9-10
3.0 GPM
VAV 9-12
2.2 GPM
VAV 9-16
1.0 GPM
VAV 9-13
2.1 GPM
VAV 9-14
1.9 GPM
VAV 9-15
2.2GPM
VAV 10-11
2.5 GPM
VAV 10-10
2.5 GPM
VAV 10-13
2.5 GPM
VAV 10-12
2.5 GPM
VAV 10-18
2.0 GPM
VAV 10-15
3.0 GPM
VAV 10-14
2.5 GPM
VAV 10-16
3.2GPMVAV 10-17
3.2 GPM
SECOND FLOOR
VAV 6-4
1.4 GPM
CUH-7
1.0 GPM
VAV 8-1
2.5 GPM
ENVIS
ION
MEC
HA
NIC
AL
EN
GIN
EER
S I
NC
.
9777 P
yramid
Court, S
uit
e 1
20
Engle
wood, C
O 8
0112
Tel-
303-6
88-0
223
Fax- 303-6
88-3
584
envis
ionengrs.c
om
Proje
ct #
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATIONAPPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISEUSED WITHOUT THE WRITTEN CONSENT OF
MOA ARCHITECTURE
NOT FOR
CONSTRUCTION
AD
DIT
ION
S A
ND
RE
NO
VA
TIO
NS
016-0
09
7/29
/201
6 11
:44:
04 A
M
M-502
MECHANICALPIPING DIAGRAM -PHASES 1A & 1B
SIE
RR
A E
LE
ME
NT
AR
Y S
CH
OO
L
PAF
08.04.16
16100.00
7771
Oak
St.
Arv
ada,
CO
800
05
BID SET
JKB
12" = 1'-0"
MECHANICAL PIPING DIAGRAM1
REVISION DATE
DNDN
1 2 3 4
6
5
7 89 10
11 12
13
A
B
C
E
G
K
L
J
M
D
F
H
6.5
E.A E.B E.C E.D E.E E.F E.G
E.H
E.J
E.1
E.2
E.3
E.4
E.5
E.6
E.7
E.8
E.9
E.10
VAV 8-03
VAV 8-04VAV 9-01 VAV 8-01 RTU-7
VAV 9-02
VAV 9-03
(E)UH-6
(E)UH-2
(E)ZC1-4
(E)ZC1-5
(E)ZC1-7
(E)ZC1-8
VAV-5-01
VAV-5-02
(E)RTU-2
RTU-5
(E)ZC3-1 (E)UH-1
(E)ZC4-4(E)ZC4-3
(E)ZC4-5
(E)AC-1
(E)ZC4-6
(E)CUH-2
(E)ZC4-1
(E)ZC4-2
VAV 9-06
VAV 9-05VAV 9-04
VAV 9-07
(E)ZC1-3
(E)ZC1-2
(E)ZC1-6
(E)ZC1-1
VAV 9-08
VAV 10-05
VAV 10-03
VAV 10-02
VAV 10-04
VAV 10-01
VAV 10-07
VAV 10-06
VAV 10-09
VAV 10-08
AREA OPENTO ABOVE
VAV 6-01
(E)UH-3
(E)RTU-4
(E)RTU-3
(E)MAU-1
(E)RTU-1
RTU-6
CUH-6
CUH-5
(E)CUH-3
(E)CUH-1
VAV 8-02
RTU-8
RTU-9
RTU-10
CUH-7
1 2 3 4
6
5
7 89 10
11 12
13
A
B
C
E
G
K
L
J
M
D
F
H
6.5
E.A E.B
E.2
E.3
E.4
E.5
E.6
E.7
E.8
E.9
E.10
RTU-6
RTU-9
RTU-10
AREA OPENTO BELOW
VAV 10-17
VAV 10-16
VAV 10-15
VAV 10-14
VAV 10-18
VAV 10-12
VAV 10-10
VAV 10-11
VAV 10-13
VAV 9-15
VAV 9-14
VAV 9-16
VAV-9-12
VAV-9-13
VAV 9-09
VAV 9-10
VAV 9-11
VAV-6-03
VAV 6-02
VAV 6-04
ENVIS
ION
MEC
HA
NIC
AL
EN
GIN
EER
S I
NC
.
9777 P
yramid
Court, S
uit
e 1
20
Engle
wood, C
O 8
0112
Tel-
303-6
88-0
223
Fax- 303-6
88-3
584
envis
ionengrs.c
om
Proje
ct #
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATIONAPPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISEUSED WITHOUT THE WRITTEN CONSENT OF
MOA ARCHITECTURE
NOT FOR
CONSTRUCTION
AD
DIT
ION
S A
ND
RE
NO
VA
TIO
NS
016-0
09
7/29
/201
6 11
:44:
16 A
M
M-510
TEMPERATURECONTROL ZONE
MAPS
SIE
RR
A E
LE
ME
NT
AR
Y S
CH
OO
L
PAF
08.04.16
16100.00
7771
Oak
St.
