Contextualization / Decontextualization (WP6 ForgetIT 1st year review)
1st Technical Meeting - WP6
-
Upload
slope-project -
Category
Education
-
view
193 -
download
0
Transcript of 1st Technical Meeting - WP6
Project SLOPE1
WP 6 – System integration
Kick-off Meeting 2-4/Jul/2014
Agenda
• Work Package Goals• Tasks Overview• Timeline• Deliverables• Task Details• Risks and Mitigation Actions• Open Discussion
Kick-off Meeting 2-4/Jul/2014
Work Package Goals
“Achieve a complete integration of the different components that are part of the SLOPE platform”
WP 2 ComponentsForest information
collection and analysisCOA,FLY,GT,ITE,TRE
WP 3 ComponentsIntegration of novel
intelligent harvesting systemsCNR,GRE,KES,ITE,MHG
WP 5 ComponentsForest information
system developmentCNR,TRE,BO
WP6 Integration (All Partners)
SLOPE PLATFORM
Kick-off Meeting 2-4/Jul/2014
Work Package Goals
• Build a WORKING System • Ready for pilots and on the field testing• 3 integration steps
• 3 main tasks (T.6.2,T.6.3,T.6.4)• Technical and Economical Analysis
• Overall solution costs• Social impacts• Environmental impacts
T.6.2
T.6.3
T.6.4
Kick-off Meeting 2-4/Jul/2014
Tasks and Roles
• T.6.1 Definition of integration Steps• Task leader: GRAPHITECH; Participants: KESLA, MHG, FLY, ITENE
• T.6.2 First Integration - Forest inventory & harvesting systems• Task leader: GRAPHITECH; Participants: KESLA, MHG, FLY, GRE, TRE, ITENE
• T.6.3 Second integration – Forest management• Task leader: MHG; Participants: CNR, BOKU, GRE, TRE, ITENE
• T.6.4 – Third integration - System validation• Task leader: GRAPHITECH; Participants: KESLA, MHG, BOKU, FLY, GRE, TRE, ITENE
• T.6.5 – Scientific Coordination• Task leader: GRAPHITECH;
Kick-off Meeting 2-4/Jul/2014
Timeline
2014 2015 2016
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
WP 6 System Integration
T.6.1 Definition of the integration steps
T.6.2 First Integration – Forest inventory & harvesting systems
T.6.3 Second integration – Forest management
T.6.4 Third integration -System validation
T.6.5 Scientific coordination
• WP 2,3,4,5 still running when T.6.1 starts• WP 2,3,4,5 closed before the end of T.6.4
Kick-off Meeting 2-4/Jul/2014
Timeline & Deliverables
2014 2015 2016
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
WP 6 System Integration
T.6.1 Definition of the integration steps
T.6.2 First Integration – Forest inventory & harvesting systems
T.6.3 Second integration – Forest management
T.6.4 Third integration -System validation
T.6.5 Scientific coordination
D.6.01 System Integration and Validation Plan
D.6.021 System Integration Report ID.6.041 SLOPE System Techno-Economic Evaluation Report I
D.6.022 System Integration Report IID.6.042 SLOPE System Techno-Economic Evaluation Report II
D.6.03 SLOPE System Field Trials Readiness Assessment Report
D.6.023 System Integration Report IIID.6.043 SLOPE System Techno-Economic Evaluation Report III
Kick-off Meeting 2-4/Jul/2014
Timeline & Deliverable & Milestone
2014 2015 2016
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
WP 6 System Integration
T.6.1 Definition of the integration steps
T.6.2 First Integration – Forest inventory & harvesting systems
T.6.3 Second integration – Forest management
T.6.4 Third integration -System validation
T.6.5 Scientific coordination
D.6.01 System Integration and Validation Plan
D.6.021 System Integration Report ID.6.041 SLOPE System Techno-Economic Evaluation Report I
D.6.022 System Integration Report IID.6.042 SLOPE System Techno-Economic Evaluation Report II
D.6.023 System Integration Report IIID.6.043 SLOPE System Techno-Economic Evaluation Report III
MS04 SLOPE System Integration Planning is completed
MS05 Forest Inventory and Intelligent Harvesting system integration
MS07 Forest Management system integrated
MS09 System testing endingD.6.03 SLOPE System Field Trials Readiness Assessment Report
Kick-off Meeting 2-4/Jul/2014
Timeline & Deliverable & Milestone & Project Meetings
2014 2015 2016
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
WP 6 System Integration
T.6.1 Definition of the integration steps
T.6.2 First Integration – Forest inventory & harvesting systems
T.6.3 Second integration – Forest management
T.6.4 Third integration -System validation
T.6.5 Scientific coordination
D.6.01 System Integration and Validation Plan
D.6.021 System Integration Report ID.6.041 SLOPE System Techno-Economic Evaluation Report I
D.6.022 System Integration Report IID.6.042 SLOPE System Techno-Economic Evaluation Report II
D.6.023 System Integration Report IIID.6.043 SLOPE System Techno-Economic Evaluation Report III
MS04 SLOPE System Integration Planning is completed
MS05 Forest Inventory and Intelligent Harvesting system integration
MS07 Forest Management system integrated
MS09 System testing endingD.6.03 SLOPE System Field Trials Readiness Assessment Report
Kick-off Meeting 2-4/Jul/2014
Deliverables
