ALL SANCTIONED SCHEMES AS ON 10/07/2014

Transcript of 2013-2014 Fund

  • REPORT AS ON 10/07/2014 ` IN LAC

    NO. DATE1 CONSTRUCTION OF 15 KM

    BITUMINOUS ROAD FROM

    DHANJHAR MORE TO

    KARAPARA (BANSIDIHA),

    RANIBANDH, BANKURA

    ADDITIONAL EXECUTIVE

    OFFICER, BANKURA ZILLA

    PARISHAD

    114/PM(F)/P

    /1B-

    143/2012

    16-05-2013 499.18268 374.59134 70% 272.23827 WORK IN PROGRESS

    2 CONSTRUCTION OF R.C.C. BOX

    BRIDGE ON ARKOSHA RIVER

    NEAR LAXMISOLE VILLAGE,

    CHHATNA, BANKURA

    ADDITIONAL EXECUTIVE

    OFFICER, BANKURA ZILLA

    PARISHAD

    117/PM(F)/P

    /1B-13/2012

    16-05-2013 51.91000 51.91000 90% 16.68464 WORK IN PROGRESS

    3 BORING OF TWO DEEP TUBE-

    WELL (`3.27600 EACH) AT

    LOHAGARH MOUZA AND BALI

    DUMDUMI MOUZA,

    CHHATNA, BANKURA

    ADDITIONAL EXECUTIVE

    OFFICER, BANKURA ZILLA

    PARISHAD

    44/PM(F)/P/

    1B-163/2013

    20-01-2014 6.55200 6.55200

    4 SCHEMES UNDER ZILLA

    PARISHAD-PUAD MEGA

    SCHEME:

    AGRICULTURE MACHINERY

    HUB FOR CULTIVATION

    THROUGH FARM

    MECHANIZATION SUPPORT

    AND TRAINING FOR

    CULTIVATORS/ FARMERS: 1

    TRACTOR WITH HYDRAULIC

    TROLLEY, 1 TRACTOR WITH

    HAL, 1 TRACTOR WITH

    ZYLOVATOR, 5 POWER TILLER,

    BANKURA

    ADDITIONAL EXECUTIVE

    OFFICER, BANKURA ZILLA

    PARISHAD

    119/PM(F)/P

    /1B-25/2014

    03-03-2014 33.00000 33.00000

    EXECUTING AGENCY WITH

    CONTACT DETAILS

    PUA DEPT.'S SANCTION

    ORDER

    BILL PAID

    FROM PUP

    DISTRICT: BANKURADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

    PHYSICAL

    PROGRESS

    NAME OF THE SCHEME RELEASED

    AMOUNT

    FROM PUP

    UC RECEIVED REMARKSSANCTIONED

    AMOUNT

    EXPECTED

    DATE OF

    COMPLETION

    SL.

    NO.

  • REPORT AS ON 10/07/2014 ` IN LAC

    NO. DATE

    EXECUTING AGENCY WITH

    CONTACT DETAILS

    PUA DEPT.'S SANCTION

    ORDER

    BILL PAID

    FROM PUP

    DISTRICT: BANKURADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

    PHYSICAL

    PROGRESS

    NAME OF THE SCHEME RELEASED

    AMOUNT

    FROM PUP

    UC RECEIVED REMARKSSANCTIONED

    AMOUNT

    EXPECTED

    DATE OF

    COMPLETION

    SL.

    NO.

    5 SCHEMES UNDER ZILLA

    PARISHAD-PUAD MEGA

    SCHEME:

    INSTALLATION OF RLI FROM

    CANAL AT VEDUERA MOUZA,

    SUPUR ANCHAL, KHATRA,

    BANKURA

    ADDITIONAL EXECUTIVE

    OFFICER, BANKURA ZILLA

    PARISHAD

    119/PM(F)/P

    /1B-25/2014

    03-03-2014 50.00000 50.00000

    6 SCHEMES UNDER ZILLA

    PARISHAD-PUAD MEGA

    SCHEME:

    RE-EXCAVATION OF MEJIA JHIL

    AT MOUZA TARAPUR, MEJIA,

    BANKURA

    ADDITIONAL EXECUTIVE

    OFFICER, BANKURA ZILLA

    PARISHAD

    119/PM(F)/P

    /1B-25/2014

    03-03-2014 50.00000 50.00000

    7 SINKING OF 332 DEEP TUBE-

    WELLS (`1.44272 EACH) FOR

    PROVIDING DRINKING WATER

    IN DIFF. BLOCKS WITHIN

    KHATRA SUB-DIVISION,

    BANKURA

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    113/PM(F)/P

    /1B-49/2013

    & 74

    16-05-2013 478.98304 63.09512 70% 63.09512 WORK IN PROGRESS,

    245 COMPLETE

    8 RE-EXCAVATION OF

    TANTIKANTA BARABUNDH

    WITH GUARDWALL, KHATRA,

    BANKURA

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    118/PM(F)/P

    /1B-21/2012

    16-05-2013 12.37325 100% 0.00000 COMPLETE

    9 CONSTRUCTION OF CHECK

    DAM OVER DHARAMPUR

    MARADI JORE, KHATRA,

    BANKURA

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    118/PM(F)/P

    /1B-21/2012

    16-05-2013 9.26139 6.68601 100% 6.68601 COMPLETE

    10 CONSTRUCTION OF

    BITUMINOUS ROAD FROM

    LOHAMERIA TO PANTRI (1 KM

    TO 6 KM), RAIPUR, BANKURA

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    119/PM(F)/P

    /1B-24/2012

    16-05-2013 56.59242 55.01622 100% 55.01622 COMPLETE

  • REPORT AS ON 10/07/2014 ` IN LAC

    NO. DATE

    EXECUTING AGENCY WITH

    CONTACT DETAILS

    PUA DEPT.'S SANCTION

    ORDER

    BILL PAID

    FROM PUP

    DISTRICT: BANKURADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

    PHYSICAL

    PROGRESS

    NAME OF THE SCHEME RELEASED

    AMOUNT

    FROM PUP

    UC RECEIVED REMARKSSANCTIONED

    AMOUNT

    EXPECTED

    DATE OF

    COMPLETION

    SL.

    NO.

    11 CONSTRUCTION OF

    BITUMINOUS ROAD FROM

    SALBONI TO SUSUNIA (0 KM

    TO 3 KM), RAIPUR, BANKURA

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    120/PM(F)/P

    /1B-25/2012

    16-05-2013 37.28448 30.25720 100% 30.25720 COMPLETE

    12 CONSTRUCTION OF GROUND

    FLOOR & 1ST FLOOR OF SOIL

    TESTING CENTRE AT DALPUR

    SREE SREE GYANANANDA

    SARASWATI ASHRAM,

    BANKURA

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    121/PM(F)/P

    /1B-48/2013

    16-05-2013 31.11718 18.47618 95% 18.47618 WORK IN PROGRESS

    13 CONSTRUCTION OF

    APPROACH ROAD FROM

    KHATRA-RANIBANDH MAIN

    ROAD TO NEWLY

    CONSTRUCTED ITI BUILDING,

    KHATRA, BANKURA

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    142/PM(F)/P

    /1B-62/2013

    14-08-2013 22.90051 21.73302 100% 21.73302 COMPLETE

    14 REPAIRING OF ROAD FROM

    HIRBANDH TO MOSHIARA VIA

    AMJHURI VILLAGE, HIRBANDH,

    BANKURA

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    174/PM(F)/P

    /1B-

    104/2013 &

    189

    09-10-2013 &

    07-11-2013

    27.83292 27.61950 100% 27.61950 COMPLETE

    15 ESTABLISHMENT OF MOTHER

    BLOCK OF MAJOR AND MINOR

    FRUITS FOR SOCIO-ECONOMIC

    UPLIFTMENT IN

    PASCHIMANCHAL

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    179/PM(F)/P

    /1B-68/2013

    10-10-2013 1.91300 1.08740 75% 1.08740 WORK IN PROGRESS

  • REPORT AS ON 10/07/2014 ` IN LAC

    NO. DATE

    EXECUTING AGENCY WITH

    CONTACT DETAILS

    PUA DEPT.'S SANCTION

    ORDER

    BILL PAID

    FROM PUP

    DISTRICT: BANKURADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

    PHYSICAL

    PROGRESS

    NAME OF THE SCHEME RELEASED

    AMOUNT

    FROM PUP

    UC RECEIVED REMARKSSANCTIONED

    AMOUNT

    EXPECTED

    DATE OF

    COMPLETION

    SL.

    NO.

    16 CONSTRUCTION OF CONCRETE

    ROAD AND PUCCA DRAIN

    FROM SYNDICATE BANK TO

    THE END 'A' ZONE OF

    SRINAGAR, BANKURA-I,

    BANKURA

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    78/PM(F)/P/

    1B-04/2014

    17-02-2014 26.04877 15% WORK IN PROGRESS

    17 CONSTRUCTION OF 50

    ANGANWADI CENTRES UNDER

    4 BLOCKS CLUBBING WITH

    MGNREGS, ONDA, CHHATNA,

    BARJORA, BANKURA-I BLOCK,

    BANKURA

    DISTRICT MAGISTRATE,

    BANKURA

    154/PM(F)/P

    /1B-91/2013

    09-09-2013 200.58850 200.58850 AMOUNT SUB-

    ALLOTED TO E.O. OF

    DIFF. P.S. ON 12-11-

    2013

    18 CONSTRUCTION OF 131

    ANGANWADI CENTRES EACH

    @ `6.89600 LAC, BANKURA

    DISTRICT MAGISTRATE,

    BANKURA

    160/PM(F)/P

    /1B-91/2013

    23-09-2013 903.37600 903.37600

    19 IMPLEMENTATION OF

    DIFFERENT PROJECT @ `50

    LAC EACH BLOCK IN 16

    BLOCKS, BANKURA

    DISTRICT MAGISTRATE,

    BANKURA

    151/PM(F)/P

    /1B-82/2013

    30-08-2013 800.00000 399.98555 30% 294.74295 WORK IN PROGRESS

    20 RENOVATION OF CANAL IN

    THE FORM OF RESECTIONING

    & LINING IN BETWEEN CH.

    0.00 AND CH. 32.00 AND CH.

    153.00 & CH. 178.00 OF DY

    NO. 8 OF BISHNUPUR BRANCH

    CANAL FOR RESTORATION OF

    DISTRESSED IRRIGATION

    POTENTIAL,

    TALDANGRA,BANKURA

    EXECUTIVE ENGINEER,

    BANKURA IRRIGATION

    DIVISION

    103/PM(F)/P

    /1B-67/2012

    12-04-2013 24.80000 24.80000 30-11-2013 0.00000

  • REPORT AS ON 10/07/2014 ` IN LAC

    NO. DATE

    EXECUTING AGENCY WITH

    CONTACT DETAILS

    PUA DEPT.'S SANCTION

    ORDER

    BILL PAID

    FROM PUP

    DISTRICT: BANKURADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

    PHYSICAL

    PROGRESS

    NAME OF THE SCHEME RELEASED

    AMOUNT

    FROM PUP

    UC RECEIVED REMARKSSANCTIONED

    AMOUNT

    EXPECTED

    DATE OF

    COMPLETION

    SL.

    NO.

    21 RENOVATION OF CANAL IN

    THE FORM OF RESECTIONING

    & LINING IN BETWEEN CH.

    426.00 & CH. 445.00 OF DY

    NO. 4 OF BISHNUPUR BRANCH

    CANAL FOR RESTORATION OF

    DISTRESSED IRRIGATION

    POTENTIAL, ONDA, BANKURA

    EXECUTIVE ENGINEER,

    BANKURA IRRIGATION

    DIVISION

    103/PM(F)/P

    /1B-67/2012

    12-04-2013 23.12000 23.12000 30-11-2013 0.00000

    22 RENOVATION OF CANAL IN

    THE FORM OF RESECTIONING

    & LINING IN BETWEEN CH.

