    Substation Automation System - An Introduction to IEC 61850

    A Technical presentation of

    Institute of Integrated Electrical Engineers of the PhilippinesEastern Region Saudi Arabia Chapter (IIEE-ERCSA )

    IIEE-ERCSA 15TH Annual Convention & Election of 2011 Set of Officers

    Substa t ion Aut om at ion Sys tem

    - An In t roduc t ion t o IEC 61850*

    By Ginofreo (Gin) QuesadaAuthor and Presenter

    Presenter Af f i l ia t ions:

    Saudi Electricity Company (SEC) Substation Automation System/SCADA/Communication Engineer

    Member, Institute of Electrical and Electronics Engineers (IEEE) and 5 of its 35 societies: Power Engineering Society-IEEE Professional Communications Society IEEE Communications Society-IEEE Education Society -IEEE Computer Society-IEEE

    Member, Association of Computing Machinery (ACM)Member, Building Industry Consultancy Services International (BICSI)

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20101111

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 201011

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    2/98

    Substation Automation System - An Introduction to IEC 61850

    Abstract of the Presentation

    Title: Subst a t ion Autom at ion Sys tem An In t roduc t ion t o IEC 61850

    ABSTRACT:The presentation is about substation automation system (SAS) based on the IECStandard 61850. It discusses the history of substation automation; explains theneed for the technology, the problem the industry continue to face and solution

    proposed by SAS. The presentation provides an introductory discussion of thestructure of IEC 61850 standard. Data model and Substation ConfigurationLanguage (SCL) approach to engineer a substation is explained. Technicalbenefits like inter-operability, fast communication between IEDs, reliability, fastrestore times of faulted substations, redundancy schemes, cyber-security, use of

    Open Systems Interconnection (OSI) are discussed. Other standards used insubstations that are closely related to IEC 61680 are also mentioned, likecommunication to the Control Center and inter-Control Center linking.

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 2010222

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    3/98

    Substation Automation System - An Introduction to IEC 61850

    The pdf version of the presentation may be accessed

    from the Authors websites starting Nov 22, 2010.

    The streaming video version will be available fromthe same sites starting Dec 4, 2010

    Main website: www.ginquesada.comLinkedIn site: www.linkedin.com/in/ginoquesadaFacebook site: www.facebook.com/ginquesadaUTube channel: www.utube.com/user/ginquesada

    Family biz site: www.quesadatech.comTwitter site: www.twitter.com/ginquesadaTown website: www.pozorrubio.ph

    Gin.S.QuesadaAuthor and Presenterwww.ginquesada.comwww.linkedin.com/in/ginoquesada

    www.utube.com/user/ginquesada

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 2010333

    http://www.ginquesada.com/http://www.linkedin.com/in/ginoquesadahttp://www.facebook.com/ginquesadahttp://www.utube.com/user/ginquesadahttp://www.quesadatech.com/http://www.twitter.com/ginquesadahttp://www.pozorrubio.ph/http://www.ginquesada.com/http://www.linkedin.com/in/ginoquesadahttp://www.utube.com/user/ginquesadahttp://www.pozorrubio.ph/http://www.twitter.com/ginquesadahttp://www.quesadatech.com/http://www.utube.com/user/ginquesadahttp://www.utube.com/user/ginquesadahttp://www.facebook.com/ginquesadahttp://www.linkedin.com/in/ginoquesadahttp://www.linkedin.com/in/ginoquesadahttp://www.ginquesada.com/http://www.ginquesada.com/
  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    4/98

    Substation Automation System - An Introduction to IEC 61850

    St reaming v ideo vers ions of present a t ions for the fo l low ing

    t op ics are be ing deve loped by t he author :

    Substation Automation and Dynamic Power Compensation1. Network Redundancy Implementations in IEC 618502. Redundancy in IEC 61850 based in IED 62439, Part 3 PRP and HSR (Parallel

    Port Redundancy and High Availability Seamless Ring)

    3. Cybersecurity Options for IEC 618504. Cybersecurity in IEC 61850 Using IEC 623515. Dynamic Power Compensation Using Series and Shunt Compensation

    Communication and DC-Solar Power1. VHF-UHF Microwave Repeater Design2. Radio Propagation