Arv
ada,
CO
800
05
BID SET
JKB
1" = 20'-0"
Overall First Floor Mechanical Plan1
PLAN NORTH
AREA 'A'EXISTINGBUILDING
AREA 'B'
AREA 'C'
KEYPLANPLAN NORTH
1" = 20'-0"
Overall Second Floor Mechanical Plan2
PLAN NORTH
REVISION DATE
HW
R
HW
R
HW
S
HW
RC
WS
CW
R
FANNUMBER
INTERLOCKEDUNIT NUMBER
FAN INTERLOCK TABLE
MISCELLANEOUS CONTROL DIAGRAMSNOT TO SCALE
DEVICE
PLUG-IN COMMUNICATION
LINE
ANALOG
INPUT
INPUT
DIGITAL
CONTROLLER
DAMPER OPEN/CLOSE
CONTROLLER
TERMINAL
DDC EQUIPMENT
EXHAUST FAN START/STOP
BY E.C.
120 VOLT POWER
1
2
3
OUTPUT
DIGITAL
ANALOG
OUTPUT
1
2
1
2
3
4
5
MS BY DIVISION 26
EXHAUST FAN CURRENT SWITCH ALARM 1
EF-9 KILN HOODEF-10 RTU-6EF-11EF-12EF-13
HWHEATING
COIL
NO
TYPICAL CABINET UNIT HEATER
AQUASTAT OPENS VALVE
T-STAT CYCLES FAN
TYPICAL EXHAUST FAN CONTROL
EQUIPMENTRTU-8RTU-9MAU-3
EIXSTING CHILLER CH-1 ALARM
EXISTING CHILLER CH-1 STATUS EXISTING CH-1 ENABLE/DISABLE
EXISTING CURRENT SWITCH FOR P-1 STATUS
EXISTING HEATING WATER RESET
EXISTING HWP-1 START/STOP
EXISTING HWP-2 START/STOP
EXISTING CURRENT SWITCH FOR P-2 STATUS
EXISTING VFD CONTROL POINT (MAINTAIN DP SETPOINT)
EXISTING OUTSIDE AIR TEMPERATURE
EXISTING HEATING WATER SUPPLY TEMP.
EXISTING HEATING WATER RETURN TEMP.
EXISTING BOILER B-1 ALARM
EXISTING HWP-1 SPEED
EXISTING HWP-2 SPEED
EXISTING VFD CONTROL POINT (MAINTAIN DP SETPOINT)
CHWP-1
FURTHEST COILCHILLED WATER
SYSTEMMAINTAINMIN. FLOW
CURRENT SWITCH FOR P-3 STATUS
CHILLED WATER RESET
P-3 START/STOP
OUTSIDE AIR TEMPERATURE
CHS TEMP (BLDG LOOP)
CHR TEMP (BLDG LOOP)
FEEDERGLYCOL
DEVICE
PLUG-IN COMMUNICATION
LINE
ANALOGINPUT
INPUTDIGITAL
CONTROLLER
CONTROLLER
CHILLED WATERSYSTEM
DDC EQUIPMENT
BY E.C.120 VOLT POWER
12345678
123456
OUTPUTDIGITAL
ANALOGOUTPUT
1234567
1234
BY DIVISION 26
P-3 SPEED
(E)CH-1STARTERMOTOR
PANELCHILLER
CHR CHRCHR
CHSCHS
(E)CHR
(E)CHS
AS-2CHS CHS
CHR
9
BLDG LOOP FLOW
78
VFD CONTROL POINT (MAINTAIN DP SETPOINT) 9
CHS TEMP
CH-1 CHS TEMP
MAKE-UP WATER METER 10
2
1
3
2
TS
TS
TS
TS
3
1
3
4
69 2
7
##
# #
L1 L2
OUTDOORS(NORTH SIDE)
COMMON BUILDING SENSOR(SENSOR SHOWN FOR REFERENCESINGLE SENSOR USED FOR ALLSYSTEM O.A.T)
1 TS
INDOORS
DPPS
FM
BMS HEADER TEMP
HWS
HWS
HWS
HWS
HWR
(E)HWP-1
B-2BOILER
(E)B-1BOILER
HW
S
HWR
BMS PANELNOT TO SCALE
BOILER B-1 START/STOP BOILER B-1 ALARM TO DDC
OUTPUTDIGITAL
INPUTDIGITAL
BOILER B-2 ALARM TO DDCBMS INTERFACE TO DDC
HEATING WATER RESET
BMS CONTROLFUNCTIONS NON-DDC
INPUTANALOG
FURTHEST COILIN HEATING WATERSYSTEM
HWR
HWS
BOILER SYSTEM ENABLE/DISABLE FROM DDC
BOILER B-2 ALARM
BMS INTERFACE
BOILER SYSTEM ENABLE/DISABLE
GLYCOL FEED
BOILER ROOM EPO ALARM
FEEDERGLYCOL
DEVICEPLUG-IN COMMUNICATION
LINE
ANALOG
INPUT
INPUTDIGITAL
SYSTEM
BY E.C.120 VOLT POWER
12345678
123456
OUTPUTDIGITAL
ANALOGOUTPUT
1234567
12345
BOILER TOBMS PANEL
BOILER TOBMS PANEL
HW
S
(E)HWP-2
BOILER B-2 START/STOP
OUTSIDE AIR TEMP FROM DDC
EPO SWITCHMOUNT AT EXIT DOORS
O.A.T TO BMS
AS-1
BY DIVISION 26 BY DIVISION 26
FLUE
32
1
2
3
4
6
5
4
21
TS
TS
21
21
1
2
1
3
25
##
##
PS
L1 L2
OUTDOORS(NORTH SIDE)
COMMON BUILDING SENSOR(SENSOR SHOWN FOR REFERENCESINGLE SENSOR USED FOR ALLSYSTEM O.A.T)
1 TS
INDOORS
DP
NOTE:
COORDINATE EXACT CONTROL FUNCTIONS AND
CONNECTION REQUIREMENTS WITH BMS PANEL
MANUFACTURER AND CONTROLS CONTRACTOR.
