2012 DiFX user’s meeting, Sydney, Australia
USNO Software Correlator: Status Report
Outline
• USNO/WACO Background• USNO Prototype Software Correlator (UPSC)• Use of DiFX• Recent Correlator Developments/Additions
Dave Boboltz, John Spitzak, Nicole Geiger, Dave Hall, Alan Fey, Chris Dieck
2012 DiFX user’s meeting, Sydney, Australia
USNO’s Role in the Geodetic Community
• USNO is the International Earth Rotation and Reference Systems Service (IERS) Rapid Service/Prediction Center for Earth Orientation.
• USNO has several functions within the International VLBI Service for Astrometry and Geodesy (IVS). – Correlator Operations Center.– VLBI Data Analysis Center.
• USNO provides several levels of data products. – Daily EOP (rapids).– Weekly EOP updates (Bulletin A).– Long-term (periodic EOP, TRF, CRF solutions).
2012 DiFX user’s meeting, Sydney, Australia
Geodetic VLBI and the IVS
• Geodetic VLBI is coordinated through the IVS. • http://ivscc.gsfc.nasa.gov/
2012 DiFX user’s meeting, Sydney, Australia
WAshington COrrelator (WACO)
• Current MarkIV “hardware” correlator was designed and constructed by MIT Haystack Observatory and is operated in cooperation with NASA.
• 1 of 4 IVS correlators
– WACO, Haystack, Bonn, Japan.
• Only 2 MarkIV correlators still in operation.
• Experiencing end-of-life issues.
• Move to software-based correlator.
2012 DiFX user’s meeting, Sydney, Australia
WACO Workload
• Daily “Intensive” experiments– Used to measure variable rotation rate of the earth (UT1-
UTC).– 7 days/week: single-baseline, 1-hour experiment.– Occasional 3-station intensives.
• VLBA (MK-PT) intensives.– 1-hr / day, 7 days / week
• Weekly R4 experiments– Used to measure EOP (polar motion, nutation, precession).– 1 per week: 5-8 stations, 24-hr experiment.
• Other experiments– 1 per month: 2-4 stations, 24-hr CRF experiments.– 4 to 6 per year: 24-hr “R1” experiments backing up Bonn.– Occasionally: other 24-hr experiments (APSG, CONT, etc).
2012 DiFX user’s meeting, Sydney, Australia
USNO Prototype Software Correlator
• Heterogeneous cluster.
– 5 nodes (workstations)
– 32 cores
• 2 Mark5 data playback units.
• 1 Gb/s ethernet switch.
• DiFX package installed.
• Proof of concept.
– Correlates geodetic VLBI data.
– Correlates MK-PT Intensives.
• Procurement of full software correlator cluster.
2012 DiFX user’s meeting, Sydney, Australia
DiFX Processing of Geodetic Intensives
• Single baseline KK-WZ• Currently correlating Friday
intensive in parallel with h/w correlator
• E-transferred data written to Mark5 modules
• Correlated on UPSC• difx2mark4• Fringe-fitting in
HOPS/Fourfit.• Geodetic databases
created.
2012 DiFX user’s meeting, Sydney, Australia
USNO-NSF-AUI/NRAO MoA
• USNO contracting with NRAO for:
– Access to MK - PT baseline.
• 1 hr intensive.
• 7 days/week.
– Continued VLBA participation in the RDV experiments.
• Six 24-hr experiments per year.
• Vital to the CRF and TRF.
• Requires high-speed connections.
2012 DiFX user’s meeting, Sydney, Australia
Status: MK-PT Fiber Links
• Pie Town link (1 Gbps).
– Available March 2011.– Numerous transfers of VLBI data. – 100 - 300 Mbps to USNO.– Contract with NRAO.
• FY13 Contract in process.
• Mauna Kea link (1 Gbps).
– Installed and available July 2011.– Numerous transfers of VLBI data.– 100 - 300 Mbps to USNO. – Contract with Univ. of Hawaii.
• FY13 contract signed.
2012 DiFX user’s meeting, Sydney, Australia
VLBA MK-PT Intensive Experiments
• IVS Intensive4 (INT4) series– IVS Nyyddd
• Dual S/X band – 4 S-band, 12 X-band– 32 MHz/channel
• ~40 min. / experiment, ~30 scans
• 16 second scan lengths– Limits data to be transferred– Source lists from USNO, ICRF
def.
• Data fringed and analyzed.– Oct. 2011 – May 2012
2012 DiFX user’s meeting, Sydney, Australia
Leap Seconds
UT1-UTC Results
2012 DiFX user’s meeting, Sydney, Australia
UT1–UTC Results: Comparison IERS C04
• Oct. 2011 – May 2012.
• IVS 24-hr sessions (red).
• IVS Intensives (green).
– wrms = 16.1 msec.
• MkPt Intensives (blue).
– wrms = 54.5 msec.
– Un-modeled motion likely in Pie Town antenna.
2012 DiFX user’s meeting, Sydney, Australia
New USNO Software Correlator
• USNO contracted with NRAO to build correlator.
– Phases I & II
– Leverage NRAO DiFX/Cluster expertise
• Phase I (Sept. 2012).
– Replacement for current 15 station hardware correlator.
– 30 compute nodes.
– 16 cores/node = 480 cores
– Delivered to USNO Friday!
• Phase II (2013 - 2014).
– Correlator expansion.
– 30 station VLBI2010 compatible
2012 DiFX user’s meeting, Sydney, Australia
Phase I Correlator
• 2 infrastructure nodes• 1 head node• 30 compute nodes
– Diskless – Mount operating system
and DiFX from infrastructure nodes
• 10 Gbps Ethernet network– Arista 10GbE switch– 64 SFP+ ports– 40 Gbps bonded
connection to SAN
2012 DiFX user’s meeting, Sydney, Australia
Phase I at NRAO, Socorro
7 node Test Cluster will remain at NRAO
33 node Production Cluster
2012 DiFX user’s meeting, Sydney, Australia
Phase I Delivered to USNO
Mark IV correlator
Mark III correlator
Seismic rated rackCluster hardware
2012 DiFX user’s meeting, Sydney, Australia
Future Plans
• Get the new correlator up and running – James Robnett (NRAO) visit to USNO 24-28 Sept.– Unpack, rack, power-up, network connections. – Connect to SAN.– Test correlations off SAN.
• Connect Mark5 units via 10GbE– Emulex OCe10102 10 Gbps iSCSI network adapters
installed.– 6 Mark5 units available now.
• Parallel operations.– Run both correlators in parallel for ~6 months.– Compare results. – Phase out Mark IV correlator
• Go operational with MK-PT Intensives