    3. DC and Solar Power Sizing design4. Fiber optics design procedure

    Information Technology1. Web design using Open and vendor-specific platforms

    Above w i l l be pub l ished in aut hor s w ebsi teswww.ginquesada.com;www.linkedin.com/in/ginoquesada;www.facebook.com/pages/Gin-Quesada/119173918139214www.utube.com/user/ginquesada

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 2010444

    http://www.ginquesada.com/http://www.linkedin.com/in/ginoquesadahttp://www.facebook.com/pages/Gin-Quesada/119173918139214http://www.utube.com/user/ginquesadahttp://www.utube.com/user/ginquesadahttp://www.facebook.com/pages/Gin-Quesada/119173918139214http://www.linkedin.com/in/ginoquesadahttp://www.ginquesada.com/
  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    5/98

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    6/98

    Substation Automation System - An Introduction to IEC 61850

    A patent ho lder

    While in the employ of one of the Philippine companies, (Vetronix, a military-run company)he received 2 patents from the Philippine Intellectual Property Office (known then as Bureauof Patents and Technology Transfer). for mil-specs mobile and handheld transceivers.

    Techn ic a l a f f i l ia t ions inc lude membersh ips w i t h

    IEEE (Institute of Electrical and Electronics Engineers) and 5 of its societies; www.ieee.org BICSI ( Building Industry Consultancy Services International); www.bicsi.org ACM (Association of Computing Machinery); www.acm.org .

    Del ivered tec hn ica l p resenta t ion in var ious pro fess iona l o rgan iza t ions:

    IEEE-Saudi Arabia Chapter, (IEEE, www.ieee.org ) in May, 2000, at the King FahadUniversity of Petroleum and Minerals (KFUPM), Dhahran City.

    Institute of Integrated Electrical Engineers of the Philippines Eastern Region Chapter,Saudi Arabia (IIEE-ERCSA, www.iiee-ercsa.org/), on communication technologies used insubstations; 1996;

    Philippine Society of Mechanical Engineer Eastern Region, Saudi Arabia Chapter (PSME-SA), www.psme-sa.com ; July 2000

    Was among the organizers of Toastmaster Club International PICPA-KSA Chapter(1995). Was VP for Education, later became the President.

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 201066

    http://www.ieee.org/http://www.bicsi.org/http://www.acm.org/http://www.ieee.org/http://www.iiee-ercsa.org/http://www.psme-sa.com/http://www.acm.org/http://www.bicsi.org/http://www.psme-sa.com/http://www.iiee-ercsa.org/http://www.ieee.org/http://www.ieee.org/
  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    7/98

    Substation Automation System - An Introduction to IEC 61850

    Some c ommun i t y se rvice p ro jec t s invo lvement :

    Organized the First Pozorrubio Essay/ Expository Writing Contest 2009-2010,

    Designed in 1999 & maintain to this day, town website (www.pozorrubio.ph ) as social workfor town mates for free

    Partner to Operation Smile: Project Pozorrubio 2011 (target to raise $40,000 for medical mission andfacilities); http://www.operationsmile.org/pasag

    Specia l t ies / In terest s

    Substation Automation System, SCADA, wireless and fiber optic communications, web and multimediadevelopment, production, and web publishing/streaming, content management systems, database,webhosting; networking and securing servers, client PCs, and networking devices; professional and

    journalistic, web/blog writing;

    Design/engineering, RFP development, project management, quality testing,

    Educ at ion and Tra in ing

    University of the Philippines, Diliman, Quezon City, Philippines, General Education; 1964-67;www.up.edu.ph University of the East, Manila, Philippines; BSECE; 1969-72; www.ue.edu.ph/manila/

    nd entrepreneurship;Executive Development Academy; 10 short courses in management a/executivedevelopmentacademy.orghttp://

    Various Vendor-, Professional association- and Company-sponsored technical seminars

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 201077

    http://www.pozorrubio.ph/index.php?option=com_content&view=category&layout=blog&id=83&Itemid=61http://www.pozorrubio.ph/http://www.operationsmile.org/pasaghttp://www.up.edu.ph/http://www.ue.edu.ph/manila/index.htmlhttp://executivedevelopmentacademy.org/http://executivedevelopmentacademy.org/http://executivedevelopmentacademy.org/http://www.operationsmile.org/pasaghttp://www.pozorrubio.ph/http://www.pozorrubio.ph/index.php?option=com_content&view=category&layout=blog&id=83&Itemid=61http://executivedevelopmentacademy.org/http://www.ue.edu.ph/manila/index.htmlhttp://www.up.edu.ph/
  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    8/98