    0.00 AND CH. 50.00 OF MINOR

    D OF DY-2 OF BISHNUPUR

    BRANCH CANAL INCLUDING

    RENOVATION OF PIPE FALL

    STRUCTURE AT CH. 11.20 &

    CROSS DRAINAGE WORK AT

    CH. 15.35 FOR RESTORATION

    OF DISTRESSED IRRIGATION

    POTENTIAL UNDER BANKURA

    IRRIGATION DIVISION, ONDA,

    BANKURA

    EXECUTIVE ENGINEER,

    BANKURA IRRIGATION

    DIVISION

    89/PM(F)/P/

    1B-67/2012

    20-02-2014 19.99683 19.99683

  • REPORT AS ON 10/07/2014 ` IN LAC

    NO. DATE

    EXECUTING AGENCY WITH

    CONTACT DETAILS

    PUA DEPT.'S SANCTION

    ORDER

    BILL PAID

    FROM PUP

    DISTRICT: BANKURADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

    PHYSICAL

    PROGRESS

    NAME OF THE SCHEME RELEASED

    AMOUNT

    FROM PUP

    UC RECEIVED REMARKSSANCTIONED

    AMOUNT

    EXPECTED

    DATE OF

    COMPLETION

    SL.

    NO.

    23 IMPROVEMENT OF CANAL IN

    THE FORM OF RESECTIONING

    & LINING OF BERAI MAIN

    CANAL INCLUDING

    RENOVATION OF IRRIGATION

    STRUCTURES IN BETWEEN CH.

    276.70 & CH. 311.50 UNDER

    BANKURA IRRIGATION

    DIVISION, ONDA, BANKURA

    EXECUTIVE ENGINEER,

    BANKURA IRRIGATION

    DIVISION

    89/PM(F)/P/

    1B-67/2012

    20-02-2014 22.49873 22.49873

    24 INCOME GENERATIVE

    COMMERCIAL HORTICULTURE

    IN SMALL PLOT (5 KATTA) FOR

    CULTIVATION OF EARLY

    SUMMER VEGETABLE

    SURROUNDED BY QUICK

    GROWING LIME; RAIPUR,

    RANIBUNDH, SARENGA,

    SIMLAPAL (250 BENEFICIARIES

    IN EACH BLOCK, COST OF

    GROWING VEGETABLE CROPS

    PER BENEFICIARY FOR 5 KATTA

    IS RS. 4,321/-), BANKURA

    MANAGING DIRECTOR, WEST

    BENGAL STATE FOOD

    PROCESSING &

    HORTICULTURE

    DEVELOPMENT CORPORATION

    LIMITED

    13/PM(F)/P/

    1B-117/2013

    07-01-2014 43.21000 43.21000 100% 43.21000 COMPLETE

    3432.54170 2203.62895 223.97065 850.84651TOTAL:

  • ` IN LAC

    NO. DATE1 SCHEMES UNDER ZILLA

    PARISHAD-PUAD MEGA

    SCHEME:

    IMPROVEMENT OF ROAD

    FROM MULUK ADARSHA PALLI

    TO SIAN HOSPITAL, BOLPUR-

    SRINIKETAN, BIRBHUM

    ADDITIONAL EXECUTIVE

    OFFICER, BIRBHUM ZILLA

    PARISHAD

    120/PM(F)/P

    /1B-28/2014

    03-03-2014 22.50000 22.50000

    2 SCHEMES UNDER ZILLA

    PARISHAD-PUAD MEGA

    SCHEME:

    REPAIRING OF ROAD FROM

    KASHIMBAZAR TO N.H.-2(B),

    BOLPUR-SRINIKETAN,

    BIRBHUM

    ADDITIONAL EXECUTIVE

    OFFICER, BIRBHUM ZILLA

    PARISHAD

    120/PM(F)/P

    /1B-28/2014

    03-03-2014 20.00000 20.00000

    3 SCHEMES UNDER ZILLA

    PARISHAD-PUAD MEGA

    SCHEME:

    IMPROVEMENT OF ROAD

    FROM DHOLKATA TO

    HABRAPAHARI PHASE-1, MD.

    BAZAR, BIRBHUM

    ADDITIONAL EXECUTIVE

    OFFICER, BIRBHUM ZILLA

    PARISHAD

    120/PM(F)/P

    /1B-28/2014

    03-03-2014 15.00000 15.00000

    4 SCHEMES UNDER ZILLA

    PARISHAD-PUAD MEGA

    SCHEME:

    REPAIRING AND

    MAINTENANCE OF CAUSEWAY

    AT GOLTE, ILLAMBAZAR,

    BIRBHUM

    ADDITIONAL EXECUTIVE

    OFFICER, BIRBHUM ZILLA

    PARISHAD

    120/PM(F)/P

    /1B-28/2014

    03-03-2014 22.50000 22.50000

    SANCTIONED

    AMOUNT

    RELEASED

    AMOUNT

    FROM PUP

    BILL PAID

    FROM PUP

    DISTRICT: BIRBHUMDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

    SL.

    NO.

    NAME OF THE SCHEME EXECUTING AGENCY WITH

    CONTACT DETAILS

    PUA DEPT.'S SANCTION

    ORDER

    EXPECTED

    DATE OF

    COMPLETION

    UC RECEIVED REMARKSPHYSICAL

    PROGRESS

  • ` IN LAC

    NO. DATE

    SANCTIONED

    AMOUNT

    RELEASED

    AMOUNT

    FROM PUP

    BILL PAID

    FROM PUP

    DISTRICT: BIRBHUMDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

    SL.

    NO.

    NAME OF THE SCHEME EXECUTING AGENCY WITH

    CONTACT DETAILS

    PUA DEPT.'S SANCTION

    ORDER

    EXPECTED

    DATE OF

    COMPLETION

    UC RECEIVED REMARKSPHYSICAL

    PROGRESS

    5 SCHEMES UNDER ZILLA

    PARISHAD-PUAD MEGA

    SCHEME:

    MAINTENANCE AND

    UPGRADATION OF SURI-

    AMJORA ROAD, SURI,

    BIRBHUM

    ADDITIONAL EXECUTIVE

    OFFICER, BIRBHUM ZILLA

    PARISHAD

    120/PM(F)/P

    /1B-28/2014

    03-03-2014 22.50000 22.50000

    6 SCHEMES UNDER ZILLA

    PARISHAD-PUAD MEGA

    SCHEME:

    IMPROVEMENT OF ROAD

    FROM KASTHOGORA TO

    DHARAMPUR, RAMPURHAT-I,

    BIRBHUM

    ADDITIONAL EXECUTIVE

    OFFICER, BIRBHUM ZILLA

    PARISHAD

    120/PM(F)/P

    /1B-28/2014

    03-03-2014 22.50000 22.50000

    7 REPAIR & RENOVATION OF

    SURI AREA OFFICE OF PUP

    SITUATED AT GOLBARI, SURI,

    BIRBHUM

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    198/PM(F)/P

    /1B-

    127/2013

    25-11-2013 2.99546 2.88624 100% 2.88624 COMPLETE

    8 IMPROVEMENT OF ROAD

    FROM SIMULTALA PITCH

    ROAD (PARUI GOYALPARA

    ROAD) VIA BANDHANBAGRAM

    HIGH SCHOOL AT KASBA G.P.,

    BOLPUR-SRINIKETAN,

    BIRBHUM

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    18/PM(F)/P/

    1B-155/2013

    07-01-2014 11.89758 WORK ORDER

    ISSUED, SUBMITTED

    TO PUA DEPTT. FOR

    ADDITIONAL

    SANCTION

  • ` IN LAC

    NO. DATE

    SANCTIONED

    AMOUNT

    RELEASED

    AMOUNT

    FROM PUP

    BILL PAID

    FROM PUP

    DISTRICT: BIRBHUMDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

    SL.

    NO.

    NAME OF THE SCHEME EXECUTING AGENCY WITH

    CONTACT DETAILS

    PUA DEPT.'S SANCTION

    ORDER

    EXPECTED

    DATE OF

    COMPLETION

    UC RECEIVED REMARKSPHYSICAL

    PROGRESS

    9 IMPROVEMENT OF ROAD

    FROM ASHADULLAPUR

    ADIBASIPARA

    (GHOSHALDANGA BRIDGE TO

    SATTORE PRIMARY HEALTH

    CENTRE) VIA SRICHANDRAPUR

    AT KASBA G.P., BOLPUR-

    SRINIKETAN, BIRBHUM

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    18/PM(F)/P/

    1B-155/2013

    07-01-2014 19.28353 WORK ORDER

    ISSUED, SUBMITTED

    TO PUA DEPTT. FOR

    ADDITIONAL

    SANCTION

    10 IMPROVEMENT OF ROAD

    FROM GHOSHALDANGA

    BRIDGE TO BISHNUBATI

    ADIBASIPARA AT KASBA G.P.,

    BOLPUR-SRINIKETAN,

    BIRBHUM

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    18/PM(F)/P/

    1B-155/2013

    07-01-2014 11.89758 WORK ORDER

    ISSUED, SUBMITTED

    TO PUA DEPTT. FOR

    ADDITIONAL

    SANCTION

    11 CONSTRUCTION OF

    APPROACH ROAD OF WEIR

    BRIDGE OVER KANDAR AT

    GHOSHALDANGA AT

    ASHADULLAPUR AT SATTORE

    G.P., BOLPUR-SRINIKETAN,

    BIRBHUM

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    18/PM(F)/P/

    1B-155/2013

    07-01-2014 4.23950 WORK ORDER

    ISSUED, SUBMITTED

    TO PUA DEPTT. FOR

    ADDITIONAL

    SANCTION

    12 IMPROVEMENT OF ROAD

    FROM DEBAGRAM

    MAGHIPARA TO SALON

    VILLAGE OF DEBAGRAM

    MAGHIPARA BHERAMARI

    ROAD AT SATTORE G.P.,

    BOLPUR-SRINIKETAN,

    BIRBHUM

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    18/PM(F)/P/

    1B-155/2013

    07-01-2014 20.70158 WORK ORDER

    ISSUED, SUBMITTED

    TO PUA DEPTT. FOR

    ADDITIONAL

    SANCTION

  • ` IN LAC

    NO. DATE

    SANCTIONED

    AMOUNT

    RELEASED

    AMOUNT

    FROM PUP

    BILL PAID

    FROM PUP

    DISTRICT: BIRBHUMDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

    SL.

    NO.

