Transcript of 11th_WCM_ Safety Presentation 2016 updated 070416
A part of your world
A part of your business
A part of your passion
A part of your future
Gunasegaran
Safety ALMY-PE
SAF Pillar Leader
Penang, MALAYSIA
11-15th April 2016
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 2/142
Shimmer And Shine Let Silver Be Mine
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 3/142
© Copyright by Automotive Lighting
WCM Structure
Co
st D
eplo
ymen
t
World Class Manufacturing
Safe
ty
Focu
sed
Imp
rove
men
t
Pro
fess
ion
al M
ain
ten
ance
Qu
alit
y
Logi
stic
s
Commitment, Involvement, Communication, Understanding, Measurement, Deployment, Implementation, Evaluation, Standardization with Visibility, Documentation
Au
ton
om
ou
s A
ctiv
itie
s (A
M &
WO
)
Earl
y P
rod
uct
/ E
qu
ipm
ent
Man
agem
ent
Peo
ple
Dev
elo
pm
ent
Envi
ron
men
t
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 4/142
© Copyright by Automotive Lighting
Safety Information for Visitors
You Are
Here
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 5/142
© Copyright by Automotive Lighting
Safety Training Room
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 6/142
© Copyright by Automotive Lighting Safety shoes
or over shoes
Safety helmet
+
Safety vest
Ear Plugs
Safety Information for Visitors
Safety Information Safety Questionnaire Safety Pass
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 7/142
© Copyright by Automotive Lighting
Area PPE Example
Pre-prod
Assembly
Tool shop
Area PPE Example
Maintenance
LOG
warehouse
Chemical
Waste Store
Plant wide
Worker’s Safety Rules – Plant Wide
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 8/142
© Copyright by Automotive Lighting
DEPARTMENTS IN CHARGE
ALL
DEPTS
Study of the law to
be applied
Introduction to Web-
base updating
System
Notification and
information to those
involved
Application
and control
EHS
EHS
Sources for data
collection EHS
Facilities
Non
Compliance
Local
Government
Agencies
Corporate
Legal Register
List
Monitoring
report
Web-base
tracking
EHS
Facilities
Legal Compliance
EVERY YEAR
FULL REVIEW
EVERY YEAR
FULL REVIEW
Compliance with laws and regulations
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 9/142
© Copyright by Automotive Lighting
Occupational & Safety Policy
Our mission of Environmental
Health & Safety is to promote
fun, harmonize and providing
a safe and healthful workplace
for our employees, contractors,
and communities
Positive Safety Culture
Strong Safety
Leadership
Effective Communication
Employees Involvement
& Participation
Learning Organization
Just Culture
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 10/142
© Copyright by Automotive Lighting
Agenda
I. Introduction
– Vision, Needs, Objectives, Targets
– Pillar Team
– Activity Organization
– KPI/KAI
– Route Map
– Last Audit Comments
– 7 Steps Status
II. Seven Steps Approach
– Step 1
– Step 2
– Step 3
– Step 4
– Step 5
III. Health Initiatives
IV. Plant Results
– KPI Plant
– SWOT Analysis
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 11/142
© Copyright by Automotive Lighting
Vision,Needs Objectives,Targets
VISION
NEEDS
OBJECTIVES
To cultivate a zero harm safety culture at all levels.
Everyone is responsible for safety.
To give to all personnel a best safety and healthy working environment.
We will not compromise on safety and expect all employees to contribute to our
safety journey and to take responsibility for their own safety.
•Zero accidents:
Reducing risks at source
Growing safety culture
TARGETS
2016
KPI 2008 2009 2010 2011 2012 2013 2014 2015 2016
Actual
2016
Target
FI For
Injury(LTI) 0.45 0 0 0 0 0 0.06 0 0 0
FI for first
aid 0.59 1.67 0.97 0.45 0.48 0 0.06 0 0 0
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 12/142
© Copyright by Automotive Lighting
Low Soon Lan / PD
Izuwan / EN
Norlia / LOG Amir / LOG
Pillar Team
Guna / SA
Mohd Hardiha / EN
Nadarajan / WO
Pillar Leader
Core team
Team Members
Pillar Leader
Core Team
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 13/142
© Copyright by Automotive Lighting
SAFETY PILLAR LEADER - BACKGROUND
Bachelor Degree
Electronic &
Electrical
Engineering
Year 1994
Professional Role
- Industrial
Assistant
Engineer
WCM Role
NA
Year 1998
Professional Role
-Industrial
Engineer
- OHSAS 18001
Internal Auditor
- ISO 14001
Internal Auditor
WCM Role
- Safety Committee
member
Year 2000-2008 Professional Role
- Process Engineer
- Industrial Engineer
- OHSAS 18001
Internal Auditor
- ISO 14001
Internal Auditor
WCM Role
Safety Working
Committee Member
- Environment
Working Committee
Member
Year 2009
Professional Role
EHS Manager
WCM Role
SAF Pillar Leader
Year 2014-2016
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 14/142
© Copyright by Automotive Lighting
Radar Chart Pillar Leader
Training: • Trained by WCM Expert Fiat -
Roberto Castellano
• Trained by WCM expert APAC –
Dieter Voigt
• Training by MM central team
• Participation to Prof. Yamashina’s
Audit in ALMY 2012
LUTI : • 5W1H
• 7 WCM tools
• 7 steps of problem solving
• Problem, phenomena & root
cause
• S- EWO
Benchmarking Turkey in
2014
Risk Assessment
Benchmarking ALCN & AL
Spain in 2015
New Risk Analysis format-
Legal Compliance, Risk
Assessment & Risk
Prediction & Risk analysis
for Non-Routine
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 15/142
© Copyright by Automotive Lighting
Team Radar Charts
SAF
PD
Mohd Hardiha
Izuwan Kamal
LowSLAngLM
AmirSahilaZamani Nadarajan
Norlia
TEAM RADAR CHART
0
1
2
3
4
55G
5W+1H, 5 WHY
7 WCM TOOLS
THE PRINCIPLE OF HEINRICHPYRAMID
SAFETY MATRIX
PPE
MANAGEMENT INITIATED SAFETY
BASIC SAFETY STANDARDS
EMERGENCY PLAN
STEP1: ACCIDENT ANALYSIS ANDCOUNTERMEASURE
GATHER NEAR MISSES ANDUNSAFE CONDITION
STEP2: COUNTERMEASURES ANDHORIZONTAL EXPANSION
SAFETY STANDARDS GAPANALYSIS
SAFETY RESPONSIBITY MATRIX
SAFETY COMMUNICATION SYSTEMINCIDENT TREND ANALYSIS
RISK ASSESSMENT
RISK PREDICTION
ERGONOMICS RISK ANALYSIS
STEP3: DEFINITION OF SAFETYSTANDARDS AND MANDATORY…
SAFETY RCA
TWTTP TO FIND ROOT CAUSES OFACCIDENTS
SMAT MANAGEMENT
STEP4: GENERAL INSPECTION FORSAFETY
STEP5: AUTONOMUS INSPECTION
EFFECTIVE REPORTING
OCCUPATIONAL HEALTH CHECKUP
STEP6: AUTONOMUS SAFETYSTANDARD
SAFETY + TWTTP + HUMAN ERRORIDENTIFICATION
SYSTEM TO CREATE MOTIVATION
PROACTIVE WCM KNOWLEDGE
PREVENTIVE REACTIVE
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 16/142
© Copyright by Automotive Lighting
Step 1 Step 2
Step 3 Step 4
Step 5 Step 6
Step 7
KAI KAI
KAI
KAI
KAI KAI
KAI
Accident & FAI
Analyzed by
S-EWO
Percentage
of
Expansion
of
countermea
sures
Percentage
of Covered
Area by Risk
Assessment
N° of OPL
N° of SOP
N°of S-card
N°of UC
N°of UA
N° of
Suggestion
N°of OPL by
workers
N° of SOP
by workers
N° of NC in
OHSAS18001 audit
Percentage of
Employees
participated into
Health Advice Prog.
Target % 100
N°of SMAT
No of UC
No of UA
KPI
KAI
No Accident
No First Aid
No Unsafe Condition
No Unsafe Act
No Near Miss
KPI & KAI
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 17/142
© Copyright by Automotive Lighting
Activity Organization – Follow Up
DAILY WEEKLY MONTHLY
• IMPROVEMENT
MEETING AND
FOLLOW UP ON
SAFETY UC & UA &
6’S ( DAILY 10.30 AM )
• EHS AUDIT THE SHOP
FLOOR
• CONFERENCE CALL
WITH EHS & WCM
CENTRAL TEAM
PILLAR AND WITH
OTHER PLANTS
• REVIEW EHS KPI &
ACTIVITY WITH TOP
MANAGEMENT
• REVIEW S-EWO AND
STATUS OF UC & UA
WITH TOP
MANAGEMENT
• INVOLVEMENT OF
TOP MANAGEMENT IN
SMAT & EMAT
• PILLAR REVIEW WITH
TOP MANAGEMENT
• SAF STEERING
COMMITEE
• EHS REPORT TO
DEPARTMENT OF
OCCUPATIONAL
SAFETY AND HEALTH
(LOCAL AUTHORITY)
• REVIEW LOCAL
LEGAL REGISTERY
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 18/142
© Copyright by Automotive Lighting
SAFETY ROUTE MAP
0
.... Autonomous Safety System
TWTTP applied up to UA
Operator SMAT
SMAT Audits & 6’S Audits
NM & UC& UA Analysis
Self Check System
Methodology
Development
Score
KPIs
0.43
Risk Analysis (Risk Assessment & Risk
Prediction)
LTA & FAI Analysis by
S-EWO
Horizontal Expansion of
Countermeasures
OPL & SOP
0 0.09
137 17
203 42
0
0
105
1147
0
0
58
1362
0
0
45
1410
0.06
295
342
0
208
346
IF
IG
UC
UA
Expansion 40% 33% 56% 56% 100% 100% 100%
0.04 0
0
67
115
100%
0
S1 S2 S3 S4 S5 S6 S7
L1 L2 L3 L4 L5 L6 L7
S1 S2 S3 S4 S5 S6 S7
L1 L2 L3 L4 L5 L6 L7
S1 S2 S3 S4
S6 S7
L1 L2 L3 L4
L6 L7
S1 S2 S3 S4 S5
S7
L1 L2 L3 L4 L5 L6 L7
S1 S2 S3 S4
S6 S7
L1 L2 L3 L4
L6 L7
S1 S2 S3 S4 S5
S7
L1 L2 L3 L4 L5
L7
Steps &
Levels
Time
S1 S2 S3 S4 S5 S6 S7
L1 L2 L3 L4 L5 L6 L7
L3 L4
L5 L5
S1 S2 S3 S4 S5
S7
L1 L2 L3 L4 L5
L7 L6 L6
Detailed Analysis of UAs
Implemented of Safety
Captain
Health Checks
Other Proactive Safety
Tools & Methods
S1 S2 S3 S4 S5
S7
L1 L2 L3 L4 L5
L7 L6
S1 S2 S3 S4 S5
S7
L1 L2 L3 L4 L5
L7
0
0
0
0
100% 100%
#
#
#
#
S1 S2 S3 S4 S5
S7
L1 L2 L3 L4 L5
L7
0
0
#
#
100%
S6 L6 S6 S6 L6 L6
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 19/142
© Copyright by Automotive Lighting
Implemented Actions Auditor: Mr. Vendange
Christian Date
Actual
Score
Oct. 2015 3
Target
Score
Mar. 2016 3
Comments:
• Good visual management.
• Detailed risk analysis and risk prediction, good
example shown. In assessment take don't mix
action to reduce occurrence with action to
reduce gravity.
• Best practice of 6S audit with good tracking of
issues. Try to make correlation of the results
with the findings of SMAT and heinrich
pyramid by sector.
• Tune the check list to be always effective
Last Audit Comments
What we have done:
• Separate the action taken to reduce the
occurrence with gravity in the risk
assessment.
• Related the results of the 6S & SMAT audit
finding at heinrich pyramid.
• Update the 6’s checklist to be more
effective.
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 20/142
© Copyright by Automotive Lighting
Agenda
I. Introduction
– Vision, Needs, Objectives, Targets
– Pillar Team
– Activity Organization
– KPI/KAI
– Route Map
– Last Audit Comments
– 7 Steps Status
II. Seven Steps Approach
– Step 1
– Step 2
– Step 3
– Step 4
– Step 5
III. Health Initiatives
IV. Plant Results
– KPI Plant
– SWOT Analysis
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 21/142
© Copyright by Automotive Lighting
7 Steps Approach
Step 6
Management initiated Self-initiated
Team initiated
Step 4
Step 5
Step 7
A AREAS
C AREAS
AA AREA
Step 3
Step 2
Step 1
B AREAS
Accidents analysis of causes
Preventive measures and horizontal deployment
Tentatives to establish safety standards (list of all the safety related problems)
General safety control, training and education to instruct the employees how to take care the safety
Autonomous control (countermeasures undertaken in case of safety problems)
Autonomus Safety standard
Full implementation of safety system
Reactive Preventive Proactive
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 22/142
© Copyright by Automotive Lighting
Plant Wide Heinrich’s Pyramid
2011 2012 2013 2014 2015
0 0 0 0 0
0 0 0 1 0
0 0 0 0 0
5 3 0 1 0
9 13 8 3 3
58 45 168 295 208
1362 1410 132 342 346
Transferring
to new plant Jan ‘16
Feb ’16
Mar ‘16
0 0 0
0 0 0
0
0
0
0 0 0
0 0 0
26 16 25
47 24 44
Fatality
LTI > 30 days
LTI < 30 days
First Aids
Near Misses
Unsafe Conditions
Unsafe Acts
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 23/142
© Copyright by Automotive Lighting
X DOA (Delagation of Authority person)
X make the plan (scheduler)
X put into practice (practitioner)
X assist the process (partner)
Safety Responsibility Matrix
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 24/142
© Copyright by Automotive Lighting
S-Matrix 2008
Area Localization
Injured
Part
Heinrich
Pyramid
Type of
Injury
Root
Cause
Counter
measures
Injuried Organ
N° of ACC,FA & NM(Heinrich Pyramid)
Type of Injury
Root Causes (UC or UA)
Countermeasures
For each year, we collected the data about safety incident on the S-MATRIX
AA A B C
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 25/142
© Copyright by Automotive Lighting
Area Classification
Step 1&2
Step 3
Step 4
Step 5
Office
Warehouse
TPM
BMC
AO
AF
Office
Metalizing HC BA
Kanban
Utilities
AF-Anti fog
HC-Hard Coating
BA-Bezel Assy
Parking Area
AA
A
A
C
B
B B
B
C
A B B
Step 6
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 26/142
© Copyright by Automotive Lighting
No. EQUIPMENT DEFINITION
2014 2015 2016 2017
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q! Q2 Q3 Q4 Q1 Q2
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
1 TPM
SAF STEP 4 STEP 5 STEP 6
> > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > >
2 BMC
SAF STEP 4 STEP 5 STEP 6
> > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > >
3 AO
SAF STEP 1 STEP 2 STEP 3 STEP 4 STEP 5
> > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > >
4 WARE HOUSE
SAF STEP 1 STEP 2 STEP 3 STEP 4 STEP 5
> > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > >
5 AF
SAF STEP 1 STEP 2 STEP 3 STEP 4 STEP 5
> > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > >
6 HC
SAF STEP 1 STEP 2 STEP 3 STEP 4 STEP 5
> > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > >
7 BA
SAF STEP 1 STEP 2 STEP 3 STEP 4 STEP 5
> > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > >
8 METALIZING
SAF STEP 1 STEP 2 STEP 3 STEP 4 STEP 5
> > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > >
9 OFFICE
SAF STEP 1 STEP 2 STEP 3 STEP 4 STEP 5
> > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > >
10 UTILITIES
SAF STEP 1 STEP 2 STEP 3 STEP 4 STEP 5
> > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > >
11 KANBAN
SAF STEP 1 STEP 2 STEP 3 STEP 4 STEP 5
> > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > >
12 PARKING
AREA
SAF
STEP 1 STEP 2 STEP 3 STEP 4
STEP 5
> > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > >
SAFETY Master Plan
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 27/142
© Copyright by Automotive Lighting
Step 3
Step 4
Step 5
Step 6
Step 7
Setting tentative standards for safety (Listing all safety problems)
General inspection for safety (Train and grow people in such a way that they care for safety)
Autonomous inspection (Predictive countermeasures against safety problems)
Fully implemented safety management
Step 1
Analysis of accidents (Analysis of causes)
Countermeasures and horizontal expansion (Countermeasures at the similar areas)
Autonomous safety standards (*Overall inspection of safety levels *Re-evaluation if safety control)
Reactive Preventive Proactive
Step 2
Step 1 & Step 2
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 28/142
© Copyright by Automotive Lighting
TRAINING TO ALL THE
MANAGEMENT and
SUPERVISORS ON THE RIGHT
PROCEDURE FOR
REPORTING ALL THE EVENTS
EHS SUPERVISOR/
DEPT MANAGER
Before HR
Plant Manager
MM Reporting System (Score card and SAD System)
EMPLOYEE
HOW TO BE SURE THAT WE ARE
REPORTING ALL THE EVENTS
SUPERVISOR/ DEPT MANAGER
SAFETY
CAMPAIGN
SKETCH SAF
CAMPAIGN
EHS SUPERVISOR/
DEPT MANAGER
After
HR
Plant Manager
AL TOP MANAGEMENT & MM Reporting System
EMPLOYEE
KEYS AT THE
GUARD’S LODGE
HOW TO IMPROVE OUR DATA COLLECTION
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 29/142
© Copyright by Automotive Lighting
Step 1&2: Logic
Using S-EWO for root cause analysis
Implement countermeasures
Effective check for 3 months
Horizontal expansion
Fatality
Major
Minor
First Aids
P
D
C
A
Countermeasures
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 30/142
© Copyright by Automotive Lighting
Step 1
Analysis of accidents
Root cause of accidents
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 31/142
© Copyright by Automotive Lighting
Incident Analysis
Provide necessary first aid treatment by OHN
Reported to E-accident report
Using S-EWO for root cause analysis
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 1
Fatality
LTI > days
LTI < 30 days
First Aids
Step 0
Root Cause Analysis
S-EWO P
P
P
Incident
reported
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 32/142
© Copyright by Automotive Lighting
Incident Analysis at Model Area
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
2
1
1
1
1
2008
TPM Model Area
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 33/142
© Copyright by Automotive Lighting
Implementation of countermeasures in the model
area
Horizontal expansion on similar areas
KAI step 2
Safety responsibility matrix
Step 2
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 34/142
© Copyright by Automotive Lighting
Num rev
Resp.
DATA
Product
BUSINESS LINE
X
X
Picture or sketch Picture or sketch
Status updateREVIEW RESP. OBJECT
INSTALLATION
COST (C.D) ERGONOMICS /W.O COSTRUCTION OPERATIVE CHECK
1
Machine component
IMPACT / PILLAR
QUALITY (Q.C) AFFIDABILITY (P.M)
Project Information
Priority Kaizen code or name
WORKING(A.M) SAFETY PROJECT DETAIL FINAL CHECK
2
After - Avoid finger/hand from stuck/hit by machine
CHECK FUNCTIONAL
PROBLEM DESCRIPTION SOLUTION DESCRIPTION
ENVIRONMENT PRELIMINARY PROJECT
MACHINE
Line Work Station Machine code
STATUS
PLANNING
DescriptionMachine name
MANTENANCE (P.M)
Suzuki YV7 HL
12B Stn.1, 2, 3, 4, 5, 9 Housing Assy. H and Cap Assy. Headlamp Assy.
MFE/Zamzam
Penang Process Final Assembly EEM
Maintenance Prevention Information
Plant Unit Pillar
SAF
EEM
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
Effectiveness Check
We have no similar accidents
Countermeasures
Countermeasure – Example Accident
Phenomena
Replace normal hot water valve to safety lock
water valve. Technician need to use 2 hand to
turn on or off the valve.
Fatality
LTI > 30 days
LTI < 30 days
First Aids
Left hand was
burned by hot
water
Problem
INJURY EXPANSION
Hot water purged
out while technician
accidentally
touched the water
valve
Root Cause:
No Safety Lock
valve
Unsafe
Condition:
Tools
/Equipment -
Weakness of
design
Horizontal Expansion
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 35/142
© Copyright by Automotive Lighting
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
Countermeasures
Effectiveness Check
We have no similar first aid
PPE Defined (Kevlar
Armguard)
Countermeasure – Example First Aid
Fatality
LTI > 30 days
LTI < 30 days
First Aids
Problem
Left forearm was
burned by hot
barrel
Phenomena
While dismantling
screw barrel,
unintentionally
touched hot barrel
without protection
Root Cause:
No SOP
Unsafe
Condition:
Insufficient
Procedures
PPE
inadequate
Horizontal Expansion
EXPANSION INJURY
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 36/142
© Copyright by Automotive Lighting
• Lever was pulled
while standing in
the wrong
position to
unscrew mold
clamp
• No safety helmet.
Phenomena
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
Countermeasures
Effectiveness Check
We have no similar first aid
Horizontal Expansion
Countermeasure – Example First Aid
EXPANSION INJURY
Train the operator proper way to tighten mold
using lever and proper PPE (Safety Helmet).
Fatality
LTI > 30 days
LTI < 30 days
First Aids
Problem
Head was injured
by metal pipe
Root Cause:
Wrong method
used
Unsafe Act:
Competence/
Knowledge
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 37/142
© Copyright by Automotive Lighting
KAI Formula Period Target
Accident Investigation N° of S-EWO applied for Accident Monthly 100 %
FAI Investigation N° of S-EWO applied for First-aids Monthly 100 %
100% of Accident and First Aids were analyzed by S-EWO and
Root Causes were detected.