    Substation Automation System - An Introduction to IEC 61850

    Subst at ion Aut om at ion Syst em

    - An In t roduc t ion t o IEC 61850*

    Ginofreo (Gin) QuesadaAuthor and Presenter

    A tec hn ica l p resenta t ion o f the

    Ins t i t u t e of In tegrat ed Elec t r ic a l Engineers

    of t he Phi l ipp ines, Inc . Eastern Region, Saudi Arabia Chapter

    15TH Annual Convention and Election of 2011 Set of Officers

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 2010888

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    9/98

    Substation Automation System - An Introduction to IEC 61850

    Abstract of the Presentation

    Title: Subst a t ion Autom at ion Sys tem An In t roduc t ion t o IEC 61850

    ABSTRACT:The presentation is about substation automation system (SAS) based on the IECStandard 61850. It discusses the history of substation automation; explains theneed for the technology, the problem the industry continue to face and solution

    proposed by SAS. The presentation provides an introductory discussion of thestructure of IEC 61850 standard. Data model and Substation ConfigurationLanguage (SCL) approach to engineer a substation is explained. Technicalbenefits like inter-operability, fast communication between IEDs, reliability, fastrestore times of faulted substations, redundancy schemes, cyber-security, use of

    Open Systems Interconnection (OSI) are discussed. Other standards used insubstations that are closely related to IEC 61850 are also mentioned, likecommunication to the Control Center and inter-Control Center linking.

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 2010999

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    10/98

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    11/98

    S b t ti A t ti S t A I t d ti t IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    12/98

    Substation Automation System - An Introduction to IEC 61850

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20101212

    Substation Automation System An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    13/98

    Substation Automation System - An Introduction to IEC 61850

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    14/98

    Substation Automation System - An Introduction to IEC 61850

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    15/98

    Substation Automation System - An Introduction to IEC 61850

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20101515

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    16/98

    Substation Automation System An Introduction to IEC 61850

    Secondary equ ipment /

    sys tems

    Pr imary equ ipment /

    sys tems

    IEDs

    HMIs

    Bay cont ro l le rs

    Comm. L inks &busses

    Substa t ion 3

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20101616

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    17/98

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    18/98

    y

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20101818

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    19/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20101919

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    20/98

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    21/98

    Func t ions of Sec ondary Syst em

    1. Protection

    2. Control3. Metering for operation & settlement4. Monitoring

    5. Analysis and diagnostics6. Support for intelligence for operation and

    restoration7. Automatic documentation8. Safe and secure operation

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20102121

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    22/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20102222

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    23/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20102323

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    24/98

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    25/98

    1. What is Substation Automation

    Substation Automation is the process of monitoring, controlling, protectionand securing operations of primary substation equipment, with the use ofcomputing and communication technologies.

    IEC 61850 is a standard for the design of electrical substation automation.is part of the International Electro-technical Commission's (IEC) TechnicalCommittee 57 (TC57) reference architecture for electric power systems.

    for its main substation engineering philosophy, uses, :

    abstract data modeling,substation configuration language,fast communication system using generic object-oriented substationevent (GOOSE) signals and

    ethernet technologies using fiber optics and high speed coppercabling infrastructure.Its main goal is interoperability of equipment from different vendorsLong term stability of the standard, i.e. making it future-proof

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20102525

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    26/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20102626

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    27/98

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    28/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20102828

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    29/98

    Sc ope of Present at ion

    1. What is SAS2 . Communica t i on needs and

    ot her requi rement s

    3. Ultimate solution begins

    4. Scope and outline of IEC 618505. Data modeling approach6. Substation configuration language

    7. Key features8. Major benefits9. Conclusions

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20102929

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    30/98

    Communication System Needs

    Communication is critically required in Power System real time operation

    Telephone system was used as early as 1930s for dispatch and switchingand comm with Control Centers, and status/control of few points

    In 1960s, digital comm became available, but still operating on low BW.

