2015 Contech Calendar
-
Upload
contech-engineered-solutions -
Category
Engineering
-
view
1.435 -
download
1
Transcript of 2015 Contech Calendar
Sunday Monday TueSday WedneSday ThurSday Friday SaTurday
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31
Christmas Day
New Year's Eve
nov 20141
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23/30 24 25 26 27 28 29
jan 20151 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
Winter Solstice
ENGINEERED SOLUTIONS
2015
Providing you
WiTh CoMPleTe
SiTe SoluTionS
For over a
CenTury.
deCeMber 2014
To help with Mexico’s Transport and Communications Infrastructure Investment Program 2013-2018, several remote areas in the country have begun improving their infrastructure and transportation areas to help accelerate economic activity and aid in the extensive construction necessary to further the development.In order to reach one of these remote locations, the Empresa ICA selected Contech CCP Pipe Mexico to help implement a cost-effective, manufacturing solution utilizing Contech’s MOBILE PIPE® Mill. The MOBILE PIPE® process includes end roll capability and is an excellent way to get pipe to a remote site or to reduce freight cost for a large diameter or detention project.
Pipe » MOBILE PIPE® Mill Storm Sewer
» Oaxaca, Mexico
» HEL-COR® Corrugated Metal Pipe
» 42”, 48” and 60” dia., for 25,000 LF
» On-site MOBILE PIPE® production
» Installation date - October 2013
January 2015
Sunday Monday TueSday WedneSday ThurSday Friday SaTurday
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
New Year’s Day
Martin Luther King, Jr. Day
dec 20141 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31
feb 20151 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
autopista oaxaca - Puerto escondido
Sunday Monday TueSday WedneSday ThurSday Friday SaTurday
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
Valentine’s Day
Presidents' Day
jan 20151 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
mar 20151 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31
February 2015
Located in Arizona, this BridgeCor® structure eliminated an unwanted at-grade railroad crossing and has improved safety on a busy county road, providing local mine access. The structure’s skew required a reinforced concrete headwall in conjunction with wingwalls constructed from Keystone® KeyGrid™system. This end treatment selection helped to stabilize the structure during the backfill process and provided a significant cost savings over cast-in-place walls.
Bridges » BridgeCor® with Keystone® Wingwalls
» BridgeCor® with Keystone® wingwalls
» 40’2” span x 28’4’ rise x 60’ length, single radius arch
» Installation date - April 2014
arizona Mine access road
Chinese New Year
Sunday Monday TueSday WedneSday ThurSday Friday SaTurday
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31Filter
®
feb 20151 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
apr 20151 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30
Daylight Savings Begins
St. Patrick's Day Spring Equinox
MarCh 2015
Maine Mall Road was one of four major thoroughfares targeted for retrofit to improve water quality of runoff entering the waterways of the Long Creek Watershed. The area was extensively developed, and included runoff from both individual properties and the public right-of-way. Existing utilities including direct burial cables and high pressure gas mains along with right-of-way and land restrictions made the placements of BMP’s difficult. Engineers selected a solution that included ten biofilters (both planted and unplanted) and three Jellyfish® Filters to provide effective stormwater treatment and improve water quality.
Stormwater Management » Jellyfish® Filter & Biofiltration
» South Portland, Maine
» Stormwater treatment
» (8) 6’ X 6’ and (2) 6’ X 12’ biofilters
» (3) Jellyfish® Filters
» Installation date – Summer 2014
Maine Mall road Stormwater improvements
Sunday Monday TueSday WedneSday ThurSday Friday SaTurday
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30
Tax Day
Earth Day
mar 20151 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31
may 20151 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31
Easter Sunday
Passover Begins
Passover Ends
Good Friday
aPril 2015
The city of Memphis sits on a bluff at the widest point of the Mississippi River and has a 57 foot annual fluctuation in water elevation. The area known as the Beale Street Landing was in need of stabilization, protection, and beautification. ArmorFlex articulated concrete blocks were used as part of the new public access area that will include modern docking facilities, commercial space and connect recreational areas with a dramatic overlook for riverfront activities and events.