    NAME OF THE SCHEME EXECUTING AGENCY WITH

    CONTACT DETAILS

    PUA DEPT.'S SANCTION

    ORDER

    EXPECTED

    DATE OF

    COMPLETION

    UC RECEIVED REMARKSPHYSICAL

    PROGRESS

    13 IMPROVEMENT OF ROAD

    FROM SALON VILLAGE TO

    BHERAMARI SCHOOL OF

    DEBAGRAM MAGHIPARA

    BHERAMARI ROAD AT

    SATTORE G.P., BOLPUR-

    SRINIKETAN, BIRBHUM

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    18/PM(F)/P/

    1B-155/2013

    07-01-2014 16.59200 WORK ORDER

    ISSUED, SUBMITTED

    TO PUA DEPTT. FOR

    ADDITIONAL

    SANCTION

    14 IMPLEMENTATION OF

    DIFFERENT PROJECT @ `50

    LAC EACH BLOCK IN 10

    BLOCKS, BIRBHUM

    DISTRICT MAGISTRATE,

    BIRBHUM

    151/PM(F)/P

    /1B-82/2013

    30-08-2013 500.00000 249.92835 50% 185.38892 WORK IN PROGRESS

    15 CONSTRUCTION OF 119

    ANGANWADI CENTRES EACH

    @ `6.89600 LAC IN 10 BLOCKS,

    BIRBHUM

    DISTRICT MAGISTRATE,

    BIRBHUM

    188/PM(F)/P

    /1B-97/2013

    07-11-2013 820.62400 820.62400 20% 62.70500 SUB-ALLOTTED TO

    E.O. OF P.S. ON 06-

    12-2013, U.C. BY

    MD. BAZAR

    16 CONSTRUCTION OF MINI

    BARRAGE OVER KANA AJOY

    (6TH & 7TH INST.),

    UPARKHARA MOUZA, BOLPUR-

    SRINIKETAN, BIRBHUM

    FUND: DISTRICT MAGISTRATE,

    BIRBHUM; E.A.: EXECUTIVE

    ENGINEER, MAYURAKSHI

    SOUTH CANALS DIVISION,

    IRRIGATION & WATERWAYS

    DIRECTORATE, SANTINIKETAN

    126/PM(F)/P

    /1B-

    89/2008(PT.-

    I) & 29

    23-05-2013 &

    08-01-2014

    160.91000 160.91000 75% 31-10-2013 109.39000 CIVIL PART

    COMPLETE

    17 IMPROVEMENT &

    STRENGTHENING OF BOLPUR

    ILLAMBAZAR ROAD FROM

    1.0 KMP TO 9.40 KMP

    EXCLUDING 3.0 KMP TO 5.20

    KMP UNDER BOLPUR SUB-

    DIVISION, BIRBHUM

    EXECUTIVE ENGINEER, P.W.D.,

    BIRBHUM DIVISION, 03462-

    255261, 9830149949,

    [email protected]

    158/PM(F)/P

    /1B-

    133/2011

    17-09-2013 137.30196 137.30196 95% 31-08-2013 46.46058 WORK IN PROGRESS

    1831.44319 1493.76431 2.88624 406.83074TOTAL:

  • ` IN LAC

    NO. DATE1 DRINKING WATER

    ARRANGEMENT IN DIFFERENT

    BLOCKS WITHIN JURISDICTION

    OF PUP AREA, BURDWAN

    ADDITIONAL EXECUTIVE

    OFFICER, BURDWAN ZILLA

    PARISHAD

    88/PM(F)/P/

    1B-20/2014

    20-02-2014 251.64000 251.64000

    2 CONSTRUCTION OF 200

    ANGANWADI CENTRES EACH

    @ `6.89600 LAC IN 10 BLOCKS,

    BURDWAN

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    150/PM(F)/P

    /1B-73/2013

    30-08-2013 1,379.20000 657.03125 35% 657.03125 WORK IN PROGRESS

    3 IMPLEMENTATION OF

    DIFFERENT PROJECT @ `50

    LAC EACH BLOCK IN 10

    BLOCKS, BURDWAN

    DISTRICT MAGISTRATE,

    BURDWAN

    151/PM(F)/P

    /1B-82/2013

    30-08-2013 500.00000 498.74322 50% 249.37161 WORK IN PROGRESS

    4 RESTORATION OF CANAL BED

    AND SLOPES INCLUDING

    LINING WORKS WITH PCC

    FROM CH. 472.00 TO CH.

    488.00 UNDER BURDWAN

    IRRIGATION SUB-DIVISION NO.-

    III, KANKSA, BURDWAN

    DISTRICT MAGISTRATE,

    BURDWAN

    47/PM(F)/P/

    1B-258/2012

    21-01-2014 22.44526 22.44526 22.44526 COMPLETE

    5 RESTORATION OF CANAL BED

    AND SLOPES INCLUDING

    LINING WORKS WITH PCC

    FROM CH. 488.00 TO CH.

    506.00 UNDER BURDWAN

    IRRIGATION SUB-DIVISION NO.-

    III, KANKSA & AUSGRAM-II,

    BURDWAN

    DISTRICT MAGISTRATE,

    BURDWAN

    47/PM(F)/P/

    1B-258/2012

    21-01-2014 22.28023 22.28023 22.28023 COMPLETE

    SANCTIONED

    AMOUNT

    RELEASED

    AMOUNT

    FROM PUP

    BILL PAID

    FROM PUP

    DISTRICT: BURDWANDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

    SL.

    NO.

    NAME OF THE SCHEME EXECUTING AGENCY WITH

    CONTACT DETAILS

    PUA DEPT.'S SANCTION

    ORDER

    EXPECTED

    DATE OF

    COMPLETION

    UC RECEIVED REMARKSPHYSICAL

    PROGRESS

  • ` IN LAC

    NO. DATE

    SANCTIONED

    AMOUNT

    RELEASED

    AMOUNT

    FROM PUP

    BILL PAID

    FROM PUP

    DISTRICT: BURDWANDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

    SL.

    NO.

    NAME OF THE SCHEME EXECUTING AGENCY WITH

    CONTACT DETAILS

    PUA DEPT.'S SANCTION

    ORDER

    EXPECTED

    DATE OF

    COMPLETION

    UC RECEIVED REMARKSPHYSICAL

    PROGRESS

    6 RESTORATION OF CANAL BED

    AND SLOPES INCLUDING

    LINING WORKS WITH PCC

    FROM CH. 528.00 TO CH.

    544.00 UNDER BURDWAN

    IRRIGATION SUB-DIVISION NO.-

    III, AUSGRAM-II, BURDWAN

    DISTRICT MAGISTRATE,

    BURDWAN

    47/PM(F)/P/

    1B-258/2012

    21-01-2014 22.34318 22.34318 22.34318 COMPLETE

    2197.90867 817.45189 657.03125 973.47153TOTAL:

  • ` IN LAC

    NO. DATE1 CONSTRUCTION OF VILLAGE

    ROADS AND BOULDER/

    MORRUM OR CONCRETE/

    SMALL CULVERT, FOOT

    BRIDGE, MINOR IRRIGATION

    FACILITY, DRINKING WATER

    SOURCE ETC. DIFFERENT PUP

    BLOCKS, PASCHIM MEDINIPUR

    ADDITIONAL EXECUTIVE

    OFFICER, PASCHIM

    MEDINIPUR ZILLA PARISHAD

    64/PM(F)/P/

    1B-08/2014

    31-01-2014 503.00270 503.00270 50% 301.80162 WORK IN PROGRESS

    2 IMPROVEMENT OF ROAD

    FROM CHERABONI TO

    BANDRABONI, BINPUR-I,

    PASCHIM MEDINIPUR

    BLOCK DEVELOPMENT

    OFFICER, BINPUR-I BLOCK

    108/PM(F)/P

    /1B-40/2013

    19-04-2013 4.44122 NIT ISSUED ON 10-

    10-2013

    3 IMPROVEMENT OF ROAD

    FROM TENTULDANGA TO

    NAHAR KHAL, BINPUR-I,

    PASCHIM MEDINIPUR

    BLOCK DEVELOPMENT

    OFFICER, BINPUR-I BLOCK

    108/PM(F)/P

    /1B-40/2013

    19-04-2013 12.79257 NIT ISSUED ON 10-

    10-2013

    4 CONSTRUCTION OF SLAB

    CULVERT AT PASCHIM

    CHAMAR BANDH, NAYAGRAM,

    PASCHIM MEDINIPUR

    BLOCK DEVELOPMENT

    OFFICER, NAYAGRAM BLOCK

    177/PM(F)/P

    /1B-90/2013

    10-10-2013 4.46171 0.12870 4.19632 100% 4.19632 COMPLETE

    5 RENOVATION OF DAMP

    BANDH, GARHBETA-III,

    PASCHIM MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    106/PM(F)/P

    /1B-42/2013

    19-04-2013 19.27379 95% WORK IN PROGRESS

    6 CONSTRUCTION OF 2

    CLASSROOMS AT BHULAVEDA

    JANAKALYAN HIGH SCHOOL

    (HS), BINPUR-II, PASCHIM

    MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    107/PM(F)/P

    /1B-41/2013

    19-04-2013 12.82295 11.14291 100% 11.14291 COMPLETE

    SANCTIONED

    AMOUNT

    RELEASED

    AMOUNT

    FROM PUP

    BILL PAID

    FROM PUP

    DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

    SL.

    NO.

    NAME OF THE SCHEME EXECUTING AGENCY WITH

    CONTACT DETAILS

    PUA DEPT.'S SANCTION

    ORDER

    EXPECTED

    DATE OF

    COMPLETION

    UC RECEIVED REMARKSPHYSICAL

    PROGRESS

  • ` IN LAC

    NO. DATE

    SANCTIONED

    AMOUNT

    RELEASED

    AMOUNT

    FROM PUP

    BILL PAID

    FROM PUP

    DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

    SL.

    NO.

    NAME OF THE SCHEME EXECUTING AGENCY WITH

    CONTACT DETAILS

    PUA DEPT.'S SANCTION

    ORDER

    EXPECTED

    DATE OF

    COMPLETION

    UC RECEIVED REMARKSPHYSICAL

    PROGRESS

    7 SINKING OF 263 INDIAN MARK-

    II TUBE-WELLS (`1.44871 LAC

    EACH) FOR PROVIDING

    DRINKING WATER IN 5 BLOCKS

    (JAMBONI, GOPIBALLAVPUR-II,

    SANKRAIL, JHARGRAM,

    BINPUR-II), PASCHIM

    MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    128/PM(F)/P

    /1B-

    112/2012 &

    104

    23-05-2013 &

    05-05-2014

    381.01073 75.17531 50% 75.17531 WORK IN PROGRESS,

    148 COMPLETE

    8 CONSTRUCTION OF CHECK

    DAM OVER NAHAR KHAL AT

    TENTULDANGA, BINPUR-I,

    PASCHIM MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    132/PM(F)/P

    /1B-53/2013

    23-05-2013 28.09204 11.89156 50% 11.89156 WORK IN PROGRESS

    9 CONSTRUCTION OF CHECK

    DAM OVER NAHAR KHAL AT

    JOULBHANGA, BINPUR-I,

    PASCHIM MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    132/PM(F)/P

    /1B-53/2013

    23-05-2013 18.25182 10.66923 70% 10.66923 WORK IN PROGRESS

    10 DISMENTLING OF BRIDGE &

    DIVERSION OF ROAD OVER

    HATITOLA TO JOSHPUR ROAD

    (NAHAR KHAL), JHARGRAM,

    PASCHIM MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    133/PM(F)/P

    /1B-54/2013

    23-05-2013 3.80927 3.80927 100% 3.80927 COMPLETE

  • ` IN LAC

    NO. DATE

    SANCTIONED

    AMOUNT

    RELEASED

    AMOUNT

    FROM PUP

    BILL PAID

    FROM PUP

    DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

    SL.

    NO.

    NAME OF THE SCHEME EXECUTING AGENCY WITH

    CONTACT DETAILS

    PUA DEPT.'S SANCTION

    ORDER

    EXPECTED

    DATE OF

    COMPLETION

    UC RECEIVED REMARKSPHYSICAL

    PROGRESS

    11 PREPARATION OF DPR

    ALONGWITH OTHER WORK

    FOR CONSTRUCTION OF

    BRIDGE AT PAPATPUR NADI

    GHAT VIZ. SOIL TESTING (`1

    LAC), SURVEY WORK (`0.5

    LAC), PREPARATION OF DPR

    (`8 LAC) & OTHER MISC.