    Cost of the optimization was the time it took to complete process

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    31/98

    As we move into the digital age:

    literally, thousands of analog and digital points are availablein a single IED

    Communication bandwith no longer limiting factor

    Substation to master comm data paths operating at 64 Kbps becamecommonplace with obvious migration path to higher rates;

    With this migration in technology, the cost component of a dataacquisition system has now become the configuration and

    documentation component

    Also a key component of a comm system is the ability to describethemselves from both a data and services

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    32/98

    Other key requirements include:

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    33/98

    Sc ope of Present at ion

    1. What is SAS2. Communication needs and other

    requirements3 . Ul t ima te solu t ion begins

    4. Scope and outline of IEC 618505. Data modeling approach6. Substation configuration language

    7. Key features8. Major benefits9. Conclusions

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20103333

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    34/98

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    35/98

    Sc ope of Present at ion

    1. Communication needs; history2. Other of requirements3. Ultimate solution begins4. Sc ope and ou t l i ne o f IEC 61850

    5. Data modeling approach6. Substation configuration language7. Key features

    8. Major benefits9. Conclusions

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20103535

    Substation Automation System - An Introduction to IEC 61850

    The Scope and Outline of IEC 61850 Standard

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    36/98

    The Scope and Outline of IEC 61850 Standard

    Table 1. The Structure of IEC 61850 Standard, Parts 1-6

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20103636

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    37/98

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    38/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20103838

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    39/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20103939

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    40/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20104040

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    41/98

    Subst at ion Conf igurat ion Language (SCL)

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20104141

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    42/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20104242

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    43/98

    Sc ope of Present at ion

    1. Communication needs; history

    2. Other of requirements3. Ultimate solution begins4. Scope and outline of IEC 61850

    5 . Da ta m odel i ng approac h6. Substation configuration language7. Key features

    8. Major benefits9. Conclusions

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20104343

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    44/98

    The Modelling Approach

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20104444

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    45/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20104545

    Substation Automation System - An Introduction to IEC 61850

    Th 61850 D i M d l

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    46/98

    The 61850 Device Model

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20104646

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    47/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20104747

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    48/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20104848

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    49/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20104949

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    50/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20105050

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    51/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20105151

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    52/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20105252

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    53/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20105353

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    54/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20105454

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    55/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20105555

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    56/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20105656

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    57/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20105757

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    58/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20105858

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    59/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20105959

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    60/98

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    61/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20106161

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    62/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20106262

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    63/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20106363

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    64/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20106464

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    65/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20106565

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    66/98

    Sc ope of Present at ion

    1. Communication needs; history

    2. Other of requirements3. Ultimate solution begins4. Scope and outline of IEC 61850

    5. Data modeling approach6 . Subs ta t i on c onf igurat i on l anguage

    7. Key features

    8. Major benefits9. Conclusions

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20106666

    Substation Automation System - An Introduction to IEC 61850

    Subst a t ion c onf igura t ion language

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    67/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20106767

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    68/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20106868

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    69/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20106969

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    70/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20107070

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    71/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20107171

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    72/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20107272

    Substation Automation System - An Introduction to IEC 61850

    Typical configuration nowadays

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    73/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20107373

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    74/98

    Sc ope of Present at ion

    1. Communication needs; history

    2. Other of requirements3. Ultimate solution begins4. Scope and outline of IEC 61850

    5. Data modeling approach6. Substation configuration language7. K ey feat ures

    8. Major benefits9. Conclusions

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20107474

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    75/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20107575

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    76/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20107676

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    77/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20107777

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    78/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20107878

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    79/98

    Sc ope of Present at ion

    1. Communication needs; history

    2. Other of requirements3. Ultimate solution begins4. Scope and outline of IEC 61850

    5. Data modeling approach6. Substation configuration language7. Key features8. Major benef i t s

    9. Conclusions

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20107979

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    80/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20108080

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    81/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20108181

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    82/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20108282

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    83/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20108383

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    84/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20108484

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    85/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20108585

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    86/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20108686

    Substation Automation System - An Introduction to IEC 61850

    S f P t t i

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    87/98

    Sc ope of Present at ion

    1. Communication needs; history

    2. Other of requirements3. Ultimate solution begins4. Scope and outline of IEC 61850

    5. Data modeling approach6. Substation configuration language7. Key features8. Major benefits9. Conc l us ions

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20108787

    Substation Automation System - An Introduction to IEC 61850

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    88/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20108888