KAI -TPM (Model Area)
Re
po
rte
d
Re
po
rte
d
An
aly
ze
d
An
aly
ze
d
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
6 of S-EWO
Step 2
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 38/142
© Copyright by Automotive Lighting
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
Expansion to other Areas
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 39/142
© Copyright by Automotive Lighting
Horizontal Expansion
Step 2 Step 3 Step 4 Step 5 Step 6 Step 0 Step 1 Step 7
KAI Formula Period Target
Countermeasures Expansion Monthly 100 % # of Expansion Completed
# of Possible/Similar Expansion Point
0
1
2
3
4
5
6
7
8
Expansion Point 2009 Expansion Completed2009
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 40/142
© Copyright by Automotive Lighting CREATE KNOWLEDGE AND
CONSOLIDATE (TEACH and
INSPECT)
KNOWLEGE ON HOW TO
PERFORM INCIDENT
ANALYSIS (LEARN and
CREATE a DOCUMENT, and
USE)
12 Managers trained
5 Supervisor
5 Operators of the Model Area
CONSOLIDATE ZERO
INJURIES and FIRST AIDS
Step1 & Step 2 Result
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 41/142
© Copyright by Automotive Lighting
Step 2
Step 3
Step 4
Step 5
Step 6
Step 7
Setting tentative standards for safety (Listing all safety problems)
General inspection for safety (Train and grow people in such a way that they care for safety)
Autonomous inspection (Predictive countermeasures against safety problems)
Fully implemented safety management
Step 1
Analysis of accidents (Analysis of causes)
Countermeasures and horizontal expansion (Countermeasures at the similar areas)
Autonomous safety standards (*Overall inspection of safety levels *Re-evaluation if safety control)
Reactive Preventive Proactive
Step 3
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 42/142
© Copyright by Automotive Lighting
Risk analysis
Setting standards
KPI step 1-3
Step 3
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 43/142
© Copyright by Automotive Lighting
Applicable to the
WORKING PLACE and to
ALL TASKS and ACTIVITIES
EVALUATE LEGAL REQUIREMENTS REGULATIONS, LEGISLATIONS ENGINEERING
CONTROL
Ris
k A
ss
es
sm
en
t
INVESTIGATION COUNTERMEASURES APPLICATION
LEGAL
COMPLIANCE NOK OK
LEGAL COMPLIANCE
EVALUATION
Applicable to the
WORKING PLACE and to
ALL TASKS and
ACTIVITIES
FOCUS ON UNSAFE CONDITIONS ENGINEERING
CONTROL
To reduce the level of the Risk
INVESTIGATION COUNTERMEASURES APPLICATION
ENGINEERING CONTROL
PROCEDURES
TRAINING
VISUAL MANAGEMENT
INVESTIGATION COUNTERMEASURES APPLICATION
RISK LEVEL MEDIUM –
HIGH LOW
EVALUATION
LEVEL OF RISK
-PHYSICAL FACTORS
- EQUIPMENT FACTORS
- EXPOSURES
DATA AGGIORNAMENTO DATA AGGIORNAMENTO 10/10/2014
WORKING STATION Mechanical Risks 2 3 4 5 MACHINE Mechanical Risks 7 8 TOOLS Mechanical risks 10 11 12 13 CHEMICAL SUBASTANCES and MATERIALS Risks 17 18 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
Wo
rk
pla
ce
Lu
og
hi d
i la
vo
ro
Fa
llin
g fro
m h
eig
ht
Ca
du
ta
d
all'a
lto
d
ella
p
erso
na
Fa
llin
g fro
m a
h
eig
ht o
f o
bje
cts o
r
pa
rticle
s
Ca
du
ta
d
all'a
lto
d
i o
gg
etti o
pa
rtice
lle
Fa
ll o
n th
e fla
t
Ca
du
ta
in
p
ia
no
Ca
du
ta
in
p
ro
fo
nd
ità
Fa
ll in
d
ep
th
Co
nta
tto
co
n ca
rich
e
ele
ttro
sta
tich
e
Co
nta
ct w
ith
e
le
ctro
sta
tic ch
arg
es
En
ta
ng
le
me
nt o
r g
ra
sp
in
g
Im
pig
lia
me
nto
o
a
ffe
rra
me
nto
Stu
mb
lin
g
In
cia
mp
o
In
su
fficie
nt lig
htin
g
In
su
fficie
nte
illu
min
azio
ne
de
ll'o
pe
ra
zio
ne
Cru
sh
Sch
ia
ccia
me
nto
Slip
pin
g
Sciv
ola
me
nto
Bu
ild
in
gs
Fa
bb
rica
ti
Micro
clim
ate
Micro
clim
a
Ro
ute
s
Via
bilità
Tra
nsp
orts
Me
zzi d
i tra
sp
orto
Ma
ch
in
ery
/E
qu
ip
me
nt
Ma
cch
in
e
Co
nta
ct w
ith
v
olta
ge
p
oin
ts (d
ire
ct
co
nta
ct)
co
nta
tto
co
n e
le
me
nti in
te
nsio
ne
(co
nta
tto
d
ire
tto
)
Ap
pro
ach
to
h
ig
h-v
olta
ge
co
mp
on
en
ts
Av
vicin
am
en
to
a
d e
le
me
nti a
d a
lta
te
nsio
ne
Fa
llin
g o
bje
cts h
an
dle
d w
ith
me
ch
an
ica
l d
ev
ice
s
Ca
du
ta
d
i o
gg
etti m
ov
im
en
ta
ti co
n
au
sili m
ecca
nici
Co
nta
ct w
ith
e
le
me
nts th
at a
re
en
erg
ize
d in
th
e e
ve
nt o
f a
co
nta
tto
co
n e
le
me
nti ch
e e
ntra
no
in
te
nsio
ne
in
ca
so
d
i g
ua
sto
(co
nta
tto
in
dire
tto
)P
ro
je
ctio
n flu
id
s, su
bsta
nce
s a
nd
po
wd
ers
Pro
ie
zio
ne
flu
id
i, so
sta
nze
, p
olv
eri
Pro
je
ctio
n m
ate
ria
ls
Pro
ie
zio
ne
m
ate
ria
li
Tip
pin
g b
y v
eh
icle
Rib
alta
me
nto
d
a v
eico
lo
Tip
pin
g e
le
me
nts u
nfix
ed
Rib
alta
me
nto
d
i e
le
me
nti n
on
fissa
ti
Dra
g a
nd
d
ro
p o
r e
ntra
pm
en
t
Tra
scin
am
en
to
o
d
i
in
tra
pp
ola
me
nto
No
ise
Ru
mo
re
Op
tica
l R
ad
ia
tio
n
Ra
dia
zio
ni O
ttich
e
Bu
rn
s fro
m fly
in
g fu
se
d p
article
s
Ustio
ne
d
a p
ro
ie
zio
ne
d
i p
artice
lle
fu
se
Bu
rn
s fro
m h
ot su
rfa
ce
s
Ustio
ne
d
a co
nta
tto
co
n su
pe
rfici
ca
ld
e
Vib
ra
tio
ns
Vib
ra
zio
ni
Ele
ctro
ma
gn
etic fie
ld
s
C
am
pi e
le
ttro
ma
gn
etici
Vid
eo
te
rm
in
al e
le
ctro
ma
gn
etic
risk
A
ttre
zza
tu
re
m
un
ite
d
i
vid
eo
te
rm
in
ale
Liftin
g e
qu
ip
me
nt
Ap
p. d
i S
olle
va
me
nto
Pre
ssu
re
e
qu
ip
me
nt
Ap
p. a
p
re
ssio
ne
To
ols
Ute
nsili
Slice
Ce
so
ia
me
nto
Pe
rfo
ra
tio
n o
r P
un
ctu
re
Pe
rfo
ra
zio
ne
o
P
un
tu
ra
Cu
t - A
bra
sio
n
Ta
glio
- A
bra
sio
ne
Hit
Urto
Distrib
utio
n sy
ste
ms (n
o e
le
ctica
l
eq
uip
me
nt)
Im
p. D
i d
istrib
uzio
ne
Ele
ctricity
Ele
ttricità
Erg
on
om
ics
Erg
on
om
ia
VD
T w
ork
ers
VD
T
Ch
em
ica
ls
Ag
en
ti ch
im
ici
Bu
rn
fro
m co
nta
ct w
ith
fre
e
fla
me
s
Ustio
ne
d
a co
nta
tto
co
n fia
mm
e
lib
ere
Ch
ok
in
g
So
ffo
ca
me
nto
Bu
rn
s fro
m co
nta
ct w
ith
ag
gre
ssiv
e su
bsta
nce
s
Ustio
ne
d
a co
nta
tto
co
n so
sta
nze
ag
gre
ssiv
e
Bu
rn
s fro
m co
nta
ct w
ith
h
ot
ste
am
Ustio
ne
d
a co
nta
tto
co
n v
ap
ori
ca
ld
i
Ex
plo
sio
n
Esp
lo
sio
ne
Bu
rn
s fro
m co
nta
ct p
arts h
ot /
co
ld
Ustio
ne
d
a co
nta
tto
p
arti
fre
dd
e/ca
ld
e
Ca
rcin
og
en
s a
nd
m
uta
ge
ns
ca
nce
ro
ge
ni e
m
uta
ge
ni
Ab
se
nto
s
Am
ia
nto
Bio
lo
gica
l a
ge
nts
Ag
. B
io
lo
gici
No
ise
Ru
mo
re
Ele
ctro
ma
gn
etic fie
ld
s
Ca
mp
i E
le
ttro
ma
gn
etici
Artificia
l o
ptica
l ra
dia
tio
ns
Ra
dia
zio
ni O
ttich
e A
rtificia
li
Io
nizin
g ra
dia
tio
ns
Ra
dia
zio
ni Io
nizza
nti
Ex
plo
sio
ns
Atm
osfe
re
E
sp
lo
siv
e
Fire
a
nd
o
th
er e
me
rg
en
cie
s
In
ce
nd
io
e
d a
ltre
e
me
rg
en
ze
Ma
jo
r a
ccid
en
ts
In
cid
en
ti rile
va
nti
Te
mp
ora
ry
a
nd
m
ob
ile
site
s
Ca
ntie
ri te
mp
. E
m
ob
ili
Co
ntra
cto
rs
Co
ntra
tti d
i a
pp
alto
Jo
bs fro
m a
h
eig
ht
La
vo
ri in
a
lte
zza
Wo
rk
re
la
te
d stre
ss (o
nly
fo
r Ita
ly
)
Stre
ss la
vo
ro
co
rre
la
to
Pa
ssiv
e sm
ok
e
Fu
mo
p
assiv
o
No
ctu
rn
al w
ork
La
vo
ro
n
ottu
rn
o
Co
nsu
mp
tio
n o
f a
lco
ho
l b
ev
era
ge
s
Co
nsu
mo
d
i b
ev
an
de
a
lco
lich
e
Dru
gs
Assu
zio
ne
so
st. S
tu
pe
fa
ce
nti
Diffe
re
nce
s in
g
en
de
r, a
ge
a
nd
fro
m o
th
er co
un
trie
s
Diffe
re
nze
g
en
ere
, e
tà
,
pro
ve
nie
nza
Wo
rk
in
g m
oth
ers
La
vo
ra
trici g
esta
nti
Disa
ble
d w
ork
ers
La
vo
ra
to
ri d
isa
bili
Ch
ild
w
ork
ers
La
vo
ra
tri m
in
ori
Visito
rs
Visita
to
ri
Oth
er p
hy
sica
l a
ge
nts
altri a
g. F
isici
Sp
ecific ty
pe
o
f co
ntra
ct
Sp
ecifica
tip
olo
gia
co
ntra
ttu
ale
Line Events (Injury/ First
Aid) Recorded
Operation/
Activity
Task
numberTask Description P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R
OP
L
SO
P
Tra
in
in
gT
ra
in
in
g o
n th
e
jo
b (in
clu
din
g
Pre
ve
ntio
na
l
Visu
al
ma
na
ge
me
nt
Wo
rk
pla
ce
Org
an
iza
tio
nP
ok
a Y
ok
e
Pro
ce
du
re
s
Ka
ize
n
PP
E
Re
de
fin
itio
n o
f
en
gin
ee
rin
g
Da
ily
W
CM
ka
ize
n
Countermeasure Description
UPS07 M1 1 Prelevare da contenitore 1 riflettore mtz 1 2 2 NA NA NA NA NA NA 1 2 2 NA NA NA 1 1 1 1 1 1 1 1 1 1 1 1 NA NA NA 1 1 1 1 2 2 1 2 2 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA 1 1 1 1 2 2 NA NA NA NA NA NA 1 2 2 1 1 1 1 1 1 1 2 2 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA 1 3 3 NA NA NA NA NA NA 1 2 2 NA NA NA 1 2 2 1 2 2 NA NA NA 1 2 2 1 2 2 1 1 1 1 1 1 1 1 1 NA NA NA 1 2 2 NA NA NA 1 2 2 55 600 647 X XQK prelievo componenti +QK fermo rulliere + QK corretta inclinazione rulliere per
ergonomia
M1 2 evacuare foglio pe 1 2 2 NA NA NA NA NA NA 1 2 2 NA NA NA 1 1 1 1 1 1 1 1 1 1 1 1 NA NA NA 1 1 1 1 2 2 1 2 2 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA 1 1 1 1 2 2 1 1 1 1 2 2 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA 1 3 3 NA NA NA NA NA NA 1 2 2 NA NA NA 1 2 2 1 2 2 NA NA NA 1 2 2 1 2 2 1 1 1 1 1 1 1 1 1 NA NA NA 1 2 2 NA NA NA 1 2 2 55 -8% X X QK evacuatore pelure
M1 3 posizionare riflettore su posaggio avvitatura 1 2 2 NA NA NA NA NA NA 1 2 2 NA NA NA 1 1 1 1 1 1 1 1 1 1 1 1 NA NA NA 1 1 1 1 2 2 1 2 2 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA 1 1 1 1 2 2 NA NA NA NA NA NA 1 2 2 1 1 1 1 1 1 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA 1 3 3 NA NA NA NA NA NA 1 2 2 NA NA NA 1 2 2 1 2 2 NA NA NA 1 2 2 1 2 2 1 1 1 1 1 1 1 1 1 NA NA NA 1 2 2 NA NA NA 1 2 2 54 X
M1 4 Prelevare da contenitore 1 basetta led 1 2 2 NA NA NA NA NA NA 1 2 2 NA NA NA 1 1 1 1 1 1 1 1 1 1 1 1 NA NA NA 1 1 1 1 2 2 1 2 2 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA 1 1 1 1 2 2 NA NA NA NA NA NA 1 2 2 1 1 1 1 1 1 1 2 2 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA 1 3 3 NA NA NA NA NA NA 1 2 2 NA NA NA 1 2 2 1 2 2 NA NA NA 1 2 2 1 2 2 1 1 1 1 1 1 1 1 1 NA NA NA 1 2 2 NA NA NA 1 2 2 55 X XQK prelievo componenti +QK fermo rulliere + QK corretta inclinazione rulliere per
ergonomia
M1 5 orientare e posizionare 2 basette laterali 1 2 2 NA NA NA NA NA NA 1 2 2 NA NA NA 1 1 1 1 1 1 1 1 1 1 1 1 NA NA NA 1 1 1 1 2 2 1 2 2 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA 1 2 2 1 1 1 1 1 1 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA 1 3 3 NA NA NA NA NA NA 1 2 2 NA NA NA 1 2 2 1 2 2 NA NA NA 1 2 2 1 2 2 1 1 1 1 1 1 1 1 1 NA NA NA 1 2 2 NA NA NA 1 2 2 52 X
M1 6 orientare e posizionare 4 basette centrali 1 2 2 NA NA NA NA NA NA 1 2 2 NA NA NA 1 1 1 1 1 1 1 1 1 1 1 1 NA NA NA 1 1 1 1 2 2 1 2 2 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA 1 2 2 1 1 1 1 1 1 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA 1 3 3 NA NA NA NA NA NA 1 2 2 NA NA NA 1 2 2 1 2 2 NA NA NA 1 2 2 1 2 2 1 1 1 1 1 1 1 1 1 NA NA NA 1 2 2 NA NA NA 1 2 2 52 X
M1 7 sistemazione cavetti 1 2 2 NA NA NA NA NA NA 1 2 2 NA NA NA 1 1 1 1 1 1 1 1 1 1 1 1 NA NA NA 1 1 1 1 2 2 1 2 2 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA 1 3 3 NA NA NA NA NA NA 1 2 2 NA NA NA 1 2 2 1 2 2 NA NA NA 1 2 2 1 2 2 1 1 1 1 1 1 1 1 1 NA NA NA 1 2 2 NA NA NA 1 2 2 51 X
Infortunio 04/2010 (UA) M1 8 avvitatura di n. 4 viti 1 2 2 NA NA NA NA NA NA 1 2 2 NA NA NA 1 1 1 1 1 1 1 1 1 1 1 1 NA NA NA 1 1 1 1 2 2 1 2 2 1 2 2 NA NA NA 1 2 2 NA NA NA NA NA NA NA NA NA 1 2 2 NA NA NA 1 1 1 NA NA NA NA NA NA 1 2 2 1 2 2 NA NA NA NA NA NA NA NA NA 1 2 2 1 2 2 NA NA NA NA NA NA 1 1 1 1 2 2 NA NA NA NA NA NA 1 2 2 1 1 1 1 1 1 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA 1 3 3 NA NA NA NA NA NA 1 2 2 NA NA NA 1 2 2 1 2 2 NA NA NA 1 2 2 1 2 2 1 1 1 1 1 1 1 1 1 NA NA NA 1 2 2 NA NA NA 1 2 2 63 X X XQK caricatore avvitatore a bussola + QK deposito avvitatore + Controllo periodico
avvitatori + visite mediche periodiche + campionamenti vibrazioni periodici
M1 9 deporre su mensola 1 2 2 NA NA NA NA NA NA 1 2 2 NA NA NA 1 1 1 1 1 1 1 1 1 1 1 1 NA NA NA 1 1 1 1 2 2 1 2 2 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA 1 3 3 NA NA NA NA NA NA 1 2 2 NA NA NA 1 2 2 1 2 2 NA NA NA 1 2 2 1 2 2 1 1 1 1 1 1 1 1 1 NA NA NA 1 2 2 NA NA NA 1 2 2 51 X
M1 10 Scaricare contenitore riflettore mtz 1 2 2 NA NA NA NA NA NA 1 2 2 NA NA NA 1 1 1 1 1 1 1 1 1 1 1 1 NA NA NA 1 1 1 1 2 2 1 2 2 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA 1 1 1 1 2 2 NA NA NA NA NA NA 1 2 2 1 2 2 1 1 1 1 2 2 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA 1 3 3 NA NA NA NA NA NA 1 2 2 NA NA NA 1 2 2 1 2 2 NA NA NA 1 2 2 1 2 2 1 1 1 1 1 1 1 1 1 NA NA NA 1 2 2 NA NA NA 1 2 2 56 X X QK Scarico automatico rulliere + Controllo integrità imballi/cassette
M1 11 Scaricare contenitore basette 1 2 2 NA NA NA NA NA NA 1 2 2 NA NA NA 1 1 1 1 1 1 1 1 1 1 1 1 NA NA NA 1 1 1 1 2 2 1 2 2 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA 1 1 1 1 2 2 NA NA NA NA NA NA 1 2 2 1 2 2 1 1 1 1 2 2 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA 1 3 3 NA NA NA NA NA NA 1 2 2 NA NA NA 1 2 2 1 2 2 NA NA NA 1 2 2 1 2 2 1 1 1 1 1 1 1 1 1 NA NA NA 1 2 2 NA NA NA 1 2 2 56 X X QK Scarico automatico rulliere + Controllo integrità imballi/cassette
M1ATTIVITA' EXTRA
CICLOPulizia Linea 1 2 2 NA NA NA NA NA NA 1 2 2 NA NA NA 1 1 1 1 1 1 1 1 1 1 1 1 NA NA NA 1 1 1 1 2 2 1 2 2 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA 1 3 3 NA NA NA NA NA NA 1 2 2 NA NA NA 1 2 2 1 2 2 NA NA NA 1 2 2 1 2 2 1 1 1 1 1 1 1 1 1 NA NA NA 1 2 2 NA NA NA 1 2 2 51 X
M1ATTIVITA' EXTRA
CICLOLucidatura 1 2 2 NA NA NA NA NA NA 1 2 2 NA NA NA 1 1 1 1 1 1 1 1 1 1 1 1 NA NA NA 1 1 1 1 2 2 1 2 2 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 NA NA NA 1 3 3 NA NA NA NA NA NA 1 1 1 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA 1 3 3 NA NA NA NA NA NA 1 2 2 NA NA NA 1 2 2 1 2 2 NA NA NA 1 2 2 1 2 2 1 1 1 1 1 1 1 1 1 NA NA NA 1 2 2 NA NA NA 1 2 2 56 X
M1ATTIVITA' EXTRA
CICLO1 2 2 NA NA NA NA NA NA 1 2 2 NA NA NA 1 1 1 1 1 1 1 1 1 1 1 1 NA NA NA 1 1 1 1 2 2 1 2 2 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA 1 3 3 NA NA NA NA NA NA 1 2 2 NA NA NA 1 2 2 1 2 2 NA NA NA 1 2 2 1 2 2 1 1 1 1 1 1 1 1 1 NA NA NA 1 2 2 NA NA NA 1 2 2 51 X
M1ATTIVITA' NON
ROUTINARIESblocco cassetta rulliera 1 2 2 NA NA NA NA NA NA 1 2 2 NA NA NA 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 1 2 2 1 2 2 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA 1 2 2 1 2 2 1 1 1 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA 1 3 3 NA NA NA NA NA NA 1 2 2 NA NA NA 1 2 2 1 2 2 NA NA NA 1 2 2 1 2 2 1 1 1 1 1 1 1 1 1 NA NA NA 1 2 2 NA NA NA 1 2 2 55 X
Overall total
level risk for
activity
Risk Assessment UPS 07 Before
Legal requirements
Overall total
level risk for
task (A)
Overall total
level risk for
activity
NOTE: Il rischio derivante da incendio ed altre emergenze è gestito mediante dispositivi, impianti e procedure previsti dal piano emergenza.
Il personale viene formato e periodicamente testato sulle procedure. L'accesso ai dispositivi di risposta in caso di emergenza è verificato
continuamente ed eventuali anomalie risolte immediatamente
Risk Level S=1 S=2 S=3 S=4
P=1 1 2 3 4
P=2 2 4 6 8
P=3 3 6 9 12
P=4 4 8 12 16
Did you have
INJ or FA Caused
by UA? NO YES
Monitor and update in case of
layout/process changes
For Model
Areas
Applicable to
ALL TASKS and ACTIVITIES
also in relation with the
WORKINGPLACE and
Environmental conditions
Potential Unsafe Act Description
Tri
p
Inci
amp
o
Slip
Sciv
ola
me
nto
Bu
rial
Sep
pe
llim
en
to
Stre
ctch
Stir
ame
nto
mu
sco
lare
Ob
iect
s fa
ll fr
om
he
igh
t
Cad
uta
ogg
ett
i dal
l'alt
o
Fall
fro
m h
eig
ht
Cad
uta
dal
l'alt
o
Stri
ke
Urt
i - C
olp
i
Co
llisi
on
Co
llisi
on
e /
Inve
stim
en
to
Cru
shin
g
Sch
iacc
iam
en
to
She
ar
Ce
soia
me
nto
Cu
t -
Nip
Tag
lio -
Gra
ffio
Pie
rcin
g
Pe
rfo
razi
on
e
Bu
rn
Ust
ion
e
Exp
losi
on
Esp
losi
on
e
Ele
ctri
c -
dir
ect
co
nta
ct
Ele
ttro
cuzi
on
e p
er
con
tatt
o d
ire
tto
Flu
id, d
ust
, su
bst
ance
s p
roje
ctio
n
Pro
iezi
on
e d
i liq
uid
i, p
olv
eri
, mat
eri
ali
Max
Le
vel o
f R
isk
Inad
egu
ate
tra
inin
g
Litt
le o
r n
o e
xpe
rie
nce
in s
pe
cifi
c jo
b
Ne
glig
en
ce
Inco
rre
ct u
se o
f P
PE
No
re
gard
of
safe
ty r
ule
s
Wo
rk c
ycle
ou
t o
f se
qu
en
ce
Lack
of
use
of
PP
E
Lack
of
trai
nin
g
PP
E n
ot
avai
lab
le
Mai
nte
nn
ce n
ot
pe
rfo
rme
d
Cle
nin
g cy
cle
no
t p
erf
orm
ed
No
re
gard
of
pro
ced
ure
s n
d r
egu
lati
on
s
(in
clu
din
g 5
S)
Lack
of
atte
nti
on
Op
era
tio
ns
no
t sc
he
du
led
OP
L
Tra
inin
g
Tra
inin
g o
n t
he
job
usi
ng
spe
cifi
c p
ost
er
Vis
ual
man
age
me
nt
Wo
rkp
lace
Org
aniz
atio
n
Po
ka Y
oke
Pro
ced
ure
s
Te
chn
ical
co
un
term
eas
ure
s
PP
E
SOP
Vid
eo
Tra
inin
g
Re
de
fin
itio
n o
f e
ngi
ne
eri
ng
pro
cess
Wo
rk c
on
dit
ion
s im
pro
vem
en
t
(illu
min
atio
n, n
ois
e, e
rgo
no
mic
s, …
)
Pla
nn
ed
Clo
sed
Re
spo
nsi
ble
Overall total
level risk for
taskBEFORE
Tra
inin
g In
ade
guat
o
asse
nte
/lim
itat
a
esp
eri
en
za
Ne
glig
en
za
Inco
rre
tto
uso
de
i DP
I
No
n r
isp
ett
o d
elle
pro
ced
ure
di s
icu
rezz
a
No
n r
isp
ett
o d
el c
iclo
Man
cato
uso
de
i DP
I
Man
can
za d
i tra
inin
g
DP
I no
n d
isp
on
ibili
Cic
lo d
i man
ute
nzi
on
e
no
n r
isp
ett
ato
Cic
lo d
i pu
lizia
no
n
risp
ett
ato
No
n r
isp
ett
o d
i
rego
lam
en
ti e
pro
ced
ure
(in
clu
so 5
S)
Man
can
za d
i
atte
nzi
on
e
Op
era
zio
ne
no
n
pre
vist
a
2885
Line
Events
(Injury/
First Aid)
Recorded
Operation/Activity Task number Task Description P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R
Tra
inin
g In
ade
guat
o
asse
nte
/lim
itat
a
esp
eri
en
za
Ne
glig
en
za
Inco
rre
tto
uso
de
i DP
I
No
n r
isp
ett
o d
elle
pro
ced
ure
di s
icu
rezz
a
No
n r
isp
ett
o d
el c
iclo
Man
cato
uso
de
i DP
I
Man
can
za d
i tra
inin
g
DP
I no
n d
isp
on
ibili
Cic
lo d
i man
ute
nzi
on
e
no
n r
isp
ett
ato
Cic
lo d
i pu
lizia
no
n
risp
ett
ato
No
n r
isp
ett
o d
i
rego
lam
en
ti e
pro
ced
ure
(in
clu
so 5
S)
Man
can
za d
i
atte
nzi
on
e
Op
era
zio
ne
no
n
pre
vist
a
1454
M1 1 Prelevare da contenitore 1 riflettore mtzMancato o incorretto uso DPI e non rispetto
5S1 1 1 1 1 1 NA NA NA 1 1 1 1 2 2 NA NA NA 2 2 4 NA NA NA 1 1 1 NA NA NA 2 2 4 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA 4 X X X X X X X
Training + OPL uso DPI + OPL201300124(5S) + Visual Uso DPI tabellone + OPL201400122(uso guanti)
+ OPL201200020 controllo e sostituzione di cassette rovinate X 15
M1 2 evacuare foglio pelureMancato o incorretto uso DPI e non rispetto
5S2 1 2 1 1 1 NA NA NA 1 1 1 1 2 2 NA NA NA 1 2 2 NA NA NA 1 1 1 NA NA NA 1 1 1 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA 2 X 11
M1 3 posizionare riflettore su posaggio avvitaturaMancato uso/Uso errato di DPI + Mancato
rispetto 5S 1 1 1 1 1 1 NA NA NA 1 2 2 1 2 2 NA NA NA 2 2 4 NA NA NA 1 1 1 NA NA NA 1 1 1 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA 4 X X X X X X X OPL201300124(5S) + Calendario WO + Posaggi secondo guidelines EEM + Video trainin Safety X 13
M1 4 Prelevare da contenitore 1 basetta ledMancato o incorretto uso DPI e non rispetto
5S1 1 1 1 1 1 NA NA NA 1 1 1 1 2 2 NA NA NA 2 2 4 NA NA NA 1 1 1 NA NA NA 2 2 4 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA 4 X X X X X X X
Training + OPL uso DPI + OPL201300124(5S) + Visual Uso DPI tabellone + OPL201400122(uso guanti)
+ OPL201200020 controllo e sostituzione di cassette rovinate X 15
M1 5 orientare e posizionare 2 basette lateraliMancato uso/Uso errato di DPI + Mancato
rispetto 5S + Non rispetto del ciclo1 1 1 1 1 1 NA NA NA 1 2 2 1 2 2 NA NA NA 2 2 4 NA NA NA 2 1 2 NA NA NA 2 2 4 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 4 X X X X X X X Training + OPL uso DPI + OPL201300124(5S) + Visual Uso DPI tabellone + OPL201400122(uso guanti) X 18
M1 6 orientare e posizionare 4 basette centraliMancato uso/Uso errato di DPI + Mancato
rispetto 5S + Non rispetto del ciclo1 1 1 1 1 1 NA NA NA 1 2 2 1 2 2 NA NA NA 2 2 4 NA NA NA 2 1 2 NA NA NA 2 2 4 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 4 X X X X X X X Training + OPL uso DPI + OPL201300124(5S) + Visual Uso DPI tabellone + OPL201400122(uso guanti) X 18
M1 7 sistemazione cavettiMancato uso/Uso errato di DPI + Mancato
rispetto 5S + Non rispetto del ciclo1 1 1 1 1 1 NA NA NA 1 2 2 1 2 2 NA NA NA 2 2 4 NA NA NA 2 1 2 NA NA NA 2 2 4 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 4 X X X X X X X Training + OPL uso DPI + OPL201300124(5S) + Visual Uso DPI tabellone + OPL201400122(uso guanti) X 18
Infortunio 04/2010
(UA)M1 8 avvitatura di n. 4 viti
Mancato o incorretto uso DPI, non rispetto
5S, non rispetto della procedura di lavoro1 3 3 1 1 1 NA NA NA 1 3 3 1 2 2 NA NA NA 2 2 4 NA NA NA 1 1 1 NA NA NA 1 3 3 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 4 X X X X X X X X X X
Training posizione corretta in fase di avvitatura + OPL uso DPI + OPL201300124(5S) + Visual Uso DPI
tabellone + OPL201400122(uso guanti) + Video trainin Safety 5S + OPL201100048 (posizione dita in
avvitatura) + OPL201200162 (deposito avvitatore in alloggiamento) X 19
M1 9 deporre su mensolaMancato o incorretto uso DPI e non rispetto
5S1 2 2 1 2 2 NA NA NA 1 1 1 1 2 2 NA NA NA 2 2 4 NA NA NA 1 1 1 NA NA NA 1 1 1 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA 4 X X X X X X X X X OPL201400122(uso guanti) + OPL201300124(5S) + Calendario WO X 14
M1 10 Scaricare contenitore riflettore mtzMancato o incorretto uso DPI e non rispetto