    WORK (`0.5 LAC), BINPUR-I,

    PASCHIM MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    135/PM(F)/P

    /1B-55/2013

    24-05-2013 10.00000 EOI ISSUED

    12 CONSTRUCTION OF

    APPROACH ROAD WITH CROSS

    DRAINAGE WORK TO

    RAMGARH POLYTECHNIC,

    BINPUR-I, PASCHIM

    MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    141/PM(F)/P

    /1B-61/2013

    & 50

    31-07-2013 &

    21-01-2014

    78.11984 72.67030 100% 72.67030 COMPLETE

    13 CONSTRUCTION OF ACCESS

    ROAD VIA SALBONI COLLEGE

    TO SALBONI STADIUM FROM

    BHADUTALA LALGARH BLACK

    TOP ROAD (600MM) WITH

    CROSS DRAINAGE STRUCTURE

    (1000MM DIA DOUBLE HUME

    PIPE) & GUARD WALL (30

    MTR) ALONG POND TO

    PROTECT THE ACCESS ROAD,

    SALBONI, PASCHIM

    MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    141/PM(F)/P

    /1B-61/2013

    & 155 & 118

    31-07-2013 &

    11-09-2013 &

    03-03-2014

    50.67236 50.66634 100% 50.66634 COMPLETE

  • ` IN LAC

    NO. DATE

    SANCTIONED

    AMOUNT

    RELEASED

    AMOUNT

    FROM PUP

    BILL PAID

    FROM PUP

    DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

    SL.

    NO.

    NAME OF THE SCHEME EXECUTING AGENCY WITH

    CONTACT DETAILS

    PUA DEPT.'S SANCTION

    ORDER

    EXPECTED

    DATE OF

    COMPLETION

    UC RECEIVED REMARKSPHYSICAL

    PROGRESS

    14 1 NO. CROSS DRAINAGE

    STRUCTURE BY 1000MM DIA

    DOUBLE HUME PIPE ON

    ACCESS ROAD TO

    GOPIBALLAVPUR MODEL

    SCHOOL AND ANOTHER

    CROSSING DRAINAGE WITH

    600 MM DIA HUME PIPE ON

    ACCESS ROAD TO

    GOPIBALLAVPUR MODEL

    SCHOOL, PASCHIM

    MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    141/PM(F)/P

    /1B-61/2013

    & 155

    31-07-2013 &

    11-09-2013

    2.39746 2.34680 100% 2.34680 COMPLETE

    15 CONSTRUCTION OF

    APPROACH ROAD TO GIRLS'

    HOSTEL OF LALGARH GIRLS'

    HIGH SCHOOL, PASCHIM

    MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    141/PM(F)/P

    /1B-61/2013

    31-07-2013 3.62914 3.52095 100% 3.52095 COMPLETE

    16 CONSTRUCTION OF

    APPROACH ROAD TO

    KRISHNABANDH INTEGRATED

    SCHOOL, PASCHIM

    MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    141/PM(F)/P

    /1B-61/2013

    31-07-2013 17.92681 17.26235 100% 17.26235 COMPLETE

    17 CONSTRUCTION OF 2 NOS.

    CROSS DRAINAGE WITH 900

    MM DIA SINGLE BARREL

    HUME PIPE CULVERT ON

    ACCESS ROAD TO MIRGA

    INTEGRATED SCHOOL,

    SALBONI, PASCHIM

    MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    141/PM(F)/P

    /1B-61/2013

    & 155

    31-07-2013 &

    11-09-2013

    2.70494 2.29095 100% 2.29095 COMPLETE

  • ` IN LAC

    NO. DATE

    SANCTIONED

    AMOUNT

    RELEASED

    AMOUNT

    FROM PUP

    BILL PAID

    FROM PUP

    DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

    SL.

    NO.

    NAME OF THE SCHEME EXECUTING AGENCY WITH

    CONTACT DETAILS

    PUA DEPT.'S SANCTION

    ORDER

    EXPECTED

    DATE OF

    COMPLETION

    UC RECEIVED REMARKSPHYSICAL

    PROGRESS

    18 CONSTRUCTION OF

    APPROACH ROAD TO

    NAYAGRAM COLLEGE,

    PASCHIM MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    141/PM(F)/P

    /1B-61/2013

    31-07-2013 78.93719 78.82938 100% 78.82938 COMPLETE

    19 CONSTRUCTION OF

    APPROACH ROAD TO ITI AT

    SALBONI, PASCHIM

    MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    141/PM(F)/P

    /1B-61/2013

    31-07-2013 7.68883 7.40097 100% 7.40097 COMPLETE

    20 REPAIRING OF BITUMEN ROAD

    FROM BINPUR TO PAPATPUR

    NODIGHAT AND BOXI VIA

    HARDA AND MURGIMORE

    (ADDITIONAL AMOUNT),

    BINPUR-I, PASCHIM

    MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    152/PM(F)/P

    /1B-

    141/2012

    06-09-2013 102.88258 40.14117 85% 40.14117 WORK ORDER

    ISSUED IN 3 PARTS;

    WORK IN PROGRESS,

    2 PART COMPLETE

    21 CONSTRUCTION OF OFFICE

    BUILDING (1ST FLOOR) FOR

    PASCHIM MEDINIPUR AREA-

    OFFICE OF PUP AT

    COLLECTORATE COMPOUND,

    MEDINIPUR SADAR, PASCHIM

    MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    153/PM(F)/P

    /1B-67/2013

    09-09-2013 41.98943 14.71570 75% 14.71570 WORK IN PROGRESS

    22 RE-EXCAVATION OF RAJ

    BUNDH AT LALGARH, BINPUR-

    I, PASCHIM MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    161/PM(F)/P

    /1B-

    101/2013 &

    103

    23-09-2013 &

    05-05-2014

    102.51219 76.19344 80% 76.19344 WORK IN PROGRESS

    23 CONSTRUCTION OF BRIDGE

    OVER NAHAR KHAL, BINPUR-I,

    PASCHIM MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    162/PM(F)/P

    /1B-

    100/2013

    23-09-2013 127.39645 25.46514 25% 25.46514 WORK IN PROGRESS

  • ` IN LAC

    NO. DATE

    SANCTIONED

    AMOUNT

    RELEASED

    AMOUNT

    FROM PUP

    BILL PAID

    FROM PUP

    DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

    SL.

    NO.

    NAME OF THE SCHEME EXECUTING AGENCY WITH

    CONTACT DETAILS

    PUA DEPT.'S SANCTION

    ORDER

    EXPECTED

    DATE OF

    COMPLETION

    UC RECEIVED REMARKSPHYSICAL

    PROGRESS

    24 CONSTRUCTION OF

    CLASSROOM, LIBRARY AND

    GIRLS' COMMON ROOM AT

    GOLAR SUSHILA VIDYAPITH,

    KESHPUR, PASCHIM

    MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    167/PM(F)/P

    /1B-

    102/2013

    25-09-2013 22.98739 16.57349 70% 16.57349 WORK IN PROGRESS

    25 CONSTRUCTION OF CONCRETE

    ROAD FROM HOTEL PRAYAG

    TO END OF SANJOY BOXI

    HOUSE, GARHBETA-III,

    PASCHIM MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    213/PM(F)/P

    /1B-

    111/2013

    19-12-2013 6.79559 6.54782 100% 6.54782 COMPLETE

    26 CONSTRUCTION OF CONCRETE

    ROAD FROM HOTEL PRAYAG

    TO GOPAL KHAMRI SAW MILL,

    GARHBETA-III, PASCHIM

    MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    213/PM(F)/P

    /1B-

    111/2013

    19-12-2013 6.79559 10% WORK IN PROGRESS

    27 CONSTRUCTION OF

    BOUNDARY WALL AND GATE

    AT KIABONI SHREE SARADA

    ASHRAM, GARHBETA-III,

    PASCHIM MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    213/PM(F)/P

    /1B-

    111/2013

    19-12-2013 4.18037 WORK IN PROGRESS

    28 CONSTRUCTION OF

    BOUNDARY WALL AND MAIN

    GATE AT KENDIJAMBONI

    NORTH KABARSTHAN (WEST

    SIDE), GARHBETA-III, PASCHIM

    MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    213/PM(F)/P

    /1B-

    111/2013

    19-12-2013 7.83480 10% WORK IN PROGRESS

  • ` IN LAC

    NO. DATE

    SANCTIONED

    AMOUNT

    RELEASED

    AMOUNT

    FROM PUP

    BILL PAID

    FROM PUP

    DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

    SL.

    NO.

    NAME OF THE SCHEME EXECUTING AGENCY WITH

    CONTACT DETAILS

    PUA DEPT.'S SANCTION

    ORDER

    EXPECTED

    DATE OF

    COMPLETION

    UC RECEIVED REMARKSPHYSICAL

    PROGRESS

    29 CONSTRUCTION OF

    BOUNDARY WALL AND MAIN

    GATE AT KENDIJAMBONI

    NORTH KABARSTHAN (NORTH

    & HALF PORTION OF EAST

    SIDE), GARHBETA-III, PASCHIM

    MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    213/PM(F)/P

    /1B-

    111/2013

    19-12-2013 7.81731 10% WORK IN PROGRESS

    30 CONSTRUCTION OF

    BOUNDARY WALL AND MAIN

    GATE AT KENDIJAMBONI

    NORTH KABARSTHAN (SOUTH

    & HALF PORTION OF EAST

    SIDE), GARHBETA-III, PASCHIM

    MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    213/PM(F)/P

    /1B-

    111/2013

    19-12-2013 7.44975 10% WORK IN PROGRESS

    31 CONSTRUCTION OF

    ADDITIONAL SCHOOL

    BUILDING IN GROUND FLOOR

    OF SERE BHALIBANDH JR.

    HIGH SCHOOL, SALBONI,

    PASCHIM MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    213/PM(F)/P

    /1B-

    111/2013

    19-12-2013 20.69437 10% WORK IN PROGRESS

    32 CONSTRUCTION OF 4 NOS.

    CLASSROOMS WITH

    STAIRCASE AND VERANDAH OF

    DHOLKATA PUKURIA

    PRANABANANDA

    VIDYAMANDIR, PUKURIA,

    JHARGRAM, PASCHIM

    MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    02/PM(F)/P/

    1B-146/2013

    02-01-2014 23.61376 5% WORK IN PROGRESS

  • ` IN LAC

    NO. DATE

    SANCTIONED

    AMOUNT

    RELEASED

    AMOUNT

    FROM PUP

    BILL PAID

    FROM PUP

    DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

    SL.

    NO.

    NAME OF THE SCHEME EXECUTING AGENCY WITH

    CONTACT DETAILS

    PUA DEPT.'S SANCTION

    ORDER

    EXPECTED

    DATE OF

    COMPLETION

    UC RECEIVED REMARKSPHYSICAL

    PROGRESS

    33 CONSTRUCTION OF PIPE

    CAUSEWAY ON BAITAL KHAL,

    GARHBETA-II, PASCHIM

    MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    04/PM(F)/P/

    1B-04/2012

    03-01-2014 44.38266 28.90132 35% 28.90132 WORK IN PROGRESS

    34 CONSTRUCTION OF GROUND

    FLOOR SCHOOL BUILDING OF

    BALARAMPUR ABHAY

    ASHRAM NAITALIM VIDYAPITH

    (H.S.), ARASENI MOUZA, P.O. -

    BALARAMPUR, P.S. -

    KHARAGPUR, PASCHIM

    MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    20/PM(F)/P/

    1B-161/2013

    07-01-2014 28.82273 WORK ORDER

    ISSUED

    35 CONSTRUCTION OF CONCRETE

    ROAD OF BARPAT GRAMIN

    ROAD IN PATINA GRAMIN

    PANCHAYAT, NAYAGRAM,

    PASCHIM MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    21/PM(F)/P/

    1B-162/2013

    07-01-2014 17.00299 16.50087 100% 16.50087 THIS PHASE

    COMPLETE, WORK

    AS PER REVISED

    ESTIMATE YET TO BE

    TAKEN UP

    36 CONSTRUCTION OF SCHOOL

    BUILDING AND GROUND

    FLOOR OF PROPOSED NEW

    BUILDING OF BHADUTALA

    VIVEKANANDA HIGH SCHOOL,

    SALBONI, PASCHIM

    MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    28/PM(F)/P/

    1B-110/2013

    08-01-2014 42.79000 5% WORK IN PROGRESS

  • ` IN LAC

    NO. DATE

    SANCTIONED

    AMOUNT

    RELEASED

    AMOUNT

    FROM PUP

    BILL PAID

    FROM PUP

    DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

    SL.