Hard Armor » ArmorFlex® Articulating Concrete Blocks
» Memphis, Tennessee
» ArmorFlex® 40 Class BAH Mattresses, 21,669 SF
» ArmorFlex® Class 45FT Mattresses, 4,402 SF
» Installation date – Fall 2012
beale Street landing
The city of Mountlake Terrace, Washington needed a new stormwater retention facility to provide stormwater treatment and downstream flood control. The facility would treat runoff from an area of about 13 acres in the city’s downtown core and protect the water quality in the Lake Ballinger watershed.To address these issues the engineers on the project proposed the creation of a facility below the Mountlake Terrace Library parking lot utilizing a CDS pre-treatment system in front of a large perforated HEL-COR® CMP retention system.
Stormwater Management » HEL-COR® Retention System
» Mountlake Terrace, Washington
» 800 LF of 120” Perforated ALT2 CMP
» CDS® hydrodynamic separator
» Installation date – February 2014
City Center regional Stormwater Facility
Sunday Monday TueSday WedneSday ThurSday Friday SaTurday
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
Memorial Day
Mother’s Day
apr 20151 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30
june 20151 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30
May 2015
31
As part of its Economic Development Strategic Plan, the city of Zionsville needed to extend Bennett Parkway in order to develop a new business park that would become home to a new 300,000-square-foot distribution center. A precast CON/SPAN® O-Series® bridge was chosen as the optimal solution because of its ability to provide a quick, cost-effective solution for the fast-track project.This O-Series® three-sided structure met the permitting requirements of the Indiana Department of Environmental Management and the Indiana Department of Transportation’s specifications, Section 723.
Bridges » Precast Bridge Systems
» Zionsville, Indiana
» CON/SPAN® O-Series®
» 19’ span x 6’8” rise x 104’ length
» Installation date – April 2013
bennett Parkway extension
Sunday Monday TueSday WedneSday ThurSday Friday SaTurday
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30
Father’s Day
Summer Solstice
may 20151 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31
july 20151 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
June 2015
Festival Shoppes is a new commercial development in Boca Raton, Florida. The development was built in an urban environment on the site of a pre-existing above ground detention pond. The underground system needed to encircle the entire building footprint, be installed underneath the parking lot, and provide a high volume of storage with little cover while maintaining traffic load. Engineers selected Terre Arch™, a modular, precast concrete stormwater storage system engineered especially for underground installation in shallow environments. The project called for 367 Terre Arch™ 48 chambers and 43 distribution manifolds, providing 247,517 cubic feet of storage.
Stormwater Management » Terre Arch® Detention System
» Boca Raton, Florida
» Stormwater Detention/Infiltration
» 367 Terre Arch™ 48 chambers
» 43 Distribution manifolds
» Installation date – Summer 2014
Festival Shoppes
Sunday Monday TueSday WedneSday ThurSday Friday SaTurday
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
Independence Day
aug 20151
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31
june 20151 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30
July 2015
Sunday Monday TueSday WedneSday ThurSday Friday SaTurday
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
july 20151 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
sep 20151 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30
auguST 2015
On September 11, 2001, the United States came under attack when four commercial airliners were hijacked and used to strike targets on the ground. Nearly 3,000 people tragically lost their lives. Due to the actions of the 40 passengers and crew aboard United Flight 93, headed for the U.S. Capital, one attack was thwarted. To honor the courageous passengers and crew, the Flight 93 National Memorial was created at the crash site. To reach the Memorial, a 800’ x 10’ multi-span, Connector® style, Continental® truss bridge, with a horizontally curved alignment, was installed in just three days. The weathering steel pedestrian bridge allows visitors dry passage over the wetlands area.
Bridges » Continental® Pedestrian Truss
» Shanksville, Pennsylvania
» Continental® Pedestrian Truss
» 10’ width x 800’ span Connector® style
» Installation date – June 2014
Flight 93 national Memorial
30 31
Sunday Monday TueSday WedneSday ThurSday Friday SaTurday
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30
Labor Day
Rosh Hashanah
aug 20151
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31
oct 20151 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
Stormwater Solutions from Contech®
STEEL REINFORCED PE TECHNOLOGY
SePTeMber 2015
The Dallas Arboretum’s Rory Meyers Children’s Adventure Garden is a fun nature and science gateway for children of all ages. The Gardens’ unique blend of innovative technology, found in the 150 interactive exhibits spread over 8 acres, entertains and educates visitors on concepts such as the solar system, energy, and more.The garden also incorporates many sustainable features including an UrbanGreen® rainwater harvesting system from Contech Engineered Solutions that provides water for irrigation. Contech worked with the consulting engineer to design a system consisting of a CDS® hydrodynamic separator, two DuroMaxx® SRPE cisterns, and mechanical pumps and controls.