5S, Manacata segnalazione cassetta rotta1 2 2 1 1 1 NA NA NA 1 1 1 1 2 2 NA NA NA 2 2 4 NA NA NA 2 2 4 NA NA NA 1 1 1 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA 4 X X X X X X X X
Training + OPL uso DPI + OPL201300124(5S) + Visual Uso DPI tabellone + OPL201400122(uso
guanti)+ Scarico automatico rulliere + OPL201100153 (cassette integre con Sketch) + OPL201200020
(gestione cassette rotte)X 16
M1 11 Scaricare contenitore basetteMancato o incorretto uso DPI e non rispetto
5S, Manacata segnalazione cassetta rotta1 2 2 1 1 1 NA NA NA 1 1 1 1 2 2 NA NA NA 2 2 4 NA NA NA 2 2 4 NA NA NA 1 1 1 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA 4 X X X X X X X X
Training + OPL uso DPI + OPL201300124(5S) + Visual Uso DPI tabellone + OPL201400122(uso
guanti)+ Scarico automatico rulliere + OPL201100153 (cassette integre con Sketch) + OPL201200020
(gestione cassette rotte)X 16
M2 1 Prelevare, da ripiano, rifl. Equipaggiato Mancato o incorretto uso DPI e non rispetto
5S1 1 1 1 1 1 NA NA NA 1 1 1 1 2 2 NA NA NA 2 2 4 NA NA NA 1 1 1 NA NA NA 2 2 4 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA 4 X X X X X X X
Training + OPL uso DPI + OPL201300124(5S) + Visual Uso DPI tabellone + OPL201400122(uso guanti)
+ OPL201200020 controllo e sostituzione di cassette rovinate X 15
M2 2 posiz su posaggioMancato uso/Uso errato di DPI + Mancato
rispetto 5S 1 1 1 1 1 1 NA NA NA 1 2 2 1 2 2 NA NA NA 2 2 4 NA NA NA 1 1 1 NA NA NA 1 1 1 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA 4 X X X X X X X OPL201300124(5S) + Calendario WO + Posaggi secondo guidelines EEM + Video trainin Safety X 13
M2 3 Prelevare G.L. da cont.Mancato o incorretto uso DPI e non rispetto
5S1 1 1 1 1 1 NA NA NA 1 1 1 1 2 2 NA NA NA 2 2 4 NA NA NA 1 1 1 NA NA NA 2 2 4 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA 4 X X X X X X X
Training + OPL uso DPI + OPL201300124(5S) + Visual Uso DPI tabellone + OPL201400122(uso guanti)
+ OPL201200020 controllo e sostituzione di cassette rovinate X 15
M2 4 eseguire ctrl estetico Mancato uso/Uso errato di DPI + Mancato
rispetto 5S 1 1 1 1 1 1 NA NA NA 1 1 1 1 2 2 NA NA NA 1 1 1 NA NA NA 1 1 1 NA NA NA 1 1 1 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA 2 X 9
M2 5 Posizionare G.L. su riflMancato uso/Uso errato di DPI + Mancato
rispetto 5S + Non rispetto del ciclo1 1 1 1 1 1 NA NA NA 1 2 2 1 2 2 NA NA NA 2 2 4 NA NA NA 2 1 2 NA NA NA 2 2 4 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 4 X X X X X X X Training + OPL uso DPI + OPL201300124(5S) + Visual Uso DPI tabellone + OPL201400122(uso guanti) X 18
M2 6 Eseguire avvitatura di 1 vite GL su rifl Mancato o incorretto uso DPI, non rispetto
5S, non rispetto della procedura di lavoro1 3 3 1 1 1 NA NA NA 1 3 3 1 2 2 NA NA NA 2 2 4 NA NA NA 1 1 1 NA NA NA 1 3 3 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 4 X X X X X X X X X X
Training posizione corretta in fase di avvitatura + OPL uso DPI + OPL201300124(5S) + Visual Uso DPI
tabellone + OPL201400122(uso guanti) + Video trainin Safety 5S + OPL201100048 (posizione dita in
avvitatura) + OPL201200162 (deposito avvitatore in alloggiamento) X 19
Infortunio
03/2010 (UC)M2 7 Prelevare 1 corpo
Mancato o incorretto uso DPI e non rispetto
5S1 1 1 1 1 1 NA NA NA 1 1 1 1 2 2 NA NA NA 2 2 4 NA NA NA 1 1 1 NA NA NA 2 2 4 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA 4 X X X X X X X
Training + OPL uso DPI + OPL201300124(5S) + Visual Uso DPI tabellone + OPL201400122(uso guanti)
+ OPL201200020 controllo e sostituzione di cassette rovinate X 15
M2 8 posizionare corpo su posaggMancato uso/Uso errato di DPI + Mancato
rispetto 5S 1 1 1 1 1 1 NA NA NA 1 2 2 1 2 2 NA NA NA 2 2 4 NA NA NA 1 1 1 NA NA NA 1 1 1 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA 4 X X X X X X X OPL201300124(5S) + Calendario WO + Posaggi secondo guidelines EEM + Video trainin Safety X 13
Unsafe Act Potential Root CausePotential Risk Countermeasures
Risk Prediction - Task Level UPS 07 BEFORE
Co
un
term
eas
ure
De
scri
pti
on
Risk Level S=1 S=2 S=3 S=4
P=1 1 2 3 4
P=2 2 4 6 8
P=3 3 6 9 12
P=4 4 8 12 16
RISK LEVEL >6 < 4
LEVEL OF RISK
- MECHANICAL RISKS
- HUMAN FACTORS
- ENVIRONMENTAL
FACTORS
EVALUATION
Ris
k P
red
icti
on
Perform the EVALUATION by
MOVEMENT
FOCUS ON UNSAFE ACT
Monitor and update in case of
new UAs found
Extension areas
Risk Analysis L
eg
al C
om
pli
an
ce
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 44/142
© Copyright by Automotive Lighting
How to Carry Out Legal Compliance
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
Investigate the
causes of
risk/harmfulness
Evaluate risk
Evaluate proper
countermeasures to
reduce risk level
Apply risk
assessment
before work
1. Conformance of national legal requirements 2. Think about past human disaster and accidents 3. Think risk based on types 4. Consider change in condition associated with the operation
1. National legal requirements 2. Risk factors 3. Guideline for Risk Level
4 Statute Laws
24 Regulations
Physical factors
Chemical factors
Psychosocial
factors
Checklist for
assessment safety
condition
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 45/142
© Copyright by Automotive Lighting
Investigation Evaluation
Results
All tasks at TPM had verified below 85 dB(A)
Legal Compliance-TPM (Model Area)
(Noise)
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
Noise (Legal)
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 46/142
© Copyright by Automotive Lighting
Investigation
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
Evaluation
Results
13 machines were verified by the authority (DOSH)
Equipments (Legal)
Legal Compliance-TPM (Model Area)
(Equipment)
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 47/142
© Copyright by Automotive Lighting
Investigation
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
Evaluation
Results
11 Points of Measurements below Legal value by authority
(DOSH)
Ergonomic
Legal Compliance- Ergonomic TPM (Model Area)
11
Ergonomic
Risk have
been assessed
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 48/142
© Copyright by Automotive Lighting
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
Parameter # of test point Frequency Reference/ Standard
Results
Noise 2 Annually <85 dB(A) 75 dB(A)
Drinking water 3 Annually Malaysia Food Act 1983
Comply to 30 tested parameters
Lighting 5 Annually >50 lux (min) 100 lux
15 % of Legal requirement measured verified OK
Legal Compliance Results TPM (Model Area)
85 % of Legal requirement checks verified OK
185
Total Articles
89
Generel Regulation List
96
Line Regulation List 66
Applicable Articles
30
Not-Applicable Articles
10
Verify by Measurement
56
Verify by Safety Check
Compliance legal
verified by checking
85%
Compliance legal required measurement
15%
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 49/142
© Copyright by Automotive Lighting
Applicable to the
WORKING PLACE and to
ALL TASKS and ACTIVITIES
EVALUATE LEGAL REQUIREMENTS REGULATIONS, LEGISLATIONS ENGINEERING
CONTROL
Ris
k A
ss
es
sm
en
t
INVESTIGATION COUNTERMEASURES APPLICATION
LEGAL
COMPLIANCE NOK OK
LEGAL
COMPLIANCE
EVALUATION
Applicable to the
WORKING PLACE and to
ALL TASKS and
ACTIVITIES
FOCUS ON UNSAFE
CONDITIONS
ENGINEERING
CONTROL
To reduce the level of the
Risk
Le
ga
l C
om
pli
an
ce
INVESTIGATION COUNTERMEASURES APPLICATION
ENGINEERING CONTROL
PROCEDURES
TRAINING
VISUAL MANAGEMENT
INVESTIGATION COUNTERMEASURES APPLICATION
RISK LEVEL MEDIUM –
HIGH LOW
EVALUATION
LEVEL OF RISK
-PHYSICAL FACTORS
- EQUIPMENT
FACTORS
- EXPOSURES
Did you have
INJ or FA Caused
by UA? NO YES
Monitor and update in case of
layout/process changes
For
Model
Areas
Applicable to
ALL TASKS and ACTIVITIES
also in relation with the
WORKINGPLACE and
Environmental conditions
Potential Unsafe Act Description
Tri
p
Inci
am
po
Slip
Sci
vola
me
nto
Bu
ria
l
Se
pp
elli
me
nto
Str
ect
ch
Sti
ram
en
to m
usc
ola
re
Ob
iect
s fa
ll fr
om
he
igh
t
Ca
du
ta o
gg
ett
i da
ll'a
lto
Fa
ll fr
om
he
igh
t
Ca
du
ta d
all'
alt
o
Str
ike
Urt
i - C
olp
i
Co
llisi
on
Co
llisi
on
e /
In
vest
ime
nto
Cru
shin
g
Sch
iacc
iam
en
to
Sh
ea
r
Ce
soia
me
nto
Cu
t -
Nip
Ta
glio
- G
raff
io
Pie
rcin
g
Pe
rfo
razi
on
e
Bu
rn
Ust
ion
e
Exp
losi
on
Esp
losi
on
e
Ele
ctri
c -
dir
ect
co
nta
ct
Ele
ttro
cuzi
on
e p
er
con
tatt
o d
ire
tto
Flu
id,
du
st,
sub
sta
nce
s p
roje
ctio
n
Pro
iezi
on
e d
i liq
uid
i, p
olv
eri
, m
ate
ria
li
Ma
x Le
vel o
f R
isk
Ina
de
gu
ate
tra
inin
g
Litt
le o
r n
o e
xpe
rie
nce
in s
pe
cifi
c jo
b
Ne
glig
en
ce
Inco
rre
ct u
se o
f P
PE
No
re
ga
rd o
f sa
fety
ru
les
Wo
rk c
ycl
e o
ut
of
seq
ue
nce
Lack
of
use
of
PP
E
Lack
of
tra
inin
g
PP
E n
ot
ava
ilab
le
Ma
inte
nn
ce n
ot
pe
rfo
rme
d
Cle
nin
g c
ycl
e n
ot
pe
rfo
rme
d
No
re
ga
rd o
f p
roce
du
res
nd
re
gu
lati
on
s
(in
clu
din
g 5
S)
Lack
of
att
en
tio
n
Op
era
tio
ns
no
t sc
he
du
led
OP
L
Tra
inin
g
Tra
inin
g o
n t
he
jo
b u
sin
g s
pe
cifi
c p
ost
er
Vis
ua
l ma
na
ge
me
nt
Wo
rkp
lace
Org
an
iza
tio
n
Po
ka
Yo
ke
Pro
ced
ure
s
Te
chn
ica
l co
un
term
ea
sure
s
PP
E
SO
P
Vid
eo
Tra
inin
g
Re
de
fin
itio
n o
f e
ng
ine
eri
ng
pro
cess
Wo
rk c
on
dit
ion
s im
pro
vem
en
t
(illu
min
ati
on
, n
ois
e,
erg
on
om
ics,
…)
Pla
nn
ed
Clo
sed
Re
spo
nsi
ble
Overall total
level risk for
taskBEFORE
Tra
inin
g I
na
de
gu
ato
ass
en
te/l
imit
ata
esp
eri
en
za
Ne
glig
en
za
Inco
rre
tto
uso
de
i DP
I
No
n r
isp
ett
o d
elle
pro
ced
ure
di s
icu
rezz
a
No
n r
isp
ett
o d
el c
iclo
Ma
nca
to u
so d
ei D
PI
Ma
nca
nza
di t
rain
ing
DP
I n
on
dis
po
nib
ili
Cic
lo d
i ma
nu
ten
zio
ne
no
n r
isp
ett
ato
Cic
lo d
i pu
lizia
no
n
risp
ett
ato
No
n r
isp
ett
o d
i
reg
ola
me
nti
e
pro
ced
ure
(in
clu
so 5
S)
Ma
nca
nza
di
att
en
zio
ne
Op
era
zio
ne
no
n
pre
vist
a
2885
Line
Events
(Injury/
First Aid)
Recorded
Operation/Activity Task number Task Description P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R
Tra
inin
g I
na
de
gu
ato
ass
en
te/l
imit
ata
esp
eri
en
za
Ne
glig
en
za
Inco
rre
tto
uso
de
i DP
I
No
n r
isp
ett
o d
elle
pro
ced
ure
di s
icu
rezz
a
No
n r
isp
ett
o d
el c
iclo
Ma
nca
to u
so d
ei D
PI
Ma
nca
nza
di t
rain
ing
DP
I n
on
dis
po
nib
ili
Cic
lo d
i ma
nu
ten
zio
ne
no
n r
isp
ett
ato
Cic
lo d
i pu
lizia
no
n
risp
ett
ato
No
n r
isp
ett
o d
i
reg
ola
me
nti
e
pro
ced
ure
(in
clu
so 5
S)
Ma
nca
nza
di
att
en
zio
ne
Op
era
zio
ne
no
n
pre
vist
a
1454
M1 1 Prelevare da contenitore 1 riflettore mtzMancato o incorretto uso DPI e non rispetto
5S1 1 1 1 1 1 NA NA NA 1 1 1 1 2 2 NA NA NA 2 2 4 NA NA NA 1 1 1 NA NA NA 2 2 4 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA 4 X X X X X X X
Training + OPL uso DPI + OPL201300124(5S) + Visual Uso DPI tabellone + OPL201400122(uso guanti)
+ OPL201200020 controllo e sostituzione di cassette rovinate X 15
M1 2 evacuare foglio pelureMancato o incorretto uso DPI e non rispetto
5S2 1 2 1 1 1 NA NA NA 1 1 1 1 2 2 NA NA NA 1 2 2 NA NA NA 1 1 1 NA NA NA 1 1 1 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA 2 X 11
M1 3 posizionare riflettore su posaggio avvitaturaMancato uso/Uso errato di DPI + Mancato
rispetto 5S 1 1 1 1 1 1 NA NA NA 1 2 2 1 2 2 NA NA NA 2 2 4 NA NA NA 1 1 1 NA NA NA 1 1 1 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA 4 X X X X X X X OPL201300124(5S) + Calendario WO + Posaggi secondo guidelines EEM + Video trainin Safety X 13
M1 4 Prelevare da contenitore 1 basetta ledMancato o incorretto uso DPI e non rispetto
5S1 1 1 1 1 1 NA NA NA 1 1 1 1 2 2 NA NA NA 2 2 4 NA NA NA 1 1 1 NA NA NA 2 2 4 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA 4 X X X X X X X
Training + OPL uso DPI + OPL201300124(5S) + Visual Uso DPI tabellone + OPL201400122(uso guanti)
+ OPL201200020 controllo e sostituzione di cassette rovinate X 15
M1 5 orientare e posizionare 2 basette lateraliMancato uso/Uso errato di DPI + Mancato
rispetto 5S + Non rispetto del ciclo1 1 1 1 1 1 NA NA NA 1 2 2 1 2 2 NA NA NA 2 2 4 NA NA NA 2 1 2 NA NA NA 2 2 4 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 4 X X X X X X X Training + OPL uso DPI + OPL201300124(5S) + Visual Uso DPI tabellone + OPL201400122(uso guanti) X 18
M1 6 orientare e posizionare 4 basette centraliMancato uso/Uso errato di DPI + Mancato
rispetto 5S + Non rispetto del ciclo1 1 1 1 1 1 NA NA NA 1 2 2 1 2 2 NA NA NA 2 2 4 NA NA NA 2 1 2 NA NA NA 2 2 4 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 4 X X X X X X X Training + OPL uso DPI + OPL201300124(5S) + Visual Uso DPI tabellone + OPL201400122(uso guanti) X 18
M1 7 sistemazione cavettiMancato uso/Uso errato di DPI + Mancato
rispetto 5S + Non rispetto del ciclo1 1 1 1 1 1 NA NA NA 1 2 2 1 2 2 NA NA NA 2 2 4 NA NA NA 2 1 2 NA NA NA 2 2 4 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 4 X X X X X X X Training + OPL uso DPI + OPL201300124(5S) + Visual Uso DPI tabellone + OPL201400122(uso guanti) X 18
Infortunio 04/2010
(UA)M1 8 avvitatura di n. 4 viti
Mancato o incorretto uso DPI, non rispetto
5S, non rispetto della procedura di lavoro1 3 3 1 1 1 NA NA NA 1 3 3 1 2 2 NA NA NA 2 2 4 NA NA NA 1 1 1 NA NA NA 1 3 3 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 4 X X X X X X X X X X
Training posizione corretta in fase di avvitatura + OPL uso DPI + OPL201300124(5S) + Visual Uso DPI
tabellone + OPL201400122(uso guanti) + Video trainin Safety 5S + OPL201100048 (posizione dita in
avvitatura) + OPL201200162 (deposito avvitatore in alloggiamento) X 19
M1 9 deporre su mensolaMancato o incorretto uso DPI e non rispetto
5S1 2 2 1 2 2 NA NA NA 1 1 1 1 2 2 NA NA NA 2 2 4 NA NA NA 1 1 1 NA NA NA 1 1 1 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA 4 X X X X X X X X X OPL201400122(uso guanti) + OPL201300124(5S) + Calendario WO X 14
M1 10 Scaricare contenitore riflettore mtzMancato o incorretto uso DPI e non rispetto
5S, Manacata segnalazione cassetta rotta1 2 2 1 1 1 NA NA NA 1 1 1 1 2 2 NA NA NA 2 2 4 NA NA NA 2 2 4 NA NA NA 1 1 1 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA 4 X X X X X X X X
Training + OPL uso DPI + OPL201300124(5S) + Visual Uso DPI tabellone + OPL201400122(uso
guanti)+ Scarico automatico rulliere + OPL201100153 (cassette integre con Sketch) + OPL201200020
(gestione cassette rotte)X 16
M1 11 Scaricare contenitore basetteMancato o incorretto uso DPI e non rispetto
5S, Manacata segnalazione cassetta rotta1 2 2 1 1 1 NA NA NA 1 1 1 1 2 2 NA NA NA 2 2 4 NA NA NA 2 2 4 NA NA NA 1 1 1 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA 4 X X X X X X X X
Training + OPL uso DPI + OPL201300124(5S) + Visual Uso DPI tabellone + OPL201400122(uso
guanti)+ Scarico automatico rulliere + OPL201100153 (cassette integre con Sketch) + OPL201200020
(gestione cassette rotte)X 16
M2 1 Prelevare, da ripiano, rifl. Equipaggiato Mancato o incorretto uso DPI e non rispetto
5S1 1 1 1 1 1 NA NA NA 1 1 1 1 2 2 NA NA NA 2 2 4 NA NA NA 1 1 1 NA NA NA 2 2 4 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA 4 X X X X X X X
Training + OPL uso DPI + OPL201300124(5S) + Visual Uso DPI tabellone + OPL201400122(uso guanti)
+ OPL201200020 controllo e sostituzione di cassette rovinate X 15
M2 2 posiz su posaggioMancato uso/Uso errato di DPI + Mancato
rispetto 5S 1 1 1 1 1 1 NA NA NA 1 2 2 1 2 2 NA NA NA 2 2 4 NA NA NA 1 1 1 NA NA NA 1 1 1 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA 4 X X X X X X X OPL201300124(5S) + Calendario WO + Posaggi secondo guidelines EEM + Video trainin Safety X 13
M2 3 Prelevare G.L. da cont.Mancato o incorretto uso DPI e non rispetto
5S1 1 1 1 1 1 NA NA NA 1 1 1 1 2 2 NA NA NA 2 2 4 NA NA NA 1 1 1 NA NA NA 2 2 4 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA 4 X X X X X X X
Training + OPL uso DPI + OPL201300124(5S) + Visual Uso DPI tabellone + OPL201400122(uso guanti)
+ OPL201200020 controllo e sostituzione di cassette rovinate X 15
M2 4 eseguire ctrl estetico Mancato uso/Uso errato di DPI + Mancato
rispetto 5S 1 1 1 1 1 1 NA NA NA 1 1 1 1 2 2 NA NA NA 1 1 1 NA NA NA 1 1 1 NA NA NA 1 1 1 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA 2 X 9
M2 5 Posizionare G.L. su riflMancato uso/Uso errato di DPI + Mancato
rispetto 5S + Non rispetto del ciclo1 1 1 1 1 1 NA NA NA 1 2 2 1 2 2 NA NA NA 2 2 4 NA NA NA 2 1 2 NA NA NA 2 2 4 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 4 X X X X X X X Training + OPL uso DPI + OPL201300124(5S) + Visual Uso DPI tabellone + OPL201400122(uso guanti) X 18
M2 6 Eseguire avvitatura di 1 vite GL su rifl Mancato o incorretto uso DPI, non rispetto
5S, non rispetto della procedura di lavoro1 3 3 1 1 1 NA NA NA 1 3 3 1 2 2 NA NA NA 2 2 4 NA NA NA 1 1 1 NA NA NA 1 3 3 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 4 X X X X X X X X X X
Training posizione corretta in fase di avvitatura + OPL uso DPI + OPL201300124(5S) + Visual Uso DPI
tabellone + OPL201400122(uso guanti) + Video trainin Safety 5S + OPL201100048 (posizione dita in
avvitatura) + OPL201200162 (deposito avvitatore in alloggiamento) X 19
Infortunio
03/2010 (UC)M2 7 Prelevare 1 corpo
Mancato o incorretto uso DPI e non rispetto
5S1 1 1 1 1 1 NA NA NA 1 1 1 1 2 2 NA NA NA 2 2 4 NA NA NA 1 1 1 NA NA NA 2 2 4 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA 4 X X X X X X X
Training + OPL uso DPI + OPL201300124(5S) + Visual Uso DPI tabellone + OPL201400122(uso guanti)
+ OPL201200020 controllo e sostituzione di cassette rovinate X 15
M2 8 posizionare corpo su posaggMancato uso/Uso errato di DPI + Mancato
rispetto 5S 1 1 1 1 1 1 NA NA NA 1 2 2 1 2 2 NA NA NA 2 2 4 NA NA NA 1 1 1 NA NA NA 1 1 1 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA 4 X X X X X X X OPL201300124(5S) + Calendario WO + Posaggi secondo guidelines EEM + Video trainin Safety X 13
Unsafe Act Potential Root CausePotential Risk Countermeasures
Risk Prediction - Task Level UPS 07 BEFORE
Co
un
term
ea
sure
De
scri
pti
on
Risk Level S=1 S=2 S=3 S=4
P=1 1 2 3 4
P=2 2 4 6 8
P=3 3 6 9 12
P=4 4 8 12 16
RISK LEVEL > 6 < 4
LEVEL OF RISK
- MECHANICAL
RISKS
- HUMAN
FACTORS
- ENVIRONMENTA
L FACTORS
EVALUATION
Ris
k P
red
icti
on
Perform the EVALUATION by
MOVEMENT
FOCUS ON UNSAFE ACT
Monitor and update in
case of new UAs found
Extension areas
Risk Analysis
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 50/142
© Copyright by Automotive Lighting PROBABILITY DESCRIPTION GRAVITY DESCRIPTION
P = 1
Very Low Probability
to Occur: There are
not previous cases
S = 1Slight: potential result
first aid
P = 2
Lower Probability to
Occur: Exist in the
past previous cases
very rare
S = 2
Medium: potential
result injury >1 day & <3
days
P = 3
Probable to Occur:
Exist in the past
previous cases
S = 3
Serious: potential result
injury >3 days & < 30
days
P = 4
Highly Probably to
Occur: Previous
cases are frequent
S =4
Very serious: potential
result injury >30 days, or
Fatal, or Occupational
illness
LEGENDA
PROBABILITY
GRAVITY
RISK MATRIX
Evaluate risk by estimating it risk level Investigate
The causes of risk
PRIORITY OF SAFETY COUNTERMEASURES
Countermeasure to reduce risk level
PAST EVENTS (INJ/FA/NM)
Identifing
hazards
Assessing
risks Appling
controls
Reviewing
effects
• 40 TYPE OF HAZARDS
• 72 DETAILED ANALYSIS
Step 3: Risk Assessment
METHOD
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 51/142
© Copyright by Automotive Lighting
Step 3: Risk Assessment (UC Evaluation)
PROBABILITY DESCRIPTION GRAVITY DESCRIPTION
P = 1
Very Low Probability
to Occur: There are
not previous cases
S = 1Slight: potential result
first aid
P = 2
Lower Probability to
Occur: Exist in the
past previous cases
very rare
S = 2
Medium: potential
result injury >1 day & <3
days
P = 3
Probable to Occur:
Exist in the past
previous cases
S = 3
Serious: potential result
injury >3 days & < 30
days
P = 4
Highly Probably to
Occur: Previous
cases are frequent
S =4
Very serious: potential
result injury >30 days, or
Fatal, or Occupational
illness
LEGENDA
Risk Level G=1 G=2 G=3 G=4
P=1 1 2 3 4
P=2 2 4 6 8
P=3 3 6 9 12
P=4 4 8 12 16
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 52/142
© Copyright by Automotive Lighting
Step 3: Risk Assessment (UC Evaluation)
Hazards / Potential Risks
Machine
Event
recorded
Task
Operation
Countermeasure
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 53/142
© Copyright by Automotive Lighting
CREATE KNOWLEDGE in the TEAM
STRONG KNOWLEGE OF THE TOOL (LEARN and CREATE a DOCUMENT)
2 SAF pillar members
1 PM pillar member
1 AM pillar member
1 line leader
1 Operator of the Model Area
SELECT THE AREA AND APPLY with the SAF- SPECIALISTS
MODEL AREA SELECTED
Step 3: Working to Eliminate Unsafe conditions -
TARGET
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 54/142
© Copyright by Automotive Lighting
0
1
2
3
4
5
6
7
8
9
10
Pareto of Risk Level (Before)
Risk Assessment Pareto
24.36%
HIGH RISK
69.23%
MEDIUM RISK
6.41%
LOW RISK
PRIORITY
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 55/142
© Copyright by Automotive Lighting
Num rev
Resp.