    Substation Automation System - An Introduction to IEC 61850

    Communication standards in Substations

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    89/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20108989

    Substation Automation System - An Introduction to IEC 61850

    Communication Standards Outside Substations

  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    90/98

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20109090

    Substation Automation System - An Introduction to IEC 61850

    Author and Presenter (Brief Profile)www.ginquesada.com

    www.linkedin.com/in/ginoquesada

    Currently a Substation Automation SCADA and Communication Engineer and a

    http://www.ginquesada.com/http://www.linkedin.com/in/ginoquesadahttp://www.linkedin.com/in/ginoquesadahttp://www.ginquesada.com/
  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    91/98

    Currently a Substation Automation, SCADA, and Communication Engineer and aMicrosoft Certified Professional (MCP), a patent holder, and a writer rolled into one,

    , lone energy provider in theSaudi Electricity Company (SEC)currently working inKingdom of Saudi Arabia.

    Ex per ienc e in Saudi Arabia

    Affiliated with Saudi Electricity Company since 1981 in 3 periods:1981-1989, pioneer communications engineer, at a time when fiber optics technology was starting in SEC;1994-2006, worked as IT and communication engineer.From 2006 to date, assigned to work on SCADA and substation automation system projects and partly

    doing communication and IT-related consultancy works to colleagues.

    Was system engineer King Khalid International Airport in Riyadh for the Land Mobile Radio system of theairport in 1993-94;

    Ex per ienc e in t he Phi l ipp ines

    Background in the field of electronics & communications started in the Philippines in 1969;worked for 4 Philippine electronics & communication companies, as product research anddevelopment engineer and/ or division heads, on wireless products catering to military market.

    Was quality control supervisor for a year at the Philippine Nuclear Power Plant in Morong,Bataan, Philippines in 1980;

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 2010919191

    Substation Automation System - An Introduction to IEC 61850

    A patent ho lder

    While in the employ of one of the Philippine companies, (Vetronix, a military-run company)

    he received 2 patents from the Philippine Intellectual Property Office (known then as Bureauf P t t d T h l T f ) f il bil d h dh ld t i

    http://www.se.com.sa/http://www.se.com.sa/http://www.se.com.sa/http://www.se.com.sa/
  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    92/98

    he received 2 patents from the Philippine Intellectual Property Office (known then as Bureauof Patents and Technology Transfer). for mil-specs mobile and handheld transceivers.

    Techn ic a l a f f i l ia t ions inc lude membersh ips w i t h

    IEEE (Institute of Electrical and Electronics Engineers) and 5 of its societies; www.ieee.org

    BICSI ( Building Industry Consultancy Services International); www.bicsi.org ACM (Association of Computing Machinery); www.acm.org .

    Del ivered tec hn ica l p resenta t ion in var ious pro fess iona l o rgan iza t ions:

    IEEE-Saudi Arabia Chapter, (IEEE, www.ieee.org ) in May, 2000, at the King Fahad

    University of Petroleum and Minerals (KFUPM), Dhahran City.

    Institute of Integrated Electrical Engineers of the Philippines Eastern Region Chapter,Saudi Arabia (IIEE-ERCSA, www.iiee-ercsa.org/), on communication technologies used insubstations; 1996;

    Philippine Society of Mechanical Engineer Eastern Region, Saudi Arabia Chapter (PSME-SA), www.psme-sa.com ; July 2000

    Was among the organizers of Toastmaster Club International PICPA-KSA Chapter(1995). Was VP for Education, later became the President.

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20109292

    Substation Automation System - An Introduction to IEC 61850

    Some c ommun i t y se rvice p ro jec t s invo lvement :

    Organized the First Pozorrubio Essay/ Expository Writing Contest 2009-2010,

    Designed in 1999 & maintain to this day town website (www pozorrubio ph ) as social work

    http://www.ieee.org/http://www.bicsi.org/http://www.acm.org/http://www.ieee.org/http://www.iiee-ercsa.org/http://www.psme-sa.com/http://www.acm.org/http://www.bicsi.org/http://www.psme-sa.com/http://www.iiee-ercsa.org/http://www.ieee.org/http://www.ieee.org/http://www.pozorrubio.ph/index.php?option=com_content&view=category&layout=blog&id=83&Itemid=61http://www.pozorrubio.ph/http://www.pozorrubio.ph/http://www.pozorrubio.ph/index.php?option=com_content&view=category&layout=blog&id=83&Itemid=61
  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    93/98