3
EPO
CONTROLLERDDC EQUIPMENT
HEATING WATER
CONTROLLER
HWR
9
GLYCOL FEED
NOTE: INTERLOCK BOILERSAND DOMESTIC BOILERSTO SHUT DOWN BY EPO.
4
##
# #
SET POINT ADJUST.
ZONE TEMP S
SPACE TEMP. SENSOR
2
1
SPACE TEMPERATURE SETPOINT
SPACE TEMPERATURE INDICATION
S
L1 L2
1 1
SPACE TEMPERATURE SETPOINTSPACE TEMPERATURE INDICATION
DEVICE
PLUG-IN COMMUNICATIONLINE
DISCHARGE AIR TEMPERATURE
ANALOGINPUT
INPUTDIGITAL
CONTROLLER
AIRFLOW VALVE
CONTROLLER
VAVTERMINAL UNIT
DDC EQUIPMENT
BY E.C.120 VOLT POWER
HEATING CONTROL VALVE123
OUTPUTDIGITAL
ANALOGOUTPUT
12
123
HWHEATING
COIL
4SPACE CO2 LEVEL & ADJUSTMENT5SPACE COT HIGH LEVEL ALARM
MAX. AIR FLOW
MIN. AIR FLOW
HEATING AIR FLOW
AIR
VO
LUM
E
SETPOINT
HTG AIRFLOW &
HTG WTR VALVE
WARMCOOL
NO
C
NONC
3-WAY VALVE 2-WAY VALVE
2
TS
1
DEAD BAND##
# #
L1 L2
1
2
SET POINT ADJUST.
ZONE TEMP S
SPACE CO2SPACE CO2 ADJUST.
SPACE TEMP. SENSOR
S
SPACE CO2 SENSOR
3
4
5
2
CH
S
HWS/CHS
FURTHEST COIL 2 PIPE
HEATING/CHILLED WATER
SYSTEM
CH
R
HWR/CHR
5DP
5
(2-PIPE) HEATING/COOLING SUPPLY CHANGE OVER VALVE
4
6
(2-PIPE) HEATING/COOLING RETURN CHANGE OVER VALVE
NC
C
NO
NC
C
NO
3
HWS/CHS
FURTHEST COIL 2 PIPE
HEATING/CHILLED WATER
SYSTEM
HWR/CHR6
N0
5
4DP
NC
C
N0
NC
C
6
CVCV HEATING/COOLING SUPPLY CHANGE OVER
CV HEATING/COOLING RETUN CHANGE OVER
ANALOGINPUT
INPUTDIGITAL
1234567
123456
OUTPUTDIGITAL
ANALOGOUTPUT
1234567
12345
UNIT DISCHARGE AIR TEMPERATURERETURN AIR TEMPERATURE
RETURN AIR SMOKE ALARM
OA/RA DAMPER MOTORSUPPLY FAN SPEED
SUPPLY FAN START/STOPEXHAUST FAN START/STOP
OUTSIDE AIR
SUPPLY FAN
DISCHARGE AIR STATIC PRESSURE (HIGH STATIC SAFETY)
RETURN AIR
COILHW
EXHAUST FAN SPEEDBUILDING DIFFERENTIAL PRESSURE
L
TER
FI
CURRENT SWITCH FOR SUPPLY FAN ALARMCURRENT SWITCH FOR EXHAUST FAN ALARM
FREEZE STAT ALARM
COILCW
UNIT ENTERING AIR TEMPERATURE* *
HEATING COIL CONTROL VALVE
RELIEF AIR
EXHAUST FAN
SUPPLY AIR
BY DIVISION 26
7HW COIL DISCHARGE AIR TEMPERATURE
8DUCT STATIC PRESSURE (CONTROL POINT)
9RA CO2 SENSOR
10
OUTSIDE AIR TEMPERATURE
NO
2-WAY VALVE
NO
2-WAY VALVE
OUTSIDE AIR AIRFLOW
COOLING COIL CONTROL VALVE
NOTES:
1. REFER TO EQUIPMENT SCHEDULES FOR COIL VALVE TYPES.
2. COORDINATE WITH TC CONTRACTOR FOR CONTROL VALVE PORT
CONFIGURATION. DIAGRAMS REPRESENT GENERAL CONFIGURATION
AND FLOW INTENT ONLY.
3. * = HARD WIRE TO SUPPLY FAN BY DIVISION 26
4. ** = CO2 SENSORS TO BE LOCATED IN ACCESSIBLE AREAS. RE: PLANS
FOR LOCATIONS.
6 RELIEF AIR DAMPER MOTOR
8
2
4 5
3
6
2
3
1
4
TSTSTS
TS
1
21
6510
23 7
#
COMMUNICATIONLINE
BY E.C.120 VOLT POWER
DEVICE
PLUG-IN
#
# #
L1 L2
AFMS
WITHIN RTUINTAKE HOOD
COMMON RTU SENSOR(SENSOR SHOWN FOR REFERENCESINGLE SENSOR USED FOR ALLSYSTEM O.A.T)
9 TS
RTU OUTDOORS
DP4
INDOORS
LLTS
SMKCO2
DPS DPS
DM
DM
DM
81
BY DIVISION 26
1
*
*
CONTROLLERDDC EQUIPMENT
AIR HANDLING UNITCONTROLLER
CURRENT SWITCH FOR WHEEL MOTOR ALARM
PICVPICV
EXISTING VFD CONTROL POINT (MAINTAIN DP SETPOINT)
DPS
11
11EXHAUST PLENUM SENSOR
CH
R
CH
S
6 5
GLYCOL FEEDER LOW LEVEL ALARM
GLYCOL FEEDER ALARM
4 2
GLYCOL FEEDER LOW LEVEL ALARM
GLYCOL FEEDER LOW LEVEL ALARM
3 CHILLED WATER SYSTEM CONTROL DIAGRAMNOT TO SCALE 1 HEATING WATER SYSTEM CONTROL DIAGRAM
NOT TO SCALE
5 TYPICAL VAV BOX w/ HW HEAT CONTROL DIAGRAMNOT TO SCALE 2 VAV AIR HANDLER CONTROL DIAGRAM (RTU-6,8,9,10)
NOT TO SCALE (CW/HW/RET)
ENVIS
ION
MEC
HA
NIC
AL
EN
GIN
EER
S I
NC
.
9777 P
yramid
Court, S
uit
e 1
20
Engle
wood, C
O 8
0112
Tel-
303-6
88-0
223
Fax- 303-6
88-3
584
envis
ionengrs.c
om
Proje
ct #
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATIONAPPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISEUSED WITHOUT THE WRITTEN CONSENT OF
MOA ARCHITECTURE
NOT FOR
CONSTRUCTION
AD
DIT
ION
S A
ND
RE
NO
VA
TIO
NS
016-0
09
7/29
/201
6 11
:44:
17 A
M
M-600
MECHANICALCONTROLDIAGRAMS
SIE
RR
A E
LE
ME
NT
AR
Y S
CH
OO
L
PAF
08.04.16
16100.00
7771
Oak
St.
Arv
ada,
CO
800
05
BID SET
JKB
REVISION DATE
FAN BY DIVISION 26= HARD WIRE TO SUPPLY*
VENTED
BY DIVISION 26
L
ET
R
IF
BURNER
MS
POWER-
DEVICE
PLUG-IN
SPACE TEMPERATURE
CURRENT SWITCH FOR SUPPLY FAN STATUS
L2L1
MAU-1
CONTROLLER
MAKE-UP AIR UNIT
ANALOGINPUT OUTPUT
ANALOG
COMMUNICATIONLINE
DDC EQUIPMENT
CONTROLLER
DIGITAL
INPUT OUTPUT
DIGITAL
MS
CRAWLSPACE
EXHAUST FAN
BY T.C.24 VOLT POWER
EF-13
TS
1
MS
BY DIVISION 26
1
SUPPLY FAN
SUPPLY AIR SMOKE ALARM
SUPPLY AIR
BY MANUF.