DATA
Product
BUSINESS LINE
X
X
Picture or sketch Picture or sketch
Status updateREVIEW RESP. OBJECT
INSTALLATION
COST (C.D) ERGONOMICS /W.O COSTRUCTION OPERATIVE CHECK
1
Machine component
IMPACT / PILLAR
QUALITY (Q.C) AFFIDABILITY (P.M)
Project Information
Priority Kaizen code or name
WORKING(A.M) SAFETY PROJECT DETAIL FINAL CHECK
2
After - Avoid finger/hand from stuck/hit by machine
CHECK FUNCTIONAL
PROBLEM DESCRIPTION SOLUTION DESCRIPTION
ENVIRONMENT PRELIMINARY PROJECT
MACHINE
Line Work Station Machine code
STATUS
PLANNING
DescriptionMachine name
MANTENANCE (P.M)
Suzuki YV7 HL
12B Stn.1, 2, 3, 4, 5, 9 Housing Assy. H and Cap Assy. Headlamp Assy.
MFE/Zamzam
Penang Process Final Assembly EEM
Maintenance Prevention Information
Plant Unit Pillar
SAF
EEM
Risk Assessment Process – Example 1
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
Fabricate mild steel container to contain
excess extruded hot resin material
EXPANSION
Model Area
Potential Risk /
Hazard:-
Removing the purged
hot and sticky
polymer underneath
the injection unit
using a carton layer –
Risk of getting burn
injury.
G=1 G=2 G=3 G=4
Risk Level
Slight:
potential
result first
aid
Medium:
potential
result
injury >1
day & <3
days
Serious:
potential
result injury
>3 days & <
30 days
Very
serious:
potential
result injury
>30 days
P=1
Very Low
Probability
to Occur1 2 3 4
P=2
Lower
Probability
to Occur2 4 6 8
P=3Probable to
Occur 3 6 9 12
P=4
Highly
Probably to
Occur4 8 12 16
KAIZEN Burns
G=1 G=2 G=3 G=4
Risk Level
Slight:
potential
result first
aid
Medium:
potential
result
injury >1
day & <3
days
Serious:
potential
result injury
>3 days & <
30 days
Very
serious:
potential
result injury
>30 days
P=1
Very Low
Probability
to Occur1 2 3 4
P=2
Lower
Probability
to Occur2 4 6 8
P=3Probable to
Occur 3 6 9 12
P=4
Highly
Probably to
Occur4 8 12 16
Root Cause:
Carton layer is not
a proper container
Unsafe Condition:
Weakness design
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 56/142
© Copyright by Automotive Lighting
G=1 G=2 G=3 G=4
Risk Level
Slight:
potential
result first
aid
Medium:
potential
result
injury >1
day & <3
days
Serious:
potential
result injury
>3 days & <
30 days
Very
serious:
potential
result injury
>30 days
P=1
Very Low
Probability
to Occur1 2 3 4
P=2
Lower
Probability
to Occur2 4 6 8
P=3Probable to
Occur 3 6 9 12
P=4
Highly
Probably to
Occur4 8 12 16
Risk Assessment Process – Example 2
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
G=1 G=2 G=3 G=4
Risk Level
Slight:
potential
result first
aid
Medium:
potential
result
injury >1
day & <3
days
Serious:
potential
result injury
>3 days & <
30 days
Very
serious:
potential
result injury
>30 days
P=1
Very Low
Probability
to Occur1 2 3 4
P=2
Lower
Probability
to Occur2 4 6 8
P=3Probable to
Occur 3 6 9 12
P=4
Highly
Probably to
Occur4 8 12 16
1°Cutter is changed to
Safety Retracable Cutter
2°Proper PPE defined (Cut
Resistant glove)
3°OPL Prepared
EXPANSION
Model Area
Potential Risk /
Hazard:-
Degating/
deburring
process using
normal penknife
– Risk of getting
cut.
Cut Normal Penknife
Root Cause:
Normal penknife
does not have
safety features
Unsafe Condition:
Weakness of
design
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 57/142
© Copyright by Automotive Lighting
Num rev
Resp.
DATA
Product
BUSINESS LINE
X
X
Picture or sketch Picture or sketch
Status updateREVIEW RESP. OBJECT
INSTALLATION
COST (C.D) ERGONOMICS /W.O COSTRUCTION OPERATIVE CHECK
1
Machine component
IMPACT / PILLAR
QUALITY (Q.C) AFFIDABILITY (P.M)
Project Information
Priority Kaizen code or name
WORKING(A.M) SAFETY PROJECT DETAIL FINAL CHECK
2
After - Avoid finger/hand from stuck/hit by machine
CHECK FUNCTIONAL
PROBLEM DESCRIPTION SOLUTION DESCRIPTION
ENVIRONMENT PRELIMINARY PROJECT
MACHINE
Line Work Station Machine code
STATUS
PLANNING
DescriptionMachine name
MANTENANCE (P.M)
Suzuki YV7 HL
12B Stn.1, 2, 3, 4, 5, 9 Housing Assy. H and Cap Assy. Headlamp Assy.
MFE/Zamzam
Penang Process Final Assembly EEM
Maintenance Prevention Information
Plant Unit Pillar
SAF
EEM
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
Risk Assessment Process - Example 3
The conveyor
completely fenced-up
EXPANSION
Model Area
KAIZEN Potential Risk /
Hazard:-
Robot drop the
molded parts at
the conveyor –
Risk dropping
part hit
operator G=1 G=2 G=3 G=4
Risk Level
Slight:
potential
result first
aid
Medium:
potential
result
injury >1
day & <3
days
Serious:
potential
result injury
>3 days & <
30 days
Very
serious:
potential
result injury
>30 days
P=1
Very Low
Probability
to Occur1 2 3 4
P=2
Lower
Probability
to Occur2 4 6 8
P=3Probable to
Occur 3 6 9 12
P=4
Highly
Probably to
Occur4 8 12 16
Root Cause:
No fencing at
conveyor
Unsafe
Condition:
Weakness
design
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 58/142
© Copyright by Automotive Lighting 0
1
2
3
4
5
6
7
8
9
10
Pareto of Risk Level (Before)
0
2
4
6
8
10
a1
a3
a5
Pareto of Risk Level (After)
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
Risk Assessment Result
Risk Eliminated
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 59/142
© Copyright by Automotive Lighting
Before After
Tolerable 1&2 5 6.41% 37 48.05%
Moderate 3&4 54 69.23% 40 51.95%
Substantial 6,8&9 19 24.36% 0 0.00%
Intolerable 12&16 0 0.00% 0 0.00%
Table: The Summary of Risk Levels
Risk Assessment Results
COUNTERMEASURES
0
10
20
30
40
50
60
OPL SOP Training Training onthe job
(includingPreventional
Register)
VisualManagement
WorkplaceOrganization
Poka Yoke Procedures Kaizen PPE EEM NewProcesses
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 60/142
© Copyright by Automotive Lighting
CREATE KNOWLEDGE in the TEAM
KNOWLEGE OF THE TOOL (LEARN and CREATE a DOCUMENT)
SELECT THE AREA AND APPLY with the SAF- SPECIALISTS
MODEL AREA COMPLETED Risk reduction: 24.36%
Step 3: Risk Assessment Result
2 SAF pillar members
1 PM pillar member
1 AM pillar member
1 line leader
1 Operator of the Model Area
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 61/142
© Copyright by Automotive Lighting
Risk Analysis
Applicable to the
WORKING PLACE and to
ALL TASKS and ACTIVITIES
EVALUATE LEGAL REQUIREMENTS REGULATIONS, LEGISLATIONS ENGINEERING
CONTROL
Ris
k A
ss
es
sm
en
t
INVESTIGATION COUNTERMEASURES APPLICATION
LEGAL
COMPLIANCE NOK OK
LEGAL COMPLIANCE
EVALUATION
Applicable to the
WORKING PLACE and to
ALL TASKS and
ACTIVITIES
FOCUS ON UNSAFE CONDITIONS ENGINEERING
CONTROL
To reduce the level of the Risk
Le
ga
l C
om
pli
an
ce
INVESTIGATION COUNTERMEASURES APPLICATION
ENGINEERING CONTROL
PROCEDURES
TRAINING
VISUAL MANAGEMENT
INVESTIGATION COUNTERMEASURES APPLICATION
RISK LEVEL MEDIUM –
HIGH LOW
EVALUATION
LEVEL OF RISK
-PHYSICAL FACTORS
- EQUIPMENT FACTORS
- EXPOSURES
DATA AGGIORNAMENTO DATA AGGIORNAMENTO 10/10/2014
WORKING STATION Mechanical Risks 2 3 4 5 MACHINE Mechanical Risks 7 8 TOOLS Mechanical risks 10 11 12 13 CHEMICAL SUBASTANCES and MATERIALS Risks 17 18 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
Wo
rk
pla
ce
Lu
og
hi d
i l
av
oro
Fa
llin
g f
ro
m h
eig
ht
Ca
du
ta
da
ll'a
lto
de
lla
pe
rso
na
Fa
llin
g f
ro
m a
he
ig
ht o
f o
bje
cts o
r
pa
rticle
s
Ca
du
ta
da
ll'a
lto
di o
gg
etti o
pa
rtice
lle
Fa
ll o
n t
he
fla
t
Ca
du
ta
in
p
ia
no
Ca
du
ta
in
p
ro
fo
nd
ità
Fa
ll i
n d
ep
th
Co
nta
tto
co
n c
arich
e
ele
ttro
sta
tich
e
Co
nta
ct w
ith
ele
ctro
sta
tic c
ha
rg
es
En
ta
ng
le
me
nt o
r g
ra
sp
in
g
Im
pig
lia
me
nto
o
a
ffe
rra
me
nto
Stu
mb
lin
g
In
cia
mp
o
In
su
fficie
nt l
ig
htin
g
In
su
fficie
nte
illu
min
azio
ne
de
ll'o
pe
ra
zio
ne
Cru
sh
Sch
ia
ccia
me
nto
Slip
pin
g
Sciv
ola
me
nto
Bu
ild
in
gs
Fa
bb
rica
ti
Micro
clim
ate
Micro
clim
a
Ro
ute
s
Via
bilità
Tra
nsp
orts
Me
zzi d
i t
ra
sp
orto
Ma
ch
in
ery
/E
qu
ip
me
nt
Ma
cch
in
e
Co
nta
ct w
ith
vo
lta
ge
po
in
ts (
dire
ct
co
nta
ct)
co
nta
tto
co
n e
le
me
nti i
n te
nsio
ne
(co
nta
tto
d
ire
tto
)
Ap
pro
ach
to
h
ig
h-v
olta
ge
co
mp
on
en
ts
Av
vicin
am
en
to
a
d e
le
me
nti a
d a
lta
te
nsio
ne
Fa
llin
g o
bje
cts h
an
dle
d w
ith
me
ch
an
ica
l d
ev
ice
s
Ca
du
ta
di o
gg
etti m
ov
im
en
ta
ti c
on
au
sili m
ecca
nici
Co
nta
ct w
ith
ele
me
nts t
ha
t a
re
en
erg
ize
d i
n th
e e
ve
nt o
f a
co
nta
tto
co
n e
le
me
nti c
he
en
tra
no
in
te
nsio
ne
in
ca
so
d
i g
ua
sto
(co
nta
tto
in
dire
tto
)P
ro
je
ctio
n f
lu
id
s, s
ub
sta
nce
s a
nd
po
wd
ers
Pro
ie
zio
ne
flu
id
i, s
osta
nze
, p
olv
eri
Pro
je
ctio
n m
ate
ria
ls
Pro
ie
zio
ne
ma
te
ria
li
Tip
pin
g b
y v
eh
icle
Rib
alta
me
nto
d
a v
eico
lo
Tip
pin
g e
le
me
nts u
nfix
ed
Rib
alta
me
nto
d
i e
le
me
nti n
on
fissa
ti
Dra
g a
nd
dro
p o
r e
ntra
pm
en
t
Tra
scin
am
en
to
o
d
i
in
tra
pp
ola
me
nto
No
ise
Ru
mo
re
Op
tica
l R
ad
ia
tio
n
Ra
dia
zio
ni O
ttich
e
Bu
rn
s f
ro
m fly
in
g f
use
d p
article
s
Ustio
ne
da
pro
ie
zio
ne
di p
artice
lle
fu
se
Bu
rn
s f
ro
m h
ot s
urfa
ce
s
Ustio
ne
da
co
nta
tto
co
n s
up
erfici
ca
ld
e
Vib
ra
tio
ns
Vib
ra
zio
ni
Ele
ctro
ma
gn
etic f
ie
ld
s
Ca
mp
i e
le
ttro
ma
gn
etici
Vid
eo
te
rm
in
al e
le
ctro
ma
gn
etic
risk
Attre
zza
tu
re
mu
nite
di
vid
eo
te
rm
in
ale
Liftin
g e
qu
ip
me
nt
Ap
p. d
i S
olle
va
me
nto
Pre
ssu
re
eq
uip
me
nt
Ap
p. a
pre
ssio
ne
To
ols
Ute
nsili
Slice
Ce
so
ia
me
nto
Pe
rfo
ra
tio
n o
r P
un
ctu
re
Pe
rfo
ra
zio
ne
o P
un
tu
ra
Cu
t -
Ab
ra
sio
n
Ta
glio
- A
bra
sio
ne
Hit
Urto
Distrib
utio
n s
yste
ms (
no
e
le
ctica
l
eq
uip
me
nt)
Im
p. D
i d
istrib
uzio
ne
Ele
ctricity
Ele
ttricità
Erg
on
om
ics
Erg
on
om
ia
VD
T w
ork
ers
VD
T
Ch
em
ica
ls
Ag
en
ti c
him
ici
Bu
rn
fro
m co
nta
ct w
ith
fre
e
fla
me
s
Ustio
ne
da
co
nta
tto
co
n f
ia
mm
e
lib
ere
Ch
ok
in
g
So
ffo
ca
me
nto
Bu
rn
s f
ro
m co
nta
ct w
ith
ag
gre
ssiv
e s
ub
sta
nce
s
Ustio
ne
da
co
nta
tto
co
n s
osta
nze
ag
gre
ssiv
e
Bu
rn
s f
ro
m co
nta
ct w
ith
ho
t
ste
am
Ustio
ne
da
co
nta
tto
co
n v
ap
ori
ca
ld
i
Ex
plo
sio
n
Esp
lo
sio
ne
Bu
rn
s f
ro
m co
nta
ct p
arts h
ot /
co
ld
Ustio
ne
da
co
nta
tto
p
arti
fre
dd
e/ca
ld
e
Ca
rcin
og
en
s a
nd
mu
ta
ge
ns
ca
nce
ro
ge
ni e
mu
ta
ge
ni
Ab
se
nto
s
Am
ia
nto
Bio
lo
gica
l a
ge
nts
Ag
. B
io
lo
gici
No
ise
Ru
mo
re
Ele
ctro
ma
gn
etic f
ie
ld
s
Ca
mp
i E
le
ttro
ma
gn
etici
Artificia
l o
ptica
l r
ad
ia
tio
ns
Ra
dia
zio
ni O
ttich
e A
rtificia
li
Io
nizin
g r
ad
ia
tio
ns
Ra
dia
zio
ni I
on
izza
nti
Ex
plo
sio
ns
Atm
osfe
re
Esp
lo
siv
e
Fire
an
d o
th
er e
me
rg
en
cie
s
In
ce
nd
io
ed
altre
em
erg
en
ze
Ma
jo
r a
ccid
en
ts
In
cid
en
ti r
ile
va
nti
Te
mp
ora
ry
an
d m
ob
ile
site
s
Ca
ntie
ri t
em
p. E
mo
bili
Co
ntra
cto
rs
Co
ntra
tti d
i a
pp
alto
Jo
bs f
ro
m a
he
ig
ht
La
vo
ri i
n a
lte
zza
Wo
rk
re
la
te
d s
tre
ss (
on
ly
fo
r I
ta
ly
)
Stre
ss l
av
oro
co
rre
la
to
Pa
ssiv
e s
mo
ke
Fu
mo
p
assiv
o
No
ctu
rn
al w
ork
La
vo
ro
n
ottu
rn
o
Co
nsu
mp
tio
n o
f a
lco
ho
l b
ev
era
ge
s
Co
nsu
mo
d
i b
ev
an
de
alco
lich
e
Dru
gs
Assu
zio
ne
so
st. S
tu
pe
fa
ce
nti
Diffe
re
nce
s i
n g
en
de
r, a
ge
an
d
fro
m o
th
er c
ou
ntrie
s
Diffe
re
nze
ge
ne
re
, e
tà
,
pro
ve
nie
nza
Wo
rk
in
g m
oth
ers
La
vo
ra
trici g
esta
nti
Disa
ble
d w
ork
ers
La
vo
ra
to
ri d
isa
bili
Ch
ild
wo
rk
ers
La
vo
ra
tri m
in
ori
Visito
rs
Visita
to
ri
Oth
er p
hy
sica
l a
ge
nts
altri a
g. F
isici
Sp
ecific t
yp
e o
f c
on
tra
ct
Sp
ecifica
tip
olo
gia
co
ntra
ttu
ale
Line Events (Injury/ First
Aid) Recorded
Operation/
Activity
Task
numberTask Description P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R P G R
OP
L
SO
P
Tra
in
in
gT
ra
in
in
g o
n th
e
jo
b (in
clu
din
g
Pre
ve
ntio
na
l
Visu
al
ma
na
ge
me
nt
Wo
rk
pla
ce
Org
an
iza
tio
nP
ok
a Y
ok
e
Pro
ce
du
re
s
Ka
ize
n
PP
E
Re
de
fin
itio
n o
f
en
gin
ee
rin
g
Da
ily
W
CM
ka
ize
n
Countermeasure Description
UPS07 M1 1 Prelevare da contenitore 1 riflettore mtz 1 2 2 NA NA NA NA NA NA 1 2 2 NA NA NA 1 1 1 1 1 1 1 1 1 1 1 1 NA NA NA 1 1 1 1 2 2 1 2 2 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA 1 1 1 1 2 2 NA NA NA NA NA NA 1 2 2 1 1 1 1 1 1 1 2 2 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA 1 3 3 NA NA NA NA NA NA 1 2 2 NA NA NA 1 2 2 1 2 2 NA NA NA 1 2 2 1 2 2 1 1 1 1 1 1 1 1 1 NA NA NA 1 2 2 NA NA NA 1 2 2 55 600 647 X XQK prelievo componenti +QK fermo rulliere + QK corretta inclinazione rulliere per
ergonomia
M1 2 evacuare foglio pe 1 2 2 NA NA NA NA NA NA 1 2 2 NA NA NA 1 1 1 1 1 1 1 1 1 1 1 1 NA NA NA 1 1 1 1 2 2 1 2 2 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA 1 1 1 1 2 2 1 1 1 1 2 2 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA 1 3 3 NA NA NA NA NA NA 1 2 2 NA NA NA 1 2 2 1 2 2 NA NA NA 1 2 2 1 2 2 1 1 1 1 1 1 1 1 1 NA NA NA 1 2 2 NA NA NA 1 2 2 55 -8% X X QK evacuatore pelure
M1 3 posizionare riflettore su posaggio avvitatura 1 2 2 NA NA NA NA NA NA 1 2 2 NA NA NA 1 1 1 1 1 1 1 1 1 1 1 1 NA NA NA 1 1 1 1 2 2 1 2 2 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA 1 1 1 1 2 2 NA NA NA NA NA NA 1 2 2 1 1 1 1 1 1 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA 1 3 3 NA NA NA NA NA NA 1 2 2 NA NA NA 1 2 2 1 2 2 NA NA NA 1 2 2 1 2 2 1 1 1 1 1 1 1 1 1 NA NA NA 1 2 2 NA NA NA 1 2 2 54 X
M1 4 Prelevare da contenitore 1 basetta led 1 2 2 NA NA NA NA NA NA 1 2 2 NA NA NA 1 1 1 1 1 1 1 1 1 1 1 1 NA NA NA 1 1 1 1 2 2 1 2 2 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA 1 1 1 1 2 2 NA NA NA NA NA NA 1 2 2 1 1 1 1 1 1 1 2 2 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA 1 3 3 NA NA NA NA NA NA 1 2 2 NA NA NA 1 2 2 1 2 2 NA NA NA 1 2 2 1 2 2 1 1 1 1 1 1 1 1 1 NA NA NA 1 2 2 NA NA NA 1 2 2 55 X XQK prelievo componenti +QK fermo rulliere + QK corretta inclinazione rulliere per
ergonomia
M1 5 orientare e posizionare 2 basette laterali 1 2 2 NA NA NA NA NA NA 1 2 2 NA NA NA 1 1 1 1 1 1 1 1 1 1 1 1 NA NA NA 1 1 1 1 2 2 1 2 2 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA 1 2 2 1 1 1 1 1 1 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA 1 3 3 NA NA NA NA NA NA 1 2 2 NA NA NA 1 2 2 1 2 2 NA NA NA 1 2 2 1 2 2 1 1 1 1 1 1 1 1 1 NA NA NA 1 2 2 NA NA NA 1 2 2 52 X
M1 6 orientare e posizionare 4 basette centrali 1 2 2 NA NA NA NA NA NA 1 2 2 NA NA NA 1 1 1 1 1 1 1 1 1 1 1 1 NA NA NA 1 1 1 1 2 2 1 2 2 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA 1 2 2 1 1 1 1 1 1 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA 1 3 3 NA NA NA NA NA NA 1 2 2 NA NA NA 1 2 2 1 2 2 NA NA NA 1 2 2 1 2 2 1 1 1 1 1 1 1 1 1 NA NA NA 1 2 2 NA NA NA 1 2 2 52 X
M1 7 sistemazione cavetti 1 2 2 NA NA NA NA NA NA 1 2 2 NA NA NA 1 1 1 1 1 1 1 1 1 1 1 1 NA NA NA 1 1 1 1 2 2 1 2 2 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA 1 3 3 NA NA NA NA NA NA 1 2 2 NA NA NA 1 2 2 1 2 2 NA NA NA 1 2 2 1 2 2 1 1 1 1 1 1 1 1 1 NA NA NA 1 2 2 NA NA NA 1 2 2 51 X
Infortunio 04/2010 (UA) M1 8 avvitatura di n. 4 viti 1 2 2 NA NA NA NA NA NA 1 2 2 NA NA NA 1 1 1 1 1 1 1 1 1 1 1 1 NA NA NA 1 1 1 1 2 2 1 2 2 1 2 2 NA NA NA 1 2 2 NA NA NA NA NA NA NA NA NA 1 2 2 NA NA NA 1 1 1 NA NA NA NA NA NA 1 2 2 1 2 2 NA NA NA NA NA NA NA NA NA 1 2 2 1 2 2 NA NA NA NA NA NA 1 1 1 1 2 2 NA NA NA NA NA NA 1 2 2 1 1 1 1 1 1 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA 1 3 3 NA NA NA NA NA NA 1 2 2 NA NA NA 1 2 2 1 2 2 NA NA NA 1 2 2 1 2 2 1 1 1 1 1 1 1 1 1 NA NA NA 1 2 2 NA NA NA 1 2 2 63 X X XQK caricatore avvitatore a bussola + QK deposito avvitatore + Controllo periodico
avvitatori + visite mediche periodiche + campionamenti vibrazioni periodici
M1 9 deporre su mensola 1 2 2 NA NA NA NA NA NA 1 2 2 NA NA NA 1 1 1 1 1 1 1 1 1 1 1 1 NA NA NA 1 1 1 1 2 2 1 2 2 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA 1 3 3 NA NA NA NA NA NA 1 2 2 NA NA NA 1 2 2 1 2 2 NA NA NA 1 2 2 1 2 2 1 1 1 1 1 1 1 1 1 NA NA NA 1 2 2 NA NA NA 1 2 2 51 X
M1 10 Scaricare contenitore riflettore mtz 1 2 2 NA NA NA NA NA NA 1 2 2 NA NA NA 1 1 1 1 1 1 1 1 1 1 1 1 NA NA NA 1 1 1 1 2 2 1 2 2 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA 1 1 1 1 2 2 NA NA NA NA NA NA 1 2 2 1 2 2 1 1 1 1 2 2 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA 1 3 3 NA NA NA NA NA NA 1 2 2 NA NA NA 1 2 2 1 2 2 NA NA NA 1 2 2 1 2 2 1 1 1 1 1 1 1 1 1 NA NA NA 1 2 2 NA NA NA 1 2 2 56 X X QK Scarico automatico rulliere + Controllo integrità imballi/cassette
M1 11 Scaricare contenitore basette 1 2 2 NA NA NA NA NA NA 1 2 2 NA NA NA 1 1 1 1 1 1 1 1 1 1 1 1 NA NA NA 1 1 1 1 2 2 1 2 2 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA 1 1 1 1 2 2 NA NA NA NA NA NA 1 2 2 1 2 2 1 1 1 1 2 2 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA 1 3 3 NA NA NA NA NA NA 1 2 2 NA NA NA 1 2 2 1 2 2 NA NA NA 1 2 2 1 2 2 1 1 1 1 1 1 1 1 1 NA NA NA 1 2 2 NA NA NA 1 2 2 56 X X QK Scarico automatico rulliere + Controllo integrità imballi/cassette
M1ATTIVITA' EXTRA
CICLOPulizia Linea 1 2 2 NA NA NA NA NA NA 1 2 2 NA NA NA 1 1 1 1 1 1 1 1 1 1 1 1 NA NA NA 1 1 1 1 2 2 1 2 2 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA 1 3 3 NA NA NA NA NA NA 1 2 2 NA NA NA 1 2 2 1 2 2 NA NA NA 1 2 2 1 2 2 1 1 1 1 1 1 1 1 1 NA NA NA 1 2 2 NA NA NA 1 2 2 51 X
M1ATTIVITA' EXTRA
CICLOLucidatura 1 2 2 NA NA NA NA NA NA 1 2 2 NA NA NA 1 1 1 1 1 1 1 1 1 1 1 1 NA NA NA 1 1 1 1 2 2 1 2 2 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 NA NA NA 1 3 3 NA NA NA NA NA NA 1 1 1 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA 1 3 3 NA NA NA NA NA NA 1 2 2 NA NA NA 1 2 2 1 2 2 NA NA NA 1 2 2 1 2 2 1 1 1 1 1 1 1 1 1 NA NA NA 1 2 2 NA NA NA 1 2 2 56 X
M1ATTIVITA' EXTRA
CICLO1 2 2 NA NA NA NA NA NA 1 2 2 NA NA NA 1 1 1 1 1 1 1 1 1 1 1 1 NA NA NA 1 1 1 1 2 2 1 2 2 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA 1 3 3 NA NA NA NA NA NA 1 2 2 NA NA NA 1 2 2 1 2 2 NA NA NA 1 2 2 1 2 2 1 1 1 1 1 1 1 1 1 NA NA NA 1 2 2 NA NA NA 1 2 2 51 X
M1ATTIVITA' NON
ROUTINARIESblocco cassetta rulliera 1 2 2 NA NA NA NA NA NA 1 2 2 NA NA NA 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 1 2 2 1 2 2 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA 1 1 1 NA NA NA NA NA NA NA NA NA 1 2 2 1 2 2 1 1 1 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 2 2 1 2 2 1 1 1 NA NA NA NA NA NA NA NA NA 1 3 3 NA NA NA NA NA NA 1 2 2 NA NA NA 1 2 2 1 2 2 NA NA NA 1 2 2 1 2 2 1 1 1 1 1 1 1 1 1 NA NA NA 1 2 2 NA NA NA 1 2 2 55 X
Overall total
level risk for
activity
Risk Assessment UPS 07 Before
Legal requirements
Overall total
level risk for
task (A)
Overall total
level risk for
activity
NOTE: Il rischio derivante da incendio ed altre emergenze è gestito mediante dispositivi, impianti e procedure previsti dal piano emergenza.