    NO.

    NAME OF THE SCHEME EXECUTING AGENCY WITH

    CONTACT DETAILS

    PUA DEPT.'S SANCTION

    ORDER

    EXPECTED

    DATE OF

    COMPLETION

    UC RECEIVED REMARKSPHYSICAL

    PROGRESS

    37 CONSTRUCTION OF BUILDING

    AND OTHER INFRASTRUCTURE

    FOR NEWLY SET UP DUKI

    JUNIOR HIGH SCHOOL,

    GARHBETA-III, PASCHIM

    MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    28/PM(F)/P/

    1B-110/2013

    08-01-2014 7.81775 20% WORK IN PROGRESS

    38 CONSTRUCTION OF CONCRETE

    ROAD FROM LALGARH GYAN

    MANDIR TO AGAMANI

    BANERJEES HOUSE VIA H/O

    SUNIL SAMANTA, NIRMAL

    ROY, AKHRAGORA HARI

    MANDIR & DIREN ROYS

    HOUSE, LALGARH GP, BINPUR-

    I, PASCHIM MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    41/PM(F)/P/

    1B-148/2013

    17-01-2014 41.12834 WORK ORDER

    ISSUED

    39 CONSTRUCTION OF CONCRETE

    ROAD FROM LALGARH GYAN

    MANDIR TO MAHADEV ROYS

    TEA SHOP VIA AIRTEL TOWER,

    POST OFFICE, BIBEK

    GOSWAMIS HOUSE & KISHOR

    TEWARIS HOUSE, LALGARH

    GP, BINPUR-I, PASCHIM

    MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    41/PM(F)/P/

    1B-148/2013

    17-01-2014 36.96035 WORK ORDER

    ISSUED

  • ` IN LAC

    NO. DATE

    SANCTIONED

    AMOUNT

    RELEASED

    AMOUNT

    FROM PUP

    BILL PAID

    FROM PUP

    DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

    SL.

    NO.

    NAME OF THE SCHEME EXECUTING AGENCY WITH

    CONTACT DETAILS

    PUA DEPT.'S SANCTION

    ORDER

    EXPECTED

    DATE OF

    COMPLETION

    UC RECEIVED REMARKSPHYSICAL

    PROGRESS

    40 CONSTRUCTION OF CONCRETE

    ROAD FROM BHOKTAPARA

    NIRANJAN DASS HOUSE TO

    RAJARBANDH VIA LALGARH

    GIRLS SCHOOL, U.B.I., SAROJ

    GOSWAMI, PRADIP

    NARAYANS HOUSE, LALGARH

    GP, BINPUR-I, PASCHIM

    MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    41/PM(F)/P/

    1B-148/2013

    17-01-2014 26.34803 WORK ORDER

    ISSUED

    41 CONSTRUCTION OF CONCRETE

    ROAD FROM BIDYUT ROYS

    HOUSE TO RAJAR BUNDH VIA

    HOUSE OF BHUDEB ROY,

    RAMKHAHARI ROY, RATAN

    KHILARI, LALGARH GP, BINPUR-

    I, PASCHIM MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    41/PM(F)/P/

    1B-148/2013

    17-01-2014 15.82739 WORK ORDER

    ISSUED

    42 CONSTRUCTION OF CONCRETE

    ROAD FROM TEA SHOP OF

    NARAD DAS AT LALGARH

    BAZAR TO KANGSHABATI NODI

    GHAT VIA BAGHAKHULHI,

    LALGARH GP, BINPUR-I,

    PASCHIM MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    41/PM(F)/P/

    1B-148/2013

    17-01-2014 25.83520 WORK ORDER

    ISSUED

    43 CONSTRUCTION OF CONCRETE

    ROAD FROM KANKON GIRLS

    SAW MILL TO RAJARBUNDH,

    LALGARH GP, BINPUR-I,

    PASCHIM MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    41/PM(F)/P/

    1B-148/2013

    17-01-2014 10.55103 WORK ORDER

    ISSUED

  • ` IN LAC

    NO. DATE

    SANCTIONED

    AMOUNT

    RELEASED

    AMOUNT

    FROM PUP

    BILL PAID

    FROM PUP

    DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

    SL.

    NO.

    NAME OF THE SCHEME EXECUTING AGENCY WITH

    CONTACT DETAILS

    PUA DEPT.'S SANCTION

    ORDER

    EXPECTED

    DATE OF

    COMPLETION

    UC RECEIVED REMARKSPHYSICAL

    PROGRESS

    44 CONSTRUCTION OF CONCRETE

    ROAD FROM PRASANTA

    DUTTAS HOUSE TO

    RAMKRISHNA VIDYALAYA VIA

    BRAHMAN PALLY, LALGARH

    GP, BINPUR-I, PASCHIM

    MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    41/PM(F)/P/

    1B-148/2013

    17-01-2014 12.52810 WORK ORDER

    ISSUED

    45 CONSTRUCTION OF CONCRETE

    ROAD FROM LATE

    SATYANARAYAN ROYS HOUSE

    TO RAJAR BUNDH, LALGARH

    GP, BINPUR-I, PASCHIM

    MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    41/PM(F)/P/

    1B-148/2013

    17-01-2014 5.34396 WORK ORDER

    ISSUED

    46 CONSTRUCTION OF CONCRETE

    ROAD FROM TEA SHOP OF

    MAHADEV ROY NEAR

    BITUMEN ROAD TO CRPF

    CAMP & FOREST RANGE

    OFFICE VIA HOUSE OF ABDUL

    SK, LALGARH GP, BINPUR-I,

    PASCHIM MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    41/PM(F)/P/

    1B-148/2013

    17-01-2014 15.82739 WORK ORDER

    ISSUED

    47 IMPROVEMENT OF MORRUM

    BOULDER ROAD AT DARHPARI

    KHAL TO KANAI HANSDA

    HOUSE VIA BARANALA,

    BINPUR-I, PASCHIM

    MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    54/PM(F)/P/

    1B-05/2014

    24-01-2014 44.58280 9.30480 50% 9.30480 WORK IN PROGRESS

    48 RE-EXCAVATION OF SURER

    BUNDH (1ST PART) AT

    RAMGARH G.P., BINPUR-I,

    PASCHIM MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    66/PM(F)/P/

    1B-10/2014

    & 106

    31-01-2014 &

    06-05-2014

    198.96817 TENDER IN PROCESS

  • ` IN LAC

    NO. DATE

    SANCTIONED

    AMOUNT

    RELEASED

    AMOUNT

    FROM PUP

    BILL PAID

    FROM PUP

    DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

    SL.

    NO.

    NAME OF THE SCHEME EXECUTING AGENCY WITH

    CONTACT DETAILS

    PUA DEPT.'S SANCTION

    ORDER

    EXPECTED

    DATE OF

    COMPLETION

    UC RECEIVED REMARKSPHYSICAL

    PROGRESS

    49 REPAIR OF CAUSEWAY-1 AT

    BORO MURGI TO

    DHALBHANGA ROAD OVER

    TARAPHENI RIVER, BINPUR-I,

    PASCHIM MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    68/PM(F)/P/

    1B-84/2013

    06-02-2014 42.18033 TENDER IN PROCESS

    50 REPAIR OF CAUSEWAY-2 AT

    CHOTO MURGI TO

    DHALBHANGA ROAD OVER

    BIJALIS KHAL, BINPUR-I,

    PASCHIM MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    68/PM(F)/P/

    1B-84/2013

    06-02-2014 3.94059 TENDER IN PROCESS

    51 CONSTRUCTION OF RCC ROAD

    BRIDGE AT PAPATPUR

    NODIGHAT (PHASE-I), BINPUR-

    I, PASCHIM MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    69/PM(F)/P/

    1B-11/2014

    & 110

    06-02-2014 &

    28-02-2014

    203.82968 DPR SUBMITTED

    52 CONSTRUCTION & REPAIR OF

    ROAD FROM BITUMINOUS

    MAIN ROAD TO CHILKIGARH

    TEMPLE AT CHILKIGARH,

    JAMBONI, PASCHIM

    MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    74/PM(F)/P/

    1B-159/13

    11-02-2014 17.68090 TENDER IN PROCESS

    53 CONSTRUCTION OF TWO

    STORIED SCHOOL BUILDING,

    BOYS TOILET BLOCK AND

    LADIES TOILET BLOCK OF

    KHASLA INDUMOTI HIGH

    SCHOOL, SALBONI, PASCHIM

    MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    75/PM(F)/P/

    1B-112/2013

    11-02-2014 36.64856 5% WORK IN PROGRESS

  • ` IN LAC

    NO. DATE

    SANCTIONED

    AMOUNT

    RELEASED

    AMOUNT

    FROM PUP

    BILL PAID

    FROM PUP

    DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

    SL.

    NO.

    NAME OF THE SCHEME EXECUTING AGENCY WITH

    CONTACT DETAILS

    PUA DEPT.'S SANCTION

    ORDER

    EXPECTED

    DATE OF

    COMPLETION

    UC RECEIVED REMARKSPHYSICAL

    PROGRESS

    54 CONSTRUCTION OF BRIDGE

    OVER KELEGHAI NADI AT

    BAGMARI GHAT, SANKRAIL,

    PASCHIM MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    65/PM(F)/P/

    1B-09/2014

    31-01-2014 45.48852 TENDER INFORMAL

    55 CONSTRUCTION OF BRIDGE AT

    PALOIDANGA OVER GHUNIA

    KHAL, SANKRAIL, PASCHIM

    MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    65/PM(F)/P/

    1B-09/2014

    31-01-2014 49.96803 WORK ORDER

    ISSUED

    56 RE-EXCAVATION OF

    BHUSKABURIS POND OF

    NEDABAHRA G.P., JHARGRAM,

    PASCHIM MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    79/PM(F)/P/

    1B-06/2014

    & 105

    17-02-2014 &

    06-05-2014

    48.09887 TENDER INVITED

    57 CONSTRUCTION OF CHECK

    DAM OVER PACHA KHAL AT

    BHANGABANDH, JHARGRAM,

    PASCHIM MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    79/PM(F)/P/

    1B-06/2014

    17-02-2014 23.18594 TENDER INVITED

    58 CONSTRUCTION OF CHECK

    DAM OVER PUTRANGI KHAL

    AT CHANDABILA, JHARGRAM,

    PASCHIM MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    79/PM(F)/P/

    1B-06/2014

    17-02-2014 25.73531 TENDER INVITED

    59 CONSTRUCTION OF CHECK

    DAM OVER NAHAR KHAL AT

    JORAKHALI, JHARGRAM,

    PASCHIM MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    79/PM(F)/P/

    1B-06/2014

    17-02-2014 19.72363 TENDER INVITED

    60 RE-EXCAVATION OF PARGANA

    BUNDH AT RAGHUNATHPUR

    MOUJA, BINPUR-I, PASCHIM

    MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    79/PM(F)/P/

    1B-06/2014

    17-02-2014 66.89922 TENDER INVITED

  • ` IN LAC

    NO. DATE

    SANCTIONED

    AMOUNT

    RELEASED

    AMOUNT

    FROM PUP

    BILL PAID

    FROM PUP

    DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

    SL.