    Designed in 1999 & maintain to this day, town website (www.pozorrubio.ph ) as social workfor town mates for free

    Partner to Operation Smile: Project Pozorrubio 2011 (target to raise $40,000 for medical mission andfacilities); http://www.operationsmile.org/pasag

    Specia l t ies / In terest s

    Substation Automation System, SCADA, wireless and fiber optic communications, web and multimediadevelopment, production, and web publishing/streaming, content management systems, database,webhosting; networking and securing servers, client PCs, and networking devices; professional andjournalistic, web/blog writing;

    Design/engineering, RFP development, project management, quality testing,

    Educ at ion and Tra in ing

    University of the Philippines, Diliman, Quezon City, Philippines, General Education; 1964-67;www.up.edu.ph

    University of the East, Manila, Philippines; BSECE; 1969-72; www.ue.edu.ph/manila/nd entrepreneurship;Executive Development Academy; 10 short courses in management a

    /executivedevelopmentacademy.orghttp:// Various Vendor-, Professional association- and Company-sponsored technical seminars

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20109393

    Substation Automation System - An Introduction to IEC 61850

    http://www.pozorrubio.ph/http://www.operationsmile.org/pasaghttp://www.up.edu.ph/http://www.ue.edu.ph/manila/index.htmlhttp://executivedevelopmentacademy.org/http://executivedevelopmentacademy.org/http://executivedevelopmentacademy.org/http://www.operationsmile.org/pasaghttp://www.pozorrubio.ph/http://executivedevelopmentacademy.org/http://www.ue.edu.ph/manila/index.htmlhttp://www.up.edu.ph/
  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    94/98

    Author and Presenter(LONG PROFILE)www.ginquesada.com

    www.linkedin.com/in/ginoquesada

    http://www.ginquesada.com/http://www.linkedin.com/in/ginoquesadahttp://www.linkedin.com/in/ginoquesadahttp://www.ginquesada.com/
  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    95/98

    Substation Automation System - An Introduction to IEC 61850

    PROFESSIONAL ACTIVITIES

    Delivered technical presentation in behalf of Saudi Electricity Company (then SCECO-East) at Institute ofElectrical and Electronic Engineers-Saudi Arabia Chapter (IEEE, www.ieee.org ) during the Annual 2-day Technical Exchange Meeting, in May, 2000, at the King Faisal University of Petroleum and Minerals,

    Dhahran City. Presentation, Ensuring Quality in Telecommunication Systems, is available at SEC Library.

    http://www.ieee.org/http://www.ieee.org/
  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    96/98

    y g y y y

    Delivered technical presentation (from 9:00 AM to 3:00 PM) for the Institute of Integrated ElectricalEngineers of the Philippines Eastern Region Chapter, Saudi Arabia (IIEE-ERCSA,www.iiee-ercsa.org/), pertaining to communication technologies used in substations during President NeilBeltran administration; and launching of the organizations website designed by Presenter during President

    Rodolfo Olays administration;

    Delivered an economic presentation (1996, Park Hotel, Al-Khobar City, KSA) and a technical presentation(2000, Dhahran International Hotel, Dhahran City, KSA) during conferences of Philippine Society ofMechanical Engineer Eastern Region, Saudi Arabia Chapter (PSME-SA),www.psme-sa.com

    Was among the organizer of Toastmaster Club International PICPA-KSA Chapter (1995). Was VP forEducation, later became the President.

    Organized Filipino Inventors Society-Saudi Arabia Chapter, 1995-1996. Was president for 2 years;conducted series of seminars on Intellectual Properties Creation, Marketing, and Protection

    EDUCATION AND TRAINI NGUniversity of the Philippines, Diliman, Quezon City, Philippines, General Education; 1964-67University of the East, Manila, Philippines; BSECE; 1969-72Executive Development Academy; 10 short courses in management and entrepreneurshipVarious Vendor-, Professional association- and Company-sponsored technical seminars

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20109696

    Substation Automation System - An Introduction to IEC 61850

    COMMU NIT Y SERVICE ACTIV ITIES

    Organized the First Pozorrubio Essay/ Expository Writing Contest, was key speaker, as thesponsoring association president, along with the town Mayor of Pozorrubio, Pangasinan,