3
EF-13 CURRENT SWITCH FOR FAN STATUS
X
123
X X
1
X
MAKE-UP AIR UNIT CONTROL DIAGRAMNOT TO SCALE (IN TC PANEL ROOM)
SPACE HUMIDITY 2
12
MAU-2 ENABLE
EF-13 START/STOP
2
SEE SPECIFICATIONS FOR OVERRIDEPANEL REQUIREMENTS, DETAILSAND SEQUENCE OF OPERATION
SEE SPECIFICATIONS FOR OVERRIDEPANEL REQUIREMENTS, DETAILSAND SEQUENCE OF OPERATION
LED (GREEN) IS ENERGIZED BYSUPPLY FAN STATUS FOR OVERRIDE
FUNCTION OR (RED) BY EVENTSWITCH POSITION.
PANEL MOUNTED TOGGLE SWITCH,SPDT WITH CENTER OFF POSITION.
UNIT FUNCTION TAG: STANDARDENGRAVED LABEL, BLACK
BACKGROUND, WHITE LETTERING,0.5" HIGH BY 3.0" WIDE. FUNCTION
INDICATES EITHER OFF, AUTO, OR ONPOSITION OF THE TOGGLE SWITCH.
ART&LMCRTU-6
COMMONSRTU-7
KINDERGARTENRTU-8
CLASSROOMSRTU-9
-EXTERIOR LIGHTS
CLASSROOMSRTU-10
MUSIC ROOM
Off Auto On
RTU-5
5" TYPLED
TOGGLE
Off Auto On
LED
TOGGLE
Off Auto On
LED
TOGGLE
Off Auto On
LED
TOGGLE
Off Auto On
LED
TOGGLE
Off Auto On
LED
TOGGLE
Off Auto On
LED
TOGGLE
20"
24"
CNO
NC
3-WAY VALVE
4
OUTSIDE AIR
3
S
TEMPERTURE SENSOR
1
H2
HUMIDITY SENSOR
2
1
ANALOGINPUT
INPUTDIGITAL
1234567
123456
OUTPUTDIGITAL
ANALOGOUTPUT
1234567
12345
UNIT DISCHARGE AIR TEMPERATURERETURN AIR TEMPERATURE
RETURN AIR SMOKE ALARM
OA/RA DAMPER MOTORSUPPLY FAN SPEED
SUPPLY FAN START/STOPEXHAUST FAN START/STOP
OUTSIDE AIR
SUPPLY FAN
DISCHARGE AIR STATIC PRESSURE (HIGH STATIC SAFETY)
RETURN AIR
COILHW
EXHAUST FAN SPEEDBUILDING DIFFERENTIAL PRESSURE
LTER
FI
CURRENT SWITCH FOR SUPPLY FAN ALARMCURRENT SWITCH FOR RETURN FAN ALARM
FREEZE STAT ALARM
COILCW
UNIT ENTERING AIR TEMPERATUREHEATING COIL CONTROL VALVE
RELIEF AIR
EXHAUST FAN
BY DIVISION 26
7HW COIL DISCHARGE AIR TEMPERATURE
89
SPACE CO2/TEMPERATURE SENSOR
10
OUTSIDE AIR TEMPERATURE
NO
2-WAY VALVE
NO
2-WAY VALVE
OUTSIDE AIR AIRFLOW
COOLING COIL CONTROL VALVE
NOTES:
1. REFER TO EQUIPMENT SCHEDULES FOR COIL VALVE TYPES.
2. COORDINATE WITH TC CONTRACTOR FOR CONTROL VALVE PORT
CONFIGURATION. DIAGRAMS REPRESENT GENERAL CONFIGURATION
AND FLOW INTENT ONLY.
3. * = HARD WIRE TO SUPPLY FAN BY DIVISION 26
4. ** = CO2 SENSORS TO BE LOCATED IN ACCESSIBLE AREAS. RE: PLANS
FOR LOCATIONS.
6 RELIEF AIR DAMPER MOTOR
8
2
4 5
3
6
2
3
1
4
TSTSTS
TS
1
21
6510
23
#
COMMUNICATIONLINE
BY E.C.120 VOLT POWER
DEVICE
PLUG-IN
#
# #
L1 L2
AFMS
WITHIN RTUINTAKE HOOD
COMMON RTU SENSOR(SENSOR SHOWN FOR REFERENCESINGLE SENSOR USED FOR ALLSYSTEM O.A.T)
9 TS
RTU OUTDOORS
DP4
INDOORS
LLTS
SMKCO2
DPS
DM
DM
DM
81
BY DIVISION 26
1
*
*
CONTROLLERDDC EQUIPMENT
AIR HANDLING UNITCONTROLLER
ANALOGINPUT
INPUTDIGITAL
1234567
123456
OUTPUTDIGITAL
ANALOGOUTPUT
1234567
1234
UNIT DISCHARGE AIR TEMPERATURERETURN AIR TEMPERATURE
RETURN AIR SMOKE ALARM
OA/RA DAMPER MOTORSUPPLY FAN SPEED
SUPPLY FAN START/STOPEXHAUST FAN START/STOP
OUTSIDE AIR
SUPPLY FAN
DISCHARGE AIR STATIC PRESSURE (HIGH STATIC SAFETY)
RETURN AIR
COILCW/HW
EXHAUST FAN SPEEDBUILDING DIFFERENTIAL PRESSURE
LTER
FI
CURRENT SWITCH FOR SUPPLY FAN ALARMCURRENT SWITCH FOR RETURN FAN ALARM
FREEZE STAT ALARM
UNIT ENTERING AIR TEMPERATURE* *
HEATING/COOLING COIL CONTROL VALVE
RELIEF AIR
EXHAUST FAN
SUPPLY AIR
BY DIVISION 26
7HW COIL DISCHARGE AIR TEMPERATURE
8DUCT STATIC PRESSURE (CONTROL POINT)
9RA CO2 SENSOR
10
OUTSIDE AIR TEMPERATUREOUTSIDE AIR AIRFLOW
NOTES:
1. REFER TO EQUIPMENT SCHEDULES FOR COIL VALVE TYPES.
2. COORDINATE WITH TC CONTRACTOR FOR CONTROL VALVE PORT
CONFIGURATION. DIAGRAMS REPRESENT GENERAL CONFIGURATION
AND FLOW INTENT ONLY.
3. * = HARD WIRE TO SUPPLY FAN BY DIVISION 26
4. ** = CO2 SENSORS TO BE LOCATED IN ACCESSIBLE AREAS. RE: PLANS
FOR LOCATIONS.
5 RELIEF AIR DAMPER MOTOR
8
2
3
5
2
3
1
4
TSTSTS
TS
1
21
6510
23 7
#
COMMUNICATIONLINE
BY E.C.120 VOLT POWER
DEVICE
PLUG-IN
#
# #
L1 L2
AFMS
WITHIN RTUINTAKE HOOD
COMMON RTU SENSOR(SENSOR SHOWN FOR REFERENCESINGLE SENSOR USED FOR ALLSYSTEM O.A.T)
9 TS
RTU OUTDOORS
DP4
INDOORS
LLTS
SMKCO2
DPS DPS
DM
DM
DM
81
BY DIVISION 26
1
*
*
CONTROLLERDDC EQUIPMENT
AIR HANDLING UNITCONTROLLER
S
SPACE CO2/TMPERATURE SENSOR
8
* *
PICVPICV
DPS
11
DPS
7
11EXHAUST PLENUM SENSOR
EXHAUST PLENUM SENSOR
2 SINGLE ZONE VAV AIR HANDLER CONTROL DIAGRAM (RTU-7)NOT TO SCALE (CW/HW/RET)
1 VAV AIR HANDLER CONTROL DIAGRAM (RTU-5)- TWO PIPENOT TO SCALE (CW/HW/RET)
4 TEMPERATURE CONTROL PANEL-OVERRIDE SWITCH PANELNOT TO SCALE IN TC PANEL ROOM
ENVIS
ION
MEC
HA
NIC
AL
EN
GIN
EER
S I
NC
.
9777 P
yramid
Court, S
uit
e 1
20
Engle
wood, C
O 8
0112
Tel-
303-6
88-0
223
Fax- 303-6
88-3
584
envis
ionengrs.c
om
Proje
ct #
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATIONAPPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISEUSED WITHOUT THE WRITTEN CONSENT OF
MOA ARCHITECTURE
NOT FOR
CONSTRUCTION
AD
DIT
ION
S A
ND
RE
NO
VA
TIO
NS
016-0
09
7/29
/201
6 11
:44:
17 A
M
M-601
MECHANICALCONTROLDIAGRAMS
(CONT.)
SIE
RR
A E
LE
ME
NT
AR
Y S
CH
OO
L
PAF
08.04.16
16100.00
7771
Oak
St.