    NO.

    NAME OF THE SCHEME EXECUTING AGENCY WITH

    CONTACT DETAILS

    PUA DEPT.'S SANCTION

    ORDER

    EXPECTED

    DATE OF

    COMPLETION

    UC RECEIVED REMARKSPHYSICAL

    PROGRESS

    61 EXCAVATION OF NEW POND

    AT KHOSA MOUZA, NEPURA

    G.P., JHARGRAM, PASCHIM

    MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    80/PM(F)/P/

    1B-13/2014

    17-02-2014 28.49980 TENDER INVITED

    62 RE-EXCAVATION OF RAJ

    BUNDH AT RAMGARH,

    RAMGARH G.P., BINPUR-I,

    PASCHIM MEDINIPUR

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    81/PM(F)/P/

    1B-22/2014

    17-02-2014 199.34859

    63 IMPLEMENTATION OF

    DIFFERENT PROJECT @ `50

    LAC EACH BLOCK IN 18

    BLOCKS, PASCHIM MEDINIPUR

    DISTRICT MAGISTRATE,

    PASCHIM MEDINIPUR

    151/PM(F)/P

    /1B-82/2013

    30-08-2013 900.00000 438.26543 30% 321.77288 WORK IN PROGRESS

    64 INFRASTRUCTURAL

    DEVELOPMENT OF SILDA

    CHANDRA SEKHAR COLLEGE

    EXECUTIVE ENGINEER-I, PWD,

    KHARAGPUR DIVISION,

    PASCHIM MEDINIPUR

    34/PM(F)/P/

    1B-

    67/2008(PT-

    IV)

    13-01-2014 100.00000 100.00000

    65 CONSTRUCTION OF DEEP

    TUBEWELL FOR IRRIGATION

    WATER AT RANABANDH,

    BINPUR-I, PASCHIM

    MEDINIPUR

    EXECUTIVE OFFICER, BINPUR-I

    PANCHAYAT SAMITY

    79/PM(F)/P/

    1B-06/2014

    17-02-2014 8.99553 8.99553

    66 CONSTRUCTION OF DEEP

    TUBEWELL FOR IRRIGATION

    WATER AT DHABANI, BINPUR-

    I, PASCHIM MEDINIPUR

    EXECUTIVE OFFICER, BINPUR-I

    PANCHAYAT SAMITY

    79/PM(F)/P/

    1B-06/2014

    17-02-2014 8.99553 8.99553

  • ` IN LAC

    NO. DATE

    SANCTIONED

    AMOUNT

    RELEASED

    AMOUNT

    FROM PUP

    BILL PAID

    FROM PUP

    DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

    SL.

    NO.

    NAME OF THE SCHEME EXECUTING AGENCY WITH

    CONTACT DETAILS

    PUA DEPT.'S SANCTION

    ORDER

    EXPECTED

    DATE OF

    COMPLETION

    UC RECEIVED REMARKSPHYSICAL

    PROGRESS

    67 CONSTRUCTION OF DEEP

    TUBEWELL FOR IRRIGATION

    WATER AT SINGPUR, BINPUR-I,

    PASCHIM MEDINIPUR

    EXECUTIVE OFFICER, BINPUR-I

    PANCHAYAT SAMITY

    79/PM(F)/P/

    1B-06/2014

    17-02-2014 8.99553 8.99553

    68 CONSTRUCTION OF

    PASSENGER SHED WITH

    TOILET AT ANDHARIA BUS

    STAND, BINPUR-I, PASCHIM

    MEDINIPUR

    EXECUTIVE OFFICER, BINPUR-I

    PANCHAYAT SAMITY

    79/PM(F)/P/

    1B-06/2014

    17-02-2014 2.96647 2.96647

    69 CONSTRUCTION OF TUBEWELL

    FOR DRINKING WATER AT

    BHANJADIHI S.S.K., ANDHARIA

    G.P., BINPUR-I, PASCHIM

    MEDINIPUR

    EXECUTIVE OFFICER, BINPUR-I

    PANCHAYAT SAMITY

    79/PM(F)/P/

    1B-06/2014

    17-02-2014 4.03449 4.03449

    70 CONSTRUCTION OF TUBEWELL

    FOR DRINKING WATER AT

    KUSUMDANGA, ANDHARIA

    G.P., BINPUR-I, PASCHIM

    MEDINIPUR

    EXECUTIVE OFFICER, BINPUR-I

    PANCHAYAT SAMITY

    79/PM(F)/P/

    1B-06/2014

    17-02-2014 4.03449 4.03449

    71 CONSTRUCTION OF TUBEWELL

    FOR DRINKING WATER AT

    DUBRAJPUR PR. SCHOOL AT

    ANDHARIA G.P., BINPUR-I,

    PASCHIM MEDINIPUR

    EXECUTIVE OFFICER, BINPUR-I

    PANCHAYAT SAMITY

    79/PM(F)/P/

    1B-06/2014

    17-02-2014 4.03449 4.03449

    72 CONSTRUCTION OF CONCRETE

    ROAD AT BHALUKHULIA MAIN

    ROAD TO AAM BAGAN

    VILLAGE ROAD,

    GOPIBALLAVPUR-II, PASCHIM

    MEDINIPUR

    EXECUTIVE OFFICER,

    GOPIBALLAVPUR-II

    PANCHAYAT SAMITY

    77/PM(F)/P/

    1B-03/2014

    17-02-2014 12.76862 12.76862

  • ` IN LAC

    NO. DATE

    SANCTIONED

    AMOUNT

    RELEASED

    AMOUNT

    FROM PUP

    BILL PAID

    FROM PUP

    DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

    SL.

    NO.

    NAME OF THE SCHEME EXECUTING AGENCY WITH

    CONTACT DETAILS

    PUA DEPT.'S SANCTION

    ORDER

    EXPECTED

    DATE OF

    COMPLETION

    UC RECEIVED REMARKSPHYSICAL

    PROGRESS

    73 CONSTRUCTION OF CONCRETE

    ROAD AT MALANCHA BATTALA

    TO RAJENDRA DANDAPAT'S

    HOUSE ROAD,

    GOPIBALLAVPUR-II, PASCHIM

    MEDINIPUR

    EXECUTIVE OFFICER,

    GOPIBALLAVPUR-II

    PANCHAYAT SAMITY

    77/PM(F)/P/

    1B-03/2014

    17-02-2014 20.99831 20.99831

    74 CONSTRUCTION OF DARKHULI

    GRAMIN ROAD IN

    RADHANAGAR G.P.,

    JHARGRAM, PASCHIM

    MEDINIPUR

    EXECUTIVE OFFICER,

    JHARGRAM PANCHAYAT

    SAMITY

    09/PM)F)/P/

    1B-152/2013

    03-01-2014 13.62735

    75 IMPROVEMENT OF ROAD

    FROM DARKHULI TO

    MOHANPUR IN RADHANAGAR

    G.P., JHARGRAM, PASCHIM

    MEDINIPUR

    EXECUTIVE OFFICER,

    JHARGRAM PANCHAYAT

    SAMITY

    09/PM)F)/P/

    1B-152/2013

    03-01-2014 6.74976

    76 IMPROVEMENT OF ROAD

    FROM TENGIOA PITCH ROAD

    TO KANYADUBA IN SAPDHARA

    AND RADHANAGAR G.P.,

    JHARGRAM, PASCHIM

    MEDINIPUR

    EXECUTIVE OFFICER,

    JHARGRAM PANCHAYAT

    SAMITY

    09/PM)F)/P/

    1B-152/2013

    03-01-2014 14.97685

    77 CONSTRUCTION OF MEETING

    HALL AT DWARIGERIA BPHC,

    GARHBETA-III, PASCHIM

    MEDINIPUR

    EXECUTIVE OFFICER,

    GARHBETA-III PANCHAYAT

    SAMITY

    28/PM(F)/P/

    1B-110/2013

    08-01-2014 16.52647 16.52647

    35.35216

  • ` IN LAC

    NO. DATE

    SANCTIONED

    AMOUNT

    RELEASED

    AMOUNT

    FROM PUP

    BILL PAID

    FROM PUP

    DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

    SL.

    NO.

    NAME OF THE SCHEME EXECUTING AGENCY WITH

    CONTACT DETAILS

    PUA DEPT.'S SANCTION

    ORDER

    EXPECTED

    DATE OF

    COMPLETION

    UC RECEIVED REMARKSPHYSICAL

    PROGRESS

    78 CONSTRUCTION OF SCHOOL

    BUILDING AT KHAJRA SATISH

    CHANDRA MEMORIAL HIGH

    SCHOOL (HS), KESHIARY,

    PASCHIM MEDINIPUR

    HEADMASTER, KHAJRA SATISH

    CHANDRA MEMORIAL HIGH

    SCHOOL (HS), PO-KUSHGERIA,

    DIST-PASCHIM MEDINIPUR

    131/PM(F)/P

    /1B-27/2013

    23-05-2013 19.50000 9.75000

    79 CONSTRUCTION OF HOSTEL

    BUILDING AT NAYAGRAM

    HIGH SCHOOL (H.S.), P.S. -

    KOTWALI, PASCHIM

    MEDINIPUR

    SCHOOL AUTHORITY,

    NAYAGRAM HIGH SCHOOL,

    P.O. - NAYAGRAM-BENASULI,

    P.S. - KOTWALI, PASCHIM

    MEDINIPUR - 721102

    206/PM(F)/P

    /1B-

    121/2013

    10-12-2013 30.84796 15.42398

    80 CONSTRUCTION OF

    BOUNDARY WALL OF

    GODAPIASAL MAHATMA

    GANDHI MEMORIAL HIGH

    SCHOOL (H.S.), SALBONI,

    PASCHIM MEDINIPUR

    SCHOOL AUTHORITY,

    GODAPIASAL MAHATMA

    GANDHI MEMORIAL HIGH

    SCHOOL (H.S.), SALBONI,

    PASCHIM MEDINIPUR

    210/PM(F)/P

    /1B-

    129/2013

    13-12-2013 24.92800 12.46400

    81 CONSTRUCTION OF

    COMMUNITY HALL AT

    JHARGRAM NANIBALA BALIKA

    VIDYALAYA, JHARGRAM,

    PASCHIM MEDINIPUR

    SCHOOL AUTHORITY,

    JHARGRAM NANIBALA BALIKA

    VIDYALAYA

    33/PM(F)/P/

    1B-17/2013

    10-01-2014 17.91143 8.95571

    82 CONSTRUCTION OF SCHOOL

    BUILDING OF PAIKAMBI

    NIGAMANANDA HIGH

    SCHOOL, GOPIBALLAVPUR-II,

    PASCHIM MEDINIPUR

    SCHOOL AUTHORITY,

    PAIKAMBI NIGAMANANDA

    HIGH SCHOOL

    82/PM(F)/P/

    1B-21/2014

    17-02-2014 28.37078 14.18539

  • ` IN LAC

    NO. DATE

    SANCTIONED

    AMOUNT

    RELEASED

    AMOUNT

    FROM PUP

    BILL PAID

    FROM PUP

    DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

    SL.

    NO.