Il personale viene formato e periodicamente testato sulle procedure. L'accesso ai dispositivi di risposta in caso di emergenza è verificato
continuamente ed eventuali anomalie risolte immediatamente
Risk Level S=1 S=2 S=3 S=4
P=1 1 2 3 4
P=2 2 4 6 8
P=3 3 6 9 12
P=4 4 8 12 16
Did you have
INJ or FA Caused
by UA? NO YES
Monitor and update in case of
layout/process changes
For Model
Areas
Applicable to
ALL TASKS and ACTIVITIES
also in relation with the
WORKINGPLACE and
Environmental conditions
RISK LEVEL > 6 < 4
LEVEL OF RISK
- MECHANICAL RISKS
- HUMAN FACTORS
- ENVIRONMENTAL
FACTORS
EVALUATION
Ris
k P
red
icti
on
Perform the EVALUATION by
MOVEMENT
FOCUS ON UNSAFE ACT
Monitor and update in case of
new UAs found
Extension areas
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 62/142
© Copyright by Automotive Lighting
Unsafe acts elimination
19
TYPES
OF
HAZARD
Estimated Risk level
PREDICTION
of what can happen
INVOLVEMENT:
Supervisor
Team Leader
Operators
THINK ABOUT:
• UNSAFE ACTS in the past.
• UNSAFE ACTS that may be risky
LEVEL OF
DETAIL:
Level of Task
RISK LEVEL:
Evaluation criteria
Coutermeasures
PRIORITY
(by level of
risk)
PROBABILITY
GRAVITY
x
COUNTERMEASURES
OPL
Training
Training on the job using specific
poster
Visual management
Workplace Organization
Poka Yoke
Procedures
Technical countermeasures
PPE
SOP
Video Training
Redefinition of engineering process
Work conditions improvement
(illumination, noise, ergonomics, …)
7 ENVIRONMENTAL
FACTORS
Step 3: Risk Prediction
METHOD
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 63/142
© Copyright by Automotive Lighting
CREATE KNOWLEDGE in the TEAM
KNOWLEGE OF THE TOOL (LEARN and CREATE a DOCUMENT)
SELECT THE AREA AND APPLY with the SAF- SPECIALISTS
MODEL AREA SELECTED
Step 3: Working to Eliminate Unsafe acts -
TARGET
2 SAF pillar members
1 PM pillar member
1 AM pillar member
1 line leader
1 Operator of the Model Area
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 64/142
© Copyright by Automotive Lighting
0
1
2
3
4
5
6
7
8
9
10
aa ab ac ad ae af ag ah ai aj ak al
am an ao ap aq ar as at au av aw ax ay az
aaa
aab
aac
aad
aae
aaf
aag
aah
aai
aaj
aak
aal
aam
Pareto of Risk Level (Before)
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
Risk Prediction Pareto
48.1%
HIGH RISK
51.9%
LOW RISK
PRIORITY
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 65/142
© Copyright by Automotive Lighting
Potential Risk /
Hazard:-
Technician did not
place the oil
container on the
secondary
containment
Risk of getting Slip
and Fall
Risk Prediction Process – Example 1
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
1°OPL Prepared to follow the procedure and
visualized the OPL on the machine, to remind the
technician to put the oil container on the secondary
containment platform
EXPANSION
Model Area
G=1 G=2 G=3 G=4
Risk Level
Slight:
potential
result first
aid
Medium:
potential
result
injury >1
day & <3
days
Serious:
potential
result injury
>3 days & <
30 days
Very
serious:
potential
result injury
>30 days
P=1
Very Low
Probability
to Occur1 2 3 4
P=2
Lower
Probability
to Occur2 4 6 8
P=3Probable to
Occur 3 6 9 12
P=4
Highly
Probably to
Occur4 8 12 16
Slip &
Fall
G=1 G=2 G=3 G=4
Risk Level
Slight:
potential
result first
aid
Medium:
potential
result
injury >1
day & <3
days
Serious:
potential
result injury
>3 days & <
30 days
Very
serious:
potential
result injury
>30 days
P=1
Very Low
Probability
to Occur1 2 3 4
P=2
Lower
Probability
to Occur2 4 6 8
P=3Probable to
Occur 3 6 9 12
P=4
Highly
Probably to
Occur4 8 12 16
Root Cause:
Technician Not Place
the oil container on
secondary
containment
Unsafe Act:
Lack of attention
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 66/142
© Copyright by Automotive Lighting
Risk Prediction Process – Example 2
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
EXPANSION
Model Area
G=1 G=2 G=3 G=4
Risk Level
Slight:
potential
result first
aid
Medium:
potential
result
injury >1
day & <3
days
Serious:
potential
result injury
>3 days & <
30 days
Very
serious:
potential
result injury
>30 days
P=1
Very Low
Probability
to Occur1 2 3 4
P=2
Lower
Probability
to Occur2 4 6 8
P=3Probable to
Occur 3 6 9 12
P=4
Highly
Probably to
Occur4 8 12 16
Potential Risk
/ Hazard:-
Unclosed
pump cover
Risk of
getting
electrocuted.
Electrocuted
G=1 G=2 G=3 G=4
Risk Level
Slight:
potential
result first
aid
Medium:
potential
result
injury >1
day & <3
days
Serious:
potential
result injury
>3 days & <
30 days
Very
serious:
potential
result injury
>30 days
P=1
Very Low
Probability
to Occur1 2 3 4
P=2
Lower
Probability
to Occur2 4 6 8
P=3Probable to
Occur 3 6 9 12
P=4
Highly
Probably to
Occur4 8 12 16
Root Cause:
Forget to close
pump cover
after
troubleshoot
Unsafe Act:
Lack of
attention
1°OPL Prepared to follow the procedure and visualized
the OPL on the machine, to remind the technician to
close the pump cover after troubleshoot
2° Update in the maintenance check list.
Maintenance
Checklist Updated
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 67/142
© Copyright by Automotive Lighting
Risk Prediction Process – Example 3
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
EXPANSION
Model Area
Trip Potential Risk /
Hazard:-
During the
process of
heating up mold,
hose not
arranged
properly which
can cause
tripping. Risk of
Trip and Fall.
G=1 G=2 G=3 G=4
Risk Level
Slight:
potential
result first
aid
Medium:
potential
result
injury >1
day & <3
days
Serious:
potential
result injury
>3 days & <
30 days
Very
serious:
potential
result injury
>30 days
P=1
Very Low
Probability
to Occur1 2 3 4
P=2
Lower
Probability
to Occur2 4 6 8
P=3Probable to
Occur 3 6 9 12
P=4
Highly
Probably to
Occur4 8 12 16
Root Cause:
Technician might
forget to upkeep
the hose
Unsafe Act:
Lack of attention
1°OPL Prepared to follow the procedure and visualized
the OPL on the machine, to remind the technician
arranged the hose and pipe properly.
2° Update in the maintenance check list.
Maintenance
Checklist Updated
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 68/142
© Copyright by Automotive Lighting 0
1
2
3
4
5
6
7
8
9
10
aa ab ac ad ae af ag ah ai aj ak al am an ao ap aq ar as at au av aw ax ay az aaa
aab
aac
aad
aae aaf
aag
aah aai
aaj
aak aal
aam
Pareto of Risk Level (Before)
0
2
4
6
8
10
aa
ab
ac
Pareto of Risk Level (After)
Step 3: Risk Prediction Result
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
Risk Eliminated
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 69/142
© Copyright by Automotive Lighting
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
Table: The Summary of Risk Levels
Risk Prediction Results TPM (Model Area)
Before After
Tolerable 1&2 38 48.1% 13 18.99%
Moderate 3&4 0 0% 64 81.01%
Substantial 6,8&9 41 51.9% 0 0%
Intolerable 12&16 0 0% 0 0%
COUNTERMEASURES
0102030405060
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 70/142
© Copyright by Automotive Lighting
CREATE KNOWLEDGE in the TEAM
KNOWLEGE OF THE TOOL (LEARN and CREATE a DOCUMENT)
SELECT THE AREA AND APPLY with the SAF- SPECIALISTS
MODEL AREA COMPLETED Risk reduction:51.9 %
Step 3:Risk Prediction Results
2 SAF pillar members
1 PM pillar member
1 AM pillar member
1 line leader
1 Operator of the Model Area
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 71/142
© Copyright by Automotive Lighting
In case of an injury or first aid we perform the analysis using the S-EWO and we update the RISK ANALYSIS
We improved our S-EWO format
Move the "X" on hit part of body
SELECT ROOT CAUSE CATEGORY
2 attitude behavior 3 management 6 tools equipments
a. negligence a. lack of training a. tool/equipment
insufficient
b. incorrect use of PPE
b. poor physical attitude known
b. lack of maintenance
c. other c. no regard of safety
rule
c. PPE not available c. design weakness
d. work cycles out of
sequence
d. inadeguate PPE d. unexpected running
of equiment/tool
e. lack of use of PPE e. physical attitude e. unscheduled cleaning
cycles
f. dubious event f. maintenance not performed f. climatic condition
g. other
g. cleaning cycle not performed
g. incorrect
install./fabbrication
h. no regard of procedures and
regulations
h. insufficient lighting
i. other i . Excessive noise
l. other
CLOSE DATE
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
A
C
T
F
O
R
I
N
J
/
F
A
DATE
Area
training/OPL maintenanceFI, kaizen, improvement
activities, ecc.
UNSAFE ACT
EXPANSION PLAN FOR SIMILAR AREAS
DATE
DUE DATE CLOSE DATE
VERIFICATION DONE BY
Unit
Employee Team Leader
Date
Signature
Safety Mgr
In the past three months, were
there events due to the same
root cause?
Do all required Unit Leaders (each shift or dept) understand
the root cause of the event and the corrective measure(s)
implemented? Is the S-EWO signed off?
C
H
E
C
K
ACHIEVED RESULTS
NOTES
Plant Mgr
In the past three months, were there events due to
the same root cause?
SIGNATURE NOTES
The expansion covered:
4 precaution attention
a. lack of attention
b. operations not
scheduled
c. misunderstanding
d. not correct use of PPE
f. unexpected illness
g. personal problems
h. other
training/OPL
1 competence/knowledge
b. little or not experience
in specific job
a. inadeguate training
counseling
ACTION PLAN - LONG TERM COUNTERMEASURES
FI, kaizen, improvement
activities, ecc.disciplinary action
FI, kaizen, improvement activities,
ecc.
FI, kaizen, improvement
activities, ecc.
counseling
RESPONSIBLE DUE DATE
disciplinary action
FI, kaizen, improvement
activities, ecc.
CATEGORIZE THE ROOT CAUSE
training/OPL
coach/return
POSSIBLE ROOT CAUSES
d. unclear procedures
e. undefined safety
practices and procedures
f. PPE inadeguate
ACTION
7 procedures systems
a. lack of standard
procedures
b. insufficient procedures
UNSAFE CONDITION
c. undefined roles
ANALYSIS OF ROOT CAUSE BY 5 WHYS ANSWER
Why
5
ROOT CAUSE:
SKETCHESSIGNATURE
WHAT (nature and body part)
4
5
3
VERIFICATION OF ROOT CAUSES OK NOK
1
N°
(was a Routine or Not Routine activity?)
HOW (how did the incident occur?)
Why
1
Why
2
Why
3
Why
4
SIGNATURE
If the answer is YES, please prepare a further action plan to take additional countermeasures
Female From other Dept
TemporaryPerm Agency
Job of the injured Analysis performed by
WHEN (when was it done? Start of shifts, end of shfit, ecc)
WHERE (is the job being done? e.g. workplace, machine, ecc)
WHO (who is doing the job?)
WHICH (which kind of operation is going on?)
2
ACHIEVED RESULTS
MaleBadge Nr
g. PPE unexpected
h. other
training/OPL
COUNTERMEASURES
5 personal condition
a. mental
deficiency/instability
b. physical
deficiency/instability
c. impaired state (due to
alcohol, drugs, Pr. Med)
d. family problems
e. health problems e. other
Name of injured Sequence number
Area/Machine/Operation/Station
5 W + 1 How Analysis (event description)
Depart. MgrSupervisor
Safety - Emergency Work Order
Safety - Emergency Work Order
SIGNATURE NOTESVERIFICATION DONE BY
SHIFT Date
Seniority of the role (internal) Hour
Does the job require a
specific training/permit? Seniority of the role (external)
Have the countermeasures been comunicated to all affected
employees and is S-EWO been signed off?
Have the countermeasures been implemented as
defined in the action plan?
Actions taken immediatilyBODY CHART SKETCH
RESPONSIBLE
Has the SOP or OPL been
updated to reflect the
implemented countermeasures?
Do all visual aid been posted and diffused?
U.T.E./Dept.
ADDITIONAL ACTION PLAN
Level of the Risk AFTERWas this Risk considered and evaluated in the Risk
Assessment (if UC)?
STANDARDIZE and ESTABLISH CONTROL
RISK ASSESSMENT & RISK PREDICTION STANDARD DOCUMENTS
F
O
R
I
N
J
/
F
A
PLA
N
D
O
In case of failure, justify:
DUE DATE CLOSE DATE
Can an Mpinfo be created for
this countermeasures? Can the
countermeasures been
proposed as a Best Practice?
Has a Ka izen been submitted to
FI / SA for this countermeasure?
Has the countermeasure been
added to the SAF audits
checking? (eg. SMAT, Operator
Check l i s t, o Check Lis t SAF)
If yes, was the countermeasure implemented not effective or
not sustained?
Was this Risk considered and evaluated in the Risk
Prediction (if UA)?
Has the Risk Assessment / Risk Prediction been updated with
the new countermeasure and level of the Risk?
Level of the Risk BEFORE
1 2 3 4 5 6
7 8 9 10 11 12
1 2° DN
< 1Week < 1 Month3 - 6 Months
> 6 Months
< 1Week < 1 Month3 - 6 Months
> 6 Months
NOT EFFECTIVE
NOT SUSTAINED
NA
NA
YES
NO
NA
YES
NO
NA
YES
NO
NA
YES
NO
NA
ROUTINE NON ROUTINE
Step 3:How to continuous improve
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 72/142
© Copyright by Automotive Lighting
Risk Analysis Non Routine Activities
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
Performed infrequently and outside
of normal duties
Does not have a documented
procedure
Can be unscheduled and unplanned
A sequence of actions regularly
followed; a fixed program
Performed as part of a regular
procedure rather than for a
special reason
PLANT ACTIVITIES
SOP / SMP
NON-ROUTINE ACTIVITIES:
Non Routine
Risk Assessment
Routine
ROUTINE ACTIVITIES:
Analysed by
Risk
Assessment
Analysed by
Risk
Prediction
YES NO
Non-Routine
SOP /
SMP
participa
nts
ParticipaN .OP.
FamilyPRESENT
(YES/NO)TASK
IMMEDIATE
COUNTERMEASURE -
If necessary describeFamily PRESENT (YES/NO) TASK
IMMEDIATE COUNTERMEASURE -
If necessary describe
OT
HE
RS Collision Possibility of investment by forklift or other equipments in motion
OT
HE
RS
Fluid, dust,
substances
projection
Possibility of penetration of foreign bodies on the
operator during working activities
AR
EA
Occupied
working areaOccupied working station
Falling of
objects
When there is the possibility of falling from a height of
objects or particles and that hurt the worker
RoutesAlternative working passages and temporary interference with
other things or peopleCrushing
When there exists the possibility to crush a part of the
body of the operator
Transport
of material
Temporary
working area
Workstations / temporary platforms created as a cause of the
change in the nature of workCut - Nip
Possibility of nip - cut due to the presence of sharp
material or equipment
Whenever a forklift, a truck, interacts or can interfere with a
workerStrike
There is the possibility that the operator can crash into a
ledge (knees, hips and head)
Temporary and
mobile sites
Every time you have to perform a temporary work activities (eg.
Construction site)Trip
When there exists the possibility of tripping with parts
protruding from the pavement or with obstacles
EQ
UIP
ME
NT
S /
TO
OLS
ToolsEquipment or instrumentation that can generate an hand
crushingExplosion
When there is the possibility of contacting with explosive
objects
Machines
Automatic machinery present in the work station that could
generate a risk of crushing, entanglement ... by moving
mechanical parts
Electric devices
Arco Flash
When there is the possibility of direct contact with
electrical devices
Lifting
equipments
Manual tools Use of manual tools (hammers, knives, pliers, wrenches) BurnWhen there is a risk that the operator can burn (hot
lamps etc.)
Laser /
Optical Rad.
Whenever you need to use for an acivity a Laser Class II or higher
(for example portable scanner)Piercing
When there is a possibility of direct contact with sharp
objects causing lacerations
Chemicals Each time that a chemical is used in the workplace
Pressure
equipmentUse or maintenance of pressure equipments Fire
When an element used in the job starts to burn due to
another element
Radiations Any radioactive material or machines that generate radiation
DA
NG
ER
S R
ELA
TE
D T
O T
HE
WO
RK
ING
AC
TIV
ITY
Jobs from
a height
Working over 1.80 meters without protection falls systems
(railings, slings etc.)
MicroclimateExcessively high or low temperatures of the working place.
Frequent temperature changes
Conifined
spaces
Whenever the operator operates under conditions of
inadequate oxygenation with risk of suffocation
Risk represented by the presence of suspended loads
Slip / FallingPossibility of slipping on the floor dirty by oil, wet or
slippery
Explosive
atmosphere
Potential risks of explosion due to the presence of chemical
material (eg. Fuel vapors)Strike
Each time the operator strikes an element with a body
part
Electromagnetic
fields
Exposure to electromagnetic fields generated by electrical or
electronic equipment or industrial machine (welding machines,
mixers ...)
Ergonomy
by tool
Tools used that presents difficulty in grip and easy
handling
Surface
temperatureWorking surface's temperatures excessively hot or cold Strech
When the operator must stretch beyond its shoulders or
below the length of his arms
Air quality Fumes, or dust clouds released in the workplaceWork
posture
Whenever you need a work posture uncomfortable or
bent to perform a task
EN
VIR
ON
ME
NT
AL
Lighting Excessive or insufficient lighting conditions.
ER
GO
NO
MY
Manual
handlingWhen there is a risk in the manual handling of loads
INDIVIDUARE TUTTI I PERICOLI RELATIVI ALLE OPERAZIONI SOPRA ELENCATE
Noise Excessive or persistent noise level Repetitive movementsWhenever an operator performs a movement / task more
than once per cycle
VibrationsExposure to excessive or repetitive vibration (vibrations
transmitted by tools/vehicles, high vibration surface)strength
Whenever the operator must push or pull toward a
component by applying excessive force
HAZARD: RISK DESCRIPTION HAZARD: RISK DESCRIPTION
BRIEF DESCRIPTION OF THE ACTIVITY:
Activity :
Non-Routine RISK ASSESSMENTDate: Plant: Dept: Area: Line/Working station: Compiled by:
Maintenance Activities
Logistic Activities Other……... Dept Manager Unit Manager Safety Manager Safety ExpertMaintenance Manager
Maintenance Supervisor/ Expert
Other: (specify) ………...
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 73/142
© Copyright by Automotive Lighting
NON ROUTINE ACTIVITIES
1. Identify all the tasks
2. What is the procedure? Does one exist? (the main points)
3. Perform Risk Assessment Review the Layout of people, posture, positions of hands and feet to determine hazards
4. Establish and implement countermeasures
5. Update or create the procedure
6. For those activities which are very critical and request special attention perform also Risk Prediction
7. Review your Risk analisys document
1
2
3
4
5
6
7
Logic for Non-Routine Activities Risk Analysis
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 74/142
© Copyright by Automotive Lighting
participa
nts
ParticipaN .OP.
FamilyPRESENT
(YES/NO)TASK
IMMEDIATE
COUNTERMEASURE -
If necessary describeFamily PRESENT (YES/NO) TASK
IMMEDIATE COUNTERMEASURE -
If necessary describe
OT
HE
RS Collision Possibility of investment by forklift or other equipments in motion
OT
HE
RS
Fluid, dust,
substances
projection
Possibility of penetration of foreign bodies on the
operator during working activities
AR
EA
Occupied
working areaOccupied working station
Falling of
objects
When there is the possibility of falling from a height of
objects or particles and that hurt the worker
RoutesAlternative working passages and temporary interference with
other things or peopleCrushing
When there exists the possibility to crush a part of the
body of the operator
Transport
of material
Temporary
working area
Workstations / temporary platforms created as a cause of the
change in the nature of workCut - Nip
Possibility of nip - cut due to the presence of sharp
material or equipment
Whenever a forklift, a truck, interacts or can interfere with a
workerStrike
There is the possibility that the operator can crash into a
ledge (knees, hips and head)
Temporary and
mobile sites
Every time you have to perform a temporary work activities (eg.
Construction site)Trip
When there exists the possibility of tripping with parts
protruding from the pavement or with obstacles
EQ
UIP
ME
NT
S /
TO
OLS
ToolsEquipment or instrumentation that can generate an hand
crushingExplosion
When there is the possibility of contacting with explosive
objects
Machines
Automatic machinery present in the work station that could
generate a risk of crushing, entanglement ... by moving
mechanical parts
Electric devices
Arco Flash
When there is the possibility of direct contact with
electrical devices
Lifting
equipments
Manual tools Use of manual tools (hammers, knives, pliers, wrenches) BurnWhen there is a risk that the operator can burn (hot
lamps etc.)
Laser /
Optical Rad.
Whenever you need to use for an acivity a Laser Class II or higher
(for example portable scanner)Piercing
When there is a possibility of direct contact with sharp
objects causing lacerations
Chemicals Each time that a chemical is used in the workplace
Pressure
equipmentUse or maintenance of pressure equipments Fire
When an element used in the job starts to burn due to
another element
Radiations Any radioactive material or machines that generate radiation
DA
NG
ER
S R
ELA
TE
D T
O T
HE
WO
RK
ING
AC
TIV
ITY
Jobs from
a height
Working over 1.80 meters without protection falls systems
(railings, slings etc.)
MicroclimateExcessively high or low temperatures of the working place.
Frequent temperature changes
Conifined
spaces
Whenever the operator operates under conditions of
inadequate oxygenation with risk of suffocation
Risk represented by the presence of suspended loads
Slip / FallingPossibility of slipping on the floor dirty by oil, wet or
slippery
Explosive
atmosphere
Potential risks of explosion due to the presence of chemical
material (eg. Fuel vapors)Strike
Each time the operator strikes an element with a body
part
Electromagnetic
fields
Exposure to electromagnetic fields generated by electrical or
electronic equipment or industrial machine (welding machines,
mixers ...)