Arv
ada,
CO
800
05
BID SET
JKB
REVISION DATE
DNDN
1
M-301
TYP OF 8
(E)28"ø(E)22"ø (E)48"x24"
(E)2
2"x1
4"
(E)ZC3-11,500 CFM
(E)ZC3-24,200 CFM
(E)CUH-4 2
1
1
(E)3/4"(E)3/4"
(E)UH-2
(E)UH-5 (E)UH-4
(E)3/4"(E)3/4"
(E)1"(E)1"(E)1 1/4"(E)1 1/4" (E)1 1/4"(E)1 1/4"
(E)3/4"(E)3/4"(E)3/4"(E)3/4"
(E)3/4"(E)3/4"
(E)1 1/2"(E)1 1/2"
(E)2"
(E)2"(E)2"
(E)2"
(E)HWR(E)HWS
(E)HWR(E)HWS
(E)HWR(E)HWS
(E)H
WR
(E)H
WS
(E)H
WS
(E)H
WR
(E)CD
(E)CD
(E)CG
(E)CD
(E)CD
(E)CD
(E)CD(E)CD
(E)ZC4-61,575 CFM
(E)2
0"x1
4"
(E)1
8"x1
4"(E
)26"
x14"
(E)26"x14"(E)26"x18"
(E)1
2"x1
4"
(E)8"ø(E)8"ø
(E)8"ø(E)8"ø
(E)6"ø
(E)CG
(E)CG
(E)CG(E)6"ø(E)6"ø
(E)10"x8"(E)10"x8"
(E)6"ø
(E)ZC4-4175 CFM
(E)ER
(E)ER
(E)8"x6"(E)8"x6"
(E)10"x10"(E)18"x10"
(E)8"x6"(E)8"x6"
(E)8"x6" (E)8"x6"
(E)ER(E)ER
(E)ER (E)ER
(E)14"x14"
(E)32"x26"
(E)ZC4-2900 CFM
(E)ZC4-1825 CFM
(E)ZC4-5250 CFM
(E)20"x20"UP TO (E)EF-7
(E)2
0"x1
8"
(E)ER
(E)8"x6"
(E)38"x24"UP TO (E)RTU-4
(E)CG
(E)CD
(E)CD
(E)8"x6"
(E)2
0"x1
2"
(E)12"x8"
(E)6"ø
(E)CD(E)3
8"x2
4"
(E)38"x24"
(E)8"x8"(E)8"x8"(E)8"x8"
(E)22"x10"
UP TO (E)RTU-4
UP TO (E)EF-2
(E)CUH-2
(E)CD(E)CD
(E)14"x20"DOWN TO CRAWLSPACE BELOW
(E)20"x14"UP TO (E)MAU-2
(E)6"ø(E)6"ø
(E)14"x12"
(E)ZC4-3560 CFM
(E)AC-1(E)CUH-3
(E)CD
(E)8"x10"(E)10"x10"
(E)1
6"x1
4"
(E)6"ø (E)6"ø(E)6"ø(E)6"ø(E)6"ø
(E)CD(E)CD (E)CD (E)CD
(E)CG
(E)42"x12"
(E)4
2"x1
2"
(E)2
0"x2
2"
42"x18"
(E)SG (E)6"ø(E)6"ø
(E)CD (E)CD
(E)10"x6" (E)10"x10"
(E)CD
(E)1
6"x1
4"
(E)10"ø
(E)CD
18"x12"
(E)SR
(E)36"ø(E)28"ø(E)22"ø
24"x16"
(E)SR
TYP OF 6
33
(E)30"x24"UP TO (E)RTU-1
DN TO (E)RTU-2(E)36"ø
(E)UH-6
COOLERS
135C
STORAGE &RECEIVING
136
UNISEX TOILET
135B
KITCHEN
135
STORAGE
106C
OUTDOORSTORAGE
107
CHAIRSTORAGE
106B
FACILITYMANAGER
OFFICE
101N
OFFICE
106A
MUSIC
105
PRINCIPAL
101A
CLOSET
101B
CLINIC
101L
ASSIST.PRIN.
101G
UNISEX
101H
UNISEX
101M
STORAGE
101K
CONF.
101C
RESOURCEROOM
101D
WORK ROOM
101E
TEST
102A
TOILET
102B
MDF ROOM
143
CHALLENGE
102
STORAGE
102F
WORKROOM
102E
CORRIDOR
101J
CONFERENCE
102C
VESTIBULE
100
MECHANICAL
141
JAN.
139
VESTIBULE
142
ELECTRICAL
140
STORAGE
134A
GIRLS
138
BOYS
137
CORRIDOR
103
TOILET
102D
RECEPTION
101
DRY STORAGE
135D
CORRIDOR
103A
CORRIDOR
103B
VESTIBULE
104
MULTI-PURPOSEGYMNASIUM
106
COMMONS
134
(E)CD (E)CD
(E)CG
(E)CG
(E)CD
(E)30"x30"
(E)3
6"x1
6"(E
)36"
x16"
(E)6"ø(E)6"ø
(E)6"ø
(E)3
8"x2
4"
(E)38"x24"UP TO (E)RTU-1
(E)40"x30"UP TO (E)RTU-2
(E)CD
(E)CG
(E)CD
(E)CG
(E)CD
(E)CG
(E)CG
(E)CD
(E)10"x10"UP TO (E)EF-1
(E)ER
(E)CD
(E)2
0"x1
6"
(E)20"x16"
(E)8"x6"(E)8"x6"
(E)6"ø
(E)6"ø
(E)8"ø
(E)1
4"x1
0"
(E)CD
(E)CD(E)ER
(E)CG
(E)CD (E)CD
(E)CG
(E)CD
(E)CD
(E)CD(E)CD
(E)CG
E.A E.B E.C E.D E.E E.F E.G
E.H
E.J
E.1
E.2
E.3
E.4
E.5
E.6
E.7
E.8
E.9
E.10
4
6
5
7
(E)2"
5
4
7
(E)LVR
(E)TG
(E)TG
(E)SG
(E)SG
(E)SG
(E)SG
KITCHENOFFICE
135A
8
8
8
8
T
10
9
1
PHASE 1B
2
3
2
11
11
T
T
4
4
12
DEMOLITION NOTES1. CAP DUCT AT POINT SHOWN. DUCTWORK ABOVE RESTROOM HARD LID TO BE ABANDONED IN
PLACE.