    NAME OF THE SCHEME EXECUTING AGENCY WITH

    CONTACT DETAILS

    PUA DEPT.'S SANCTION

    ORDER

    EXPECTED

    DATE OF

    COMPLETION

    UC RECEIVED REMARKSPHYSICAL

    PROGRESS

    83 CONSTRUCTION OF GIRLS

    TOILET AND URINAL AT ANTRA

    SARADAMONI BALIKA

    VIDYALAYA, P.O. - ATTARKHI,

    PASCHIM MEDINIPUR

    SCHOOL AUTHORITY, ANTRA

    SARADAMONI BALIKA

    VIDYALAYA

    91/PM(F)/P/

    1B-17/2014

    20-02-2014 5.91387 5.91387

    84 CONSTRUCTION OF CYCLE

    STAND AT SUBARNAREKHA

    MAHAVIDYALAYA,

    GOPIBALLAVPUR, PASCHIM

    MEDINIPUR

    TEACHER-IN-CHARGE,

    SUBARNAREKHA

    MAHAVIDYALAYA

    83/PM(F)/P/

    1B-139/2013

    17-02-2014 6.68148 6.68148

    85 CONSTRUCTION OF SINGLE

    STORIED ADDITIONAL

    CLASSROOMS OF

    BAGHUASOLE JUNSOLE

    NEHRU VIDYAPITH, P.S. -

    BELIABERA, GOPIBALLAVPUR-

    II, PASCHIM MEDINIPUR

    HEADMASTER, BAGHUASOLE

    JUNSOLE NEHRU VIDYAPITH

    105/PM(F)/P

    /1B-

    145/2013

    28-02-2014 15.88238 15.88238

    86 WORK OF ADDITIONAL

    CONSTRUCTION OF

    VERANDAH, SANITATION

    SYSTEM, ELECTRIFICATION

    ETC. IN RESPECT OF

    CLASSROOM IN MIDNAPORE

    TOWN HANDICAPPED SOCIETY

    AT OLD JAIL BUILDING,

    COLLEGE GROUND ROAD,

    MIDNAPORE TOWN WITHIN

    SOCIETY TRAINING CENTRE

    (VIKASH) COMPOUND,

    PASCHIM MEDINIPUR

    SECRETARY, MEDINIPUR

    TOWN HANDICAPPED

    WELFARE SOCIETY

    12/PM(F)/P/

    1B-232/2013

    07-01-2014 9.43872 4.71936

  • ` IN LAC

    NO. DATE

    SANCTIONED

    AMOUNT

    RELEASED

    AMOUNT

    FROM PUP

    BILL PAID

    FROM PUP

    DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

    SL.

    NO.

    NAME OF THE SCHEME EXECUTING AGENCY WITH

    CONTACT DETAILS

    PUA DEPT.'S SANCTION

    ORDER

    EXPECTED

    DATE OF

    COMPLETION

    UC RECEIVED REMARKSPHYSICAL

    PROGRESS

    87 INCOME GENERATIVE

    COMMERCIAL HORTICULTURE

    IN SMALL PLOT (5 KATTA) FOR

    CULTIVATION OF EARLY

    SUMMER VEGETABLE

    SURROUNDED BY QUICK

    GROWING LIME; 11 BLOCKS

    OF JUNGLE MAHAL (250

    BENEFICIARIES IN EACH

    BLOCK, COST OF GROWING

    VEGETABLE CROPS PER

    BENEFICIARY FOR 5 KATTA IS

    RS. 4,321/-), PASCHIM

    MEDINIPUR

    MANAGING DIRECTOR, WEST

    BENGAL STATE FOOD

    PROCESSING &

    HORTICULTURE

    DEVELOPMENT CORPORATION

    LIMITED

    15/PM(F)/P/

    1B-117/2013

    07-01-2014 118.82750 118.82750 100% 118.82750 COMPLETE

    4514.93582 1381.90259 586.21639 1328.61839TOTAL:

  • ` IN LAC

    NO. DATE1 CONSTRUCTION OF ROAD

    FROM BEGUNKODAR TO

    SAHARJURI (AJODHYA) VIA

    BAMNI IN 4 (A,B,C,D) PARTS

    FROM 0.00 KM TO 14.5 KM

    UNDER "ZILLA PARISHAD-

    PUAD MEGA SCHEME"

    PROGRAMME

    ADDITIONAL EXECUTIVE

    OFFICER, PURULIA ZILLA

    PARISHAD

    38/PM(F)/P/

    1B-157/2013

    16-01-2014 500.00000 500.00000 30% 25-11-2014 99.07000 WORK IN PROGRESS

    2 SINKING OF 15 DEEP TUBE-

    WELLS WITH ELECTRIFICATION

    (`3.31740 LAC EACH) IN

    DIFFERENT SCHOOL ATTACHED

    HOSTEL PREMISES, PURULIA-II,

    PURULIA

    BLOCK DEVELOPMENT

    OFFICER, PURULIA-II BLOCK

    110/PM(F)/P

    /1B-

    203/2012

    08-05-2013 49.76100 36.32053 60% 36.32053 9 COMPLETE

    3 IMPROVEMENT OF ROAD

    FROM SIRKABAD HOSPITAL

    MORE TO AJODHYA HILL TOP

    (14.00 KM), BAGHMUNDI,

    PURULIA

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    127/PM(F)/P

    /1B-60/2013

    & 19 & 108

    23-05-2013 &

    07-01-2014 &

    06-05-2014

    359.42844 CONTRACTOR NOT

    YET MOBILIZED HIS

    MANPOWER, A

    NOTICE

    FORWARDED TO

    HIM

    4 CONSTRUCTION OF SURFACE

    FLOW MINOR IRRIGATION

    SCHEME AT KULAI, SANTURI,

    PURULIA

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    129/PM(F)/P

    /1B-

    240/2012

    23-05-2013 35.18224 BDO FORWARDED A

    MASS PETETION FOR

    CHANGE OF

    LOCATION

    5 CONSTRUCTION OF SURFACE

    FLOW MINOR IRRIGATION

    SCHEME AT BARI, MANBAZAR-

    II, PURULIA

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    129/PM(F)/P

    /1B-

    240/2012

    23-05-2013 27.17421 95% WORK IN PROGRESS

    SANCTIONED

    AMOUNT

    RELEASED

    AMOUNT

    FROM PUP

    BILL PAID

    FROM PUP

    DISTRICT: PURULIADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

    SL.

    NO.

    NAME OF THE SCHEME EXECUTING AGENCY WITH

    CONTACT DETAILS

    PUA DEPT.'S SANCTION

    ORDER

    EXPECTED

    DATE OF

    COMPLETION

    UC RECEIVED REMARKSPHYSICAL

    PROGRESS

  • ` IN LAC

    NO. DATE

    SANCTIONED

    AMOUNT

    RELEASED

    AMOUNT

    FROM PUP

    BILL PAID

    FROM PUP

    DISTRICT: PURULIADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

    SL.

    NO.

    NAME OF THE SCHEME EXECUTING AGENCY WITH

    CONTACT DETAILS

    PUA DEPT.'S SANCTION

    ORDER

    EXPECTED

    DATE OF

    COMPLETION

    UC RECEIVED REMARKSPHYSICAL

    PROGRESS

    6 CONSTRUCTION OF SURFACE

    FLOW MINOR IRRIGATION

    SCHEME AT K.P. RANGADI,

    HURA, PURULIA

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    129/PM(F)/P

    /1B-

    240/2012

    23-05-2013 37.26413 95% WORK IN PROGRESS

    7 CONSTRUCTION OF SURFACE

    FLOW MINOR IRRIGATION

    SCHEME AT MAHARA,

    MANBAZAR-I, PURULIA

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    129/PM(F)/P

    /1B-

    240/2012

    23-05-2013 25.78526 12.69541 100% 12.69541 COMPLETE

    8 CONSTRUCTION OF SURFACE

    FLOW MINOR IRRIGATION

    SCHEME AT TENTULIA,

    RAGHUNATHPUR-II, PURULIA

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    129/PM(F)/P

    /1B-

    240/2012

    23-05-2013 31.63863 95% WORK IN PROGRESS

    9 CONSTRUCTION OF SURFACE

    FLOW MINOR IRRIGATION

    SCHEME AT AGAYA, PUNCHA,

    PURULIA

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    129/PM(F)/P

    /1B-

    240/2012

    23-05-2013 34.67832 95% WORK IN PROGRESS

    10 CONSTRUCTION OF SURFACE

    FLOW MINOR IRRIGATION

    SCHEME AT TENTULHITY,

    PARA, PURULIA

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    129/PM(F)/P

    /1B-

    240/2012

    23-05-2013 32.48988 8.29994 95% 8.29994 WORK IN PROGRESS

    11 CONSTRUCTION OF SURFACE

    FLOW MINOR IRRIGATION

    SCHEME AT GURDA,

    BARABAZAR, PURULIA

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    129/PM(F)/P

    /1B-

    240/2012

    23-05-2013 28.25933 95% WORK IN PROGRESS

  • ` IN LAC

    NO. DATE

    SANCTIONED

    AMOUNT

    RELEASED

    AMOUNT

    FROM PUP

    BILL PAID

    FROM PUP

    DISTRICT: PURULIADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

    SL.

    NO.

    NAME OF THE SCHEME EXECUTING AGENCY WITH

    CONTACT DETAILS

    PUA DEPT.'S SANCTION

    ORDER

    EXPECTED

    DATE OF

    COMPLETION

    UC RECEIVED REMARKSPHYSICAL

    PROGRESS

    12 CONSTRUCTION OF SURFACE

    FLOW MINOR IRRIGATION

    SCHEME AT URUSHARAM,

    JHALDA-II, PURULIA

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    129/PM(F)/P

    /1B-

    240/2012

    23-05-2013 29.34824 27.15007 100% 27.15007 COMPLETE

    13 CONSTRUCTION OF SURFACE

    FLOW MINOR IRRIGATION

    SCHEME AT PRATAPPUR,

    JOYPUR, PURULIA

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    129/PM(F)/P

    /1B-

    240/2012

    23-05-2013 29.73171 10.10608 95% 10.10608 WORK IN PROGRESS

    14 CONSTRUCTION OF

    ADDITIONAL CLASSROOM OF

    ARSHA COLLEGE, ARSHA,

    PURULIA

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    166/PM(F)/P

    /1B-

    103/2013 &

    107

    24-09-2013 &

    06-05-2014

    59.12228 18.41429 55% 02-08-2014 18.41429 WORK IN PROGRESS

    15 WORK OF CEMENT CONCRETE

    ROAD FROM TULSI MAHATO'S

    HOUSE TO CHIKRA SHIB

    MANDIR, PURULIA-I, PURULIA

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    173/PM(F)/P

    /1B-22/2013

    09-10-2013 29.46500 80% 15-07-2014 AFTER COMPLETING

    750M OUT OF 900M,

    WORK STOPPED DUE

    TO PUBLIC

    INTERFERENCE

    16 CONSTRUCTION OF 102

    ANGANWADI CENTRES EACH

    @ `6.89600 LAC IN DIFFERENT

    BLOCKS, PURULIA

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    178/PM(F)/P

    /1B-

    116/2013

    10-10-2013 703.39200 25.21308 10% 25.21308 WORK IN PROGRESS

    17 RE-EXCAVATION OF CHAKBAD

    BORO BANDH,

    RAGHUNATHPUR-II, PURULIA

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    179/PM(F)/P

    /1B-

    115/2013

    21-10-2013 22.59676 20.33877 100% 20.33877 COMPLETE

  • ` IN LAC

    NO. DATE

    SANCTIONED

    AMOUNT

    RELEASED

    AMOUNT

    FROM PUP

    BILL PAID

    FROM PUP

    DISTRICT: PURULIADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

    SL.

    NO.