Ergonomy
by tool
Tools used that presents difficulty in grip and easy
handling
Surface
temperatureWorking surface's temperatures excessively hot or cold Strech
When the operator must stretch beyond its shoulders or
below the length of his arms
Air quality Fumes, or dust clouds released in the workplaceWork
posture
Whenever you need a work posture uncomfortable or
bent to perform a task
EN
VIR
ON
ME
NT
AL
Lighting Excessive or insufficient lighting conditions.E
RG
ON
OM
YManual
handlingWhen there is a risk in the manual handling of loads
INDIVIDUARE TUTTI I PERICOLI RELATIVI ALLE OPERAZIONI SOPRA ELENCATE
Noise Excessive or persistent noise level Repetitive movementsWhenever an operator performs a movement / task more
than once per cycle
VibrationsExposure to excessive or repetitive vibration (vibrations
transmitted by tools/vehicles, high vibration surface)strength
Whenever the operator must push or pull toward a
component by applying excessive force
HAZARD: RISK DESCRIPTION HAZARD: RISK DESCRIPTION
BRIEF DESCRIPTION OF THE ACTIVITY:
Activity :
Non-Routine RISK ASSESSMENTDate: Plant: Dept: Area: Line/Working station: Compiled by:
Maintenance Activities
Logistic Activities Other……... Dept Manager Unit Manager Safety Manager Safety ExpertMaintenance Manager
Maintenance Supervisor/ Expert
Other: (specify) ………...Team that perform the Evaluation
Non routinary activity TASK DESCRIPTION
RISKS IDENTIFICATION &
DEFINITION OF IMMEDIATE COUNTERMEASURES
Countermeasures definition
PPE
OPERATION RISK BEFORE RISK AFTER
NEEDED FOR OPERATION
Nr.
NEEDED FOR
OPERATION Nr.
NEEDED FOR
OPERATION Nr.
NEEDED FOR OPERATION
Nr.
NEEDED FOR
OPERATION Nr.
DATE
1. ALL THE PPEs MUST BE WORN FOR ALL THE ACTIVITIES AND DURING ALL THE WORKING TIME
2. IMMEDIATELY REPORT TO YOUR SUPERVISOR ANY UNSAFE CONDICTION OR ACT
3. MANTEIN SAFEYOUR WORKING AREA IN ORDER TO DON'T CREATE ANY RISK FOR YOURSELF OR YOUR COLLEAGUES
4. BE CONSCIUS OF THE RISKS RELATED TO YOUR ACTIVITES
5. ALWAYS USE THE PEDESTRIAN PASSAGES TO ACHIEVE YOUR WORKING AREA
6. RESPECT THE WORKING INSTRUCTION AND MAKE YOUR COLLEAGUES TO RESPECT THEM TOO
7. ALWAYS PAY ATTENTION TO FORK LIFT DRIVERS OR TO TRUCKS
8. DO NOT USE ANY TOOL / MACHINE / EQUIPMENT THAT HAS BEEN GIVEN TO YOU BY AN UNAUTHORIZED PERSON
9. IT'S FORBITTEN THE USAGE OF MOBILES DIRING THE WORKING TIME
10. PAY ATTENTION TO ALL THE SIGNALS, EMERGENCY LIGHTS AND EMERGENCY EXITS. PAY ATTENTION TO THE AREAS THAT HAVE BEEN CLOSED OF FORBITTEN TO THE ACCES OF UNAUTHORIZED PERSONS.
WORK SAFE IN EVERY TIME!
WORKER'S SIGNATURE
WITH THE SIGNATURE THE WORKER DECLARES THAT RECEIVED THE WORKING INSTRUCTION ABOUT RISKS RELATED TO THIS SPECIFIC WORKING ACTIVITY
LOCK OUT PROCEDURE
NAME AND SURNAME OF THE WORKER ROLE SIGNATURENAME AND SURNAME OF THE
SUPERVISORSIGNATURE
GENERAL INSTRUCTIONS AND RULES
SCREW DRIVER / MANUAL TOOL
MACHINES / TOOLS / PROCEDURE REQESTED TRAINING/ AUTHORIZATIONS / PERMITS NEEDED CHEMICAL SUBSTANCES TO BE USED
TYPE OF MACHINE/ TOOL TYPE OF PERMIT / AUTHORIZATION SUSTANCE NEEDED FOR OPERATION Nr.
LIFTING PLATFORMTRAINING / AUTHORIZATION FOR ELECTRICAL
WORKS
WELDERTRAINING / AUTHORIZATION FOR DRIVING
FORKLIFTS
SCAFFOLDING PERMIT FOR WELIDING / CUTTING
PPE TYPE TIPO DI D.P.I.: TIPO DI D.P.I.:
HEARING PROTECTION GLASSES SLEEVES
CUT RESISTANT GLOVES GLOVES FOR HEAT GLOVES FOR CHEMICAL SUBSTANCES
HIGH VISIBILITY VESTS FINGER PROTECTION SAFETY HEARNESS
NON CONDUCTIVE CLOTHES SAFETY CLOTHES SAFETY MASK
MECHANICAL PROTECTION GLOVES SAFETY SHOES RUBBER BOOTS
HELMET ANTIFOG GLASSES SAFETY VISOR
PPE REQUESTED
RISK= PROBABILITY*GRAVITY
ALL THE RISKS MUST BE MAGED BEFORE TO START THE ACTIVITY
HAZARD IDENTIFIED COUNTERMEASURE COUNTERMEASURE DESCRIPTIONRESP. OF CHECKING THE
EFFECTIVENESSSKTECHES
R G = 1 G = 2 G = 3 G = 4
P = 1 1 2 3 4
P = 2 2 4 6 8
P = 3 3 6 9 12
P=4 4 8 12 16
R G = 1 G = 2 G = 3 G = 4
P = 1 1 2 3 4
P = 2 2 4 6 8
P = 3 3 6 9 12
P=4 4 8 12 16
R G = 1 G = 2 G = 3 G = 4
P = 1 1 2 3 4
P = 2 2 4 6 8
P = 3 3 6 9 12
P=4 4 8 12 16
R G = 1 G = 2 G = 3 G = 4
P = 1 1 2 3 4
P = 2 2 4 6 8
P = 3 3 6 9 12
P=4 4 8 12 16
R G = 1 G = 2 G = 3 G = 4
P = 1 1 2 3 4
P = 2 2 4 6 8
P = 3 3 6 9 12
P=4 4 8 12 16
R G = 1 G = 2 G = 3 G = 4
P = 1 1 2 3 4
P = 2 2 4 6 8
P = 3 3 6 9 12
P=4 4 8 12 16
R G = 1 G = 2 G = 3 G = 4
P = 1 1 2 3 4
P = 2 2 4 6 8
P = 3 3 6 9 12
P=4 4 8 12 16
R G = 1 G = 2 G = 3 G = 4
P = 1 1 2 3 4
P = 2 2 4 6 8
P = 3 3 6 9 12
P=4 4 8 12 16
PROBABILITY DESCRIPTION GRAVITY DESCRIPTION
P = 1
Very Low Probability to
Occur: There are not
previous cases
S = 1 Slight: potential result first aid
P = 2
Lower Probability to Occur:
Exist in the past previous
cases very rare
S = 2Medium: potential result injury
>1 day & <3 days
P = 3Probable to Occur: Exist in
the past previous cases S = 3
Serious: potential result injury
>3 days & < 30 days
P = 4Highly Probably to Occur:
Previous cases are frequent S =4
Very serious: potential result
injury >30 days, or Fatal, or
Occupational illness
LEGENDA
Risk Level G=1 G=2 G=3 G=4
P=1 1 2 3 4
P=2 2 4 6 8
P=3 3 6 9 12
P=4 4 8 12 16
Countermeasures
Very high
risk
Not
acceptable
The risk is not acceptable and must strongly attached . Is
needed to implement immediate countermeasures in
order to reduce the level of the risk at least to a tolerable
level.
High risk Improvable
The risk is not acceptable and must be improvable. Is
needed to implement rapid countermeasures in order to
reduce the level of the risk at least to a tolerable level.
Medium risk Tolerable
The risk is tolerable. Is needed to evaluate possible
countermeasures in order to reduce the level of the risk
to an acceptable level. Continuous improvement
approach is required.
Low risk AcceptableThe risk is acceptable. Continuous monitoring about
safety conditions is required.
Risk level
Risk Level
R=P x SRange
RR= 1 - 2
R R= 3 - 4
R R= 6 - 9
R R= 12 - 16
RISK LEVEL
RISK ASSESSMENT CRITERIA
Risks ASSESSMENT (R=PxG)
COUTERMEASURES DEFINITION
SUPERVISORs / PERSONS IN CHARGE TO ENSURE THE APPLICATION OF THE COUNTERMEASURES
PPE REQUESTED PER TASK
EQUIPMENTS/ PROCEDURES REQUESTED PER TASK
TRAINING/ AUTHORIZATIONS / PERMITS PER TASK
CHEMICALS REQUESTED PER TASK
SAFETY RULES
AND
SIGNATURES
TOOL
Non Routine Activities
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 75/142
© Copyright by Automotive Lighting
Num rev
Resp.
DATA
Product
BUSINESS LINE
X
X
Picture or sketch Picture or sketch
Status updateREVIEW RESP. OBJECT
INSTALLATION
COST (C.D) ERGONOMICS /W.O COSTRUCTION OPERATIVE CHECK
1
Machine component
IMPACT / PILLAR
QUALITY (Q.C) AFFIDABILITY (P.M)
Project Information
Priority Kaizen code or name
WORKING(A.M) SAFETY PROJECT DETAIL FINAL CHECK
2
After - Avoid finger/hand from stuck/hit by machine
CHECK FUNCTIONAL
PROBLEM DESCRIPTION SOLUTION DESCRIPTION
ENVIRONMENT PRELIMINARY PROJECT
MACHINE
Line Work Station Machine code
STATUS
PLANNING
DescriptionMachine name
MANTENANCE (P.M)
Suzuki YV7 HL
12B Stn.1, 2, 3, 4, 5, 9 Housing Assy. H and Cap Assy. Headlamp Assy.
MFE/Zamzam
Penang Process Final Assembly EEM
Maintenance Prevention Information
Plant Unit Pillar
SAF
EEM
Lock out station SOP
EXPANSION
Model Area
We trained our workers how to use the
lock out and tag out. We created the
LOTO Board
Non Routine Work – LOTO Procedure
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 76/142
© Copyright by Automotive Lighting
Num rev
Resp.
DATA
Product
BUSINESS LINE
X
X
Picture or sketch Picture or sketch
Status updateREVIEW RESP. OBJECT
INSTALLATION
COST (C.D) ERGONOMICS /W.O COSTRUCTION OPERATIVE CHECK
1
Machine component
IMPACT / PILLAR
QUALITY (Q.C) AFFIDABILITY (P.M)
Project Information
Priority Kaizen code or name
WORKING(A.M) SAFETY PROJECT DETAIL FINAL CHECK
2
After - Avoid finger/hand from stuck/hit by machine
CHECK FUNCTIONAL
PROBLEM DESCRIPTION SOLUTION DESCRIPTION
ENVIRONMENT PRELIMINARY PROJECT
MACHINE
Line Work Station Machine code
STATUS
PLANNING
DescriptionMachine name
MANTENANCE (P.M)
Suzuki YV7 HL
12B Stn.1, 2, 3, 4, 5, 9 Housing Assy. H and Cap Assy. Headlamp Assy.
MFE/Zamzam
Penang Process Final Assembly EEM
Maintenance Prevention Information
Plant Unit Pillar
SAF
EEM
G=1 G=2 G=3 G=4
Risk Level
Slight:
potential
result first
aid
Medium:
potential
result
injury >1
day & <3
days
Serious:
potential
result injury
>3 days & <
30 days
Very
serious:
potential
result injury
>30 days
P=1
Very Low
Probability
to Occur1 2 3 4
P=2
Lower
Probability
to Occur2 4 6 8
P=3Probable to
Occur 3 6 9 12
P=4
Highly
Probably to
Occur4 8 12 16
G=1 G=2 G=3 G=4
Risk Level
Slight:
potential
result first
aid
Medium:
potential
result
injury >1
day & <3
days
Serious:
potential
result injury
>3 days & <
30 days
Very
serious:
potential
result injury
>30 days
P=1
Very Low
Probability
to Occur1 2 3 4
P=2
Lower
Probability
to Occur2 4 6 8
P=3Probable to
Occur 3 6 9 12
P=4
Highly
Probably to
Occur4 8 12 16
RISK ASSESSMENT: NUMERICAL EVALUATION
Horizontal Expansion
EXPANSION
Maintenance
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
Risk Analysis Maintenance
(Non-Routine)
9
Set up life line for person who work on the Hoist Crossbeam
3
When Maintenance Person walk on the Hoist crossbeam, there was not Life line for them to attach safety belt.
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 77/142
© Copyright by Automotive Lighting
Routine Procedure Non - Routine
Procedure
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
Safety Standards Documents
TPM (Model Area)
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 78/142
© Copyright by Automotive Lighting
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
Non Routine Activities: Plant Results
LIST OF NON ROUTINE
ACTIVITIES (PM +AM+SAF) 268 SMP
11 SAF
Procedures
1. Working at height 2. Handling Chemical 3. Welding Work External 4. Pressure vessel 5. Crane Handling 6. Electrical Appliance 7. Traffic Control 8. Fire Fighting Equipment 9.Personal Protect Equipment 10.Safety Devices 11.Chemical Labelling
268 STANDARDIZED ACTIVITIES
11 Non-routine work Procedures
SAF
PM
AM
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 79/142
© Copyright by Automotive Lighting
Contractors Management
Contract
Safety Procedures
Safety Meeting
Legal Requirements
Risk Analysis
Training
Audit / Inspection
Activities follow up
Monthly follow up meeting
Safety Information
Process review
Contractors Management
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 80/142
© Copyright by Automotive Lighting
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
EHS Contractor
Compliance Form
Type of hazard
PPE requirement
Job safety analysis
in sequence
Environmental
aspect
Contractor Job
Safety
Analysis
Training course outline:
1. Legal requirement on
EHS
2. ALMA EHS requirement
3. Communication process
4. Emergency contact
5. Risk assessment on site
Pre-assessment Site Assessment
Zero
Accidents
Risk Analysis Process for
Contractors
SAF
ENV
Construction map at Security
Room
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 81/142
© Copyright by Automotive Lighting UA & UC Condition Root Causes Countermeasures
Step 2 Step 3 Step 5 Step 6 Step 7 Step 0 Step 1
Audit Frequency/Number of UA & UC
Step 4
Contractors Audit
*Data updated to March 2016 All
findings
Closed
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 82/142
© Copyright by Automotive Lighting
Visual Safety Standards Examples
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
Employee
Safety
Machinery
Safety
Fire
Protection
System
Employee
Communication
Center
FIRE PANNEL
FIRE HOSE
PPE CHECKS
SAFETY TRAINING ROOM
PPE SIGNAGE & DETAILS
WALK WAYS
WALK WAYS
MACHINE SAFETY
EVACUATION PLANS SAFETY
MIRRORS
MACHINE FENCING
SAFETY
BLIND SPOT
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 83/142
© Copyright by Automotive Lighting
Visual Safety Standards Examples
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
Employee
Safety
Fire
Protection
System
Employee
Communication Center
SAFETY FENCING
SAFETY POSTER
SAFETY BOARD
EMERGENCY POINT
SAFETY SHOE
SAFETY VEST
SAFETY HELMET
FIRE EXTINGUISHER
ERT EQUIPMENT
PPE FOR CRANE OPERATOR
DOJO ROOM
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 84/142
© Copyright by Automotive Lighting
Num rev
Resp.
DATA
Product
BUSINESS LINE
X
X
Picture or sketch Picture or sketch
Maintenance Prevention Information
Plant Unit Pillar MFE/Zamzam
Penang Process Final Assembly EEM
Suzuki YV7 HL
12B AllHousing Assy , Headlamp Assy.&
Function TestingHeadlamp Assy.
MACHINE
Line Work Station Machine code
STATUS
PLANNING
DescriptionMachine name
MANTENANCE (P.M)
After - Easy excess o trouble shoot problem.
CHECK FUNCTIONAL
PROBLEM DESCRIPTION SOLUTION DESCRIPTION
ENVIRONMENT PRELIMINARY PROJECT
Priority Kaizen code or name
WORKING(A.M) SAFETY PROJECT DETAIL FINAL CHECK
2
1
Machine component
IMPACT / PILLAR
QUALITY (Q.C) AFFIDABILITY (P.M)
Project Information Status update
REVIEW RESP. OBJECT
INSTALLATION
COST (C.D) ERGONOMICS /W.O COSTRUCTION OPERATIVE CHECK
HOUSING ASSY. STATION GLUING STATION
GLUING STATION
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
Safety MP info Model Area (TPM)
Num rev
Resp.
DATA
Product
BUSINESS LINE
X
X
Picture or sketch Picture or sketch
Status updateREVIEW RESP. OBJECT
INSTALLATION
COST (C.D) ERGONOMICS /W.O COSTRUCTION OPERATIVE CHECK
1
Machine component
IMPACT / PILLAR
QUALITY (Q.C) AFFIDABILITY (P.M)
Project Information
Priority Kaizen code or name
WORKING(A.M) SAFETY PROJECT DETAIL FINAL CHECK
2
After - Avoid finger/hand from stuck/hit by machine
CHECK FUNCTIONAL
PROBLEM DESCRIPTION SOLUTION DESCRIPTION
ENVIRONMENT PRELIMINARY PROJECT
MACHINE
Line Work Station Machine code
STATUS
PLANNING
DescriptionMachine name
MANTENANCE (P.M)
Suzuki YV7 HL
12B Stn.1, 2, 3, 4, 5, 9 Housing Assy. H and Cap Assy. Headlamp Assy.
MFE/Zamzam
Penang Process Final Assembly EEM
Maintenance Prevention Information
Plant Unit Pillar
Num rev
Resp.
DATA
Product
BUSINESS LINE
X
X
Picture or sketch Picture or sketch
Status updateREVIEW RESP. OBJECT
INSTALLATION
COST (C.D) ERGONOMICS /W.O COSTRUCTION OPERATIVE CHECK
1
Machine component
IMPACT / PILLAR
QUALITY (Q.C) AFFIDABILITY (P.M)
Project Information
Priority Kaizen code or name
WORKING(A.M) SAFETY PROJECT DETAIL FINAL CHECK
2
After - Avoid danger to operator
CHECK FUNCTIONAL
PROBLEM DESCRIPTION SOLUTION DESCRIPTION
ENVIRONMENT PRELIMINARY PROJECT
MACHINE
Line Work Station Machine code
STATUS
PLANNING
DescriptionMachine name
MANTENANCE (P.M)
Suzuki YV7 HL
12B All
Housing Assy. Headlamp Assy.
G;luing & Lens Pressing, Light
Test & Leak Test
Headlamp Assy.
MFE/Zamzam
Penang Process Final Assembly EEM
Maintenance Prevention Information
Plant Unit Pillar
Num rev
Resp.
DATA
Product
BUSINESS LINE
X
X
Picture or sketch Picture or sketch
Maintenance Prevention Information
Plant Unit Pillar MFE/Zamzam
Penang Process Final Assembly EEM
Suzuki YV7 HL
12B AllHousing Assy , Headlamp Assy.&
Function TestingHeadlamp Assy.
MACHINE
Line Work Station Machine code
STATUS
PLANNING
DescriptionMachine name
MANTENANCE (P.M)
After - Easy excess o trouble shoot problem.
CHECK FUNCTIONAL
PROBLEM DESCRIPTION SOLUTION DESCRIPTION
ENVIRONMENT PRELIMINARY PROJECT
Priority Kaizen code or name
WORKING(A.M) SAFETY PROJECT DETAIL FINAL CHECK
2
1
Machine component
IMPACT / PILLAR
QUALITY (Q.C) AFFIDABILITY (P.M)
Project Information Status update
REVIEW RESP. OBJECT
INSTALLATION
COST (C.D) ERGONOMICS /W.O COSTRUCTION OPERATIVE CHECK
HOUSING ASSY. STATION GLUING STATION
GLUING STATION
Num rev
Resp.
DATA
Product
BUSINESS LINE
X
X
Picture or sketch Picture or sketch
Status updateREVIEW RESP. OBJECT
INSTALLATION
COST (C.D) ERGONOMICS /W.O COSTRUCTION OPERATIVE CHECK
1
Machine component
IMPACT / PILLAR
QUALITY (Q.C) AFFIDABILITY (P.M)
Project Information
Priority Kaizen code or name
WORKING(A.M) SAFETY PROJECT DETAIL FINAL CHECK
2
After - Avoid finger/hand from stuck/hit by machine
CHECK FUNCTIONAL
PROBLEM DESCRIPTION SOLUTION DESCRIPTION
ENVIRONMENT PRELIMINARY PROJECT
MACHINE
Line Work Station Machine code
STATUS
PLANNING
DescriptionMachine name
MANTENANCE (P.M)
Suzuki YV7 HL
12B Stn.1, 2, 3, 4, 5, 9 Housing Assy. H and Cap Assy. Headlamp Assy.
MFE/Zamzam
Penang Process Final Assembly EEM
Maintenance Prevention Information
Plant Unit Pillar
Num rev
Resp.
DATA
Product
BUSINESS LINE
X
X
Picture or sketch Picture or sketch
Status updateREVIEW RESP. OBJECT
INSTALLATION
COST (C.D) ERGONOMICS /W.O COSTRUCTION OPERATIVE CHECK
1
Machine component
IMPACT / PILLAR
QUALITY (Q.C) AFFIDABILITY (P.M)
Project Information
Priority Kaizen code or name
WORKING(A.M) SAFETY PROJECT DETAIL FINAL CHECK
2
After - Avoid finger/hand from stuck/hit by machine
CHECK FUNCTIONAL
PROBLEM DESCRIPTION SOLUTION DESCRIPTION
ENVIRONMENT PRELIMINARY PROJECT
MACHINE
Line Work Station Machine code
STATUS
PLANNING
DescriptionMachine name
MANTENANCE (P.M)
Suzuki YV7 HL
12B Stn.1, 2, 3, 4, 5, 9 Housing Assy. H and Cap Assy. Headlamp Assy.
MFE/Zamzam
Penang Process Final Assembly EEM
Maintenance Prevention Information
Plant Unit Pillar
Num rev
Resp.
DATA
Product
BUSINESS LINE
X
X
Picture or sketch Picture or sketch
Status updateREVIEW RESP. OBJECT
INSTALLATION
COST (C.D) ERGONOMICS /W.O COSTRUCTION OPERATIVE CHECK
1
Machine component
IMPACT / PILLAR
QUALITY (Q.C) AFFIDABILITY (P.M)
Project Information
Priority Kaizen code or name
WORKING(A.M) SAFETY PROJECT DETAIL FINAL CHECK
2
After - Avoid danger to operator
CHECK FUNCTIONAL
PROBLEM DESCRIPTION SOLUTION DESCRIPTION
ENVIRONMENT PRELIMINARY PROJECT
MACHINE
Line Work Station Machine code
STATUS
PLANNING
DescriptionMachine name
MANTENANCE (P.M)
Suzuki YV7 HL
12B All
Housing Assy. Headlamp Assy.
G;luing & Lens Pressing, Light
Test & Leak Test
Headlamp Assy.
MFE/Zamzam
Penang Process Final Assembly EEM
Maintenance Prevention Information
Plant Unit Pillar
Num rev
Resp.
DATA
Product
BUSINESS LINE
X
X
Picture or sketch Picture or sketch
Maintenance Prevention Information
Plant Unit Pillar MFE/Zamzam
Penang Process Final Assembly EEM
Suzuki YV7 HL
12B AllHousing Assy , Headlamp Assy.&
Function TestingHeadlamp Assy.
MACHINE
Line Work Station Machine code
STATUS
PLANNING
DescriptionMachine name
MANTENANCE (P.M)
After - Easy excess o trouble shoot problem.
CHECK FUNCTIONAL
PROBLEM DESCRIPTION SOLUTION DESCRIPTION
ENVIRONMENT PRELIMINARY PROJECT
Priority Kaizen code or name
WORKING(A.M) SAFETY PROJECT DETAIL FINAL CHECK
2
1
Machine component
IMPACT / PILLAR
QUALITY (Q.C) AFFIDABILITY (P.M)
Project Information Status update
REVIEW RESP. OBJECT
INSTALLATION
COST (C.D) ERGONOMICS /W.O COSTRUCTION OPERATIVE CHECK
HOUSING ASSY. STATION GLUING STATION
GLUING STATION
Num rev
Resp.
DATA
Product
BUSINESS LINE
X
X
Picture or sketch Picture or sketch
Status updateREVIEW RESP. OBJECT
INSTALLATION
COST (C.D) ERGONOMICS /W.O COSTRUCTION OPERATIVE CHECK
1
Machine component
IMPACT / PILLAR
QUALITY (Q.C) AFFIDABILITY (P.M)
Project Information
Priority Kaizen code or name
WORKING(A.M) SAFETY PROJECT DETAIL FINAL CHECK
2
After - Avoid finger/hand from stuck/hit by machine
CHECK FUNCTIONAL
PROBLEM DESCRIPTION SOLUTION DESCRIPTION
ENVIRONMENT PRELIMINARY PROJECT
MACHINE
Line Work Station Machine code
STATUS
PLANNING
DescriptionMachine name
MANTENANCE (P.M)
Suzuki YV7 HL
12B Stn.1, 2, 3, 4, 5, 9 Housing Assy. H and Cap Assy. Headlamp Assy.
MFE/Zamzam
Penang Process Final Assembly EEM
Maintenance Prevention Information
Plant Unit Pillar
Num rev
Resp.
DATA
Product
BUSINESS LINE
X
X
Picture or sketch Picture or sketch
Status updateREVIEW RESP. OBJECT
INSTALLATION
COST (C.D) ERGONOMICS /W.O COSTRUCTION OPERATIVE CHECK
1
Machine component
IMPACT / PILLAR
QUALITY (Q.C) AFFIDABILITY (P.M)
Project Information
Priority Kaizen code or name
WORKING(A.M) SAFETY PROJECT DETAIL FINAL CHECK
2
After - Avoid finger/hand from stuck/hit by machine
CHECK FUNCTIONAL
PROBLEM DESCRIPTION SOLUTION DESCRIPTION
ENVIRONMENT PRELIMINARY PROJECT
MACHINE
Line Work Station Machine code
STATUS
PLANNING
DescriptionMachine name
MANTENANCE (P.M)
Suzuki YV7 HL
12B Stn.1, 2, 3, 4, 5, 9 Housing Assy. H and Cap Assy. Headlamp Assy.