2. REMOVE EXISTING CABINET UNIT HEATER, ASSOCIATED THERMOSTAT, AND ALL ACCESSORIES.RETURN CABINET UNIT HEATER TO OWNER. CAP EXISTING PIPING AT BRANCH TAKEOFF.
3. REMOVE EXISTING DUCTWORK INCLUDING AIR DEVICES, HANGERS, AND ACCESSORIES TO POINTSHOWN.
4. REMOVE EXISTING RETURN GRILLE. USE SHEET METAL TO CAP DUCT AT WALL. REINSTALL GRILLEON WALL.
5. COMPLETE PRE-BALANCE OF EXISTING ZONE COIL AIRFLOW.
6. REMOVE 48x24 DUCT ABOVE CEILING BACK TO WITHIN 12 INCHES OF ZC3-2 AND CAP. LEAVE OPENTO PLENUM.
7. REMOVE EXISTING PIPING, INSULATION, HANGERS, AND SUPPORTS BACK TO BRANCH TAKEOFF ANDCAP ABOVE CEILING.
8. EXISTING FIRE/SMOKE DAMPER TO BE DISCONNECTED AND FIXED IN THE OPEN POSITION.RE: ED-111A FOR ELECTRICAL DISCONNECTION.
9. REMOVE SECTION OF EXISTING RETURN DUCT WORK IN STORAGE ROOM. LEAVE RETURN DUCTOPEN TO STORAGE ROOM.
10. REMOVE EXISTING THERMOSTAT FOR (E)ZC3-1 AND KEEP FOR REINSTALLATION IN STORAGEROOM PLENUM.
11. EXISTING PIPING NOT SHOWN ON PLAN TO REMAIN.
12. DAMAGED RETURN AND SUPPLY DUCT LINER TO BE REMOVED. SEE NEW WORK FOR REPLACEMENT.PROVIDE LINEAR FOOT PRICING FOR REPLACEMENT TO OWNER.
X
DEMOLITION NOTES1. REMOVE EXISTING UNIT HEATER, ASSOCIATED THERMOSTAT, AND ALL ACCESSORIES. RETURN
UNIT HEATER TO OWNER. CAP EXISTING PIPING ABOVE CEILING.
2. REMOVE AND HOLD EXISTING DIFFUSER FOR RELOCATION. RE: 1/M-101A FOR NEW LOCATION.
3. REMOVE AND HOLD EXISTING RETURN GRILLE AND SOUND BOOT FOR RELOCATION. RE: 1/M-101A FORNEW LOCATION.
4. REMOVE EXISTING THERMOSTAT AND HOLD FOR RELOCATION. RE: 1/M-101A FOR NEW LOCATION.
X
GENERAL NOTES1. PRIOR TO CONSTRUCTION AIR AND WATER PRE-BALANCE READINGS SHALL BE TAKEN FOR ALL
EQUIPMENT. INFORMATION SHALL BE LOGGED AND SUBMITTED TO OWNER. THESE READINGS WILLBE USED FOR VERIFICATION OF SYSTEMS AFTER CONSTRUCTION IS COMPLETE.
ENVIS
ION
MEC
HA
NIC
AL
EN
GIN
EER
S I
NC
.
9777 P
yramid
Court, S
uit
e 1
20
Engle
wood, C
O 8
0112
Tel-
303-6
88-0
223
Fax- 303-6
88-3
584
envis
ionengrs.c
om
Proje
ct #
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATIONAPPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISEUSED WITHOUT THE WRITTEN CONSENT OF
MOA ARCHITECTURE
NOT FOR
CONSTRUCTION
AD
DIT
ION
S A
ND
RE
NO
VA
TIO
NS
016-0
09
7/29
/201
6 11
:44:
22 A
M
MD-101A
FIRST FLOORMECHANICAL
DEMOLITION PLAN- AREA A -
PHASES 1A & 1B
SIE
RR
A E
LE
ME
NT
AR
Y S
CH
OO
L
CMD
08.04.16
16100.00
7771
Oak
St.
Arv
ada,
CO
800
05
BID SET
JKB
PLAN NORTHPLAN NORTH
AREA 'A'EXISTINGBUILDING
AREA 'B'
AREA 'C'
KEYPLAN 1/8" = 1'-0"
FIRST FLOOR MECHANICAL DEMOLITION PLAN - AREA A1
REVISION DATE