    Philippines, Hon. Emma T. Chan, Vice-Mayor Rey Reyes, and Councilor Dennis Uy during theAwarding Ceremony in January 14 2009 at towns municipal function hall Ten veteran town

    http://www.iiee-ercsa.org/http://www.psme-sa.com/http://www.psme-sa.com/http://www.iiee-ercsa.org/
  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    97/98

    Awarding Ceremony in January 14, 2009 at town s municipal function hall. Ten veteran townwriters were awarded cash and plaques and framed certificates;

    Designed town website (www.pozorrubio.ph ) of Pozorrubio, Pangasinan in 1999, andcontinue to maintain it to this day for free for the resident and foreign-based Pozorrubians associal service;

    Conducted 4 computer assembly workshops in Pozorrubio, Pangasinan for free as socialservice to fellow Pozorrubians. Conducts website design by distance learning approach.

    As President of Filipino Inventors Society Saudi Arabia Chapter, sponsored the exhibits ofFilipino inventors at Dhahran International Expo Center

    Major sponsor: 11th Basic and Advanced Recital, Center for Performing Arts, Dhahran PalaceHotel, July, 2010, Dhahran City, Saudi Arabia.

    Main website: www.quesada.comLinkedIn site: www.linkedin.com/in/ginoquesada

    Facebook site: www.facebook.com/ginquesadaUTube channel: www.utube.com/user/ginquesadaFamily biz site: www.quesadatech.comTwitter: www.twitter.com/ginquesadaTown website: www.pozorrubio.phMy flagship client site: http://punch.dagupan.com

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 20109797

    Substation Automation System - An Introduction to IEC 61850

    St reaming v ideo vers ions of present a t ions for the fo l low ing

    t op ics are be ing deve loped by t he author :

    Substation Automation and Dynamic Power Compensation1 N t k R d d I l t ti i IEC 61850

    http://www.pozorrubio.ph/http://www.quesada.com/http://www.linkedin.com/in/ginoquesadahttp://www.facebook.com/ginquesadahttp://www.utube.com/user/ginquesadahttp://www.quesadatech.com/http://www.twitter.com/ginquesadahttp://www.pozorrubio.ph/http://punch.dagupan.com/http://punch.dagupan.com/http://www.pozorrubio.ph/http://www.pozorrubio.ph/http://www.twitter.com/ginquesadahttp://www.quesadatech.com/http://www.utube.com/user/ginquesadahttp://www.facebook.com/ginquesadahttp://www.linkedin.com/in/ginoquesadahttp://www.quesada.com/
  • 8/7/2019 2010-11-18_SubstationAutomationSystems-byGinQuesada

    98/98

    y p1. Network Redundancy Implementations in IEC 618502. Redundancy in IEC 61850 based in IED 62439, Part 3 PRP and HSR (Parallel

    Port Redundancy and High Availability Seamless Ring)3. Cybersecurity Options for IEC 618504. Cybersecurity in IEC 61850 Using IEC 623515. Dynamic Power Compensation Using Series and Shunt Compensation

    Communication and DC-Solar Power1. VHF-UHF Microwave Repeater Design2. Radio Propagation3. DC and Solar Power Sizing design

    4. Fiber optics design procedureInformation Technology

    1. Web design using Open and vendor-specific platforms

    Above w i l l be pub l ished in aut hor s w ebsi teswww.ginquesada.com;www.linkedin.com/in/ginoquesada;www.facebook.com/pages/Gin-Quesada/119173918139214www.utube.com/user/ginquesada

    *Presented by Gin.Quesada during the IIEE-ERCSA 15TH Annual Convention and Election of 2011 Set of Officers,held at Tulip Inn Hotel, Dammam-Al-Khobar Highway, Al-Khobar , Saudi Arabia, November 19, 2010989898

    http://www.ginquesada.com/http://www.linkedin.com/in/ginoquesadahttp://www.facebook.com/pages/Gin-Quesada/119173918139214http://www.utube.com/user/ginquesadahttp://www.utube.com/user/ginquesadahttp://www.facebook.com/pages/Gin-Quesada/119173918139214http://www.linkedin.com/in/ginoquesadahttp://www.ginquesada.com/