Stormwater Management » UrbanGreen® Rainwater Harvesting
» Dallas, Texas
» CDS® hydrodynamic separator
» (2) DuroMaxx® SRPE Cisterns providing 50,000 gallons of storage
» Installation date – Summer 2012
Dallas Arboretum - Rory Meyers Children’s Adventure Garden
Sunday Monday TueSday WedneSday ThurSday Friday SaTurday
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
Columbus Day
Halloween
sep 20151 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30
nov 20151 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30
oCTober 2015
In order for motorists to travel south on US 85, they had to first cross the BNSF railroad tracks (which was closed more than 3 hours a day), deal with the normal flow of traffic while also avoiding additional commuters from a major employer in the area. The result was the perfect recipe for congestion. Plans to separate the railroad crossing from US 85 were 30 years in the making and include realignment where US 85 enters Torrington. A main component to the realignment was a 24,000 square foot Keystone Compac II retaining wall. Since every construction step necessary to completing the realignment relied upon, in some way, the construction of the wall system, timing was critical.
Retaining Walls » Keystone® Retaining Wall Systems
» Torrington, Wyoming
» Keystone® Compac II
» 24,000 LF
» Installation date – April 2013
u.S. 85 realignment
noveMber 2015
Sunday Monday TueSday WedneSday ThurSday Friday SaTurday
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30
Veterans Day
Thanksgiving Day
oct 20151 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
dec 20151 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31
STEEL REINFORCED PE TECHNOLOGY
Daylight Savings Ends Election Day
In February 2013, the Mobile Airport Authority filed an application with the Federal Aviation Administration to garner a small stipend intended for continued development and rehabilitation for the airport. Part of that involved the rehabilitation of a single 1,740’ long, 132” diameter culvert that ran under Runway 14/32.Given the location, replacement was completely out of the question. The Airport did not want to have to shut down operations while construction was underway. Ultimately, they turned to a 120” diameter DuroMaxx® steel reinforced polyethylene (SRPE) liner pipe supplied by Contech Engineered Solutions to slipline into the existing culvert.
Pipe » DuroMaxx® Steel Reinforced Polyethylene
» Mobile, Alabama
» 1500 LF of 120” DuroMaxx® SRPE
» Installation date – March 2014
Mobile regional airport - runway 14/32
Photo courtesy of Chris Wisehart – Indiana Reline, Inc.
The city of Temecula needed to replace an obsolete bridge with a new structure that would serve as a centerpiece for the community and also improve pedestrian safety. A weathering steel, Cambridge style, U.S. Bridge truss was chosen as the replacement. The new bridge includes 9’ 8” wide sidewalks on both sides, with pedestrian viewpoints overlooking the creek. The new structure is compatible with the Murrieta Creek Restoration and Flood Control improvements proposed by U.S. Army Corps of Engineers and the Riverside County Flood Control and Water Conservation District.
Bridges » U.S. Bridge® Vehicular Truss
» Old Town Temecula, California
» U.S. Bridge® Cambridge truss
» 28’ width x 152’ span, two-lane bridge
» Installation date – May 2014
Main Street over Murrieta Creek
DeCeMber 2015
SunDay MonDay TueSDay WeDneSDay ThurSDay FriDay SaTurDay
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31
Christmas DayChristmas Eve
New Year's Eve
nov 20151 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30
jan 20161 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31
ENGINEERED SOLUTIONS
ENGINEERED SOLUTIONS800-338-1122 | www.ContecheS.com/calendar
MARKETS SERVED• Agriculture / Irrigation• Airports / Ports / Railway• Commercial / Industrial / Residential• DOT / Roads• Energy / Mining / Natural Resources• Government / Institutional• Military• Recreation / Parks / Golf Courses• Rehabilitation / Relining
SoluTionS PRoViDED• Bridges & Structures• Erosion Control• Pipe• Retaining Walls• Stormwater Management• Wastewater Treatment
© 2014 Contech Engineered Solutions LLC