MFE/Zamzam
Penang Process Final Assembly EEM
Maintenance Prevention Information
Plant Unit Pillar
Num rev
Resp.
DATA
Product
BUSINESS LINE
X
X
Picture or sketch Picture or sketch
Status updateREVIEW RESP. OBJECT
INSTALLATION
COST (C.D) ERGONOMICS /W.O COSTRUCTION OPERATIVE CHECK
1
Machine component
IMPACT / PILLAR
QUALITY (Q.C) AFFIDABILITY (P.M)
Project Information
Priority Kaizen code or name
WORKING(A.M) SAFETY PROJECT DETAIL FINAL CHECK
2
After - Avoid danger to operator
CHECK FUNCTIONAL
PROBLEM DESCRIPTION SOLUTION DESCRIPTION
ENVIRONMENT PRELIMINARY PROJECT
MACHINE
Line Work Station Machine code
STATUS
PLANNING
DescriptionMachine name
MANTENANCE (P.M)
Suzuki YV7 HL
12B All
Housing Assy. Headlamp Assy.
G;luing & Lens Pressing, Light
Test & Leak Test
Headlamp Assy.
MFE/Zamzam
Penang Process Final Assembly EEM
Maintenance Prevention Information
Plant Unit Pillar
Num rev
Resp.
DATA
Product
BUSINESS LINE
X
X
Picture or sketch Picture or sketch
Maintenance Prevention Information
Plant Unit Pillar MFE/Zamzam
Penang Process Final Assembly EEM
Suzuki YV7 HL
12B AllHousing Assy , Headlamp Assy.&
Function TestingHeadlamp Assy.
MACHINE
Line Work Station Machine code
STATUS
PLANNING
DescriptionMachine name
MANTENANCE (P.M)
After - Easy excess o trouble shoot problem.
CHECK FUNCTIONAL
PROBLEM DESCRIPTION SOLUTION DESCRIPTION
ENVIRONMENT PRELIMINARY PROJECT
Priority Kaizen code or name
WORKING(A.M) SAFETY PROJECT DETAIL FINAL CHECK
2
1
Machine component
IMPACT / PILLAR
QUALITY (Q.C) AFFIDABILITY (P.M)
Project Information Status update
REVIEW RESP. OBJECT
INSTALLATION
COST (C.D) ERGONOMICS /W.O COSTRUCTION OPERATIVE CHECK
HOUSING ASSY. STATION GLUING STATION
GLUING STATION
Num rev
Resp.
DATA
Product
BUSINESS LINE
X
X
Picture or sketch Picture or sketch
Status updateREVIEW RESP. OBJECT
INSTALLATION
COST (C.D) ERGONOMICS /W.O COSTRUCTION OPERATIVE CHECK
1
Machine component
IMPACT / PILLAR
QUALITY (Q.C) AFFIDABILITY (P.M)
Project Information
Priority Kaizen code or name
WORKING(A.M) SAFETY PROJECT DETAIL FINAL CHECK
2
After - Avoid finger/hand from stuck/hit by machine
CHECK FUNCTIONAL
PROBLEM DESCRIPTION SOLUTION DESCRIPTION
ENVIRONMENT PRELIMINARY PROJECT
MACHINE
Line Work Station Machine code
STATUS
PLANNING
DescriptionMachine name
MANTENANCE (P.M)
Suzuki YV7 HL
12B Stn.1, 2, 3, 4, 5, 9 Housing Assy. H and Cap Assy. Headlamp Assy.
MFE/Zamzam
Penang Process Final Assembly EEM
Maintenance Prevention Information
Plant Unit Pillar
Num rev
Resp.
DATA
Product
BUSINESS LINE
X
X
Picture or sketch Picture or sketch
Status updateREVIEW RESP. OBJECT
INSTALLATION
COST (C.D) ERGONOMICS /W.O COSTRUCTION OPERATIVE CHECK
1
Machine component
IMPACT / PILLAR
QUALITY (Q.C) AFFIDABILITY (P.M)
Project Information
Priority Kaizen code or name
WORKING(A.M) SAFETY PROJECT DETAIL FINAL CHECK
2
After - Avoid finger/hand from stuck/hit by machine
CHECK FUNCTIONAL
PROBLEM DESCRIPTION SOLUTION DESCRIPTION
ENVIRONMENT PRELIMINARY PROJECT
MACHINE
Line Work Station Machine code
STATUS
PLANNING
DescriptionMachine name
MANTENANCE (P.M)
Suzuki YV7 HL
12B Stn.1, 2, 3, 4, 5, 9 Housing Assy. H and Cap Assy. Headlamp Assy.
MFE/Zamzam
Penang Process Final Assembly EEM
Maintenance Prevention Information
Plant Unit Pillar
14 SAFETY MP INFO ALREADY CREATED
SAF
EEM
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 85/142
© Copyright by Automotive Lighting
POKA-YOKE SAFETY
The mistake-proofing philosophy recognizes that people sometimes
forget and make errors. The approach uses common-sense ideas and
methods in both process and product to eliminate human and mechanical
errors.
• Great efforts have been made in applying these concepts
to Safety and accident prevention.
Curtain Sensor
Two hand Start Push Button Two hand Start Push Button
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
23 POKA-
YOKE
SAF
EEM
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 86/142
© Copyright by Automotive Lighting
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
BEST PRACTICES
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 87/142
© Copyright by Automotive Lighting
Lock-out & Tag-out Work Flow
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
Maintenance people check the energy points according to machine lock-out sop
Take lock and tag go to machine
Implement lock-out and tag-out
Start the maintenance
Remove the lock and tag from the machine .
Breakdown
Operator deliver order to
maintenance
Preventive Maintenance
Lock out station &Tag Maintenance Lock out SOP
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 88/142
© Copyright by Automotive Lighting
KAI Formula Reporting
Frequency
Implemented standard N° of OPL Monthly
Implemented standard N° of SOP Monthly
KAI
Step 3 – TPM (Model Area)
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
0
20
40
60
80
100
120
140
160
180
200
2008 2009 2010 2011 2012 2013 2014 2015 Mar-160
2
4
6
8
10
12
14
16
2008 2009 2010 2011 2012 2013 2014 2015 Mar-16
OPL Cumulative SOP Cumulative
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 89/142
© Copyright by Automotive Lighting
TPM (Model Area)
Heinrich’s Pyramid
Fatality
LTI > 30 days
LTI < 30 days
First Aids
Near Misses
Unsafe Conditions
Unsafe Acts
2008 2009
0 0
0 0
3 0
3 0
4 9
9 78
18 56
Step 0 Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1 Step 2 Step 3 Step 4 Step 6
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 90/142
© Copyright by Automotive Lighting
Expansion Area
Heinrich’s Pyramid
Fatality
LTI > 30 days
LTI < 30 days
First Aids
Near Misses
Unsafe Conditions
Unsafe Acts
2009 2010
0 0
0 0
0 0
1 0
1 1
6 26
58 150
Step 0 Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1 Step 2 Step 3 Step 4 Step 6
BMC
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 91/142
© Copyright by Automotive Lighting
Expansion Area
Heinrich’s Pyramid
Fatality
LTI > 30 days
LTI < 30 days
First Aids
Near Misses
Unsafe Conditions
Unsafe Acts
2010 2011 2012
0 0 0
0 0 0
0 0 0
2 3 0
3 4 4
5 4 0
96 243 365
Step 0 Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1 Step 2 Step 3 Step 4 Step 6
AO
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 92/142
© Copyright by Automotive Lighting
Plant Wide
Heinrich’s Pyramid
Step 5 Step 7 Step 0 Step 1 Step 2 Step 3 Step 4 Step 6
2011 2012 2013 2014 2015
0 0 0 0 0
0 0 0 1 0
0 0 0 0 0
5 3 0 1 0
9 13 8 3 3
58 45 168 295 208
1362 1410 132 342 346
Transferring
to new plant Jan ‘16
Feb ’16
Mar ‘16
0 0 0
0 0 0
0
0
0
0 0 0
0 0 0
26 16 25
47 24 44
Fatality
LTI > 30 days
LTI < 30 days
First Aids
Near Misses
Unsafe Conditions
Unsafe Acts
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 93/142
© Copyright by Automotive Lighting
Expansion Area
Heinrich’s Pyramid
Fatality
LTI > 30 days
LTI < 30 days
First Aids
Near Misses
Unsafe Conditions
Unsafe Acts
2013 Jan ‘14
0 0
0 1
0 0
0 0
3 0
23 11
31 5
Step 0 Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1 Step 2 Step 3 Step 4 Step 6
WAREHOUSE
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 94/142
© Copyright by Automotive Lighting
While
transferring PES
unit into bins the
operator have
pain at back
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
Effectiveness Check Horizontal Expansion
Step 3
We have no similar accidents
INJURY
EXPANSION
Analysis of Incident
Countermeasures Train all the operator to inform his
history of medical problem (related to
work) to their superior or to nurse at
sick bay. And retrain the method of
lifting of heavy bins. Problem
Fatality
LTI > 30 days
LTI < 30 days
First Aids
Back pain
Phenomena
Root Cause: Never tell his history of medical problem (related to work) to the superior. Unsafe Act: Physical deficiency / instability
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 95/142
© Copyright by Automotive Lighting
81 TOTAL
Rating
B M A B (low) M (medium) A (high)
3.01Safety-critical aspects are discussed periodically by the
production committee8 3 5 8 Sometimes Often Always
3.02An action plan exists and responsibilities and dates of
completion of the activities have been assigned5 3 5 5 Sometimes Often Always
3.03 This plan is shared with the resources involved 5 1 3 5 Sometimes Often Always
3.04 Safety tags are used 5 1 3 5Have been formalized but not
deployed
Have been formalized and
deployed
Are used regularly in the pilot
area
3.05 A safety tags management plan has been drafted 5 1 3 5Have been formalized but not
deployed
Have been formalized and
deployed
Are used regularly in the pilot
area
3.06 5S activities have been mainteined 5 1 3 5 No Partially Yes
3.07Kaizen, OPL, SOP have been implemented to improve
safety in workplace5 1 3 5 Sometimes Often Always
3.08 A workplace risk assessment exists. 8 3 5 8 In some workstation In many workstation In all workstation
3.09
Documentation for risk assessment are updated
periodically after modifications to work cycles,
replacement of chemical products, equipment,
5 3 5 8 Sometimes Often Always
3.10Supervisors know the assessment of risks regarding
their area of responsibility.5 3 5 8 Some Many All
3.11 People heve been trained about area risks 3 1 3 8 Some Many All
3.12 One point lessons on safety exist 3 1 3 5Have been formalized but not
deployed
Have been formalized and
deployed
Are used regularly in the pilot
area
3.13 SOP for safety critical operations have been created 3 1 3 5 Yes some examples Yes, many examples Everywhere
3.14 Visual control of safety-critical aspects in the area exists 1 1 3 5 Yes some examples Yes, many examples Everywhere
3.15Machine and process specific Lock-out/ tag-out sheets
exist.5 1 3 5
Have been formalized but not
deployed
Have been formalized and
deployed
Are used regularly in the pilot
area
3.16PPE Visual Management are displayed at workstation
level.5 1 3 5 Sometimes Often Always
3.17 Pedestrian Walkways have been clearly idenfied. 5 1 3 5 No Partially Yes
Rating criteria
WCMSAFETY
PILLAR AUDIT CHECK-LIST STEP 3
CHECKS
PLANT
DATE 09-Mar-15
List of all the
problems
Standard Visual
Management
Risks
Assessment
REMARKSSCORE
Restore basic
condition
TOPIC No.
AREA TPM & BMC
INTERNAL AUDITORS GUNA, ZAMANI & TAN
AUDIT CHECK-LIST RATING STANDARDS
85 TOTAL
Rating
B M A B (low) M (medium) A (high)
3.01Safety-critical aspects are discussed periodically by the
production committee8 3 5 8 Sometimes Often Always
3.02An action plan exists and responsibilities and dates of
completion of the activities have been assigned5 3 5 5 Sometimes Often Always
3.03 This plan is shared with the resources involved 5 1 3 5 Sometimes Often Always
3.04 Safety tags are used 5 1 3 5Have been formalized but not
deployed
Have been formalized and
deployed
Are used regularly in the pilot
area
3.05 A safety tags management plan has been drafted 5 1 3 5Have been formalized but not
deployed
Have been formalized and
deployed
Are used regularly in the pilot
area
3.06 5S activities have been mainteined 5 1 3 5 No Partially Yes
3.07Kaizen, OPL, SOP have been implemented to improve
safety in workplace5 1 3 5 Sometimes Often Always
3.08 A workplace risk assessment exists. 8 3 5 8 In some workstation In many workstation In all workstation
3.09
Documentation for risk assessment are updated
periodically after modifications to work cycles,
replacement of chemical products, equipment,
5 3 5 8 Sometimes Often Always
3.10Supervisors know the assessment of risks regarding
their area of responsibility.5 3 5 8 Some Many All
3.11 People heve been trained about area risks 3 1 3 8 Some Many All
3.12 One point lessons on safety exist 3 1 3 5Have been formalized but not
deployed
Have been formalized and
deployed
Are used regularly in the pilot
area
3.13 SOP for safety critical operations have been created 5 1 3 5 Yes some examples Yes, many examples Everywhere
3.14 Visual control of safety-critical aspects in the area exists 3 1 3 5 Yes some examples Yes, many examples Everywhere
3.15Machine and process specific Lock-out/ tag-out sheets
exist.5 1 3 5
Have been formalized but not
deployed
Have been formalized and
deployed
Are used regularly in the pilot
area
3.16PPE Visual Management are displayed at workstation
level.5 1 3 5 Sometimes Often Always
3.17 Pedestrian Walkways have been clearly idenfied. 5 1 3 5 No Partially Yes
Rating criteria
WCMSAFETY
PILLAR AUDIT CHECK-LIST STEP 3
CHECKS
PLANT
DATE 09-Mar-15
List of all the
problems
Standard Visual
Management
Risks
Assessment
REMARKSSCORE
Restore basic
condition
TOPIC No.
AREA TPM & BMC
INTERNAL AUDITORS GUNA, ZAMANI & TAN
AUDIT CHECK-LIST RATING STANDARDS
93 TOTAL
Rating
B M A B (low) M (medium) A (high)
3.01Safety-critical aspects are discussed periodically by the
production committee8 3 5 8 Sometimes Often Always
3.02An action plan exists and responsibilities and dates of
completion of the activities have been assigned5 3 5 5 Sometimes Often Always
3.03 This plan is shared with the resources involved 5 1 3 5 Sometimes Often Always
3.04 Safety tags are used 5 1 3 5Have been formalized but not
deployed
Have been formalized and
deployed
Are used regularly in the pilot
area
3.05 A safety tags management plan has been drafted 5 1 3 5Have been formalized but not
deployed
Have been formalized and
deployed
Are used regularly in the pilot
area
3.06 5S activities have been mainteined 5 1 3 5 No Partially Yes
3.07Kaizen, OPL, SOP have been implemented to improve
safety in workplace5 1 3 5 Sometimes Often Always
3.08 A workplace risk assessment exists. 8 3 5 8 In some workstation In many workstation In all workstation
3.09
Documentation for risk assessment are updated
periodically after modifications to work cycles,
replacement of chemical products, equipment,
8 3 5 8 Sometimes Often Always
3.10Supervisors know the assessment of risks regarding
their area of responsibility.5 3 5 8 Some Many All
3.11 People heve been trained about area risks 8 1 3 8 Some Many All
3.12 One point lessons on safety exist 3 1 3 5Have been formalized but not
deployed
Have been formalized and
deployed
Are used regularly in the pilot
area
3.13 SOP for safety critical operations have been created 5 1 3 5 Yes some examples Yes, many examples Everywhere
3.14 Visual control of safety-critical aspects in the area exists 3 1 3 5 Yes some examples Yes, many examples Everywhere
3.15Machine and process specific Lock-out/ tag-out sheets
exist.5 1 3 5
Have been formalized but not
deployed
Have been formalized and
deployed
Are used regularly in the pilot
area
3.16PPE Visual Management are displayed at workstation
level.5 1 3 5 Sometimes Often Always
3.17 Pedestrian Walkways have been clearly idenfied. 5 1 3 5 No Partially Yes
Rating criteria
WCMSAFETY
PILLAR AUDIT CHECK-LIST STEP 3
CHECKS
PLANT
DATE 09-Mar-15
List of all the
problems
Standard Visual
Management
Risks
Assessment
REMARKSSCORE
Restore basic
condition
TOPIC No.
AREA TPM & BMC
INTERNAL AUDITORS GUNA, ZAMANI & TAN
AUDIT CHECK-LIST RATING STANDARDS
Step 5 Step 7 Step 0 Step 1 Step 2 Step 3 Step 4 Step 6
Target
Steps Audit Results
Achieved 93% proceed to
Step 4
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 96/142
© Copyright by Automotive Lighting
EHS Training
Analysis of NM, UA & UC(S-EWO + S-TWTTP)
General inspection for safety
KPI step 1-4
Step 4
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 97/142
© Copyright by Automotive Lighting
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
Analysis of Near Miss, UC & UA
Unsafe Condition
Near miss
First Aid
LTI >30 days
LTI ≤ 30 days
Unsafe Acts
Line walk by snapshot, audit or incident
reported
Investigation using S-EWO + S-TWTTP (UA)
Implement countermeasures
Report to EHS database action plan
Effectiveness check
Horizontal expansion
Standardization
P
D
D
C
A
A
EHS Database
Fatality
P
Countermeasures
Effectiveness check for
non recurrence Horizontal Expansion
Detection
“0” event
OK
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 98/142
© Copyright by Automotive Lighting
Audit System
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
Daily Employee
Checklist
Daily Team
Leader Checklist
*Plant Manager
*Departmental Manager
*Safety & Health Committee
*Supervisor
*Plant Manager,
*Departmental Manager
* Supervisor
Weekly SMAT
audit
Monthly EHS audit
SMAT Operator
Daily 6’S
SMAT
SCHEDULE
*Team Leader
*Operator
*Safety Captain
Daily Safety
Observation
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 99/142
© Copyright by Automotive Lighting
Step 2 Step 3 Step 4 Step 5 Step 6 Step 0 Step 1
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 100/142
© Copyright by Automotive Lighting
Num rev
Resp.
DATA
Product
BUSINESS LINE
X
X
Picture or sketch Picture or sketch
Status updateREVIEW RESP. OBJECT
INSTALLATION
COST (C.D) ERGONOMICS /W.O COSTRUCTION OPERATIVE CHECK
1
Machine component
IMPACT / PILLAR
QUALITY (Q.C) AFFIDABILITY (P.M)
Project Information
Priority Kaizen code or name
WORKING(A.M) SAFETY PROJECT DETAIL FINAL CHECK
2
After - Avoid finger/hand from stuck/hit by machine
CHECK FUNCTIONAL
PROBLEM DESCRIPTION SOLUTION DESCRIPTION
ENVIRONMENT PRELIMINARY PROJECT
MACHINE
Line Work Station Machine code
STATUS
PLANNING
DescriptionMachine name
MANTENANCE (P.M)
Suzuki YV7 HL
12B Stn.1, 2, 3, 4, 5, 9 Housing Assy. H and Cap Assy. Headlamp Assy.
MFE/Zamzam
Penang Process Final Assembly EEM
Maintenance Prevention Information
Plant Unit Pillar
SAF
EEM
Update the risk assessment
EXPANSION
NEAR MISSES
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
Countermeasures
Horizontal Expansion
SMAT Near Misses Detection & Countermeasures
Technician
almost fall due
to imbalance
step.
Effectiveness Check for non recurrence
KAIZEN Near Misses
Unsafe Conditions
Unsafe Acts
Weld Back & Change the new stand for safe
Problem
Almost fall from
platform
Phenomena Hazard:
Fall on
Root Cause: No Support stand on the platform
Unsafe Condition:
Weakness Design
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 101/142
© Copyright by Automotive Lighting
Num rev
Resp.
DATA
Product
BUSINESS LINE
X
X
Picture or sketch Picture or sketch
Status updateREVIEW RESP. OBJECT
INSTALLATION
COST (C.D) ERGONOMICS /W.O COSTRUCTION OPERATIVE CHECK
1
Machine component
IMPACT / PILLAR
QUALITY (Q.C) AFFIDABILITY (P.M)
Project Information
Priority Kaizen code or name
WORKING(A.M) SAFETY PROJECT DETAIL FINAL CHECK
2
After - Avoid finger/hand from stuck/hit by machine
CHECK FUNCTIONAL
PROBLEM DESCRIPTION SOLUTION DESCRIPTION
ENVIRONMENT PRELIMINARY PROJECT
MACHINE
Line Work Station Machine code
STATUS
PLANNING
DescriptionMachine name
MANTENANCE (P.M)
Suzuki YV7 HL
12B Stn.1, 2, 3, 4, 5, 9 Housing Assy. H and Cap Assy. Headlamp Assy.
MFE/Zamzam
Penang Process Final Assembly EEM
Maintenance Prevention Information
Plant Unit Pillar
SAF
EEM
Update the risk assessment
Aug 10 Sep 10 Oct 10 Nov 10
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
Countermeasures
Horizontal Expansion Effectiveness Check for non recurrence
Grinding safety glass
already broke due to
lose holder
EXPANSION UC
Near Misses
Unsafe Conditions
Unsafe Acts
SMAT UC Detection & Countermeasures
KAIZEN To fabricate special holder with permanent rivet to hold the cover Detection: Unsafe
Condition
Hazard:
Fluid, dust,
substances
projection Root Cause:
Lose glass holder Unsafe
Condition: Tools
Equipment -Weakness
design
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 102/142
© Copyright by Automotive Lighting
Update the risk prediction
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
Countermeasures
Effectiveness Check for non recurrence
Horizontal Expansion
SMAT UA Detection & Countermeasures
Operator left
the pallet jack
at the walkway
EXPANSION
UA
Near Misses Unsafe Conditions
Unsafe Acts
Detection : Unsafe
Act
Disciplinary action
Root Cause: Operator not
following safety rules Unsafe Act: Attitude/ Behaviour
- Negligence
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 103/142
© Copyright by Automotive Lighting
EHS Audit
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
Chemical Safety
Machinery
Electrical Safety
Fire Safety
6’
FINDING
S-EWO
ROOT CAUSE ANALISYS Unsafe
Act Unsafe
Condition
No repetitive events reported
S-EWO&S-TWTTP
IMPLEMENT COUNTERMEASURE
EXPANSION
PLANT WIDE
Model Area
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 104/142
© Copyright by Automotive Lighting
EHS Training Process
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
Training effectiveness evaluation
People development plan by Departmental Head & HR
EHS established TNA
• Risk Prediction Assessment Advanced
• Hazard Communication
• Workplace Inspection
• Hazard Identification, Risk Assessment & Control
Intermediate
• Understanding S-EWO
• Accident Prevention
• Emergency Preparedness
• Machinery Safety
Preliminary
White
Collar
Blue
Collar
SAF
PD
EHS TRAINING RECORD / DATA
2015 JAN – MAR 2016
Cat. #
Courses # Part.
Total
Hours
#
Courses
#
Part.