    NAME OF THE SCHEME EXECUTING AGENCY WITH

    CONTACT DETAILS

    PUA DEPT.'S SANCTION

    ORDER

    EXPECTED

    DATE OF

    COMPLETION

    UC RECEIVED REMARKSPHYSICAL

    PROGRESS

    18 CONSTRUCTION OF GROUND

    FLOOR OF SCHOOL BUILDING

    AT JARGO HIGH SCHOOL,

    JHALDA-I, PURULIA

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    217/PM(F)/P

    /1B-39/2013

    27-12-2013 24.98244 65% 07-08-2014 WORK IN PROGRESS

    19 CONSTRUCTION OF

    ADDITIONAL CLASSROOMS IN

    NEWLY UPGRADED GHONGA

    HIGH SCHOOL, PURULIA-II,

    PURULIA

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    07/PM(F)/P/

    1B-141/2013

    03-01-2014 12.33650 85% 25-07-2014 WORK IN PROGRESS

    20 CONSTRUCTION OF SCHOOL

    BUILDING AT PAIRACHALI

    ADIBASI JR. GIRLS HIGH

    SCHOOL, MANBAZAR-I,

    PURULIA

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    08/PM(F)/P/

    1B-138/2013

    03-01-2014 39.30432 13.40668 50% 31-08-2014 13.40668 WORK IN PROGRESS

    21 CONSTRUCTION OF CONCRETE

    ROAD AND GUARD WALL

    FROM MAHALI PARA TO

    VAGLA GARAH (HERODIH),

    ARSHA, PURULIA

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    37/PM(F)/P/

    1B-135/2013

    16-01-2014 49.47410 75% 15-07-2014 WORK IN PROGRESS

    22 CONSTRUCTION OF 81

    ANGANWADI CENTRES EACH

    @ `6.89600 LAC IN DIFFERENT

    BLOCKS, PURULIA

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    42/PM(F)/P/

    1B-116/2013

    & 109

    17-01-2014 &

    06-05-2014

    558.57600 5.34812 5% 5.34812 WORK IN PROGRESS

    23 CONSTRUCTION OF ROAD

    FROM GOPALPUR BUS STAND

    TO BAGDA BUS STAND

    (ADDITIONAL WORK),

    PUNCHA, PURULIA

    CHIEF EXECUTIVE OFFICER,

    PASCHIMANCHAL UNNAYAN

    PARSHAD

    56/PM(F)/P/

    1B-198/2012

    28-01-2014 51.86754 100% COMPLETE

  • ` IN LAC

    NO. DATE

    SANCTIONED

    AMOUNT

    RELEASED

    AMOUNT

    FROM PUP

    BILL PAID

    FROM PUP

    DISTRICT: PURULIADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

    SL.

    NO.

    NAME OF THE SCHEME EXECUTING AGENCY WITH

    CONTACT DETAILS

    PUA DEPT.'S SANCTION

    ORDER

    EXPECTED

    DATE OF

    COMPLETION

    UC RECEIVED REMARKSPHYSICAL

    PROGRESS

    24 IMPLEMENTATION OF

    DIFFERENT PROJECT @ `50

    LAC EACH BLOCK IN 20

    BLOCKS, PURULIA

    DISTRICT MAGISTRATE,

    PURULIA

    151/PM(F)/P

    /1B-82/2013

    30-08-2013 1,000.00000 498.68918 50% 393.72000 SCHEMES ARE IN

    PROGRESS

    25 CONSTRUCTION OF

    BOUNDARY WALL OF PURULIA

    PALLY SEVA SANGHA

    FOOTBALL GROUND, KENDA,

    PUNCHA, PURULIA

    EXECUTIVE OFFICER, PUNCHA

    PANCHAYAT SAMITY

    01/PM(F)/P/

    1B-140/2013

    02-01-2014 22.91735 22.91735 100% 22.91735 COMPLETE

    26 CONSTRUCTION OF

    ADDITIONAL CLASSROOM OF

    ADABONA NAGENDRA NATH

    HIGH SCHOOL (H.S.),

    BARABAZAR, PURULIA

    EXECUTIVE OFFICER,

    BARABAZAR PANCHAYAT

    SAMITY

    06/PM(F)/P/

    1B-136/2013

    03-01-2014 16.27236 16.27236

    27 CONSTRUCTION OF

    BOUNDARY WALL AT

    BARABAZAR BIKRAM TUDU

    MEMORIAL COLLEGE, P.O.-

    BARABHUM, BARABAZAR,

    PURULIA

    EXECUTIVE OFFICER,

    BARABAZAR PANCHAYAT

    SAMITY

    76/PM(F)/P/

    1B-143/13

    14-02-2014 17.53881 17.53881 100% 17.00189 COMPLETE

    28 INSTALLATION OF MINI DEEP

    TUBE WELL WITH

    SUBMERSIBLE PUMP AT

    SARBORI BARUIPARA, SARBORI

    KIRTANPARA, SARBORI MORE

    NEAR BUS STAND, NIMDANGA

    PRIMARY SCHOOL & RANIPUR

    COLIERY HIGH SCHOOL,

    SARBORI GP, NETURIA,

    PURULIA

    EXECUTIVE OFFICER, NETURIA

    PANCHAYAT SAMITY

    16/PM(F)/P/

    1B-131/2013

    07-01-2014 20.59305 20.59305

  • ` IN LAC

    NO. DATE

    SANCTIONED

    AMOUNT

    RELEASED

    AMOUNT

    FROM PUP

    BILL PAID

    FROM PUP

    DISTRICT: PURULIADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

    SL.

    NO.

    NAME OF THE SCHEME EXECUTING AGENCY WITH

    CONTACT DETAILS

    PUA DEPT.'S SANCTION

    ORDER

    EXPECTED

    DATE OF

    COMPLETION

    UC RECEIVED REMARKSPHYSICAL

    PROGRESS

    29 CONSTRUCTION OF BRIDGE

    FROM SATRA TO BALIGARA,

    PURULIA-I, PURULIA

    EXECUTIVE OFFICER, PURULIA-

    I PANCHAYAT SAMITY

    84/PM(F)/P/

    1B-15/2014

    17-02-2014 44.76922 44.76922

    30 CONSTRUCTION OF

    BOUNDARY WALL, MS GRILL

    GATE, MAIN ENTRANCE GATE

    & COW CATCHER AT BARASINI

    N.L. HIGH SCHOOL (H.S.),

    PURULIA-II, PURULIA

    EXECUTIVE OFFICER, PURULIA-

    II PANCHAYAT SAMITY

    17/PM(F)/P/

    1B-156/2013

    07-01-2014 12.47592 12.47592

    31 CONSTRUCTION OF

    BOUNDARY WALL AND MAIN

    ENTRANCE GATE OF ANAI

    JAMBAD P.S.D.J. HIGH

    SCHOOL, PURULIA-II, PURULIA

    EXECUTIVE OFFICER, PURULIA-

    II PANCHAYAT SAMITY

    73/PM(F)/P/

    1B-142/2013

    11-02-2014 7.01459 7.01459

    32 EXTENSION OF HOSPITAL

    BUILDING AND

    CONSTRUCTION OF STAFF

    QUARTERS FOR REFERRAL EYE

    HOSPITAL OF NANRITAM,

    PARA, PURULIA

    SECRETARY, NANRITAM, FLAT

    NO. 6, 28/1/2, SELIMPUR

    ROAD, KOLKATA - 700031

    140/PM(F)/P

    /1B-09/2012

    26-07-2013 56.56642 56.56642 100% 28-02-2014 56.56642 COMPLETE

    33 CONSTRUCTION OF TRIBAL

    HOSTEL AT YUGACHARYA

    VIVEKANANDA SEVA SAMITY,

    RADHAMOHANPUR, P.S.-

    BORO, PURULIA

    SECRETARY, YUGACHARYA

    VIVEKANANDA SEVA SAMITY

    90/PM(F)/P/

    1B-19/2014

    20-02-2014 47.97740 47.97740

  • ` IN LAC

    NO. DATE

    SANCTIONED

    AMOUNT

    RELEASED

    AMOUNT

    FROM PUP

    BILL PAID

    FROM PUP

    DISTRICT: PURULIADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

    SL.

    NO.

    NAME OF THE SCHEME EXECUTING AGENCY WITH

    CONTACT DETAILS

    PUA DEPT.'S SANCTION

    ORDER

    EXPECTED

    DATE OF

    COMPLETION

    UC RECEIVED REMARKSPHYSICAL

    PROGRESS

    34 CULTIVATION OF 5000

    KILOGRAM 'BROOD LAC' IN

    1000 KUSUM TREES FOR

    EMPLOYMENT OF 1000

    FAMILIES IN 14 MOUZAS,

    PURULIA

    MANAGING DIRECTOR, WEST

    BENGAL FOREST

    DEVELOPMENT CORPORATION

    LIMITED, 6A, RAJA SUBODH

    MULLICK SQUARE (7TH

    FLOOR), KOLKATA - 700013

    72/PM(F)/P/

    1B-12/2014

    11-02-2014 40.00000 40.00000

    35 INCOME GENERATIVE

    COMMERCIAL HORTICULTURE

    IN SMALL PLOT (5 KATTA) FOR

    CULTIVATION OF EARLY

    SUMMER VEGETABLE

    SURROUNDED BY QUICK

    GROWING LIME; 8 BLOCKS OF

    JUNGLE MAHAL (250

    BENEFICIARIES IN EACH

    BLOCK, COST OF GROWING

    VEGETABLE CROPS PER

    BENEFICIARY FOR 5 KATTA IS

    RS. 4,321/-), PURULIA

    MANAGING DIRECTOR, WEST

    BENGAL STATE FOOD

    PROCESSING &

    HORTICULTURE

    DEVELOPMENT CORPORATION

    LIMITED

    14/PM(F)/P/

    1B-117/2013

    07-01-2014 86.42000 86.42000 100% 86.42000 COMPLETE

    36 RE-EXCAVATION OF CHECK

    DAM AT SUTAN TANDI,

    AJODHYA HILL, BAGHMUNDI,

    PURULIA

    MANAGING DIRECTOR, WEST

    BENGAL FOREST

    DEVELOPMENT CORPORATION

    LIMITED, 6A, RAJA SUBODH

    MULLICK SQUARE (7TH

    FLOOR), KOLKATA - 700013

    115/PM(F)/P

    /1B-30/2014

    28-02-2014 68.35100 34.17550

    37 PROPOSED BUILDING AND

    OPEN STAGE FOR LAW-BIR-

    BAISI AT SUTANTANDI,

    AJODHYA HILL, BAGHMUNDI,

    PURULIA

    MANAGING DIRECTOR, WEST

    BENGAL FOREST

    DEVELOPMENT CORPORATION

    LIMITED, 6A, RAJA SUBODH

    MULLICK SQUARE (7TH

    FLOOR), KOLKATA - 700013

    117/PM(F)/P

    /1B-31/2014

    03-03-2014 24.01281 24.01281

    4236.76726 1429.42261 177.29297 852.98863TOTAL:

  • ` IN LAC

    DISTRICT SANCTIONED

    AMOUNT

    RELEASED AMOUNT/ BILL

    PAID

    AMOUNT UTILISED % OF UTILISATION W.R.T.

    RELEASED AMOUNT

    BANKURA 3432.54170 2427.59960 850.84651 35.05

    BIRBHUM 1831.44319 1496.65055 406.83074 27.18

    BURDWAN 2197.90867 1474.48314 973.47153 66.02

    PASCHIM MEDINIPUR 4514.93582 1968.11898 1328.61839 67.51

    PURULIA 4236.76726 1606.71558 852.98863 53.09

    GRAND TOTAL 16213.59664 8973.56785 4412.75580 49.18

    PASCHIMANCHAL UNNAYAN PARSHAD

    FINANCIAL YEAR 2013-14

    REPORT AT A GLANCE