• D. 6.01 System Integration and Validation Plan• Integration and validation procedures and timeline to validate the SLOPE system• Based on the use cases in WP1
• D.6.03 SLOPE System Field Trials Readiness Assessment Report• Assessment of the initial user experience and recommendations for the field trials
operations. • Guidance and system operation manual for the Field Trials operators
Kick-off Meeting 2-4/Jul/2014
Deliverables
• D. 6.021 System Integration Report I: • Integration test and validation concept procedures results • Assessment of the initial user experience• Recommendations for field trials operations
• D 6.022 System Integration Report II: • Integration test and validation concept procedures results (rev. 2)• Assessment of the initial user experience (rev. 2)• Recommendations for field trials operations (rev. 2)
• D 6.023 System Integration Report III: • Integration test and validation concept procedures results (rev. 3)• Assessment of the initial user experience (rev. 3)• Recommendations for field trials operations (rev. 3)
Kick-off Meeting 2-4/Jul/2014
Deliverables
• D6.041 SLOPE System Techno-Economic Evaluation Report I: • Analysis of technical and economical aspects of SLOPE system • Current practices and the potential known alternatives comparison• Estimation phase
• D6.042 SLOPE System Techno-Economic Evaluation Report II: • Analysis of technical and economical aspects of SLOPE system • Current practices and the potential known alternatives comparison• Preliminary results phase
• D6.043 SLOPE System Techno-Economic Evaluation Report III: • Analysis of technical and economical aspects of SLOPE system • Current practices and the potential known alternatives comparison• Final results phase
Kick-off Meeting 2-4/Jul/2014
Tasks Details
Kick-off Meeting 2-4/Jul/2014
Task 6.1
Definition of the integration steps• Leader: Graphitech• Participants: KESLA, MHG, FLY, ITENE
Objectives• Define the integration steps• Define validation concepts
• Functionalities• Communication
Kick-off Meeting 2-4/Jul/2014
How to achieve these objectives?
1. System Architecture Analysis (from T.1.5)• Component Diagram
2. Use case / general process Analysis (from T.1.1 and T.1.3)• Functional Requirements (execute A, execute B, etc.)• Non-functional reqirements (speed, reliability, etc.)
Kick-off Meeting 2-4/Jul/2014
How to achieve these objectives?
3. Enumerate all needed software components, hardware, tools etc.• Forest model• Measurement systems• 3D Model Visualisation Software • Other Software
4. Identify and verify connection between components5. Plan how to connect between
1. Forest Model with Harvesting 2. Forest Model & Harvesting with Forest Management
Kick-off Meeting 2-4/Jul/2014
How to achieve these objectives?
6. For each integration step between two or more subsystems1. For each identified interaction between subsystems components:
1. Describe the interaction 2. Describe the expected result3. Define importance level (i.e. low, medium, high)
2. Define minimum threshold to be achieved
Test
N°
Interaction
DescriptionExpected result Obtained Result Achieved
Anomaly
Description
... ... ... ... ... ...
8The user use the 3D
model to…The application shows …. The application HAS shown… YES None
... ... ... ... ... ...
Kick-off Meeting 2-4/Jul/2014
Components to be integrated
WP2
WP3WP5
WP4
SLOPE DBSLOPE DBSLOPE DB
Kick-off Meeting 2-4/Jul/2014
Deliverables
Reports:• D.6.01 System Integration and Validation Plan (M13)
Kick-off Meeting 2-4/Jul/2014
Expectations
• Contribution from each partner for its component
• Joint contribution for each couple of integrated components by the corresponding partners
• Regular Telcos on a Monthly basis• First Telco at Task’s start
Kick-off Meeting 2-4/Jul/2014
Risks
• Data Formats • DB Model (T.1.5 and T.5.1)• Reduce Harmonization/adaptation• Images and other data formats
• Unreliable Services• Hardware interfaces with software
• RFID• BT
• Inability to reproduce planned test field/conditions
• Component testing takes time!
Kick-off Meeting 2-4/Jul/2014
Mitigating Actions
• Exhaustive System Architecture• T.1.5 and Parallel Session of Tomorrow
• Exhaustive Requirement analysis• D.1.1 and D.1.2
• Common data model• T.1.4
• Communication• Skype (Small Group, no desktop sharing)• WebEx (up to 25 persons with desktop sharing)• Monthly Basis
Kick-off Meeting 2-4/Jul/2014
Open Discussion
Kick-off Meeting 2-4/Jul/2014
Thank you for your attention
DANIELE MAGLIOCCHETTI
Fondazione GraphitechVia Alla Cascata 56C38123 Trento (ITALY)
Phone: +39 0461.283395Fax: +39 0461.283398
Kick-off Meeting 2-4/Jul/2014
Task 6.5
Scientific Coordination• Leader: Graphitech
Objectives• Technical supervision of technology functionalities as planned• Management of issues related to Software licenses and/or required hardware• Quality Assurance and assessment/evaluation of technology results• Regular reporting of the technical development of the project