Total
Hours
Adv. 6 22 148 1 1 40
Inter. 9 312 928 2 42 42
Prelim. 11 332 822.5 2 39 54
Total 26 666 1898.5 5 82 136
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 105/142
© Copyright by Automotive Lighting
EHS SPECIFIC TRAINING
Training for Specific Tasks
FIRE FIGHTING &
FIRST AID TRAINING
EMERGENCY RESPONSE
TEAM MEMBERS
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
SAF
PD
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 106/142
© Copyright by Automotive Lighting
Safety Poster Competition
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
1st Place
2nd Place
3rd Place
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 107/142
© Copyright by Automotive Lighting
Month Subject
Jan Safety Leadership
Feb Stress Management
Mar Fire Safety
Apr Food Safety
May Road Safety
Jun Electrical Safety
Jul Obesity
Aug Hearing Conservation
Sep Healthy Diet Healthy Living
Oct Accident Prevention
Nov Workplace Safety – PPE
Dec 5S
#/Month Training Hours/ Month
EHS Theme
54 1.2
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
EHS Training Process
SAF
PD
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 108/142
© Copyright by Automotive Lighting
05
1015202530354045505560
Jan
13
Fe
b 1
3
Ma
r 1
3
Ap
r 13
Ma
y 1
3
Ju
n 13
Ju
ly
13
Au
g 1
3
Se
pt
13
Oc
t
13
No
v 13
Dec
13
Jan
14
Fe
b 1
4
Ma
r 1
4
Ap
r 14
Ma
y 1
4
Ju
n 1
4
Ju
ly
14
Au
g 1
4
Se
pt
14
Oc
t
14
No
v 14
Dec
14
Jan
15
Fe
b-1
5
Ma
r '1
5
Ap
r '1
5
Ma
y '1
5
Ju
n '1
5
Ju
l '1
5
Au
g '1
5
Se
p '1
5
Oc
t '1
5
No
v '1
5
Dec
'1
5
Jan
'1
6
Fe
b'1
6
Ma
r '1
6
Smart Audit Result
UC UA SAFE ACT SMAT
KAI Formula Reporting
Frequency
SMAT AUDIT N° of Smat Audit Weekly
UC N° of UC Monthly
UA N° of UA Monthly
Audit Results TPM (Model Area)
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
UA:↓85%
Safe Act:↑85 %
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 109/142
© Copyright by Automotive Lighting
TPM (Model Area) Heinrich’s Pyramid
Fatality
LTI > 30 days
LTI < 30 days
First Aids
Near Misses
Unsafe Conditions
Unsafe Acts
20
08
20
09
20
10
20
11
20
12
20
13
20
14
20
15
Jan
‘16
Feb
‘16
Mar ‘16
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
3 0 0 0 0 0 0 0 0 0 0
3 0 0 0 0 0 0 0 0 0 0
4 9 3 1 3 2 0 0 0 0 0
9 78 33 51 45 38 13 9 0 0 0
18 56 260 182 209 65 37 24 0 0 0
Step 7 Step 6 Step 5 Step 4 Step 3 Step 2 Step 1 Step 0
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 110/142
© Copyright by Automotive Lighting
20
09
20
10
20
11
20
12
20
13
20
14
20
15
Jan
’16
Feb
‘16
Mar ‘16
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
1 0 2 3 0 0 0 0 0 0
1 1 1 2 0 0 0 0 0 0
6 26 2 0 23 34 35 0 0 0
58 150 231 132 45 45 46 3 2 0
BMC
Fatality
LTI > 30 days
LTI < 30 days
First Aids
Near Misses
Unsafe Conditions
Unsafe Acts
Step 7 Step 6 Step 5 Step 3 Step 2 Step 0 Step 1 Step 4
Expansion Area Heinrich’s Pyramid
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 111/142
© Copyright by Automotive Lighting
AO
Fatality
LTI > 30 days
LTI < 30 days
First Aids
Near Misses
Unsafe Conditions
Unsafe Acts
20
10
20
11
20
12
20
13
20
14
20
15
Jan
‘16
Feb
‘16
Mar ‘16
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
2 3 0 0 1 0 0 0 0
3 4 4 2 0 0 0 0 0
5 4 0 58 12 31 1 2 1
96 243 365 24 22 53 9 4 3
Step 6 Step 5 Step 3 Step 2 Step 0 Step 1 Step 4 Step 7
Expansion Area Heinrich’s Pyramid
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 112/142
© Copyright by Automotive Lighting
Plant Wide Heinrich’s Pyramid
Step 6 Step 5 Step 3 Step 2 Step 0 Step 1 Step 4 Step 7
2011 2012 2013 2014 2015
0 0 0 0 0
0 0 0 1 0
0 0 0 0 0
5 3 0 1 0
9 13 8 3 3
58 45 168 295 208
1362 1410 132 342 346
Transferring
to new plant Jan ‘16
Feb ’16
Mar ‘16
0 0 0
0 0 0
0
0
0
0 0 0
0 0 0
26 16 25
47 24 44
Fatality
LTI > 30 days
LTI < 30 days
First Aids
Near Misses
Unsafe Conditions
Unsafe Acts
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 113/142
© Copyright by Automotive Lighting
We consider our Step 4 consolidated
because:
1. The Plan of SMAT Activities is respected 100%
2. Appropriate countermeasures are correctly expanded after being verified
3. The number of Unsafe Acts has decreased significantly
and the number of SAFE Acts has increased
4. People react in a positive way to SMAT interviews
5. When people feel that safety culture has been rooted in their work area
Step 6 Step 5 Step 3 Step 2 Step 0 Step 1 Step 4 Step 7
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 114/142
© Copyright by Automotive Lighting
70 TOTAL
Rating
B M A B (low) M (medium) A (high)
4.01A Safety Audit System has been defined (people
involved, frequancy, tool…)5 1 3 5 Drafted Defined
Defined, shared, managed
and updated
4.02 An audit schedule has been developped. 5 1 3 5 Drafted DefinedDefined, shared, managed
and updated
4.04 Specialists perform audit (checklist). 8 3 5 8 No Sometimes As scheduled
4.05 Supervisors perform audit (checklist). 5 3 5 8 No Sometimes As scheduled
4.06The critical issues identified have been analyzed and the
solutions planned have been inserted in the action plan.8 3 5 8 No Sometimes Yes
4.07The critical issues identified have been reported in
Heinrich Pyramid.5 1 3 5 No Sometimes Yes
4.08 For corrective measures, a follow up system exsist 8 3 5 8 Drafted DefinedDefined, shared, managed
and updated
4.09The corrective measures adopted in the area are
extended to areas with the same type of risk.5 1 3 5 Drafted Defined
Defined, shared, managed
and updated
4.10Awareness campaigns have been launched to resolve
the critical aspects highlighted in the action plan.3 3 5 8 Defined and shared Drafted shared and deployed
Defined, shared, issued and
learning has been checked
4.11 Specific training paths have been initiated for managers. 3 3 5 8 Defined and shared Drafted shared and deployedDefined, shared, issued and
learning has been checked
4.12Specific training paths have been initiated for
supervisors.5 3 5 8 Defined and shared Drafted shared and deployed
Defined, shared, issued and
learning has been checked
4.13Specific training paths have been initiated for team
leader/operators.5 3 5 8 Defined and shared Drafted shared and deployed
Defined, shared, issued and
learning has been checked
Activity Board 4.14
The improvements generated by corrective actions
(number of accidents, near misses, etc.) are monitored
periodically in the Activity board.
5 3 5 8 Drafted Present Present and updated
Safety
Meeting4.15
Safety meeting are regularly done involving all the
workers5 3 5 8 No Sometimes Yes
TOPIC
WCMSAFETY
PILLARAUDIT CHECK-LIST STEP 4
PLANT
AREA
GUNA, ZAMANI & TAN
DATE 09-Mar-15
SCORE
TPM & BMC
INTERNAL AUDITORS
REMARKS
General
Inspection
Personnel
training
RATING STANDARDS
Rating criteriaNo. CHECKS
AUDIT CHECK-LIST
83 TOTAL
Rating
B M A B (low) M (medium) A (high)
4.01A Safety Audit System has been defined (people
involved, frequancy, tool…)5 1 3 5 Drafted Defined
Defined, shared, managed
and updated
4.02 An audit schedule has been developped. 5 1 3 5 Drafted DefinedDefined, shared, managed
and updated
4.04 Specialists perform audit (checklist). 8 3 5 8 No Sometimes As scheduled
4.05 Supervisors perform audit (checklist). 8 3 5 8 No Sometimes As scheduled
4.06The critical issues identified have been analyzed and the
solutions planned have been inserted in the action plan.8 3 5 8 No Sometimes Yes
4.07The critical issues identified have been reported in
Heinrich Pyramid.5 1 3 5 No Sometimes Yes
4.08 For corrective measures, a follow up system exsist 8 3 5 8 Drafted DefinedDefined, shared, managed
and updated
4.09The corrective measures adopted in the area are
extended to areas with the same type of risk.5 1 3 5 Drafted Defined
Defined, shared, managed
and updated
4.10Awareness campaigns have been launched to resolve
the critical aspects highlighted in the action plan.8 3 5 8 Defined and shared Drafted shared and deployed
Defined, shared, issued and
learning has been checked
4.11 Specific training paths have been initiated for managers. 5 3 5 8 Defined and shared Drafted shared and deployedDefined, shared, issued and
learning has been checked
4.12Specific training paths have been initiated for
supervisors.5 3 5 8 Defined and shared Drafted shared and deployed
Defined, shared, issued and
learning has been checked
4.13Specific training paths have been initiated for team
leader/operators.8 3 5 8 Defined and shared Drafted shared and deployed
Defined, shared, issued and
learning has been checked
Activity Board 4.14
The improvements generated by corrective actions
(number of accidents, near misses, etc.) are monitored
periodically in the Activity board.
5 3 5 8 Drafted Present Present and updated
Safety
Meeting4.15
Safety meeting are regularly done involving all the
workers5 3 5 8 No Sometimes Yes
TOPIC
WCMSAFETY
PILLARAUDIT CHECK-LIST STEP 4
PLANT
AREA
GUNA, ZAMANI & TAN
DATE 09-Mar-15
SCORE
TPM & BMC
INTERNAL AUDITORS
REMARKS
General
Inspection
Personnel
training
RATING STANDARDS
Rating criteriaNo. CHECKS
AUDIT CHECK-LIST
95 TOTAL
Rating
B M A B (low) M (medium) A (high)
4.01A Safety Audit System has been defined (people
involved, frequancy, tool…)5 1 3 5 Drafted Defined
Defined, shared, managed
and updated
4.02 An audit schedule has been developped. 3 1 3 5 Drafted DefinedDefined, shared, managed
and updated
4.04 Specialists perform audit (checklist). 8 3 5 8 No Sometimes As scheduled
4.05 Supervisors perform audit (checklist). 8 3 5 8 No Sometimes As scheduled
4.06The critical issues identified have been analyzed and the
solutions planned have been inserted in the action plan.8 3 5 8 No Sometimes Yes
4.07The critical issues identified have been reported in
Heinrich Pyramid.5 1 3 5 No Sometimes Yes
4.08 For corrective measures, a follow up system exsist 8 3 5 8 Drafted DefinedDefined, shared, managed
and updated
4.09The corrective measures adopted in the area are
extended to areas with the same type of risk.5 1 3 5 Drafted Defined
Defined, shared, managed
and updated
4.10Awareness campaigns have been launched to resolve
the critical aspects highlighted in the action plan.8 3 5 8 Defined and shared Drafted shared and deployed
Defined, shared, issued and
learning has been checked
4.11 Specific training paths have been initiated for managers. 8 3 5 8 Defined and shared Drafted shared and deployedDefined, shared, issued and
learning has been checked
4.12Specific training paths have been initiated for
supervisors.8 3 5 8 Defined and shared Drafted shared and deployed
Defined, shared, issued and
learning has been checked
4.13Specific training paths have been initiated for team
leader/operators.8 3 5 8 Defined and shared Drafted shared and deployed
Defined, shared, issued and
learning has been checked
Activity Board 4.14
The improvements generated by corrective actions
(number of accidents, near misses, etc.) are monitored
periodically in the Activity board.
5 3 5 8 Drafted Present Present and updated
Safety
Meeting4.15
Safety meeting are regularly done involving all the
workers8 3 5 8 No Sometimes Yes
TOPIC
WCMSAFETY
PILLARAUDIT CHECK-LIST STEP 4
PLANT
AREA
GUNA, ZAMANI & TAN
DATE 09-Mar-15
SCORE
TPM & BMC
INTERNAL AUDITORS
REMARKS
General
Inspection
Personnel
training
RATING STANDARDS
Rating criteriaNo. CHECKS
AUDIT CHECK-LIST
Target
Step 6 Step 5 Step 3 Step 2 Step 0 Step 4 Step 7 Step 1
Steps Audit Results
Achieved 95% proceed to
Step 5
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 115/142
© Copyright by Automotive Lighting
Autonomous inspection for safety
Safety Observation Card
Step 5
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 116/142
© Copyright by Automotive Lighting
Audit System
Daily Operator
Checklist
Daily Team
Leader Checklist
*Plant Manager
*Departmental Manager
*Safety & Health Committee
*Supervisor
*Plant Manager,
*Departmental Manager
* Supervisor
Weekly SMAT
audit
Monthly EHS audit
SMAT Operator
Daily 6’S
SMAT
SCHEDULE
*Team Leader
*Operator
*Safety Captain
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
Daily Safety
Observation
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 117/142
© Copyright by Automotive Lighting
SMAT by Operator
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
IMPLEMENT COUNTERMEASURE
FINDING
ROOT CAUSE ANALISYS Unsafe
Act
S-EWO&S-TWTTP
Unsafe Condition
S-EWO
Tools and equipments
Personal Protective Equipment
Fire Safety
6’
Electrical Safety
No repetitive events reported
EXPANSION
Model Area
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 118/142
© Copyright by Automotive Lighting
Performed
before starting
work
PPE’s state
Order and
cleanliness
Safety devices
working
Testing other
possible unsafe
conditions
CHECK
Performed
before starting
work
Verify Operator
checklist
complete
Safety devices
working
Check for any
deficiencies
CHECK
Report
Deficiencies
Fix
Deficiencies
Daily Checklist
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 119/142
© Copyright by Automotive Lighting
Daily Operator Checklist
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
Machinery
Personal Protective Equipment
Fire Safety
6’
Electrical Safety IMPLEMENT COUNTERMEASURE
FINDING
ROOT CAUSE ANALISYS
Unsafe Condition S-EWO
No repetitive events reported
EXPANSION
Model Area
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 120/142
© Copyright by Automotive Lighting
Daily Team Leader Checklist
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
Machinery
Personal Protective Equipment
Fire Safety
6’
Electrical Safety
FINDING
S-EWO
ROOT CAUSE ANALISYS Unsafe
Act Unsafe
Condition
No repetitive events reported
S-EWO&S-TWTTP
IMPLEMENT COUNTERMEASURE
EXPANSION
Model Area
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 121/142
© Copyright by Automotive Lighting
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
Coaching Visual Aid Training/OPL Kaizen/ImprovementActivities
Countermeasure against UA
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
Audit Results TPM (Model Area)
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
Instruction Maintenance Kaizen/ImprovementActivities
Countermeasures against UC
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 122/142
© Copyright by Automotive Lighting
Autonomous Safety – Safety Captain
Safety Captain Training
A captain trains workers UC / UA
SMAT with other operator
Main Aim of
SAFETY CAPTAIN:
To be an example and
support for the spread of
safety culture among
workers.
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
Safety Observation Board
Safety Captain Duty
Safety Observation Card
Training of Operators by the
safety captain
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 123/142
© Copyright by Automotive Lighting
SAF Captain -Example
RISK : Unsafe Act
Horizontal Expansion
EXPANSION
PLANT WIDE
Model Area
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
COUNTERMEASURE APPLICATION
No repetitive events reported
Effectiveness Check for non recurrence
Immediate Briefing and training given by
Safety Captain to operators on using
PPE
Operator not using PPE
(mask, goggles & earplug)
when doing blowing activity
Root Cause: Not follow safety
procedure Unsafe Act:
Attention/negligence
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 124/142
© Copyright by Automotive Lighting
KAI Formula Reporting
Frequency
Safety Observation N° of Safety Observation Monthly
UC N° of UC Monthly
UA N° of UA Monthly
Safe Act N° of Safe Act Monthly
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
Safety Observation TPM (Model Area)
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 125/142
© Copyright by Automotive Lighting
20
08
20
09
20
10
20
11
20
12
20
13
20
14
20
15
Jan
‘16
Feb
‘16
Mar ‘16
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
3 0 0 0 0 0 0 0 0 0 0
3 0 0 0 0 0 0 0 0 0 0
4 9 3 1 3 2 0 0 0 0 0
9 78 33 51 45 38 13 9 0 0 0
18 56 260 182 209 65 37 24 0 0 0
TPM (Model Area) Heinrich’s Pyramid
Fatality
LTI > 30 days
LTI < 30 days
First Aids
Near Misses
Unsafe Conditions
Unsafe Acts
Step 7 Step 6 Step 5 Step 4 Step 3 Step 2 Step 1 Step 0 Step 5
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 126/142
© Copyright by Automotive Lighting
20
09
20
10
20
11
20
12
20
13
20
14
20
15
Jan
’16
Feb
‘16
Mar ‘16
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
1 0 2 3 0 0 0 0 0 0
1 1 1 2 0 0 0 0 0 0
6 26 2 0 23 34 35 0 0 0
58 150 231 132 45 45 46 3 2 0
BMC
Fatality
LTI > 30 days
LTI < 30 days
First Aids
Near Misses
Unsafe Conditions
Unsafe Acts
Step 7 Step 6 Step 5 Step 3 Step 2 Step 0 Step 1 Step 4 Step 5
Expansion Area Heinrich’s Pyramid
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 127/142
© Copyright by Automotive Lighting
Plant Wide Heinrich’s Pyramid
Step 6 Step 5 Step 3 Step 2 Step 0 Step 1 Step 4 Step 7 Step 5
2011 2012 2013 2014 2015
0 0 0 0 0
0 0 0 1 0
0 0 0 0 0
5 3 0 1 0
9 13 8 3 3
58 45 168 295 208
1362 1410 132 342 346
Transferring
to new plant Jan ‘16
Feb ’16
Mar ‘16
0 0 0
0 0 0
0
0
0
0 0 0
0 0 0
26 16 25
47 24 44
Fatality
LTI > 30 days
LTI < 30 days
First Aids
Near Misses
Unsafe Conditions
Unsafe Acts
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 128/142
© Copyright by Automotive Lighting
Steps Audit Results
80 TOTAL
Rating
B M A B (low) M (medium) A (high)
4.01Training on SMAT audit has been performed to people
involved5 1 3 5 Defined and shared Drafted shared and deployed
Defined, shared, issued and
learning has been checked
4.02 Plant manager perform SMAT audit. 8 3 5 8 No Sometimes As scheduled
4.03 Manager perform SMAT audit 8 3 5 8 No Sometimes As scheduled
4.04 Team leader perform audit (checklist) 5 3 5 8 No Sometimes As scheduled
4.05 Workers perform audit (checklist) 5 3 5 8 No Sometimes As scheduled
4.06The critical issues identified have been analyzed and the
solutions planned have been inserted in the action plan.8 3 5 8 No Sometimes Yes
4.07The critical issues identified have been reported in
Heinrich Pyramid.5 1 3 5 No Sometimes Yes
4.08 For corrective measures, a follow up system exsist 8 3 5 8 Drafted DefinedDefined, shared, managed
and updated
4.09The corrective measures adopted in the area are
extended to areas with the same type of risk.5 1 3 5 Drafted Defined
Defined, shared, managed
and updated
4.10 Workers are involved in Safety Suggestion system 5 3 5 8 No Sometimes Yes
4.11 Workers partecipate to Quick Kaizen or Standard Kaizen 5 3 5 8 No Sometimes Yes
4.12 Workers update activity board 5 3 5 8 No Sometimes Yes
4.13Workers give evidence of Unsafe Condition using safety
tags5 3 5 8 No Sometimes Yes
Activity Board 4.14
The improvements generated by corrective actions
(number of accidents, near misses, etc.) are monitored
periodically in the Activity board.
3 1 3 5 Drafted Present Present and updated
PLANT
AREA TPM & BMC
INTERNAL AUDITORS GUNA, ZAMANI & TAN
09-Mar-15
WCMSAFETY
PILLARAUDIT CHECK-LIST STEP 5
DATE
No.
Autonomous
Inspection
Workers
involvment
RATING STANDARDS
Rating criteria
AUDIT CHECK-LIST
CHECKS REMARKSSCORETOPIC
88 TOTAL
Rating
B M A B (low) M (medium) A (high)
4.01Training on SMAT audit has been performed to people
involved5 1 3 5 Defined and shared Drafted shared and deployed
Defined, shared, issued and
learning has been checked
4.02 Plant manager perform SMAT audit. 8 3 5 8 No Sometimes As scheduled
4.03 Manager perform SMAT audit 8 3 5 8 No Sometimes As scheduled
4.04 Team leader perform audit (checklist) 5 3 5 8 No Sometimes As scheduled
4.05 Workers perform audit (checklist) 8 3 5 8 No Sometimes As scheduled
4.06The critical issues identified have been analyzed and the
solutions planned have been inserted in the action plan.8 3 5 8 No Sometimes Yes
4.07The critical issues identified have been reported in
Heinrich Pyramid.5 1 3 5 No Sometimes Yes
4.08 For corrective measures, a follow up system exsist 8 3 5 8 Drafted DefinedDefined, shared, managed
and updated
4.09The corrective measures adopted in the area are
extended to areas with the same type of risk.5 1 3 5 Drafted Defined
Defined, shared, managed
and updated
4.10 Workers are involved in Safety Suggestion system 5 3 5 8 No Sometimes Yes
4.11 Workers partecipate to Quick Kaizen or Standard Kaizen 5 3 5 8 No Sometimes Yes
4.12 Workers update activity board 5 3 5 8 No Sometimes Yes
4.13Workers give evidence of Unsafe Condition using safety
tags8 3 5 8 No Sometimes Yes
Activity Board 4.14
The improvements generated by corrective actions
(number of accidents, near misses, etc.) are monitored
periodically in the Activity board.
5 1 3 5 Drafted Present Present and updated
PLANT
AREA TPM & BMC
INTERNAL AUDITORS GUNA, ZAMANI & TAN
09-Mar-15
WCMSAFETY
PILLARAUDIT CHECK-LIST STEP 5
DATE
No.
Autonomous
Inspection
Workers
involvment
RATING STANDARDS
Rating criteria
AUDIT CHECK-LIST
CHECKS REMARKSSCORETOPIC
97 TOTAL
Rating
B M A B (low) M (medium) A (high)
4.01Training on SMAT audit has been performed to people
involved5 1 3 5 Defined and shared Drafted shared and deployed
Defined, shared, issued and
learning has been checked
4.02 Plant manager perform SMAT audit. 8 3 5 8 No Sometimes As scheduled
4.03 Manager perform SMAT audit 8 3 5 8 No Sometimes As scheduled
4.04 Team leader perform audit (checklist) 8 3 5 8 No Sometimes As scheduled
4.05 Workers perform audit (checklist) 8 3 5 8 No Sometimes As scheduled
4.06The critical issues identified have been analyzed and the
solutions planned have been inserted in the action plan.8 3 5 8 No Sometimes Yes
4.07The critical issues identified have been reported in
Heinrich Pyramid.5 1 3 5 No Sometimes Yes
4.08 For corrective measures, a follow up system exsist 8 3 5 8 Drafted DefinedDefined, shared, managed
and updated
4.09The corrective measures adopted in the area are
extended to areas with the same type of risk.5 1 3 5 Drafted Defined
Defined, shared, managed
and updated
4.10 Workers are involved in Safety Suggestion system 5 3 5 8 No Sometimes Yes
4.11 Workers partecipate to Quick Kaizen or Standard Kaizen 8 3 5 8 No Sometimes Yes
4.12 Workers update activity board 8 3 5 8 No Sometimes Yes
4.13Workers give evidence of Unsafe Condition using safety
tags8 3 5 8 No Sometimes Yes
Activity Board 4.14
The improvements generated by corrective actions
(number of accidents, near misses, etc.) are monitored
periodically in the Activity board.
5 1 3 5 Drafted Present Present and updated
PLANT
AREA TPM & BMC
INTERNAL AUDITORS GUNA, ZAMANI & TAN
09-Mar-15
WCMSAFETY
PILLARAUDIT CHECK-LIST STEP 5
DATE
No.
Autonomous
Inspection
Workers
involvment
RATING STANDARDS
Rating criteria
AUDIT CHECK-LIST
CHECKS REMARKSSCORETOPIC
Target
Step 6 Step 3 Step 2 Step 0 Step 1 Step 4 Step 5 Step 7
Achieved
97%
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 129/142
© Copyright by Automotive Lighting
Agenda
I. Introduction
– Vision, Needs, Objectives, Targets
– Pillar Team
– Activity Organization
– KPI/KAI
– Route Map
– Last Audit Comments
– 7 Steps Status
II. Seven Steps Approach
– Step 1
– Step 2
– Step 3
– Step 4
– Step 5
III. Health Initiatives
IV. Plant Results
– KPI Plant
– SWOT Analysis
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 130/142
© Copyright by Automotive Lighting
Step 6 Step 3 Step 2 Step 0 Step 1 Step 4 Step 5 Step 7
Health Initiatives– Flow chart
Management
Consider all the hazards/job activities
(e.g.. Ergonomic, noise, chemicals…)
Annual check-up.Let people know
about their physical condition
EHS Dept. HR Dept.
Occupational health Medical checkup
Health Initiatives
Management
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 131/142
© Copyright by Automotive Lighting
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
Occupational Health Program
Medical
Surveillance report
Audiometric Test
report
Tested
Chemical Risk Assessment 147
Eye Test 500
Audiometric Test 248
Medical Surveillance 69
Chemical Risk
Assessment report
Eye Test
100 %
Compliance
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 132/142
© Copyright by Automotive Lighting
Occupational Health Program
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 133/142
© Copyright by Automotive Lighting
Health Initiative
Health prevention– SPORT
Futsal
Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 0 Step 1
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 134/142
© Copyright by Automotive Lighting
Agenda
I. Introduction
– Vision, Needs, Objectives, Targets
– Pillar Team
– Activity Organization
– KPI/KAI
– Route Map
– Last Audit Comments
– 7 Steps Status
II. Seven Steps Approach
– Step 1
– Step 2
– Step 3
– Step 4
– Step 5
III. Health Initiatives
IV. Plant Results
– KPI Plant
– SWOT Analysis
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 135/142
© Copyright by Automotive Lighting
0
0.2
0.4
0.6
0.8
1
1.2
1.4
1.6
1.8
2008 2009 2010 2011 2012 2013 2014 2015 2016YTD
MACYears
First Aid Frequency Index
00.10.20.30.40.5
2008 2009 2010 2011 2012 2013 2014 2015 2016YTD
MACYears
Frequency Index0.45
KPI Plant
Start 05/2008
0
0.02
0.04
0.06
0.08
0.1
2008 2009 2010 2011 2012 2013 2014 2015 2016YTDMAC
Years
Gravity IndexStart05/2008
0.06
0.09
0.04
0 0.06 0
0.48
1.67
0.45
0.97
0.59
0
MAR
MAR MAR
Start 05/2008
0
0 0
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 136/142
© Copyright by Automotive Lighting
0
2
4
6
8
10
12
14
2015 Internal Benchmarking
Worst Best
No
of
Accid
en
t
Plant
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 137/142
© Copyright by Automotive Lighting
0
1
2
3
4
5
6
7
2015 External Benchmarking
Worst Best
No
of
Accid
en
t
Plant
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 138/142
© Copyright by Automotive Lighting
THIS PLANT HAS WORKED
806 DAYS
WITHOUT AN ACCIDENT
LAST ACCIDENT: 28-01-2014
Conclusion
MODEL AREA WITHOUT AN
ACCIDENT 2520 DAYS
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 139/142
© Copyright by Automotive Lighting
Projects Training & Benchmark Needs
Implementation of 3D module at safety dojo room
Next 2 Years
67
2017 2018 2015
11°Audit
59 3
71
2016
3
3
2014
2
3
50 56
SAF future plan
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 140/142
© Copyright by Automotive Lighting
Benchmarking plant which safety pillar score 4.
Benchmarking plant which has implement step 7.
Benchmarking and training for risk analysis movement level.
Projects Training & Benchmark Needs Next 2 Years
67
2017 2018 2015
11°Audit
59 3
71
2016
3
3
2014
2
3
50 56
SAF future plan
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 141/142
© Copyright by Automotive Lighting WEAKNESSES STRENGTHS
OPPORTUNITIES THREATS
Top Management(MD) total involvement and
contribution in improving safety
management system.
Managers genuine intention in enhancing
and improve the safety management system.
Safety culture; high involvement and
expansion of team leaders and operators
S-MAT and E-MAT applications
OHSAS certificated more than 7 years
•Collaboration with WCM central
•Involvement of all workers towards
improving safety standards.
•Continuous improvement of working
conditions
•Know-how improvement on safety matters
•Local Authority Audit (DOSH) for safety
improvement
Some contractors are not at the
required level.
New legislation changes.
• SWOT
WORLD CLASS MANUFACTURING Automotive Lighting
Penang Malaysia, April 2016 142/142